UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549
FORM 10-Q
(Mark One)
☒ | Quarterly Report Pursuant to Section 13 Or 15(d) Of The Securities Exchange Act of 1934 |
For the quarterly period ended September 30, 2026
☐ | Transition Report Under Section 13 Or 15(d) Of The Securities Exchange Act of 1934 |
For the transition period ________ to ________
COMMISSION FILE NUMBER 001-08675
UNITED STATES ANTIMONY CORPORATION |
(Exact name of registrant as specified in its charter) |
Texas | | 81-0305822 |
(State or other jurisdiction of incorporation or | (IRS Employer Identification No.) | |
organization) | ||
4438 W. Lovers Lane, Unit 100, Dallas, TX | | 75209 |
(Address of principal executive office) | (Postal Code) |
(406) 606-4117
(Registrant’s telephone number)
Securities registered pursuant to Section 12(b) of the Act:
Title of Each Class | | Trading Symbol | | Name of Each Exchange on Which Registered |
Common Stock, $0.01 par value | UAMY | NYSE | ||
Common Stock, $0.01 par value | UAMY | NYSE Texas |
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ☒ No ☐
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☒ No ☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, or a non-accelerated filer. See definition of “Accelerated filer and large accelerated filer” in Rule 12b-2 of the Exchange Act (Check one):
Large Accelerated Filer | ☐ | Accelerated Filer | ☐ |
Non-accelerated Filer | ☒ | Smaller Reporting Company | ☒ |
Emerging Growth Company | ☐ |
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ☐ No ☒
As of November 9, 2026, there were 149,329,434 shares outstanding of the registrant’s $0.01 par value common stock.
Table of Contents
3 | ||
MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS | 28 | |
39 | ||
39 | ||
40 | ||
40 | ||
40 | ||
UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS. | 41 | |
42 | ||
42 | ||
42 | ||
43 | ||
2
PART I - FINANCIAL INFORMATION
ITEM 1. FINANCIAL STATEMENTS
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
CONDENSED CONSOLIDATED BALANCE SHEETS (UNAUDITED)
| September 30, | | December 31, | |||
2026 | 2025 | |||||
ASSETS |
| |
| | ||
CURRENT ASSETS |
| |
| | ||
Cash and cash equivalents | $ | 30,053,201 | $ | 30,494,320 | ||
Investment in debt securities held to maturity |
| 4,709,690 |
| 4,577,706 | ||
Accounts receivable, net |
| 1,927,432 |
| 4,213,305 | ||
Inventories |
| 28,126,132 |
| 12,522,009 | ||
Prepaid expenses and other current assets |
| 2,781,399 |
| 434,842 | ||
Note receivable | 4,000,000 | 2,500,000 | ||||
Total current assets |
| 71,597,854 |
| 54,742,182 | ||
Property, plant and equipment, net |
| 61,865,400 |
| 42,374,839 | ||
Operating lease right-of-use assets |
| 21,261 |
| 48,106 | ||
Investment in debt securities held to maturity - noncurrent |
| 16,219,988 |
| 15,773,251 | ||
Investment in equity securities | 39,373,225 | 40,494,328 | ||||
Investment in joint venture | 53,914 | — | ||||
Restricted cash |
| 821,612 |
| 162,756 | ||
Other assets, net |
| 330,207 |
| 330,207 | ||
Total assets | $ | 190,283,461 | $ | 153,925,669 | ||
LIABILITIES AND STOCKHOLDERS’ EQUITY |
| |
| | ||
CURRENT LIABILITIES |
| |
| | ||
Accounts payable | $ | 11,886,135 | $ | 6,924,518 | ||
Accrued liabilities |
| 3,170,289 |
| 2,937,842 | ||
Accrued liabilities - directors |
| 153,875 |
| 143,931 | ||
Current portion of operating lease liabilities |
| 13,134 |
| 34,103 | ||
Current portion of long-term debt |
| 142,279 |
| 136,942 | ||
Total current liabilities |
| 15,365,712 |
| 10,177,336 | ||
Operating lease liabilities, net of current portion |
| 8,127 |
| 14,003 | ||
Long-term debt, net of current portion |
| 146,287 |
| 58,483 | ||
Asset retirement obligations |
| 2,818,200 |
| 2,720,658 | ||
Total liabilities |
| 18,338,326 |
| 12,970,480 | ||
COMMITMENTS AND CONTINGENCIES (Note 16) |
|
|
| | ||
STOCKHOLDERS’ EQUITY |
|
|
| | ||
Preferred stock $0.01 par value, 50,000,000 shares authorized: |
|
|
| | ||
Series A - no shares issued and outstanding |
|
| ||||
Series B - 750,000 shares issued and outstanding (liquidation preference $988,125 and $982,500, respectively) |
| 7,500 |
| 7,500 | ||
Series C - 177,904 shares issued and outstanding (liquidation preference $97,847 both periods) |
| 1,779 |
| 1,779 | ||
Series D - no shares issued and outstanding |
|
| ||||
Common stock, $0.01 par value, 500,000,000 shares authorized; 150,746,204 and 140,042,270 shares issued, respectively |
| 1,507,462 |
| 1,400,423 | ||
Treasury stock (1,422,695 and 149,639 shares of common stock at cost, respectively) |
| (11,135,959) |
| (574,153) | ||
Additional paid-in capital |
| 247,763,158 |
| 185,608,189 | ||
Accumulated deficit |
| (66,198,805) |
| (45,488,549) | ||
Total stockholders’ equity |
| 171,945,135 |
| 140,955,189 | ||
Total liabilities and stockholders’ equity | $ | 190,283,461 | $ | 153,925,669 | ||
The accompanying notes are an integral part of these condensed consolidated unaudited financial statements.
3
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS (UNAUDITED)
Three months ended September 30, | Nine months ended September 30, | |||||||||||
| 2026 | | 2025 | | 2026 | | 2025 | |||||
Revenues | $ | 10,133,437 | $ | 8,701,951 | $ | 24,843,107 | $ | 26,227,079 | ||||
Cost of revenues |
| 5,839,295 |
| 6,688,509 |
| 18,856,201 |
| 19,004,362 | ||||
Gross profit |
| 4,294,142 |
| 2,013,442 |
| 5,986,906 |
| 7,222,717 | ||||
Operating expenses: |
|
|
|
| | |||||||
General and administrative |
| 1,852,801 |
| 882,909 |
| 4,795,027 |
| 2,276,455 | ||||
Salaries and benefits |
| 3,218,465 |
| 4,940,319 |
| 13,322,618 |
| 7,305,380 | ||||
Professional fees |
| 776,005 |
| 522,531 |
| 3,146,690 |
| 1,441,436 | ||||
Mineral exploration | 4,407,039 | 1,037,637 | 4,935,671 | 1,145,925 | ||||||||
Gain on sale or disposal of property, plant and equipment, net |
| — |
| (8,216) |
| (1,900) |
| (8,716) | ||||
Gain on lease termination |
| — |
| (469,822) |
| — |
| (469,822) | ||||
Other operating expenses |
| 23,177 |
| 25,266 |
| 270,240 |
| 71,242 | ||||
Total operating expenses |
| 10,277,487 |
| 6,930,624 |
| 26,468,346 |
| 11,761,900 | ||||
Loss from operations |
| (5,983,345) |
| (4,917,182) |
| (20,481,440) |
| (4,539,183) | ||||
Other income (expense), net: |
|
|
|
| | |||||||
Interest and investment income |
| 473,542 |
| 150,563 |
| 1,227,442 |
| 472,719 | ||||
Unrealized loss on investment in equity securities | (3,845,926) | — | (1,121,103) | — | ||||||||
Other miscellaneous income (expense), net |
| 18,719 |
| (14,081) |
| (73,469) |
| 13,843 | ||||
Total other income (expense), net |
| (3,353,665) |
| 136,482 |
| 32,870 |
| 486,562 | ||||
Loss before income taxes and equity in losses of joint venture |
| (9,337,010) |
| (4,780,700) |
| (20,448,570) |
| (4,052,621) | ||||
Income tax expense |
| — |
| — |
| — |
| — | ||||
Loss before equity in losses of joint venture |
| (9,337,010) |
| (4,780,700) |
| (20,448,570) |
| (4,052,621) | ||||
Equity in losses of joint venture | (189,046) | — | (261,686) | — | ||||||||
Net loss | (9,526,056) | (4,780,700) | (20,710,256) | (4,052,621) | ||||||||
Preferred dividends |
| (1,875) |
| (1,875) |
| (5,625) |
| (5,625) | ||||
Net loss available to common shareholders | $ | (9,527,931) | $ | (4,782,575) | $ | (20,715,881) | $ | (4,058,246) | ||||
Net loss per share: |
| |
| |
| |
| | ||||
Basic | $ | (0.06) | $ | (0.04) | $ | (0.14) | $ | (0.03) | ||||
Diluted | $ | (0.06) | $ | (0.04) | $ | (0.14) | $ | (0.03) | ||||
Weighted average shares outstanding: |
|
| |
|
| | ||||||
Basic |
| 149,528,881 |
| 123,412,910 |
| 145,945,136 |
| 118,494,796 | ||||
Diluted |
| 149,528,881 |
| 123,412,910 |
| 145,945,136 |
| 118,494,796 | ||||
The accompanying notes are an integral part of these condensed consolidated unaudited financial statements.
4
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
CONDENSED CONSOLIDATED STATEMENTS OF CHANGES IN STOCKHOLDERS’ EQUITY (UNAUDITED)
For the three and nine months ended September 30, 2026 and 2025
Preferred Stock | Common Stock | |||||||||||||||||||||
Additional | Total | |||||||||||||||||||||
Paid-In | Accumulated | Treasury | Stockholders’ | |||||||||||||||||||
| Shares | | Par Value | | Shares | | Par Value | | Capital | | Deficit | | Stock | | Equity | |||||||
Balance - December 31, 2025 | 927,904 | $ | 9,279 | 140,042,270 | $ | 1,400,423 | $ | 185,608,189 | $ | (45,488,549) | $ | (574,153) | $ | 140,955,189 | ||||||||
Net loss | — | — | — | — | — | (11,294,490) | — | (11,294,490) | ||||||||||||||
Share-based compensation |
| — |
| — |
| — |
| — |
| 4,833,965 |
| — |
| — |
| 4,833,965 | ||||||
Issuance of common stock under equity incentive plan |
| — |
| — |
| 2,006,621 |
| 20,066 |
| 844,327 |
| — |
| (5,798,403) |
| (4,934,010) | ||||||
Issuance of common stock for cash, net of issuance costs |
| — |
| — |
| 126,436 |
| 1,264 |
| 1,338,182 |
| — |
| — |
| 1,339,446 | ||||||
Issuance of common stock upon exercise of warrants |
| — |
| — |
| 1,563,643 |
| 15,637 |
| 979,175 |
| — |
| — |
| 994,812 | ||||||
Balance - March 31, 2026 |
| 927,904 |
| 9,279 |
| 143,738,970 |
| 1,437,390 |
| 193,603,838 |
| (56,783,039) |
| (6,372,556) |
| 131,894,912 | ||||||
Net income |
| — |
| — |
| — |
| — |
| — |
| 110,290 |
| — |
| 110,290 | ||||||
Share-based compensation |
| — |
| — |
| — |
| — |
| 2,904,927 |
| — |
| — |
| 2,904,927 | ||||||
Issuance of common stock under equity incentive plan |
| — |
| — |
| 1,442,588 |
| 14,426 |
| 442,344 |
| — |
| (3,045,453) |
| (2,588,683) | ||||||
Issuance of common stock for cash, net of issuance costs |
| — |
| — |
| 4,199,997 |
| 42,000 |
| 47,689,392 |
| — |
| — |
| 47,731,392 | ||||||
Issuance of common stock upon exercise of warrants |
| — |
| — |
| 1,140,000 |
| 11,400 |
| 957,600 |
| — |
| — |
| 969,000 | ||||||
Balance - June 30, 2026 |
| 927,904 |
| 9,279 |
| 150,521,555 |
| 1,505,216 |
| 245,598,101 |
| (56,672,749) |
| (9,418,009) |
| 181,021,838 | ||||||
Net loss |
| — |
| — |
| — |
| — |
| — |
| (9,526,056) |
| — |
| (9,526,056) | ||||||
Share-based compensation |
| — |
| — |
| — |
| — |
| 2,074,151 |
| — |
| — |
| 2,074,151 | ||||||
Issuance of common stock under equity incentive plan |
| — |
| — |
| 94,399 |
| 944 |
| (944) |
| — |
| (18,997) |
| (18,997) | ||||||
Issuance of common stock for cash, net of issuance costs |
| — |
| — |
| — |
| — |
| (17,560) |
| — |
| — |
| (17,560) | ||||||
Common stock repurchased | — | — | — | — | — | — | (1,698,953) | (1,698,953) | ||||||||||||||
Issuance of common stock upon exercise of warrants |
| — |
| — |
| 130,250 |
| 1,302 |
| 109,410 |
| — |
| — |
| 110,712 | ||||||
Balance - September 30, 2026 |
| 927,904 | $ | 9,279 |
| 150,746,204 | $ | 1,507,462 | $ | 247,763,158 | $ | (66,198,805) | $ | (11,135,959) | $ | 171,945,135 | ||||||
5
The accompanying notes are an integral part of these condensed consolidated unaudited financial statements.
6
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS (UNAUDITED)
The accompanying notes are an integral part of these condensed consolidated unaudited financial statements.
7
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
NOTE 1 - NATURE OF OPERATIONS
United States Antimony Corporation and its subsidiaries in the U.S., Mexico, and Canada (“USAC,” the “Company,” “Our,” “Us,” or “We”) sell antimony, zeolite, and precious metals primarily in the U.S. and Canada. The Company mines, purchases and processes ore primarily into antimony oxide, antimony metal ingots, antimony trisulfide, and precious metals at its facilities located in Montana and Mexico. Antimony oxide is used to form a flame-retardant system for plastics, rubber, fiberglass, textile goods, paints, coatings, and paper, as a color fastener in paint, and as a phosphorescent agent in fluorescent light bulbs. Antimony metal ingots are used in bearings, storage batteries, and ordnance. Antimony trisulfide is used as a primer in ammunition. The Company also recovers precious metals, primarily gold and silver, at its Montana facility from third party ore. In April 1998, the Company formed US Antimony de Mexico, S.A. de C.V. (“USAMSA”) to produce antimony products in Mexico, and, in August 2005, the Company formed Antimonio de Mexico, S.A. de C.V. (“ADM”) to explore and develop antimony and precious metal deposits in Mexico. The Company formed Bear River Zeolite Company (“BRZ”) in 2000 where at its facility located in Idaho, the Company mines and processes zeolite, a group of industrial minerals used in water filtration, sewage treatment, nuclear waste and other environmental cleanup, odor control, gas separation, animal nutrition, soil amendment and fertilizer, and other miscellaneous applications. Beginning in 2024 and continuing in 2025 and 2026, the Company has acquired mining claims, real properties (patented claims) and leases located in Alaska, Montana and Ontario, Canada all of which are prospective for both antimony ore and other critical minerals. These acquisitions have the potential to increase antimony ore throughput at the Company’s facilities, reduce the cost of third-party antimony ore purchases, provide reliability of supply, expand the Company’s product offerings and diversify its critical mineral portfolio. The Company has also entered into an agreement to acquire certain exploration rights for mining properties located in the southeastern United States.
NOTE 2 - BASIS OF PRESENTATION AND SIGNIFICANT ACCOUNTING POLICIES
In the opinion of management, the accompanying unaudited condensed consolidated financial statements contain all adjustments, consisting of only normal recurring adjustments, necessary for a fair statement of its financial position as of September 30, 2026, and its results of operations and cash flows for the three and nine months ended September 30, 2026 and 2025. The Condensed Consolidated Balance Sheet as of December 31, 2025, was derived from audited annual financial statements but does not contain all of the footnote disclosures from the annual financial statements.
These unaudited interim financial statements have been prepared by management in accordance with accounting principles generally accepted in the United States of America (“U.S. GAAP”). They should be read in conjunction with the annual audited financial statements included in the Company’s Annual Report on Form 10-K for the year ended December 31, 2025, filed with the Securities and Exchange Commission on March 19, 2026.
Use of Estimates
The preparation of financial statements in accordance with U.S. GAAP requires the use of estimates and assumptions that affect the reported amounts of assets and liabilities, disclosure of contingent assets and liabilities known to exist as of the date the financial statements are published, and the reported amounts of revenues and expenses during the reporting period. Uncertainties with respect to such estimates and assumptions are inherent in the preparation of the Company’s consolidated financial statements; accordingly, it is possible that the actual results could differ from these estimates and assumptions, which could have a material effect on the reported amounts of the Company’s consolidated financial position and results of operations. Operating results for the three and nine months ended September 30, 2026, are not necessarily indicative of the results that may be expected for the full year ending December 31, 2026.
Reclassifications
Certain reclassifications have been made to conform prior period amounts to the current period’s presentation. These reclassifications have no effect on the results of operations, stockholders’ equity or cash flows as previously reported.
8
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
Investment in Joint Venture
The Company uses the equity method to account for its investment in the joint venture (“JV”) with Americas Gold and Silver Corporation (“Americas”) because it has significant influence over, but does not control, the JV. The Company’s initial investment was recorded at cost and is subsequently adjusted for the Company’s proportionate share of the JV’s net income or loss, additional capital contributions, and distributions received. Since the JV is currently in the early stages of organizational development and has not commenced construction of its new state-of-the-art hydrometallurgical processing facility, there have been no significant operational activities recorded. The Company’s share of the JV’s results is recognized in “Equity in losses of joint venture” in the Condensed Consolidated Statements of Operations, and the investment is presented within noncurrent assets on the Condensed Consolidated Balance Sheets.
Government Grants
The Company early adopted ASU 2025-10, Government Grants (Topic 832), effective January 1, 2026. Government grants are recognized when it is probable that the Company will comply with the conditions of the grant and that the grant will be received. Grants related to long-lived assets are accounted for using the cost accumulation approach and are recognized as a reduction of the carrying amount of the related property, plant and equipment, allocated to the underlying depreciable asset categories on a pro rata basis relative to the capitalized costs incurred. Cash received from grants related to capital expenditures is classified as an investing activity in the Condensed Consolidated Statements of Cash Flows. See NOTE 9 – GOVERNMENT GRANT for further details.
Recent Accounting Pronouncements
In November 2024, the Financial Accounting Standards Board (the “FASB”) issued ASU 2024-03, Income Statement - Reporting Comprehensive Income - Expense Disaggregation Disclosures (Subtopic 220-40): Disaggregation of Income Statement Expenses, which requires disclosure about the types of costs and expenses included in certain expense captions presented on the income statement. The new disclosure requirements are effective for the Company’s annual periods for fiscal years beginning after December 15, 2026, and interim periods within fiscal years beginning after December 15, 2027, with early adoption permitted, and may be applied either prospectively or retrospectively. The Company is currently evaluating the potential impact this update will have on its consolidated financial statements and expense disclosures in the notes to the consolidated financial statements.
In September 2025, the FASB issued ASU No. 2025-06, Intangibles - Goodwill and Other - Internal-Use Software (Subtopic 350-40): Targeted Improvements to the Accounting for Internal-Use Software. The amendments in this ASU clarify and refine the criteria for capitalizing costs related to internal-use software. Under the new guidance, capitalization is permitted when both of the following conditions are met: (i) management has authorized and committed to funding the software project, and (ii) it is probable that the project will be completed, and the software will be used to perform the function intended. This ASU will be effective for annual periods beginning after December 15, 2027, for interim reporting periods beginning within those annual periods, and early adoption is permitted. Management is currently evaluating this update to determine its impact on the Company’s consolidated financial statements.
The Company does not believe that issued, but not yet effective, accounting pronouncements, if currently adopted, would have a material effect on its condensed consolidated financial statements.
9
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
NOTE 3 – EARNINGS PER SHARE
Basic earnings per share (“EPS”) is computed as net income (loss) available to common stockholders divided by the weighted average number of common shares outstanding for the period. Diluted EPS is calculated the same as Basic EPS but reflects the potential dilution that could occur from common shares issuable through stock options, restricted stock units (“RSUs”), and warrants in the weighted average number of common shares outstanding. Each stock option, RSU, and warrant represents the right to receive one share of the Company’s common stock.
The following table sets forth the calculation of basic and diluted weighted average shares outstanding and net loss per share for the periods presented:
The following table summarizes potentially dilutive common stock equivalents that were excluded from the computation of diluted net loss per share because their effect would have been anti-dilutive.
(1) | All common stock warrants were fully exercised prior to September 30, 2026, and no warrants remained outstanding at quarter-end. |
NOTE 4 – FAIR VALUE MEASUREMENTS
The Company uses the fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. Fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date, essentially an exit price, based on the highest and best use of the asset or liability. The levels of the fair value hierarchy are:
| ● | Level 1—Quoted market prices in active markets for identical assets or liabilities; |
| ● | Level 2—Significant other observable inputs (i.e., quoted prices for similar items in active markets, quoted prices for identical or similar items in markets that are not active, inputs other than quoted prices that are observable, such as interest rate and yield curves, and market-corroborated inputs); and |
| ● | Level 3—Unobservable inputs in which there is little or no market data, which require the reporting unit to develop its own assumptions. |
10
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
The classification of fair value measurements within the established three-level hierarchy is based upon the lowest level of input that is significant to the measurements. Financial instruments, although not recorded at fair value on a recurring basis, include cash and cash equivalents, held-to-maturity debt securities, restricted cash for reclamation bonds, note receivable and debt obligations. Equity investments with readily determinable fair values are measured at fair value on a recurring basis, with changes in fair value recognized in earnings.
The carrying amount of cash and cash equivalents approximates fair value because of its short-term nature. The estimated fair values of investments in debt securities held to maturity were based on Level 2 inputs. The carrying amount of restricted cash for reclamation bonds and the note receivable approximate fair value based on their contractual terms. The fair value of the Company’s debt is estimated to be face value based on the contractual terms of the underlying debt arrangements and market-based expectations. The Company’s investment in equity securities is classified as a Level 1 fair value measurement because it is valued each reporting period using readily available quoted market prices from the Australian Securities Exchange.
NOTE 5 – REVENUE
Products consist of the following:
| ● | Antimony: includes antimony oxide, antimony metal ingots, and antimony trisulfide. |
| ● | Zeolite: includes coarse and fine zeolite crushed in various product sizes. |
| ● | Precious metals: includes unrefined and refined gold and silver. |
Sales by product were as follows:
Domestic and foreign revenues were as follows:
Sales to customers representing more than 10% of our total year-to-date revenues were as follows:
11
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
Customer receivables representing more than 10% of our net accounts receivable balance were as follows:
| September 30, | | December 31, |
| |||
2026 | 2025 |
| |||||
Customer A | $ | — | $ | — | |||
Customer B |
| 379,632 |
| 1,008,384 | |||
Customer C |
| 462,971 |
| — | |||
Customer D |
| — |
| 2,592,400 | |||
Customer E |
| 337,744 |
| — | |||
Total customer accounts receivable | $ | 1,180,347 | $ | 3,600,784 | |||
Total customer receivables as a % of accounts receivable, net |
| 61 | % |
| 85 | % | |
The Company’s trade accounts receivable balance related to contracts with customers was $1,927,432 at September 30, 2026 and $4,213,305 at December 31, 2025, which is net of an allowance for credit losses of $1,671 and $909 at September 30, 2026 and December 31, 2025, respectively. The Company’s products do not involve any warranty agreements and product returns are not typical.
In September 2025, the Company secured a five-year, sole-source Indefinite Delivery, Indefinite Quantity (IDIQ) contract with the U.S. Defense Logistics Agency (DLA) Strategic Materials, which is responsible for managing the National Defense Stockpile (NDS). The contract, with a maximum value of $245 million, is for the sale of antimony metal ingots (99.65% purity) to replenish the NDS through September 2030. Pricing is determined at the time each delivery order is placed based on prevailing market rates along with certain specific fees and each shipment will represent a separate performance obligation satisfied at a point in time. As a result, revenue will be recognized when each shipment of antimony metal ingots is delivered to the DLA’s depot and formally accepted by the government. Since entering into this agreement, the Company has received sales orders pursuant to this contract totaling approximately $57 million. During the third quarter of 2026, the DLA formally accepted four shipments consisting of approximately 162,000 pounds of antimony metal ingots, resulting in the recognition of approximately $5.1 million in revenue.
In November 2025, the Company executed a five-year sales agreement with a new industrial customer for the sale of antimony trioxide. As called for in the agreement, once the monthly delivery schedule through December 2026 is completed, subsequent deliveries, pricing (pursuant to semiannual market-based adjustments), and volume commitments will be subject to mutual written agreement between the Company and the customer every six months. During the nine months ended September 30, 2026 and 2025, the Company recognized $3.8 million and $4.7 million, respectively, of revenue related to this customer.
NOTE 6 – INVESTMENT IN DEBT SECURITIES HELD TO MATURITY
The following is a summary of the Company’s investment securities held to maturity as of September 30, 2026:
Gross | Gross | |||||||||||
Amortized | Unrealized | Unrealized | Estimated Fair | |||||||||
| Cost | | Gains | | Losses | | Value | |||||
Held-to-maturity securities – current: | ||||||||||||
U.S. Treasury Strips | $ | 4,709,690 | $ | — | $ | (5,667) | $ | 4,704,023 | ||||
Held-to-maturity securities – noncurrent: |
|
|
| |||||||||
U.S. Treasury Strips |
| 16,219,988 |
| — |
| (437,680) |
| 15,782,308 | ||||
Total held-to-maturity securities | $ | 20,929,678 | $ | — | $ | (443,347) | $ | 20,486,331 | ||||
12
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
The following is a summary of the Company’s investment securities held to maturity as of December 31, 2025:
Gross | Gross | |||||||||||
Amortized | Unrealized | Unrealized | Estimated Fair | |||||||||
| Cost | | Gains | | Losses | | Value | |||||
Held-to-maturity securities – current: |
| |
| |
| |
| | ||||
U.S. Treasury Strips | $ | 4,577,706 | $ | 3,004 | $ | — | $ | 4,580,710 | ||||
Held-to-maturity securities – noncurrent: |
| |
| |
| |
| | ||||
U.S. Treasury Strips |
| 15,773,251 |
| 68,770 |
| (2,144) |
| 15,839,877 | ||||
Total held-to-maturity securities | $ | 20,350,957 | $ | 71,774 | $ | (2,144) | $ | 20,420,587 | ||||
Total recognized accretion income for these investments during the three and nine months ended September 30, 2026was $198,347 and $584,995, respectively. The Company also recognized interest income accretion on its U.S. Treasury Strips of $126,450 and $222,440 during the three and nine months ended September 30, 2025, respectively.
Consistent with the Company’s classification of its U.S. Treasury Strips as held to maturity, those securities scheduled to mature in the next twelve months after the reporting date are considered current assets and those having maturity dates more than twelve months after the reporting date are considered non-current assets. As of September 30, 2026, the Company’s held to maturity securities were scheduled to mature as follows:
Margin Credit Line
In 2025, the Company secured a $19.0 million margin credit line with a national bank that is collateralized by the Company’s U.S. Treasury Strips and bears interest at one above the base commercial rate. Borrowings of $5.0 million and $10.0 million during the first and second quarters of 2026, respectively, were repaid prior to the end of each quarter, and no borrowings were outstanding as of September 30, 2026 or December 31, 2025. Availability under the margin credit line is subject to customary margin requirements based upon a percentage of the value of the pledged securities.
NOTE 7 – INVENTORIES
Inventories as of September 30, 2026 and December 31, 2025 consisted primarily of finished antimony metal ingots and antimony oxide products, antimony ore and concentrates, and finished zeolite products. Inventories are stated at the lower of first-in, first-out cost or estimated net realizable value. Finished antimony products and finished zeolite products primarily include direct materials, direct labor, overhead, depreciation, and freight. Inventories by type were as follows:
September 30, | December 31, | |||||
| 2026 | | 2025 | |||
Antimony oxide | $ | 2,959,872 | $ | 577,000 | ||
Antimony metal ingots |
| 17,757,192 |
| 2,242,881 | ||
Antimony ore and concentrates |
| 7,081,917 |
| 9,196,257 | ||
Total antimony inventory |
| 27,798,981 |
| 12,016,138 | ||
Zeolite |
| 327,151 |
| 505,871 | ||
Total inventories | $ | 28,126,132 | $ | 12,522,009 | ||
As of September 30, 2026 and December 31, 2025, inventories were valued at cost, except for the portion of inventory that was valued at net realizable value because costs were greater than the amount the Company expects to receive on the sale of this inventory. During the nine months ended September 30, 2026, the Company recorded write-downs totaling $268,369 to adjust antimony inventory to its NRV. There were no inventory NRV adjustments during the nine months ended September 30, 2025.
13
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
NOTE 8 – NOTE RECEIVABLE
In 2025, as part of an international strategic supply agreement with a supplier for the purchase of processed antimony meeting specified quality standards over an approximate 36-month period, the Company extended a secured promissory note to the supplier in the original principal amount of $2,500,000. The note was amended and restated in February and April 2026 to incorporate accrued interest into the outstanding principal balance.
During the second quarter of 2026, the parties entered into a new Convertible Promissory Note (the “Convertible Note”), which replaced the previously outstanding note receivable. The Company entered into the Convertible Note as part of its ongoing strategic commercial relationship with the supplier. The additional funding is intended to support the supplier’s continued development of its antimony processing capabilities and future product supply.
The Convertible Note has a principal balance of $4,000,000 and bears interest at 10.0% per annum. The principal balance of the Convertible Note includes the outstanding indebtedness under the most recent financing arrangement, $40,752 of accrued interest, $356,570 previously advanced for inventory that had not been received as of the date of the Convertible Note, and $1,116,154 of additional funding provided by the Company. The Convertible Note matures upon the earliest of (i) five days following written demand by the Company, (ii) the occurrence of an event of default, or (iii) May 29, 2028. The Convertible Note also grants the Company the right, at its election, to convert all or a portion of the outstanding indebtedness, including accrued and unpaid interest, into membership interests of the borrower which owns a hydrometallurgical processing facility located internationally. As a condition of the Convertible Note, the Company received an exclusive license to this antimony processing technology for use in North America and Australia. In addition, management believes the pricing of the processed antimony received from this supplier is more favorable relative to prevailing international market rates.
The Convertible Note is secured by substantially all of the assets of the borrower and is further supported by a personal guaranty from the borrower’s principal owner. The Convertible Note also contains mandatory prepayment provisions, setoff rights, and other customary creditor protections. Management evaluated the embedded conversion feature and concluded that separate derivative accounting was not required. The Company evaluated the collectability of the Convertible Note in accordance with its expected credit loss methodology and concluded that no allowance for expected credit losses was required after considering, among other factors, the pledged collateral, contractual demand rights, the borrower’s current operating status, expected future operating cash flows, and other credit enhancements associated with the financing arrangement. Because the Company has an unconditional contractual right to demand repayment at any time, the Convertible Note is classified as a current asset in the Condensed Consolidated Balance Sheet.
During the three and nine months ended September 30, 2026, the Company recognized interest income on the Convertible Note of $102,222 and $137,778, respectively.
NOTE 9 – GOVERNMENT GRANT
In March 2026, the Company was awarded a $27.0 million grant by the U.S. Department of War under Title III of the Defense Production Act (“DPA”) to support the expansion and modernization of its domestic antimony processing operations and to fund a portion of the Company’s Alaskan antimony mining operations. The award is administered through the Defense Industrial Base Consortium (“DIBC”), which is managed by Advanced Technology International.
During the third quarter of 2026, the DIBC modified the Project Sub-Agreement with the Company, resulting in $20.3 million of the $27.0 million award being currently authorized for payment and $6.7 million remaining subject to additional authorization by the U.S. government. The award is structured as a milestone-based, firm fixed-price arrangement, with payments contingent upon the achievement and formal acceptance of specified milestones, as well as compliance with certain ongoing requirements, including environmental, reporting, and project execution obligations.
As part of those obligations, the Company is responsible for executing the complete expansion of its Thompson Falls, Montana facility, as well as advancing related mining integration activities in the state of Alaska. The period of performance under the agreement extends through January 22, 2028.
14
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
On March 25, 2026, the Company received formal approval from the DIBC confirming the achievement of three project milestones associated with $12.8 million of committed funding. Management concluded that the recognition criteria under ASC 832 had been satisfied because the related performance conditions had been met and receipt of the funding was probable. As a result, during the first quarter of 2026, the Company recognized a $12.8 million government grant receivable, which was collected in April 2026. In accordance with its accounting policy for government grants (see NOTE 2), the Company recognized the corresponding grant proceeds as a reduction of the carrying amount of Property, Plant, and Equipment (“PP&E”) associated with the Thompson Falls facility expansion.
In April 2025, the Company engaged engineering and construction firms to expand its existing smelting operating capacity located in Thompson Falls, Montana. This facility expansion was substantially completed during the second quarter of 2026, with $25.7 million, net of $12.8 million in grant proceeds, transferred from construction in progress to the appropriate PP&E asset categories during the second and third quarters of 2026 as the related assets were placed in service. The reduced carrying value of the depreciable assets is expected to result in lower depreciation expense prospectively over the remaining estimated useful lives of those assets.
As of September 30, 2026, the Company had not recognized any amounts related to the remaining $14.2 million of the award. Of this amount, $7.5 million was authorized for payment but remained subject to achievement and formal acceptance of the applicable milestones, and $6.7 million remained subject to future authorization by the U.S. government. The Company expects to receive additional funding under the agreement as further milestones are completed in the near future, and the related funding is subsequently approved.
NOTE 10 – PROPERTY, PLANT AND EQUIPMENT
The major components of the Company’s PP&E by segment were as follows:
September 30, 2026 | | Antimony | | Zeolite | | All Other | | Total | ||||
Plant and equipment | $ | 34,472,088 | $ | 7,457,183 | $ | 4,068,921 | $ | 45,998,192 | ||||
Buildings |
| 7,881,667 |
| 1,705,893 |
| 6,437,320 |
| 16,024,880 | ||||
Mineral rights and interests |
| — |
| 16,753 |
| 8,810,383 |
| 8,827,136 | ||||
Land |
| 2,083,094 |
| — |
| 2,009,598 |
| 4,092,692 | ||||
Construction in progress |
| 2,136,539 |
| 1,093,046 |
| 125,108 |
| 3,354,693 | ||||
Total property, plant and equipment |
| 46,573,388 |
| 10,272,875 |
| 21,451,330 |
| 78,297,593 | ||||
Accumulated depreciation |
| (11,073,499) |
| (4,491,374) |
| (867,320) |
| (16,432,193) | ||||
Property, plant and equipment, net | $ | 35,499,889 | $ | 5,781,501 | $ | 20,584,010 | $ | 61,865,400 | ||||
December 31, 2025 | | Antimony | | Zeolite | | All Other | | TOTAL | ||||
Plant and equipment | $ | 14,814,441 | $ | 7,031,403 | $ | 487,751 | $ | 22,333,595 | ||||
Buildings |
| 1,106,303 |
| 1,705,893 |
| 3,111,073 |
| 5,923,269 | ||||
Mineral rights and interests |
| — |
| 16,753 |
| 6,107,085 |
| 6,123,838 | ||||
Land |
| 2,083,094 |
| — |
| 1,530,782 |
| 3,613,876 | ||||
Construction in progress |
| 19,071,013 |
| 45,000 |
| — |
| 19,116,013 | ||||
Total property, plant and equipment |
| 37,074,851 |
| 8,799,049 |
| 11,236,691 |
| 57,110,591 | ||||
Accumulated depreciation |
| (10,278,230) |
| (4,146,457) |
| (311,065) |
| (14,735,752) | ||||
Property, plant and equipment, net | $ | 26,796,621 | $ | 4,652,592 | $ | 10,925,626 | $ | 42,374,839 | ||||
In January 2026, the Company purchased substantially all assets associated with a precious metals milling facility located in Radersburg, Montana for total consideration of approximately $4,816,000, which included approximately $66,000 of direct transaction costs. The acquired assets included land, buildings and site improvements, and machinery and equipment. Following the acquisition, the facility was configured to allow for antimony flotation and concentration operations while retaining its precious metals processing capability, and the Company has subsequently added on-site laboratory capabilities. The transaction was accounted for as an asset acquisition, and the purchase price was allocated to the acquired assets based on their relative fair values. Following this allocation, machinery and equipment totaled approximately $1,722,000, buildings and improvements totaled approximately $2,615,000, and land totaled approximately $479,000. These assets are included in property, plant and equipment and the “All Other” category for segment reporting.
15
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
The acquired assets are being depreciated over their estimated remaining useful lives, which range from 1 to 10 years for machinery and equipment and 20 to 30 years for buildings and improvements.
Mineral rights and interests
In January 2026, the Company paid $1.3 million to purchase 36 federal mining claims located in the Koyukuk Mining District of Alaska (commonly referred to as Nolan Creek) that are prospective for both antimony and gold. This agreement does not require the Company to make any royalty payments.
In January 2026, the Company paid approximately $108,000 to repurchase 1% of the net smelter return royalty associated with 50 single-cell mining claims located in the Sudbury District of Ontario, Canada (commonly referred to as Fostung Tungsten). The royalty obligation originated from the Company’s June 2025 acquisition of this property which was originally subject to a 1.5% net smelter return royalty based on the value realized from ore mined from the property.
In March 2026, the Company completed a series of mineral rights purchases in Sanders County, Montana (commonly referred to as Stibnite Hill), including three patented lode mining claims and the surface rights associated with a fourth patented lode mining claim, for aggregate consideration of approximately $846,000. The acquisitions were completed through separate purchase agreements and provide the Company with fee simple title to the underlying mineral properties.
In May 2026, the Company executed an agreement to acquire the ownership rights to various . Payments for these claims have been or will be made by the Company on or around the payment dates indicated as follows:
Payment Date | | Payment Amount | |
May 2026 | $ | 150,000 | |
May 2027 |
| 150,000 | |
May 2028 |
| 150,000 | |
May 2029 |
| 1,079,000 | |
Total | $ | 1,529,000 | |
This agreement requires net smelter royalty payments by the Company based on the value realized from minerals produced from the mining claims. The agreement can be terminated without cause at any time by the Company with thirty days’ written notice.
The Company has entered into multiple agreements to acquire . Pursuant to the terms of these agreements, the Company is obligated as of September 30, 2026 to make aggregate payments to purchase these claims of approximately $6.8 million, payable as follows: approximately $550,000 in 2027, $575,000 in 2028, $3.3 million in 2029, and $2.35 million in 2030. In addition to these fixed payment obligations, the agreements generally require the Company to pay net smelter royalties based on the value realized from future production, with certain agreements providing the Company with the option to repurchase a portion of such royalties. The agreements also include aggregate exploration and development spending commitments of approximately $4.65 million over periods ranging from approximately to five years. Each of the agreements may be terminated by the Company without cause upon notice, which would relieve the Company of future payment and spending obligations.
All payments related to these mining claims and leases that became due on or before September 30, 2026 were made by the Company pursuant to the terms of the underlying agreements. The payments made to acquire these mining claims and leases are capitalized in the “Mineral rights and interests” component of PP&E in the Condensed Consolidated Balance Sheets and included in the “All Other” category for segment reporting.
NOTE 11 – LEASES
Philipsburg Operating Lease
In September 2024, the Company executed a contract to lease a metals concentration facility located in Philipsburg, Montana. The lease was terminated in September 2025, and the Company’s need for the facility was replaced by its January 2026 acquisition of a precious
16
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
metals milling facility located in Radersburg, Montana. The Company recorded $85,032 and $389,542 of lease expense related to this lease during the three and nine months ended September 30, 2025, respectively, and no expense related to this lease in 2026.
Dallas Operating Lease
In the first quarter of 2025, the Company executed a contract to lease office space for its corporate headquarters located in Dallas, Texas with a lease term of 24 months and total fixed payments during the term of $3,945 per month, or $94,680 in total. The Company is amortizing the lease on a straight-line basis over the term of the lease. The Company recorded the present value of the lease payments over the term as a lease liability and ROU asset. The Company used its incremental borrowing rate as the discount rate since the rate implicit in the lease was not readily determinable. The lease does not include any transfer of ownership of the office space at the end of the lease, nor any option to extend the lease or purchase the facility, nor any residual value guarantees. The Company cannot terminate the lease without cause and must provide the office space to the lessor at the end of the lease in the same condition as it was received.
Canada Operating Lease
On October 1, 2025, the Company leased office space located in Sudbury, Ontario, Canada with a lease term of 60 months that expires on September 30, 2030. The Company is required to make monthly base rent payments of $1,050 in Canadian dollars which are converted to U.S. dollars using the spot exchange rate in effect on the payment date. The Company recorded $22,772 in U.S. dollars as the present value of the rent payments as a lease liability and corresponding ROU asset and is amortizing the lease on a straight-line basis over the term of the lease. Since the monthly rent payments are made in Canadian dollars, the lease liability was initially measured using the spot exchange rate in effect on the lease commencement date and is remeasured into U.S. dollars at each reporting date with any resulting foreign currency transaction gains or losses recognized in earnings. The Company’s incremental borrowing rate was used as the discount rate since the rate implicit in the lease was not readily determinable. The lease does not include any transfer of ownership of the office space at the end of the lease, nor any option to purchase the facility, nor any residual value guarantees. The Company has the option to renew or extend the lease for one additional term of five years, provided written notice is given to the landlord at least six months prior to the lease expiring. The Company did not consider the additional lease term covered by the renewal option in the initial lease liability since exercise of the renewal option was not reasonably certain at lease commencement.
The following table summarizes expense and cash payments for the Company’s operating leases during the periods noted:
At September 30, 2026, the weighted average remaining lease term of operating leases was 36 months and the weighted average discount rate for operating leases was 3.49%.
The following table is a maturity analysis of the future minimum lease payments for operating leases as of September 30, 2026:
17
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
NOTE 12 – INVESTMENT IN EQUITY SECURITIES
In October 2025, the Company acquired 51.7 million shares, or approximately ten percent at that time, of the issued and outstanding shares of Larvotto Resources Limited (“Larvotto”) through twelve open-market cash purchases totaling $37,172,842 (measured in U.S. dollars). Larvotto is an Australian-based public company engaged in the exploration and development of critical minerals, particularly antimony and gold, whose shares are traded on the Australian Securities Exchange. Since the Company has less than a 20% ownership interest in Larvotto and does not exert significant influence through board representation, contractual governance rights, or other mechanisms that would allow participation in the financial or operational policy decisions of the business, the Company recorded this transaction as an investment in equity securities. The investment is measured at fair value each reporting period using readily available quoted market prices from the Australian Securities Exchange. As a result, the Company has classified the Larvotto investment as a Level 1 fair value measurement within the fair value hierarchy and all changes in its fair value are recorded as other income (expense), net, in the Condensed Consolidated Statements of Operations. These changes in fair value may result from movements in Larvotto’s share price, changes in the Australian dollar (“AUD”) / U.S. dollar (“USD”) exchange rate, or a combination of both. The Company’s Larvotto investment is classified as a non-current asset in the Condensed Consolidated Balance Sheets because it is considered a strategic investment that may be held long-term.
The following table summarizes the changes in the fair value of the Company’s investment in Larvotto, which is measured using Level 1 inputs:
There were no unrealized gains or losses on investments in equity securities recorded as other income (expense) during the three and nine months ended September 30, 2025.
NOTE 13 – INVESTMENT IN JOINT VENTURE
In February 2026, the Company entered into a joint venture agreement with Americas Gold and Silver Corporation (“Americas”) to construct and operate a new, state-of-the-art hydrometallurgical processing facility (the “JV”). The Company holds a 49% membership interest, with the remaining 51% held by Americas. While the Company is responsible for day-to-day activities of the JV, governance is shared through a management committee with equal representation from each member, and all significant decisions require unanimous approval. Accordingly, the Company does not have a controlling financial interest in the JV and accounts for its investment under the equity method of accounting.
The JV is expected to be funded in part through contributions of nonmonetary assets, including (i) rights to use proprietary hydrometallurgical processing technology to be contributed by the Company through a sublicense arrangement and (ii) rights to use and ultimately acquire the project site to be contributed by Americas through a staged lease-to-transfer structure. As of September 30, 2026, these nonmonetary contributions have not yet been made.
The Company has made capital contributions to the JV of $315,600 and is required to fund its proportionate share of future capital expenditures in accordance with the JV agreement. The Company expects to continue to make additional contributions as the JV progresses through the construction and development phase of the project. The timing and amount of such contributions will depend on the JV’s approved budgets and project development schedule which are in process.
The JV is currently in the early stages of organizational development and has not commenced any significant operational activities. For the three and nine months ended September 30, 2026, the Company recognized equity in losses of the JV of $189,046 and $261,686,
18
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
respectively, which primarily reflects organizational, development, and other pre-operating costs incurred by the JV. As of September 30, 2026, the carrying value of the Company’s investment in the JV was $53,914.
Earlier this year, the Company made a formal application on behalf of the JV to the Department of War for grant awards to fund the construction of this new hydrometallurgical processing facility. The likelihood of such future awards cannot yet be determined.
NOTE 14 – LONG-TERM DEBT
Long-term debt was as follows:
| September 30, 2026 | | December 31, 2025 | |||
Equipment financing - maturing May 2027 | $ | 93,167 | $ | 195,425 | ||
Equipment financing - maturing May 2030 |
| 195,399 |
| — | ||
Total debt | 288,566 | 195,425 | ||||
Less current portion of debt payments | (142,279) | (136,942) | ||||
Long-term debt, net of current portion | $ | 146,287 | $ | 58,483 | ||
In May 2024, BRZ acquired a large front-end wheel loader pursuant to a financing arrangement with a total contractual obligation of approximately $425,000, payable in 36 monthly installments of $11,799 maturing in May 2027. The financing arrangement provided for a fixed rate of 3.49% per annum. The financing arrangement is secured by a purchase money security interest in the wheel loader and is guaranteed by the Company. As of September 30, 2026, the outstanding principal balance under the agreement was $93,167, all of which was classified as current portion of long-term debt.
In April 2026, the Company acquired a mid-size front-end wheel loader to be used at its Radersburg, Montana flotation and concentration facility located in Radersburg, Montana pursuant to a financing arrangement with a total contractual obligation of approximately $238,000, payable in 48 monthly installments of $4,958 maturing in May 2030. The financing arrangement does not bear a stated rate of interest; accordingly, the Company recorded the equipment and related financing obligation at the present value of the future contractual payments using an imputed market interest rate of 6.0%. This resulted in the Company recording the equipment and debt at approximately $211,000 which is net of a debt discount of approximately $27,000, which is being amortized to interest expense over the term of the financing arrangement using the effective interest method. The financing obligation is secured by a purchase money security interest in the equipment. As of September 30, 2026, the outstanding principal balance consisted of $49,112 classified as current portion of long-term debt and $146,287 classified as long-term.
At September 30, 2026, principal payments on debt were due as follows:
19
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
NOTE 15 – TAX
Management estimates the Company’s 2026 effective tax rate to be 0% based on the Company’s year-to-date pretax loss, cumulative loss position, historical operating losses, and other available evidence supporting the continued need for a full valuation allowance against its net deferred tax assets. Accordingly, no income tax expense or benefit has been recorded for the three- and nine-month periods ended September 30, 2026.
Mexico Tax Assessment
In 2019, the Mexican tax authority (“SAT”) re-opened its audit of USAMSA’s 2013 income tax return and assessed the Company $16.3 million pesos, which was approximately $865,000 USD as of December 31, 2019, which the Company contested. In January 2026, the Federal Administrative Justice Court (Tribunal Federal de Justicia Administrativa) issued a final judgment in favor of the Company, declaring the underlying tax credit and related interest, penalties, and additional employee profit sharing invalid. As a result, the matter is resolved with no amounts due from the Company. This resolution had no impact on the Company’s consolidated financial statements, as no liability had been recorded in connection with this matter.
Mexico Import Value Added Tax
USAMSA recorded a receivable of $3,028,798 and $1,875,771 as of September 30, 2026 and December 31, 2025, respectively, for the Import Value Added Tax (“IVA tax” or “VAT”) it pays on certain goods and services representing amounts to be reimbursed from the Mexican government. USAMSA has recorded full reserves against its IVA tax receivable balances as of September 30, 2026 and December 31, 2025, respectively, resulting in net IVA tax receivables of zero at both period ends.
NOTE 16 – COMMITMENTS AND CONTINGENCIES
Mine Safety Matters
Historically, BRZ has been assessed fines and penalties by the Mine Safety and Health Administration (“MSHA”). During the nine months ended September 30, 2026, BRZ received six citations from MSHA and paid $1,928 in penalties. All six citations were rectified by BRZ and terminated by MSHA either on the day the citations were issued or within two days after. As of September 30, 2026 and December 31, 2025, BRZ had no accrued liabilities relating to MSHA citations.
BRZ’s Zeolite Lease
BRZ has a lease through December 31, 2034 with Zeolite, LLC that entitles BRZ to surface mine and process zeolite on property in Preston, Idaho, in exchange for an annual payment and a royalty payment, which is based on the amount of zeolite shipped from the leased property (“BRZ Lease”).
Inventory Purchase Commitments
As of September 30, 2026, the Company had outstanding purchase commitments for antimony inventory with an aggregate estimated cost of approximately $1 million, which is not reflected in the Condensed Consolidated Balance Sheet. The Company expects to take delivery of this inventory during the remainder of 2026.
Legal Matters
The Company’s Mexican subsidiary USAMSA is a defendant in a commercial lawsuit relating to historical obligations under an agreement for certain services related to mining claims in Mexico. The action is in its initial stages with the plaintiff seeking approximately $339,000 in damages and $54,390 of associated value added tax. In connection with the litigation, a Mexican court issued a precautionary attachment order requiring the Company to restrict approximately $339,000 held in a bank account as security pending resolution of the matter and until posting of a judicial surety bond to substitute for the attachment is completed. As a result, the Company has classified such amount as restricted cash in the accompanying Condensed Consolidated Balance Sheet as of September 30, 2026.
20
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
The Company intends to vigorously defend the action and, based on the information currently available and after consultation with legal counsel, management does not believe a loss is probable. Accordingly, no liability has been recorded as of September 30, 2026, although an adverse outcome remains reasonably possible. The Company has subsequently filed a countersuit against the same party in excess of the amounts described to recover amounts previously paid to the party for services subject to the disagreement. The Company does not believe a loss is probable at this time and has not accrued a loss contingency. The Company has assessed the reasonably possible loss under ASC 450-20-50 and does not expect any such loss to exceed the amounts claimed by the plaintiff set forth above.
The Company is the plaintiff in two civil actions filed in the U.S. District Court for the District of Montana, described in the following paragraphs. The Company has not recorded a loss accrual with respect to its own claims in either matter, as gain contingencies are not recognized until realized. The counterclaims asserted in the mining claim matter have been evaluated under ASC 450-20, and the Company has determined that a loss is neither probable nor reasonably estimable at this time; accordingly, no accrual has been recorded with respect to the counterclaims.
In September 2026, the Company filed an action seeking to quiet title to, and recover damages for trespass on, a group of unpatented lode mining claims previously staked by the Company in calendar year 2025 in Sanders County, Montana. The defendant has counterclaims, which the Company has answered and denied. The matter is in the early stages of discovery.
In October 2026, the Company filed an action against a vendor in the amount of $2.4 million arising out of a 2025 vendor contract for the design and fabrication of certain custom equipment for the Company’s Thompson Falls smelter expansion. The Company alleges that the vendor failed to deliver conforming equipment on the contracted schedule and seeks compensatory damages, interest, and attorneys’ fees. The matter is in the early stages of discovery.
The Company is from time to time involved in various other claims, legal proceedings, and complaints arising in the ordinary course of business. The Company does not believe that adverse decisions in any such pending or threatened proceedings, or any amount that the Company might be required to pay by reason thereof, would have a material adverse effect on the financial condition or future results of the Company.
NOTE 17 – STOCKHOLDERS’ EQUITY
Issuance of Common Stock
During the nine months ended September 30, 2026 and 2025, the Company issued 3,543,608 shares and 2,100,699 shares, respectively, of its common stock in conjunction with the vesting of RSUs and exercising of stock options. See the “Share-Based Compensation” section below for further details.
Sale of Common Stock
During the nine months ended September 30, 2026, the Company sold 4,326,433 shares of its common stock in “at the market offerings” and received gross proceeds of $50,033,307 based on a weighted average price of $11.56 per share. The aggregate net proceeds received by the Company, after deducting direct issuance costs of $980,029, totaled $49,053,278.
During the first nine months of 2025, the Company sold 5,513,358 shares of its common stock in “at the market offerings” and received gross proceeds of $21,387,718 based on a weighted average price of $3.88 per share. The aggregate net proceeds received by the Company, after deducting direct issuance costs of $435,862, totaled $20,951,856.
In August 2025, the Company completed a registered direct offering with an institutional investor. The offering resulted in the sale of 4,000,000 shares of common stock at a purchase price of $4.50 per share for $18,000,000 in gross proceeds. For this offering, the Company incurred direct issuance costs of $511,260, which consisted primarily of placement agent commissions and various legal, accounting, and filing costs. The aggregate net proceeds received by the Company, after deducting offering fees and expenses, totaled $17,488,740.
21
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
The Company also issued 2,833,893 shares of its common stock during the first nine months of 2026 related to the exercise of pre-existing warrants. See the “Common Stock Warrants” section below for further details.
Share-Based Compensation
In December 2023, shareholders approved the Company’s 2023 Equity Incentive Plan (“the Plan”), which provided for the grant of incentive stock options and non-qualified stock options and other types of awards. The general purpose of the Plan is to provide a means whereby eligible employees, officers, directors, and other service providers develop a sense of proprietorship and personal involvement in the development and financial success of the Company, and to encourage them to devote their best efforts to our business, thereby advancing our interests and the interests of our shareholders. On July 31, 2025, the Company’s shareholders approved the Amended and Restated 2023 Equity Incentive Plan (the “Amended Plan”) which increased the maximum number of shares of common stock available for issuance under the Amended Plan to 23,700,000 shares. As of September 30, 2026, there were 11.5 million shares remaining for issuance under the Amended Plan.
Share-based compensation expense for the periods noted was as follows:
The following table summarizes the aggregate non-cash stock-based compensation recognized in the Condensed Consolidated Statement of Operations for stock options and RSUs:
Stock Options
Stock options granted typically have a 10-year contractual term and are subject to either service or performance-based vesting conditions. The following table shows the weighted-average assumptions used to value options granted during the nine months ended September 30, 2026:
Nine Months Ended |
| |||
Weighted-Average Grant Date Assumptions | | September 30, 2026 |
| |
Expected term (in years) |
| 9.8 | ||
Risk-free interest rate |
| 4.2 | % | |
Expected dividend yield |
| — | % | |
Expected volatility |
| 97.7 | % | |
Fair value per share | $ | 7.45 | ||
Expected term – The expected term represents the period of time that options are expected to be outstanding. As the Company does not have sufficient historical exercise behavior, it uses the contractual term of the option or the simplified method as defined in Staff Accounting Bulletin Topic 14 for the expected term assumption.
22
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
Risk-free interest rate – The risk-free interest rate is based on the U.S. Treasury rate in effect at the time of the grant with an equivalent term approximating the expected term of the options.
Expected dividend yield—The Company bases the expected dividend yield assumption on the fact that it has never paid cash dividends and has no present intention to pay cash dividends.
Expected volatility – The expected volatility is based on the historical volatility of our stock price over the expected term of the stock option.
Activity with respect to stock options is summarized as follows:
As of September 30, 2026, total unrecognized share-based compensation expense related to stock options was $2,343,960, which is expected to be recognized over a weighted average remaining period of 0.7 years. During the nine months ended September 30, 2026, 1,722,289 stock options were exercised to purchase shares of common stock. These exercises included 421,797 options for cash proceeds of $259,501 and cashless exercises where 372,185 shares of common stock were acquired by the Company as treasury stock to pay for the aggregate exercise price of the stock options and, in certain cases, to satisfy mandatory payroll tax withholding obligations, where 928,307 shares of common stock were issued to the award recipients. See the “Treasury Stock” section below for further details. The total intrinsic value of the stock options exercised during the nine months ended September 30, 2026 was $14,778,570.
During the nine months ended September 30, 2025, 672,500 stock options were exercised to purchase shares of common stock. These exercises included 250,000 options for cash proceeds of $55,000 and cashless exercises where 52,461 shares of common stock were surrendered to the Company to pay for the aggregate exercise price of the stock options and 370,039 shares of common stock were issued. The total intrinsic value of the 672,500 stock options exercised during the nine months ended September 30, 2025 was $1,410,033.
Restricted Stock Units
Activity with respect to RSUs is summarized as follows:
Weighted- | |||||
Average | |||||
Grant Date | |||||
Fair Value | |||||
| Shares | | Per Share | ||
RSUs outstanding at December 31, 2025 |
| 2,869,111 | $ | 1.86 | |
Granted |
| 790,106 |
| 8.30 | |
Vested |
| (1,821,319) |
| 2.07 | |
Forfeited |
| (394,483) |
| 3.82 | |
RSUs outstanding at September 30, 2026 |
| 1,443,415 | $ | 4.57 | |
23
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
As of September 30, 2026, total unrecognized share-based compensation expense related to RSUs was $4,488,039, which is expected to be recognized over a weighted-average remaining period of 1.5 years. The weighted average remaining contractual term of the nonvested RSU shares was 1.3 years as of September 30, 2026. During the nine months ended September 30, 2026 and 2025, 1,821,319 and 1,428,199 shares of common stock, respectively, were issued upon the vesting of RSUs with a total fair value of $17,150,130 and $1,269,256, respectively. Shares retained by the Company as treasury stock to satisfy the related payroll tax withholding obligations are described in the “Treasury Stock” section below.
Common Stock Warrants
During the nine months ended September 30, 2026, the Company issued 2,833,893 shares of common stock related to the exercise of pre-existing warrants and received gross proceeds of $2,074,524 based on a weighted average exercise price of $0.73 per share. In the first nine months of 2025, the Company issued 5,772,822 shares of common stock related to the exercise of pre-existing warrants and received gross proceeds of $4,427,756 based on a weighted average exercise price of $0.77 per share. There were no warrants issued or that expired during the nine months ended September 30, 2026 and 2025.
Following is a summary of the Company’s warrant activity during the nine months ended September 30, 2026:
Weighted | |||||
Number of | Average | ||||
| Warrants | | Exercise Price | ||
Balance at December 31, 2025 |
| 2,833,893 | $ | 0.73 | |
Exercised |
| (2,833,893) |
| 0.73 | |
Balance at September 30, 2026 |
| — | $ | — | |
Treasury Stock
The Company retains and holds shares of its common stock as treasury stock to manage the settlement of employee equity awards. Shares are retained primarily to cover the option exercise price and, if any, required tax withholding for cashless stock option exercises and to satisfy employees’ tax obligations upon RSU vesting. In addition, shares repurchased under the Company’s share repurchase program described below are held as treasury stock.
24
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
Treasury stock activity during the nine months ended September 30, 2026 was as follows:
| Shares | | Cost | ||
Balance at December 31, 2025 |
| 149,639 | $ | 574,153 | |
Shares withheld upon cashless exercise of stock options |
| 372,185 |
| 3,654,449 | |
Shares withheld to satisfy payroll tax obligations upon vesting of RSUs |
| 532,231 |
| 5,208,404 | |
Shares repurchased under share repurchase program |
| 368,640 |
| 1,698,953 | |
Balance at September 30, 2026 |
| 1,422,695 | $ | 11,135,959 | |
During the nine months ended September 30, 2025, 52,461 newly issued common shares with a cost of $101,429 were retained by the Company as treasury stock to pay for the aggregate exercise price of the stock options and 88,399 of newly issued common shares with a cost of $409,246 were retained by the Company as treasury stock to satisfy the mandatory payroll tax obligations resulting from the vesting of RSUs.
On August 19, 2026, the Company’s Board of Directors (the “Board”) approved and authorized a share repurchase program under which the Company may repurchase up to $100 million of its outstanding common stock. Repurchases may be made in the open market, in privately negotiated transactions, or otherwise, at the discretion of the Company’s chief executive officer as authorized by the Board and subject to applicable securities laws and market conditions. The Company may also, from time-to-time, enter into Rule 10b5-1 plans to facilitate repurchases of its shares under this authorization. During the three months ended September 30, 2026, the Company repurchased 368,640 shares of common stock for an aggregate purchase price of $1.7 million under the share repurchase program. The repurchased shares are held as treasury stock. As of September 30, 2026, approximately $98.3 million remained available for future repurchases under the program. The program has no fixed expiration date and does not obligate the Company to repurchase any specific number or amount of shares and may be modified, suspended, or terminated at any time at the discretion of the Company’s Board.
NOTE 18 – BUSINESS SEGMENTS
The Company has two reportable segments: antimony and zeolite. The antimony segment includes our facility located in the Burns Mining District of Sanders County, Montana, which processes raw antimony ore primarily into antimony oxide, antimony metal ingots, antimony trisulfide, and precious metals, and facilities operated by our USAMSA subsidiary in Mexico, which process raw antimony ore primarily into antimony metal ingots and a lower grade of antimony oxide. The zeolite segment includes our facility located in Preston, Idaho, which mines, processes, and sells zeolite.
The following components of the Company’s business were not engaged in business activities as of September 30, 2026 from which they generated revenue offset by related expenses: Los Juarez, Mexico in our ADM subsidiary, Ontario, Canada, Alaska, and the mining claims in Thompson Falls, Montana. Therefore, these components, along with the Company’s personal residence for a management employee, apartment complex in Thompson Falls, Montana for hourly employees, and flotation and concentration facility located in Radersburg, Montana, have been included in the “All Other” category for segment reporting. The Company’s chief operating decision maker is its chief executive officer.
Total assets by segment were as follows:
25
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
Total capital expenditures by segment were as follows:
Three months ended September 30, | Nine months ended September 30, | |||||||||||
Capital expenditures | | 2026 | | 2025 | | 2026 | | 2025 | ||||
Antimony segment | $ | 2,339,563 | $ | 7,928,732 | $ | 16,145,543 | $ | 9,374,143 | ||||
Zeolite segment | 494,820 |
| 284,833 |
| 1,473,826 |
| 367,032 | |||||
All other | 2,706,812 |
| 461,606 |
| 10,735,167 |
| 6,328,069 | |||||
Total capital expenditures | $ | 5,541,195 | $ | 8,675,171 | $ | 28,354,536 | $ | 16,069,244 | ||||
Selected segment operational information was as follows:
Three months ended September 30, 2025 | | Antimony | | Zeolite | | All Other | | Total | ||||
Total revenues | $ | 8,030,005 | $ | 671,946 | $ | — | $ | 8,701,951 | ||||
Depreciation and amortization |
| 170,813 |
| 98,678 |
| 10,337 |
| 279,828 | ||||
Loss from operations |
| (3,646,313) |
| (236,420) |
| (1,034,449) |
| (4,917,182) | ||||
Other income |
| |
| |
| |
| 136,482 | ||||
Income tax expense |
| |
| |
| |
| — | ||||
Net loss |
| |
| |
| | $ | (4,780,700) | ||||
Nine months ended September 30, 2026 | | Antimony | | Zeolite | | All Other | | Total | ||||
Total revenues | $ | 20,925,712 | $ | 3,917,395 | $ | — | $ | 24,843,107 | ||||
Depreciation and amortization |
| 847,459 |
| 344,917 |
| 504,065 |
| 1,696,441 | ||||
Loss from operations |
| (8,866,255) |
| (1,635,272) |
| (9,979,913) |
| (20,481,440) | ||||
Other income |
| |
| |
| |
| 32,870 | ||||
Income tax expense |
| |
| |
| |
| — | ||||
Equity in losses of joint venture |
| |
| |
| | (261,686) | |||||
Net loss | $ | (20,710,256) | ||||||||||
Nine months ended September 30, 2025 | | Antimony | | Zeolite | | All Other | | Total | ||||
Total revenues | $ | 23,572,156 | $ | 2,654,923 | $ | — | $ | 26,227,079 | ||||
Depreciation and amortization |
| 509,404 |
| 304,065 |
| 25,884 |
| 839,353 | ||||
Loss from operations |
| (1,669,738) |
| (666,448) |
| (2,202,997) |
| (4,539,183) | ||||
Other income |
| |
| |
| |
| 486,562 | ||||
Income tax expense |
| |
| |
| |
| — | ||||
Net loss |
| |
| |
| | $ | (4,052,621) | ||||
26
UNITED STATES ANTIMONY CORPORATION AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
September 30, 2026
NOTE 19 - SUBSEQUENT EVENT
Shipments to DLA
In October 2026, the Company shipped to the DLA approximately 113,000 pounds of antimony metal ingots pursuant to three additional orders under its existing contract with the DLA. The related invoices totaled approximately $3.6 million. All three shipments were formally accepted by the DLA during October 2026, at which time control transferred to the DLA and the Company recognized the related revenue. The Company has also subsequently received payment in full for these shipments.
Note Receivable
On October 27, 2026, pursuant to the terms of the Convertible Note, the Company received written notice, subject to final negotiation of several items including potential security release, from the supplier of its intention to prepay the outstanding balance owed on the note. If finalized, the Supplier is to repay the outstanding principal balance of $4.0 million, together with accrued interest of approximately $177,000. The prepayment is not subject to any premium or penalty. As of the filing date of this Report, the prepayment had not yet been received from the supplier and the parties remained in ongoing discussions regarding the timing of the prepayment, which the Company understands remains in process. The Company’s exclusive long-term strategic supply agreement with the supplier for the purchase of processed antimony will remain in place. The Company’s exclusive license to the Supplier’s antimony processing technology for use in North America and Australia will also remain in place.
Share Repurchase Program
In October 2026, the Company repurchased 404,397 shares of common stock for an aggregate purchase price of $1.4 million under its share repurchase program. The repurchased shares are being held as treasury stock.
Nolan Creek Technical Report Summary
On October 26, 2026, the Company published an initial assessment technical report summary on the Nolan Creek property located in northern Alaska that was purchased by the Company in January 2026. This Initial Assessment-level Technical Report Summary (the “Nolan Creek TRS”) was prepared in accordance with the mining property disclosure rules specified in subpart 1300 of Regulation S-K and filed as an exhibit to the Form 8-K filed by the Company on October 26, 2026. The report provides an initial assessment of the property’s mineral resource potential; however, the report does not establish mineral resources or mineral reserves for the site in accordance with Regulation S-K Item 1300. Exploration activities at the Nolan Creek property began in October 2026 with excavation of a bulk sample of approximately 1,000 tons.
27
ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS.
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS
Readers should note that, in addition to the historical information contained herein, this Quarterly Report and the exhibits attached hereto contain “forward-looking statements” within the meaning of, and intended to be covered by, the safe harbor provisions of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements are based upon current expectations and beliefs concerning future developments and their potential effects on the Company including matters related to the Company’s operations, pending contracts and future revenues, financial performance and profitability, ability to execute on its increased production and installation schedules for planned capital expenditures, and the size of forecasted deposits. Although the Company believes that the expectations reflected in the forward-looking statements and the assumptions upon which they are based are reasonable, it can give no assurance that such expectations and assumptions will prove to have been correct. The reader is cautioned not to put undue reliance on these forward-looking statements, as these statements are subject to numerous factors and uncertainties.
Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always using words or phrases such as “believes,” “expects” or “does not expect,” “is expected,” “outlook,” “anticipates” or “does not anticipate,” “plans,” “estimates,” “forecast,” “project,” “pro forma,” or “intends,” or stating that certain actions, events or results “may” or “could,” “would,” “might” or “will” be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements are subject to numerous assumptions, risks, and uncertainties, which change over time. Forward-looking statements speak only as of the date they are made and are subject to assumptions and uncertainties. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties, and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements, including, without limitation, risks related to:
| ● | The Company’s properties being in the exploration stage; |
| ● | Macroeconomic factors; |
| ● | The imposition of new tariffs, changes in trade policy or agreements, or the escalation of trade tensions between the United States and other countries or regions; |
| ● | Continued operational losses; |
| ● | Negative consequences related to mineral operations being subject to existing and new government regulations within and outside the United States; |
| ● | The Company’s ability to obtain additional capital to develop the Company’s resources, if any; |
| ● | Concentration of customers; |
| ● | Increase in energy costs; |
| ● | Mineral exploration and development activities; |
| ● | Mineral estimates; |
| ● | The Company’s insurance coverage for operating risks; |
| ● | The fluctuation of prices for antimony and precious metals, such as gold and silver; |
| ● | The competitive industry of mineral exploration; |
| ● | The title and rights in the Company’s mineral properties; |
| ● | Environmental hazards; |
| ● | The possible dilution of the Company’s common stock from additional financing activities; |
| ● | Metallurgical and other processing problems; |
| ● | Unexpected geological formations; |
| ● | Global economic and political conditions; |
| ● | Staffing in remote locations; |
| ● | Changes in product costing; |
| ● | Inflation on operational costs and profitability; |
| ● | Competitive technology positions and operating interruptions (including, but not limited to, labor disputes, leaks, fires, flooding, landslides, power outages, explosions, unscheduled downtime, transportation interruptions, war and terrorist activities); |
| ● | Global pandemics, natural disasters, or civil unrest; |
| ● | Mexican labor and other issues regarding safety and organized control over our properties; |
28
| ● | The positions and associated outcomes of Mexican and other taxing authorities; |
| ● | Cybersecurity and business disruptions; |
| ● | Ineffective use of cash and cash equivalents, including proceeds from stock offerings; |
| ● | Potential conflicts of interest with the Company’s management; |
| ● | Mining exploration, development, and production not being economically viable; |
| ● | Processing and selling ore from new suppliers and internal sources not being economically viable; |
| ● | Mineral reserve estimates, including those prepared by “Qualified Persons” (as defined by SEC Regulation S-K 1300), which are not guarantees of the volume or grade of ore that will ultimately be recovered; |
| ● | Risks associated with non-domestic supply of antimony ore including, among others, receipt of ore later than expected or not at all, antimony content in ore being less than expected, higher costs than expected related to logistics, ore content making ore more difficult to process, more costly to process, and/or take more time to process than expected, and the inability to process ore due to its possible content of deleterious elements; |
| ● | Not achieving revenue growth, revenue diversification, and/or additional profit expected from initiatives and changes in our business that have been implemented or are being implemented; |
| ● | Volatility in market prices related to the Company’s investment in equity securities; |
| ● | Risks associated with the Company’s supply contracts, including its sole-source contract with the DLA for antimony metal ingots; |
| ● | Not having the cash flow from operations or other sources or vehicles to fully fund and support the business, strategy, initiatives, changes, and operations, among others; |
| ● | A discrepancy between the number of outstanding shares of our common stock as determined by the Transfer Agent and the number of outstanding shares of our common stock as determined by the Depositary Trust Company; |
| ● | Lack of personnel to execute the Company’s strategy; |
| ● | Operational and performance risks associated with the Company’s role as the managing member of a joint venture; |
| ● | Dilution, financing, and governance risks associated with the Company’s minority ownership position and capital funding obligations in the joint venture; |
| ● | The Company’s ability to achieve specified milestones, comply with program requirements, and obtain continued authorization in order to receive funding under its Department of War grant award; |
| ● | Credit and supply chain risks related to the Company’s $4.0 million Convertible Promissory Note and strategic relationship with a key international antimony supplier; |
| ● | Operational, inventory valuation, and liquidity risks associated with the Company’s significant inventory position in Mexico; and |
| ● | Fluctuations in the price of the Company’s common stock. |
This list is not an exhaustive list of the factors that may affect the Company’s forward-looking statements. Some of the important risks and uncertainties that could affect forward-looking statements are described further under Part I, Item 1A, “Risk Factors” of the Company’s Annual Report on Form 10-K for the year ended December 31, 2025, and under Part II, Item 1A, “Risk Factors” and Part I, Item 2, “Management’s Discussion and Analysis of Financial Condition and Results of Operations” of this Quarterly Report. If one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those anticipated, believed, estimated, or expected. The Company cautions readers not to place undue reliance on any such forward-looking statements, which speak only as of the date made. United States Antimony Corporation disclaims any obligation subsequently to revise any forward-looking statements to reflect events or circumstances after the date of such statements or to reflect the occurrence of anticipated or unanticipated events, except as required by law. The Company advises readers to carefully review this Form 10-Q, the exhibits hereto, and the reports and documents incorporated by reference herein and filed with the Securities and Exchange Commission (the “SEC”).
You should read this report with the understanding that our actual future results, levels of activity, performance and events and circumstances may be materially different from what we expect and from our historical results.
29
This report contains estimates, projections, and other information concerning our industry, our business and the markets for our products. We obtained the industry, market, and similar data set forth in this report from our own internal estimates and research and from industry research, publications, surveys, and studies conducted by third parties, including governmental agencies. Information that is based on estimates, forecasts, projections, market research or similar methodologies is inherently subject to uncertainties, and actual events or circumstances may differ materially from events and circumstances that are assumed in this information. While we believe that the data we use from third parties is reliable, we have not separately verified this data. You are cautioned not to give undue weight to any such information, projections, and estimates. As a result of a number of known and unknown risks and uncertainties, our actual results or performance may be materially different from those expressed or implied by forward-looking statements.
As used in this Quarterly Report, the terms “we,” “us,” “our,” “United States Antimony Corporation”, “US Antimony,” “USAC,” and the “Company” mean United States Antimony Corporation, unless otherwise indicated. All dollar amounts in this Quarterly Report are expressed in U.S. dollars, unless otherwise indicated.
Management’s Discussion and Analysis is intended to be read in conjunction with the Company’s consolidated financial statements and the integral notes (“Notes”) thereto included in the Company’s Annual Report on Form 10-K for the fiscal year ended December 31, 2025.
DESCRIPTION OF BUSINESS
Overview
United States Antimony Corporation began operations in Montana in January 1970 with an initial strategy centered around antimony mining and processing in Montana. Antimony mining ceased in the U.S. in the 1980’s, including our antimony mining operations in Montana, due to a significant increase of less expensive antimony ore being imported into the United States from foreign countries. However, the Company continued to process ore sourced from certain foreign suppliers into antimony oxide, metal, and trisulfide and into precious metals, primarily gold and silver, at its smelting facility in Montana. In 2025, the Company purchased certain surface rights to one of its mining claims in Montana and mined 840 tons of antimony ore. The Company has continued mining this location in 2026 and has transported additional quantities of high-grade stibnite ore to the Company’s Radersburg, Montana flotation mill. While still procuring antimony ore from foreign suppliers, the Company’s operation in Montana is once again vertically integrated with the mining of its own ore.
In the early 2000’s, the Company expanded its footprint with antimony and precious metals operations located in Mexico and zeolite operations located in Idaho. Our zeolite operations are vertically integrated from mining to selling zeolite products to its customers, which is the Company’s goal for its businesses.
Beginning in 2024 and continuing in 2025 and 2026, the Company has acquired mining claims, real properties (patented claims) and leases located in Alaska, Montana and Ontario, Canada prospective for both antimony ore and other critical minerals which have the potential to increase antimony ore throughput at the Company’s facilities, reduce the cost of third-party antimony ore purchases, expand the Company’s product offerings and diversify its mineral portfolio. The Company has also entered into certain agreements to acquire exploration rights for mining properties located in the southeastern United States. We have invested in these mining properties to further our strategy of vertical integration, expand the Company’s product portfolio, and to lower our ore cost compared to third-party antimony ore purchases. No active, revenue-producing operations have been conducted thus far in 2026 from the Company’s mining claims and leases located in Los Juarez, Mexico (our ADM subsidiary), Ontario, Canada, Alaska, and Thompson Falls, Montana. However, the Company has performed exploration activities and limited surface mining at several locations.
In January 2026, the Company completed the acquisition of a of a precious metals milling facility in Radersburg, Montana for total cash consideration of $4.8 million. The Company has since reconfigured the facility for antimony flotation and concentration operations while retaining its precious metals processing capability. The Radersburg property is expected to enhance midstream processing capacity and further vertically integrate the Company’s domestic antimony supply chain. During the first nine months of 2026, the Company has invested approximately $2.0 million in capital expenditures to modernize equipment and machinery and construct a new fully equipped metallurgical laboratory built on the Radersburg property.
In January 2026, the Company paid $1.3 million to purchase 36 federal mining claims located in the Koyukuk Mining District of Alaska (commonly referred to as Nolan Creek) that are prospective for antimony and gold. This agreement does not require the Company to make any royalty payments. During the fall of 2026, the Company staked an additional 48, 160-acre, State of Alaska mining claims that overlap the original Federal Mining Claims purchased in January.
30
In February 2026, the Company entered into a joint venture agreement with Americas Gold and Silver Corporation (“Americas”) to construct and operate a new, state-of-the-art hydrometallurgical processing facility. The Company holds a 49% membership interest, with the remaining 51% held by Americas. While the Company is responsible for managing the day-to-day activities of the joint venture, governance is shared through a management committee with equal representation from each member, and all significant decisions require unanimous approval.
On March 11, 2026, the Company’s common stock began trading on the New York Stock Exchange (“NYSE”) and continued trading on NYSE Texas. Prior to that date, the Company’s common stock was listed on the NYSE American exchange and NYSE Texas.
In March 2026, the Company was awarded a $27.0 million grant from the U.S. Department of War under the Defense Production Act to support the expansion and modernization of its domestic antimony processing facilities and to fund a portion of the Company’s Alaskan antimony mining operations. The award, which is milestone-based, was modified by the DIBC during the third quarter of 2026, increasing the amount authorized for payment from $16.2 million to $20.3 million and reducing the amount subject to future authorization from $10.8 million to $6.7 million. On March 25, 2026, the Company received approval for three project milestones representing $12.8 million of committed funding for the Thompson Falls, Montana facility expansion. Based on the achievement and approval of these milestones, the Company recognized $12.8 million in the first quarter of 2026 as a grant receivable and a corresponding reduction of property, plant and equipment. The related cash proceeds were received in April 2026. Additional funding under the award is contingent upon the achievement and approval of future project milestones which are expected to occur in the near future.
On April 10, 2026, the Company published an initial assessment technical report summary on its Fostung tungsten project. This Initial Assessment-level Technical Report Summary, dated January 31, 2026 (the “Fostung TRS”), was prepared in accordance with the mining property disclosure rules specified in subpart 1300 of Regulation S-K and filed as an exhibit to the Form 8-K filed by the Company on April 10, 2026. The Fostung project was acquired by the Company in 2025 and includes 50 single-cell tungsten mining claims located in the Sudbury District of Ontario. As noted, the Fostung TRS is an Initial Assessment-level report and, accordingly, does not establish any Mineral Reserves. The report does, however, estimate 14.8 million tons of inferred mineral resources containing approximately 54.2 million pounds of tungsten. Exploration of the deposit indicates potential to expand the resource further, and preliminary test work has demonstrated the ability to improve the grade of the tungsten-bearing material through sorting.
On October 26, 2026, the Company published an initial assessment technical report summary on the Nolan Creek property located in northern Alaska that was purchased by the Company in January 2026. This Initial Assessment-level Technical Report Summary (the “Nolan Creek TRS”) was prepared in accordance with the mining property disclosure rules specified in subpart 1300 of Regulation S-K and filed as an exhibit to the Form 8-K filed by the Company on October 26, 2026. The report provides an initial assessment of the property’s mineral resource potential; however, the report does not establish mineral resources or mineral reserves for the site in accordance with Regulation S-K Item 1300. Exploration activities at the Nolan Creek property began in October 2026 with excavation of a bulk sample of approximately 1,000 tons.
Antimony Revenue Mix — Government and Industrial Customers Both Contributing
Through the first half of 2026, substantially all of the Company’s antimony-segment revenue consisted of antimony trioxide (“ATO”) sales to a diversified base of industrial customers across flame-retardant and specialty-chemical end markets. In the third quarter of 2026, the Company began recognizing deliveries under its five-year Indefinite Delivery, Indefinite Quantity contract with the U.S. Defense Logistics Agency (“DLA”) Strategic Materials, adding a government revenue stream alongside the Company’s continuing ATO industrial sales. As of September 30, 2026, antimony revenue is being generated across both channels concurrently, with the Thompson Falls facility supporting production for both. ATO shipments to industrial customers slowed in the third quarter of 2026 relative to the first half of the year, reflecting temporary feedstock availability constraints at the Company’s Thompson Falls facility and the timing of specific customer orders.
31
Diversified ATO Industrial Customer Base, Anchored by a Key Long-Term Contract
The Company sells ATO to a diversified portfolio of industrial customers across the United States. Within that customer base, in November 2025 the Company entered into a five-year sales agreement with a new industrial customer that specifies a contractually fixed monthly delivery schedule through December 2026, with subsequent six-month delivery periods, pricing (subject to semiannual market-based adjustments), and volume commitments established by mutual written agreement through the balance of the five-year term. This anchor contract provides forward contractual visibility for a defined portion of ATO production. The balance of ATO output continues to be sold on a non-committed basis to the Company’s broader industrial customer base, which has demonstrated continued demand through the first nine months of 2026. Third-quarter 2026 ATO shipment volumes to this customer base were below first-half 2026 levels due primarily to feedstock availability and order-timing factors discussed above. The Company’s ATO customer base, including the anchor contract customer, has indicated continued demand, and the Company expects ATO shipments to resume to pre-slowdown levels during the fourth quarter of 2026 and into 2027, subject to feedstock availability and seasonality of potential order timing.
Supportive Policy and Market Backdrop
The Company is one of a limited number of domestic antimony producers. Management believes that continued focus by federal and industrial customers on domestic sourcing of critical minerals, including antimony, is supportive of near-term and longer-term demand for the Company’s products. The Company is positioning Thompson Falls processing capacity to serve both expanding commercial industrial demand and continued federal procurement activity.
Operations
The Company has two reportable segments: antimony and zeolite. Antimony and zeolite are minerals used in a wide range of industrial, commercial, and governmental applications, and the Company supplies these minerals in processed forms suitable for end-use applications.
Antimony Segment
The antimony segment includes our facility located in the Burns Mining District of Sanders County, Montana, which processes raw antimony ore primarily into antimony oxide, antimony metal ingots, antimony trisulfide, and precious metals, and facilities operated by our USAMSA subsidiary in Mexico, which process raw antimony ore primarily into antimony metal and a lower grade of antimony oxide.
Antimony is a mineral included on the U.S. Government’s Critical Minerals List that is used in many products by both military and industrial customers. USAC processes antimony ore into finished products that can be used in these applications. Antimony mined from the ground, which is called antimony ore or ore, is typically not salable as a finished product primarily due to impurities in the ore, the ore size not being compatible with its intended use, and the percentage of antimony contained in the ore being too low. We process ore to remove impurities, refine the size, and increase the percentage of antimony contained in the ore to approximately 71.4% to make the finished product called antimony trisulfide, to approximately 83% to make the finished product called antimony oxide, and to approximately 99.65% to make the finished product called antimony metal. Antimony trisulfide, oxide, and metal can be sold as finished products to companies in many industries as well as government agencies. Antimony oxide is used to form a flame-retardant system for plastics, rubber, fiberglass, textile goods, paints, coatings, and paper, as a color fastener in paint, and as a phosphorescent agent in fluorescent light bulbs. Antimony metal is used in bearings, storage batteries, and ordnance. Antimony trisulfide is used as a primer in ammunition. The ore we purchase for our facility located in Montana contains antimony, gold, and silver. Our Montana facility processes this ore and sells the gold and silver back to the company from which the ore was purchased, representing all of our precious metals sales, while selling the antimony to other companies across various industries. Our Mexico facilities have been processing ore primarily into antimony metal.
We estimate (but have not independently confirmed) that our present share of the domestic and international markets for antimony oxide products is approximately 4% and less than 1%, respectively. We believe we are competitive due to the following:
| ● | To our knowledge, we are the only U.S. domestic operating, permitted processor of antimony products. |
| ● | We can process ore quickly and have minimal shipping time to domestic customers. |
32
| ● | We have a reputation for quality products delivered on a timely basis. |
| ● | We believe our smelter in Coahuila, Mexico is the largest operating smelter for the processing of antimony products in Mexico. |
| ● | We are a fully vertically integrated operation that includes mining, processing and selling antimony products. We believe there are few, if any, other companies outside of Russia and China that can make that claim. |
Zeolite Segment
The zeolite segment includes our vertically integrated Bear River Zeolite (“BRZ”) facility located in Preston, Idaho that mines, processes, and sells zeolite. Zeolite is a mineral that is included in many products that are used every day. BRZ can provide these minerals in a form that can be used in these products. Our zeolite has been used for many purposes including water filtration, sewage treatment, nuclear waste and other environmental cleanup, odor control, gas separation, animal nutrition, soil amendment and fertilizer, and other miscellaneous applications.
On July 24, 2025, the Company published a technical report summary on its zeolite mineral deposit located in Preston, Idaho. This Technical Report Summary, dated July 2, 2025 (the “TRS”), on the Bear River Zeolite Project was prepared in accordance with the mining property disclosure rules specified in subpart 1300 of Regulation S-K. The TRS reported approximately 2.3 million short tons of proven mineral reserves and 2.8 million short tons of probable mineral reserves. The full text of the TRS is an exhibit to the Form 8-K filed by the Company on July 25, 2025.
BRZ has a lease with Zeolite, LLC that entitles BRZ to surface mine and process zeolite on the property in Preston, Idaho, in exchange for an annual payment and a royalty payment, which is based on the amount of zeolite shipped from the leased property (“BRZ Lease”). The BRZ Lease, which was extended in 2025, currently ends on December 31, 2034. In addition, BRZ can surface mine and process zeolite on property owned by the U.S. Bureau of Land Management that is located adjacent to the Company’s Preston, Idaho property after obtaining required permits.
“Zeolite” refers to a group of industrial minerals that consist of hydrated aluminosilicates that hold cations such as calcium, sodium, ammonium, various heavy metals, and potassium in their crystal lattice. Water is loosely held in cavities in the lattice. BRZ zeolite is regarded as one of the best zeolites in the world due to its high cation exchange capacity (CEC) of approximately 180-220 meq/100 gr. (which predicts plant nutrient availability and retention in soil), its hardness and high clinoptilolite content (which is an effective barrier to prevent problematic radionuclide movement), its absence of clay minerals, and its low sodium content. Our zeolite has been used in:
☐ | Soil Amendment and Fertilizer. Zeolite has been successfully used to fertilize golf courses, sports fields, parks and common areas, and high value agricultural crops. |
☐ | Water Filtration. Zeolite is used for particulate, heavy metal and ammonium removal in swimming pools, municipal water systems, industrial water discharge streams, fisheries, fish farms, and aquariums. |
☐ | Mine Underground Ventilation. Zeolite is used in underground mining operations to help mitigate ammonia generated from the detonation of ammonium nitrate/fuel oil (ANFO) explosives. When ANFO explosives are detonated, ammonia can be released into the mine’s ventilation air, potentially affecting air quality for underground workers. Zeolite is employed as an absorbent material to capture ammonia from the ventilation stream, helping to reduce airborne ammonia concentrations and maintain a cleaner breathing environment for miners. |
☐ | Sewage Treatment. Zeolite is used in sewage treatment plants to remove nitrogen and as a carrier for microorganisms. |
☐ | Nuclear Waste and Other Environmental Cleanup. Zeolite has shown a strong ability to selectively remove strontium, cesium, radium, uranium, and various other radioactive isotopes from solution. Zeolite can also be used for the cleanup of soluble metals such as mercury, chromium, copper, lead, zinc, arsenic, molybdenum, nickel, cobalt, antimony, calcium, silver and uranium. |
☐ | Odor Control. A major cause of odor around cattle, hog, and poultry feed lots is the generation of the ammonium in urea and manure. The ability of zeolite to absorb ammonium prevents the formation of ammonia gas, which disperses the odor. |
33
☐ | Gas Separation. Zeolite has been used for some time to separate gases, to re-oxygenate downstream water from sewage plants, smelters, pulp and paper plants, and fishponds and tanks, and to remove carbon dioxide, sulfur dioxide and hydrogen sulfide from methane generators as organic waste, sanitary landfills, municipal sewage systems, animal waste treatment facilities, and is excellent in pressure swing apparatuses. |
☐ | Animal Nutrition. According to third-party research, feeding up to 2% zeolite increases growth rates, decreases conversion rates, and prevents scours. |
☐ | Miscellaneous Uses. Other uses include catalysts, petroleum refining, concrete, solar energy and heat exchange, desiccants, pellet binding, horse and kitty litter, floor cleaner, traction control, ammonia removal from mining waste, and carriers for insecticides, pesticides and herbicides. |
SUMMARY FINANCIAL INFORMATION
Consolidated Statements of Operations Information:
| Three months ended September 30, | Nine months ended September 30, | ||||||||||
| 2026 | | 2025 | | 2026 | | 2025 | |||||
Revenues | $ | 10,133,437 | $ | 8,701,951 | $ | 24,843,107 |
| $ | 26,227,079 | |||
Cost of revenues | 5,839,295 | 6,688,509 | 18,856,201 | 19,004,362 | ||||||||
Gross profit | 4,294,142 | 2,013,442 | 5,986,906 |
| 7,222,717 | |||||||
Total operating expenses | 10,277,487 | 6,930,624 | 26,468,346 | 11,761,900 | ||||||||
Loss from operations | (5,983,345) | (4,917,182) | (20,481,440) | (4,539,183) | ||||||||
Total other income (expense), net | (3,353,665) | 136,482 | 32,870 | 486,562 | ||||||||
Loss before income taxes and equity in losses of joint venture | (9,337,010) | (4,780,700) | (20,448,570) | (4,052,621) | ||||||||
Income tax expense |
| — |
| — |
| — |
| — | ||||
Loss before equity in losses of joint venture | (9,337,010) | (4,780,700) | (20,448,570) |
| (4,052,621) | |||||||
Equity in losses of joint venture | (189,046) | — | (261,686) | — | ||||||||
Net loss | $ | (9,526,056) | $ | (4,780,700) | $ | (20,710,256) | $ | (4,052,621) | ||||
Consolidated Balance Sheet Information:
| September 30, 2026 | | December 31, 2025 | |||
Working capital | $ | 56,232,142 | $ | 44,564,846 | ||
Total assets |
| 190,283,461 |
| 153,925,669 | ||
Accumulated deficit |
| (66,198,805) |
| (45,488,549) | ||
Total stockholders’ equity |
| 171,945,135 |
| 140,955,189 | ||
Consolidated Results of Operations:
Revenues increased $1.4 million, or 16%, to $10.1 million for the three months ended September 30, 2026, and decreased $1.4 million, or 5%, to $24.8 million for the nine months ended September 30, 2026, compared to the corresponding prior-year periods. Gross profit was $4.3 million, or 42% of revenues, for the three months ended September 30, 2026, compared to $2.0 million, or 23% of revenues, in the prior-year period, and $6.0 million, or 24% of revenues, for the nine months ended September 30, 2026, compared to $7.2 million, or 28% of revenues, in the prior-year period. Cost of revenues included write-downs of antimony inventory to net realizable value of $0.1 million and $0.3 million for the three and nine months ended September 30, 2026, respectively, with no such write-downs in the prior-year periods. Revenues and gross profit by segment are discussed below.
34
Operational and Financial Performance of Continuing Operations by Segment:
Antimony
Financial and operational performance of our antimony business for the three months ended September 30, 2026 and 2025 was as follows:
Three months ended September 30, |
| |||||||||||
Antimony | | 2026 | | 2025 | | $ Change | | % Change |
| |||
Revenue (a) | $ | 8,826,078 | $ | 8,030,005 | $ | 796,073 |
| 10 | % | |||
Gross profit (a) | $ | 4,049,101 | $ | 2,189,229 | $ | 1,859,872 |
| 85 | % | |||
Pounds of antimony sold (a) |
| 468,842 |
| 279,607 |
| 189,235 |
| 68 | % | |||
Average sales price per pound | $ | 18.83 | $ | 28.72 | $ | (9.89) |
| (34) | % | |||
Average cost per pound | $ | 10.19 | $ | 20.89 | $ | (10.70) |
| (51) | % | |||
Average gross profit per pound | $ | 8.64 | $ | 7.83 | $ | 0.81 |
| 10 | % | |||
Gross margin percentage | 45.88 | % | 27.26 | % | 18.62 | % | 68 | % | ||||
| a) | Excludes revenue from sales of gold and silver of $266,841 and $nil for the three months ended September 30, 2026 and 2025, respectively, and the related gross profit and pounds, which are included in the antimony segment. |
Financial and operational performance of our antimony business for the nine months ended September 30, 2026 and 2025 was as follows:
| a) | Excludes revenue from sales of gold and silver of $677,034 and $(20,539) for the nine months ended September 30, 2026 and 2025, respectively, and the related gross profit and pounds, which are included in the antimony segment. |
Antimony revenue increased $796,000, or 10%, for the three months ended September 30, 2026, due in part to sales under the Company’s five-year, sole-source IDIQ contract with the DLA. During the third quarter of 2026, the DLA formally accepted shipments totaling approximately 162,000 pounds of antimony metal ingots, resulting in the recognition of approximately $5.1 million in revenue. The increase in quarterly revenue was partially offset by a 34% decrease in the average sales price per pound, while pounds of antimony sold increased 68% compared to the corresponding prior year period. The lower average sales price per pound primarily reflected the decline in antimony market prices from the elevated levels experienced in 2025, partially offset by the higher contract pricing on shipments to the DLA. For the nine months ended September 30, 2026, antimony revenue decreased $3.3 million, or 14%, primarily due to a 28% decrease in the average sales price per pound, partially offset by a 20% increase in pounds of antimony sold compared to the corresponding prior-year period. As described in Note 5, each individual DLA order is priced, subject to contractual pricing formula, at the prevailing market rate for antimony metal at the time the order is placed. The market price for antimony metal has declined through 2026, and as a result, DLA orders received by the Company through 2026 are at a lower realized price per pound than the inaugural DLA order that was partially fulfilled in the third quarter. Accordingly, the antimony gross margin recognized in the three months ended September 30, 2026 should not be considered indicative of gross margin to be recognized in future periods as lower priced DLA orders are fulfilled.
35
Antimony gross profit increased $1.9 million, or 85%, for the three months ended September 30, 2026 as compared to the corresponding prior year period, while gross profit decreased $2.3 million, or 30%, for the nine months ended September 30, 2026. Our gross margin percentage, which improved to 46% from 27% for the three-month period, was positively affected by higher pricing related to shipments made under the Company’s contract with the DLA. For the nine-month period, gross margin declined to 26% from 32% in the prior year, primarily attributable to lower average selling prices for antimony experienced during 2026, partially offset by lower average costs per pound. Lower average cost per pound has primarily been driven by lower market prices for feedstock.
Zeolite
Financial and operational performance of our zeolite business for the three months ended September 30, 2026 and 2025 was as follows:
Three months ended September 30, |
| |||||||||||
Zeolite | | 2026 | | 2025 | | $ Change | | % Change |
| |||
Revenue | $ | 1,040,518 | $ | 671,946 | $ | 368,572 |
| 55 | % | |||
Gross profit (loss) (a) | $ | 6,606 | $ | (25,813) | $ | 32,419 |
| n/m | ||||
Tons of zeolite sold |
| 3,824 |
| 2,491 |
| 1,333 |
| 54 | % | |||
Average sales price per ton | $ | 272 | $ | 270 | $ | 2 |
| 1 | % | |||
Average cost per ton | $ | 270 | $ | 280 | $ | (10) |
| (4) | % | |||
Average gross profit (loss) per ton (a) | $ | 2 | $ | (10) | $ | 12 |
| n/m | ||||
(a) – n/m means not meaningful
Financial and operational performance of our zeolite business for the nine months ended September 30, 2026 and 2025 was as follows:
Zeolite revenue increased $368,572, or 55%, and $1.3 million, or 48%, for the three and nine months ended September 30, 2026, respectively, as compared to the corresponding periods in the prior year. These increases were primarily attributable to tons of zeolite sold increasing 54% and 51% during the three and nine-month periods, respectively, which reflected the Company’s expanded sales efforts, including additional penetration into the cattle market, as well as continued growth in its traditional industrial markets. The impact of changes in the average sales price per ton was not significant during both the three- and nine-month periods, as the average sales price increased by 1% during the three-month period and decreased by 2% during the nine-month period.
Gross profit was $6,606 for the three months ended September 30, 2026, an increase of $32,419 compared to the corresponding prior-year period, and $260,113 for the nine months ended September 30, 2026, a decrease of $15,607 compared to the corresponding prior-year period. For both the three- and nine-month periods, the benefit of higher sales volumes and the related revenue growth was largely offset by higher freight costs associated with the Company’s expanded geographic distribution and increased production costs associated with the higher volumes. As a result, gross profit improved modestly for the three-month period and was relatively unchanged for the nine-month period.
Consolidated Financial Performance:
Operating Expenses
Operating expenses increased $3.3 million and $14.7 million for the three and nine months ended September 30, 2026, respectively, compared to the corresponding prior-year periods, primarily due to the following:
| ● | Mineral exploration expense increased $3.4 million and $3.8 million for the three and nine months, respectively, primarily due to exploration activities in Alaska. |
36
| ● | Salaries and benefits decreased $1.7 million for the three months and increased $6.0 million for the nine months. Non-cash share-based compensation included in salaries and benefits was $1.9 million and $3.7 million for the three months ended September 30, 2026 and 2025, respectively, and $9.0 million and $4.2 million for the nine months ended September 30, 2026 and 2025, respectively. The nine-month increase reflected additional personnel to support the Company’s expanded operations and growth initiatives and an increase in equity awards granted following shareholder approval of the Amended and Restated 2023 Equity Incentive Plan in 2025, while the third-quarter decrease reflected the timing of stock award vesting. |
| ● | General and administrative expenses increased $1.0 million and $2.5 million for the three and nine months, respectively, to support the Company’s expanded operations and growth initiatives. |
| ● | Professional fees increased $0.3 million and $1.7 million for the three and nine months, respectively, primarily due to various strategic initiatives. |
| ● | The prior-year periods included a $0.5 million gain on the termination of the Philipsburg lease, which reduced operating expenses in those periods. |
Other Income (Expense), Net
Other income (expense), net, decreased $3.5 million and $0.5 million for the three and nine months ended September 30, 2026, respectively, compared to the corresponding prior-year periods. These decreases were primarily attributable to unrealized losses on the Company’s equity investment in Larvotto of $3.8 million during the third quarter and $1.1 million for the nine-month period, partially offset by increased interest income during both periods resulting from higher cash balances invested in interest-bearing accounts and investment securities. These unrealized losses reflected both declines in Larvotto’s share price on the Australian Securities Exchange and a weakening of the Australian dollar relative to the U.S. dollar. Because the investment is measured at fair value each reporting period, the Company’s results of operations may continue to fluctuate with changes in Larvotto’s share price and the AUD/USD exchange rate.
Capital Resources and Liquidity:
| September 30, | | December 31, | |||
Working Capital | 2026 | 2025 | ||||
Current assets | $ | 71,597,854 | $ | 54,742,182 | ||
Current liabilities |
| (15,365,712) |
| (10,177,336) | ||
Working capital | $ | 56,232,142 | $ | 44,564,846 | ||
Nine months ended September 30, | ||||||
Cash Flow Information | | 2026 | | 2025 | ||
Net cash used in operating activities | $ | (24,721,566) | $ | (6,220,686) | ||
Net cash used in investing activities |
| (16,829,870) |
| (35,995,481) | ||
Net cash provided by financing activities |
| 41,769,173 |
| 42,415,350 | ||
Net increase in cash and cash equivalents and restricted cash | $ | 217,737 | $ | 199,183 | ||
Net cash used in operating activities was $24.7 million for the nine months ended September 30, 2026, compared to $6.2 million in the corresponding prior year period. The increased use of operating cash in 2026 was primarily driven by higher working capital requirements, including a $16.2 million increase in inventories as the Company built up its antimony inventory. Operating cash flows were also affected by a net loss of $20.7 million, partially offset by non-cash charges, including $9.8 million of share-based compensation expense, $1.7 million of depreciation and amortization, and a $1.1 million unrealized loss on the Company’s equity investment in Larvotto.
Inventory by segment as of the dates indicated was as follows:
37
Net cash used in investing activities was $16.8 million for the nine months ended September 30, 2026, compared to $36.0 million in the prior year comparative period. Investing activities in the current period were primarily driven by $28.4 million of capital expenditures and $1.1 million of additional advances made to a strategic supplier under a new convertible note receivable. Capital expenditures were primarily attributable to ongoing construction associated with the expansion of the Company’s existing smelting operations in Thompson Falls, Montana, the acquisition of the Radersburg flotation mill, and other capital investments, including the acquisition of additional mining claims and machinery and equipment. These cash outflows were partially offset by $12.8 million of government grant proceeds received during the period as reimbursement for qualifying capital expenditures associated with the Thompson Falls expansion. Investing activities also included $1.3 million of proceeds from the maturity of U.S. Treasury Strips and $0.3 million of capital contributions to the JV. Investing activities in the first nine months of 2025 were comprised of $19.9 million for purchases of U.S. Treasury Strips and $16.1 million for capital expenditures.
Net cash provided by financing activities was $41.8 million during the first nine months of 2026 as compared to $42.4 million of net cash provided by financing activities for the prior year nine-month period. Significant financing activities in 2026 include $49.1 million of net proceeds received from the sale of common stock in “at the market offerings” and $2.1 million of proceeds received from the exercise of pre-existing common stock warrants. These increases were offset in part by $9.5 million of treasury stock acquired, consisting of $7.8 million of shares withheld to satisfy employee payroll tax withholding obligations in connection with the vesting of RSUs and the exercise of stock options and $1.7 million of common stock repurchases under the share repurchase program authorized by the Board. Significant financing activities in the first nine months of 2025 included $38.4 million of net proceeds received from the sale of common stock in “at the market offerings” and one direct offering with an institutional investor, and $4.4 million of proceeds received from the exercise of pre-existing common stock warrants.
The Company has historically funded its operations and growth in part through the sale or issuance of common stock, exercise of warrants, debt, and other investment vehicles, an approach the Company has successfully utilized in the past. However, our ability to access capital or raise funds when needed is not assured and, if financing is not available when needed, in the amounts and on the terms required, or is unavailable altogether the Company could be required to significantly curtail its operations, modify existing strategic plans, and/or dispose of certain operations or assets, which could materially harm our business, prospects, financial condition, and operating results.
In 2025, the Company secured a $19.0 million margin credit line with a national bank that is collateralized by the Company’s U.S. Treasury Strips and bears interest at one percent above the base commercial rate. Borrowings of $5.0 million and $10.0 million during the first and second quarters of 2026, respectively, were repaid prior to the end of each quarter, and no borrowings were outstanding as of September 30, 2026 or December 31, 2025. Availability under the margin credit line is subject to customary margin requirements based upon a percentage of the value of the pledged securities.
As discussed in Note 9, in March 2026 the Company was awarded a $27.0 million grant from the U.S. Department of War under the Defense Production Act, of which $12.8 million was received in April 2026. As of September 30, 2026, $7.5 million of the remaining award was authorized for payment subject to the achievement and formal acceptance of specified milestones, and $6.7 million remained subject to future authorization by the U.S. government.
The Company could also receive additional funding from the U.S. Government for initiatives related to facility expansion and critical exploration and development mining. The Company has made formal applications in 2026 to several governmental agencies for a total of $155 million. However, there is no assurance that additional U.S. Government funding will be accessible to the Company.
In addition, the Company continues to review each segment’s operational and financial results for opportunities to improve cash flow and to make informed decisions that benefit the Company overall.
38
Material Cash Requirements
As of September 30, 2026, the Company’s material cash requirements included (i) payments of approximately $6.8 million through 2030 to acquire mining claims, leases, and exploration rights (approximately $550,000 in 2027, $575,000 in 2028, $3.3 million in 2029, and $2.35 million in 2030) and exploration and development spending commitments of approximately $4.65 million over periods ranging from approximately three to five years, each of which may be terminated by the Company upon notice (see Note 10); (ii) future capital contributions to the JV in proportion to the Company’s 49% interest, the timing and amount of which depend on JV budgets and development schedules that are in process (see Note 13); (iii) inventory purchase commitments of approximately $1 million expected to be settled during the remainder of 2026 (see Note 16); and (iv) principal payments on equipment financing of approximately $0.3 million (see Note 14) and operating lease payments of approximately $0.1 million (see Note 11). The Company may also repurchase additional shares under its $100 million share repurchase program, which does not obligate the Company to repurchase any specific number or amount of shares.
In August 2026, the Board approved and authorized a share repurchase program under which the Company may repurchase up to $100 million of its outstanding common stock. During the three months ended September 30, 2026, the Company repurchased 368,640 shares of common stock that resulted in a cash outlay of approximately $1.7 million. As of September 30, 2026, approximately $98.3 million remained available for future repurchases under the program.
As of September 30, 2026, the Company had cash and cash equivalents of $30.1 million and investments in debt securities of $20.9 million as available liquidity. In addition, the Company had no borrowings outstanding under its $19.0 million margin credit line, availability under which is subject to customary margin requirements, and $7.5 million of grant funding authorized for payment upon the achievement and formal acceptance of specified milestones. Net cash used in operating activities was $24.7 million for the nine months ended September 30, 2026. We intend to fund our cash requirements with cash and cash equivalents, cash generated from operations, and capital raised from various investment vehicles and believe that cash from these sources will be sufficient to cover our requirements for the next 12 months. We intend to increase production, reduce costs, and grow revenue profitably by continuing to invest in our employees, customers, infrastructure, and operations. We may also use our available cash to acquire businesses or additional properties. The nature of these investments and transactions, however, makes it difficult to predict the amount and timing of future cash requirements.
ITEM 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
Not applicable.
ITEM 4. CONTROLS AND PROCEDURES
Conclusions of Management Regarding Effectiveness of Disclosure Controls and Procedures
At the end of the period covered by this Quarterly Report on Form 10-Q, an evaluation was carried out under the supervision and with the participation of the Company’s management, including the Principal Executive Officer (“PEO”) and Principal Financial Officer (“PFO”), of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as defined in Rule 13a – 15(e) and Rule 15d – 15(e) under the Exchange Act). Based on that evaluation, the PEO and the PFO have concluded that our disclosure controls and procedures were not effective in ensuring that: (i) information required to be disclosed by the Company in reports that it files or submits to the SEC under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in applicable rules and forms, and (ii) material information required to be disclosed in our reports filed under the Exchange Act is accumulated and communicated to our management, including our PEO and PFO, as appropriate, to allow for accurate and timely decisions regarding required disclosure.
The conclusion that our disclosure controls and procedures were not effective as of September 30, 2026 is a result of the previously identified material weakness in internal control over financial reporting described in Part II, Item 9A of the Company’s Annual Report on Form 10-K for the year ended December 31, 2025. The material weakness related to insufficient qualified accounting personnel and the related design and operation of controls over the financial statement close and reporting process. Notwithstanding the material weakness, management has concluded that the unaudited condensed consolidated financial statements included in this Quarterly Report present fairly, in all material respects, the Company’s financial position, results of operations and cash flows for the periods presented in conformity with U.S. GAAP.
39
Management has taken steps to address the previously identified material weakness, including hiring additional qualified personnel to lead the accounting department, Sarbanes-Oxley compliance, SEC reporting, accounts payable, payroll, and finance and accounting in Mexico and at BRZ, as well as information technology personnel. These additional personnel have strengthened the Company’s accounting and financial reporting capabilities; however, management has not completed the evaluation and testing necessary to conclude that the material weakness has been fully remediated. In addition, in 2025 the Company engaged a third-party accounting firm to assist with the implementation of new accounting software and with Sarbanes-Oxley compliance, both of which are ongoing.
Changes in Internal Control over Financial Reporting
Other than the continued remediation efforts discussed above related to the design and implementation of sufficient controls and processes around internal controls over financial reporting, there have been no changes during the quarter ended September 30, 2026 in the Company’s internal controls over financial reporting that have materially affected, or are reasonably likely to materially affect, internal controls over financial reporting. During the third quarter of 2026, the Company completed the migration of its general ledger and core accounting records to the NetSuite ERP system. The NetSuite implementation introduces new system-based controls over data integrity, user access, segregation of duties, and workflow approvals, and management views this change as part of the ongoing remediation of the previously identified material weakness. The Company is continuing to evaluate the design of, and test the operating effectiveness of, its internal controls in the new ERP environment.
PART II - OTHER INFORMATION
ITEM 1. LEGAL PROCEEDINGS.
Information regarding the Company’s legal proceedings is included in Note 16—COMMITMENTS AND CONTINGENCIES to the unaudited condensed consolidated financial statements included in this Quarterly Report.
ITEM 1A. RISK FACTORS.
There have been no material changes from the risk factors previously disclosed in the Company’s Form 10-K for the year ended December 31, 2025, which was filed with the SEC on March 19, 2026, except as described below.
The Company’s receipt of funds under its Department of War award is subject to significant conditions, and failure to satisfy these conditions or obtain continued authorization could adversely impact its operations and financial condition. In March 2026, the Company was awarded up to $27.0 million in funding from the U.S. Department of War under the Defense Production Act, administered through the DIBC, to support the expansion and modernization of its domestic antimony processing operations. The award is structured as a milestone-based arrangement, with $20.3 million currently authorized for payment and the remaining $6.7 million subject to future authorization at the discretion of the U.S. government. Payments are contingent upon the Company achieving specified project milestones, obtaining formal government approval of such milestones, and complying with ongoing requirements, including environmental, reporting, and project execution obligations.
There can be no assurance that the Company will successfully complete all required milestones, maintain compliance with all applicable conditions, or receive approval for additional funding. Any failure to meet these requirements, delays in milestone achievement or approval, changes in government priorities, or termination or modification of the agreement could result in a delay, reduction, or forfeiture of expected funding. In addition, the Company is required to fund a portion of the project costs, and if anticipated grant proceeds are not received in a timely manner or at all, the Company may be required to obtain alternative sources of financing or delay planned capital expenditures.
The Company’s financing and commercial arrangement with a key antimony supplier exposes us to credit, operational, and supply chain risks. We have entered into a commercial antimony sourcing arrangement with an international supplier as part of our strategy to support and expand our antimony supply chain. This arrangement is supported by a $4.0 million Convertible Promissory Note (the “Convertible Note”) that is secured by substantially all assets of the supplier and supported by a personal guaranty from the supplier’s principal owner. While these protections are intended to mitigate our credit exposure, there can be no assurance that the supplier will have sufficient liquidity, operational capacity, or financial resources to satisfy its obligations under the note or related commercial agreements.
40
If the international supplier experiences financial distress, operational difficulties, liquidity constraints, regulatory challenges, equipment failures, or other adverse developments, it may be unable to repay amounts owed to us, deliver anticipated antimony products, or otherwise perform under its contractual obligations. In such circumstances, we could incur losses associated with the note receivable, experience delays or disruptions in anticipated antimony supply, incur additional costs to obtain alternative sources of supply, or be required to devote additional resources to enforcing our contractual rights.
In addition, although the Convertible Note provides us with the right to convert indebtedness into membership interests of the supplier, it is a privately held company and there can be no assurance that any equity interests received upon conversion would have a readily realizable value or provide a recovery equivalent to the amounts owed under the note. Any of these events could adversely affect our business, financial condition, results of operations, cash flows, and growth strategy.
The Company’s significant inventory position in Mexico may expose us to operational, inventory valuation, and liquidity risks. The Company maintains a significant inventory of antimony materials at its facilities in Mexico which is periodically being moved to and undergoing final processing at the Company’s Thompson Falls smelters. The ultimate realization of the value of this inventory depends upon our ability to efficiently process these materials into finished products that meet applicable customer specifications in a commercially acceptable and timely manner. Processing results may be affected by numerous factors, including the characteristics of the raw materials, recovery rates, production yields, equipment performance, operating efficiencies, and other manufacturing variables.
If we are unable to process these materials as anticipated, or if processing requires additional time, costs, or modifications to our production methods, the inventory may remain on hand longer than expected, resulting in increased carrying costs, reduced liquidity, and higher working capital requirements. In addition, if market prices for antimony continue to decline while such inventory remains on hand, or if the estimated net realizable value of the inventory falls below its carrying value for any reason, we may be required to recognize inventory write-downs, which could adversely affect our gross margins, operating results, financial condition, and cash flows.
Any significant delay or inability to convert this inventory into finished products that satisfy customer requirements could materially and adversely affect our business, financial condition, results of operations, and cash flows.
ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS.
Sales of Unregistered Equity Securities
Not applicable.
Issuer Purchases of Equity Securities
During the quarter ended September 30, 2026, the Company withheld 3,869 shares of its common stock with an aggregate value of $18,997 to satisfy employees’ tax withholding obligations upon the vesting of restricted stock units. These shares were recorded as treasury stock.
The following table sets forth information regarding the Company’s repurchase of shares of its outstanding common stock during the third quarter of 2026:
41
ITEM 3. DEFAULTS UPON SENIOR SECURITIES.
None.
ITEM 4. MINE SAFETY DISCLOSURES.
The information concerning mine safety violations or other regulatory matters required by Section 1503 (a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act and Item 104 of Regulation S-K is included in Exhibit 95 to this report.
ITEM 5. OTHER INFORMATION.
During the quarter ended September 30, 2026, no director or officer of the Company adopted or terminated a “Rule 10b5-1 trading arrangement” or a “non-Rule 10b5-1 trading arrangement,” as those terms are defined in Item 408 of Regulation S-K.
42
ITEM 6. EXHIBITS.
Exhibit No. | | Description |
3.1 | ||
3.2 | ||
23.1 * | Consent of Thomas K. Bundtzen, Pacific Rim Geological Consulting, Inc. | |
31.1 * | ||
31.2 * | ||
32.1 ** | ||
95 * | ||
96.1 * | Technical Report Summary and Initial Assessment on the Nolan Creek Property. | |
101.INS | Inline XBRL Instance Document. | |
101.SCH | Inline XBRL Taxonomy Extension Schema Document. | |
101.CAL | Inline XBRL Taxonomy Extension Calculation Linkbase Document. | |
101.DEF | Inline XBRL Taxonomy Extension Definition Linkbase Document. | |
101.LAB | Inline XBRL Taxonomy Extension Label Linkbase Document. | |
101.PRE | Inline XBRL Taxonomy Extension Presentation Linkbase Document. | |
104 | Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101). |
* | Filed herewith. |
** | Furnished herewith. |
43
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.
| UNITED STATES ANTIMONY CORPORATION | ||
Date: November 12, 2026 | By: | /s/ Gary C. Evans | |
Gary C. Evans | |||
Chairman of the Board and CEO | |||
(principal executive officer) | |||
Date: November 12, 2026 | By: | /s/ Shawn P. Winkler | |
Shawn P. Winkler | |||
Senior Vice President and Chief Financial Officer | |||
(principal financial officer) | |||
44
Exhibit 23.1
Pacific Rim Geological Consulting, Inc.
P.O. Box 81906, Fairbanks, Alaska 99708
Phone 907 388 6607 Email: Bundtzen@pacrimgeol.com
October 22, 2026
United States Securities and Exchange Commission
100 F Street, N.E.
Washington, D.C. 20549
Re: United States Antimony Corporation (USAC) – Consent of Qualified Person
Ladies and Gentlemen:
Pursuant to the requirements of Subpart 1300 of Regulation S-K (17 CFR § 229.1300 et seq.) under the Securities Act of 1933, as amended, and the Securities Exchange Act of 1934, as amended, I, Thomas Bundtzen, hereby consent to:
1. | The public filing and use by United States Antimony Corporation (the “Company”) of the technical report summary titled “SEC S-K 1300 Technical Report Summary, Initial Assessment and Estimation of Placer Gold and Lode Antimony-Gold Resources, Nolan Creek Area, Wiseman Mining District Alaska” dated October 6, 2026 (the “Technical Report Summary”) as an exhibit to and in connection with the Company’s Form 8-K, and any other filings made by the Company with the U.S. Securities and Exchange Commission (the “SEC”). |
2. | The use of my name, and any quotations from or summarization of the Technical Report Summary, in the Company’s SEC filings, including any registration statements, annual reports, or prospectus supplements. |
3. | The incorporation by reference of the Technical Report Summary, and references to my name or my status as a Qualified Person, into any subsequently filed registration statements or amendments thereto. |
I hereby confirm that I have read the relevant disclosures in the Company’s filing(s) for which this consent is provided, and that the disclosure fairly and accurately represents the information, conclusions, and mineral resource estimates contained in the Technical Report Summary for which I am responsible as a Qualified Person.
Sincerely,
1

