0000354707false12/312026Q3000004620712/312026Q3FALSEFALSEFALSEFALSE6.676.67xbrli:sharesiso4217:USDiso4217:USDxbrli:shareshe:entityhe:claimhe:installmentxbrli:purehe:plaintiffhe:class_action_casehe:segmentutr:MWhe:defendenthe:agreementhe:turbinehe:contracthe:gasTurbinehe:projecthe:institution0000354707he:HawaiianElectricCompanyAndSubsidiariesMember2026-01-012026-09-3000003547072026-01-012026-09-3000003547072026-10-300000354707he:HawaiianElectricCompanyAndSubsidiariesMember2026-10-3000003547072026-07-012026-09-300000354707he:ElectricUtilitySegmentMember2026-07-012026-09-300000354707he:ElectricUtilitySegmentMember2025-07-012025-09-300000354707he:ElectricUtilitySegmentMember2026-01-012026-09-300000354707he:ElectricUtilitySegmentMember2025-01-012025-09-300000354707us-gaap:AllOtherSegmentsMember2026-07-012026-09-300000354707us-gaap:AllOtherSegmentsMember2025-07-012025-09-300000354707us-gaap:AllOtherSegmentsMember2026-01-012026-09-300000354707us-gaap:AllOtherSegmentsMember2025-01-012025-09-3000003547072025-07-012025-09-3000003547072025-01-012025-09-3000003547072026-09-3000003547072025-12-310000354707us-gaap:CommonStockMember2025-12-310000354707us-gaap:RetainedEarningsMember2025-12-310000354707us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-12-310000354707us-gaap:RetainedEarningsMember2026-01-012026-03-3100003547072026-01-012026-03-310000354707us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-01-012026-03-310000354707us-gaap:CommonStockMember2026-01-012026-03-310000354707us-gaap:CommonStockMember2026-03-310000354707us-gaap:RetainedEarningsMember2026-03-310000354707us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-03-3100003547072026-03-310000354707us-gaap:RetainedEarningsMember2026-04-012026-06-3000003547072026-04-012026-06-300000354707us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-04-012026-06-300000354707us-gaap:CommonStockMember2026-04-012026-06-300000354707us-gaap:CommonStockMember2026-06-300000354707us-gaap:RetainedEarningsMember2026-06-300000354707us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-06-3000003547072026-06-300000354707us-gaap:RetainedEarningsMember2026-07-012026-09-300000354707us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-07-012026-09-300000354707us-gaap:CommonStockMember2026-07-012026-09-300000354707us-gaap:CommonStockMember2026-09-300000354707us-gaap:RetainedEarningsMember2026-09-300000354707us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-09-300000354707us-gaap:CommonStockMember2024-12-310000354707us-gaap:RetainedEarningsMember2024-12-310000354707us-gaap:AccumulatedOtherComprehensiveIncomeMember2024-12-3100003547072024-12-310000354707us-gaap:RetainedEarningsMember2025-01-012025-03-3100003547072025-01-012025-03-310000354707us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-01-012025-03-310000354707us-gaap:CommonStockMember2025-01-012025-03-310000354707us-gaap:CommonStockMember2025-03-310000354707us-gaap:RetainedEarningsMember2025-03-310000354707us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-03-3100003547072025-03-310000354707us-gaap:RetainedEarningsMember2025-04-012025-06-3000003547072025-04-012025-06-300000354707us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-04-012025-06-300000354707us-gaap:CommonStockMember2025-04-012025-06-300000354707us-gaap:CommonStockMember2025-06-300000354707us-gaap:RetainedEarningsMember2025-06-300000354707us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-06-3000003547072025-06-300000354707us-gaap:RetainedEarningsMember2025-07-012025-09-300000354707us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-07-012025-09-300000354707us-gaap:CommonStockMember2025-07-012025-09-300000354707us-gaap:CommonStockMember2025-09-300000354707us-gaap:RetainedEarningsMember2025-09-300000354707us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-09-3000003547072025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMember2026-07-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMember2025-07-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMember2025-01-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMember2025-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:CommonStockMember2025-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:OtherAdditionalCapitalMember2025-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RetainedEarningsMember2025-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AdditionalPaidInCapitalMember2025-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2025-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RetainedEarningsMember2026-01-012026-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMember2026-01-012026-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2026-01-012026-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:CommonStockMember2026-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:OtherAdditionalCapitalMember2026-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RetainedEarningsMember2026-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AdditionalPaidInCapitalMember2026-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2026-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMember2026-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RetainedEarningsMember2026-04-012026-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMember2026-04-012026-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2026-04-012026-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AdditionalPaidInCapitalMember2026-04-012026-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:CommonStockMember2026-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:OtherAdditionalCapitalMember2026-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RetainedEarningsMember2026-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AdditionalPaidInCapitalMember2026-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2026-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMember2026-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RetainedEarningsMember2026-07-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2026-07-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AdditionalPaidInCapitalMember2026-07-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:CommonStockMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:OtherAdditionalCapitalMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RetainedEarningsMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AdditionalPaidInCapitalMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:CommonStockMember2024-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:OtherAdditionalCapitalMember2024-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RetainedEarningsMember2024-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AdditionalPaidInCapitalMember2024-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