Thomas K. Bundtzen
Qualified Person (QP)
AIPG Certified Professional Geologist (CPG) #10912
Alaska Certified Professional Geologist #592
2
EXHIBIT 31.1
Certification
I, Gary C. Evans, certify that:
1. | I have reviewed this quarterly report on Form 10-Q of United States Antimony Corporation for the quarter ended September 30, 2026; |
2. | Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report; |
3. | Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report; |
4. | The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a–15(e) and 15d–15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a–15(f) and 15d–15(f)) for the registrant and have: |
(a) | Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared; |
(b) | Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles; |
(c) | Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and |
(d) | Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting; and |
5. | The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions): |
(a) | All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and |
(b) | Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting. |
Date: November 12, 2026
/s/ Gary C. Evans | |
|
Gary C. Evans | | |
Chairman of the Board and CEO | | |
EXHIBIT 31.2
Certification
I, Shawn P. Winkler, certify that:
1. | I have reviewed this quarterly report on Form 10-Q of United States Antimony Corporation for the quarter ended September 30, 2026; |
2. | Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report; |
3. | Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report; |
4. | The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a–15(e) and 15d–15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a–15(f) and 15d–15(f)) for the registrant and have: |
(a) | Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared; |
(b) | Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles; |
(c) | Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and |
(d) | Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting; and |
5. | The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions): |
(a) | All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and |
(b) | Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting. |
Date: November 12, 2026
/s/ Shawn P. Winkler | |
|
Shawn P. Winkler | | |
Senior Vice President and Chief Financial Officer | | |
EXHIBIT 32.1
CERTIFICATION PURSUANT TO 18 U.S.C. SECTION 1350
AS ADOPTED PURSUANT TO SECTION 906 OF THE SARBANES-OXLEY ACT OF 2002
In connection with the quarterly report of United States Antimony Corporation (the “Company”) on Form 10-Q for the quarter ended September 30, 2026, as filed with the Securities and Exchange Commission (the “Report”), Gary C. Evans, Chairman of the Board and Chief Executive Officer of the Company and Shawn P. Winkler, Senior Vice President and Chief Financial Officer of the Company, each certifies pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, that:
(1) | the Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and |
(2) | the information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company. |
/s/ Gary C. Evans | |
Gary C. Evans | |
Chairman of the Board and CEO | |
| |
Date: November 12, 2026 | |
| |
/s/ Shawn P. Winkler | |
Shawn P. Winkler | |
Senior Vice President and Chief Financial Officer | |
| |
Date: November 12, 2026 | |
EXHIBIT 95
MINE SAFETY DISCLOSURE
Pursuant to Section 1503(a) of the recently enacted Dodd-Frank Wall Street Reform and Consumer Protection Act (the “Dodd-Frank Act”), issuers that are operators, or that have a subsidiary that is an operator, of a coal or other mine in the United States are required to disclose in their periodic reports filed with the SEC information regarding specified health and safety violations, orders and citations, issued under the Federal Mine Safety and Health Act of 1977 (the “Mine Act”) by the Mine Safety and Health Administration (the “MSHA”), as well as related assessments and legal actions, and mining-related fatalities.
The following table provides information for the three months ended September 30, 2026:
Mine | | §104 | | §104(b) | | §104(d) | | §110(b)(2) | | §107(a) | | Proposed | | Mining | | §104(e) | | Pending |
Bear River Zeolite | | — | | — | | — | | — | | — | | $302 | | — | | No | | No |
(1) | The total number of violations received from MSHA under §104 of the Mine Act, which includes citations for health or safety standards that could significantly and substantially contribute to a serious injury if left unabated. |
(2) | The total number of orders issued by MSHA under §104(b) of the Mine Act, which represents a failure to abate a citation under §104(a) within the period of time prescribed by MSHA. |
(3) | The total number of citations and orders issued by MSHA under §104(d) of the Mine Act for unwarrantable failure to comply with mandatory health or safety standards. |
(4) | The total number of flagrant violations issued by MSHA under §110(b)(2) of the Mine Act. |
(5) | The total number of orders issued by MSHA under §107(a) of the Mine Act for situations in which MSHA determined an imminent danger existed. |
(6) | A written notice from the MSHA regarding a pattern of violations, or a potential to have such pattern under §104(e) of the Mine Act. |
Exhibit 96.1
REPORT
SEC S-K 1300 Technical Report Summary
Initial Assessment and Estimation of Placer Gold and Lode Antimony-Gold Resources, Nolan Creek Area, Wiseman Mining District Alaska
Submitted to:
U.S. Antimony Corporation (USAC)
4438 West Lovers Lane, Suite 100, Dallas Texas 75209 USA
Submitted by:
Pacific Rim Geological Consulting, Inc.,
P.O. Box 81906, Fairbanks, Alaska USA 99708
1 907 388 6607
E-Mail: Bundtzen@pacrimgeol.com