2024-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMember2024-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RetainedEarningsMember2025-01-012025-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMember2025-01-012025-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2025-01-012025-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AdditionalPaidInCapitalMember2025-01-012025-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:CommonStockMember2025-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:OtherAdditionalCapitalMember2025-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RetainedEarningsMember2025-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AdditionalPaidInCapitalMember2025-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2025-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMember2025-03-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RetainedEarningsMember2025-04-012025-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMember2025-04-012025-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2025-04-012025-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AdditionalPaidInCapitalMember2025-04-012025-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:CommonStockMember2025-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:OtherAdditionalCapitalMember2025-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RetainedEarningsMember2025-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AdditionalPaidInCapitalMember2025-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2025-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMember2025-06-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RetainedEarningsMember2025-07-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2025-07-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:CommonStockMember2025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:OtherAdditionalCapitalMember2025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RetainedEarningsMember2025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AdditionalPaidInCapitalMember2025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMember2025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMember2026-09-300000354707he:TortRelatedLegalClaimsMember2026-09-300000354707he:TortRelatedLegalClaimsMemberus-gaap:LossFromCatastrophesMember2024-11-012024-11-010000354707he:TortRelatedLegalClaimsMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberus-gaap:LossFromCatastrophesMember2024-11-012024-11-010000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMember2024-11-010000354707he:HawaiianElectricCompanyIncAndOtherDefendantsMemberhe:TortRelatedLegalClaimsMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberus-gaap:LossFromCatastrophesMember2024-11-012024-11-010000354707he:TortRelatedLegalClaimsMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberus-gaap:LossFromCatastrophesMember2024-11-010000354707he:HawaiianElectricCompanyAndSubsidiariesMember2026-04-102026-04-1000003547072026-04-012026-04-300000354707he:TortRelatedLegalClaimsMemberus-gaap:LossFromCatastrophesMember2026-09-3000003547072026-01-012026-06-3000003547072026-09-162026-09-160000354707us-gaap:SubsequentEventMember2026-10-282026-10-280000354707he:SecuritiesActionMember2026-01-052026-01-050000354707he:SecuritiesActionMember2025-07-012025-09-300000354707he:SecuritiesActionMember2025-01-012025-09-300000354707he:ShareholderDerivativeActionsDistrictOfHawaiiMember2023-09-112024-11-060000354707he:ShareholderDerivativeActionsNorthernDistrictOfCaliforniaMember2023-12-262024-02-080000354707he:ShareholderDerivativeActionsDistrictOfHawaiiMember2024-04-082024-06-080000354707he:ShareholderDerivativeActionsMember2025-12-312025-12-310000354707he:ShareholderDerivativeActionsMember2026-07-140000354707he:MauiWildfireNegligenceMemberus-gaap:LossFromCatastrophesMember2026-01-012026-09-300000354707he:InsuranceClaimsLegalRelatedRecoveriesMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesLegalExpensesMember2026-07-012026-09-300000354707us-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesLegalExpensesMember2026-07-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesLegalExpensesMember2026-01-012026-09-300000354707us-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesLegalExpensesMember2026-01-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesOtherExpenseMember2026-07-012026-09-300000354707us-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesOtherExpenseMember2026-07-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesOtherExpenseMember2026-01-012026-09-300000354707us-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesOtherExpenseMember2026-01-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberus-gaap:LossFromCatastrophesMember2026-07-012026-09-300000354707us-gaap:NaturalDisastersAndOtherCasualtyEventsMemberus-gaap:LossFromCatastrophesMember2026-07-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberus-gaap:LossFromCatastrophesMember2026-01-012026-09-300000354707us-gaap:NaturalDisastersAndOtherCasualtyEventsMemberus-gaap:LossFromCatastrophesMember2026-01-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesLegalExpensesMember2025-07-012025-09-300000354707us-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesLegalExpensesMember2025-07-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesLegalExpensesMember2025-01-012025-09-300000354707us-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesLegalExpensesMember2025-01-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesWildfireTortRelatedClaimsMember2025-07-012025-09-300000354707us-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesWildfireTortRelatedClaimsMember2025-07-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesWildfireTortRelatedClaimsMember2025-01-012025-09-300000354707us-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesWildfireTortRelatedClaimsMember2025-01-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesOtherExpenseMember2025-07-012025-09-300000354707us-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesOtherExpenseMember2025-07-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesOtherExpenseMember2025-01-012025-09-300000354707us-gaap:NaturalDisastersAndOtherCasualtyEventsMemberhe:LossFromCatastrophesOtherExpenseMember2025-01-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberus-gaap:LossFromCatastrophesMember2025-07-012025-09-300000354707us-gaap:NaturalDisastersAndOtherCasualtyEventsMemberus-gaap:LossFromCatastrophesMember2025-07-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberus-gaap:LossFromCatastrophesMember2025-01-012025-09-300000354707us-gaap:NaturalDisastersAndOtherCasualtyEventsMemberus-gaap:LossFromCatastrophesMember2025-01-012025-09-300000354707he:ElectricUtilitySegmentMemberus-gaap