October 2nd, 2026
1
TABLE OF CONTENTS
2
3
11.3 | Mineral Resource Estimate | 83 |
11.4 | Measured Lode Antimony-Gold Resource at Nolan Creek | 93 |
11.5 | Indicated Lode Antimony-Gold Resource Estimate at Nolan Creek | 101 |
11.6 | Inferred Lode Antimony-Gold Resource Estimate at Nolan Creek | 105 |
11.7 | Mineral Resource Uncertainty Discussion | 115 |
11.8 | Assumptions for Multi-Commodity Mineral Resource Estimate | 119 |
11.9 | Qualified Person’s Opinion on Factors that Influence Economic Extraction | 119 |
12.0 MINERAL RESERVE ESTIMATES | 120 | |
13.0 MINING METHODS | 121 | |
14.0 PROCESSING AND RECOVERY Methods | 122 | |
15.0 INFRASTRUCTURE | 123 | |
15.1 | Previous Production Infrastructure on property | 123 |
15.2 | Present State of Infrastructure on Property | 123 |
16.0 MARKET STUDIES | 124 | |
17.0 ENVIRONMENTAL STUDIES, PERMITTING, AND PLANS, NEGOTIATIONS OR AGREEMENTS WITH LOCAL INDIVIDUALS OR GROUPS | 125 | |
17.1 | Geotechnical-Environmental Studies | 125 |
17.2 | Hydrological Studies | 127 |
17.3 | Environmental Monitoring | 129 |
17.4 | Water Management Plan | 129 |
17.5 | Mine Closure | 129 |
17.6 | Permitting | 130 |
17.7 | Plans, Negotiations, or Agreements with Local Individuals or Groups | 132 |
17.8 | Descriptions of any commitments to ensure local hiring | 132 |
17.9 | Qualified Person’s Opinion | 132 |
18.0 CAPITAL AND OPERATING COSTS | 134 | |
19.0 ECONOMIC ANALYSIS | 135 | |
20.0 ADJACENT PROPERTIES | 136 | |
21.0 OTHER RELEVANT DATA AND INFORMATION | 137 | |
22.0 INTERPRETATION AND CONCLUSIONS | 138 | |
22.1 | Mineral Resources | 138 |
4
22.2 | Environmental, Permitting and Social | 138 |
22.3 | Mineral Processing | 139 |
22.4 | Mineral Reserves | 139 |
23.0 RECOMMENDATIONS | 140 | |
23.1 | Mineral Resources | 140 |
23.2 | Environmental, Permitting and Social | 143 |
23.3 | Geotechnical | 143 |
23.4 | Mineral Processing | 143 |
23.5 | Tailings Storage Facility | 144 |
23.6 | Mineral Reserves | 144 |
24.0 REFERENCES | 145 | |
25.0 RELIANCE ON INFORMATION PROVIDED BY REGISTRANT | 152 | |
26.0 APPENDIX I | 153 | |
27.0 APPENDIX II | 168 | |
Figures
Figure 3.1 Map of the thirty-six (36) federal claims purchased by USAC, January 2026 | 23 |
Figure 3.2 Forty-eight (48) Alaska State Claims covering the Nolan Creek area 2026 | 23 |
Figure 4.1 Nolan Creek location map, showing access features to claims held by USAC | 25 |
Figure 4.2 Coldfoot Camp, 06 13 2026; USAC vehicle in foreground; photo by QP | 26 |
Figure 4.3 Main Street of Wiseman Village on 06 13 2026. Photo by QP | 27 |
Figure 4.4 Nolan Mine Camp as it appeared during spring, 2008; From QP files | 28 |
Figure 5.1 Prospector #3 Multi-Purpose NQ Core Drill TM, October 22, 2007; QP files | 30 |
Figure 5.2 Low profile truck used in underground placer mining, circa 2006; from QP | 32 |
Figure 5.3 Washing plant washed pay gravels from 2005-2007, Swede Channel project | 32 |
Figure 6.1 Geologic map of the Nolan Creek area; from Dillon and Reifenstuhl (1990) | 35 |
Figure 6.2 Photomicrographs, Workman’s Bench mineralized system | 38 |
Figure 7.1 Location Map Showing Locations of 771 placer drill collars, Nolan Creek | 41 |
Figure 7.2 Plan of Swede Channel Underground Development; 2005-2006 | 42 |
Figure 7.3 Plan of Mary’s East Underground Development and Exploration Drilling | 43 |
Figure 7.4 Contour map from drill data and underground workings in Nolan Creek Valley | 44 |
5
Figure 7.5 A—gold concentrate rich in stibnite; B—placer nuggets of gold plus stibnite | 44 |
Figure 7.6 Map of Nolan Creek Basin with 870 Khz geophysical (resistivity) anomaly | 45 |
Figure 7.7 Soil sample locations on Workman Bench-Pringle Bench area | 46 |
Figure 7.8 1994 inaugural percussion (RC) drill hole results for Workman’s Bench | 47 |
Figure 7.9 Selected Stibnite-bearing intervals in 2008 and 2009 diamond drill hole | 48 |
Figure 7.10 Schematic of Workman’s Bench, showing locations of drill holes | 54 |
Figure 7.11 Schematic, cross section A-A’, southern portion of Workman’s Bench | 55 |
Figure 7.12 Schematic, cross section B-B’ in the central portion, Workman’s Bench | 56 |
Figure 7.13 Schematic, cross section C-C’ in northern portion Workman’s Bench | 57 |
Figure 7.14 Schematic plane view of Pringle Bench, showing locations of drill holes | 58 |
Figure 7.15 Schematic, cross sectional profile D-D’ on Pringle Bench | 59 |
Figure 8.1 Geologists collect channel sample underground, Workmen’s Bench | 62 |
Figure 8.2 Location, underground channel samples, Workman’s Bench | 63 |
Figure10.1 Side view of 2007 Nolan washing plant | 72 |
Figure10.1 Plan view of 2006 Nolan wash plant | 73 |
Figure 10.3 Tabled Concentrate from Workman’s Bench analyzed Hazen Research Labs | 75 |
Figure 10.4 Hazen mineralogical separation process flowchart for Workman’s Bench | 76 |
Figure 10.5 Gold (bright color) in stibnite (gray), Workman’s Bench Bulk sample | 77 |
Figure 10.6 Stibnite-gold concentrates from table products from Nolan Bulk Sample | 78 |
Figure 10.7 Drill plan showing the locations of mercury analyses, 2008 core drilling | 80 |
Figure11.1 Location of placer-style gold mineral resource estimates, Nolan Creek | 85 |
Figure11.2 Polygon layout for D-Block #1 and 3B3-Block indicated resources placer gold | 87 |
Figure 11.3 Histogram plots of antimony (on left) and gold (on right) distribution | 90 |
Figure 11.4 As-Au and Sb-Au correlations for assay results Workman’s Bench | 90 |
Figure 11.5 Surface view of Workman’s bench mineralized zones with drill collars | 94 |
Figure 11.6 Measured resource polygons for ‘A’ Zone, Workman’s Bench, Nolan Creek | 95 |
Figure 11.7 Measured resource polygons for ‘B’ Zone, Workman’s Bench | 97 |
Figure 11.8 Measured resource polygons for ‘West’ Zone, Workman’s Bench | 99 |
Figure 11.9 Indicated Resource polygons for ‘A’ Zone, Workman’s Bench, 2009 drilling | 102 |
Figure 11.10 Indicated resource polygons for B Zone, Workman’s Bench, 2009 drilling | 103 |
Figure 11.11 Inferred Resource polygons for ‘A’ Zone, Workman’s Bench | 105 |
Figure 11.12 Inferred Resource polygons for ‘B’ Zone, Workman’s Bench | 106 |
Figure 11.13 Inferred Resource polygons for ‘C’ Zone, Workman’s Bench | 107 |
Figure 11.14 Surface view of Pringle Bench mineralized zones trenches and drill locales | 110 |
Figure 11.15 Inferred Resource polygons for ‘A’ Zone, Pringle Bench; 2009 drilling | 111 |
Figure 11.16 Inferred Resource polygons for West Zone, Pringle Bench; 2009 drilling | 112 |
Figure 11.17 Plan view image of Workman’s bench ‘A’ Zone vein-fault. Scale 100 feet | 116 |
Figure 11.18 Side profile of Workman’s Bench ‘A’ Zone looking northwest; with Sb grade | 117 |
6
Figure 15.1 A—Fuel tank storage facility in 2009; B—Same Fuel tank storage in 2026 | 123 |
Figure 17.1 Land reclamation conducted on previously mined Odgen-Eureka Bench | 125 |
Figure 17.2 A—Underground drift looking E/Se in 2008 Note near-horizontal, phyllitic schist bands in base and roof; B—portal on April 12th, 2008. Photos from QP files | 127 |
Figure 17.3 Core logging summary from 2007 core drilling, showing acidity | 128 |
Figure 17.4 A--Inside machine shop as it appeared in 2006; note dirt floor in shop; B—inside machine shop as it appeared in 06 13 2026—both from QP files | 130 |
Figure 23.1 Priority 1 work program for Workman’s Bench | 140 |
Figure 23.2 Priority II program for Pringle Bench | 141 |
Figure 23.3 Removal of overburden on Pringle Bench with hydraulic technology | 141 |
Figure 23.4 Pringle Bench mineralized surface exposed by removal of overburden | 142 |
Figure 23.5 USAC manger Rodney Blakestad inspects drill core storage facility | 142 |
Tables
7
Table 11.10 Data for probable resource in ‘A’, ‘B’ and ‘West’ Zones, Workman’s Bench | 100 |
Table 11.11 Indicated resource summary 2009 drill program, A-Zone, Workman’s Bench | 101 |
Table 11.12 Indicated resource summary 2009 Drill Program, B-Zone, Workman’s Bench | 101 |
Table 11.13 Measured and Indicated lode resources, Workman’s Bench | 104 |
Table 11.14 Total inferred lode mineral resources, Workman’s Bench and Pringle Bench | 104 |
Table 11.15 Polygonal Block Inferred Resource Estimate for ‘C Zone’, Workman’s Bench | 108 |
Table 11.16 Polygonal Inferred Resource Estimate ‘A Zone’, Workman’s Bench | 108 |
Table 11.17 Polygonal Inferred Resource Estimate ‘West Zone’, Workman’s Bench | 108 |
Table 11.18 Polygonal Block inferred resource estimate for ‘B-Zone’, Workman’s Bench | 108 |
Table 11.19 Summary of Inferred Antimony and Gold Resources From Workman’s Bench | 109 |
Table 11.20 Polygonal inferred resource ‘A’ Zone, Pringle Bench Bundtzen (2009) | 113 |
Table 11.21 Polygonal inferred resource Pringle bench, A-Zone, Bundtzen (2011) | 113 |
Table 11.22 Polygonal inferred resource calculation for ‘West’ Zone, Pringle Bench | 113 |
Table 11.23 Polygonal inferred resource from 2009 Drill Program, West-Zone, Pringle Bench | 114 |
Table 11.24 Total Inferred Lode Mineral Resource calculation, Pringle Bench | 114 |
Table 11.25 Proven Indicated Resources calculated by VulcanTM | 117 |
Table 11.26 Comparative Results of Polygonal Method versus VulcanTM block model | 118 |
Table 17.1 Results of Field Rinses of samples, Nolan Lode Project | 131 |
Table 17.2 Underground sampling program for ML/ARD Program, Nolan Camp, 2008 | 132 |
Appendices
APPENDIX I: Summary of Relevant Sample Data Used in Calculation of all Categories of Sb and Au Resources from Workman’s Bench That are Described in this Technical Report; Including Relevant Trace Element Data | 154 |
APPENDIX II Summary of Relevant Sample Data Used in Calculation of Inferred Sb and Au Resources from Pringle Bench that are described in this Technical Report | 169 |
8
DATE AND SIGNATURE PAGE
The effective date of the Mineral Resources Estimates is October 6th, 2026
Author and | Sections | Signature |
Thomas K. Bundtzen | All Sections |
|
The qualifications and relevant experiences of the QP is summarized below:
Thomas K. Bundtzen (the QP):
| ◾ | Education: |
B.S. Geology, 1973 College of Earth Science and Mineral Industries (CESMI), University of Alaska-Fairbanks.
M.S. Economic Geology, 1981, Department of Geology and Geophysics, University of Alaska-Fairbanks.
| ◾ | Years of Experience |
Twenty-five (25) years as senior economic geologist with the Alaska Division of Geological and Geophysical Surveys (1972-1997).
Twenty-eight (28) years as President and Principal Economic Geologist with Alaska-based firm Pacific Rim Geological Consulting, Inc. based in Fairbanks, Alaska USA (1998-2026.
| ◾ | Relevant Experience |
During 1979-1981, the QP completed his M.S. Thesis in the Kantishna Mining district of Interior Alaska and studied four stibnite-gold deposits, including the Stampede mine, Alaska’s largest historic producer of antimony. Since 1980, the QP has studied and sampled semi-massive stibnite vein deposits in the Fairbanks, Tok, Iditarod, Cape Nome, Ruby and Innoko mining districts of Interior and Western Alaska.
While participating in an International Minerals Exchange between the U.S. Geological
9
Survey, Soviet (later Russian) Ministry of Natural Resource, the Alaska Division of Geological and Geological Survey, and the Geological Survey of Canada (1989-1997), the QP examined stibnite deposits and mines throughout the Russian Far East.
From 2004-2011, the QP conducted field investigations in the Fairbanks and Wiseman districts and has written Technical Reports for the firm Silverado Gold Mines Ltd., the former owner of the claims in Nolan Creek valley now held by USAC. These include the Workman’s Bench and Pringle Bench antimony-gold lode deposits, which are the principal subjects being reviewed in this Technical Report. A Technical Report summarizing placer resources and initial lode resource estimates was prepared by the QP in 2008. Subsequently Canadian National Instrument NI 43-101 Technical Reports on the Nolan Creek and antimony-gold deposits were released in June, 2009, and subsequently amended in July, 2011.
10
1.0 | EXECUTIVE SUMMARY |
1.1 Property Description and Ownership
This Technical Report summarizes the geologic framework, and mineral resources as an initial assessment placer gold resources and the Workman’s Bench and Pringle Bench antimony-gold lode deposits owned by Great Land Minerals LLC (GLM) a wholly owned subsidiary of the United States Antimony Corporation (USAC) in the Nolan Creek area (Nolan Creek) of the historic Koyukuk Mining District. According to government reports, historic mineral production in the area is about 350,000 oz of placer-style gold and a small amount of stibnite (ore of antimony) since 1894. Nolan Creek is about 175 mi (280 km) north-northwest of Fairbanks, Alaska. This analysis focuses on the lode antimony-gold deposits owned by GLM/USAC.
Nolan Creek is part of the Koyukuk Mining District, which covers about 12,500 sq mi (32,000 km2) of northern Alaska. The district is bounded on the east by the South Fork of Koyukuk River, the Alatna River on the west, the continental divide of the Brooks Range on the north, and the Kanuti River Basin on the south. Nolan Creek is at the center of the Koyukuk Mining District. Elevations in the area range from 4,635 ft (1420 m) on Vermont Dome to about 1,220 ft (370 m) on the floodplain of the Middle Fork of the Koyukuk River.
GLM acquired thirteen (13) lode and twenty-three (23) placer federal mining claims in Nolan Creek valley through a Trustee’s sale in a public auction on January 30th, 2026. The properties had been previously owned by Silverado Gold Mines Ltd. (Silverado) a Canadian public company based in Vancouver, British Columbia, which conducted exploration and mining placer gold deposits and exploration of lode targets from both surface and underground operations from 1979-to-2009. Silverado operated in Alaska vis it’s wholly owned U.S. subsidiary Silverado Gold Mines Inc. and a private company, Tri-Con Mining Ltd.
During the fall of 2026, GLM staked an additional forty-eight (48), 160-acre, State-of-Alaska mining claims that overlap the original Federal Mining Claims purchased at auction in January. These new state claims were staked to cover open ground in the Nolan Creek area of interest as a result of the Pipeline Corridor land transfer from Federal (U.S. Government) domain to State of Alaska domain. Acquisition by GLM of the Alaska state claims depicted in Figure 3.2 will ensure that the original historic federal claims purchased by GLM from the 2026 auction are not compromised by third parties as a result of the new federal-to state transfers being acted upon in the Pipeline Corridor. All of the mining claims occur in the Wiseman B-1 USGS quadrangle of northern Alaska.
1.2 Geology and Mineralization
The bedrock geology of Nolan Creek is dominated by units of the Brooks Range schist belt, a poly-deformed package of schist, greenstone, and orthogneiss. The schist belt is part of the Coldfoot sub-terrane of the Arctic Alaska terrane, which underlies more than 75% of the south flank of the Brooks Range.
11
The Workman’s Bench and Pringle Bench properties contain quartz-stibnite-gold veins that cut a high-angle, structurally controlled zone that is 150 ft to 300 ft wide (45-to-91 m) and at least 1,600 ft (488 m) in length. These quartz-only and stibnite-quartz (gold) veins strike northeast and cross-cut low angle cleavage at steep to vertical angles. Besides locally massive stibnite, the quartz-carbonate vein stock works also contain arsenopyrite.
The gold-stibnite-quartz veins of Nolan Creek Valley strongly resemble the gold-antimony deposit type (U.S. Geological Survey Deposit Model 36C). These deposits are characterized by the presence of stibnite, berthierite, high fineness gold, and aurostibnite hosted in metamorphosed, quartz-carbonate-bearing, compressive shear zones within low grade, greenschist facies metamorphic rocks. The deposit types are characterized by deformed, ductile fabrics and tectonically re-crystallized, fine grained, granoblastic stibnite lobes and lenses.
The gold-antimony deposit type 36C is considered to be a sub-type of the mesothermal, auriferous lodes found in mineral provinces worldwide. Mineral deposit type 36C is not very well documented in North America but well studied in Asia, Europe, and Africa. Worldwide examples include deposits in the Transvaal of South Africa, the Reefton District in New Zealand, and deposits in Eastern Europe and in Russia. Olympiada in Siberia is an example of a large, productive gold- stibnite deposit of this type. The Olympiada deposit is currently one of the worlds’ largest producers of antimony—which is produced as a byproduct of the mainly gold-mining operation there. Placer gold deposits eroding from the Sb-Au vein deposits have formed in valleys and on benches of Nolan Creek valley and the Hammond River areas.
1.3 Status of Exploration
Most of the exploration on the property occurred during 1979-2009, when the previous owner explored both placer and lode (hardrock) prospects in the Nolan Creek claim area. From 1979-to-2006, Silverado drilled 910 reverse circulation (RC) holes totaling 58,756 feet (17,913 m) in search of placer gold resources. About 90 percent of these drill holes were conducted on claims now owned by GML/USAC.
From 1981-to-2009, the previous owner drilled seventy-two (72) relatively shallow (454 feet TD maximum) diamond drill core holes totaling 21,144 feet (6,446 m) to explore the Workman’s Bench and Pringle Bench antimony-gold deposits. In addition, the previous owner conducted 70.28 line miles of VLF/EM) geophysical surveys and 4,672 feet of trenching on the Workman’s Bench and Pringle Bench antimony-gold deposits.
About 1,283 soil and stream sediment samples have also been collected by the previous owner on the GLM property. To the QP’s knowledge, there has been no further exploration of mineral resources on the property since 2011.
1.4 Development and Mine Operations
From 1979-to-2007, the previous owner produced 23,150 oz placer gold from 271,771 yds3 of pay gravel from a variety of surface and underground placer mining operations. No further development occurred after 2011.
12
1.5 Mineral Resource Estimate
Mr. Thomas K. Bundtzen, President of Pacific Rim Geological Consulting Inc. (Pacific Rim), an independent Qualified Person (QP) for the writing of this Technical Report, has estimated Indicated placer gold resources in Nolan Creek valley, and Measured, Indicated and Inferred lode antimony and lode gold mineral resources on Workman’s Bench and Pringle Bench. No Mineral Reserves are included in this report. The QP reports only Measured, Indicated, and Inferred Mineral Resources in this Initial Assessment of the subject property.
Indicated Placer gold mineral resources, Nolan Creek
Resource | Cut-off grade | Quantity | Grade | Metal |
Indicated | 0.06 | 66,800 | 0.095 | 6,250 |
The effective date of these resources is July 29th, 2008; amended September 15th, 2026 |
Rounding may result in some discrepancies. |
No processing recovery factors have been applied to these resources |
The industry standard unit of quantity for Alaskan placer deposit is cubic yards. The weight of a cubic yard averages about 2.4 short tons. |
Measured and Indicated lode antimony-gold resources, Workman’s Bench
Resource | Cut-off grade | Quantity | Grade | Metal | Grade | Metal |
Measured and Indicated | 4.0 | 53,616 | 26.27 | 14,089 | 0.372 | 19,968 |
The effective date of these indicated resources is July 12th, 2011; amended on September 16th, 2026 |
Cut-off grade is 4.0% Sb ‘equivalent’, which refers to the combined values of gold plus antimony expressed in terms of percent antimony. |
Total Inferred lode mineral resources, Workman’s Bench and Pringle Bench
Resource | Deposit | Cut-off grade | Quantity | Grade | Metal | Grade | Metal |
Category | | (% Sb) | (short tons) | (% Sb) | (ton Sb) | (oz/ton Au) | (oz Au) |
Inferred | Pringle | 4.0 | 12,817 | 19.61 | 2,513.8 | 0.499 | 6,390.4 |
Inferred | Workman’s | 4.0 | 19,642 | 11.17 | 2,127.0 | 0.273 | 5,362.1 |
Total Inferred | Workman’s | 4.0 | 32,459 | 14.29 | 4,640.8.5 | 0.362 | 11,752.5 |
The effective date of these resources is March 7th, 2011; amended September 18th, 2026. Cut-off grade is 4.0% Sb ‘equivalent’, which refers to the combined values of gold plus antimony expressed in terms of percent antimony. |
13
1.6 Mineral Reserve Estimate
No mineral reserve estimates have been made by the QP on mineral properties described in this Technical Report.
1.7 Mining Methods
No mining methods have been recommended by the QP for mineral properties described in this report.
1.8 Processing and Recovery Methods
No specific Processing and Recovery Methods are recommended by the QP for the mineral properties described in this report; pending further acquisition of information by GLM.
1.9 Capital and Operating Costs
No Capital of Operating Costs have been made on the mineral properties in this Technical Report.
1.10 Economic Analysis
No economic analysis has been made on the Nolan Creek properties for the purposes of this Technical Report.
1.11 Infrastructure
The previous owner of the mineral property maintained a self-sufficient camp that included camp infrastructure capable of housing thirty (30) mine employees, machine shops, and a diesel power plant (see Figure 4.4 of this Technical Report). A 2007 upgrade project included:
| ● | The purchase and installation of a ten room housing unit; |
| ● | The construction of an engineering office; |
| ● | The upgrading of laboratory facilities; |
| ● | The installation of a new sewage treatment facility; |
| ● | The construction of a new kitchen and cafeteria; and |
| ● | The installation of new communications equipment. |
| ● | Installation of 2,500 gallon plastic holding tanks for water needs. |
However, all of these facilities are in a state of disrepair and cannot be used.
The QP does not recommend any construction of new infrastructure, pending a complete review by GLM of what current camp infrastructure is salvageable and what, if anything, must be removed from the site.
1.12 Permitting Requirements
Presently a mixed property ownership exists between the State of Alaska and the U.S. Interior Department Bureau of Land Management. This manifests itself in both state and federal mining
14
claims. The state of Alaska has General Selection Lands (GS 5167) Ta’d surrounding the active GLM federal Mining claims and an ANILCA Top Filing covering the active federal mining claims owned by USAC. GLM has also located State of Alaska mining claims over the active federal mining claims to protect its claim ownership position. This process has been used numerous times to facilitate ownership transfer from BLM to the State of Alaska for high value mineral lands. Currently, permit requirements include the following:
Alaska Department of Natural Resources
Alaska Placer Mining Application (APMA AAC Title 27, AS 38.05)
Approved Plan of Operations (AAC Title 27, AS 38.05)
Approved Reclamation Plan (AAC Title 27, 38.05)
Approved Mine Closure Plan (AAC Title 27, 38.05)
Temporary Water Use Permit (TWUP 11 AAC 93.035, 93.220)
Alaska Department of Environmental Conservation
APDES (Authorized under the federal Clean Water Act, 33 U.S.C. 1251-1387
and implemented in Alaska by 18 AAC Chapter 83)
Storm Water Plan, SWPPP; (AS 46.03.100; 18 AAC 83.615)
Industrial Waste Water Permit (APDES Program)
Solid Wate Permit (ACC Title 17, AS Title 16)
Air Quality Permit (AS 46.14, 18 AAC 50)
Alaska Department of Fish & Game
Title 16 Habitat Permit (AS Title 16)
U.S. Army Corps of Engineers
404 Wetlands Permit (Clean Water Act)
U.S. Bureau of Land Management
Plan of Operations Approval
Environmental Assessment (EA, National Environmental Policy Act of 1969, 43 CFR Part 46)
Reclamation Plan (30 U.S. Code 1258 Supplemented by 43CFR Part 3600, Subpart 3601 and related BLM manuals)
GLM will have to pay taxes to the Alaska Department of Revenue; complete required maintenance of the Nolan Road from the Alaska Department of Transportation and Public Facilities; and conform with guidelines set forth by the Alaska State Historical Preservation Office, if artifacts are encountered.
1.13 Qualified Person’s Conclusions and Recommendations
The QP does not make any specific recommendations to GLM for advancing their indicated placer gold resources in Nolan Creek Valley. If those resources become a priority for development, GLM should attempt to determine whether the paystreaks occur in dry versus wet environments.
15
GLM should complete additional infill diamond core drilling on Workman’s Bench. Workman’s Bench should be the top priority because it contains the best chance thus far known for documenting consistent widths and grades of stibnite-quartz-gold mineralization. The exploration focus on ‘A’ Zone previously described but also include subsidiary vein systems. Drill-testing the zone of inferred mineralization should be given a high priority. A drill priority should also be to drill-test Pringle Bench.
The diamond drill core should be of a larger size than the modified NQ core previously used--not necessarily due to high recovery as the older NQ core was satisfactory in producing high recovery rates. Instead, use of larger diameter ‘P’ core and a drill rig capable of drilling to 1,000 foot depths (or more) could greatly assist in determining the overall vertical extent of the mineralizing system. In order to accomplish the drill-testing, Pringle Bench should be scrapped off much like it was prior to 2011.
GLM should build on environmental baseline work initiated by the previous owner. On behalf of the previous owner, SRK Consulting initiated base line studies on the property in 2008, but none have been completed since. GLM should advance baseline studies through investigations of geochemical characterization, meteorological precipitation, hydrological steam run-off (including storm water) prediction and mixing zone potential. An early significant conclusion from past environmental work is that un-weathered materials have a neutral pH; hence an Acid Rock Drainage (ARD) mitigation plan should be aimed at minimizing oxidation of waste rock and ore materials during disposal and in-capsulation of material. GLM should advance baseline studies through investigations of geochemical characterization, meteorological precipitation, hydrological steam run-off (including storm water) prediction and mixing zone potential. Large samples taken underground should be run using acid-base accounting procedures. In similar fashion, selected core of both mineralized vein and wall rock material from representative drill holes along strike and at depth should be split for the expressed purpose of acid-base accounting analyses. Large samples taken underground should be run using acid-base accounting procedures.
To the QP’s knowledge, the previous owner was not engaged in any partnerships or agreements with outside parties. The leading landowner in the area is Doyon Limited (Doyon), a regional native corporation based in Fairbanks. Doyon owns lands immediately west of the Nolan Creek area, which juxtaposes the Gates of the Arctic National Park and Preserve. Doyon is currently in partnership with Wiseman Metals, a subsidiary of MDF-Global, on a district-scale evaluation of copper-precious metal ‘skarn’ and ‘porphyry’ style copper mineralization north-northeast of Coldfoot.
The 415 pound bulk sample collected in 2008 by the QP and processed by Hazen Research in Colorado yielded promising results concerning the beneficiation of the antimony-gold mineralization for the Nolan lode project (see Chapter 10 of this Technical Report). That bulk sample was collected underground from the main ‘A zone’ on Workman’s Bench. The QP suggests
16
that four (4) additional bulk samples of vein-fault mineralization be collected: 1) another bulk sample from ‘A’ zone on Workman’s bench using both underground and surface exposures and selected core where available; 2) a bulk sample from the ‘B’, West, and ‘C’ mineral zones on Workman’s Bench; 3) a bulk sample from the ‘A’ zone on Pringle Bench; and 4) a bulk sample from other mineralized zones on Pringle Bench. Collecting more metallurgical data will allow GLM to continue to refine their mill-plans and provide increased confidence to a potential market for their stibnite-gold concentrate products. GML/USAC may then elect to construct a pilot plant on-site and process larger amounts of mineralized materials.
The QP does not recommend work on a tailings facility until information acquired from mineral processing, geotechnical, environmental or infill drilling programs are completed and when a Proven Reserve has been established.
Mineral reserves cannot be established until a fundamentally upgraded, technical analysis is completed from previous studies. A positive reserve analysis was provided in Chapter 18 of previous Technical Report issued by the QP in his Technical Report for the previous owner of the Nolan Creek claims.
However, economic assumptions for the 2011 reserve study on properties currently held by GLM have significantly changed. Commodity prices have improved dramatically, but inflationary costs for fuel, groceries, equipment, labor and many other factors have driven costs significantly upward for operating a mineral development in Nolan Creek valley. In addition, the 2011 mine model envisioned use of the Nolan Camp facility as a base for developing underground mining operations. That camp facility is currently in a state of fundamental disrepair and cannot be used in a reserve analysis of the lode-antimony-gold deposits on the subject property.
17
2.0 | INTRODUCTION |
2.1 Registrant Information
United States Antimony Corporation; referred to in this Technical Report as ‘USAC’ (NYSE American; UASE; NYSE Texas; UAMY) is a critical minerals company focused on the production of antimony and zeolites. USAC owns and operates two antimony smelters in North America located in Thompson Falls, Montana and in Madero, Mexico respectively. Besides antimony, USAC operates the Bear River zeolite mine in Idaho, producing a mineral product for water filtration, agriculture and environmental remediation. Great Land Minerals LLC (GLM), which purchased the claims in the Nolan Creek area in 2026, is a wholly owned subsidiary of USAC.
2.2 Terms of Reference and Purpose
This Technical Report was requested by U.S. Antimony Corporation (USAC).
According to government reports, historic placer gold production in the Koyukuk mining district is estimated at about 350,000 oz of placer-style gold and a small amount of stibnite (ore of antimony) since 1894. Nearly half of the total gold production was sourced in the Nolan Creek basin, which is partially claimed by USAC. Nolan Creek is about 175 mi (280 km) north-northwest of Fairbanks, Alaska. Rather than placer gold, this analysis focuses on the lode antimony-gold deposits on properties in Nolan Creek basin held by USAC. The independent Qualified Person, Mr. Thomas K. Bundtzen, President of Pacific Rim Geological Consulting Inc. (Pacific Rim), is responsible for this Technical Report. Henceforth Mr. Bundtzen is referred to as the QP.
The primary purpose of this Technical Report is to disclose lode antimony-gold mineral resources for USAC’s holdings in the Nolan Creek Area (Nolan Creek) of the historic Koyukuk Mining District of Northern Alaska.
2.3 Sources of Information
The sources of information are numerous and include U.S. Government, State of Alaska, and unpublished private company reports, which are detailed in the References section of this report. Geological mapping and framework studies summaries of the Nolan Creek area have been published by Maddren (1910, 1913), Brosge and Reiser (1970), Dillon (1989), Dillon and others (1986), Dillon and Reifenstuhl (1990), Moore and others (1994), Mull (1989), and Eden (1999, 2000).
Reed (1938) provided a comprehensive summary of all gold exploration and production activities in the Koyukuk District including detailed descriptions of activities in Nolan Creek area, including USAC’s holdings. Kurtak et al (2002) provides an exhaustive summary of all historic mining activities in the Koyukuk district, with an emphasis on activities in the Wiseman quadrangle where the USAC properties reside.
18
2.4 Personal Inspection Summary
During his career with the Alaska Department of Natural Resources, Division of Geological and Geophysical Surveys, the QP completed geological mapping and mineral resource investigations on some mineral properties described in this Technical Report. The author visited Nolan Creek in 1994, when the previous owner was producing placer gold from Mary’s underground and Ogden-Eureka open cut placer deposits, and witnessed placer gold processing activities. The purpose of the 1994 trip was to observe the previous owner’s gold production activities, which were subsequently described in the State of Alaska Minerals Report series (Swainbank et al, 1995).
In 1999, the QP sampled and mapped stibnite-gold lodes on Smith Dome and Pringle Bench, which constitutes a part of GLM/USAC’s lode claim group in the area. The QP’s 1999 work in the Koyukuk Mining District was completed on behalf of North Star Exploration Inc., a junior mining company based in Denver, Colorado. From November 14 to 15, 2004, the QP visited the previous owner’s operation at Nolan Creek, where he examined current infrastructure, and discussed with geologists Brian Flanigan and Edward Armstrong the technical databases stored on the property.
During April 22 to 24, 2008, the QP examined stibnite mineralization in the Workman’s Bench underground workings, collected channel samples to cross-check those collected by Silverado geologists, mapped the geological features, and acquired a large bulk sample for laboratory bench testing. During June 13 to 14, 2008, the QP examined all mineralized intercepts from the 2007 core drilling program on Workman’s Bench and examined and sampled surface exposures of stibnite mineralization also on Workman’s Bench.
On 2008, the QP visited Nolan Camp and examined all significantly mineralized core intervals acquired from the 2008 exploration of the Workman’s bench property (Bundtzen, 2008a, 2008b, 2008c. A total of 124 mineralized intervals as cut in drill core were inspected by the QP.
During portions of July 23-25, 2009, the QP reviewed the previous owner’s 2009 drill program at Nolan Creek with Karl Sharp, the company geologist. During parts of the time interval August 13-29, the QP inspected the following technical items acquired by him from Karl Sharp: 1) certified analytical results of drill core intervals; 2) photos for surface and subsurface exploration activities; 3) EXCEL spread sheets of the data acquired during the drill program; 4) core logs from all holes that had been completed; 5) Sharp’s preliminary interpretations of the structural corridors drilled during the season; and 6) surveys of drill collar locations in UTM coordinates and elevations based on the NAD27AK datum. At the QP’s request, selected sections of core were brought to his Fairbanks office later in September for further inspection. Because the most important, mineralized structure—the A zone—exhibits a peculiar fine-grained granoblastic texture, comparisons between underground samples collected by the QP in 2008 and the samples brought to Fairbanks by Sharp were made by the QP in his office. During December 11-17, the QP reviewed with Karl Sharp all of the data acquired during the 2009 drill program including his (Sharp’s) structural interpretation of the mineralization encountered and his thoughts on previous exploration work completed in 2007 and 2008. During this last effort, the QP inspected a total of 23 new mineralized intercepts.
19
2.5 Previously Filed Technical Reports
In December, 2004, the QP produced an Independent Technical Review of the Nolan Creek area for the previous owner (Bundtzen, 2004). That document reviewed all aspects of mineral activities, including exploration, development, and mining activities, environmental remediation steps needed for compliance, and permitting issues at all of their properties held in the Fairbanks and Koyukuk districts by Silverado. Comprehensive in nature, the report format was designed to be compliant with Technical Report formatting.
In July, 2008, 2009, and in 2011, the QP completed the Canadian National Instrument (NI) 43-101-compliant documents: 1) Estimation of Lode and Placer Mineral Resources, Nolan Creek, Wiseman B-1 Quadrangle, Koyukuk Mining District, Northern Alaska, July 29, 2008; and 2) Update on lode mineral resources and reserve estimates, antimony-gold lode deposits, Nolan Creek, Wiseman B-1 quadrangle, Koyukuk Mining district, Alaska, June, 2009; amended 2011. These documents were publicly released to the Canadian server SEDAR.
2.6 Units of Measure
Because of extensive prior use in virtually all categories of measuring, the QP has used the English system of measurements in this Technical Report. A metric conversion table is presented below.
Table 2.1 Units of measure used in this Technical Report
20
3.0 | PROPERTY DESCRIPTION |
3.1 Nolan Creek Area Claims
GLM/USAC acquired thirteen (13) lode and twenty-three (23) placer federal mining claims in Nolan Creek valley through a Trustee’s sale in a public auction on January 30th, 2026 (Figure 3.1). The properties had been previously owned by a private company (Silverado) which conducted exploration and mining placer gold deposits and exploration of lode targets from both surface and underground operations from 1979-to-2009.
On December 22nd, 2015, the previous private company executed a Deed of Trust conveying a certain property in the Nolan Creek Valley of the Southern Brooks Range, Alaska to Yukon Title Company (Fairbanks) as Trustee with Alminco LLC as Beneficiary, which deed was recorded on February 3rd, 2016.
Because the Trustee failed to perform the Deed of Trust as promised, the Deed of Trust was assigned to Nolan Metals LLC through recordation of an assigned Deed of Trust on September 15th, 2025. A notice of Sale of the property was posted on October 23rd, 2025. A public auction was held on January 30th, 2026 in the Rabinowitz Memorial Courthouse in Fairbanks, Alaska. The property was sold to Great Land Minerals LLC (GLM) for the sum of One Million Three Hundred Thousand Dollars ($1,300,000 USD). GML is a wholly owned subsidiary of USAC.
During the fall of 2026, USAC staked an additional forty-eight (48), 160-acre, State-of-Alaska mining claims that overlap the original Federal Mining Claims purchased at auction in January, 2026 (Figure 3.2). These new state claims were staked to cover open ground in the Nolan Creek area of interest as a result of the Pipeline Corridor land transfer from Federal (U.S. Government) domain to State of Alaska domain. Acquisition by USAC of the Alaska state claims depicted in Figure 3.2 will insure that the original historic federal claims purchased by USAC from the 2026 auction are not compromised by third parties as a result of the new federal-to state transfers being acted upon in the Pipeline Corridor.
21
Table 3.1 Legal Description the Federal Mining Claims acquired by GLM in January, 2026
22