:OperatingSegmentsMember2026-07-012026-09-300000354707us-gaap:CorporateNonSegmentMember2026-07-012026-09-300000354707he:ElectricUtilitySegmentMemberus-gaap:OperatingSegmentsMember2026-01-012026-09-300000354707us-gaap:CorporateNonSegmentMember2026-01-012026-09-300000354707he:ElectricUtilitySegmentMemberus-gaap:OperatingSegmentsMember2026-09-300000354707us-gaap:CorporateNonSegmentMember2026-09-300000354707he:ElectricUtilitySegmentMemberus-gaap:OperatingSegmentsMember2025-07-012025-09-300000354707us-gaap:CorporateNonSegmentMember2025-07-012025-09-300000354707he:ElectricUtilitySegmentMemberus-gaap:OperatingSegmentsMember2025-01-012025-09-300000354707us-gaap:CorporateNonSegmentMember2025-01-012025-09-300000354707he:ElectricUtilitySegmentMemberus-gaap:OperatingSegmentsMember2025-12-310000354707us-gaap:CorporateNonSegmentMember2025-12-310000354707he:ASBHawaiiIncMemberhe:AmericanSavingsBankFSBASBMember2024-12-310000354707he:ASBHawaiiIncMemberhe:AmericanSavingsBankFSBASBMember2025-12-310000354707he:AmericanSavingsBankFSBASBMemberus-gaap:IPOMember2026-09-160000354707he:AmericanSavingsBankFSBASBMemberus-gaap:IPOMember2026-09-162026-09-160000354707he:ASBHawaiiIncMemberus-gaap:IPOMemberhe:AmericanSavingsBankFSBASBMember2026-09-162026-09-160000354707he:ASBHawaiiIncMemberhe:AmericanSavingsBankFSBASBMember2026-09-300000354707he:ASBHawaiiIncMemberhe:AmericanSavingsBankFSBASBMember2026-01-012026-09-300000354707he:GLST1LLCMember2025-01-012025-12-310000354707he:GLST1LLCMember2025-03-310000354707he:GLST1LLCMember2025-12-310000354707he:TortRelatedLegalClaimsMemberus-gaap:NaturalDisastersAndOtherCasualtyEventsMemberus-gaap:LossFromCatastrophesMember2026-04-100000354707he:SecuritiesActionMember2026-04-102026-04-100000354707he:MahipapaLLCMember2026-01-012026-09-300000354707he:MahipapaLLCMemberus-gaap:DisposalGroupHeldforsaleNotDiscontinuedOperationsMember2026-07-012026-09-300000354707he:MahipapaLLCMemberus-gaap:DisposalGroupHeldforsaleNotDiscontinuedOperationsMember2026-01-012026-09-300000354707he:MahipapaLLCMemberus-gaap:DisposalGroupHeldforsaleNotDiscontinuedOperationsMember2025-12-310000354707he:MahipapaLLCMemberus-gaap:DisposalGroupHeldforsaleNotDiscontinuedOperationsMember2026-09-300000354707us-gaap:VariableInterestEntityPrimaryBeneficiaryMember2026-09-300000354707he:GLST1LLCMember2026-04-100000354707us-gaap:SubsequentEventMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2024-01-012026-11-060000354707he:HawaiianElectricIndustriesInc.HawaiianElectricCompanyInc.AndMauiElectricCompanyLimitedMemberhe:PropertyInsurerLitigationMember2026-02-132026-02-130000354707he:MauiWindstormAndWildfiresHawaiianElectricPlaintiffsMember2026-07-292026-07-290000354707he:MolokaiNewEnergyPartnersMember2018-07-310000354707he:MolokaiNewEnergyPartnersMember2018-07-012018-07-310000354707he:MauiElectricCompanyLimitedMember2026-09-300000354707he:HawaiianElectricParentMemberhe:PCBContaminationMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberhe:Stage1And2RenewablePPMember2026-09-300000354707he:HawaiianElectricParentMemberhe:KalaeloaPartnersLPMember2026-07-012026-09-300000354707he:HawaiianElectricParentMemberhe:KalaeloaPartnersLPMember2025-07-012025-09-300000354707he:HawaiianElectricParentMemberhe:KalaeloaPartnersLPMember2026-01-012026-09-300000354707he:HawaiianElectricParentMemberhe:KalaeloaPartnersLPMember2025-01-012025-09-300000354707he:HawaiianElectricParentMemberhe:HamakuaEnergyLLCMember2026-07-012026-09-300000354707he:HawaiianElectricParentMemberhe:HamakuaEnergyLLCMember2025-07-012025-09-300000354707he:HawaiianElectricParentMemberhe:HamakuaEnergyLLCMember2026-01-012026-09-300000354707he:HawaiianElectricParentMemberhe:HamakuaEnergyLLCMember2025-01-012025-09-300000354707he:HawaiianElectricParentMemberhe:HpowerMember2026-07-012026-09-300000354707he:HawaiianElectricParentMemberhe:HpowerMember2025-07-012025-09-300000354707he:HawaiianElectricParentMemberhe:HpowerMember2026-01-012026-09-300000354707he:HawaiianElectricParentMemberhe:HpowerMember2025-01-012025-09-300000354707he:HawaiianElectricParentMemberhe:PunaGeothermalVentureMember2026-07-012026-09-300000354707he:HawaiianElectricParentMemberhe:PunaGeothermalVentureMember2025-07-012025-09-300000354707he:HawaiianElectricParentMemberhe:PunaGeothermalVentureMember2026-01-012026-09-300000354707he:HawaiianElectricParentMemberhe:PunaGeothermalVentureMember2025-01-012025-09-300000354707he:HawaiianElectricParentMemberhe:KapoleiEnergyStorageMember2026-07-012026-09-300000354707he:HawaiianElectricParentMemberhe:KapoleiEnergyStorageMember2025-07-012025-09-300000354707he:HawaiianElectricParentMemberhe:KapoleiEnergyStorageMember2026-01-012026-09-300000354707he:HawaiianElectricParentMemberhe:KapoleiEnergyStorageMember2025-01-012025-09-300000354707he:HawaiianElectricParentMemberhe:SolarIndependentPowerProducerMember2026-07-012026-09-300000354707he:HawaiianElectricParentMemberhe:SolarIndependentPowerProducerMember2025-07-012025-09-300000354707he:HawaiianElectricParentMemberhe:SolarIndependentPowerProducerMember2026-01-012026-09-300000354707he:HawaiianElectricParentMemberhe:SolarIndependentPowerProducerMember2025-01-012025-09-300000354707he:HawaiianElectricParentMemberhe:WindIndependentPowerProducersMember2026-07-012026-09-300000354707he:HawaiianElectricParentMemberhe:WindIndependentPowerProducersMember2025-07-012025-09-300000354707he:HawaiianElectricParentMemberhe:WindIndependentPowerProducersMember2026-01-012026-09-300000354707he:HawaiianElectricParentMemberhe:WindIndependentPowerProducersMember2025-01-012025-09-300000354707he:HawaiianElectricParentMemberhe:OtherIndependentPowerProducersMember2026-07-012026-09-300000354707he:HawaiianElectricParentMemberhe:OtherIndependentPowerProducersMember2025-07-012025-09-300000354707he:HawaiianElectricParentMemberhe:OtherIndependentPowerProducersMember2026-01-012026-09-300000354707he:HawaiianElectricParentMemberhe:OtherIndependentPowerProducersMember2025-01-012025-09-300000354707he:HawaiianElectricParentMember2026-07-012026-09-300000354707he:HawaiianElectricParentMember2025-07-012025-09-300000354707he:HawaiianElectricParentMember2026-01-012026-09-300000354707he:HawaiianElectricParentMember2025-01-012025-09-300000354707he:WaenaBatteryEnergyStorageSystemProjectMember2020-09-012020-09-300000354707he:WaenaBatteryEnergyStorageSystemProjectMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2023-12-012023-12-310000354707he:WaenaBatteryEnergyStorageSystemProjectMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2025-07-012025-07-310000354707he:WaenaBatteryEnergyStorageSystemProjectMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-09-300000354707he:ClimateAdaptationTransmissionAndDistributionResilienceProgramMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2024-01-310000354707he:ClimateAdaptationTransmissionAndDistributionResilienceProgramMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2024-01-312024-01-310000354707he:HawaiianElectricCompanyAndSubsidiariesMember2024-08-070000354707he:HawaiianElectricCompanyAndSubsidiariesMember2026-07-160000354707he:WaiauRepowerProjectMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2025-03-280000354707he:WaiauRepowerProjectMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2025-10-170000354707he:WaiauRepowerProjectMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-03-232026-03-230000354707he:WaiauRepowerProjectMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-04-172026-04-170000354707he:WaiauRepowerProjectMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-06-250000354707he:WaiauRepowerProjectMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-09-300000354707he:WaiauRepowerProjectMemberhe:HawaiianElectricCompanyAndSubsidiariesMemberhe:GEVernovaOperationsLLCMember2026-04-280000354707he:WaiauRepowerProjectMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2025-12-012025-12-310000354707he:WildfireMitigationPlanWMPMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2025-12-312025-12-310000354707he:WildfireMitigationPlanWMPMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-06-250000354707he:WildfireMitigationPlanWMPMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMember2020-12-232020-12-230000354707he:HawaiianElectricCompanyAndSubsidiariesMember2026-03-060000354707he:HawaiianElectricCompanyAndSubsidiariesMember2026-07-170000354707he:HawaiianElectricCompanyAndSubsidiariesMember2025-01-012025-12-310000354707he:HawaiianElectricParentMember2025-01-012025-12-310000354707he:HawaiiElectricLightCompanyIncMember2025-01-012025-12-310000354707he:MauiElectricCompanyLimitedMember2025-01-012025-12-310000354707srt:ScenarioForecastMemberhe:HawaiianElectricParentMember2026-04-012026-10-300000354707srt:ScenarioForecastMemberhe:HawaiiElectricLightCompanyIncMember2026-04-012026-10-300000354707srt:ScenarioForecastMemberhe:MauiElectricCompanyLimitedMember2026-04-012026-10-300000354707srt:ScenarioForecastMember2026-04-012026-10-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberhe:WildfireMitigationPlanMember2025-12-312025-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberhe:WildfireMitigationPlanMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberhe:SuspensionOfDisconnectionsMember2026-09-300000354707srt:ParentCompanyMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2026-07-012026-09-300000354707he:HawaiiElectricLightCompanyIncMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2026-07-012026-09-300000354707he:MauiElectricCompanyLimitedMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2026-07-012026-09-300000354707he:OtherSubsidiariesMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2026-07-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMembersrt:ConsolidationEliminationsMember2026-07-012026-09-300000354707srt:ParentCompanyMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-07-012025-09-300000354707he:HawaiiElectricLightCompanyIncMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-07-012025-09-300000354707he:MauiElectricCompanyLimitedMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-07-012025-09-300000354707he:OtherSubsidiariesMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-07-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMembersrt:ConsolidationEliminationsMember2025-07-012025-09-300000354707srt:ParentCompanyMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2026-01-012026-09-300000354707he:HawaiiElectricLightCompanyIncMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2026-01-012026-09-300000354707he:MauiElectricCompanyLimitedMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2026-01-012026-09-300000354707he:OtherSubsidiariesMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2026-01-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMembersrt:ConsolidationEliminationsMember2026-01-012026-09-300000354707srt:ParentCompanyMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-01-012025-09-300000354707he:HawaiiElectricLightCompanyIncMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-01-012025-09-300000354707he:MauiElectricCompanyLimitedMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-01-012025-09-300000354707he:OtherSubsidiariesMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-01-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMembersrt:ConsolidationEliminationsMember2025-01-012025-09-300000354707srt:ParentCompanyMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2026-09-300000354707he:HawaiiElectricLightCompanyIncMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2026-09-300000354707he:MauiElectricCompanyLimitedMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2026-09-300000354707he:OtherSubsidiariesMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMembersrt:ConsolidationEliminationsMember2026-09-300000354707srt:ParentCompanyMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMembersrt:AffiliatedEntityMember2026-09-300000354707he:HawaiiElectricLightCompanyIncMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMembersrt:AffiliatedEntityMember2026-09-300000354707he:MauiElectricCompanyLimitedMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMembersrt:AffiliatedEntityMember2026-09-300000354707he:OtherSubsidiariesMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMembersrt:AffiliatedEntityMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMembersrt:ConsolidationEliminationsMembersrt:AffiliatedEntityMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMembersrt:AffiliatedEntityMember2026-09-300000354707srt:ParentCompanyMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-12-310000354707he:HawaiiElectricLightCompanyIncMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-12-310000354707he:MauiElectricCompanyLimitedMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-12-310000354707he:OtherSubsidiariesMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMembersrt:ConsolidationEliminationsMember2025-12-310000354707srt:ParentCompanyMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2024-12-310000354707he:HawaiiElectricLightCompanyIncMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2024-12-310000354707he:MauiElectricCompanyLimitedMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2024-12-310000354707he:OtherSubsidiariesMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2024-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMembersrt:ConsolidationEliminationsMember2024-12-310000354707srt:ParentCompanyMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-09-300000354707he:HawaiiElectricLightCompanyIncMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-09-300000354707he:MauiElectricCompanyLimitedMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-09-300000354707he:OtherSubsidiariesMemberhe:HawaiianElectricCompanyAndSubsidiariesMembersrt:ReportableLegalEntitiesMember2025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMembersrt:ConsolidationEliminationsMember2025-09-300000354707us-gaap:RevolvingCreditFacilityMemberhe:UnsecuredRevolvingLineOfCreditMember2026-09-300000354707us-gaap:RevolvingCreditFacilityMemberhe:UnsecuredRevolvingLineOfCreditMember2025-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RevolvingCreditFacilityMemberhe:UnsecuredRevolvingLineOfCreditMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RevolvingCreditFacilityMemberhe:UnsecuredRevolvingLineOfCreditMember2025-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RevolvingCreditFacilityMemberhe:ABLCreditFacilityAgreementMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RevolvingCreditFacilityMemberhe:ABLCreditFacilityAgreementMember2025-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RevolvingCreditFacilityMemberhe:StandingCommitmentLetterMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RevolvingCreditFacilityMemberhe:StandingCommitmentLetterMember2025-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RevolvingCreditFacilityMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RevolvingCreditFacilityMember2025-12-310000354707us-gaap:RevolvingCreditFacilityMember2026-09-300000354707us-gaap:RevolvingCreditFacilityMember2025-12-310000354707he:HEIFacilityMember2025-09-050000354707he:HEIFacilityMember2023-05-140000354707us-gaap:LetterOfCreditMemberhe:HEIFacilityMember2025-09-050000354707us-gaap:BridgeLoanMemberhe:HEIFacilityMember2025-09-050000354707he:HawaiianElectricFacilityMember2025-09-050000354707he:HawaiianElectricFacilityMember2023-05-140000354707us-gaap:LetterOfCreditMemberhe:HawaiianElectricFacilityMember2025-09-050000354707us-gaap:BridgeLoanMemberhe:HawaiianElectricFacilityMember2025-09-050000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:LetterOfCreditMemberhe:HawaiianElectricFacilityMember2025-12-050000354707us-gaap:LineOfCreditMemberhe:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:RevolvingCreditFacilityMemberhe:ABLCreditFacilityAgreementMember2024-05-170000354707us-gaap:SeniorNotesMemberhe:SeniorNotesDue2028To2052Membersrt:MinimumMember2026-09-300000354707us-gaap:SeniorNotesMemberhe:SeniorNotesDue2028To2052Membersrt:MaximumMember2026-09-300000354707us-gaap:SeniorNotesMemberhe:SeniorNotesDue2028To2052Memberus-gaap:CorporateNonSegmentMember2026-09-300000354707us-gaap:SeniorNotesMemberhe:SeniorNotesDue2028To2052Memberus-gaap:CorporateNonSegmentMember2025-12-310000354707us-gaap:LineOfCreditMemberhe:RevolvingCreditFacilityAt2.50Due2030Memberus-gaap:CorporateNonSegmentMember2026-01-012026-09-300000354707us-gaap:LineOfCreditMemberhe:RevolvingCreditFacilityAt2.50Due2030Memberus-gaap:CorporateNonSegmentMember2026-09-300000354707us-gaap:LineOfCreditMemberhe:RevolvingCreditFacilityAt2.50Due2030Memberus-gaap:CorporateNonSegmentMember2025-12-310000354707he:TermLoanMemberhe:Mahipapa2.60NonRecourseLoanDue2036Memberus-gaap:NonrecourseMember2026-09-300000354707he:TermLoanMemberhe:Mahipapa2.60NonRecourseLoanDue2036Memberus-gaap:NonrecourseMemberus-gaap:CorporateNonSegmentMember2026-09-300000354707he:TermLoanMemberhe:Mahipapa2.60NonRecourseLoanDue2036Memberus-gaap:NonrecourseMemberus-gaap:CorporateNonSegmentMember2025-12-310000354707he:TermLoanMemberhe:Mahipapa5.625NonRecourseLoanDue2027Memberus-gaap:NonrecourseMember2026-09-300000354707he:TermLoanMemberhe:Mahipapa5.625NonRecourseLoanDue2027Memberus-gaap:NonrecourseMemberus-gaap:CorporateNonSegmentMember2026-09-300000354707he:TermLoanMemberhe:Mahipapa5.625NonRecourseLoanDue2027Memberus-gaap:NonrecourseMemberus-gaap:CorporateNonSegmentMember2025-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberhe:SpecialPurposeRevenueBondsAndSeniorNotesMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberhe:SpecialPurposeRevenueBondsAndSeniorNotesMember2025-12-310000354707us-gaap:LineOfCreditMemberhe:RevolvingCreditFacilityAt2.50Due2030Memberus-gaap:CorporateNonSegmentMember2025-01-012025-12-310000354707he:TermLoanMemberhe:MahipapaNonRecourseLoansMember2025-12-310000354707us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2025-12-310000354707us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2025-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2025-12-310000354707us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2026-01-012026-09-300000354707us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2026-01-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2026-01-012026-09-300000354707us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2026-09-300000354707us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2026-09-300000354707us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2024-12-310000354707us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2024-12-310000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2024-12-310000354707us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2025-01-012025-09-300000354707us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2025-01-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2025-01-012025-09-300000354707us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2025-09-300000354707us-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:AccumulatedDefinedBenefitPlansAdjustmentMember2025-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberus-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2026-07-012026-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberus-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2025-07-012025-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberus-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2026-01-012026-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberus-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember2025-01-012025-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberus-gaap:AccumulatedDefinedBenefitPlansAdjustmentNetPriorServiceCostCreditMember2026-07-012026-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberus-gaap:AccumulatedDefinedBenefitPlansAdjustmentNetPriorServiceCostCreditMember2025-07-012025-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberus-gaap:AccumulatedDefinedBenefitPlansAdjustmentNetPriorServiceCostCreditMember2026-01-012026-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberus-gaap:AccumulatedDefinedBenefitPlansAdjustmentNetPriorServiceCostCreditMember2025-01-012025-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberhe:AccumulatedDefinedBenefitPlansAdjustmentImpactOfDecisionAndOrdersOfThePublicUtilityCommissionIncludedInRegulatoryAssetsMember2026-07-012026-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberhe:AccumulatedDefinedBenefitPlansAdjustmentImpactOfDecisionAndOrdersOfThePublicUtilityCommissionIncludedInRegulatoryAssetsMember2025-