Figure 3.1 Map depiction of thirty-six (36) federal claims (pink) purchased by GLM in January 2026

Figure 3.2 Forty-eight (48) new State of Alaska Claims covering the Nolan Creek staked by USAC in the fall of 2026.
23
4.0ACCESSIBILITY, CLIMATE, LOCAL INFRASTRUCTURE AND PHYISIOGRPHY
4.1 Topography and Land Description
The Koyukuk Mining District is bounded on the east by the South Fork of Koyukuk River, the Alatna River on the west, the continental divide of the Brooks Range on the north, and the Kanuti River basin on the south. Elevations in the district range from 4,635 ft on Vermont Dome to about 1,220 ft on the floodplain of the Middle Fork of the Koyukuk River. Other prominent landforms present at or near Nolan Creek include Smith Dome at 4,005 ft elevation, Montana Mountain at 3,270 ft, and Midnight Dome at 3,860 ft (Figure 4.1).
4.2 Access to the Property
Nolan Creek is at the center of the Koyukuk district. Regularly scheduled commuter flights from Fairbanks to the 4,500 ft long, state-maintained Coldfoot Airport are provided by Wright Air Service Inc. Nolan Creek is road-accessible from Fairbanks via the Dalton Highway, which services the Trans-Alaska Pipeline and the North Slope oil fields. The Trans-Alaska Pipeline System (TAPS) and Dalton Highway corridor in the valley of the Middle Fork, Koyukuk River are east-southeast of the Nolan Creek property holdings. In 1985, the access road from Wiseman to Nolan Creek was upgraded to secondary standards by the Alaska Department of Transportation and Public Facilities (DOTPF). Since 2012, DOTPF has paved selected portions of the Dalton Highway. It is estimated that by 2020, about 40 percent of the highway had been paved from the Elliot Highway to Chandler Shelf, about 80 miles north of Coldfoot. USAC’s Nolan Creek property is remote and far from Alaska’s urban areas. The GML/USAC camp at Nolan Creek is located 175 air miles north-northwest of Fairbanks, Alaska’s second largest community, with a population in 2026 of about 99,500, when counting adjacent military bases.
4.3 Climate Description
Nolan Creek Valley is located about 75 mi north of the Arctic Circle. Winter usually begins in late September or early October and lasts until early April. A very brief spring is followed by summer in early June, which lasts until late August. Fall weather conditions occur for about one month in September. Coldfoot, about 15 mi southeast of Nolan Creek Valley, recorded the unofficial all-time, State of Alaska record low of −82°F in January,1989.
24

Figure 4.1 Nolan Creek location map, showing access to claims held by GLM/USAC.
25
4.4 Vegetation and Land Use
Vegetation in the area is dominantly mature white spruce forests and occasional groves of birch and alder. Although lower slopes are heavily forested, the entire area was logged during the late 19th to early 20th Centuries to provide fuel logs for cabins, for mine timbers for early underground placer mine activities, and wood for general construction activities. Currently, the timberline is at about 2,500 ft elevation. Alpine species consist of various mosses, shrubs, lichen, and wild berries.
Current land use in the area is primarily focused on tourism. Bed and Breakfast facilities in Wiseman host small select groups of international tourists seeking wildlife observation, dog mushing and observation of the ‘Northern Lights’. A public facility describing outdoor activities are found at the Gates of the Arctic National Park and Preserve offices in Coldfoot. Due to the currently high gold prices, there has been expansion of traditional, small scale gold mining activities in the area. Mineral exploration in the area is currently being carried out by several mining companies using rotor wing aircraft.
The community of Coldfoot, which is about 13 miles south of the community of Wiseman, has Alaska’s most northern gas station, grocery, bar, and public lodging facilities. The weather station at Coldfoot provides the Alaska State Weather Service with climatic condition on the Southern Brooks Range. DOTPF operates a large shop facility at Coldfoot on a year-round basis and maintains a 125 mi long segment of the Dalton Highway and the Coldfoot Airport.
The small community of Wiseman, with a 2010 census population of 35, is at the junction of the seven (7) mile long, secondary access road that links the Dalton Highway with Silverado’s Nolan Creek mine camp.

Figure 4.2 Coldfoot Camp, June 13th, 2026; USAC vehicle in foreground; photo by QP
26

Figure 4.3 Main Street of Wiseman Village on June 13th, 2026. Photo by QP.
4.5 Availability of Required Infrastructure
All types of fuels related to mine infrastructure needs can be obtained from Coldfoot. Both fixed wing and rotor wing aircraft facilities can also be accessed from Coldfoot Airport.
The previous owner of the mineral property (Silverado) maintained a self-sufficient camp that included camp infrastructure capable of housing thirty (30) mine employees, machine shops, and a diesel power plant. A 2007 upgrade project included:
| ● | The purchase and installation of a ten room housing unit; |
| ● | The construction of an engineering office; |
| ● | The upgrading of laboratory facilities; |
| ● | The installation of a new sewage treatment facility; |
| ● | The construction of a new kitchen and cafeteria; and |
| ● | The installation of new communications equipment. |
| ● | Installation of 2,500 gallon plastic holding tanks for water needs. |
However, all of these facilities are in a state of disrepair and cannot be used. Rooms for employees involved in exploration and development activities could be housed in Coldfoot.
27

Figure 4.4 Nolan Mine Camp as it appeared during spring, 2008; From QP files
28
5.0HISTORY
5.1 Mining History of Area
Placer gold was found on the bars of the Koyukuk River between 1885 and 1890, and the first commercial discoveries on Nolan Creek and Hammond River and tributaries were made in 1901 (Cobb, 1973). The earliest placer mines were open cuts using hand methods and sometimes mechanization. Since the ground was frozen, steam boilers were frequently deployed to mine frozen pay gravels. Beginning in 1908 deeply buried but rich gold placers were found at considerable depths of up to 200 feet; much of the ground has been acquired by GML. These ‘drift mines operated up until WWII. After WWII, most gold mines in the Koyukuk district, including those in Nolan Creek Valley, closed due to the fixed price of gold in the United States, coupled with rising inflationary challenges.
After the gold price was decontrolled in 1971, small scale gold mines were restarted. In 2026, an estimated six (6) mechanized placer gold mines operated in the Koyukuk district, with many using Coldfoot as a supply base.
Beginning in 1979, in the Nolan Valley, which now includes the claims held by USAC, placer gold deposits were developed using both surface methods such as bulldozers and excavators and underground methods using low profile mine extraction equipment and standard blasting technologies—much like what you would see in an underground hardrock mine. Gold bearing gravels were stockpiled on the surface during winter months and processed through sluice boxes on the surface during summer months. Two such operations on Nolan Creek and nearby Vermont Creek used underground methods to mine placer gold in the last 30 plus years.
5.2 Drilling Exploration History
From 1979-to-2007, approximately 910 Reverse Circulation (RC) drill holes that totaled 58,756 feet have evaluated placer gold deposits in the study area and in Vermont Creek basin to the NE. Drill holes range from 25 ft to 145 ft in depth and average 62 ft in depth. During the drill program, more than 11,750 five-ft intervals were systematically panned down the entire length of each drill hole. The drill holes were generally designed on 50 ft centers. In Nolan Creek Valley, drill hole collars are oriented along north 070° west (Bearing 290°) lines, which crosscut the northeast trend of ancestral and modern, gold-bearing fluvial deposits. The extensive drill program led to the direct discovery and subsequent development of commercial placer gold paystreaks, which were excavated on various bench deposits in Nolan Creek valley using both open-cut and underground mining methods.
Table 5.1 summarizes lode drilling programs conducted in Nolan Creek valley—all on ground currently held by GLM. Drilling commenced in 1993 on Thompson Pup using percussion technology and then expanded to Workman’s Bench in 1994 and Pringle Bench in 2006. Diamand core drill programs occurred on Workman’s Bench and Pringle Bench from 2007-to-2009.
29
Table 5.1 Summary of lode drilling programs, Nolan Creek

Figure 5.1 Prospector #3 Multi-Purpose NQ Core Drill TM, October 22, 2007, From QP files
30
5.3 Historical Mineral Production
Through 2002, about 344,990 oz of gold have been recovered from both open cut and underground placer mines in the Koyukuk District (Kurtak et al, 2002). The largest single producer has been Nolan Creek and its tributaries, Smith Creek and Archibald and Fay Gulches, which produced an estimated 185,000 oz of placer gold from 1901-to-2007, or about 54% of the Koyukuk District total. It is estimated by the QP that more than 100,000 oz of gold was produced from 1908 to 1911 by underground drift miners on Nolan Creek.
From 1979 to 2007, the previous owner mined pay gravel from a variety of surface and underground placer mining operations in Nolan Creek valley (Table 5.2). Production during 2003, 2006 and 2007 totaled 5,113 ounces gold. Hence the total for the Koyukuk district must be at least 350,000 ounces gold. No further development or gold production activity on the claims occurred after 2011. Total production from 1979 to 2007 was 23,150 oz of placer gold recovered from 271,771 cu yd of gravel at an average grade of 0.085 oz/cu yd gold (Table 5.2).
Table 5.2 Placer gold production from Silverado properties, 1979 to 2007, Nolan Creek
In 1948, approximately 5.0 tons of high-grade selected stibnite ores were produced from an open- cut operation on Pringle Bench, which occurs on claims now held by GLM. These hand sorted ores were shipped to a refinery in Texas.
31

Figure 5.2 Low profile truck used in underground placer mining, circa 2006; from QP files

Figure 5.3 Washing plant processing pay gravels, 2005-2007, Swede Channel project; from QP files.
32
6.0GEOLOGICAL SETTING, MINERALIZATION, AND DEPOSIT
6.1 Regional Geology
The bedrock geology of the Wiseman-Nolan Creek area has been described by several previous workers including Maddren (1910, 1913), Brosge and Reiser (1970), Turner et al (1979), Dillon et al (1986), Mull (1989), Dillon (1989), Dillon and Reifenstuhl (1990), Moore et al (1994), and Eden (1999, 2000). The following geologic discussions use information from all of these sources. After review of published geological mapping, the QP selected the map provided by Dillon and Reifenstuhl (1990) for display of the most relevant and accurate information used in this Technical Report.
The bedrock geology of the general area is dominated by units of the Brooks Range ‘Schist Belt’ or Province, a poly-deformed package of schist, greenstone, and gneiss. The Schist Belt is part of the Coldfoot sub-terrane of the Arctic Alaska Terrane, which underlies more than 75 percent of the south flank of the Brooks Range. The Coldfoot sub-terrane is composed of Proterozoic to Middle Devonian, poly-metamorphic meta-sedimentary rocks which have been intruded by Devonian granitic plutons and overlain by also bimodal meta-volcanic rocks also of Devonian age (Dillon, 1989). Although no fossils have been found, chloritic metasiltstone (Dbcs), black slate and phyllite (Dbs), and chloritic carbonates (Dcc) are correlative with the Devonian Beaucoup Formation, as summarized by Mull (1989). The Beaucoup Formation and other metamorphosed rocks in the Wiseman-Nolan Creek area are thought to be near the stratigraphic top of the Coldfoot sub-terrane (Dillon, 1989; Dillon and Reifenstuhl, 1990).
The Wiseman-Nolan Creek area has been subjected to the effects of Pleistocene glaciation, which has carved U-shaped valley profiles in the valleys of Wiseman, and Jap Creeks, and the main trunk valleys of the Hammond and Middle Fork of the Koyukuk Rivers. Glaciers from the Middle Pleistocene Sagavanirktok Glaciation traversed at high elevations down trunk valleys along the entire flank of the southern Brooks Range, reaching lowland areas in the lower Chandalar River on the east, the Kanuti Flats to the south, and Kobuk River to the west (Hamilton, 1979, 1986). Glacial drift of the Sagavanirktok River Glaciation (Qd1) occupies hill slopes, low saddle areas, and high level cirques to maximum elevations of about 3,200 ft.
According to Dillon (1989), Mull (1989), Dillon and Reifenstuhl (1990), Moore et al (1994), and Eden (1999), two and possibly three well-defined periods of regional dynamo-thermal metamorphism have affected the layered rocks of the Coldfoot sub-terrane in the Wiseman-Nolan Creek. These layered metamorphic rocks, which monoclinally dip to the north throughout the map area, contain a complex fold and faulting history; fold axes generally strike northeast with fold vergence in several directions. Schistosity is defined on two discrete cleavage surfaces. The oldest (S2), parallels bedding and the youngest (S3), is a semi-penetrative axial planar feature that probably formed during a thrust or recumbent folding event (Dillon and Reifenstuhl, 1990; Eden, 1999). Several thrust planes have been mapped at Nolan Creek. During Late Jurassic to Early Cretaceous
33
time, the rock units of the Coldfoot sub-terrane including the Beaucoup Formation were thrust over thrust panels to the north and outside the study area. Brittle deformation began to form as the last regional metamorphic gradients subsided in mid-Cretaceous time.
6.2 Local and Property Geology
The Coldfoot sub-terrane underlies most of the valley of Nolan Creek (Dillon, 1989). The Beaucoup Formation and other metamorphosed rocks in the Wiseman-Nolan Creek area are thought to be near the stratigraphic top of the Coldfoot sub-terrane (Dillon and Reifenstuhl, 1990).
Although Dillon and Reifenstuhl (1990) do not describe non-metamorphosed or metamorphosed intrusive rocks at Nolan Creek, Eden (1999, 2000) describes metabasite dikes near the mouth of Steep Gulch. Granite gneiss yields U/Pb ages of 360 Ma on the western slopes of the Middle Fork Koyukuk River valley, about 10 mi south of Nolan Creek. These Middle Devonian granitic intrusions, which were metamorphosed along with the host Beaucoup Formation, could conceivably underlie Nolan Creek at depth.
Dillon and Reifenstuhl (1990) and Eden (1999) map west-dipping, northeast-striking reverse faults in Nolan Creek valley that post-date fold deformation thrusting and are thought to be the result of east-west compression documented in other areas of the southern Brooks Range. This brittle deformational event produced a NE/NW, high-angle, orthogonal fault pattern that host the antimony-gold-quartz deposits that constitute a prime focus of this Technical Report.
The more youthful V-shaped profiles in Nolan and Vermont Creeks reflect erosional profiles that post-date the major glacial events described above, and there is no evidence that Late Pleistocene ice ever developed in Nolan Creek Valley or tributaries. Steepened valley walls are now covered by a mixture of colluvial-landslide, solifluction, and talus deposits (Qcl, Qcs, Qct units). Modern stream alluvium underlies the course of present Nolan, Smith, and Wiseman Creeks and tributaries of the Hammond River (Qa unit).
34
Figure 6.1 Geologic map of the Nolan Creek area Koyukuk District; modified from Dillon and Reifenstuhl (1990).

35
6.3 Alteration and Mineralization
Northeast-trending, steeply dipping, auriferous stibnite-quartz veins cut phyllitic schist on Workman’s Bench on the left (south) limit of Smith Creek about 800 ft upstream from its confluence with Nolan Creek (Eden, 1999). The mineralization on Workman’s Bench is almost certainly correlative with the stibnite-gold-quartz veins exposed in placer cuts and trenches on the Pringle Bench north of Smith Creek, which have been known since the early 20th Century (Killeen, 1942; Ebbley and Wright, 1948).
Mineralization consists of quartz-sulfide veins cutting host Beaucoup Formation that mainly consist of stibnite, arsenopyrite, and minor Sb-sulfosalts. Free gold is associated with both arsenopyrite and stibnite.
6.4 Deposit Types
Placer gold deposits in the Nolan Creek and Hammond River areas can be classified as an ‘Incised Glacio-Fluvial’ subtype of heavy mineral placer deposits (Maddren, 1913; Laznika, 1985). The Koyukuk District examples, especially on Nolan Creek, probably formed in similar fashion to that observed in the Valdez Creek district of south-central Alaska, Alaska’s largest placer gold mine during the 1980s and 1990s (Reger and Bundtzen, 1990); the Chandalar district east of the Koyukuk district; the Porcupine district in southeast Alaska; the Cassiar-Caribou district of British Columbia, Canada (Knight and McTaggart, 1989); and the Bolotny-Ravkosky district in northeast Russia (Tchapko,1995).
Different explanations have been advanced for the origin of the placer deposits in Nolan Creek. Maddren (1913) believed that the left limit, bench deposits such as the Mary’s Bench, Swede, West Block, and Ogden-Eureka Bench placers may be remnants of narrow, crudely washed beaches formed along the mountain sides when Nolan Creek was an arm of Glacial Lake Wiseman.
The Workman’s Bench and Pringle Bench properties contain quartz-stibnite-arsenopyrite-gold veins. These quartz-only and stibnite-quartz (gold) veins strike northeast and cross-cut low angle cleavage at steep to vertical angles. Besides locally massive stibnite, the quartz-carbonate vein stock works also contain arsenopyrite.
The Workman’s Bench and Pringle Bench properties contain quartz-stibnite-gold veins that cut a high angle, structurally controlled zone that is 150 ft to 300 ft wide and at least 3,500 ft in length. These quartz-carbonate-sulfide and stibnite-quartz (gold) veins strike north 45° east and cross-cut low angle cleavage at steep-to-vertical angles. Besides locally massive stibnite, the veins also contain local arsenopyrite. According to Ebbley and Wright (1948), individual quartz-sulfide veins north of Smith Creek ranged from1 inches-to-4 inches thick and can be traced for at least 400 ft of strike length. This area, now known as ‘Pringle Bench’, contains individual quartz-sulfide (stibnite) veins up to 1.5 feet in thickness, based on 2009 Silverado exploration work.
Bedrock units on Workman’s Bench and Pringle Bench consist of dark gray, carbonaceous phyllite and schist, light gray quartz-rich meta-sandstone, greenish gray chlorite rich muscovite schist, and
36
occasional lenses of calcareous chlorite schist. Isolated boudins of greenstone-gabbro have also been observed, but not in place. The layered rock units have been deformed by both open and sub-isoclinal folds. Metamorphic foliation in the hanging wall and footwall zones of the vein-fault zone is normally shallow, with dips of less than 45°. S1 foliation usually parallels compositional banding, but locally, a conspicuous S2 secondary cleavage crosscuts compositional banding at a high angle. Northeast and northwest-striking, high angle fault zones and low angle thrust faults cut the metamorphic rock basement.
Lode mineralization at Workman’s Bench and Pringle Bench systems consists of a northeast-striking, steeply dipping zone of gold-bearing, quartz-stibnite veins and veinlets. At Workman’s Bench, stibnite-bearing veinlets occur from 86 ft-to-234 ft from the portal or over a width of about 150 ft. Because the drift was cut perpendicular to strike, this represents a true thickness of the vein-veinlet swarm. A more focused zone of quartz stibnite vein concentration occurs mainly from 136 ft-to-234 ft or an estimated width of about 98 ft, where 67 individual veins were identified. Within the ‘Crosscut A’ zone, 21 of the veins contained identifiable stibnite. In the ‘Crosscut C’ zone, the same mineralized stock work veins occur from 120 feet-to-228 feet or an estimated width of 108 ft. Within this measured width, 79 individual veins were identified, 22 of which contain stibnite.
At Pringle Bench, which is the northeasterly extension of the Workman’s Bench system, the same stibnite-quartz vein-fault system widens to nearly 400 ft in three subsidiary zones. In 2009, the ‘A zone’ vein fault was recognized on Pringle Bench—the same zone that contains the bulk of the known mineralization on Workman’s Bench.
A majority of veins observed in either trenches, core, or underground workings exhibit nearly horizontal slickensides, suggesting intrusion of hydrothermal fluids along fault zones and lateral movement subsequent to vein emplacement.
Geologists recognized that distinct near-vertical vein-fault structures could be recognized in drill core and in the underground workings on the basis of both spatial relationships and physical features. All of these structures strike approximately north 45o east, and can be traced for variable lengths along strike. The strongest mineralized vein-fault is designated ‘A’ zone, which exhibits evidence of post-mineralization movement. Others include ‘B’ zone, ‘West’ zone, and ‘C’ zone. Detailed physical characteristics of these structures and how they are recognized during exploration are found in Chapter 11 of this Technical Report.
Polished section analysis shows that two basic fabrics are observed in the stibnite (aurostibnite)-quartz veins:
| ● | Simple, twinned stibnite blades and grains showing resorption textures with euhedral, quartz crystals and grains. |
| ● | Extensive shearing and local coarsening of sulfide grains (mainly stibnite), 120°triple junctions in mono-mineralic stibnite, and recrystallization of gangue minerals (quartz) that indicate dynamic metamorphism. |
37
Mineralization in the ‘A’ zone’ at Workman’s Bench contains a shear fabric consisting of parallel lamina of recrystallized stibnite. These fabrics are referred to in the literature as thermal metamorphic textures (i.e., Ineson, 1989). The sheared fabric results in a fine-grained stibnite exhibiting a distinct granoblastic texture, which contrasts with the other subsidiary stibnite-bearing veins-faults that contain coarser grained stibnite grains and blades. Microprobe analyses by Cannon Microprobe Inc. document that siderite (as gangue) and accessory arsenopyrite occur in the stibnite-bearing zones along vein selvage zones (Figure 6.2).
More than 90% of the veins and veinlets dip steeply southeast, with dips ranging from 50° to 85°. A few veins dip steeply northwest. A system of east-west to northwest striking, moderately dipping vein-faults cut through the underground workings. The QP observed that these faults both offset, to a minor degree, the northeast-striking, stibnite-bearing veins, but are also cut by other northeast-striking stibnite veins.
Figure 6.2 Photomicrographs, Workman’s Bench mineralized system
|
|
The gold-stibnite-quartz veins of Nolan Creek Valley strongly resemble the gold-antimony deposit type (Berger, 1986; U.S. Geological Survey Deposit Model 36C). These deposits are characterized by the presence of stibnite, berthierite, high fineness gold, and aurostibite hosted in metamorphosed, quartz-carbonate-bearing, compressive shear zones within low grade, greenschist facies metamorphic rocks. The deposit types are characterized by deformed, ductile fabrics and tectonically recrystallized, fine grained, granoblastic stibnite lobes and lenses.
The gold-antimony deposit type 36C is considered to be a sub-type of the mesothermal, auriferous lodes found in mineral provinces worldwide (Berger, 1993; Laznika, 1985; Hodgson, 1993). Radiogenic leads characterize gold-bearing vein deposits of the Brooks Range (Gacetta and Church, 1989). This data reinforces the classification of the Nolan lode deposits as mesothermal in origin. Mineral deposit type 36C is not very well documented in North America but well studied in Asia, Europe, and Africa. Worldwide examples include deposits in the Transvaal of South Africa, the Reefton District in New Zealand, and deposits in Eastern Europe and in Russia. Olympiada in Siberia is an example of a large, productive gold (stibnite) deposit of this type.
38
7.0EXPLORATION
From 1978-to-2009, Silverado explored for placer gold and lode gold deposits on federal claims in Nolan Creek basin, which are now owned by GLM.
7.1 Exploration of Heavy Mineral Placer Deposits
Placer gold exploration in Nolan Creek basin was primarily carried out using Reverse Circulation (RC) drilling technology. The RC drill program identified a system of left-limit benches situated east of the main channel immediately east of Nolan Creek valley. Figure 7.1 illustrates the channel configurations of 771 drill collars as determined from drill campaign conducted on the property from 1979-to-2005.
Drill holes range from 25 feet-to-145 feet in depth and average 62 feet in depth. During the drill program, more than 11,750 five-ft intervals were systematically processed and panned down the entire length of each drill hole. The drill holes were generally designed on 50 ft centers. In Nolan Creek Valley, drill hole collars are oriented to 2900, which crosscut the northeast trend of ancestral and modern, gold-bearing fluvial deposits.
The pattern illustrates the steeply incised nature of the Nolan Deep channel, and the much more irregular incised depressions and channel cuts on the left limit of Nolan Creek. Figure 7.1 does not include drilling information from 2006 and 2007 campaigns, which would likely reveal more detailed information about the bench system.
RC drilling was the principal exploration method used by the previous owner in the identification of placer gold deposits in Nolan Creek basin. RC drilling campaigns have led directly to the development and test mining of placer deposits at Nolan Creek. These would include successful development of the relatively high-grade Mary’s Bench and Ogden-Eureka Bench deposits in 1994; the West Block and 3B1 Underground deposits in 1995, The Swede Channel development in 1999 and 2005-2006; and the Mary’s East deposit during 2007.
In general, placer gold deposits were evaluated with a line of fences that were interpreted to be perpendicular to the trend of the fluvial channels. Holes were spaced 50-75 feet apart. The drilling campaigns concentrated mainly on the main channel of Nolan Creek above the previous owners camp and along the left limit bench deposits east of camp. Drill fences of a more reconnaissance nature explored extensions of the main Nolan Creek deposit below Silverado’s camp, in the headward portions of Smith Creek and on high altitude benches north of Fay Creek.
Figure 7.2 illustrates the channel configurations as determined from the drilling campaign conducted prior to 2006 at Swede Channel, a left limit fluvial deposit east of the main Nolan Creek valley. During the drill program, the different geological units were logged along with depth to bedrock. Drilling completed in 1999 yielded a strong gold anomaly in a channel-like depression. This drill hole, MB42A, eventually led the previous owner to test this anomaly with underground test-mining six years later in the fall of 2005 (Bundtzen, 2006 a, b, c).
39
Figure 7.1 Location Map Showing Locations of 771 placer drill collars in Nolan Creek Valley placer field.

40
Figure 7.3 illustrates the general configuration of the left limit bench placers at Mary’s East, the highest level bench system so far drilled and mine-tested. Unlike Swede Channel and other drill-tested bench deposits, Mary’s East appears to be predominately a colluvial deposit composite slope debris and minor fluvial sand. It’s irregular configuration contrasts with the more sinuous features of a fluvial channel.
Figure 7.4 illustrates the stacked nature of bench systems on the left limit of Nolan Creek, using the mine-tested areas and the drill-indicated resources. Radio-carbon ages presented by Bundtzen and Eden (2008) indicate that the Swede and Ogden-Eureka deposits formed from 39,000-to-42,000 B.P. whereas the Mary’s East deposits formed at approximately 45,000 B.P.

Figure 7.2 Plan of Swede Channel Exploration and Underground Development; 2005-2006
41

Figure 7.3 Plan of Mary’s East Underground Development and Exploration Drilling.
42

Figure 7.4 Contour map constructed from drill data and underground workings in Nolan Creek Valley.
A |
B |
Figure 7.5 A—gold concentrate rich in arsenopyrite and stibnite; B—nuggets of gold plus stibnite—indicating a clear correlation between the two metals. Both photos from 2007 cleanup operations, Nolan Creek. Photos by the QP during 2007 cleanup activities from Mary’s Bench underground mining activities.
43
7.2 Exploration of Antimony-Gold Lode Deposits
The combination of soil surveys, VLF/EM geophysical data, and past trenching on Smith Creek at Pringle Bench and Workman’s Bench laid the foundation for the interpretation of the character of lode mineralization on the GLM property. Table 7.1 summarizes the exploration activities for lode mineralization (excluding drilling, which is summarized in Table 5.1) that took place from 1981-to-2009.
In the summer of 2003, the previous owner modeled the resistivity data using Surfer 8.02 by Golden Software, with kriging parameters that focused on narrow target zones (Flanigan, 2003a; Flanigan et al, 2003). The modeled geophysical data resulted in the recognition of two northeast-trending 870 Hz resistivity lows, one of which more-or-less correlates with the trend of quartz-sulfide veins on Smith Creek and the associated gold, antimony, and arsenic-in-soil anomalies (7.7). This geophysical anomaly, with associated quartz-sulfide lode prospects and metalliferous soil anomalies, were referred to as the ‘Solomon Shear’ lode target (Flanigan, 2003b). Flanigan estimates that the Solomon Shear is about 1 mi long and 0.25 mi wide, with geophysical indications of extensions, possibly offset, for an additional 2 mi to 3 mi to the northeast.
Figure 7.6 Map of Nolan Creek Basin illustrating 870 Khz geophysical (resistivity) anomaly in gray

A stream sediment sample grid also covered the general area known by the previous owners geological staff as the Solomon Shear (Figure 7.8). The soils geochemistry clearly showed a direct correlation of a northeast-striking zone at least 1.5 miles long and up to 600 feet wide.
VLF/EM data was also acquired; however, the results did not assist in defining the mineralized structures like the resistivity and soil sampling program did.
44
Figure 7.7 Summary of 2004 and 2007 soil sample grid programs, in the Workman Bench-Pringle Bench and Hillside areas; data from previous owners.

45
An early 1993 drill campaign tested mineralization at Thompson’s Pup. Four drill holes penetrated a brownish gray phyllite with varying degrees of silicification, pyritization, and generally weak hydrothermal alteration. Arsenopyrite and trace stibnite were identified in two drill logs (93TPHR-03 and 04). At 50 ft to 55 ft in drill hole 93TPHR-04, grades were 145 ppb gold, > 1.0% arsenic (the upper limit of detection for As), and 25 ppm antimony, in association with abundant quartz veins.
Table 7.1 Summary of lode exploration activities, Nolan Creek, 1981-to-2009
Activity | Sample count | Drill hole count | Total (ft) |
Soil/stream sediment samples | 1,383(1) | NA | NA |
Rock chip samples | 275 | NA | NA |
Rotary drilling (lode) | 739 | 14 | 3,695 |
Core drilling (lode) | 1,842 | 72 | 21,144 |
Trenching | 340(3) | NA | 4,672(3) |
Underground exploration drifts | NA | NA | 470 |
Geophysical surveys (VLF/EM) | NA | NA | 70.28 line mi(5) |
Notes:
- | (1) Does not include soil sampling conducted by USBLM on Silverado claims. |
- | (2) 5 ft intervals were panned and gold, where encountered, weighed or estimated. |
- | (3) Estimated from 2004, 2006, 2007, and 2009 Silverado work. Does not include exploration work completed by the federal government (USBLM). |
- | (4) Exploration drifting only. Does not include production or development stopes. |
- | (5) Does not include airborne work conducted by USBLM over Silverado claims. |
Total amount of drilling on the subject Nolan properties was previously summarized in Table 5.1. In 1994, the previous owner completed an inaugural, short, rotary drill program to test the lode potential of the Workman’s Bench area, where stibnite-gash veins were found in a placer mine cut. A ‘first phase’ program consisted of about 750 ft of drilling in four drill holes that ranged from 130 ft-to-300 ft in depth. Figure 7.8 illustrates the results. Three different horizons display vein-hosted gold-antimony mineralization over 100 ft-to-120 ft of true width. The veins range from 0.026 oz/ton Au-to-0.086 oz/ton Au over 5.0 ft assay intervals, with up to >1.0% antimony and 4,370 ppm arsenic. One 10.0 ft assay interval averaged about 0.036 oz/ton Au, >1.0% antimony, and 3,300 ppm arsenic. Underground exposures have shown that veins dip vertical or steeply southeast, not northwest as shown in 1994 cross sections.
In 2006, one RC drill hole tested Pringle Bench (Table 7.2). In 2007 the previous owner purchased it’s own diamond drill rig and contracted the drilling to subcontractor Tricon, originally using BTW-sized core on the Pringle Bench and Workman’s Bench deposits. A conversion to NQ core which is larger in diameter by about ¼ inch, was made during July, 2008. NQ refers to the size of the core, which is approximately 1.75 inches in diameter. Core drilling is better suited to this narrow-vein style of deposits than RC percussion drilling.
During 2007, the previous owner tested closely spaced stibnite-quartz veins and veinlets at Pringle Bench north of Smith Creek using eleven diamond drill holes totaling 2,415 ft (Table 7.2). Also
46
during 2007, Silverado drilled seven drill holes totaling 2,140 ft to test the Workman’s Bench deposit (Table 7.3).

Figure 7.8 Section of 1994 inaugural percussion (RC) drill hole results for Workman’s Bench; illustrating a pioneer attempt at exploring the Workman’s Bench antimony-gold deposit
47
Exploration work conducted during the latter part of 2007 and all of 2008 focused on: 1) driving 470 feet of underground drift to affirm surface and core sampling results and collection of bulk sample for a metallurgical test; and 2) completion of 72 diamond drill holes totaling 21,144 feet to test the extent of the Workman’s Bench and Pringle bench antimony-gold mineralized system. This confirmed that several parallel mineralized veins are intersected by diamond drill holes for a strike length of more than 3,500 feet (including across Smith Creek) and a maximum vertical depth of 450 feet.
During 2009, diamond drill core program was designed by contractor Karl Sharp to: 1) explore shallower level of Workman’s Bench southwest of the underground workings driven in 2008; and 2) test deeper levels of the Pringle Bench vein-fault system and provide for vertical extensions of the shallow inferred resource estimate reported in the 2009 NI- 43-101 Technical Report (Bundtzen, 2009). In 2009, approximately 5,000 feet were drilled in twenty holes on Pringle and Workman’s Bench. The previous owner soon recognized the need to selectively sample the thin mineralized quartz veins and changed their sampling protocol so that smaller samples, better representing these veins, could be taken.
Collar location, orientation data and drill footage summaries for the RC and diamond core programs on Pringle and Workman’s bench are provided in Tables 7.2 and 7.3. Coordinates for all collars were determined with the GarminTM Global Positioning System (GPS) using NAD27 Alaska datum. This datum was used because the USGS !:63,360 scale topographic maps created at that time used NAD27 Alaska datum. GPS measurements were taken 2-to-4 times to ensure that the collar was accurately located. All collar elevations are determined from the same benchmark (BM) at survey control point CP-06-01. The significance of using the same benchmark is that a much more accurate elevation estimate for each collar can be ascertained.
A |
B |
Figure 7.9 Stibnite-bearing interval in drill hole 08SH01, from 93.5 to 94.4 feet; B Massive granoblastic stibnite in DDH 09SH-05; true thickness estimated to be 1.5 feet.
48
Table 7.2 Collar location and data, Pringle Bench, 2006, 2007, and 2009 Exploration Campaigns
RC Drill Hole
DDH No. | UTM Easting | UTM Northing | Datum | Zone | Collar Elevation | Azimuth | Dip | Total Depth | Core Diameter |
06SH01 | 618868.02 | 7486656.03 | NAD 27 Alaska | 5W | 1801.50 | 320 | -45 | 300 | RC, 8 in |
Diamond Core Drill Holes
DDH No. | UTM Easting | UTM Norhing | Datum | Zone | Collar Elev. (ft) | Azimuth | Dip | Total Depth (ft) | Core Size |
07SH02 | 618888.00 | 7486745.27 | NAD 27 Alaska | 5W | 1848.50 | 320 | -45 | 212 | BTW |
07SH03 | 618867.00 | 7486735.00 | NAD 27 Alaska | 5W | 1848.50 | 320 | -45 | 102 | BTW |
07SH04 | 618867.00 | 7486735.00 | NAD 27 Alaska | 5W | 1848.50 | 320 | -45 | 284 | BTW |
07SH05 | 618889.00 | 7486768.00 | NAD 27 Alaska | 5W | 1872.60 | 320 | -45 | 297 | BTW |
07SH06 | 618913.00 | 7486776.00 | NAD 27 Alaska | 5W | 1884.90 | 320 | -45 | 139 | BTW |
07SH07 | 618931.00 | 7486782.00 | NAD 27 Alaska | 5W | 1898.10 | 320 | -45 | 207 | BTW |
07SH08 | 618942.00 | 7486790.00 | NAD 27 Alaska | 5W | 1900.50 | 320 | -45 | 182 | BTW |
07SH09 | 618942.00 | 7486790.00 | NAD 27 Alaska | 5W | 1900.50 | 320 | -45 | 92 | BTW |
07SH10 | 619008.00 | 7486676.00 | NAD 27 Alaska | 5W | 1873.70 | 320 | -45 | 301 | BTW |
07SH11 | 618985.00 | 7486706.00 | NAD 27 Alaska | 5W | 1876.40 | 320 | -45 | 307 | BTW |
07SH12 | 618985.00 | 7486704.00 | NAD 27 Alaska | 5W | 1876.40 | 320 | -45 | 292 | BTW |
09SH10 | 618918 | 7486843 | NAD 27 Alaska | 5W | 1913.00 | 110 | -45 | 267 | NQ |
09SH11 | 618862 | 7486741 | NAD 27 Alaska | 5W | 1854.00 | 160 | -45 | 142 | NQ |
09SH12 | 618862 | 7486741 | NAD 27 Alaska | 5W | 1854.00 | 160 | -60 | 137 | NQ |
09SH13 | 618860 | 7486743 | NAD 27 Alaska | 5W | 1854.00 | 160 | -69 | 267 | NQ |
09SH14 | 618927 | 7486755 | NAD 27 Alaska | 5W | 1887.00 | 320 | -45 | 202 | NQ |
09SH15 | 618927 | 7486755 | NAD 27 Alaska | 5W | 1887.00 | 320 | -65 | 222 | NQ |
09SH16 | 618967 | 7486802 | NAD 27 Alaska | 5W | 1920.00 | 320 | -45 | 192 | NQ |
09SH17 | 618808 | 7486735 | NAD 27 Alaska | 5W | 1835.00 | 140 | -55 | 139 | NQ |
09SH18 | 618879 | 7486722 | NAD 27 Alaska | 5W | 1850.00 | 320 | -60 | 137 | NQ |
09SH19 | 618874 | 7486721 | NAD 27 Alaska | 5W | 1850.00 | 250 | -60 | 282 | NQ |
09SH20 | 618874 | 7486721 | NAD 27 Alaska | 5W | 1850.00 | 245 | -65 | 342 | NQ |
Total Drill Holes, Pringle Bench—23
Total Drill Footage, Pringle Bench—5,044 Feet
Note—Five (5) percussion drill holes completed in 2003 that total 1,340 feet are not included in the above tabulation
49
Table 7.3 Collar location and data Workman’s Bench; 2007, 2008, and 2009 exploration campaigns
DDH No. | UTM Easting | UTM Norhing | Datum | Zone | Collar Elev. (ft) | Azimuth | Dip | Total Depth (ft) | Core Size |
|---|---|---|---|---|---|---|---|---|---|
07SH01 | 618652.00 | 7486576.58 | NAD 27 Alaska | 5W | 1749.10 | 140 | -45 | 312 | BTW |
07SH13 | 618571.00 | 7486484.00 | NAD 27 Alaska | 5W | 1776.80 | 143 | -45 | 358 | BTW |
07SH14 | 618571.00 | 7486484.00 | NAD 27 Alaska | 5W | 1776.80 | 100 | -45 | 407 | BTW |
07SH15 | 618579.00 | 7486499.00 | NAD 27 Alaska | 5W | 1776.80 | 100 | -45 | 323 | BTW |
07SH16 | 618525.00 | 7486470.00 | NAD 27 Alaska | 5W | 1766.00 | 140 | -45 | 397 | BTW |
07SH17 | 618500.00 | 7486495.00 | NAD 27 Alaska | 5W | 1763.30 | 140 | -45 | 252 | BTW |
07SH18 | 618615.00 | 7486507.00 | NAD 27 Alaska | 5W | 1811.00 | 90 | -45 | 91 | BTW |
08SH01A | 618669.37 | 7486571.13 | NAD 27 Alaska | 5W | 1751.20 | 184 | -45 | 216 | BTW |
08SH01B | 618669.37 | 7486571.13 | NAD 27 Alaska | 5W | 1751.20 | 140 | -45 | 312 | NQ |
08SH02 | 618662.66 | 7486569.92 | NAD 27 Alaska | 5W | 1752.71 | 110 | -45 | 343 | NQ |
08SH03 | 618675.00 | 7486564.00 | NAD 27 Alaska | 5W | 1755.00 | 140 | -50 | 252 | NQ |
08SH04 | 618740.14 | 7486553.52 | NAD 27 Alaska | 5W | 1751.00 | 320 | -50 | 55 | NQ |
08SH05 | 618771.00 | 7486541.00 | NAD 27 Alaska | 5W | 1751.00 | 320 | -50 | 30 | NQ |
08SH06 | 618621.85 | 7486506.24 | NAD 27 Alaska | 5W | 1788.00 | 100 | -50 | 72 | NQ |
08SH07 | 618551.00 | 7486477.00 | NAD 27 Alaska | 5W | 1777.00 | 140 | -50 | 370 | NQ |
08SH08 | 618485.00 | 7486452.00 | NAD 27 Alaska | 5W | 1772.00 | 140 | -50 | 452 | NQ |
08SH09 | 618426.00 | 7486379.00 | NAD 27 Alaska | 5W | 1762.00 | 140 | -50 | 457 | NQ |
08SH10 | 618558.00 | 7486465.33 | NAD 27 Alaska | 5W | 1777.00 | 140 | -45 | 317 | NQ |
08SH11 | 618584.00 | 7486489.00 | NAD 27 Alaska | 5W | 1780.00 | 140 | -60 | 362 | NQ |
08SH12 | 618584.00 | 7486489.00 | NAD 27 Alaska | 5W | 1780.00 | 100 | -50 | 282 | NQ |
08SH13 | 618619.24 | 7486508.75 | NAD 27 Alaska | 5W | 1788.00 | 90 | -60 | 312 | NQ |
08SH14 | 618674.39 | 7486570.08 | NAD 27 Alaska | 5W | 1752.00 | 140 | -45 | 242 | NQ |
08SH15 | 618671.51 | 7486567.75 | NAD 27 Alaska | 5W | 1752.00 | 180 | -45 | 397 | NQ |
08SH16 | 618671.51 | 7486567.75 | NAD 27 Alaska | 5W | 1752.00 | 190 | -45 | 352 | NQ |
08SH17 | 618672.65 | 7486567.85 | NAD 27 Alaska | 5W | 1752.00 | 140 | -70 | 497 | NQ |
08SH18 | 618501.00 | 7486434.00 | NAD 27 Alaska | 5W | 1803.00 | 140 | -60 | 472 | NQ |
08SH19 | 618501.00 | 7486434.00 | NAD 27 Alaska | 5W | 1803.00 | 140 | -45 | 307 | NQ |
08SH20 | 618501.00 | 7486434.00 | NAD 27 Alaska | 5W | 1803.00 | 110 | -50 | 397 | NQ |
08SH21 | 618501.00 | 7486434.00 | NAD 27 Alaska | 5W | 1803.00 | 170 | -50 | 402 | NQ |
08SH22 | 618560.00 | 7486468.00 | NAD 27 Alaska | 5W | 1777.00 | 140 | -60 | 302 | NQ |
08SH23 | 618560.00 | 7486468.00 | NAD 27 Alaska | 5W | 1777.00 | 165 | -50 | 307 | NQ |
08SH24 | 618560.00 | 7486468.00 | NAD 27 Alaska | 5W | 1777.00 | 120 | -50 | 317 | NQ |
08SH25 | 618451.00 | 7486419.00 | NAD 27 Alaska | 5W | 1765.00 | 140 | -45 | 427 | NQ |
08SH26 | 618426.00 | 7486379.00 | NAD 27 Alaska | 5W | 1762.00 | 120 | -45 | 432 | NQ |
08SH27 | 618426.00 | 7486379.00 | NAD 27 Alaska | 5W | 1762.00 | 140 | -45 | 402 | NQ |
08SH28 | 618426.00 | 7486379.00 | NAD 27 Alaska | 5W | 1762.00 | 160 | -45 | 450 | NQ |
08SH29 | 618451.00 | 7486419.00 | NAD 27 Alaska | 5W | 1765.00 | 110 | -45 | 450 | NQ |
08SH30 | 618451.00 | 7486419.00 | NAD 27 Alaska | 5W | 1765.00 | 155 | -45 | 450 | NQ |
08SH31 | 618451.00 | 7486419.00 | NAD 27 Alaska | 5W | 1765.00 | 140 | -55 | 487 | NQ |
50
Table 7.3 Continued Collar location and data Workman’s Bench; 2007, 2008, and 2009 exploration campaigns
DDH No. | UTM Easting | UTM Northing | Datum | Zone | Collar Elevation | Azimuth | Dip | Depth | Core Size |
08SH32 | 618639.00 | 7486563.00 | NAD 27 Alaska | 5W | 1758.00 | 160 | -45 | 307 | NQ |
08SH33 | 618639.00 | 7486563.00 | NAD 27 Alaska | 5W | 1758.00 | 160 | -45 | 367 | NQ |
09SH01 | 618594 | 7486411 | NAD 27 Alaska | 5W | 1880.00 | 320 | -45 | 257 | NQ |
09SH02 | 618594 | 7486411 | NAD 27 Alaska | 5W | 1880.00 | 291 | -50 | 302 | NQ |
09SH03 | 618548 | 7486371 | NAD 27 Alaska | 5W | 1880.00 | 326 | -45 | 302 | NQ |
09SH04 | 618564 | 7486387 | NAD 27 Alaska | 5W | 1880.00 | 290 | -55 | 297 | NQ |
09SH05 | 618529 | 7486347 | NAD 27 Alaska | 5W | 1873.00 | 320 | -69 | 342 | NQ |
09SH06 | 618530 | 7486350 | NAD 27 Alaska | 5W | 1873.00 | 335 | -66 | 302 | NQ |
09SH07 | 618516 | 7486337 | NAD 27 Alaska | 5W | 1870.00 | 305 | -69 | 322 | NQ |
09SH08 | 618547 | 7486365 | NAD 27 Alaska | 5W | 1873.00 | 297 | -68 | 332 | NQ |
09SH09 | 618547 | 7486365 | NAD 27 Alaska | 5W | 1873.00 | 297 | -45 | 207 | NQ |
Total Core Drill Holes Workman’s Bench--50
Total Drill Footage Workman’s Bench—16,400 feet
Note—Four (4) percussion (RC) drill holes completed in 1994 that total 780 feet are not included in the above tabulation
51
Figures 7.10-to-7.15 depict the vein-fault system on Pringle and Workman’s Benches that has been drilled by the previous owner since 2006, but mainly since 2007. Figure 7.10 is the plane view of the Workman’s bench vein-fault system. Figure 7.12 is a plane view of the Pringle Bench vein-fault system. Much of the data for the cross-sectional profiles on Workman’s Bench was compiled from a series of twelve (12) large plates that depict vertical sections constructed by the company (see Staff, 2008, a-l). Additional vertical profiles were completed by the QP after inspection of the 2009 drill program data. A cross-sectional profile on Pringle Bench was developed by the QP mainly from drill information provided by the previous owner. Three cross sectional profiles, namely A-‘A’, B-‘B’, and C-‘C’, which are shown in Figures 7.11-to-7.13, provide a generalized fence of the Workman’s Bench vein-fault system from southwest to northeast. They reveal that three, sometimes four, mineralized zones designated ‘West’, ‘A’, ‘B’, and ’C’ zones, are more-or-less sub-parallel to each other and dip steeply southeast in the southern part, steeply northwest in the central part, and essentially vertical in the northern part of the drill tested system. The vertical profile designated D-‘D’ on Pringle Bench indicates that the vein-fault system there dips steeply to the northwest. Geologists recognized that distinct near-vertical vein-fault structures could be recognized in drill core and in the underground workings on the basis of both spatial relationships and physical features.
· | ‘A’ zone is the largest and most distinctive of the mineralized structures at Nolan—appearing on both Workman’s and Pringle Benches. It is almost always accompanied by a distinctive lateral slickenside on its footwall and a pervasive quartz-sulfide stock work on it’s hanging wall. This post-mineral movement creates a distinctive granoblastic texture in stibnite. ‘A’ zone varies from less than 1.0 feet to 5.8 feet in true thickness and is thicker when combined with the stock work hanging wall. |
· | ‘B’ zone generally occurs 40-50 feet to the southeast of ‘A’ zone and sub-parallels the latter. It is also a vein-fault but does not generally contain slickensides—indicating that movement has not taken place after mineralization. Besides the conspicuous quartz-stibnite mineralization, ‘B’ zone also contains significant siderite gangue—up to 10 percent. ‘B’ zone is somewhat thinner than ‘A’ zone, averaging about 0.85 foot true thickness, but can attain a true thickness of 4.8 feet. |
· | ‘West’ zone generally lies 20-30 feet west of ‘A’ Zone but sometimes further. It is similar to ‘B’ zone in that it does not contain slicken-sided features typical of ‘A’ Zone. However, it can contain distinctive stock work quartz-sulfide zones in it’s hanging wall like ‘A’ Zone. ‘West’ zone averages the same thickness as ‘B’ Zone but can be up to 5.0 feet true thickness. It has been recognized on both Workman’s Bench and Pringle Bench. |
· | ‘C’ zone is the weakest mineralized Sb-Au vein-fault in the Nolan system and has only been positively identified on Workman’s Bench. Like ‘B’ and ‘West’ zones, no post-mineral slickenside has been observed. It averages only about 0.75 feet in thickness and normally found about 30-40 feet southeast of ‘B’ zone. It is also the weakest mineralization observed on the Workman’s bench and thus far con only be traced for about 275 feet of strike length. |
Other Sb-Au veinlet zones have been recognized and sampled but cannot be correlated with a specific fault structure of the Nolan system. More work has to be completed to better understand these additional zones.
52
Two methods were deployed to calculate the estimated true widths of the mineralized vein-faults being evaluated for resources estimates. Firstly, the core-logging geologist estimated true widths by measuring across the extent of the parallel footwall and hanging wall contacts of the mineralized structure being sampled with host metamorphic phyllite. This field estimate is aided by the fact that foliation in the host phyllite, is nearly horizontal. Thus the geologist can check his true width calculations with the angle of the drill hole. During April, June, and September of 2008, the QP looked at all core intervals, underground stations, and selected channel sites in order to check true width intervals. In 2009, the QP examined twelve of the twenty-two core intervals to estimate true width. When true widths were ambiguous in core, standard trigometric calculations were used to calculate the actual dip of the vein(s) in core versus the calculated angle that the vein intersects the zone. Additional descriptive information is described in section 12 of this report. A comparison of drill interval widths versus estimated true width are presented in Appendices I and II.
No down-hole orientation surveys were conducted. Oriented drill holes are important to insure that drill azimuths are not off course. The QP judges that the shortcomings of not having oriented core is minimized by: 1) the relatively short drill holes that accessed the mineralized zones; 2) the relative competency of the host rocks; and 3) the near horizontal foliation of the host lithology probably minimize the potential of steeply angled drill holes from bending and diverting off trajectory for any significant amounts. As an example, down hole depths of most mineralized intercepts; i.e., ‘A’ zone, were predicted accurately at the drill site by the geologist before the actual intersection took place. However, as more drill holes explore deeper portions of the system, more holes should be oriented to avoid down-dip inaccuracies.
53

Figure 7.10 Schematic of Workman’s Bench, illustrating bench configuration, locations of 2007-2009 drill holes, the ‘A’ zone’, ‘West’ zone, ‘B’ zone, and ‘C’ zone, and locations of three cross sectional profiles illustrated in Figures 7.11. 7-12, and 7-13.
54

Figure 7.11 Schematic, cross sectional profile A-A’ the southern portion of Workman’s Bench, illustrating the intersection of the major mineralizing structures currently being assessed—note that the ‘Zones as drawn represent a width of the mineralized structure and not the sampled assay interval, which is generally thinner.
55

Figure 7.12 Schematic, cross sectional profile B-B’ in the central portion of Workman’s Bench, just south of the ‘South Portal’ tunnel, illustrating the intersection of the near-vertical, major mineralizing structures currently being assessed—note that the ‘Zones’ as drawn represent a width of mineralizing structure from inspection of core and not the sampled assay interval, which is generally thinner.
56

Figure 7.13 Schematic, cross sectional profile C-C’ in the northern portion of Workman’s Bench, just north of the ‘North Portal’ tunnel, illustrating the intersection of the near-vertical, major mineralizing structures currently being assessed—note that the ‘Zones’ as drawn represent a width of mineralizing structure from inspection of core and not the sampled assay interval, which is generally thinner.
57

Figure 7.14 Schematic plane view of Pringle Bench, illustrating bench configuration, locations of 2006, 2007 and 2009 drill holes, the ‘A Zone’, ‘West Zone, and other non-designated vein-fault zones; location of cross-sectional profile D-D’ illustrated in Figure 7.15.
58

Figure 7.15 Schematic, cross sectional profile D-D’ (and including RC hole 06SH01) on Pringle Bench, illustrating the intersection of the essentially vertical, major mineralizing structures currently being assessed—namely ‘A’ Zone (red) and West Zone (blue). Note that the ‘A’ and ‘West’ zones as drawn represent a width of mineralizing structure from inspection of core and not the sampled assay interval, which is generally much thinner. From QP files.
59
8.0 | SAMPLE PREPARATION, ANALYSES, AND SECURITY |
8.1 Site Sample Preparation Methods and Security
The previous firm developing the placer deposits directly supervised the primary collection, sample preparation, and analysis of all placer deposit samples.
Gold nuggets within the placer systems can be very large (50% greater than number 4 mesh size) and variably distributed; hence, the requirement for collecting and analyzing large samples. The percussion samples were analyzed in their entirety without sub-sampling to minimize potential bias caused by sub-sampling material with extreme size variation in gold nuggets.
Sample grades for the Nolan Creek placer deposits are expressed as oz/yd3 Au. Accurate measurement of the volume of the sample is therefore as critical as accurate recovery and weighing of the contained gold. The volume in the analysis is the in-situ or bank volume of the sample. This is determined using swell factors that have been determined for the deposits. These factors are subject to local variation (e.g., because of higher silt content in the sample) that may cause inaccuracies in the analytical results.
Two methods were traditionally used by the previous owner to estimate gold grades in a placer resource. One method is to calculate the amount of gold present in a bank cubic yard or ounces gold/cubic yard. When all of the values are on or near the bedrock-gravel interface, an alternative method of estimating gold quantities in a placer deposit is the amount of gold present on one square foot of surface area on bedrock—known as a bedrock square foot (brsf). Because most of the placer gold in the Nolan Deep Channel and in left limit benches are ‘bedrock placers’, some Silverado geologists expressed gold values in exploration drill programs in ‘brsf’. This value varied with the thickness of auriferous materials both above and below the bedrock-gravel interface. The previous owner established conversion factors for converting ounces gold/brsf to ounces gold/cubic yard, which systematically varied from valley floor and bench deposits. For this summary, the QP expressed all drill hole grade data in ounces gold per cubic yard.
Sample recovery calculations have been implemented by the previous owner’s geological staff and described by Flanigan (2003d; 2004). The QP could not verify every sample or the reported results for authenticity, but he is reasonably confident that sampling programs were carried out in a professional manner by competent, qualified individuals.
As an example, Table 8.1 summarizes data collected for drill hole intersections for one of the placer target areas: D-3B3 Block.
60
Table 8.1 Drill hole intersection summary for 3B3-Block
Drill hole | From | To | True Thickness | Grade |
NC-3B3 10-1 | 30 | 42 | 12 | 0.012 |
NC 3B3 11-3 | 85 | 97 | 12 | 0.015 |
NC-3B3 2-1 | 105 | 110 | 5 | 0.024 |
NC-3B3 2-3 | 75 | 85 | 10 | 0.275 |
NC-3B3 2-4 | 70 | 75 | 5 | 0.176 |
NC 3B3 3-1 | 55 | 60 | 5 | 0.010 |
NC 3B3 3-3 | 90 | 95 | 5 | 0.041 |
NC 3B3 3-5 | 125 | 135 | 10 | 0.117 |
NC 3B3 4-1 | 105 | 110 | 5 | 0.011 |
NC 3B3 6-3 | 50 | 55 | 5 | 0.061 |
NC 3B3 7-3 | 55 | 60 | 5 | 0.067 |
NC 3B3 9-5B | 90 | 97 | 7 | 0.134 |
Four types of samples were collected during previous lode exploration campaigns. Soil samples were taken every 50 ft over established grids. Silverado used hand-held, mechanized augers to collect the samples and sometimes spade shovels. Trench channel samples were taken each 5 ft. When mineralized veins are encountered, a narrower (to a minimum of 6 in) segment was collected. This reflects previous owner’s interest in evaluating the stibnite-bearing veins for selective extraction rather than looking at the deposits as a lower grade bulk tonnage play. All drill core was cut by diamond saws at the mine site. Half of the core was split and bagged for shipment to the selected lab; the other half was kept for further logging activities and reference.
The location of trenches and diamond drill holes are described for the lode deposits at Pringle Bench and Workman’s Bench in Chapter 7 of this report. Summaries of the number of RC and diamond core samples are presented in Tables 5.1 and 7.1 of this Technical Report. The locations of channel samples for the Workman’s Bench underground development work deposit are shown in Figure 8.1. Table 8.2 summarizes how sample interval and assay data are presented by the QP from the diamond core drilling, surface-trench, and underground sampling programs.
In February 2008, the previous owner completed an underground channel sample program of thin zones of quartz-stibnite mineralization exposed in the workings driven in late 2007. True sample widths across mainly massive stibnite veins ranged from 3 inches-to-11 inches and averaged 6.5 inches. In April 2008, geologists re-entered the underground workings and collected an additional 92 channel samples along 460 ft of underground development.
A portable, air-powered chipper (i.e., jackhammer) and chisel were used to extract the samples, mostly 5 ft intervals. The sample channel was first cut with an air-powered rock saw before being extracted with the jackhammer. Sample weight was estimated to be about 15 pounds each, for a total of approximately 600 kg for the 92 samples. The broken sample was collected on a plastic sheet lain on the floor of the drive immediately below the channel. The QP considers that adequate care was taken in the collection of the material in the sampled intervals. In April, 2008, the QP
61
collected 23 independent channel samples from underground workings, using sampling methods similar to those described above.
During September 29-30, 2008, the QP inspected the methodology of the sampling methods and approaches during the processing of core from the 2008 Workman’s Bench exploration program. In contrast to the 2007 exploration drill program on both Pringle and Workman’s Benches, where 5.0 foot lengths of core were systematically assayed along with selected mineralized zones, sample intervals selected during the 2008 drill program on Workman’s Bench were entirely focused on the relatively thin mineralized veins intervals in core. Five-foot intervals in core were not assayed if veinlet mineralization was not recognized. This Previous owner’s decision reflects the desire to focus exclusively on relatively small, high grade, antimony-gold veinlet zones in core. As a result, the total number of assay intervals during the 2008 drill program (627) was only 52 percent of the 2007 drill program total (1,195) despite the fact that drill footage in 2008 (11,597 ft) exceeded the drill footage in 2007 (4,555 ft) by about 160 percent.

Figure 8.1 Geologists collect channel sample in underground Workmen’s Bench development using horizontal diamond saw cut across mineralized zone; circa April, 2008. From QP files.
62

Figure 8.2 Location of underground development and channel samples, Workman’s Bench
63
Table 8.2 Table of selected sample composite, illustrating assay information and true widths of mineralized structures from 2009 Workman’s Bench core drilling program.
Drill Hole # | Underground, | Stibnite Target | From | To (feet) | Width | Estimated | Sb (%) | Au | As | Hg | Pb | Brief Description |
09SH01 | Drill Core | ‘A’ Zone | 181.1 | 182.0 | 0.90 | 0.75 | <0.01 | 0.072 | 7,730 | 0.25 | 2.5 | Dense quartz vein swarm with trace stibnite and arsenopyrite |
09SH01 | Drill Core | West Zone | 189.9 | 190.6 | 0.70 | 0.58 | 0.07 | 0.126 | 6,680 | 0.27 | 8.9 | 3.25 inch thick vuggy quartz-stibnite vein |
09SH02 | Drill Core | ‘A’ Zone hanging wall | 160.3 | 162.0 | 1.70 | 1.36 | 5.64 | 0.035 | 2,310 | 0.27 | 0.9 | Quartz carbonate stibnite stockwork |
09SH02 | Drill Core | ‘A’ Zone | 162.0 | 162.9 | 0.90 | 0.72 | 0.18 | 0.035 | 4,560 | 0.37 | 15.6 | Quartz-stibnite breccias vein; analytical Sb content lower than visual in core |
09SH02 | Drill Core | ‘A’ Zone | 162.9 | 164.6 | 1.70 | 1.36 | 3.05 | 0.042 | 3,790 | 0.40 | 29.1 | Two vertical quartz-stibnite veins 0.75 inches thick; 0.30 foot carbonate vein |
09SH03 | Drill Core | ‘A’ Zone hanging wall | 164.1 | 164.6 | 0.50 | 0.40 | 0.35 | 0.012 | NA | NA | NA | 3/8 inch qtz +Sb; 30% stibnite—over-drilled |
09SH03 | Drill Core | ‘A’ Zone | 168.0 | 168.6 | 0.60 | 0.40 | 0.80 | 0.019 | NA | NA | NA | <1/2 inch qtz-Sb; 80% stibnite-over -drilled |
09SH04 | Drill Core | ‘B’ Zone | 145.0 | 148.7 | 3.70 | 2.75 | 1.57 | 0.169 | 5,130 | 0.90 | 2.6 | Quartz-carbonate veins and quartz-stibnite breccias—contamination from hanging wall |
09SH04 | Drill Core | ‘A’ Zone | 193.6 | 195.8 | 2.20 | 1.62 | 3.71 | 0.002 | 415 | 0.24 | 3.4 | Abundant quartz carbonate stibnite |
09SH04 | Drill Core | ‘A’ Zone | 195.8 | 196.3 | 0.50 | 0.37 | 1.65 | 0.190 | 2,170 | 0.37 | 15.7 | Similar to 09SS047 but more arsenopyrite |
09SH05 | Drill Core | ‘A’ Zone | 276.2 | 276.7 | 0.50 | 0.30 | 47.29 | 0.217 | 2.9 | 1.16 | 0.7 | Hanging wall of massive stibnite vein; arsenopyrite in hanging wall |
09SH05 | Drill Core | ‘A’ Zone | 276.7 | 278.3 | 1.60 | 1.30 | 69.21 | 0.251 | <0.1 | 1.63 | 0.2 | Massive stibnite vein (see cover photo) |
09SH05 | Drill Core | ‘A’ Zone | 278.3 | 278.8 | 0.50 | 0.30 | 39.53 | 0.389 | 17.9 | 0.79 | 1.3 | Footwall contact zone |
64
Sample security from both placer and lode sampling programs were maintained by geological contractors. All samples were stored in a secure trailer at Nolan Camp. Individual samples were composited into larger rice bags and sealed with plastic tape. Samples were then stored in a locked trailer at Nolan Camp prior to transport to the ALS Chemex preparation laboratory in Fairbanks, Alaska.
8.2 Laboratory Sample Preparation Methods and Analytical Procedures
Samples from placer deposits were analyzed in their entirety (i.e., no sub-sampling) to minimize potential bias from sub-sampling of material with such a large proportion of gold nuggets. Samples from RC drilling were split with a splitter and surface samples were split by contracted laboratory personnel. The primary sample was processed through a gravity separation technique at the drill rig to separate gold nuggets, finer-grained gold, and heavy minerals from the host gangue material. A systematic procedure was developed by Tricon Mining geological staff for the collection and preparation of percussion drill hole samples. The sample was emitted from the drill and immediately submitted to a drill-mounted cyclone to dissipate the sample velocity, and then passed through a JonesTM splitter. The split sample was then processed through a Denver Gold SaverTM. The oversize discharged to a revolving drum screen to a ‘picking plate’ where +¼ inch nuggets were hand-picked. The – ¼ inch undersize reported to a Teflon lateral action sluice and the resultant heavy mineral concentrate was hand-panned. The gold in the concentrate was then picked with tweezers. The remaining fine heavy concentrate was treated with amalgamation and the resultant gold bead was weighed along with the hand-picked gold with a ChampTM electronic balance.
The previous owner conducted volume measurements of samples collected during 2003 and 2004 placer drilling programs. Results of these measurements showed that a 5 ft sample from the Nolan Deep Channel averaged 14.80 gallons, whereas a 5 ft sample from the Mary’s East Bench deposit averaged 19.20 gallons. The Nolan Deep Channel deposits contain significant amounts of silt, sand, and clay, whereas the left limit bench deposits such as those at Mary’s East are much coarser grained. Determination of volumetric measurements results in a more accurate estimate of gold grade in the placer deposit. Hence each placer deposit was volume-characterized by Silverado contractors during exploration.
Sample grades for placer deposits are expressed as gold content per bank volume of material where bank volume is the in-situ volume of material. To calculate the bank volume the sample volume must be factored using a predefined swell factor that quantifies how much the volume of the sample increases as a result of extraction. Swell factors for mine operations were estimated by Murton (2004) to be 130%, whereas the calculated swell factor during the 2003-to-2004 rotary drill programs was calculated by Flanigan (2004) to be 117%. The weight of the gold extracted from the sample (the method of recovery which was
65
described previously) is divided by the bank volume of the sample to determine the grade of the sample expressed in oz/cu yd Au.
For lode exploration, diamond core samples were split in half on site by company personnel using a core saw. Half of the core was submitted to external laboratories for analysis and half is retained on site.
ALS Chemex of Vancouver, Canada, an ISO 9001:2000 accredited laboratory, analyzed most of the Silverado sample stream from lode-style deposits. Alaska Assay Laboratories LLC of Fairbanks, Alaska, an ANS/ISO/IEC Standard 17035:2005 accredited laboratory were subsequently used by Silverado for analytical work. Both laboratories produced a coarse split from which a finely ground material to 150 mesh is analyzed. The pulverized material and the coarse reject were stored by the laboratories for possible re-analysis. Both laboratories were utilized during the 2008 exploration program. In 2009, analytical services were exclusively provided by ALS Chemex Labs (now ALS USA Inc.).
8.3 Quality Control and Quality Assurance Programs
Quality assurance and quality control (QAQC) was routinely performed by the previous owner’s exploration contractors. During 2008, standards have been obtained from Shea Clark Smith, (Minerals, Exploration, and Environmental Geochemistry) in Reno, Nevada that supplies standards for mining companies. For core intervals intersecting vein zones, two standards and one blank are randomly inserted in batches of twenty (20) sample intervals. One standard contains 0.174 oz/ton gold. The other standard contains 0.261 oz/ton gold. For core penetrating mainly wall rock zones, one standard and one blank were randomly inserted into batches of twenty (20) samples, with the standard used containing 0.174 oz/ton gold. The standards for gold that were inspected by the QP during 2008; all appear to be within a narrow 1.0 percent of the values.
During 2009, standards were again obtained from Shea Clark Smith, (Minerals, Exploration, and Environmental Geochemistry) in Reno, Nevada. One mineralized standard contained 6 ppm (0.174 oz/ton) gold while another contained 9 ppm (0.264 oz/ton) gold. A blank consisting of pure quartz was also obtained from Shea Clark Smith. Duplicate samples were prepared by Karl Sharp using known intervals with known assay values. In 2009, standards, blanks, and duplicate samples were inserted into the sample stream every twenty (20) samples in a similar fashion to that developed for the 2008 sample stream.
The QP inspected ALS Chemex certified analytical results for the 2008-2009 programs. For example, in 2009, Certificates FA09127826-828; FA0917035-037; FA09091985; FA09085913; and FA09081078 contained 170 assayed samples from all sources. Of these the QP observed the standards and blanks. The low gold standard (6 ppm Au) ranged from 5.91-6.27 and averaged 6.04 ppm Au. The higher standard (9 ppm Au) ranged from 8.61-9.38 and averaged 8.84 ppm Au. The QP judges that the contracted laboratory was performing in a satisfactory manner. Antimony standards were not deployed.
66
Core recovery was checked in every box coming off the drill rig. The QP witnessed core loggers estimating core recovery during 2007 and 2008. During 2008, Silverado's geological contractors have reported that core recovery and Rock Quality Designators values (RQD) averaged 95 percent, especially after switching from BTW size core to the larger diameter NQ core. During his October 22-23, 2007, June 13-14, 2008, and September 29-30, 2008 site visits, the QP noted that core recovery is consistently very high and averages >90 percent. Lower RQD values occur in mineralized intervals.
8.4 Qualified Person’s Opinion Regarding Sample Collection and Preparation
The QP considers that contractors for the previous owner competently prepared samples analysis and dispatch to external laboratories. The QP observed sampling procedures and QAQC issues at Nolan Creek since about 2003.
During the April 20th 2008 inspection of the Workman’s Bench underground workings, the QP suggested some modifications to Silverado contactors during the collection of channel samples underground, which included covering the floor of the drift with a tarp to collect the samples and to prevent contamination and using larger sample bags than were being used.
For the 2009 programs, only narrow mineralized zones were selected for assay; therefore, the bulk of the core volume was not submitted for analytical work. The QP suggests that a selected portion of the unanalyzed core should be submitted for: 1) the same analytical methods as used in the mineralized zones in order to estimate the possibility of bulk mineable albeit lower grade zones of mineralization; and 2) acid-base accounting (ABA), in order to better predict the acid generating capacity (AGC) of the site during development and for future permitting requirements.
67
9.0DATA VERIFICATION
9.1 Exploration and Mineral Resource Data Verification
The QP has verified all exploration and resource data relied upon in this Technical Report.
Concerning placer deposits, the QP observed contractors from the previous owner prepare placer samples for separation of placer gold, the subsequent weighing of recovered gold and calculation of gold per unit volume of material. Concentrate splits were stored at Nolan Camp. The QP inspected these records during 2003-to-2004 and also looked at chip trays collected during 2006-to-2007. The QP observed placer exploration conducted by the previous owner’s contractors during underground development of Swede Channel in 2006. The QP is confident that contractors conducted a sound panning program that was directly factored into the development of drifts and crosscuts.
Concerning lode deposits, in 2009, the QP observed mineralized sample intervals being prepared for submittal to the ALS Chemex Laboratory in his Fairbanks office complex. All of the core boxes were nailed shut prior to shipment to Fairbanks. According to geologist Karl Sharp (pers. commun., September, 2009), splitting occurred after the core was photographed.
Selected field duplicates of sampled intervals, two from underground channels, and one from a trench, were submitted by the QP to an umpire laboratory (Alaska Assay Laboratories LLC) to check analytical results from ALS Chemex. In as much as the samples are collected by different individuals at different times and analyzed by different labs, the QP judges that results from this limited comparison indicate acceptable levels of bias and accuracy for gold and antimony values (Table 9.1).
Table 9.1 Duplicate analytical comparisons between QP and contractor samples
During 2008, Silverado submitted sixty-one (61) duplicate samples of mineralized core to ALS Chemex, and analyzed them for the Au-GRA21 and Sb-AA65 packages (Table 9.2). The QP did not rigorously compare the data but generally found that, by visual inspection, the assay results for both antimony and gold compared, varied, on average about 2.5 percent.
68
Table 9.2 List of Duplicate Samples, Workman’s Bench Drilling Program 2008
Total: 61 duplicate samples
FA08083476 08SS13 08SS14 08SS18 08SS25 FA08086192 08SS33 08SS46 08SS51 FA08093001 08SS102 08SS106 08SS111 FA08093002 08SS119 08SS122 08SS123 08SS124 FA08076587 08SS02 08SS09 FA08093003 08SS52 08SS67 08SS68 08SS70 FA08095943 08SS138 08SS147 08SS149 08SS150 FA08117975 08SS235 08SS241 08SS242 FA08135958 08SS353 08SS372 FA08135959 08SS375 08SS386 | FA08108707 08SS281 08SS283 08SS287 FA08108706 08SS195 08SS196 08SS212 FA08108707 08SS215 08SS218 08SS227 FA08117976 08SS254 08SS255 08SS192 FA08100110 08SS177 08SS182 08SS190 FA08100111 08SS158 08SS159 08SS170 FA08093000 08SS73 08SS80 FA08127442 08SS313 08SS326 FA08127448 08SS302 08SS305 FA08130451 08SS342 08SS351 FA08137318 08SS413 08SS426 |
69
In the vast majority of cases (>97%), the mineralized zones had corresponding elevated values of antimony and frequently (but not always) gold. In four (4) examples (1.9 percent of the total 202 sample assay intervals on Workman’s Bench), where stibnite-quartz and trace visual gold was identified in core, analytical results did not indicate correspondingly high metal values; i.e., sample intervals 08SS216 (DDH 08SH14), 08SS379 (DDH 08SH32), 08SS380 (DDH 08SH32), and 08SS243 (DDH08SH17). In the remaining 98.1 percent of the assay intervals, analytical results seemed to correspond with estimated amounts of mineralization; i.e. estimated content of stibnite and occasional visible gold.
9.2 Exploration Data Limitations
Although drill core intervals can be checked through re-assay activities, placer intervals cannot be checked as the sample material is completely consumed. After interviews with the previous owner’s contractors involved with the earlier placer exploration programs, the QP is satisfied that exploration data acquired during that time is reliable.
The QP cannot comment on the validity of sampling and analysis performed prior to the mid-1990s, because he was not present during the exploration programs. The early RC (percussion) drill programs directed at assessing lode mineral potential in the Nolan Creek area are not very well documented. For example, the specific locations of drill hole collars on the Thompson Pup area could not be found.
Because of uncertain sampling procedures, and apparent inaccurate orientations of mineralized structures, the QP did not use percussion drilling results to calculate resource estimates.
70
10.0MINERAL PROCESSING AND METALLURGICAL TESTING
10.1 Placer Deposits
The previous owner used a number of different plant designs for the processing of gold from placer deposits. During the early 1980s, test pits were completed on Archibald Creek and limited amounts of pay gravels were fed into a trommel screen, and standard sluice box equipped with Hungarian riffles. During the 1990s, recovery technologies improved with the construction of newer washing plant facility. In 2003, a new plant was designed to wash 150 cu yd/h in two 10-hour shifts per day. Improvements to the plant included: 1) Hydraulic riffles to promote an active riffle bed in the sluice box; 2) a one inch screen classifier; 3) A sand screw to the dewatering system; and 4) because of coarse gold, an oversize discharge belt with a nugget alarm system.
In 2006, the washing plant was redesigned to improve plant efficiency and improve gold recovery (Figure 10.2 and Figure 10.3). Oversize (greater than 4 in) from the plant is directed to a TechronTM Model #5500 conveyor belt (Techron) oriented at 90° to the length of the washing plant. Any nugget that hits this belt was automatically scanned by the metal detector which is situated at 45 ft along the conveyor belt system. If detected, a trap door was triggered, which dropped the nugget into a wash tub. It is worth noting that the largest gold material recovered during the 2006 washing plant cycle, a flat 9.05 oz gold nugget composed of essentially pure placer gold, escaped the main grizzly and the elongated harp screen but was detected and ‘saved’ by the electronic detector.
Undersize material was further sorted by size and gold was recovered using two sluice boxes. All heavy mineral concentrates accumulated in hydraulic nugget traps within the sluice boxes and in the hydraulic riffles ere further processed through a Denver Gold SaverTM. The washing plant had five nugget traps (numbered 1 to 5 on Figure 10.3), 16 ft of hydraulic riffles, and 16 ft of expanded riffles. The plant layout was approximately 110 ft in length and about 65 ft in width.
During operations, the QP observed a steady, even feed of pay gravel, efficient removal of oversize materials, and an effective water delivery system. From discussions with company officials and direct inspection by the QP, there was practically no placer gold observed in the middle and lower riffles of both the main and sulfide sluice boxes. Panning of concentrates from these sections failed to yield any significant placer gold (Josh Moore, pers. comm., 2006). Gold recovery was very high and estimated to exceed 95%.
71

Figure 10.2 | Side view of 2007 Nolan washing plant |
72

Figure 10.3 | Plan view of 2006 Nolan wash plant |
73
The Silverado gold recovery plant was designed to process 35 yd/hr. From June 27 to July 21, 2006, the plant processed 8,896 cu yd during 278 hours of operation at a rate of 32 cu yd/h. During June 20-to-July 30, 2007, the plant operated for 705 hours and processed 19,615 cu yd, an average rate of 29 cu yd/hr. When fully operational, two day-and-night shifts washed for 11 hours each, with 2 hours each day devoted to plant maintenance.
During his June 2026 inspection of the property, the QP searched for but not identify any component of the 2006 washing plant and assumes that it has been dismantled/scrapped and/or moved to another site.
10.2 Lode Deposits
The previous owner acquired a permit from USBLM to collect and process a maximum 1,000 cu yd of material from the Workman’s Bench lode for metallurgical testing. This large bulk sample could determine further grinding, flotation, and other processing and characteristics of stibnite; however, the bulk sample was never collected.
In April 2008, the QP collected a 414 pound bulk sample of semi-massive to massive stibnite, vein quartz, and wall rock gangue all from the defined mineralized ‘A’ zone in the Workman’s Bench underground workings (see Bundtzen, 2008c). The purpose was to determine the mineralogical nature of the antimony mineralization and the source of significant gold values. There is variation in gold content of the stibnite zones even within constrained sample collection areas. The bulk sample was sent to Hazen Research Labs Inc. (Hazen) in Golden, Colorado, USA in to determine the most optimal grind for potential marketing of a stibnite product and identify the mineralogical nature of gold and antimony values. The QP believes that the bulk sample was representative of the ‘A’ mineralized zone on Workman’s Bench.
Two reports were produced by Hazen in September: 1) Report #1-Flotation and Gravity Results, Workman’s Bench Stibnite-Gold Deposit, Wiseman District, Alaska; and 2) Report #2-Mineralogical Examination, Workman’s Bench Stibnite-Gold Deposit, Wiseman District (Schultz, 2008 a, b). Both yielded important and relevant information. Hazen tested both gravity and flotation separation technologies, provided for heavy mineral components of the ore, predicted recovery of both stibnite and free gold, and suggested recovery technologies to be used in a future operation.
Importantly, in the QP’s opinion, the bulk sample demonstrated that stibnite can be effectively separated from the other heavy mineral components such as gold and arsenopyrite, which report separately in the rougher concentrate table testing (see Figure 10.3). Hence the two economic products of the proposed mineral development, stibnite (antimony) and native gold, can be successfully separated. The stibnite concentrates can be upgraded to market quality and most of the gold (90 percent according to Hazen test results) can be recovered at the mine site, using gravity separation techniques.
74

Figure 10.3 Tabled Rougher Concentrate from Workman’s Bench Deposit analyzed by Hazen Research Labs, Inc.
75
Gravity separation using a quarter DeisterTM shaking table produced a second, cleaner gold and arsenopyrite concentrate that assayed 9.4 oz/ton. This test work indicates that coarse gold and coarse stibnite can likely be recovered by gravity separation; however, fine-grained components of both mineralogical products might benefit from flotation (Figure 10.3). Given the tendency for stibnite to ‘slime’, a flotation circuit may be an important prerequisite for a recovery system. Using gravity-only methods would result in a stibnite recovery of approximately 85 percent and gold recovery of about 90 percent.
Report #2 (Schultz, 2008b) was designed to learn more about the mineralogical constituents of the bulk sample. In an effort to determine the nature of the gold occurrence, gravity concentration was carried out using heavy liquid, to enable detection and to allow examination of a statistically valid number of gold particles and also to obtain preliminary information on response to gravity separation. A 500-g split from the minus 10-mesh head sample was dry-screened at 35-mesh, and the oversized material was stage-crushed to minus 35-mesh for the gravity separation and the mineralogical work on the separated fractions. For the separation, the minus 35-mesh split was wet-screened at 500 mesh. The minus 35 mesh fraction was separated with heavy liquid using acetylene tetra-bromide at a specific gravity of 2.96 to upgrade the heavy minerals and concentrate the gold (Figure 10.4).

Figure 10.4 Hazen mineralogical separation process flowchart, Workman’s Bench bulk sample.
76
The heavy liquid sink product contained as predicted, dominantly stibnite, but also other minerals as summarized in Table 10.1 below.
Table 10.1. Composition of the Heavy-Liquid Sink Product
Constituent | Estimate Area, % |
Stibnite | 85 |
Gangue | 10 |
Pyrite (including marcasite) | 3 |
Arsenopyrite | 2 |
Rutile | 1 |
Chalcopyrite | Trace |
Covellite | Trace |
Gold | Trace |
Small gold inclusions (less than 20 µm) in stibnite were observed in the sink product. The identification was confirmed by Electron Microprobe (EMP) analysis, which shows 100 percent Au. Also, fine microcrystalline gold was observed associated with stibnite. The EMP analysis of these particles also showed 100 percent Au. Figure 10.5 illustrates gold inclusions in stibnite.

Figure 10.5 Gold (bright color) in stibnite (gray grain), Workman’s Bench Bulk sample.
77
A split portion of the concentrate from the shaking table was panned to concentrate the gold even further. Several gold particles were observed ranging in size between 500 µm to about 2 mm. Figure 10.6 illustrates the gold in the shaking table concentrate; note the coarse nature of the gold particles in the sample.
A | |
B |
Figure 10.6 Stibnite-gold concentrates from table products from Nolan Bulk Sample—A and B illustrate sampled product variability. Magnification is approximately 25X.
10.3 Trace Element Content of Nolan Mineralized Zones
Trace element content of the stibnite mineralization in the Nolan Creek area will affect potential marketability. Amalgamet-CanadaTM provides specifications for threshold concentrations of trace elements in stibnite ores, which if exceeded, could result in penalties. The metals of concern are mercury, lead, arsenic, selenium, tellurium, tin, and bismuth. Three of these elements, mercury, lead, and arsenic, are addressed because they are usually the most scrutinized during metallurgical and environmental evaluation of stibnite ores. The previous owner analyzed for all of these elements during their Workman’s bench exploration program. When the QP released his July 29, 2008 NI 43-101 Technical Report (Bundtzen, 2008c) to the previous owner, he indicated that mercury analyses did not exist for 2007 and earlier exploration sampling programs and recommended that mercury analyses be given a priority, given the need to document mercury levels in stibnite-gold mineralization for metallurgical and marketing issues. The previous owner responded to this recommendation and added mercury analyses to the analytical package for the 2008 core drilling campaign on Workman’s Bench.
Table 10.2 compares a selected roster of industry standard trace impurities with trace elements identified from the Workman’s Bench and Pringle Bench stibnite-quartz zones. Arsenic, mercury, lead, selenium, bismuth, tellurium, and tin, all pass accepted industrial criteria (maximum quantities) for those metals. The average levels for all of the trace metals in the assay intercepts
78
fall below the Amalgamet-Canada metal specifications, which were used as a standard to test the metallurgical nature of the Workman’s Bench mineralization.
The Silverado data set includes mercury results from 174 mineralized assay intervals used in the resource analysis, or about 80 percent of those used in the mineral resource estimates. For specific clarification, mercury assays exists for all holes drilled in 2008 and 2009, but does not exist for the 2007 drill holes, nor in surface trench samples and underground channel samples collected prior to April, 2008. However, the 2008 and 2009 drill holes and respective intercepts into mineralized zones flank the 2007 drill core intercepts described in the previously released July, 29th, 2008 Technical Report (Bundtzen, 2008 c). The 2008 drill intercepts represent approximately 80 percent of all mineralized intercept data acquired on Workman’s Bench and Pringle Bench. Figure 10.7 illustrates where mercury data is available in mineralized intervals.
Mercury values from the 2008 drill-indicated intervals range from nil to a maximum value of 8.12 ppm and average 0.774 ppm mercury (n=134). Twenty-one (or 16 percent) of the intervals contained greater than 1.00 ppm mercury whereas 113 (or 84 percent) of the intervals contained less than 1.00 ppm mercury. The QP inspected the 2009 drill core analytical data from 43 intercepted mineralized zones. Mercury values from the 2009 intercepts ranged from 0.22 ppm-to-15.70 ppm and averaged 1.45 ppm. None of the mercury values exceed the threshold of concern (see Table 10.2).
Lead and arsenic values exist for all 2007, 2008 and 2009 drill core intervals, but not trench or chip samples. For 2007-2008, about 87 percent of the mineralized intercepts have Pb and As control. All 2009 vein-fault assay intervals have arsenic and lead assay control. For 199, or 91 percent of the analyses, arsenic levels average 2,379 ppm (0.224 percent) and lead values are very low, averaging just 17.1 ppm. The highest lead value was 275 ppm, indicating that lead only exists in very small amounts in the mineralized rock.
However, for 15 sample intervals or 8 percent of the sample population, arsenic values are >1.00 percent. Arsenic levels in zones of greater than 10 percent antimony average about 0.18 percent. For 2009, arsenic values ranged from 2.9 ppm to 9,380 ppm and averaged 2,312 ppm. Lead values ranged from 0.2 ppm to 14.5 ppm and averaged 6.55 ppm. The QP is confident that the mercury, arsenic, and lead values encountered in the core drilling program provides adequate information for the metallurgical testing summarized in this Technical Report.
The maximum arsenic value in these higher-grade Sb intervals is 0.41 percent in sample interval #203789, which contains 22.48 percent Sb (sample control #61, Appendix I). During consideration of milling technologies, future work should focus on the most effective removal of arsenopyrite from the stibnite concentrate prior to marketing. The metallurgical data shown by the Hazen Research on the Bulk Sample (see Figure 10.1) shows that arsenopyrite and gold report to separate mill circuits during gravity processing.
79

Figure 10.7 Drill plan showing the locations of mercury analyses on 2008 core drilling program on Workman’s Bench
80
Table 10.2 Selected stibnite quality comparative characteristics from Amalgamet-Canada.
Amalgamet-Canada Threshold of | Average Content Workman’s bench |
<0.50 % Pb+As | 0.224 % arsenic for 91 percent of intervals; and 17.1 ppm lead |
Trace Selenium (<30 ppm) | 5.0 ppm selenium |
Trace tellurium (<10 ppm) | <2.0 ppm tellurium |
Trace tin (<10 ppm) | <4.0 ppm tin |
Trace bismuth (<10 ppm) | <3.0 ppm bismuth |
Trace mercury (<20 ppm) | 0.90 ppm mercury (maximum value is 15.70 ppm)(1) |
(1) mercury data available for 177 mineralized intervals from 2008 and 2009 core drilling programs
10.4 Recovery Estimates
In Report #1 (Schultz, 2008a), rod mill grinding followed by two rougher stages yielded a gold recovery of 98% and an antimony recovery of nearly 100%, which indicates flotation may be a viable process for recovering gold and antimony at Workman’s Bench. The gold and antimony grades from the sample were 0.546 oz/ton (as stated, 18.7 g/t) and 36.7 percent, respectively, which compare favorably to the average measured and indicated resource grade estimates (Chapter 11).
10.5 Qualified Person’s Opinion
Metallurgical Results of the Bulk Sample processed by Hazen Research suggest that coarse gold and coarse stibnite can likely be recovered by gravity separation; however, fine grained components of both mineralogical products might benefit from flotation (Figure 10.3). Given the tendency for stibnite to ‘slime’, a flotation circuit may be an important prerequisite for a recovery system. However, using gravity-only methods could result in high stibnite and gold recoveries.
In the QP’s judgment, the Hazen bulk sample work, coupled with his own mineralogical work derived from his underground sampling, provide enough information to initiate design and operations for recovery of gold and stibnite.
Lead values ranged from 0.2 ppm to 14.5 ppm and averaged 6.55 ppm. The QP is confident that the mercury, arsenic, and lead values encountered in the core drilling program provides adequate information reducing their effect on concentrate quality. However, because arsenic is present in significant amounts because it is part of the gold-antimony mineral system, it’s presence has to be taken into account. During design of a mill and marketing of a sulfide concentrate. The QP reviewed tin, bismuth, selenium, and tellurium values. For the majority of the mineralized zones, values were below limits of detection as indicated in Table 10.2.
81
11.0 | MINERAL RESOURCE ESTIMATES |
11.1 Disclosure
The mineral resource estimates reported in this section were prepared by Mr. Thomas K. Bundtzen, President of Pacific Rim Geological Consulting Inc. and AIPG Certified Professional Geologist. Mr. Bundtzen is the QP and is independent of GML/USAC. In accordance with CIM Definition Standards (Staff, 2003, 2004, 2005a, b), a mineral resource may be sub-divided into Inferred, Indicated, and Measured categories. “Measured and Indicated Mineral Resources” are that part of a mineral resource for which quantity and grade can be estimated with a level of confidence sufficient to allow the application of technical and economic parameters to support mine planning and evaluation of the economic viability of the deposit. An “Inferred mineral resource” is that part of a mineral resource for which quantity and grade can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity (Staff, 2004). The QP judges that the mineral resource estimates presented in this Section are representative of the mineralized zones that have been explored by the previous owner.
The QP is unaware of any issues that materially affect the mineral resource in a detrimental sense, and has checked agency records, company correspondence with regulatory agencies and reviewed regulatory agency websites. In addition:
| ● | To the best of the QP’s knowledge, there are no known material exploration, legal, marketing, socio-economic, political, title, permitting, or taxation issues; |
| ● | To the best of the QP’s knowledge, apart from the usual environmental aspects that require consideration as part of any mineral exploration project, there are no known material specific environmental issues; and |
| ● | To the best of the QP’s knowledge, there are no known material mining, metallurgical, or infrastructure issues other than those discussed in this Technical Report. |
11.2 Key Assumptions, Parameters and Methods
Firstly, according to CIM standards, “Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability”. The writer (QP) judges that the gold-antimony Nolan Deposits contain Measured, Indicated and Inferred Resources of gold and antimony. The placer gold deposits contain both Indicated and Inferred Mineral Resources of placer gold.
The QP estimated mineral resources using the following steps:
· | Personal inspection of both and the Nolan Creek placer-gold and Workman’s Bench lode gold-antimony properties during 1999-2004, and 2007-to-2009 respectively. |
· | Database compilation and data validation by the QP. |
· | Geological interpretation and modeling by the QP. |
· | Compositing assay intervals to a common length. |
· | Determination of average material density for both lode and placer properties by the QP. |
82
· | Analysis of grade variability by the QP. |
· | Polygonal estimation of grade by compositing of sample assay information taken within designated widths and lengths of mineralized zones by the QP. |
· | Assignment of appropriate cut-off grades, the lowest grade that the QP judges can be mined economically. |
· | Classification of confidence with respect to CIM (2005) guidelines by the QP; and. |
· | Mineral resource tabulation and validation of the resource estimates by the QP. |
Because of the well-designed drill data set available for the Nolan Creek Placer deposits, the writer has produced an Indicated Resource estimate for placer gold, using accepted polygonal weighting methods that have been deployed for heavy mineral placer deposits worldwide. Doheny (1941, 1942a, b) describes polygonal resource estimation methodology while assessing large, low grade placer gold resources for both the United Stated Smelting, Refining, and Mining (USSR&M) Company in the Nome and Fairbanks districts of Alaska and the Yukon Consolidated Gold Corporation (YCGC) operations in the Klondike district in Yukon, Canada. Daily 1962) advocated use of polygonal weighting methods for globally distributed large heavy mineral placers. Peters (1978) describes five geometric patterns used in polymetallic lode mineral resource calculations, including the triangular block method used in this analysis.
A Society of Economic Geologists (SEG) publication summarizes polygonal methods of resource estimation in Ore Reserve Estimates in the Real World (Stone and others,1998). While describing triangular estimation techniques, these authors state:
“Polygons can be constructed with the drill holes at the corners of the polygons. Such polygons consist of triangles; the solid lines define triangles with a drill hole at each apex…the area is easily calculated but the thickness and grade are calculated by averaging the intercepts in the bounding drill holes”.
The triangular method works best when the majority of samples exceed cut-off grades in large, planar-shaped deposits such those that frequently occur in placer fields, including in the Nolan Creek Deposits or thin, linear vein-like lode deposits. This is also the methodology selected by the writer for estimating Measured, Indicated and Inferred lode Mineral Resources at Nolan Creek.
Although this Technical Report does not estimate Mineral Reserves and instead only reports Mineral Resources, Section 229.1302(d)(2) of SK 1300 states that an assessment of resources as presented in a Technical Report of this nature must estimate a cut-off grade from ‘assumed’ unit costs and estimated commodity prices disclose the prices used and reasons for choosing cut off grades. The QP uses a cutoff grade of 0.06 oz/yd gold for indicated gold resources found in drill-tested, deeply buried placer deposits. Using a price estimate of $2,500/ounce, this cutoff grade reflects the greatly added costs of mine extraction encountered during the mining of frozen, deeply buried mineral resources which require underground mine technologies for extraction of the gold.
83
Consistent with past Technical Reports produced by the QP for the Nolan Sb-Au lodes, a cut-off grade of 4.0 percent ‘equivalent’ antimony was used, reflecting the dominance of Sb in the resource estimates. A subsidiary factor corroborated the economic cutoff grade of 4.0 percent equivalent antimony. This includes gold values. The QP understands that commodity prices (Sb and Au) have risen since release of previous Technical Reports. He has assumed a price of $12 US/pound for refined antimony in this study and $2,500.00/oz gold Upon inspecting core and assay interval information from both Pringle Bench and Workman’s Bench, the QP also observed that a 4 percent antimony value (6-7 percent stibnite) generally reflects sharp metallogenic boundaries of the mineralized veins being investigated (see Figure 11.4-B). The drop-off at approximately 4.0 percent antimony equivalent is apparent in most assay intervals (for example, see Sub-Chapter 11.7—Mineral Resource Uncertainties (page 115-119) and Appendices I and II of this Technical Report.
11.3 Mineral Resource Estimates
Concerning placer deposits, the QP estimated mineral resources for a number of deposits at Nolan Creek Figure (11.1). The QP considered the resource summaries of Armstrong et al 1994) and Childress (1995) during his review of placer resources. The QP considers that the two deposits, D-Block #1 and 3B3 Block contain Indicated Resources of gold and the remaining five deposits contain only Inferred placer gold resources (D-Block #2 Below Discovery, Wooll Bench, Treasure Chest South, Smith Creek, and Slisco Bench).
84