07-012025-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberhe:AccumulatedDefinedBenefitPlansAdjustmentImpactOfDecisionAndOrdersOfThePublicUtilityCommissionIncludedInRegulatoryAssetsMember2026-01-012026-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberhe:AccumulatedDefinedBenefitPlansAdjustmentImpactOfDecisionAndOrdersOfThePublicUtilityCommissionIncludedInRegulatoryAssetsMember2025-01-012025-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2026-07-012026-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2025-07-012025-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2026-01-012026-09-300000354707us-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2025-01-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberus-gaap:AccumulatedDefinedBenefitPlansAdjustmentNetPriorServiceCostCreditMember2026-07-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberus-gaap:AccumulatedDefinedBenefitPlansAdjustmentNetPriorServiceCostCreditMember2025-07-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberus-gaap:AccumulatedDefinedBenefitPlansAdjustmentNetPriorServiceCostCreditMember2026-01-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberus-gaap:AccumulatedDefinedBenefitPlansAdjustmentNetPriorServiceCostCreditMember2025-01-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberhe:AccumulatedDefinedBenefitPlansAdjustmentImpactOfDecisionAndOrdersOfThePublicUtilityCommissionIncludedInRegulatoryAssetsMember2026-07-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberhe:AccumulatedDefinedBenefitPlansAdjustmentImpactOfDecisionAndOrdersOfThePublicUtilityCommissionIncludedInRegulatoryAssetsMember2025-07-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberhe:AccumulatedDefinedBenefitPlansAdjustmentImpactOfDecisionAndOrdersOfThePublicUtilityCommissionIncludedInRegulatoryAssetsMember2026-01-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMemberhe:AccumulatedDefinedBenefitPlansAdjustmentImpactOfDecisionAndOrdersOfThePublicUtilityCommissionIncludedInRegulatoryAssetsMember2025-01-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2026-07-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2025-07-012025-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2026-01-012026-09-300000354707he:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:ReclassificationOutOfAccumulatedOtherComprehensiveIncomeMember2025-01-012025-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesResidentialMember2026-07-012026-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesResidentialMember2026-07-012026-09-300000354707he:ElectricEnergySalesResidentialMember2026-07-012026-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesResidentialMember2026-01-012026-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesResidentialMember2026-01-012026-09-300000354707he:ElectricEnergySalesResidentialMember2026-01-012026-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesCommercialMember2026-07-012026-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesCommercialMember2026-07-012026-09-300000354707he:ElectricEnergySalesCommercialMember2026-07-012026-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesCommercialMember2026-01-012026-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesCommercialMember2026-01-012026-09-300000354707he:ElectricEnergySalesCommercialMember2026-01-012026-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesLargeLightAndPowerMember2026-07-012026-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesLargeLightAndPowerMember2026-07-012026-09-300000354707he:ElectricEnergySalesLargeLightAndPowerMember2026-07-012026-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesLargeLightAndPowerMember2026-01-012026-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesLargeLightAndPowerMember2026-01-012026-09-300000354707he:ElectricEnergySalesLargeLightAndPowerMember2026-01-012026-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesOtherMember2026-07-012026-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesOtherMember2026-07-012026-09-300000354707he:ElectricEnergySalesOtherMember2026-07-012026-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesOtherMember2026-01-012026-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesOtherMember2026-01-012026-09-300000354707he:ElectricEnergySalesOtherMember2026-01-012026-09-300000354707he:ElectricUtilitySegmentMemberhe:OtherSalesMember2026-07-012026-09-300000354707us-gaap:AllOtherSegmentsMemberhe:OtherSalesMember2026-07-012026-09-300000354707he:OtherSalesMember2026-07-012026-09-300000354707he:ElectricUtilitySegmentMemberhe:OtherSalesMember2026-01-012026-09-300000354707us-gaap:AllOtherSegmentsMemberhe:OtherSalesMember2026-01-012026-09-300000354707he:OtherSalesMember2026-01-012026-09-300000354707he:ElectricUtilitySegmentMemberhe:RegulatoryRevenueMember2026-07-012026-09-300000354707us-gaap:AllOtherSegmentsMemberhe:RegulatoryRevenueMember2026-07-012026-09-300000354707he:RegulatoryRevenueMember2026-07-012026-09-300000354707he:ElectricUtilitySegmentMemberhe:RegulatoryRevenueMember2026-01-012026-09-300000354707us-gaap:AllOtherSegmentsMemberhe:RegulatoryRevenueMember2026-01-012026-09-300000354707he:RegulatoryRevenueMember2026-01-012026-09-300000354707he:ElectricUtilitySegmentMemberus-gaap:ProductAndServiceOtherMember2026-07-012026-09-300000354707us-gaap:AllOtherSegmentsMemberus-gaap:ProductAndServiceOtherMember2026-07-012026-09-300000354707us-gaap:ProductAndServiceOtherMember2026-07-012026-09-300000354707he:ElectricUtilitySegmentMemberus-gaap:ProductAndServiceOtherMember2026-01-012026-09-300000354707us-gaap:AllOtherSegmentsMemberus-gaap:ProductAndServiceOtherMember2026-01-012026-09-300000354707us-gaap:ProductAndServiceOtherMember2026-01-012026-09-300000354707us-gaap:TransferredOverTimeMemberhe:ElectricUtilitySegmentMember2026-07-012026-09-300000354707us-gaap:TransferredOverTimeMemberus-gaap:AllOtherSegmentsMember2026-07-012026-09-300000354707us-gaap:TransferredOverTimeMember2026-07-012026-09-300000354707us-gaap:TransferredOverTimeMemberhe:ElectricUtilitySegmentMember2026-01-012026-09-300000354707us-gaap:TransferredOverTimeMemberus-gaap:AllOtherSegmentsMember2026-01-012026-09-300000354707us-gaap:TransferredOverTimeMember2026-01-012026-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesResidentialMember2025-07-012025-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesResidentialMember2025-07-012025-09-300000354707he:ElectricEnergySalesResidentialMember2025-07-012025-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesResidentialMember2025-01-012025-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesResidentialMember2025-01-012025-09-300000354707he:ElectricEnergySalesResidentialMember2025-01-012025-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesCommercialMember2025-07-012025-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesCommercialMember2025-07-012025-09-300000354707he:ElectricEnergySalesCommercialMember2025-07-012025-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesCommercialMember2025-01-012025-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesCommercialMember2025-01-012025-09-300000354707he:ElectricEnergySalesCommercialMember2025-01-012025-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesLargeLightAndPowerMember2025-07-012025-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesLargeLightAndPowerMember2025-07-012025-09-300000354707he:ElectricEnergySalesLargeLightAndPowerMember2025-07-012025-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesLargeLightAndPowerMember2025-01-012025-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesLargeLightAndPowerMember2025-01-012025-09-300000354707he:ElectricEnergySalesLargeLightAndPowerMember2025-01-012025-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesOtherMember2025-07-012025-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesOtherMember2025-07-012025-09-300000354707he:ElectricEnergySalesOtherMember2025-07-012025-09-300000354707he:ElectricUtilitySegmentMemberhe:ElectricEnergySalesOtherMember2025-01-012025-09-300000354707us-gaap:AllOtherSegmentsMemberhe:ElectricEnergySalesOtherMember2025-01-012025-09-300000354707he:ElectricEnergySalesOtherMember2025-01-012025-09-300000354707he:ElectricUtilitySegmentMemberhe:OtherSalesMember2025-07-012025-09-300000354707us-gaap:AllOtherSegmentsMemberhe:OtherSalesMember2025-07-012025-09-300000354707he:OtherSalesMember2025-07-012025-09-300000354707he:ElectricUtilitySegmentMemberhe:OtherSalesMember2025-01-012025-09-300000354707us-gaap:AllOtherSegmentsMemberhe:OtherSalesMember2025-01-012025-09-300000354707he:OtherSalesMember2025-01-012025-09-300000354707he:ElectricUtilitySegmentMemberhe:RegulatoryRevenueMember2025-07-012025-09-300000354707us-gaap:AllOtherSegmentsMemberhe:RegulatoryRevenueMember2025-07-012025-09-300000354707he:RegulatoryRevenueMember2025-07-012025-09-300000354707he:ElectricUtilitySegmentMemberhe:RegulatoryRevenueMember2025-01-012025-09-300000354707us-gaap:AllOtherSegmentsMemberhe:RegulatoryRevenueMember2025-01-012025-09-300000354707he:RegulatoryRevenueMember2025-01-012025-09-300000354707he:ElectricUtilitySegmentMemberus-gaap:ProductAndServiceOtherMember2025-07-012025-09-300000354707us-gaap:AllOtherSegmentsMemberus-gaap:ProductAndServiceOtherMember2025-07-012025-09-300000354707us-gaap:ProductAndServiceOtherMember2025-07-012025-09-300000354707he:ElectricUtilitySegmentMemberus-gaap:ProductAndServiceOtherMember2025-01-012025-09-300000354707us-gaap:AllOtherSegmentsMemberus-gaap:ProductAndServiceOtherMember2025-01-012025-09-300000354707us-gaap:ProductAndServiceOtherMember2025-01-012025-09-300000354707us-gaap:TransferredOverTimeMemberhe:ElectricUtilitySegmentMember2025-07-012025-09-300000354707us-gaap:TransferredOverTimeMemberus-gaap:AllOtherSegmentsMember2025-07-012025-09-300000354707us-gaap:TransferredOverTimeMember2025-07-012025-09-300000354707us-gaap:TransferredOverTimeMemberhe:ElectricUtilitySegmentMember2025-01-012025-09-300000354707us-gaap:TransferredOverTimeMemberus-gaap:AllOtherSegmentsMember2025-01-012025-09-300000354707us-gaap:TransferredOverTimeMember2025-01-012025-09-300000354707us-gaap:PensionPlansDefinedBenefitMember2026-07-012026-09-300000354707us-gaap:PensionPlansDefinedBenefitMember2025-07-012025-09-300000354707us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2026-07-012026-09-300000354707us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2025-07-012025-09-300000354707us-gaap:PensionPlansDefinedBenefitMember2026-01-012026-09-300000354707us-gaap:PensionPlansDefinedBenefitMember2025-01-012025-09-300000354707us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2026-01-012026-09-300000354707us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMember2025-01-012025-09-300000354707us-gaap:PensionPlansDefinedBenefitMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-07-012026-09-300000354707us-gaap:PensionPlansDefinedBenefitMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2025-07-012025-09-300000354707us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-07-012026-09-300000354707us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2025-07-012025-09-300000354707us-gaap:PensionPlansDefinedBenefitMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-01-012026-09-300000354707us-gaap:PensionPlansDefinedBenefitMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2025-01-012025-09-300000354707us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-01-012026-09-300000354707us-gaap:OtherPostretirementBenefitPlansDefinedBenefitMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2025-01-012025-09-300000354707he:EquityAndIncentivePlanMember2026-09-300000354707he:NonemployeeDirectorStockPlanMember2026-09-300000354707us-gaap:CommonStockMember2026-07-012026-09-300000354707us-gaap:CommonStockMember2025-07-012025-09-300000354707us-gaap:CommonStockMember2026-01-012026-09-300000354707us-gaap:CommonStockMember2025-01-012025-09-300000354707us-gaap:RestrictedStockUnitsRSUMember2026-06-300000354707us-gaap:RestrictedStockUnitsRSUMember2025-06-300000354707us-gaap:RestrictedStockUnitsRSUMember2025-12-310000354707us-gaap:RestrictedStockUnitsRSUMember2024-12-310000354707us-gaap:RestrictedStockUnitsRSUMember2026-07-012026-09-300000354707us-gaap:RestrictedStockUnitsRSUMember2025-07-012025-09-300000354707us-gaap:RestrictedStockUnitsRSUMember2026-01-012026-09-300000354707us-gaap:RestrictedStockUnitsRSUMember2025-01-012025-09-300000354707us-gaap:RestrictedStockUnitsRSUMember2026-09-300000354707us-gaap:RestrictedStockUnitsRSUMember2025-09-300000354707he:LongTermIncentivePlanMember2026-01-012026-09-300000354707he:LongTermIncentivePlanLinkedToTotalReturnToShareholdersMember2026-06-300000354707he:LongTermIncentivePlanLinkedToTotalReturnToShareholdersMember2025-06-300000354707he:LongTermIncentivePlanLinkedToTotalReturnToShareholdersMember2025-12-310000354707he:LongTermIncentivePlanLinkedToTotalReturnToShareholdersMember2024-12-310000354707he:LongTermIncentivePlanLinkedToTotalReturnToShareholdersMember2026-07-012026-09-300000354707he:LongTermIncentivePlanLinkedToTotalReturnToShareholdersMember2025-07-012025-09-300000354707he:LongTermIncentivePlanLinkedToTotalReturnToShareholdersMember2026-01-012026-09-300000354707he:LongTermIncentivePlanLinkedToTotalReturnToShareholdersMember2025-01-012025-09-300000354707he:LongTermIncentivePlanLinkedToTotalReturnToShareholdersMember2026-09-300000354707he:LongTermIncentivePlanLinkedToTotalReturnToShareholdersMember2025-09-300000354707he:LongTermIncentivePlanLinkedToTotalReturnToShareholdersMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-09-300000354707he:LongTermIncentivePlanLinkedToTotalReturnToShareholdersMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