Figure 11.1 Location of placer-style gold mineral resource estimates, Nolan Creek.
Only the Indicated placer gold resources in D-Block #1 and 3B3 Block are presented in this Technical Report. Details for the inferred resources estimates can be found in Bundtzen (2008c).
The QP estimated indicated placer gold resources in the Nolan area using a polygonal weighting method (i.e., Triangular Diagram Method) as advocated by Doheny (1941; 1942 a, b), Daily (1962), Peters (1978), and Cook (1983). For this method, data from three drill holes are used to estimate the volume and grade for a triangular area of influence. By linking each triangular area, the method provides a model of the placer mineral deposit in terms of shape, grade, and depth.
The accuracy of the resource estimate is influenced by the density of drill holes in the deposit, the regularity of the drilling pattern (i.e., whether the drilling pattern is isotropic, anisotropic, or erratic in distribution), the volume of material estimated by each drill hole, and the inherent variability of gold distribution in the deposit. Nugget effect is one of the main concerns when estimating resources for this type of deposit. Gold nuggets as large as 41.5 oz have been recovered from Silverado operations at Nolan Creek, and more than 25 nuggets have exceeded 10 oz. Such coarse
85
gold concentrations are not uniformly distributed in paystreaks, which is a source of error in placer resource estimation. Other variables that may influence the mineral resource estimation include the proposed mining method, recovery technologies, clay and boulder content of the paystreak, and accuracy of drill station locations.
Reconciliations of estimated metal content versus actual (mined) metal content for two selected Silverado’s placer deposits are presented in Table 11.1. These reconciliations indicate that the polygonal approach to estimation gives favorable results over the life of mining operations. Polygonal estimations on average predict 6% less metal than actual production while kriging methods significantly underestimate the global metal content of the resources. During the 37-year history (1928 to 1965) of the United States Smelting Refining and Manufacturing Company (USSR&M) in the Fairbanks district, historically Alaska’s largest corporate producer of placer gold, about 4.1 Moz of placer gold were recovered with bucketline dredging technologies in the Fairbanks district. All deposits were defined with drilling lines spaced about 150 ft apart. Actual gold recovery exceeded the estimates by approximately 8.5% (Boswell, 1979, p. 15).
Table 11.1 Reconciliation of actual versus estimated gold content for two selected placer deposits, Nolan Creek
Location | Estimation | Drill hole | Drilling | Drilling | Estimated | Mined | Difference |
Swede Underground | polygonal | 23 | 403 | anisotropic | 2,200 | 2,305 | 4.7 |
Ogden-Eureka | polygonal | 53 | 5,572 | isotropic | 7,509 | 8,127 | 7.6 |
D-Block #1 Below Discovery is defined by 50 rotary drill holes, 23 of which intercept fluvial sediments with significant gold values. Included in the resource definition are 8 drill holes completed during 1994 and 15 drill holes completed in December, 2003. Drill hole distribution is anisotropic although most of the drilling was aligned along northwest lines perpendicular to the strike of the interpreted channel. Drilling density averages 2,055 cu yd/drill hole. Depth to bedrock is quite variable in D-Block #1 Below Discovery and ranges from 10 ft to 75 ft but generally averages about 35 ft. Geological drill hole logs indicate that the gold concentrations are nearly always on or near the bedrock surface and average about 7.25 ft thick. Twenty-three polygons define an indicated resource of 4,320 oz Au in 47,278 cu yd of gravel, at an average grade of 0.091 oz/cu yd Au, (Table 11.2).
South of D-Block #1 Below Discovery, along the same buried channel trend, twelve drill holes in four lines define the 3B3-Block deposit. This placer deposit is also on or near bedrock but is much deeper than D-Block #1, ranging from 42 ft to 135 ft and averaging about 75 ft deep. Twelve polygons define a resource of 19,525 cu yd of gravel averaging 0.099 oz/cu yd Au (Table 11.3). The drilling pattern defining the 3B3-block deposit is anisotropic with 1,627 cu yd/ drill hole.
86
Tables 11.2 D Block #1 Below Discovery and 3B3 Block indicated resource estimates.
Polygon | Area | Average | Volume | Average grade | Metal |
A1 | 6,000 | 8.3 | 1,845 | 0.086 | 159 |
A2 | 7,200 | 10.0 | 2,667 | 0.077 | 205 |
A3 | 5,700 | 16.6 | 3,504 | 0.072 | 252 |
A4 | 8,550 | 8.3 | 2,628 | 0.008 | 21 |
A5 | 5,700 | 16.6 | 3,504 | 0.114 | 400 |
B1 | 6,400 | 6.6 | 1,564 | 0.253 | 396 |
B2 | 8,500 | 10.0 | 3,148 | 0.203 | 639 |
B3 | 7,975 | 5.0 | 1,477 | 0.197 | 291 |
B4 | 7,890 | 8.3 | 2,425 | 0.015 | 36 |
B5 | 6,500 | 8.3 | 1,998 | 0.040 | 80 |
C1 | 7,400 | 6.6 | 1,809 | 0.315 | 570 |
C2 | 7,100 | 6.6 | 1,736 | 0.207 | 359 |
C3 | 7,650 | 5.0 | 1,417 | 0.202 | 286 |
C4 | 4,760 | 5.0 | 881 | 0.022 | 19 |
C5 | 6,800 | 5.0 | 1,259 | 0.043 | 54 |
D1 | 5,600 | 6.6 | 1,396 | 0.025 | 29 |
D2 | 5,350 | 6.6 | 1,307 | 0.023 | 30 |
D3 | 6,500 | 6.6 | 1,589 | 0.021 | 33 |
D4 | 5,240 | 5.0 | 970 | 0.016 | 16 |
E1 | 1,900 | 6.6 | 464 | 0.020 | 9 |
E2 | 2,900 | 6.6 | 709 | 0.023 | 16 |
E3 | 5,000 | 6.6 | 1,222 | 0.024 | 29 |
E4 | 3,900 | 5.0 | 722 | 0.019 | 14 |
F1 | 7,000 | 5.0 | 1,296 | 0.020 | 26 |
F2 | 9,900 | 5.0 | 1,833 | 0.067 | 123 |
F3 | 10,200 | 5.0 | 1,889 | 0.060 | 113 |
F4 | 10,900 | 5.0 | 2,018 | 0.057 | 115 |
Total | 178,515 | 7.25 | 47,277 | 0.091 | 4,320 |
Polygon | Area | Average | Volume | Average grade | Metal |
A1 | 5,400 | 9.0 | 1,800 | 0.103 | 186 |
A2 | 8,400 | 9.4 | 2,924 | 0.101 | 295 |
A3 | 7,600 | 9.0 | 2,530 | 0.096 | 243 |
B1 | 6,900 | 5.0 | 1,275 | 0.050 | 64 |
B2 | 5,400 | 8.3 | 1,660 | 0.113 | 188 |
B3 | 5,500 | 8.3 | 1,690 | 0.144 | 243 |
B4 | 5,250 | 6.6 | 1,280 | 0.284 | 363 |
C1 | 7,900 | 5.0 | 1,464 | 0.027 | 39 |
C2 | 7,600 | 6.6 | 1,857 | 0.037 | 69 |
C3 | 4,500 | 5.0 | 833 | 0.056 | 47 |
C4 | 5,650 | 5.0 | 1,046 | 0.080 | 84 |
C5 | 6,300 | 5.0 | 1,166 | 0.097 | 113 |
Total | 76,400 | 6.9 | 19,525 | 0.099 | 1,934 |
87

Figure 11.2 Polygon layout for D-Block #1 and 3B3-Block indicated resources of placer gold; 39 polygons were used in calculating the resource estimates.
88
Table 11.3 summarizes the Indicated Mineral Resource estimates for the D-Block #1 and 3BE Blocks placer gold deposits in Nolan Creek valley.
Table 11.3 Placer deposit Indicated Mineral Resource, USAC Nolan Creek placer claims
The triangular block method (a.k.a. polygonal method) was selected by the QP to calculate Measured, Indicated, and Inferred lode antimony-gold mineral resources in the Nolan Creek area. Peters (1978) describes five (5) geometric polygonal patterns for ore reserve calculations as: 1) uniform spacing; 2) perpendicular at midpoints between holes; 3) triangular blocks (the method used in this analysis); 4) random spacing; and 5) angular bisectors. He suggests that geometric pattern methods are best used for tabular deposits such as massive sulfide bodies and for veins. A sixth method known as the ‘cross sectional method’ is used when there is significant variance in deposit thicknesses.
There are several important considerations for the comparison of indicated versus inferred resources: 1) The assessment of the areas of influence between core drill or other control points or ‘area of influence’; 2) the comparison of tonnage present in each polygonal block; 3) drill pattern; i.e., whether it is isotropic, anisotropic, or erratic, and 4) factoring in other features such as known vein length and depth continuity (or lack of), and assay grade variance. Table 11.4 summarizes the resource classification criteria adapted by the QP for the Nolan lode evaluation.
Table 11.4 Characteristics of Measured/Indicated resource- versus Inferred resource, Nolan Creek antimony-gold deposits, Alaska
Locations | Resource Category | Drill | # | Total | Tons/ | Comments |
Workman’s Bench | Measured and Indicated Resources | Mainly isotropic | 123 | 53,616 | 442 | Vein-faults exhibit predictable widths and orientations |
Workman’s Bench and Pringle Bench | Inferred Resources | Erratic to anisotropic | 62 | 32,459 | 523 | Some interval variances- both laterally and at depth |
89
Vein-fault continuity is a significant consideration in assessing the classification of polygons. ‘A’ zone has been identified for a strike length of 3,500 feet, based on 72 core drill holes and extended surface sampling control. The West and ‘B’ zones have less strike length but can be verified for significant strike length, based on test drilling and surface control. The more consistent the vein-fault, the more predictable is the presence of mineralization. Finally, drill pattern is an important criteria at Nolan Creek. Even though the relative density of polygons at Pringle Bench is more-or-less comparable with indicated resources on Workman’s Bench, the drill pattern at Pringle bench has a generally erratic distribution. Because of this, the QP decided that all resources on Pringle Bench could only be regarded as inferred.
For average grades of antimony and gold, each channel interval was weighted by an interval of influence as well as a width in order to obtain an area of influence. It is important that metal grades not be overstated in a mineral deposit—thus exaggerating the amount of resources in question. It is also important to note that the Nolan Creek lodes that have been drill-tested drills are primarily antimony deposits. Based on past and present prices, the antimony content of the vein-faults constitute about 70-75% of the value. Gold is a byproduct, albeit a significant credit. In order to better understand antimony and gold distribution in the vein-faults, the QP constructed two (2) histograms that depict: 1) gold grades on Workman’s Bench and Pringle; and 2) antimony grades on Workman’s Bench and Pringle Bench (Figure 11.3). Some 247 assay intervals are used in the analysis. For gold, the trends start off with a quick peak between 0.01 and 0.06 oz/ton, then level off and then break away at a steep 70 degree slope and then level off again at about 1.1 oz/ton. There are six (6) assay values on Workman’s Bench that exceed 1.0 oz/ton and three (3) on Pringle bench that exceed 1.0 oz/ton.
The antimony histograms for Pringle and Workman’s Bench exhibit a different pattern to the gold grade data (Figure 11.4-A). For both Pringle and Workman’s Bench antimony values peak early at about 5.0 percent, drop to a relatively flat trend beginning at about 10-15% antimony; and then continues on a horizontal trend all the way to the maximum 65+% antimony values. Sixty-one (61) or 25 percent of the sample population exceeds 30 percent antimony. The QP assigned a Sb cut-off grade at 4.0 percent based on assay distribution graphically shown in Figure 11.4-A as well as past-to-current price estimates for high grade stibnite concentrates.
In order to understand why the gold and antimony histograms differ, correlation coefficients were calculated for the 2008 Workman’s Bench data, the largest data set (Figures 11.4 a, b). The correlation coefficient between gold and antimony is 0.58. The correlation coefficient between gold and arsenic is 0.87. It is known from inspection of core, from the mapping of underground workings, from ore microscopy studies, and finally bench testing (Section 10 of this Report) that gold is found in quartz-carbonate-gold-arsenopyrite veinlets that frequently form selvages around the main stibnite structures. Gold is also found as grains in the stibnite itself. The Hazen Research bench tests show that the gold grains are liberated upon grinding of the stibnite and the arsenopyrite and gold grains bleed off in a separate train during Wiffley table testing.
90
|
|
Figure 11.3, a, b Histogram plots of antimony (on left) and gold (on right) distribution from 247 assay intervals, Pringle Bench and Workman’s Bench vein-faults, Nolan Creek, Alaska. Note that the data points are derived from submitted assay intervals and are not necessarily total true width estimates for vein-faults.
|
|
Figures 11.4 a, b Correlation coefficients for assay intervals from Workman’s Bench (n=118); a—coefficient of 0.87 for gold versus arsenic; and b—coefficient of 0.58 for gold versus antimony.
91
Table 11.5 shows that the majority of the nine high-grade gold assay intervals from Workman’s Bench and Pringle Bench are diluted when added to other assayed samples within a true and weighted vein-fault width.
Table 11.5 Analysis of high grade, assayed gold intervals (>1.0 oz/ton), Workman’s Bench and Pringle Bench antimony-gold deposits.
Deposit | Drill Hole/ | Intercept | True | Gold | Antimony | Comments |
Workman’s Bench ‘B’ Zone | 08SH32 | 205.7-206.6 | 0.74 | 1.13 | 38.74 | Part of a wider zone with two composites that contain an average true thickness of 2.9 feet; weighted average grade of composite sample interval is 0.18 oz/ton Au |
Workman’s Bench ‘A’ Zone | Channel 203808 underground | 172.0-173.5 | 1.50 | 1.19 | 43.63 | Measured 1.50 foot true thickness width underground |
Workman’s Bench ‘B’ Zone | WBUG5 S2 | 199.8-200.2 taped from control point | 0.50 | 1.04 | 50.04 | Thin, 0.4 foot wide massive stibnite, vein core; part of 3 composited samples that average 0.37 oz/ton Au |
Workman’s Bench ‘A’ Zone | 08SH018 | 315.0-316.8 | 1.15 | 2.88 | 27.65 | Part of high-grade stibnite zone with visible gold when composited with sample 08SS254, yields an average gold grade of 1.57 oz/ton. |
Workman’s Bench ‘A’ Zone | 07SH14 | 209.0-209.2 | 0.20 | 1.61 | 51.42 | Part of a composited interval that has a true thickness of 0.85 feet, Weighted average grade of 0.64 oz/ton Au |
Workman’s Bench ‘A’ Zone | 08SH25 | 374.8-376.5 | 1.41 | 2.86 | 43.20 | 1.70 foot intercept has true thickness of 11.0 inches; composited with two other samples within ‘A’ zone interval that averages 1.07 oz/ton Au in a 2.9 foot true vein-fault thickness. |
Pringle Bench | 09SH18 | 74.5-75.5 | 0.66 | 5.72 | 37.73 | High grade Au zone has true width of 0.66 feet. Combined with true vein width of 2.00 ft for ‘A’ zone., which yields a weighted average of 1.95 oz/ton Au |
Pringle Bench ‘A’ Zone | 09SH20 | 205.5-206.5 | 0.66 | 1.69 | 2.74 | Quartz-carbonate stibnite vein zone with visible gold |
Pringle Bench | Channel Sample in Trench H; (07H03) | 33.0-49.2 | 16.2 | 5.56 | 8.74 | Wide “A’ zone channel |
The QP has decided that a very high-grade gold value should be capped at 1.9 ounces/ton gold for the grade of a true sample width interval. This relatively high level does allow for the occurrence of high-grade zones if their spatial relationship shows a pattern. The high-grade zones in both drill holes 09SH 18, 08SH18, 09HS18, and 07H03 were capped at 1.9 oz/ton gold. The QP believes that the histogram of gold values shown ai Figure 11.3-B supports that decision.
The data set acquired by the previous owners of the federal claims on Nolan Project is comprehensive. Samples have been professionally collected, assayed and archived by contractors
92
and employees. The QP believes the large sample suite to be accurate and can be relied upon. However, some selected information was scrutinized by the QP. In addition to the rejection of the high-grade gold sample interval on Pringle Bench previously described, a few sample intervals were disregarded in the resource calculations because their values were not believed to be representative. Examples are cited below. Sample control #84-86 samples at Workman’s bench were reported to be true thickness estimates of 8.2 feet each of disseminated to massive stibnite-bearing zones that assayed up to 30.30 % antimony and 0.22 oz/ton gold. But upon inspection of the zones in the field by the QP, it was determined that samples may have been testing a northwest-bearing shear along it’s rake, and not perpendicular to the high-angle northeast structures being evaluated. Additionally, no thicknesses reported on the surface have so far been recognized in drill holes, or in sample control directly underneath in the underground workings. This data was not used in resource calculations. The U.S. Bureau of Land Management (USBLM) reported results of 13 samples at surface exposures on Workman’s bench that assayed up to 61.7% antimony and 0.476 oz/ton gold. The QP attempted to see if these data points could be used but concluded they were just grab samples—not representative across true widths of mineralization. He did not use this data in resource calculations.
Owing to the oxidized and locally slumped nature of surface exposures, some trench information on Pringle Bench was scrutinized. One channel in Trench I included a 6.5 foot true thickness of ‘B’ Zone that averaged 30.35% Sb. A similar high value over a thick ‘A’ zone occurs in Trench M. After the QP inspected these zones in the field, he was unsure as to whether the assays could be used in the resource analysis. The West zone that was sampled in Trench M was inspected by the QP and assay and width information from the fresh exposure there appeared to be valid; hence that data was used.
In order to complete the polygonal resource calculations, the QP rigorously calculated tonnage factors for the inferred and indicated resources presented in this Technical Report. Thrush et al (1968) specifies specific gravity estimates for pure stibnite (4.52), for quartz gangue (2.70), and for pelitic schist (2.66). A tonnage factor was calculated using the equation provided by Peters (1978). Pure stibnite would have a tonnage factor of about 7.1 cu ft/ton. The tonnage factor was individually calculated for each polygon using the equation of Peters (1978). The equation is: Tonnage Factor=2000/specific gravity X 62.5=cubic feet per ton. Pure stibnite is 71.5 percent antimony. As an example for polygon # 5, which contains 29.6 percent antimony (41.4 percent stibnite), the average calculated specific gravity of the polygonal zone is 3.89. The tonnage factor for this polygon is 2000/3.89X62.5=8.20 cubic feet/ton. For a lower grade zone; i.e., polygon 29, which assays 18.19 percent antimony (25.4 percent stibnite), then the specific gravity of the polygon is 3.82. The tonnage factor is 2000/3.82X62.5=8.39 cubic feet/ton. The QP calculated the tonnage factor for each polygon and arrived at an average tonnage factor of 8.21 cubic feet/ton—rounded to 8.20 cubic feet/ton for the Technical Report analysis.
Two control samples of mineralized vein intervals and one sample of wall rock from Workman’s bench underwent specific gravity (SG) and absorption measurements (ASTM C 127) at the
93
laboratory of Shannon and Wilson Inc. in Fairbanks. Table 11.6 summarizes the results and compares them to SG calculated using methods described above. High grade nearly massive stibnite that assayed 56.88 percent Sb from station #203804 yielded a SG of 4.38 and a tonnage factor of 7.31. In contrast, much lower grade material from the bulk sample that assayed 9.10 percent Sb, yielded an SG of 3.45, and a tonnage factor of 9.27. The average tonnage factor for the high-and low-grade stibnite zones, which have an average assay of 33.04 percent Sb, is 8.29. These limited physical SG measurements are consistent with SG values calculated from assay data and inferred SG of country rock material used in the QP’s resource calculations.
Table 11.6 Specific gravity (SG) measurements (ASTM C 127) from selected mineralized intervals, Workman’s Bench; laboratory analyses by Shannon and Wilson, Inc., Fairbanks
Consistent with past Technical Reports produced by the QP for the Nolan Sb-Au lodes, a cut-off grade of 4.0 percent ‘equivalent’ antimony was used, reflecting the dominance of Sb in the resource values.
11.4 Measured Lode Antimony-Gold Resource at Nolan Creek
This Technical Report describes the Measured Resource Estimate as summarized in Tables 11.7; 11.8. No new information concerning the measured resources has been generated for the Nolan Creek project since the release of those estimates on July, 2011; which were filed on SEDAR (www.sedarplus.ca.com). Graphic depictions of resource blocks and data tables that define the probable reserve are summarized in Figures 11.6-11.26 and Tables 11.9-to-11.28.
Table 11.7 Measured lode mineral resource, Workman’s Bench Nolan Creek area
Resource | Cut-off | Quantity | Grade | Metal | Grade | Metal |
Measured | 4.0 | 42,412 | 28.00 | 11,880 | 0.408 | 17,300 |
Notes:
The effective date of this measured resource is July, 2011; amended September 2026 |
Assumed processing recoveries for the base case are 90% gold recovery and 85% antimony recovery. The unit ton refers to short tons. |
Rounding may result in some discrepancies. |
94

Figure 11.5 Surface view of Workman’s bench mineralized zones, showing locations of underground workings, 2007-2008 drill hole control (in black), 2009 drill hole control (in blue), and interpreted extensions and fault offsets of A, B, C and West Zones.
95

Figure 11.6 Measured resource polygons for ‘A’ Zone, Workman’s bench, Nolan Creek Area
96
Table 11.8 Polygonal Measured Resource block summary for ‘A’ Zone, Workman’s Bench
97

Figure 11.7 Measured Resource polygons for ‘B’ Zone, Workman’s bench, Nolan Creek Area
98
Table 11.9 Polygonal block summary for ‘B’ Zone, Workman’s Bench Table 2 Polygonal Measured Resource calculations for ‘B’ Zone, Workman’s bench, Nolan Creek Area, Alaska
Table 11.10 Polygonal Measured Resource Calculation for ‘West’ Zone, Workman’s Bench, Nolan Creek area, Alaska
Polygon | Tons | Antimony (%) | Antimony (tons) | Gold (oz/ton) | Gold (ounces) |
1 | 565 | 2.86 | 16.1 | 0.908 | 513.0 |
2 | 446 | 2.39 | 10.6 | 0.108 | 48.2 |
3 | 450 | 3.12 | 14.0 | 0.921 | 414.5 |
4 | 359 | 2.64 | 9.5 | 0.121 | 43.4 |
5 | 131 | 3.36 | 4.4 | 0.140 | 18.3 |
6 | 73 | 9.30 | 6.8 | 0.143 | 10.2 |
7 | 210 | 9.81 | 20.6 | 0.124 | 26.0 |
8 | 297 | 18.09 | 53.7 | 0.105 | 31.2 |
9 | 110 | 19.06 | 20.9 | 0.261 | 28.7 |
10 | 95 | 12.10 | 11.5 | 0.225 | 21.3 |
11 | 109 | 14.53 | 15.8 | 0.215 | 23.4 |
12 | 166 | 13.13 | 21.8 | 0.229 | 38.0 |
13 | 286 | 18.35 | 52.4 | 0.293 | 83.8 |
14 | 397 | 11.75 | 46.6 | 0.098 | 38.9 |
15 | 175 | 21.56 | 37.7 | 0.146 | 25.6 |
16 | 537 | 19.82 | 106.4 | 0.140 | 75.2 |
17 | 160 | 23.59 | 37.7 | 0.143 | 22.8 |
18 | 192 | 35.32 | 67.8 | 0.230 | 44.2 |
19 | 75 | 31.78 | 23.8 | 0.196 | 14.7 |
20 | 115 | 21.74 | 25.0 | 0.113 | 13.0 |
21 | 256 | 25.28 | 64.7 | 0.147 | 37.6 |
TOTAL/AVERAGE | 5,204 | 12.80 | 667.8 | 0.302 | 1,572 |
99

Figure 11.8 Measured resource polygons for ‘West’ Zone, Workman’s bench, Nolan Creek Area
100
Table 11.10 Summary data for Measured Resource in ‘A’, ‘B’ and ‘West’ Zones, Workman’s Bench, Nolan Creek area, Alaska
Physical | ‘A’ Zone | ‘B’ Zone | ‘West’ Zone | Total or |
Total Strike Length of Vein Used in Resource Calculation | 980 | 525 | 900 | 980 |
Maximum Depth (Vertical) of Vein Used in Resource Calculation | 355 | 355 | 225 | 355 |
Average Sample Interval Width | 0.95 | 0.65 | 0.60 | 0.73 |
Number of Drill Hole Intercepts and Channel Sample Locations Used | 48 | 22 | 19 | 89 |
Number of polygons Used in Indicated Resource Calculation | 59 | 26 | 21 | 106 |
Calculated Tons of Mineralization | 28,452 | 8,756 | 5,204 | 42,412 |
Calculated Average Grade Sb (%) | 31.52 | 25.63 | 12.80 | 28.00 |
Total Tons, Contained Antimony | 8,967.9 | 2,244.2 | 667.8 | 11,875 |
Calculated Average Grade Gold (oz/ton) | 0.405 | 0.480 | 0.302 | 0.408 |
Contained Gold (oz) | 11,516.7 | 4,210.8 | 1,572.0 | 17,300 |
11.5 Indicated Lode Antimony-Gold Resource Estimate at Nolan Creek
Indicated mineral resources are that part of a mineral resource for which quantity and grade can be estimated with a level of confidence sufficient to allow the application of technical and economic parameters to support mine planning and evaluation of the economic viability of the deposit.
During the 2009 Workman’s Bench evaluation, nine holes (9) totaling 2,663 feet in length were collared and oriented to test shallow extensions of: 1) A-zone, the largest of the several high-grade vein-fault structures; and 2) B-zone, a subsidiary parallel structure southeast of A-Zone. Sixteen
101
(16) polygons define the indicated resources in both ‘A Zone’ and ‘B Zone’ vein fault structures, which aggregate 11,204 tons grading 19.7 percent antimony and 0.238 ounces/ton gold (Figures 11.9 and 11.10). The 2009 drill intercepts used to calculate the indicated resources are adjacent to the ‘A Zone’ and ‘B Zone’ vein-faults on Workman’s Bench. Tables 11.11 and 11.12 provide the numerical calculations for the Indicated Resource estimates within ‘A Zone’ and ‘B Zone’, Workman’s Bench, Nolan Creek area.
Table 11.11 Indicated resource block summary from 2009 Drill Program, A-zone, Workman’s Bench
Polygon | Tons | Antimony | Antimony | Gold | Gold |
A (1) | 806 | 34.45 | 277.7 | 0.479 | 386.1 |
B (2) | 198 | 18.47 | 36.6 | 0.192 | 38.0 |
C (3) | 820 | 49.45 | 405.5 | 0.557 | 456.7 |
D (4) | 215 | 35.80 | 76.9 | 0.349 | 75.0 |
E (5) | 450 | 5.64 | 25.4 | 0.035 | 15.7 |
F (6) | 915 | 20.71 | 189.5 | 0.294 | 269.0 |
G (7) | 750 | 37.20 | 279.0 | 0.398 | 298.5 |
H (8) | 614 | 30.96 | 190.1 | 0.285 | 174.9 |
I (9) | 675 | 7.17 | 48.4 | 0.098 | 66.2 |
J (10) | 850 | 19.21 | 163.3 | 0.177 | 150.5 |
K (11) | 1,212 | 3.78 | 45.8 | 0.124 | 150.3 |
L (12) | 1,225 | 12.00 | 147.0 | 0.150 | 183.8 |
M (13) | 1,694 | 10.12 | 171.4 | 0.189 | 320.2 |
TOTAL | 10,424 | 19.72 | 2056.6 | 0.248 | 2,584.9 |
Table 11.12 Indicated resource block summary from 2009 Drill Program, B-zone, Workman’s Bench
Polygon | Tons | Antimony | Antimony | Gold | Gold |
O (14) | 430 | 24.28 | 104.4 | 0.093 | 40.0 |
P (15) | 215 | 12.98 | 27.9 | 0.112 | 24.1 |
Q (16) | 135 | 15.37 | 20.7 | 0.137 | 18.5 |
TOTAL/AVERAGE | 780 | 19.61 | 153.0 | 0.105 | 82.6 |
102

Figure 11.9 Indicated Mineral Resource polygons for ‘A’ Zone, Workman’s Bench, Nolan Creek Area, based on 2009 drilling.
103

Figure 11.10 Indicated mineral resource polygons for B Zone, Workman’s Bench, Nolan Creek area, based in 2009 drilling
104
The combined Measured and Indicated resource estimate for the Workman’s lode system is summarized in Table 11.13.
Table 11.13 Measured and Indicated lode antimony-gold resources, Workman’s Bench, Nolan Creek area
Resource | Cut-off grade | Quantity | Grade | Metal | Grade | Metal |
Measured and Indicated | 4.0 | 53,616 | 26.27 | 14,089 | 0.372 | 19,968 |
The effective date of these indicated resources is July 12th, 2011; amended on September 16th, 2026 |
Cut-off grade is 4.0% Sb ‘equivalent’, which refers to the combined values of gold plus antimony expressed in terms of antimony. |
11.6 Inferred Lode Antimony-Gold Resource Estimate at Nolan Creek
According to the CIM, an “Inferred mineral resource” is that part of a mineral resource for which quantity and grade can be estimated on the basis of geological evidence and limited sampling and reasonably assumed but not verified by geological and grade continuity (Staff, 2004).
Inferred lode resource estimates for Workman’s Bench include zones on the A, B, C and West zones and Pringle Bench are summarized in Table 11.14.
Table 11.14 Total Inferred lode Mineral Resources, Workman’s Bench and Pringle Bench Nolan Creek
The effective date of these resources is March 7th, 2011; amended September 18th, 2026 . |
Mineral Resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. |
105

Figure 11.11 Inferred Resource polygons for ‘A’ Zone, Workman’s Bench, Nolan Creek Area
106

Figure 11.12 Inferred Resource polygons for ‘B’ Zone, Workman’s Bench, Nolan Creek Area
107

Figure 11.13 Inferred Resource polygons for ‘C’ Zone, Workman’s Bench, Nolan Creek Area
108
Table 11.15 Polygonal Block Inferred Resource estimate for ‘C Zone’, Workman’s Bench
Table 11.16 Polygonal Block Inferred Resource estimate for ‘A Zone’, Workman’s Bench
Polygon | Tons | Antimony (%) | Antimony (tons) | Gold (oz/ton) | Gold (ounces) |
1 | 826 | 11.87 | 98.0 | 0.260 | 214.7 |
2 | 1,524 | 9.36 | 142.6 | 0.213 | 324.6 |
3 | 2,737 | 19.13 | 523.5 | 0.266 | 728.0 |
Total/Average | 5,087 | 15.02 | 764.1 | 0.249 | 1,267.3 |
Table 11.17 Polygonal Block, Inferred Resource estimate for ‘West Zone’, Workman’s Bench
Table 11.18 Polygonal Block Inferred Resource estimate for ‘B-Zone’, Workman’s Bench
Polygon | Tons | Antimony (%) | Antimony(tons) | Gold (oz/ton) | Gold (ounces) |
1 | 2,291 | 9.96 | 228.0 | 0.105 | 240.5 |
2 | 1,733 | 15.20 | 263.4 | 0.147 | 254.8 |
3 | 965 | 8.28 | 79.2 | 0.347 | 334.9 |
TOTAL/AVERAGE | 4,989 | 11.44 | 570.6 | 0.166 | 830.2 |
109
Table 11.19 Summary of Inferred Antimony and Gold Resources From ‘A’, ‘B’, ‘C’, and West Zones, Workman’s Bench Lode, Nolan Creek Area.
Category | Cut-Off | Quantity of | Grade | Metal | Grade | Metal (oz |
‘A’ Vein Inferred | 4.0 | 5,087 | 15.02 | 764.1 | 0.249 | 1,267.3 |
‘B’ Vein Inferred | 4.0 | 4,989 | 11.44 | 570.7 | 0.166 | 830.2 |
‘C’ Vein Inferred | 4.0 | 4,232 | 3.64 | 154.0 | 0.132 | 560.2 |
‘West Vein Inferred | 4.0 | 5,334 | 11.96 | 637.9 | 0.507 | 2,704.4 |
Totals | 4.0 | 19,642 | 10.83 | 2,127.0 | 0.273 | 5,362.1 |
During 2009, eleven (11) drill holes totaling 2,329 feet were collared and oriented to test the ‘A zone’ and ‘West zone’ structures on Pringle Bench, which are the same structures that have been drill-tested on Workman’s Bench. Figure 11.14 illustrates the surface plan of the Pringle bench that the QP used in his resource calculations. The primary objective of the 2009 exploration program was to test deeper portions of both ‘A’ and ‘West’ vein-faults, which previously had been drill-tested to depths of only about 150 feet below the surface. Figures 11.15 and 11.16 illustrate the polygonal configuration of the ‘A Zone’ and the ‘West Zone’ mineralized structures respectively. Upon the combination of the previous (2009) and current (2011) data, twenty-three (23) polygons define an inferred resource of 12,817 tons grading 19.61 percent antimony and 0.499 ounces/ton gold. The 2009 exploration program on Pringle Bench: 1) confirmed gold and antimony mineralization to depths of up to 400 feet below the surface; and 2) yielded gold values that were higher than the average content observed in the shallower portions of the vein-fault system explored in 2007. Tables 11.20-to-11.24 summarize the polygonal block data for all inferred resource estimates on Pringle Bench.
110

Figure 11.14 Surface view of Pringle Bench mineralized zones, showing drill locations; 2007 (black) and 2009 drill holes (blue).
111

Figure 11.15 Polygonal Block Inferred Mineral Resource polygons for ‘A’ Zone, Pringle Bench, Nolan Creek Area, based in 2009 drilling.
112

Figure 11.16 Polygonal Block Inferred Mineral Resource polygons for West Zone, Pringle Bench, Nolan Creek Area, based in 2009 drilling.
113
Table 11.20 Polygonal Inferred Mineral Resource calculation for ‘A’ Zone, Pringle Bench, from Bundtzen (2009b)
Table 11.21 Polygonal Inferred Mineral Resource calculation for Pringle Bench from 2009 Drill Program, A-Zone, (This Technical Report)
Table 11.22 Polygonal Inferred Mineral Resource calculation for ‘West’ Zone, Pringle Bench (Bundtzen, 2009b)
114
Table 11.23 Polygonal Inferred Mineral Resource calculation from 2009 Drill Program, West-Zone, Pringle Bench
Polygon | Tons | Antimony | Antimony | Gold | Gold |
O (15) | 297 | 3.97 | 11.8 | 0.010 | 3.0 |
P (16) | 505 | 7.15 | 36.1 | 0.014 | 7.1 |
Q (17) | 378 | 5.85 | 22.1 | 0.018 | 6.8 |
TOTAL/ | 1,108 | 6.31 | 70.0 | 0.015 | 16.9 |
Table 11.24 Polygonal Total Inferred Lode Mineral Resource Antimony-Gold calculation, Pringle Bench, Nolan Creek
Resource | Cut-Off | Vein-Fault | Quantity | Grade | Metal | Grade | Metal |
Inferred | 4.0 | A (2008) | 737 | 29.13 | 214.7 | 0.113 | 83.4 |
Inferred | 4.0 | West (2008) | 1,951 | 9.86 | 192.3 | 0.049 | 94.7 |
Inferred | 4.0 | West (2009) | 1,108 | 6.31 | 70.0 | 0.015 | 16.9 |
Inferred | 4.0 | A and West Zones Combined | 12,817 | 19.61 | 2513.8 | 0.499 | 6390.4 |
The 2009 Inferred Resource estimates for Silverado’s Nolan Creek properties; i.e., Workman’s Bench and Pringle Bench, did not change from what was reported by the QP in his previous Technical Report issued June 1, 2009; (amended July, 2011). The inferred lode mineral total tonnage increased from 24,077 tons as inferred in the 2009 Technical Report to 32,459 tons in this Technical Report, or an increase of about 35 percent. In terms of in-place metal content, antimony increased from 2,997.6 tons as indicated in the 2011 Technical Report to 4,640.8 tons in this Technical Report, an increase of 63 percent. In-place gold increased from 5,894.7 ounces as Indicated Mineral Resources in the 2011 Technical Report to 11,752 ounces in this Technical Report.
11.7 Mineral Resource Uncertainty Discussion
Concerning placer resources, the QP constructed 39 polygons to determine an Indicated Resource estimate for placer gold deposits in Nolan Creek Valley; namely the 3B3 and D-Block #1 Below Discovery. Both placers occur below overburden ranging from 70-to-100 feet of overburden. Most of the unconsolidated ground is frozen and is capable of being mined using mechanized equipment successfully deployed by the previous owner. However, in 2003, live water was encountered while attempting to mine buried placer gold deposits about 400 feet upstream from D-Block #1 Below Discovery on the right limit of Nolan Creek, causing mine operations to be curtailed. Another uncertainty is that historic underground placer mining has occurred adjacent to 3B3 and D-Block
115
#1 Below Discovery resource blocks. Although past drilling efforts carried out by the previous owner did not encounter mined ground, there is a possibility that some of the indicated resource area has been depleted by historic operations.
For lode mineral resources, the QP constructed 123 polygons to demonstrate Measured and Indicated Resources of gold and antimony at Nolan Creek; and 62 polygons to demonstrate Inferred Resources of antimony and gold at Nolan Creek. The QP is confident with these resource estimates. However, they occur in relatively thin fault-controlled structures and mining methodology is not discussed in this report.
The QP used traditional polygonal methods to determine resource potential for both placers and lodes. The QP acknowledges that many mineral resource estimates are now determined using computer-based ‘kriging-based’ technologies.
To confirm the results of the polygonal methods used in determining the resource calculations at Nolan Creek, the QP contacted Will Robinson, E.I.T. Senior Geologist, who has experience with the VulcanTM computer-based, block model method for estimating mineral resources. Robinson agreed to examine selected portions of Silverado’s data base and calculate indicated resources using a Vulcan program. The QP supervised Robinson during the Vulcan-Polygonal test comparison and formatted the design of the test. But the latter ran the computer program independently of the QP. Because of time considerations, the QP determined that the comparison would be confined to the ‘A’ Zone in Workman’s bench, which contains the largest single block of resources. The QP told Robinson to: 1) set a cut-off at 4% Sb equivalent; and 2) cap gold grades at 1.5 oz/ton. The following was given:
· | All drill, underground, and surface (trench) information that was used to calculate polygonal resources was forwarded to Robinson by the QP. A table containing only ‘A’ zone data was prepared for the Vulcan estimate. All of this data was derived from Appendix I. This included drill hole depths, precise GPS collar coordinates, drill hole intercepts from Table 11.2 of this Technical Report; estimated true widths of mineralized vein-fault intercepts and weighted assay grades are from this Technical Report. The data used to calculate resources within ‘A; Zone on Workman’s Bench consists of forty (40) diamond core holes totaling 10,079 feet as well as ten (10) surface trenches and underground channel sample data that test the ‘A’ Zone. The maximum drill hole depth is 497 feet and the average depth is 352 feet. Spacing between drill holes and sample points varies but is more-or less isometric, averaging about 75 feet. Files created by Robinson for the Vulcan program include COLLAR.csv, ASSAY.csv, and SURVEY.csv. |
· | To help facilitate the effort and reduce the time expended on the Vulcan program, the QP used the specific gravity and tonnage factors previously calculated for the polygonal estimates for the Vulcan resource estimates. |
Past polygonal resource estimates were not given to Robinson. After discussions, Robinson wanted to combine the 2007-2008 ‘A’ Zone data set with the 2009 ‘A’ Zone data set. In that the 2007-2008 data from ‘A’ Zone on Workman’s bench calculated an indicated resource prior to
116
conversion into a measured resource, the QP judged that it was reasonable to combine the 2007-2008 and 2009 data sets. A three-dimensional geologic solid representing the A-zone vein was created using conventional methods in Vulcan. The solid conforms to the uppermost and lower most assay interval for drill holes and trenches contained within the A-zone vein. This solid was used to constrain the compositing, block model construction and resource estimation for this study. The block model was constructed using the Vulcan 3D modeling software. The orientation of the A-zone block model was selected to be 45o in order to conform to the observed trend of mineralization. The parent block size was selected to be a uniform 10’ x 10’ x 10’. The indicated resource estimation for the block model was conducted using the Inverse Distance Squared (ID2) method. The search ellipse for the estimation was selected to be 23’ x 5’ x 23’ in order to conform to the planar, steeply dipping nature of the A-zone vein and reflect the average spacing between composites. The sample constraints put on this estimate were that a minimum of one sample was required for a given block to be estimated and no more than 4 samples could be used for estimating any given block. The results of the block model estimation can be seen in Figures 11.17 and 11.18.

Figure 11.17 Plan view image of Workman’s bench ‘A’ Zone vein-fault. Estimated blocks are shown displaying antimony grade. Scale (squares) are 100 feet across.
117

Figure 11.18 Side profile view of Workman’s Bench ‘A’ Zone looking northwest; displaying Sb grade.
The indicated resources contained within the A-zone vein were calculated using the above block estimations. Specific gravity and tonnage factor data was available for all assay intervals and was included in the resource estimate. Although the QP mandated that a 4.0% antimony-equivalent cut-off grade be used, Robinson judged that it would be useful to the study to compare the indicated resources contained in the A-Zone vein using cutoff grades of 0.0% equivalent Sb and 4.0 % equivalent Sb (Table 11.25). Nearly the same amount of antimony is realized for the zero percent versus 4.0 percent Sb cutoff (1.4 percent difference), but more gold is indicated (6.9 percent
difference) in the zero percent cut-off.
Table 11.25 Measured and Indicated Resources calculated by VulcanTM
Material | Cutoff | Sb | Au | Total | Total | Tons | Ounces |
MINERALIZATION | 0.0 | 23.15 | 0.275 | 51,713 | 454,833 | 11,972 | 14,221 |
MINERALIZATION | 4.0 | 29.17 | 0.327 | 40,458 | 344,776 | 11,802 | 13,230 |
WASTE | 4.0 | 1.50 | 0.088 | 11,254 | 110,057 | 169 | 990 |
Table 11.26 compares the indicated resource estimates using polygonal methods versus the indicated resource estimates produced by the Vulcan analysis. Summary data for indicated resources of ‘A’ zone on Workman’s Bench determined from polygonal estimates are contained in At a 4.0 percent Sb cut-off, the Vulcan indicated resource volume (in tons) estimate is 4.0 percent larger; the antimony grade is also 2.9 percent larger, but the Vulcan gold grade is 9.9 percent lower
118
than the polygonal indicated resource estimate. In terms of in-place metal resource, the Vulcan antimony estimate is 6.9 percent higher than the polygonal estimate, but the Vulcan gold estimate is 6.20 percent lower than the polygonal estimate. Stone and others (1998) have stated that resource estimates between two completely different estimation methods can vary by 10 percent or more. The QP concludes that the polygonal resource estimate compares favorably to the Vulcan resource estimate and that the former estimate is an accurate indication of size and grade of mineralization in the Nolan lode system.
Table 11.26 Comparative Results of Polygonal Method for resources in A-Zone Workman’s Bench, used by writer, versus computer VulcanTM block model method
11.8 Assumptions for Multiple Commodity Resource Estimate
In nearly all cases, the principal mineralized zones contain, stibnite, quartz, minor arsenopyrite. Metallurgical work, assay information, and mineralogical content all suggest that the principal mineral products are free gold and stibnite. Both are readily marketable in today’s economic environment. Gold is at record high prices. Antimony is currently a much sought after critical mineral/metal. Testing shows that the gold reports to both arsenopyrite and stibnite on wiffley table tests. However, the QP does not consider arsenic as a recoverable commodity. Hence the principal resource estimates discussed in this Technical Report are focused on antimony and gold.
119
11.9 Qualified Person’s Opinion on Factors that are likely to influence the prospect of economic extraction.
The confirmation of drill-indicated resource, both surface and underground engineering studies quantifying wall-rock stability and selected mining methods, environmental mitigation where-ever needed, overall environmental assessment of the property, and market demand of a mineral product will all influence the economic viability of developing the lode deposits of antimony and gold and placer gold resources on GLM’s claims in Nolan valley.
Based on his experience reviewing antimony and gold deposits in Alaska, the Russian Far East, and elsewhere, it is the QP’s opinion that the grade and known size characteristics of lode antimony and gold and the relatively large nugget content of the placer deposits at the Nolan Creek property provide reasonable prospects for economic extraction of the mineral resources based on this Initial Assessment and Technical Report Summary.
120
12.0 | MINERAL RESERVE ESTIMATES |
Mineral reserve estimates are not presented in this Technical Report by the QP on the subject mineral properties.
121
13.0 | MINING METHODS |
No Mining Methods have been proposed for the mineral properties that are the subject of this Technical Report.
122
14.0 | PROCESSING AND RECOVERY METHODS |
The QP described the historic processing of placer gold by the previous owner (see Chapter 10.1; Placer Deposits). Hower, the QP does not recommend a specific processing methodology for placer gold recovery in this Technical Report.
The QP has described results of a bulk sample metallurgical test on lode antimony-gold mineralization in Chapter 10.2 of the Technical Report. However, the QP is not recommending any recovery method until more research has been completed by GLM.
123
15.0 | INFRASTRUCTURE |
15.1 Previous Production Infrastructure on property
The previous owner of the mineral property (Silverado) maintained a self-sufficient camp that included camp infrastructure capable of housing thirty (30) mine employees, machine shops, kitchen, individual ‘apartments’ for employees, a laundromat, recreational facilities, laboratories and a diesel power plant (see Figure 4.4 of this Technical Report). The power plant was capable of supplying up to 1.5 Mw of power for all needs within the camp and for maintenance of underground mining equipment. The sewer system was specially designed by Life Water Engineering in Fairbanks due to the existence of permafrost. A 2007 upgrade project included:
· | The purchase and installation of a ten-room housing unit; |
· | The construction of an engineering office; |
· | The upgrading of laboratory facilities; |
· | The installation of a new sewage treatment facility; |
· | The construction of a new kitchen and cafeteria; and |
· | The installation of new communications equipment. |
· | Installation of 2,500 gallon plastic holding tanks for water needs. |
It was previously assumed by the QP that the camp facility was completely capable of supporting the proposed underground development on Workman’s Bench.
15.2 Present State of Infrastructure on Property
The QP inspected the camp facility in June, 2026. Virtually all of the facilities listed above are in a state of disrepair and cannot be used. The QP recommends that construction of new infrastructure should take place only after a complete review of what current camp infrastructure is salvageable and what must be removed from the site.
A |
B |
Figure 15.1 A—Fuel tank storage facility in 2009; B—Same Fuel tank storage facility in 2026; which features collapsed staircase to top of tanks a failed fire extinguisher and other repair issues Both photos by the QP
124
16.0 | MARKET STUDIES |
Market studies have not been completed for this Technical Report.
125
17.0 | GEOTECHNICAL-HYDROLOGICAL-ENVIRONMENTAL STUDIES, PERMITTING, AND PLANS, OR AGREEMENTS WITH LOCAL INDIVIDUALS OR GROUPS |
17.1 Geotechnical-Environmental Studies
The previous owner aggressively engaged in land reclamation efforts during their development of both surface and underground mining activities. All of their work was completed under guidance of both the Alaska Department of Environmental Conservation and the U.S. Bureau of land Management (USBLM).

Figure 17.1 Example of land reclamation conducted on previously mined Odgen-Eureka Bench, left limit of Nolan Creek, circa 2006. Photo from QP files
Geotechnical studies of the Workman’s and Pringle Bench have been mainly confined to core logging by the previous owner’s geological contractors completed during the definition of ore zones. The QP has examined the underground workings on Workman’s bench during April 7-10, 2008, and measured joint sets, foliation and compositional banding, and inspected fault zones. Foliation and compositional banding strikes northeast (025-045o) and generally dips shallow to the southeast ranging from 05-to-015o. At some stations, compositional banding and foliation is horizontal. Figure 17.2 illustrates the near-horizontal nature of compositional banding in phyllitc schist in the ‘A’ Crosscut. Northwest striking high angle faults offset the northeast veins in small
126
amounts. The previous owner reclaimed placer mine tailings under the advice and direction of the Alaska Department of Natural Resources.
Because the claims are federal, reclamation activities follow guidelines administered by the USBLM. Overall water quality is administered by the State of Alaska Department of Environmental Conservation (ADEC). The QP conducted an audit of the ADEC and Alaska Department of Natural Resources (ADNR) websites for any environmental liabilities related to Silverado’s Nolan Creek properties and could not find any notice of water quality violations, public notice violations, non-point source water pollution control issues, or wastewater violations.
Nolan Creek is classified as an ‘industrial stream’, which recognizes placer mining as a determined use in the Koyukuk district. Under Alaska State law all disturbed lands must be reclaimed after mining activities have ceased, regardless of land ownership. For placer mining in Nolan Creek, Silverado participates in the statewide bond pool administered by the ADNR. Reclamation has occurred consistent with the operating plan and has been reduced from a bonded 60 acres to about 40 acres, per discussions with USBLM field personnel.
The Nolan Creek property is on federal lands that are adjacent to Gates of the Arctic National Park and Preserve, which is administered by the U.S. National Park Service (USNPS). According to records researched by the QP, neither the USBLM nor USNPS had lodged a complaint about exploration or mining activities that have occurred on Nolan Creek claims at least through 2011.
All mineralized zones at Workman’s Bench are near-vertical ‘vein-faults’ that strike in a northeasterly direction. Most of the northeast-striking joint sets have some silica vein selvage infilling. The northwest striking joints and fractures have both vein filling but are also frequently barren. The main ‘A’ zone shows slickensides in a horizontal configuration, indicating mostly post mineralization, lateral low angle slip planes. The ‘B’ and ‘West’ Zones also occur along fault planes, but do not show obvious evidence of lateral movement. Past mine planning took into account the fault structure of ‘A’ zone and avoided driving along it’s projected surface to prevent wall rock instability.
Wall rocks enclosing the stibnite-quartz lodes contain significant pyrite and pyrrhotite, which could result in Acid Rock Drainage issues (ARD). PRGCI geological contractor R.C. Swainbank estimated sulfide content in 18 core drill holes from Pringle and Workman’s bench that were completed in 2007 (Figure 17.3). Phyllitic schist contains the highest sulfide content. The QP recommends that any plan of action for lode mineral development incorporates the characterization of the material, a definition of waste rock, geochemical testing, review of geochemical parameters present in drill core, and an implementation plan.
127
A | |
B |
Figure 17.2 A—Underground drift looking E/SE in 2008. Note near-horizontal, phyllitic schist bands in base and roof; B—portal on April 12th , 2008. Photos from QP files.
17.2 Hydrological and Engineering Studies
The Workman’s Bench deposit occupies a near-horizontal terrace level at an elevation of 1,800 feet near the confluence of Smith Creek, a third order tributary, with Nolan Creek, a second order trunk stream. The Workman’s Bench mineralized system trends in a northeast direction toward Smith Creek Valley. The underground workings driven into the Workman’s Bench lode are dry. One hole, 08BT17, which is part of the Workman’s bench evaluation, intersected “live water”. The drill hole is situated at the northeastern edge of the drill pattern completed in Workman’s bench and does not affect the Mineral Resources described in this Technical Report. The drill hole likely intersected water from Smith Creek—drilling did not advance further because it was assumed that Smith Creek constituted a northeasterly limit of Workman’s bench due to this condition
128

Figure 17.3 Core logging summary from 2007 core drilling, illustrating rock types and sulfide-bearing zone.
129
According to the previous owner’s operational mine manager, Ray Medina (written email communication), the hole was plugged off. The QP assumed from inspection of data that no other holes on Workman’s Bench contained water and all drilled dry. Mr. Medina did not believe the single wet drill hole on the northeastern margin of the defined resource is a problem and suggests that the drill hole 08SH17 could be grouted off if necessary. Based on observations of the drill hole data and underground mine conditions, the QP agreed with this assessment. The other hole that drilled wet was on Pringle Bench to the northeast (07SH04). There is other evidence to corroborate the general dry nature of the bedrock subsurface. A number of large diameter well holes were drilled in the camp vicinity to find a good source of water. Three drill holes explored the Workman’s Bench area to depths of up to 400 feet but failed to encounter water. Left limit benches on Nolan Creek; i.e., Swede Channel and Mary’s Bench, were found to be dry during underground drift mining of frozen placer gold deposits (see Bundtzen, 2006 a-c).
17.3 Environmental Monitoring
The QP is not aware of any current environmental monitoring on the GLM properties in Nolan Creek valley.
17.4 Water Management Plan
The QP is not aware of the current water management plan being implemented on the GLM properties.
17.5 Mine Closure
Alaska Statute Title 27.19 (Reclamation) and Alaska Statute 38.05 require Reclamation and Mine Closure Plans as part of the APMA process for approval.
A potential issue for past mine closure by the previous owner deals with the maintenance shop facility at the Nolan Creek Mine. The shop has a dirt floor and has been in use since the early 1980s to repair heavy equipment such as various types of drills, low profile Dux mine-haul trucks, tractors and miscellaneous vehicles. The shop may contain contaminated soils that will need to be remediated. Other issues may involve fuel storage, and removal of other materials from contaminated sites at the original Nolan Camp.
130
A |
B |
Figure 17.4 —A--Inside machine shop as it appeared in 2006 with mechanic repairing low-profile mining equipment; note dirt floor in shop; B—inside machine shop as it appeared on June 13th, 2026—both photos from QP files.
17.6 Permitting
Presently a mixed property ownership for GLM claims exists between the State of Alaska and the U.S. Interior Department Bureau of Land Management. This manifests itself in both state and federal mining claims. The state of Alaska has General Selection Lands (GS 5167) Ta’d surrounding the active USAC federal Mining claims and an ANILCA Top Filing covering the active federal mining claims owned by USAC. GLM/USAC has also located State of Alaska mining claims over the active federal mining claims to protect its claim ownership position. This process has been used numerous times to facilitate ownership transfer from BLM to the State of Alaska for high value mineral lands. Currently, permit requirements include the following:
Alaska Department of Natural Resources
Alaska Placer Mining Application (APMA AAC Title 27, AS 38.05)
Approved Plan of Operations (AAC Title 27, AS 38.05)
Approved Reclamation Plan (AAC Title 27, 38.05)
Approved Mine Closure Plan (AAC Title 27, 38.05)
Temporary Water Use Permit (TWUP 11 AAC 93.035, 93.220)
Alaska Department of Environmental Conservation
APDES (Authorized under the federal Clean Water Act, 33 U.S.C. 1251-1387
and implemented in Alaska by 18 AAC Chapter 83)
Storm Water Plan, SWPPP; (AS 46.03.100; 18 AAC 83.615)
Industrial Waste Water Permit (APDES Program)
Solid Wate Permit (ACC Title 17, AS Title 16)
Air Quality Permit (AS 46.14, 18 AAC 50)
Alaska Department of Fish & Game
Title 16 Habitat Permit (AS Title 16)
131
U.S. Army Corps of Engineers
404 Wetlands Permit (Clean Water Act)
U.S. Bureau of Land Management
Plan of Operations Approval
Environmental Assessment (EA, National Environmental Policy Act of 1969, 43 CFR Part 46)
Reclamation Plan (30 U.S. Code 1258 Supplemented by 43CFR Part 3600, Subpart 3601 and related BLM manuals)
Importantly, an Alaska Placer Mining Application Permit (APMA Permit) will be required for GLM to operate on their claims at Nolan Creek. Two Nolan Creek claims were found to be listed on active State of Alaska APMA Permits during calendar year 2011, which reflects the recent underground placer mining activities that have taken place in Swede Channel and Mary’s East placer deposits. Other APMA Permits identified on other claims in Nolan Creek Valley have been closed due to inactivity.
The previous owner filed active Plan of Operations on Nolan Creek is filed with USBLM. Both surface and underground mining activities follow the rules administered by the U.S. Mine Safety and Health Administration (MSHA). The previous owner’s mining operations on Nolan Creek had been inspected by MSHA officials several times during 2002 to 2003. The QP observed two field inspections concerning the previous owner’s activities by MSHA officers. One citation was issued during the spring of 2006 that requested remedial action at their portal for the ‘Swede Channel Project’. The portal for those underground workings was shored up and subsequently approved by MSHA.
The previous owner acquired a permit from USBLM to collect a bulk mineralized sample. This permit would have allowed the previous owner to acquire up to 1,000 cu yd of mineralized materials for metallurgical testing and analysis from their Workman’s Bench stibnite-gold resource area. The QP identified the need for former owner to produce a potential acid generation plan for the bulk sample collection effort.
In June, 2008, the previous owner engaged SRK Consulting, Inc. (SRK) to complete a Sampling and Analysis Plan (SAP) as part of a Metal Leaching/Acid Rock Drainage (ML/ARD) mitigation program for the Nolan Lode project. Field work by SRK professionals took place in July, 2008 at Nolan Camp. The purpose of the site visit was to evaluate: 1) existing weather conditions; 2) potential of future changes in oxidation conditions; 3) mobility of regulated contaminants; and 4) any differences between tock types. SRK reviewed site geology and examined core from 2008 drill holes. This work confirmed that sulfides occur not only in mineralized vein-faults but also disseminated throughout the wall rock. Table 17.1 summarizes the analytical results from the initial sampling collection program. SRK examined gangue minerals and identified siderite and ankerite (iron-rich carbonates) but calcite was judged to be uncommon. Seven samples collected by SRK from the existing adit waste rock, rock exposed in historic trenches, and from weathered pyritic bedrock for field rinse (contact) tests to evaluate the initial acid generating potential. Three samples of relatively un-oxidized adit waste rock (Nolan 1-3) were not acidic (pH=6.97-7.44)
132
although the presence of soluble weathering products was shown by elevated conductivity. Two older trench samples (Nolan 6-7) were also non-acidic (pH=7.07-7.33) but also showed the presence of soluble weathering. One weathered phyllite sample was strongly acidic (pH=2.48). A significant initial conclusion of these results is that because un-weathered materials are relatively neutral, the objective of an ARD mitigation plan is to minimize oxidation of waste rock and ore materials during disposal and in-capsulation.
Table 17.1 Results of Field Rinses of samples, Nolan Lode Project; from Day and Jeffress (2008)
Sample # | Sample Descriptions | pH | Conductivity (uS) | ORP |
Distilled water | | 4.85 | 9 | 391 |
Nolan 1 | Phyllite near portal opening waste materials | 7.02 | 1031 | 188 |
Nolan 2 | Phyllite near portal opening waste materials | 6.97 | 701 | 204 |
Nolan 3 | Phyllite near portal opening waste materials | 7.44 | 489 | 189 |
Nolan 6 | Phyllite fines from trench near Smith Creek | 7.07 | 3,930 | 208 |
Nolan 7 | Black phyllite from trench near Smith Creek | 7.33 | 1,751 | 206 |
Nolan 8 | Salts precipitated from black phyllite | 7.71 | 3,360 | 186 |
Nolan 9 | Weathered bedrock, orange | 2.48 | 4,170 | 596 |
At the request of SRK, the previous owner’s contractors collected samples from the underground mine workings for further testing, which are summarized in Table 17.2. The general approach of the underground sampling program as outlined by SRK was to target 13 feet (4 m) of true width in waste rock to evaluate variations along mineralization. However, the QP has not verified the results of analytical testing of these samples.
Table 17.2 Underground sampling program for ML/ARD Program, Nolan Camp, 2008
A regulatory issue did affect the previous owner’s 2007-2008 core drilling program on Pringle Bench north of Smith Creek. Exploration must comply with Section 106 of the National Historic Preservation Act (NHPA) as codified in USBLM regulation 36CFR 800. Silverado hired Northern Land Use Research (NLUR) of Fairbanks, Alaska to complete a cultural review on a number of claims where historic mining activities had taken place. NLUR produced a report for the previous owner
133
detailing the extent of historical artifacts present on the mining claims. That report was then forwarded to the USBLM (Neely, 2007).
17.7 Plans, Negotiations, or Agreements with Local Individuals or Groups
The QP is unaware of any negotiations or agreements with outside groups in the exploration and development of their mineral properties as described in this report.
17.8 Descriptions of any commitments to ensure local procurement and hiring
The QP is unaware of any commitments to ensure local procurement and hiring by USAC.
17.9 Qualified Person’s Opinion
The previous owner of the claims in the Nolan Creek area conducted geotechnical, hydrological, and environmental studies needed to acquire necessary permits to conduct their mining operations for placer gold and permits to conduct exploration of lodes.
The QP is unaware of any agreements reached with local individuals and groups. However, the previous owner established economic relations for provisions of goods and services necessary to operate their mining ventures. The previous owner was a regular customer for fuel, groceries, and needed equipment from Fairbanks and beyond as needed to operate their enterprise at Nolan Creek.
However, the Nolan camp closed nearly 15 years ago, and as a result, these relationships have ended. The QP believes that, given all the circumstances discussed above, it would be reasonable for GLM to initiate an aggressive program to rehabilitate and develop the lode antimony-gold resources described in this Initial Assessment and Technical Summary Report.
134
18.0 | CAPITAL AND OPERATING COSTS |
No capital or operating costs were generated for this Technical Report.
135
19.0 | ECONOMIC ANALYSIS |
No economic analysis has been completed by the QP for this Technical Report.
136
20.0 | ADJACENT PROPERTIES |
The Slisco Bench placer gold deposit occurs in the Vermont Creek drainage about two miles northeast of the subject claim group. The auriferous bench was explored extensively by RC drilling by the previous owner of the Nolan Creek claims during 2004-to-2005 (see Bundtzen (2008c). The bench system is thought to be very similar to that Nolan Creek valley and may have formed due to the same geological processes as at the former site.
Antimony-gold lode deposits have been described in the Chandalar mining district about 40 miles east of the Nolan Creek area and at Sukakpak Mountain about 15 miles north of the Nolan Creek and east of the Dalton Highway (Kurtak et al (1992). Both vein systems cut rocks of the Coldfoot terrane and may have a similar geological origin to those exposed on the subject claims in the Nolan Creek area. No lode antimony-gold mineral resources have been identified at either locale.
137
21.0 | OTHER RELEVANT DATA AND INFORMATION |
There is no additional relevant data to be reported by the QP for this Technical Report.
138
22.0 | INTERPRETATION AND CONCLUSIONS |
22.1 Mineral Resources
High-grade lode antimony and gold resources occur on Workman’s Bench and Pringle Bench in the Nolan Creek area, Wiseman District, Alaska, which has been previously examined for previous owners by the QP. There has been no additional environmental base line work, surface and underground engineering investigations, or metallurgical work at Nolan Creek since 2011. On Workman’s Bench, drill-tested, Measured and Indicated Mineral resources amount to 53,616 tons grading 26.27 percent antimony and 0.372 oz/ton gold. Using both drill-indicated and surface trenching data, an Inferred Mineral Resource totals 32,459 tons grading 14.50 percent antimony and 0.362 oz/ton gold occurs at Workman’s Bench and Pringle Bench to the northeast.
Based on targeted RC drilling programs across Federal placer claims, the previous owner identified an indicated resource in D-Block #1 and 3B3 zones amounting to 66,800 cubic yards grading 0.095 oz/yd gold.
It is assumed by the QP that both resource types would be developed using underground extraction technologies.
22.2 Environmental Permitting and Social
Permit requirements include an Alaska Placer Mine Application (APMA) from both state and federal agencies, including the U.S. Bureau of Land Management; a national pollution discharge elimination system (NPDES) permit from the U.S. Environmental Protection Agency; a 404 Wetlands permit from the U.S. Army Corps of Engineers; approval from the Mine Safety and Health Administration (MSHA); APMA and Bonding negotiations from the Alaska Department of Natural Resources (ADNR); a waste water treatment permit from the Alaska Department of Environmental Conservation (ADEC); and a Title 16 Permit from the Alaska Department of Fish and Game (ADF&G).
GLM will need to negotiate a maintenance plan for the Nolan Road with the Alaska Department of Transportation and Public Facilities, which conforms with guidelines set forth by the Alaska State Historical Preservation Office, if artifacts are encountered.
The QP is unaware of any social interactions or obligations with other groups active in the Nolan Creek area.
22.3 Mineral Processing
On behalf of the previous owner, the QP collected a 414 pound bulk sample of semi-massive to massive stibnite, vein quartz, and wall rock gangue all from the defined mineralized ‘A’ zone in the Workman’s Bench underground workings (see Bundtzen, 2008c). The purpose was to determine
139
the mineralogical nature of the antimony mineralization and the source of significant gold values. That bulk sample was collected underground from the main ‘A Zone’ on Workman’s Bench.
The bulk sample was sent to Hazen Research Labs Inc. (Hazen) in Golden, Colorado, USA in to determine the most optimal grind for potential marketing of a stibnite product and identify the mineralogical nature of gold and antimony values. The bench test results were very successful in helping to identify a processing path to produce gold and antimony concentrates for the market.
There is variation in gold content of the stibnite-bearing zones, even within constrained sample collection areas. The QP suggests that four (4) additional bulk samples of vein-fault mineralization be collected: 1) an additional sample of ‘A’ zone mineralization on Workman’s Bench ; 2) a bulk sample from ‘B’, West, and C zones on Workman’s Bench; 3) a bulk sample of the ‘A’ zone from Prongle Bench; and 4) a bulk sample from other mineralized zones on Pringle Bench.
22.4 Mineral Reserves
No Mineral Reserves have been identified in this Technical Report.
140
23.0 | RECOMMENDATIONS |
23.1 Mineral Resources
The QP does not make any specific recommendations to GLM/USAC for advancing their Indicated placer gold resources in Nolan Creek Valley. If those resources become a priority for development, the company should attempt to determine whether the paystreaks occur in dry versus water environments.
Going forward, GLM should complete additional infill diamond core drilling on Workman’s Bench. Workman’s Bench should be the top priority because it contains the best chance thus far known for documenting consistent widths and grades of stibnite-quartz-gold mineralization. The exploration focus on ‘A’ zone previously described but also include subsidiary vein systems. Drill-testing the zone of inferred mineralization should be given a high priority. A drill priority should also be to drill-test Pringle Bench. Figures 23.1 and 23.2 illustrate the proposed target areas.

Figure 23.1 Plan map of Priority 1 work program for Workman’s Bench, illustrating drill pattern to be used (in blue), and past drill collars and intercepts (in black and red).
141

Figure 23.2 Priority II program recommended for Pringle Bench, illustrating drill pattern to be used
The diamond drill core should be of a larger size than the modified NQ core previously used--not necessarily due to high recovery as the older NQ core was satisfactory in producing high recovery rates. Instead, use of larger diameter ‘P’ core and a drill rig capable of drilling to 1,000 foot depths (or more) could greatly assist in determining the overall vertical extent of the mineralizing system.
In order to accomplish the drill-testing, Pringle Bench should be scrapped off much like it was prior to 2011. The veins to be targeted for exploration were clearly visible (Figure 23.3, 23.4).

Figure 23.3 Ray Medina removes Pringle Bench overburden with hydraulic/air pressure technology, 2009. Photo from QP files.
142

Figure 23.4 Pringle Bench mineralized surface revealed after removal of overburden. The stibnite-quartz-gold veins and associated fault structures are marked in red. Photo from QP files.
Review of previous drill programs should be a priority before new drilling takes place. Most of the core has been stored on the property and appears to be in a useable condition (Figure 23.5)

Figure 23.5 USAC VP Rodney Blakestad inspects drill core storage facility on Nolan Creek. Photo from QP files.
143
23.2 Environmental, Permitting and Social.
GLM/USAC should build on environmental baseline work initiated by the previous owner. On behalf of the previous owner, SRK Consulting initiated base line studies on the property in 2008, but none have been completed since. GLM should advance baseline studies through investigations of geochemical characterization, meteorological precipitation, hydrological steam run-off (including storm water) prediction and mixing zone potential. An early significant conclusion from past environmental work is that un-weathered materials have a neutral pH; hence an ARD mitigation plan should be aimed at minimizing oxidation of waste rock and ore materials during disposal and in-capsulation of material. Large samples taken underground should be run using acid-base accounting procedures. In similar fashion, selected core of both mineralized vein and wall rock material from representative drill holes along strike and at depth should be split for the expressed purpose of acid-base accounting analyses.
To the QP’s knowledge, the previous owner was not engaged in any partnerships or agreements with outside parties. The leading landowner in the area is Doyon Limited (Doyon), a regional native corporation based in Fairbanks. Doyon owns lands immediately west of the Nolan Creek area, which juxtaposes the Gates of the Arctic National Park and Preserve. Doyon is currently in partnership with Wiseman Metals, a subsidiary of MDF-Global, on a district-scale evaluation of copper-precious metal ‘skarn’ and ‘porphyry style copper mineralization north northeast of Coldfoot; sometimes referred to as the ‘Chandalar Copper Belt’.
23.3 Geotechnical
Further work should expand the bedrock joint study with core-stress testing engineering studies initiated by the previous owner, which examined underground workings on Workman’s Bench. In addition, ASTM tensile stress measurements could be completed at a facility at the University of Alaska-Fairbanks, which can be made available for contracted uses. The QP has used this lab in past years during material site investigations for the Alaska Department of Transportation and Public Facilities. Completion of this work will help confirm what is already known about rock behavior as well as add information about modifications needed for underground extraction techniques and waste disposal planning.
23.4 Mineral Processing
Additional processing studies will be required to address specific mineral recovery objectives for either future lode or placer mining objectives. It is recommended to consult with University of Alaska geological engineering facilities as well as commercial facilities for additional mineral processing studies.
144
23.5 Tailings Storage
The QP does not recommend work on a tailings facility until information acquired from mineral processing, geotechnical, environmental or infill drilling programs are completed and when a proven reserve has been established During their initial planning for development of the lode antimony-gold assets at Workman’s Bench, the previous owner was considering use of the abandoned frozen drifts created by underground placer mine activities for the disposal of tailings. The QP assumes this plan was canceled after 2011, when the property became dormant.
23.6 Mineral Reserves
Mineral reserves cannot be established until a fundamentally upgraded, technical economic analysis is completed, incorporating previous studies and future studies. A Mineral Reserve analysis was provided in Chapter 18 of a previous Canadian National Instrument (NI) 43-101 Technical Report issued by the QP for the previous owner of subject claims (Bundtzen, 2011).
However, economic assumptions for the 2011 NI 43-101 Mineral Reserve study have significantly changed. Commodity prices have increased, but inflationary costs for fuel, groceries, equipment, labor and many other factors have driven costs significantly upward for operating a mineral development in Nolan Creek valley. Geopolitical issues have also become important considerations. A new mineral reserve study is recommended to be conducted at the discretion of GLM/USAC.
145
24.0 | REFERENCES |
Armstrong, Edward J., Childress, R., and Currey, Jeff, 1994, Gold reserve, and resource estimates and calculated assumptions for Nolan Creek placer deposits: Unpublished Silverado Gold Mines Ltd document dated October 27, 1994; 34 pages.
Berger, B.R., 1986, Descriptive model of low sulfide gold-quartz veins, in, Cox, D.P., and Singer, D.A., eds., Mineral deposit models, U.S. Geological Survey Bulletin 1693, p. 239-243.
Berger, V.I., 1993, Descriptive and grade and tonnage model for gold-antimony deposits: U.S. Geological Survey Open File Report 93-194, 22 pages.
Brosge, W.P., and Reiser, H.N., 1970, Geochemical reconnaissance in the Wiseman and Chandalar mining districts and adjacent region, southern Brooks Range. U.S. Geological Survey Professional Paper 709, 21 pages.
Bundtzen, T.K., 2004, Information Review and Recommendations Gold Properties on Ester Dome and at Eagle Creek, Fairbanks mining district, Alaska; and Nolan Area, Koyukuk mining district, Alaska: Independent Technical Report for Silverado Gold Mines, ltd., Pacific Rim Geological Consulting, Inc., unpublished report, 258 pages
Bundtzen, T.K., 2006a, Swede Channel 2005/2006 Development Project, Nolan Creek, Koyukuk District, Northern Alaska: Project review for Silverado Gold Mines ltd., by Pacific Rim Geological Consulting, Inc. 52 pages.
Bundtzen, T.K., 2006b, Project update: Completion of 2005-2006 Swede Channel Phase I Underground Development Activities on Nolan Creek, Koyukuk District, Northern Alaska: Project review for Silverado Gold Mines ltd., by Pacific Rim Geological Consulting, Inc. 68 pages.
Bundtzen, T.K., 2006c, Project Update: 1) Placer gold production from cleanup of 2006 Swede Channel pay gravels; and 2) Exploration activities of Silverado Gold Mines Ltd. In Koyukuk district: Project review for Silverado Gold Mines ltd., by Pacific Rim Geological Consulting, Inc. 64 pages
Bundtzen, 2008a, Review of 2007 Silverado Gold Mines, Ltd., Exploration and Gold production Activities in Koyukuk district, Northern Alaska: Discussion of New Placer Geology Information: Project review for Silverado Gold Mines ltd., by Pacific Rim Geological Consulting, Inc. 80 pages.
Bundtzen, T.K., 2008b, Bulk Sampling and Resource Evaluation Program, Workman Bench Gold-Antimony Deposit, Koyukuk District, Northern Alaska: Project Review for Silverado Gold Mines ltd., by Pacific Rim Geological Consulting, Inc. 44 pages.
Bundtzen, T.K., 2008c, Estimation of lode and placer mineral resources, Nolan Creek, Wiseman B-1 quadrangle, Koyukuk mining district, Northern Alaska, July 29, 2008: NI 43-101 Technical Report for Silverado Gold Mines, Inc., 133 pages.
146
Bundtzen, T.K., 2009, Update of Mineral resources and reserve estimates, and Preliminary Feasibility Study, Workman’s Bench Antimony-Gold Lode Deposit, Nolan Creek, Wiseman B-1 Quadrangle, Koyukuk Mining District, Northern Alaska; June 1, 2009): NI 43-101 report for Silverado Gold Mines, Ltd.
Bundtzen, T.K., 2011, Update of Mineral resources and reserve estimates, and Preliminary Feasibility Study, Workman’s Bench Antimony-Gold Lode Deposit, Nolan Creek, Wiseman B-1 Quadrangle, Koyukuk Mining District, Northern Alaska, July 9th, 2011: NI 43-101 report for Silverado Gold Mines, Ltd.
Bundtzen, T.K., and Eden, Karsten, 2008, Power Point Presentation on Swede Channel Developments, Wiseman B-1 Quadrangle, Alaska. Given at the Spring Alaska Miners Association Conference, March 25, 2008, Fairbanks Alaska.
Childress, R. L., 1995, Gold Reserve and Resource estimates for the Nolan Creek Placer Project: Unpublished Silverado Gold Mines Ltd. document dated January 14, 1995, 38 pages; which includes drill target area plates.
Cobb, E.H., 1973, Placer deposits of Alaska: U.S. Geological Survey Bulletin 1374, 213 pages
Cook, D.J., 1983, Placer Mining in Alaska: Mineral Industry Research Laboratory Report No. 65, Fairbanks, Alaska, 157 pages.
Daily, Arthur, 1962, Valuation of large gold-bearing placers: Engineering and Mining Journal Vol. 163, No. 7, pages 80-88.
Day, Stephen, and Jeffress, Bill, 2008, Sampling and Analysis Plan (SAP), Nolan Creek: Unpublished memo report to Silverado Gold Mines, Inc. and Tricon Mining, October 9th, 2008, 5 pages.
Dillon, J.T., 1989, Structure and stratigraphy of the southern Brooks Range and northern Koyukuk basin near the Dalton Highway, in, Mull, C.G., and Adams, K.E., eds., Dalton Highway, Yukon River to Prudhoe Bay, Alaska: Alaska Division of Geological and Geophysical Surveys Guidebook #7, p. 157-187.
Dillon, J.T., Brosge, W.P., and Dutro, J.T., Jr., 1986, Generalized geologic map of the Wiseman quadrangle, Alaska: U.S. Geological Survey Open File Report 86-219, one sheet @ 1:250,000 plus text.
Dillon, J.T., Lamal, K.K., and Huber, J.A., 1989, Gold deposits in the Upper Koyukuk and Chandalar mining districts, in, Mull, C.G., and Adams, K.E., eds., Dalton Highway, Yukon River to Prudhoe Bay: Alaska Division of Geological and Geophysical Surveys Guidebook #7, p. 195-201.
147
Dillon, J.T., and Reifenstuhl, R.R., 1990, Geologic map of the Wiseman B-1 quadrangle, south-central Brooks Range, Alaska: Alaska Division of Geological and Geophysical Surveys Professional Report 101, one sheet @ 1:63,360 scale plus text.
Doheny, L. C., 1941, Placer valuation in Alaska—Part I: Engineering and Mining Journal Vol. 142, No. 12, December, 1941, pages 47-49.
Doheny, L. C., 1942a, Placer valuation in Alaska—Part II: Engineering and Mining Journal Vol. 143, No. 1, January, 1942, pages 43-44.
Doheny, L. C., 1942b, Placer valuation in Alaska—Part III: Engineering and Mining Journal Vol. 143, No. 3, March, 1942, pages 48-49.
Driscoll, Alan J., Jr., 1987, Geology and economic geology of the Wiseman area, Koyukuk mining district, northern Alaska: Unpublished, confidential technical report by Alaska Mining Company, (ALMINCO), Anchorage, Alaska, 25 pages plus appendices.
Ebbley, N. Jr., and Wright, W.S., 1948, Antimony deposits in Alaska: U.S. Bureau of Mines Report of Investigations 4173, p. 37-38.
Eden, Karsten, 1999, Geology and gold mineralization of the Nolan area in the Brooks Range, Alaska: Masters thesis presented to Institute of Mineral Geology and Mining Engineering, Technical University of Clausthal, Germany, 147 pages. Several plates @ 1:21,000 scale.
Eden, Karsten, 2000, Geology and gold mineralization of the Nolan area in the Brooks Range, Alaska: U.S. Bureau of Land Management Open File Report 78, 140 pages
Flanigan, Brian P., 2003a, Discussion of geophysical modeling and interpretation of Solomon’s Shear: Confidential memo to Ed Armstrong, President, Tri-Con Mining Company Inc., August 10, 2003, 5 pages.
Flanigan, Brian P., 2003b, Tri-Con Mining Company Inc. Geology Department Monthly report June 1 to June 30, 2003: Unpublished, confidential activity summary for Tri-Con Mining dated July 2, 2003, 2 pages.
Flanigan, Brian P., 2003c, Results of Excavator sampling Program: Unpublished, confidential activity summary for Tri-Con Mining, Inc. dated July 30, 2003, 1 page.
Flanigan, Brian P., 2003d, Tri-Con Mining Company Inc. Geology Department Monthly report July 2 to June 30, 2003: Unpublished, confidential activity summary for Tri-Con Mining Inc. dated July 31, 2003, 2 pages.
Flanigan, Brian P. 2004, Comparison of Nolan Creek placer mining recoveries and drill-indicated resource estimates—an attempt to improve future placer gold resources estimates: Unpublished, confidential activity summary for Tri-Con Mining, Inc. dated October 25, 2004, 10 pages.
148
Flanigan, Brian P., Glassburn, Fawn, Kirkham, Russell, and Lessard, Richard, 2003, Solomon’s Shear and other potential lode targets at Nolan Creek: Unpublished, confidential activity summary for Tri-Con Mining, Inc. dated August 3, 2003, 7 pages with plates.
Gacetta, J.D., and Church, S.E., 1989, Lead isotope data base for sulfide occurrences in Alaska: U.S. Geological Survey Open File Report 89-688, 59 pages.
Hamilton, T.D., 1979, Surficial geologic map of the Wiseman quadrangle, Alaska: U.S. Geological Survey Miscellaneous Investigations Map MF-1122, scale 1:250,000
Hamilton, T.D., 1986, Late Cenozoic glaciation of the central Brooks Range, Alaska, in, Hamilton, T.D., Reed, K.M., and Thorson, R.M., eds., Glaciation in Alaska—the Geologic Record: Alaska Geological Society Special Research Volume, pages 9-50.
Hodgson, C.J., 1993, Mesothermal lode gold deposits, in, Kirkham, R.V., Sinclair, W.D., Thorpe, R.I., and Duke, J.M., eds., Mineral deposit modeling: Geological Association of Canada Special Paper 40, p. 635-678.
Ineson, P.R., 1989, Introduction to Practical Microscopy: Longman Scientific Technical, John Wiley and Sons New York, 181 pages
Joesting, H.R., 1942, Strategic Minerals in Interior Alaska: Alaska Territorial Department of Mines pamphlet #2, 46 pages.
Killeen, P.L., 1942, Antimony deposits near Wiseman, Alaska: U.S. Geological Survey War Pamphlet, 3 pages.
Knight, J.L., and McTaggart, K.C., 1989, Lode and Placer gold of the Coquihalla and Wells areas, Cariboo district, British Columbia, Canada: Exploration in British Columbia-1989: British Columbia geological Survey p. 105-117.
Kurtak, J.M., Klieforth, R.F., Clark, J.M., and Maclean, E.A., 2002, Mineral investigations in the Koyukuk mining district, northern Alaska: Volume II—Introductory Text and Summary of mines, prospects, and mineral occurrences in the Melozitna, Survey Pass, Tanana, and Wiseman quadrangles, Alaska: U.S. Department of Interior, Bureau of Land Management BLM-Alaska Technical Report 50, 450 pages
Laznicka, Peter, 1985, Empirical Metallogeny—Depositional Environments, Lithologic Associations, and Metallic Ores: Elsevier Publishers, Amsterdam, p. 1,350 pages.
Maddren, A.G., 1910, The Koyukuk-Chandalar region,: U.S. Geological Survey Bulletin 442-G, pages 284-315.
Maddren, A.G., 1913, The Koyukuk-Chandalar region, Alaska: U.S. Geological Survey Bulletin 532, 119 pages.
149
Moiser, E.L., and Lewis, J.S., 1986, Analytical results, geochemical signatures, and sample locality map of lode gold, placer gold, and heavy mineral concentrates from the Koyukuk-Chandalar mining district, Alaska: U.S. Geological Survey Open File Report 86-345, 173 pages.
Moore, T.E., Wallace, W.K., Bird, K.J., Karl, S.M., Mull, C.G., and Dillon, J.T., 1994, Geology of northern Alaska, in, Plafker, George, and Berg, H.C., eds., The Geology of Alaska: Boulder, Colorado, Geological Society of America, the Geology of North America, Volume G-1, p. 49-140.
Mull, C.G., 1989, Chapter 6—Summary of structural style and history of the Brooks Range deformation, in, Mull, C.G., and Adams, K.E., eds., Dalton Highway, Yukon River to Prudhoe Bay, Alaska: Alaska Division of Geological and Geophysical Surveys Guidebook #7, p. 47-56.
Neely, Burr, 2007, Cultural Resource Survey of proposed Exploration Drilling and Mining Locations in the Vicinity of Nolan, Alaska: Unpublished report prepared for Silverado Gold Mines, Inc. by Northern Land Use Research, Inc., 22 pages.
Peters, W.C., 1978, Exploration and Mining Geology: John Wiley and Sons, New York, 695 pages.
Proffett, J.M., 1982, Preliminary report on the geology of the Hammond River-Vermont Creek gold placer area, Wiseman district, Alaska: Unpublished Confidential Report by J.M Proffett and Associates, Inc., Eagle River, Alaska, 15 pages.
Reed, Irving McKinney, 1938, Upper Koyukuk Region, Alaska: Alaska Territorial Department of Mines Miscellaneous Report 194-7, 169 pages.
Reger, R.D., and Bundtzen, T.K., 1990, Multiple glaciation and gold placer formation, Valdez Creek valley, western Clearwater Mountains, Alaska: Alaska Division of Geological and Geophysical Surveys Professional Report 107, 29 pages.
Schultz, C.P., 2008a, Report #1: Flotation and gravity results, Workman’s Bench Stibnite-Gold Bulk Sample, Wiseman District, Alaska: Unpublished report by Hazen Research, Inc., for Pacific Rim Geological Consulting, Inc. 10 pages.
Schultz, C.P., 2008b, Report #2: Mineralogical examination Workman’s Bench Stibnite-Gold Bulk Sample, Wiseman District, Alaska: Unpublished report by Hazen Research, Inc., for Pacific Rim Geological Consulting, Inc. 18 pages.
Staff, 2003, Standards and Guidelines for Valuation of Mineral properties: Special Committee of the CIM Metallurgy and Petroleum Valuation of Mineral properties: 33 pages.
Staff, 2004, Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines: CIM Council, 35 pages.
Staff, 2005a, National Instrument 43-101 Standards of Disclosure for Mineral projects, Form 43-101 and Companion Policy 43-101 CP: 29 pages.
150
Staff, 2005b, Form 43-101F1-Contents of the Technical report: 9 pages.
Silverado Staff (Eden), 2008a, Workman’s bench Drilling and Underground Exploration Program 2007-2008, Horizontal Plan View Map, October 21, 2008; one sheet at scale 1:1,000
Silverado Staff (Eden), 2008b, Workman’s bench Drilling and Underground Exploration Program 2007-2008, Vertical Section 1, S1-S1’, October 21, 2008 scale: one inch=50 feet
Silverado Staff (Eden), 2008c, Workman’s bench Drilling and Underground Exploration Program 2007-2008, Vertical Section 2, S2-S2’, scale: October 21, 2008, scale one inch=50 feet
Silverado Staff (Eden), 2008d, Workman’s bench Drilling and Underground Exploration Program 2007-2008, Vertical section 3, S3-S3’, October 21, 2008, scale: one inch=50 feet
Silverado Staff (Eden), 2008e, Workman’s bench Drilling and Underground Exploration Program 2007-2008, Vertical section 4, S4-S4’, October 21, 2008, scale: one inch=50 feet
Silverado Staff (Eden), 2008e, Workman’s bench Drilling and Underground Exploration Program 2007-2008, Vertical section 5, S5-S5’, scale: one inch=50 feet
Silverado Staff (Eden), 2008f, Workman’s bench Drilling and Underground Exploration Program 2007-2008, Vertical section 1, A-A’, May 2, 2008 scale: one inch=50 feet
Silverado Staff (Eden), 2008g, Workman’s bench Drilling and Underground Exploration Program 2007-2008, Vertical section 2, B-B’, June 6, 2008 scale: one inch=50 feet
Silverado Staff (Eden), 2008h, Workman’s bench Drilling and Underground Exploration Program 2007-2008, Vertical section 3, C-C’, May 2, 2008, scale: one inch=50 feet
Silverado Staff (Eden), 2008i, Workman’s bench Drilling and Underground Exploration Program 2007-2008, Vertical section 4, D-D’, May 2, 2008, scale: one inch=50 feet
Silverado Staff (Eden), 2008j, Workman’s bench Drilling and Underground Exploration Program 2007-2008, Vertical section 5, E-E’, May 2, 2008, scale: one inch=50 feet
Silverado Staff (Eden), 2008k, Workman’s bench Drilling and Underground Exploration Program 2007-2008, Vertical section 6, F-F’, May 2, 2008, scale: one inch=50 feet
Silverado Staff (Eden), 2008l, Workman’s bench Drilling and Underground Exploration Program 2007-2008, Vertical section 7, H-H’, June 6, 2008, scale: one inch=50 feet
Silverado Staff (Eden), 2008m, Pringle bench Drilling and Underground Exploration Program 2007, Vertical section 7, H-H’, February 8, 2008, scale: one inch=100 feet
Stone, J.G., Dunn, P.G., and Sheahan, P., 1998, Ore Reserve Estimates in the Real World: Society of Economic Geologists Special Publication Number 3, Second Edition, Citizens Printing Company, Littleton, Colorado, 160 pages
151
Swainbank, R.C., Bundtzen, T.K., Clough, A.H., Henning, M.W., and Hansen, E.W., 1995, Alaska’s Mineral Industry-1994, Alaska Division of Geological and Geophysical Surveys Special Report 49, 77 pages.
Tchapko, Vitali, 1995, Placer and hardrock gold deposits in the Central Kolyma area, Magadan region, Northeast Russia, in, Bundtzen, T.K., Fonseca, A.L., and Mann, Roberta, eds., Geology and Mineral Deposits of the Russian Far east: Alaska Miners Association Special Symposium Volume 1, p. 29-35.
Turner, D.L., Forbes, R.B., and Dillon, J.T., 1979, K-Ar geochronology of the southern Brooks Range, Alaska: Canadian Journal of Earth Sciences, vol. 16, no. 9, p. 1789-1804.
152
25.0 RELIANCE ON INFORMATION PROVIDED BY REGISTRANT
The Registrant (GLM/USAC) provided detailed information concerning their ownership of the thirty-six (36) federal lode and placer claims in the Nolan Creek Valley that were acquired through a Trustee’s public auction on January, 30, 2026. The Registrant also provided details of the forty-eight (48) Alaska State Mining Claims acquired during the fall of 2026.
In June, 2026, the QP accompanied USCA’s Vice President of the company’s Mining Division, Rodney Blakestad, on a two-day examination of the company’s properties in Nolan Creek valley.
Remaining information disclosed in this Technical Report is the responsibility of the QC.
153
APPENDIX I: Summary of Relevant Sample Data Used in Calculation of all Categories of Sb and Au Resources from Workman’s Bench That are Described in this Technical Report; Including Relevant Trace Element Data
Sample | Drill Hole # | Underground | Stibnite | From (feet) | To | Width | Estimated | Sb (%) | Au | As | Hg | Pb | Brief Description |
1 | 08SH02 | | West of ‘A’ Zone | 160.0 | 160.6 | 0.6 | 0.50 | 23.30 | 0.031 | 2520 | 0.30 | 24.0 | Quartz-Stibnite vein |
2 | 08SH02 | | ‘A’ Zone | 186.5 | 187.5 | 1.0 | 0.70 | 37.92 | 0.091 | 15.0 | 0.72 | <0.2 | 5.5 inch (true |
3 | 08SH02 | | ‘B’ Zone | 193.0 | 193.8 | 0.8 | 0.58 | 7.11 | 0.190 | 3260 | 0.59 | 10.3 | 2 parallel quartz |
4 | 08SH03 | | West of ‘A’ Zone | 41.4 | 42.5 | 1.1 | 1.00 | 37.91 | 0.301 | 0.8 | 0.45 | 1.4 | Sheared stibnite- |
5 | Including | | West of ‘A’ Zone | 41.4 | 42.0 | 0.6 | 0.45 | 42.05 | 0.420 | <0.01 | 1.38 | <0.2 | Sheared nearly |
6 | 08SH03 | | ‘A’ Zone | 115.9 | 117.0 | 1.1 | 0.91 | 26.73 | 0.410 | 139 | 0.40 | 5.1 | Several closely |
7 | 08SH03 | | Hanging wall ‘A’ zone | 117.0 | 117.5 | 0.5 | 0.41 | 0.07 | 0.360 | 8560 | 1.26 | 20.6 | Hanging wall trace |
8 | 08SH03 | | ‘B’ Zone | 130.3 | 130.9 | 0.6 | 0.49 | 13.65 | 0.130 | 188 | 0.41 | 17.6 | Stibnite-quartz vein |
9 | 08SH03 | | Zone not designated | 161.5 | 162.0 | 0.5 | 0.41 | 0.01 | 0.140 | >10000 | 0.37 | 9.8 | Arsenopyrite-rich |
10 | 08SH03 | | ‘C’ Zone | 195.5 | 196.1 | 0.6 | 0.41 | 0.70 | 0.130 | 9930 | 0.15 | 56.1 | Quartz-stibnite zone; |
11 | 08SH01B | | ‘West’ Zone | 33.8 | 35.2 | 1.4 | 0.92 | 53.44 | 0.280 | <0.1 | 0.30 | 5.0 | Massive stibnite with |
12 | 08SH01B | | ‘A’ Zone’ Footwall | 95.7 | 96.4 | 0.7 | 0.42 | 28.69 | 0.230 | 110 | 0.36 | 1.2 | 5 inch thick, vertical |
13 | 08SH01B | | Main ‘A’ Zone | 98.2 | 101.3 | 3.0 | 2.49 | 18.43 | 0.130 | 248 | 0.28 | 1.3 | quartz-stibnite veins; |
154
Sample | Drill Hole # | Underground | Stibnite | From (feet) | To | Width | Estimated | Sb (%) | Au | As | Hg | Pb | Brief Description |
14 | 08SH01B | | Hanging Wall | 108.0 | 108.5 | 0.5 | 0.41 | 26.05 | 0.020 | 5.9 | 0.21 | 1.1 | 2.0 inch massive |
15 | 08SH01B | | ‘B’ Zone | 139.0 | 142.2 | 3.2 | 2.65 | 12.22 | 0.015 | 300 535 100 | 3.67 0.37 0.30 | 1.2 19.2 0.7 | Massive stibnite |
16 | Including | | ‘B’ zone | 141.6 | 142.2 | 0.6 | 0.49 | 19.87 | 0.010 | 100.5 | 0.3 | 0.7 | Thickest stibnite- |
17 | 08SH01B | | ‘C’ Zone | 198.7 | 199.2 | 0.5 | 0.41 | 17.86 | 0.210 | 610 | 0.16 | 0.9 | 2.0 inch semi-massive |
18 | 08SH15 | | ‘West Zone | 84.0 | 85.7 | 1.7 | 1.10 | 10.55 | 0.141 | 1,220 | 0.57 | 0.7 | Stibnite-quartz zone |
19 | 08SH15 | | ‘A’ Zone | 113.0 | 117.0 | 4.0 | 2.58 | 23.06 | 0.028 | 527 | 0.87 | <0.02 | Semi-massive stibnite |
20 | 08SH15 | | ‘B’ Zone | 182.5 | 190.7 | 8.2 | 4.80 | 6.25 | 0.092 | 2836 | 0.31 | <0.02 | Diffuse zone of |
21 | 08SH15 | | ‘C’ Zone ? | 194.6 | 196.2 | 1.6 | 0.94 | 0.89 | 0.050 | 7620 | 0.29 | 18.3 | Weak zone with thin |
22 | 08SH14 | | ‘West’ Zone | 56.5 | 57.0 | 0.5 | 0.41 | 4.02 | 0.008 | 742 | 0.18 | 2.0 | 1.0 inch quartz- |
23 | 08SH14 | | Zone not | 88.3 | 92.0 | 3.7 | 3.07 | 0.27 | 0.180 | >10000 | 0.23 | 6.9 | Arsenopyrite-rich |
24 | 08SH14 | | ‘A’ Zone | 108.5 | 109.2 | 0.7 | 0.60 | 0.06 | 0.010 | 3000 | 0.31 | 9.0 | Notes from 09/27/08 |
25 | 08SH14 | | ‘B’ Zone | 121.0 | 122.0 | 1.0 | 0.83 | 0.25 | 0.260 | 4270 | 0.27 | 24.6 | Disseminated stibnite |
26 | 08SH14 | | ‘C’ Zone | 179.2 | 179.9 | 0.7 | 0.58 | 1.75 | 0.040 | 4320 | 0.44 | 81.2 | Vuggy Quartz vein |
27 | 08SH14 | | Possible ‘C’ Zone Extension | 183.8 | 184.3 | 0.6 | 0.50 | 0.02 | 0.190 | >10000 | 0.29 | 41.5 | Arsenopyrite-rich |
28 | 08SH17 | | ‘A’ Zone | 285.0 | 288.3 | 3.3 | 1.91 | 0.00 | 0.160 | 8080 | 0.30 | 4.6 | Wide zone of |
155
Sample | Drill Hole # | Underground | Stibnite | From (feet) | To | Width | Estimated | Sb (%) | Au | As | Hg | Pb | Brief Description |
29 | Including | | ‘A’ Zone | 287.6 | 288.3 | 0.9 | 0.52 | 4.63 | 0.230 | >10000 | 0.24 | 5.6 | 4 inch zone of |
30 | 08SH17 | | ‘B’ Zone | 299.3 | 299.9 | 0.6 | 0.35 | 13.63 | 0.200 | 28.5 | 1.02 | <0.2 | 0.75 inch of massive |
31 | 08SH17 | | ‘C’ Zone | 311.8 | 312.9 | 1.1 | 0.64 | 0.01 | 0.120 | >10000 | 0.30 | 8.9 | Visual by QP: |
32 | 08SH16 | | West of ‘west’ Zone | 156.0 | 157.0 | 1.0 | 0.83 | 0.93 | 0.092 | 9340 | 0.37 | 12.8 | Quartz-stibnite vein |
33 | 08SH16 | | ‘West’ Zone | 197.0 | 198.0 | 1.0 | 0.83 | 1.11 | 0.020 | 2370 | 0.28 | 13.7 | Quartz-stibnite vein 4 |
34 | 08SH16 | | ‘A’ Zone | 233.7 | 234.7 | 1.0 | 0.83 | 1.64 | 0.053 | 7910 | 0.17 | 21.2 | Quartz vein with 5-8% |
35 | 08SH16 | | ‘B’ Zone | 309.5 | 310.5 | 1.0 | 0.83 | 0.00 | 0.390 | 1000 | 0.28 | 9.6 | Quartz vein with |
36 | 07SH01 | | ‘A’ Zone Main Vein | 201.00 | 202.00 | 1.0 | 0.83 | 9.37 | 0.211 | 2250 | NA | NA | Semi-Massive stibnite |
37 | 07SH01 | | ‘B’ Zone | 223.50 | 242.50 | 19.00 | 15.77 | 3.24 | 0.091 | 3020 | NA | NA | Quartz –stibnite vein |
38 | Including | | ‘B’ Zone | 237.40 | 242.50 | 6.00 | 4.81 | 8.81 | 0.191 | 1250 | NA | NA | Two main stibnite- |
39 | Including | | ‘B’ Zone | 238.40 | 238.90 | 0.50 | 0.41 | 28.69 | 0.023 | NA | NA | NA | Massive stibnite in |
40 | Trench (W399) | | ‘A’ Zone Main Vein | NA | NA | 1.20 | 1.20 | 50.63 | 0.240 | NA | NA | NA | Furthest trench |
41 | 07SH18 | | ‘West’ Zone | 46.5 | 53.5 | 7.0 | 3.26 | 1.24 | 0.029 | 325 | NA | NA | Stibnite bearing |
42 | Including | | ‘West’ Zone | 52.7 | 53.5 | 0.8 | 0.67 | 7.94 | 0.058 | 160 | NA | NA | Stibnite bearing |
43 | 08SH16 | | ‘West’ Zone | 156.0 | 157.0 | 1.0 | 0.83 | 0.93 | 0.090 | 9340 | 0.37 | 12.8 | Quartz carbonate vein |
44 | 08SH16 | | ‘A’ Zone | 197.0 | 198.0 | 1.0 | 0.83 | 1.11 | 0.020 | 2370 | 0.28 | 13.7 | Disseminated stibnite |
156
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Sb (%) | Au | As | Hg | Pb | Brief Description |
45 | 08SH32 | | ‘West’ Zone | 171.5 | 177.5 | 6.0 | 6.23 | 0.085 | See below | See below | See below | Wide zone (true |
46 | Including | | West Zone | 171.5 | 172.8 | 1.6 | 14.63 | 0.110 | See below | See below | See below | Wide zone of quartz- |
47 | Including | | ‘West Zone | 172.8 | 173.3 | 0.5 | 21.24 | 0.180 | 578 | 1.57 | 5.1 | Semi-massive stibnite |
48 | Including | | West Zone | 176.0 | 177.5 | 1.5 | 12.62 | 0.060 | 337 | 0.46 | 5.1 | Three flecks of gold |
49 | 08SH32 | | ‘A’ Zone hanging wall | 177.5 | 179.5 | 2.0 | 0.04 | 0.010 | 320 | 0.26 | 46.7 | Visual by QP: 20% |
50 | 08SH32 | | ‘A’ Zone Hanging Wall | 186.5 | 188.0 | 1.5 | 1.22 | 0.275 | 1490 | 0.21 | 10.3 | Quartz carbonate vein |
51 | 08SH32 | | ‘A’ Zone | 203.7 | 209.5 | 5.8 | 8.20 | 0.180 | >10000 18.2 7600 | 0.28 7.22 0.26 | 3.9 0.2 5.6 | Wide zone (true |
52 | Including | | ‘A’ Zone | 205.7 | 206.6 | 0.9 | 38.74 | 1.130 | 18.2 | 7.22 | 0.2 | Strong zone of |
53 | 08SH32 | | ‘B’ Zone | 212.0 | 213.5 | 1.5 | 0.09 | 0.030 | 5250 | 0.23 | 13.5 | 5% percent Sb2S3 in |
54 | 08SH33 | | ‘West ’ Zone | 162.0 | 167.0 | 5.0 | 2.70 | 0.040 | 2140 | 0.59 | 23.9 | Wide stockwork vein |
55 | 08SH33 | | ‘A’ Zone | 242.0 | 243.2 | 1.2 | 14.74 | 0.030 | 68.5 | 0.29 | 1.2 | Wide zone (true |
56 | Including | | ‘A’ Zone | 242.0 | 242.6 | 0.6 | 19.68 | 0.040 | 68.5 | 0.29 | 1.2 | Disseminated to |
57 | | 203797 | ‘A’ Zone | 166.20 | 167.70 | 1.50 | 0.36 | 0.036 | 67 | ND | 275 | NW fracture adjacent |
58 | 08SH13 | | Zone not designated | 17.8 | 18.3 | 0.5 | 13.16 | 0.025 | 20.4 | 2.1 | <0.2 | Quartz-stibnite zone |
157
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Estimated | Sb (%) | Au | As | Hg | Pb | Brief Description |
59 | 08SH13 | | ‘West’ Zone? | 121.3 | 126.7 | 5.4 | 3.40 | 1.99 | 0.138 | >10000 | 0.31 | 11.8 | Significant wide zone |
60 | 08SH13 | | ‘A’ Zone | 187.5 | 188.8 | 1.3 | 1.00 | 22.15 | 0.061 | 308 | 0.17 | 1.3 | Thick quartz-stibnite |
61 | 08SH13 | | ‘B’ Zone | 208.4 | 212.2 | 3.8 | 2.43 | 6.21 | 0.061 | 2050 4410 | 0.53 0.19 | 14.0 18.4 | Wide zone of |
62 | Including | | ‘B’ Zone | 208.4 | 209.9 | 1.5 | 0.96 | 6.97 | 0.26 | 2050 | 0.53 | 14.0 | Stibnite lobes in wide |
63 | 08SH13 | | ‘C’ Zone | 250.6 | 252.6 | 2.0 | 1.28 | 0.07 | 0.050 | 5760 | 0.12 | 24.5 | Quartz carbonate |
64 | | 203405 | ‘West’ Zone | 138.0 | 139.5 | 1.5 | 1.50 | 41.20 | 0.110 | NA | NA | NA | Semi-massive stibnite |
65 | | 203789 | ‘West’ Zone | 40.5 | 42.0 | 1.5 | 1.50 | 22.48 | 0.556 | 4152 | NA | 141 | In wall of connecting |
66 | | 203808 | A Zone | 172.0 | 173.50 | 1.50 | 1.50 | 43.64 | 1.19 | 52 | NA | <0.2 | Nearly massive |
67 | | WBUG3 S1 | ‘A’ Zone | 172.9 | 173.32 | 0.42 | 0.42 | 52.10 | 0.676 | 0.5 | NA | 1.1 | Massive stibnite core |
68 | | WBUG3 S2 | ‘A’ Zone | 172.9 | 173.32 | 0.42 | 0.42 | 58.89 | 0.329 | <0.1 | NA | 0.5 | Massive stibnite core |
69 | | WBUGG3 S3 | ‘A’ Zone | 172.9 | 173.32 | 0.42 | 0.42 | 60.90 | 0.031 | 3010 | NA | 18.2 | Massive stibnite core |
70 | | WBUGG3 S4 | ‘A’ Zone | 172.9 | 173.32 | 0.42 | 0.42 | 55.71 | 0.451 | 1.3 | NA | 0.4 | Massive stibnite core |
71 | | WBUGG3 S5 | ‘A’ Zone | 172.9 | 173.32 | 0.42 | 0.42 | 11.10 | 0.444 | 2520 | NA | 4.5 | Massive stibnite core |
72 | | WBUG8- S2 | ‘A’ Zone | 182.9 | 183.32 | 0.42 | 0.42 | 58.76 | 0.145 | 0.7 | NA | 0.2 | Massive stibnite core |
73 | | 203802 | ‘A’ Zone | 114.0 | 116.50 | 2.50 | 2.50 | 37.78 | 0.076 | 68 | NA | <0.2 | ‘A’ Zone in south drift |
74 | | 203810 | ‘B’ Zone | 183.0 | 183.5 | 0.5 | 0.50 | 41.00 | 0.696 | 66 | NA | <0.2 | Nearly massive |
75 | | 203791 | ‘B’ Zone | 199.1 | 200.35 | 0.50 | 0.50 | 39.73 | 0.362 | 1163 | NA | <0.2 | Nearly massive |
76 | | WBUGG8 S1 | ‘A’ Zone | NA | NA | 0.42 | 0.42 | 57.52 | 0.359 | 1 | NA | <0.2 | Massive stibnite |
77 | | WBUG5 S2 | ‘B’ Zone | 199.8 | 200.22 | 0.42 | 0.42 | 50.04 | 1.040 | 0.7 | NA | <0.2 | Massive stibnite in |
78 | | WBUG8 S3 | ‘B’ Zone | NA | NA | 0.42 | 0.42 | 58.02 | 0.696 | 2.5 | NA | <0.2 | Massive stibnite core |
79 | | 203795 | ‘A’ Zone | 40.00 | 41.50 | 1.50 | 1.50 | 40.35 | 0.357 | 52 | NA | <0.2 | Semi-Massive |
80 | | 203488 | ‘B’ Zone | 122.00 | 123.2.0 | 0.65 | 0.65 | 18.05 | 0.039 | NA | NA | NA | Semi-Massive |
81 | | WBUG9 S1 | ‘B’ Zone | 124.00 | 124.42 | 0.42 | 0.42 | 33.92 | 0.084 | 18.8 | NA | <0.2 | Semi-Massive |
158
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Estimated | Sb | Au | As | Hg | Pb | Brief Description |
82 | | WBUGG9 S2 | ‘B’ Zone | NA | NA | 0.42 | 0.42 | 17.34 | 0.130 | 459 | NA | 0.4 | Semi-Massive stibnite |
83 | | WBUGG5 S3 | ‘C’ Zone | NA | NA | 0.42 | 0.42 | 13.38 | 0.031 | 2530 | NA | 3.8 | Semi-Massive stibnite |
84 | | WBUGG9 S4 | ‘B’ Zone | NA | NA | 0.50 | 0.50 | 7.34 | 0.513 | 5590 | NA | 2.3 | Semi-massive stibnite |
85 | | 203804 | B Zone Vein | 218.0 | 218.45 | 0.45 | 0.45 | 56.88 | 0.033 | NA | NA | NA | Massive stibnite vein |
86 | | 203450 | A Zone | 68.00 | 69.50 | 1.50 | 1.50 | 57.02 | 0.012 | NA | NA | NA | Massive Stibnite vein |
87 | | 203409 | B Zone Vein | 172.00 | 172.45 | 0.45 | 0.40 | 51.41 | 0.372 | NA | NA | NA | Massive Stibnite |
88 | | Trench J (52) | A Zone Main | 151.0 | 159.2 | 8.2 | 8.20 | 30.30 | 0.140 | NA | NA | NA | Semi-massive stibnite |
89 | | Trench J | A Zone Main | 159.2 | 167.4 | 8.2 | 8.20 | 1.72 | 0.220 | NA | NA | NA | Disseminated stibnite |
90 | | Trench J | Surface B | 167.4 | 175.6 | 8.2 | 8.20 | 11.70 | 0.037 | NA | NA | NA | Semi-massive stibnite |
91 | | 267397 | Main ‘A’ Vein; | 171.4 | 172.25 | 0.85 | 0.85 | 36.51 | 0.793 | 67 | NA | 275 | Massive Stibnite |
92 | | Trench J | Surface B | 175.6 | 183.8 | 8.2 | 8.20 | 29.30 | 0.120 | NA | NA | NA | Semi-massive stibnite |
93 | | Trench J | Zone between | 183.80 | 192.00 | 8.2 | 8.20 | 2.56 | 0.016 | NA | NA | NA | Disseminated stibnite |
94 | | Trench J | ‘B’ Zone | 192.00 | 201.80 | 9.8 | 9.80 | 14.05 | 0.016 | NA | NA | NA | Semi-massive stibnite |
95 | | Trench J | West Vein on Surface | 35.0 | 43.2 | 8.2 | 8.20 | 1.70 | 0.040 | NA | NA | NA | West Vein as seen in |
96 | 08SH18 | | Interpreted ‘West’ Vein | 276.0 | 277.0 | 1.0 | 0.64 | 0.01 | 0.037 | NA | NA | NA | Arsenopyrite-rich |
97 | 08SH18 | | ‘A’ Zone | 313.0 | 315.0 | 2.0 | 1.27 | 0.15 | 0.102 | 3,420 | 0.23 | 6.5 | Footwall zone with |
98 | 08SH18 | | ‘A’ Zone | 315.0 | 316.8 | 1.8 | 1.15 | 27.65 | 2.88 | 27.1 | 3.21 | 0.5 | High grade quartz-stibnite vein |
99 | | WBUG1-S2 | ‘A’ Zone | 138.80 | 139.22 | 0.42 | 0.42 | 64.34 | 0.030 | NA | NA | NA | Massive stibnite near |
100 | 07SH15 | | ‘West’ Zone’ | 127.0 | 130.5 | 3.5 | 2.59 | 0.25 | 0.035 | 1,000 | 268 | 11.2 | Disseminated stibnite |
101 | 07SH15 | | ‘A’ Zone | 192.0 | 197.8 | 5.80 | 4.29 | 4.07 | 0.104 | 912 | NA | 3.6 | Disseminated stibnite |
102 | 07SH15 | | ‘B’ Zone | 242.00 | 247.80 | 5.80 | 3.95 | 3.45 | 0.060 | 982 | NA | 5.5 | Quartz stibnite |
159
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Estimated | Sb | Au | As | Hg | Pb | Brief Description |
103 | Including | | ‘B’ Zone | 245.3 | 245.8 | 0.60 | 0.49 | 34.51 | 0.554 | 138 | NA | 3.1 | Semi-Massive stibnite |
104 | 07SH15 | | ‘C’ Zone | 253.3 | 253.8 | 0.5 | 0.41 | 9.69 | 0.056 | 922 | NA | 2.0 | Disseminated stibnite |
105 | 08SH12B | | ‘West’ Zone | 180.4 | 180.9 | 0.5 | 0.41 | 6.94 | 0.050 | 1,060 | 0.36 | 0.3 | Quartz vein 8 inches |
106 | 08SH12B | | ‘A’ Zone | 204.1 | 209.0 | 4.9 | 3.62 | 6.99 | 0.107 | 1,936 | 0.36 | 1.0 | Stibnite-bearing |
107 | Including | | ‘A’ Zone | 204.1 | 205.0 | 0.90 | 0.72 | 7.05 | 0.05 | 1,345 | 0.35 | 1.5 | Base of hanging wall |
108 | Including | | ‘A’ Zone | 208.1 | 209.0 | 0.9 | 0.72 | 20.97 | 0.220 | 10.8 | 0.47 | <0.2 | Semi-massive stibnite |
109 | 08SH12B | | ‘B’ Zone | 236.3 | 236.8 | 0.5 | 0.40 | 0.40 | 0.030 | 2930 | 0.19 | 69.1 | Thin, 3 inch thick |
110 | 08SH12B | | ‘C’ Zone | 250.0 | 251.7 | 1.7 | 1.36 | 0.01 | 0.040 | 2720 | 0.31 | 10.4 | Quartz veon zone |
111 | 08SH12B | | ‘West Zone’ | 179.8 | 180.4 | 0.6 | 0.41 | 0.01 | 0.029 | 4130 | 0.13 | 2.3 | Veinlet zone in |
112 | 07SH14 | | ‘West’ Zone | 161.6 | 172.0 | 10.4 | 7.80 | 4.99 | 0.056 | 2470 | NA | NA | Stibnite stockwork |
113 | Including | | ‘West’ Zone | 166.2 | 167.6 | 1.4 | 1.05 | 29.23 | 0.224 | 201 | NA | NA | Semi-Massive stibnite |
114 | 07SH14 | | ‘A’ Zone | 208.6 | 209.6 | 1.0 | 0.80 | 6.42 | 0.242 | 7000 | NA | NA | Stibnite stockwork vein zone |
115 | Including | | ‘A’ Zone | 209.0 | 209.15 | 0.15 | 0.10 | 51.42 | 1.610 | 1100 | NA | NA | Thin massive stibnite |
116 | 07SH14 | | ‘B’ Zone | 240.0 | 240.5 | 0.5 | 0.40 | 8.81 | 0.160 | 621 | NA | NA | Thin stibnite |
117 | 07SH14 | | ‘C’ Zone | 257.7 | 258.7 | 1.0 | 0.8 | 0.152 | 0.071 | 5,580 | NA | ND | Disseminated Sb and |
118 | 08SH11 | | ‘West’ Zone | 184.7 | 185.4 | 0.9 | 0.58 | 3.55 | 0.073 | 2670 | 0.17 | 2.4 | Stibnite bearing |
119 | 08SH11 | | ‘A’ Zone | 193.0 | 197.0 | 4.0 | 2.56 | 8.12 | 0.184 | 6700 | 0.22 | 7.5 | Stibnite bearing |
160
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Estimated | Sb | Au | As | Hg | Pb | Brief Description |
120 | Including | | Footwall of ‘A’ | 193.6 | 194.5 | 0.9 | 0.58 | 10.02 | 0.120 | 1710 | 0.21 | 3.7 | Footwall zone of ‘A’ |
121 | Including | | ‘A’ Zone | 196.2 | 197.0 | 0.8 | 0.51 | 10.36 | 0.330 | 389 | 0.13 | 0.7 | Main ‘A’ zone |
122 | 08SH11 | | ‘B’ Zone | 225.3 | 226.1 | 0.8 | 0.51 | 11.20 | 0.700 | 984 | 2.01 | 1.6 | Quartz-stibnite zone |
123 | 08SH11 | | ‘C’ Zone? | 275.8 | 276.8 | 1.0 | 0.65 | 11.36 | 0.040 | 7790 | 0.11 | 6.5 | Quartz-stibnite vein |
124 | 07SH13 | | ‘West’ Vein | 38.5 | 39.3 | 0.8 | 0.66 | 2.34 | 0.074 | >10000 | NA | 7.8 | Thin quartz stibnite |
125 | 07SH13 | | ‘A’ Zone | 133.0 | 134.5 | 1.5 | 1.24 | 0.05 | 0.230 | 3740 | NA | 4.2 | True thickness of |
126 | 07SH13 | | ‘B’ Zone | 196.0 | 200.0 | 4.0 | 2.80 | 3.37 | 0.040 | 1315 | NA | 5.0 | Stibnite bearing |
127 | Including | | ‘B’ Zone | 196.0 | 196.5 | 0.5 | 0.40 | 7.79 | 0.031 | 1315 | NA | 19.6 | Stibnite bearing |
128 | Including | | ‘B’ Zone | 199.5 | 200.0 | 0.5 | 0.40 | 19.09 | 0.100 | 172 | NA | <0.2 | Stibnite bearing |
129 | 08SH22 | | West of ‘West’ | 204.5 | 205.5 | 1.0 | 0.64 | 0.72 | 0.016 | 2100 | 0.07 | 14.6 | Stockwork vein with |
130 | 08SH22 | | ‘West’ Zone | 215.0 | 222.0 | 7.0 | 4.00 | 0.46 | 0.017 | 636 | 0.09 | 10.0 | Thick zone of quartz |
131 | 08SH22 | | ‘A’ Zone | 226.0 | 227.5 | 1.5 | 1.20 | 13.10 | 0.080 | 1705 | 0.12 | 1.4 | Quartz-stibnite |
132 | Including | | ‘A’ Zone | 227.5 | 228.0 | 0.5 | 0.35 | 18.97 | 0.120 | 1110 | 0.14 | 0.6 | Semi-massive stibnite |
133 | 08SH22 | | ‘B’ Zone | 252.8 | 253.3 | 0.5 | 0.35 | 0.02 | 0.140 | >10000 | 0.18 | 20.8 | Quartz-carbonate vein |
161
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Estimated | Sb | Au | As | Hg | Pb | Brief Description |
134 | 08SH24 | | ‘West’ Zone | 99.0 | 100.0 | 1.0 | 0.80 | 19.58 | 0.090 | 703 | 1.73 | 5.7 | 75 degrees steep SE |
135 | 08SH24 | | ‘A’ Zone | 118.7 | 119.4 | 0.7 | 0.56 | 11.05 | 0.060 | 1285 | 0.85 | 11.8 | Quartz-stibnite zone |
136 | 08SH24 | | ‘B’ Zone | 204.1 | 205.5 | 1.4 | 1.12 | 15.13 | 0.250 | >10000 | 0.32 | 8.9 | Thick zone of quartz- |
137 | Including | | ‘B’ Zone | 204.9 | 205.5 | 0.6 | 0.48 | 28.72 | 0.340 | 37.3 | 0.68 | 0.3 | Semi-massive stibnite |
138 | 08SH24 | | ‘C’ Zone | 265.0 | 267.0 | 2.0 | 1.10 | 0.064 | 0.110 | >10000 | 0.15 | 57.1 | Thick quartz vein |
139 | 08SH07 | | ‘West’ Zone | 171.5 | 172.0 | 0.5 | 0.40 | 3.95 | 0.060 | 4340 | 0.2 | 2.1 | Quartz-stibnite |
140 | 08SH07 | | Zone not | 175.0 | 175.5 | 0.5 | 0.40 | 3.43 | 0.011 | 773 | 0.2 | 2.1 | Thin quartz vein with |
141 | 08SH07 | | Zone not | 181.5 | 182.0 | 0.5 | 0.40 | 17.54 | 0.020 | 33.8 | 0.95 | 2.8 | 2.0 inch massive |
142 | 08SH07 | | ‘A’ Zone | 185.2 | 185.7 | 0.5 | 0.40 | 11.28 | 0.020 | 102 | 0.9 | 3.1 | 2.0 inch massive |
143 | 08SH07 | | ‘A’ Zone | 201.0 | 202.0 | 1.0 | 0.80 | 0.03 | 0.300 | >10000 | 0.29 | 9.9 | Steep quartz- |
144 | 08SH07 | | ‘B’ Zone | 221.0 | 222.0 | 0.8 | 0.64 | 21.10 | 0.149 | 378 | 1.14 | 0.9 | Contains 4.0 inch |
145 | 08SH07 | | ‘C’ Zone? | 250.0 | 250.5 | 0.5 | 0.40 | 0.01 | 0.040 | 6090 | 0.2 | 5.5 | Vug-rich quartz vein |
146 | 08SH10 | | ‘West’ Zone | 90.2 | 91.6 | 1.4 | 1.16 | 4.39 | 0.280 | 5370 | 0.26 | 18.8 | Thick gold-bearing |
147 | 08SH10 | | Footwall ‘A’ | 104.4 | 105.1 | 0.7 | 0.58 | 4.41 | 0.050 | 6200 | 0.23 | 21.2 | Quartz-carbonate vein |
162
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Estimated | Sb | Au | As | Hg | Pb | Brief Description |
148 | 08SH10 | | ‘A’ Zone | 106.3 | 107.0 | 0.7 | 0.58 | 20.36 | 0.100 | 512 | 1.48 | 4.0 | 8 inch thick stibnite |
149 | 08SH10 | | ‘B’ Zone | 188.4 | 189.2 | 0.8 | 0.64 | 25.00 | 0.120 | 112.5 | 1.56 | 3.6 | 8 inch thick stibnite- |
150 | 08SH10 | | ‘C’ Zone | 290.8 | 291.5 | 0.7 | 0.58 | 0.08 | 0.014 | 1620 | 0.16 | 5.4 | Quartz vein 3 inches |
151 | 08SH23 | | ‘A’ Zone | 194.5 | 195.5 | 1.0 | 0.80 | 18.24 | 0.520 | 798 | 0.48 | 2.9 | Quartz-stibnite vein |
152 | 07SH16 | | ‘A’ Zone | 238.1 | 243.1 | 5.0 | 4.15 | 1.79 | 0.045 | 1090 | NA | 3.1 | Stibnite bearing |
153 | Including | | A Zone Vein | 242.8 | 243.3 | 0.5 | 0.41 | 42.72 | 0.170 | NA | NA | 4.2 | Massive stibnite in |
154 | 07SH16 | | ‘ B’ Zone | 245.3 | 245.8 | 0.5 | 0.41 | 23.24 | 0.030 | 42.7 | NA | 19.9 | Semi-massive stibnite |
155 | 07SH16 | | ‘C’ Zone? | 366.0 | 366.5 | 0.5 | 0.41 | 0.12 | 0.035 | 1510 | NA | 2.1 | Thin quartz vein with |
156 | 08SH20 | | West of ‘A’ | 212.0 | 217.0 | 5.0 | 4.0 | 0.10 | 0.000 | 41.2 | 0.41 | 18.2 | Zone of quartz |
157 | 08SH20 | | ‘A’ Vein | 242.6 | 243.3 | 0.7 | 0.56 | 3.32 | 0.030 | 3250 | 0.11 | 1.0 | Quartz=stibnite vein |
158 | 08SH20 | | ‘B’ Vein? | 278.8 | 279.8 | 1.0 | 0.80 | 0.01 | 0.044 | 4340 | 0.28 | 46.3 | Quartz-aspy vein |
159 | 08SH20 | | ‘C’ Vein? | 329.5 | 330.0 | 0.5 | 0.40 | 0.02 | 0.062 | >10000 | 0.16 | 93.3 | Quartz aspy vein |
160 | 08SH08 | | ‘West’ Zone | 347.9 | 348.6 | 0.7 | 0.56 | 5.77 | 2.68 | >10000 | 0.54 | 8.7 | 4.0 inch wide massive |
161 | 08SH08 | | Footwall of ‘A’ | 375.0 | 375.5 | 0.5 | 0.40 | 34.77 | 0.610 | 73.2 | 8.12 | 1.1 | Massive stibnite lense |
163
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Estimated | Sb (%) | Au | As | Hg | Pb | Brief Description |
162 | 08SH08 | | ‘A’ Zone | 378.4 | 381.2 | 2.8 | 2.25 | 18.29 | 0.183 | 2,919 | 0.41 | 1.1 | Massive stibnite lense |
163 | Including | | Hanging Wall ‘A’ Zone | 380.0 | 381.2 | 1.2 | 0.96 | 46.02 | 0.050 | 39.8 | 0.42 | 1.1 | Hanging Wall of ‘A’ |
164 | 08SH08 | | ‘B’ Zone | 405.2 | 405.7 | 0.5 | 0.40 | 0.03 | 0.014 | 3490 | 0.27 | 5.8 | Weal quartz vein |
165 | 08SH19 | | ‘West’ Zone? | 148.5 | 149.0 | 0.5 | 0.40 | 1.76 | 0.005 | 84.9 | 0.48 | 4.3 | Weak quartz stibnite |
166 | 08SH19 | | ‘A’ Zone | 217.0 | 219.5 | 2.5 | 2.07 | 19.13 | 0.138 | 2750 13.1 | 0.28 4.28 | 2.3 0.3 | Wide zone of stibnite- |
167 | Including | | ‘A’ Zone Footwall | 217.0 | 217.5 | 0.5 | 0.41 | 22.75 | 0.030 | 26.7 | 0.92 | 0.3 | Two 1.0 inch thick |
168 | Including | | Main ‘A’ Zone | 218.5 | 219.5 | 1.0 | 0.83 | 34.61 | 0.350 | 13.1 | 4.28 | 0.3 | Two stibnite + quartz |
169 | 08SH29 | | ‘A’ Zone | 347.0 | 348.0 | 1.0 | 0.83 | 0.02 | 0.000 | 146 | 0.01 | 32 | Quartz-carbonate vein |
170 | 08SH21 | | Footwall to ‘A’ Zone | 305.0 | 305.5 | 0.5 | 0.40 | 16.96 | 0.040 | 263 | 0.24 | 0.5 | Stibnite plus quartz |
171 | 08SH21 | | Main ’A’ Zone | 305.5 | 307.0 | 1.5 | 1.20 | 63.47 | 0.080 | 3.1 | 3.65 | <0.2 | Massive stibnite 13 |
172 | 08SH21 | | Hanging Wall to ‘A’ Zone | 312.7 | 313.5 | 0.7 | 0.56 | 30.20 | 0.410 | 101 | 8.46 | 0.2 | Quartz-stibnite vein; |
173 | 08SH21 | | ‘B’ Zone | 317.0 | 317.7 | 0.7 | 0.56 | 27.10 | 0.190 | 72.7 | 0.54 | 0.4 | Vertical quartz-stibnite |
174 | 08SH21 | | ‘B’ Zone | 317.7 | 318.7 | 1.0 | 0.80 | 4.85 | 0.020 | 2150 | 0.17 | 13.8 | Disseminated zone in |
164
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Estimated | Sb (%) | Au | As | Hg | Pb | Brief Description |
175 | 08SH25 | | ‘West’ Zone? | 40.8 | 41.3 | 0.5 | 0.41 | 1.07 | 0.040 | >10000 | 0.3 | 120 | Quartz vein with |
176 | 08SH25 | | ‘A’ Zone | 374.8 | 376.5 | 1.7 | 1.41 | 43.20 | 2.860 | 367 | 1.81 | 0.5 | Massive stibnite with |
177 | 08SH25 | | Hanging Wall of ‘A’ Zone | 376.5 | 378.5 | 2.0 | 1.66 | 4.46 | 0.140 | 3080 | 0.41 | 7.4 | A total of four (4) |
178 | Including | | Hanging Wall of ‘A’ Zone | 376.5 | 377.0 | 0.5 | 0.41 | 4.45 | 0.214 | 5630 | 0.35 | 15.6 | Gold enriched portion |
179 | 08SH31 | | ‘West’ Zone | 272.0 | 273.5 | 1.5 | 1.09 | 0.010 | 0.090 | >10000 | 0.09 | 3.3 | Weak quartz vein |
180 | 08SH26 | | Footwall of ‘A’ Zone | 334.5 | 335.0 | 0.5 | 0.37 | 1.04 | 0.260 | >10000 | 0.09 | 3.6 | Several quartz-sulfide |
181 | 08SH26 | | Interpreted ‘A’ Zone | 337.0 | 337.5 | 0.5 | 0.37 | 3.59 | 0.070 | 6700 | 0.14 | 7.2 | Quartz-stibnite vein |
182 | 08SH26 | | Hanging Wall ‘A’ Zone | 340.5 | 341.0 | 0.5 | 0.37 | 4.91 | 0.030 | 3250 | 0.13 | 52.7 | Quartz-stibnite vein |
183 | 08SH26 | | ‘B’ Zone? | 352.0 | 359.0 | 7.0 | 5.11 | 0.01 | Trace | 82.4 | 0.04 | 5.6 | Swarm of quartz veins |
184 | 08SH09 | | ‘A’ Zone | 346.4 | 347.4 | 1.0 | 0.80 | 5.85 | 0.090 | 3020 | 0.51 | 3.1 | Quartz-stibnite vein |
185 | 08SH09 | | ‘A’ Zone Hanging Wall | 350.5 | 351.2 | 0.7 | 0.56 | 0.01 | 0.084 | 5890 | 0.33 | 2.4 | Quartz vein with trace |
165
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Estimated | Sb (%) | Au | As | Hg | Pb | Brief Description |
187 | 08SH27 | | ‘A’ Zone | 346.0 | 347.0 | 1.0 | 0.80 | 0.01 | 0.010 | 3860 | 0.07 | 36.6 | Quartz vein with |
188 | 09SH01 | | ‘B’ Zone | 114.2 | 114.8 | 0.6 | 0.50 | 13.90 | 0.071 | 475 | 0.79 | 0.50 | One inch wide |
189 | 09SH01 | | ‘A’ Zone Hanging Wall | 178.2 | 181,1 | 2.9 | 2.40 | 0.03 | 0.058 | 6,310 | 0.22 | 4.1 | Vuggy coarse quartz |
190 | 09SH01 | | ‘A’ Zone | 181.1 | 182.0 | 0.9 | 0.75 | <0.01 | 0.072 | 7,730 | 0.25 | 2.5 | Dense quartz vein |
191 | 09SH01 | | West Zone | 189.9 | 190.6 | 0.7 | 0.58 | 0.07 | 0.126 | 6,680 | 0.27 | 8.9 | 3.25 inch thick vuggy |
192 | 09SH02 | | ‘A’ Zone | 160.3 | 162.0 | 1.7 | 1.36 | 5.64 | 0.035 | 2,310 | 0.27 | 0.9 | Quartz carbonate |
193 | 09SH02 | | ‘A’ Zone Hanging Wall | 162.0 | 162.9 | 0.9 | 0.72 | 0.18 | 0.035 | 4,560 | 0.37 | 15.6 | Quartz-stibnite |
194 | 09SH02 | | ‘A’ Zone Hanging Wall | 162.9 | 164.6 | 1.7 | 1.36 | 3.05 | 0.042 | 3,790 | 0.40 | 29.1 | Two vertical quartz- |
195 | 09SH03 | | ‘A’ Zone hanging wall | 164.1 | 164.6 | 0.5 | 0.40 | 0.35 | 0.012 | NA | NA | NA | 3/8 inch qtz +Sb; 30% |
196 | 09SH03 | | ‘A’ Zone | 168.0 | 168.6 | 0.6 | 0.40 | 0.80 | 0.019 | NA | NA | NA | <1/2 inch qtz-Sb; 80% |
197 | 09SH04 | | ‘B’ Zone | 145.0 | 148.7 | 3.7 | 2.75 | 1.57 | 0.169 | 5,130 | 0.90 | 2.6 | Quartz-carbonate |
198 | 09SH04 | | ‘A’ Zone | 193.6 | 195.8 | 2.2 | 1.62 | 3.71 | 0.002 | 415 | 0.24 | 3.4 | Abundant quartz |
199 | 09SH04 | | ‘A’ Zone | 195.8 | 196.3 | 0.5 | 0.37 | 1.65 | 0.190 | 2,170 | 0.37 | 15.7 | Similar to 09SS047 |
166
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Estimated | Sb (%) | Au | As | Hg | Pb | Brief Description |
200 | 09SH05 | | ‘A’ Zone | 276.2 | 276.7 | 0.5 | 0.30 | 47.29 | 0.217 | 2.9 | 1.16 | 0.7 | Hanging wall of |
201 | 09SH05 | | ‘A’ Zone | 276.7 | 278.3 | 1.6 | 1.30 | 69.21 | 0.251 | <0.1 | 1.63 | 0.2 | Massive stibnite vein |
202 | 09SH05 | | ‘A’ Zone | 278.3 | 278.8 | 0.5 | 0.30 | 39.53 | 0.389 | 17.9 | 0.79 | 1.3 | Footwall contact zone |
203 | 09SH06 | | ‘A’ Zone | 214.3 | 215.3 | 1.0 | 0.75 | 36.24 | 0.061 | 12.3 | 15.70 | 0.4 | Massive stibnite up to |
204 | 09SH07 | | ‘A’ Zone Hanging wall | 216.2 | 217.0 | 0.9 | 0.62 | 34.00 | 0.648 | 45.7 | 3.74 | 0.2 | Quartz-stibnite veins, |
205 | 09SH07 | | ‘A’ Zone | 218.0 | 219.6 | 1.6 | 0.93 | 47.97 | 0.780 | 3.6 | 7.02 | 2.9 | One foot wide |
206 | 09SH08 | | ‘A’ Zone | 278.6 | 279.7 | 1.1 | 0.64 | 55.38 | 0.566 | <0.1 | 12.15 | 0.7 | 0.64 feet wide (true |
207 | 09SH09 | | Hanging wall of ‘A’ Zone | 165.5 | 166.5 | 1.0 | 0.83 | 0.09 | 0.060 | 5,800 | 0.27 | 3.4 | Quartz-stibnite |
208 | 09SH09 | | ‘A’ Zone | 169.0 | 172.3 | 3.3 | 2.00 | 2.20 | 0.090 | 8,380 | 0.26 | 14.5 | Broken, chaotic |
167
APPENDIX IISummary of Relevant Sample Data Used in Calculation of Inferred Sb and Au Resources from Pringle Bench that are described in this Technical Report.
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Estimated | Sb | Au | As | Hg | Pb | Brief Description |
1 | | Trench I | West of | 90.2 | 95.1 | 4.9 | 4.9 | 14.64 | 0.030 | NA | NA | NA | Multiple thin stibnite |
2 | | Trench I | ‘West’ | 100.6 | 102.7 | 2.1 | 2.1 | 26.23 | 0.230 | NA | NA | NA | Semi-massive stibnite- |
3 | | Trench I | ‘A’ Zone | 132.2 | 133.4 | 1.2 | 1.2 | 30.03 | 0.044 | NA | NA | NA | Trench exposure shows |
4 | | Trench I | ‘B’ Zone | 157.4 | 163.3 | 5.9 | 5.9 | 30.35 | 0.035 | NA | NA | NA | Semi-massive stibnite in |
5 | | Trench I | ‘C’ Zone | 189.6 | 190.2 | 0.6 | 0.6 | 22.92 | 0.040 | NA | NA | NA | Thin, semi-massive |
6 | | Trench I | East of ‘C’ | 428.0 | 428.2 | 0.2 | 0.2 | 48.07 | 0.020 | NA | NA | NA | Massive stibnite near |
7 | | Trench I | East of ‘C’ | 472.3 | 472.6 | 0.3 | 0.3 | 59.52 | 0.010 | NA | NA | NA | Massive stibnite near |
8 | | Trench I | East of ‘C’ | 540.2 | 540.4 | 0.2 | 0.2 | 64.76 | 0.010 | NA | NA | NA | Massive stibnite near |
9 | 07SH08 | | ‘B’ Zone | 45.0 | 46.5 | 1.5 | 1.25 | 5.62 | 0.069 | NA | NA | NA | Vertical stibnite-quartz |
10 | Including | | ‘B’ Zone | 45.0 | 45.5 | 0.5 | 0.42 | 12.60 | 0.140 | NA | NA | NA | Vertical stibnite-quartz |
11 | 07SH08 | | West | 147.0 | 148.0 | 1.0 | 0.83 | 0.31 | 0.052 | NA | NA | NA | Disseminated stibnite |
12 | 07SH08 | | ‘A’ Zone | 78.25 | 79.25 | 1.0 | 0.80 | 40.80 | 0.212 | NA | NA | NA | Nearly massive stibnite |
13 | 07SH09 | | ‘B’ Zone | 46.75 | 47.75 | 1.0 | 0.83 | 8.78 | 0.020 | NA | NA | NA | Vertical stibnite-quartz |
14 | 07SH09 | | ‘A’ Zone | 80.0 | 80.5 | 0.5 | 0.42 | 33.51 | 0.391 | NA | NA | NA | Nearly massive stibnite |
15 | 07SH09 | | ‘West’ | 86.0 | 86.5 | 0.5 | 0.42 | 10.78 | 0.044 | NA | NA | NA | Disseminated stibnite |
168
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Estimated | Sb | Au | As | Hg | Pb | Brief Description |
16 | | Trench M | ‘West’ | 114.8 | 116.9 | 2.1 | 2.10 | 19.90 | 0.035 | NA | NA | NA | ‘West’ Zone of semi- |
17 | | Trench M | ‘A’ Zone | 121.4 | 127.9 | 6.5 | 6.50 | 35.11 | 0.000 | NA | NA | NA | Semi-massive stibnite in |
18 | | Trench M | ‘B’ Zone | 127.9 | 141.0 | 13.1 | 13.1 | 1.45 | 0.020 | NA | NA | NA | Continuous chip through |
19 | 07SH07 | | ‘B’ Zone | 30.0 | 31.0 | 1.0 | 0.83 | 7.11 | 0.023 | NA | NA | NA | About 12% stibnite in |
20 | 07SH07 | | ‘A’ Zone | 65.0 | 66.0 | 1.0 | 0.83 | 14.88 | 0.338 | NA | NA | NA | Interpreted ‘A’ Zone of |
21 | 07SH07 | | ‘West’ | 132.5 | 133.0 | 0.5 | 0.42 | 0.29 | 0.022 | NA | NA | NA | Stibnite in quartz vein |
22 | 07SH06 | | ‘A’ Zone | 18.3 | 19.3 | 1.0 | 0.83 | 60.03 | <0.005 | NA | NA | NA | Massive stibnite lense 6 |
23 | 07SH06 | | ‘West | 36.8 | 37.3 | 0.5 | 0.42 | 8.28 | 0.028 | NA | NA | NA | Disseminated stibnite in |
24 | 07SH06 | | ‘West | 42.0 | 42.5 | 0.5 | 0.42 | 6.88 | <0.005 | NA | NA | NA | Disseminated stibnite in |
25 | 07SH05 | | West | 112.0 | 115.0 | 3.0 | 2.22 | 2.97 | <0.005 | NA | NA | NA | Silicified zone with |
26 | 07SH02 | | ‘A’ Zone | 39.5 | 40.5 | 1.0 | 0.83 | 19.56 | 0.020 | NA | NA | NA | Quartz-stibnite vein with |
27 | 07SH02 | | ‘West’ | 51.5 | 52.5 | 1.0 | 0.83 | 0.21 | 0.015 | NA | NA | NA | Disseminated stibnite in |
28 | | Trench ‘D’ | ‘West’ | 67.0 | 67.5 | 0.5 | 0.50 | 27.86 | 0.090 | NA | NA | NA | High angle, semi- |
169
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Estimated | Sb | Au | As | Hg | Pb | Brief Description |
29 | | Trench ‘D’ | ‘A’ Zone | 85.0 | 86.5 | 1.5 | 1.50 | 14.95 | 0.037 | NA | NA | NA | Disseminated stibnite in |
30 | 07SH02 | | West Sb- | 183.5 | 187.5 | 4.0 | 2.5 | 1.05 | 0.019 | NA | NA | NA | Wide zone with vein |
31 | Including | | West Sb- | 183.5 | 186.5 | 3.0 | 2.0 | 1.70 | 0.017 | NA | NA | NA | Vein zone about 2.0 feet |
32 | 07SH04 | | West | 108.5 | 109.0 | 0.5 | 0.42 | 6.05 | 0.004 | NA | NA | NA | Disseminated stibnite in |
33 | 07SH03 | | ‘A’ Zone | 17.5 | 18.4 | 0.9 | 0.75 | 3.83 | 0.054 | NA | NA | NA | Quartz-stibnite vein with |
34 | 07SH03 | | West | 34.6 | 35.1 | 0.5 | 0.50 | 0.84 | 0.005 | NA | NA | NA | Disseminated stibnite in |
35 | | Trench F | West of | 200.0 | 200.3 | 0.3 | 0.30 | 20.18 | 0.748 | NA | NA | NA | Steep, stibnite-quartz |
36 | | Trench F | ‘West’ | 315.0 | 315.3 | 0.3 | 0.30 | 8.43 | 0.090 | NA | NA | NA | Steep, stibnite-quartz |
37 | | Trench F | ‘A’ Zone | 350.0 | 350.3 | 0.3 | 0.30 | 17.42 | 0.120 | NA | NA | NA | Quartz-stibnite vein with |
38 | | Trench F | ‘C’ Zone | 435.0 | 435.3 | 0.3 | 0.30 | 46.33 | 0.040 | NA | NA | NA | Thin stibnite vein in |
39 | 06SH01 | | ‘A’ Zone | 275.0 | 280.0 | 5.0 | 4.15 | 2.50 | 0.050 | NA | NA | NA | RC Program with |
40 | 06SH01 | | ‘B’ Zone | 250.0 | 255.0 | 5.0 | 4.15 | 0.93 | 0.030 | NA | NA | NA | Disseminated stibnite in |
41 | 09SH11 | | West | 10.7 | 11.4 | 0.7 | 0.58 | 38.51 | 0.807 | 36.2 | 1.51 | 1.7 | Massive stibnite 0.5 feet |
42 | 06STO30-032) | Trench H | West | 85.0 | 86.5 | 1.50 | 1.50 | 14.90 | 0.050 | NA | NA | NA | Continuous Chip |
170
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Estimated | Sb | Au | As | Hg | Pb | Brief Description |
43 | 09SH11 | | ‘A’ Zone | 29.0 | 30.0 | 1.0 | 0.83 | 10.25 | 0.122 | 1,120 | 0.12 | 2.2 | Quartz-stibnite vein 0.6 |
44 | 09SH12 | | Footwall | 17.0 | 17.5 | 0.5 | 0.42 | 7.20 | 0.041 | 3,370 | 0.23 | 0.4 | Broken quartz-stibnite |
45 | 09SH12 | | ‘A’ Zone | 20.0 | 21.5 | 1.5 | 1.25 | 32.10 | 0.052 | 39.9 | 0.34 | 0.2 | One foot of massive |
46 | 09SH13 | | ‘A’ Zone | 233.0 | 237.8 | 4.8 | 2.78 | 8.91 | 0.045 | 1,260 | 0.33 | 2.1 | Two foot wide (true |
47 | 09SH14 | | ‘B’ Zone | 43.2 | 44.7 | 1.5 | 1.25 | 36.60 | 0.008 | 0.7 | 0.18 | 4.3 | 0.3 foot wide quartz- |
48 | 09SH14 | | ‘A’ Zone | 112.5 | 113.5 | 1.0 | 0.83 | 50.94 | 0.019 | 1.2 | 2.44 | 1.2 | Massive stibnite with |
49 | 09SH14 | | West | 129.5 | 130.0 | 0.5 | 0.30 | 6.94 | 0.011 | 1,430 | 0.21 | 3.6 | Braided quartz-stibnite |
50 | 09SH15 | | ‘B’ Zone | 13.0 | 13.7 | 0.7 | 0.41 | 15.25 | 0.156 | 2,170 | 0.22 | 1.6 | Sheared quartz-stibnite |
51 | 09SH15 | | ‘A’ Zone | 156.0 | 157.0 | 1.0 | 0.58 | 3.32 | 0.057 | 7,880 | 0.30 | 61.1 | Two parallel quartz- |
52 | 09SH15 | | ‘A’ Zone | 162.5 | 163.5 | 1.0 | 0.58 | 35.48 | 0.030 | 75.3 | 0.46 | 1.3 | One foot wide zone of |
53 | 09SH16 | | ‘A’ Zone branch | 152.0 | 153.0 | 1.0 | 0.74 | 8.20 | 0.015 | 1,110 | 0.24 | 3.5 | Over-drilled quartz- |
54 | 09SH16 | | ‘A’ Zone | 156.0 | 157.0 | 1.0 | 0.74 | 10.16 | 0.039 | 2,210 | 0.49 | 7.9 | Broken quartz-stibnite |
55 | 09SH16 | | West | 160.5 | 161.5 | 1.0 | 0.74 | 5.77 | 0.071 | 8,290 | 1.04 | 18.2 | 0.3 feet quartz-stibnite |
56 | 09SH18 | | ‘A’ Zone | 72.5 | 74.5 | 2.0 | 1.33 | 3.30 | 0.009 | 990 | 0.15 | 14.1 | Quartz-carbonate |
171
Sample | Drill Hole # | Underground | Stibnite | From | To | Width | Estimated | Sb | Au | As | Hg | Pb | Brief Description |
57 | 09SH18 | | ‘A’ Zone | 74.5 | 75.5 | 1.0 | 0.66 | 37.73 | 5.72 | 6.9 | 0.32 | <0.2 | Quartz-stibnite vein with |
58 | 09SH18 | | West | 109.5 | 111.5 | 2.0 | 1.33 | 4.11 | 0.016 | NA | NA | NA | Braided quartz stibnite |
59 | 09SH19 | | ‘A’ Zone | 173.8 | 174.7 | 0.9 | 0.50 | 32.50 | 0.330 | 34.2 | 0.85 | 0.6 | Semi-massive stibnite |
60 | 09SH19 | | West | 215.5 | 216.5 | 1.0 | 0.52 | 7.95 | 0.033 | 1,635 | 0.27 | 10.7 | Braised quartz-antimony |
61 | 09SH20 | | ‘A’ Zone | 205.5 | 206.5 | 1.0 | 0.50 | 2.74 | 1.690 | 8.560 | 0.30 | 11.2 | Quartz-carbonate- |
62 | 09SH20 | | ‘A’ Zone | 223.0 | 224.0 | 1.0 | 0.50 | 11.48 | 0.044 | NA | NA | NA | Massive stibnite-quartz |
63 | 09SH20 | | Offset? ‘A’ | 272.0 | 273.0 | 1.0 | 0.50 | 11.08 | 0.055 | NA | NA | NA | Massive stibnite-quartz |
64 | 09SH20 | | West | 324.5 | 325.5 | 1.0 | 0.50 | 27.29 | 0.010 | 42 | 0.34 | 1.0 | Massive stibnite-quartz |
65 | 09SH20 | | West | 335.0 | 338.0 | 3.0 | 1.74 | 9.75 | 0.135 | 1,675 | 039 | 8.1 | Numerous braided |
66 | | Channel | ‘A’ Zone | 33.0 | 49.2 | 16.2 | 16.2 | 8.74 | 5.56 | NA | NA | NA | Wide “A’ zone channel |
172