2025-09-300000354707he:LongTermIncentivePlanAwardsLinkedToOtherPerformanceConditionsMember2026-06-300000354707he:LongTermIncentivePlanAwardsLinkedToOtherPerformanceConditionsMember2025-06-300000354707he:LongTermIncentivePlanAwardsLinkedToOtherPerformanceConditionsMember2025-12-310000354707he:LongTermIncentivePlanAwardsLinkedToOtherPerformanceConditionsMember2024-12-310000354707he:LongTermIncentivePlanAwardsLinkedToOtherPerformanceConditionsMember2026-07-012026-09-300000354707he:LongTermIncentivePlanAwardsLinkedToOtherPerformanceConditionsMember2025-07-012025-09-300000354707he:LongTermIncentivePlanAwardsLinkedToOtherPerformanceConditionsMember2026-01-012026-09-300000354707he:LongTermIncentivePlanAwardsLinkedToOtherPerformanceConditionsMember2025-01-012025-09-300000354707he:LongTermIncentivePlanAwardsLinkedToOtherPerformanceConditionsMember2026-09-300000354707he:LongTermIncentivePlanAwardsLinkedToOtherPerformanceConditionsMember2025-09-300000354707he:HawaiianElectricIndustriesInc.AndHawaiianElectricCompanyInc.AndSubsidiariesMember2026-01-012026-09-300000354707he:HawaiianElectricIndustriesInc.AndHawaiianElectricCompanyInc.AndSubsidiariesMember2025-01-012025-09-300000354707us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:MoneyMarketFundsMember2026-09-300000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:MoneyMarketFundsMemberus-gaap:FairValueInputsLevel1Member2026-09-300000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:MoneyMarketFundsMemberus-gaap:FairValueInputsLevel2Member2026-09-300000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:MoneyMarketFundsMember2026-09-300000354707us-gaap:CarryingReportedAmountFairValueDisclosureMember2026-09-300000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueInputsLevel1Member2026-09-300000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueInputsLevel2Member2026-09-300000354707us-gaap:EstimateOfFairValueFairValueDisclosureMember2026-09-300000354707us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:MoneyMarketFundsMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-09-300000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:MoneyMarketFundsMemberhe:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:FairValueInputsLevel1Member2026-09-300000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:MoneyMarketFundsMemberhe:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:FairValueInputsLevel2Member2026-09-300000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:MoneyMarketFundsMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-09-300000354707us-gaap:CarryingReportedAmountFairValueDisclosureMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-09-300000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberhe:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:FairValueInputsLevel1Member2026-09-300000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberhe:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:FairValueInputsLevel2Member2026-09-300000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2026-09-300000354707us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:MoneyMarketFundsMember2025-12-310000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:MoneyMarketFundsMemberus-gaap:FairValueInputsLevel1Member2025-12-310000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:MoneyMarketFundsMemberus-gaap:FairValueInputsLevel2Member2025-12-310000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:MoneyMarketFundsMember2025-12-310000354707us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:MoneyMarketFundsMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2025-12-310000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:MoneyMarketFundsMemberhe:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:FairValueInputsLevel1Member2025-12-310000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:MoneyMarketFundsMemberhe:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:FairValueInputsLevel2Member2025-12-310000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:MoneyMarketFundsMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2025-12-310000354707us-gaap:CarryingReportedAmountFairValueDisclosureMember2025-12-310000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueInputsLevel1Member2025-12-310000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberus-gaap:FairValueInputsLevel2Member2025-12-310000354707us-gaap:EstimateOfFairValueFairValueDisclosureMember2025-12-310000354707us-gaap:CarryingReportedAmountFairValueDisclosureMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2025-12-310000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberhe:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:FairValueInputsLevel1Member2025-12-310000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberhe:HawaiianElectricCompanyAndSubsidiariesMemberus-gaap:FairValueInputsLevel2Member2025-12-310000354707us-gaap:EstimateOfFairValueFairValueDisclosureMemberhe:HawaiianElectricCompanyAndSubsidiariesMember2025-12-31

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D. C. 20549
 FORM 10-Q
 
☒      QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period ended September 30, 2026
 OR
     ☐         TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
Exact Name of Registrant as Specified in Its CharterCommission File NumberI.R.S. Employer Identification No.
HAWAIIAN ELECTRIC INDUSTRIES, INC.1-850399-0208097
and Principal Subsidiary
HAWAIIAN ELECTRIC COMPANY, INC.1-495599-0040500
State of Hawaii
(State or other jurisdiction of incorporation or organization)
 
Hawaiian Electric Industries, Inc. – 1001 Bishop Street, Suite 2900, Honolulu, Hawaii  96813
Hawaiian Electric Company, Inc. – 1099 Alakea Street, Suite 2200, Honolulu, Hawaii  96813
(Address of principal executive offices and zip code)
 
Hawaiian Electric Industries, Inc. – (808) 543-5662
Hawaiian Electric Company, Inc. – (808) 543-7771
(Registrant’s telephone number, including area code) 
Not applicable
(Former name, former address and former fiscal year, if changed since last report)
RegistrantTitle of each classTrading Symbol(s)Name of each exchange on which registered
Hawaiian Electric Industries, Inc. Common Stock, Without Par ValueHENew York Stock Exchange

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Hawaiian Electric Industries, Inc.Yes☒No☐Hawaiian Electric Company, Inc. Yes☒No☐
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Website, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).
Hawaiian Electric Industries, Inc.Yes☒No☐Hawaiian Electric Company, Inc.Yes☒No☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Securities Exchange Act of 1934.
Hawaiian Electric Industries, Inc.:Hawaiian Electric Company, Inc.:
Large accelerated filer☒Smaller reporting company☐Large accelerated filer☐Smaller reporting company☐
Accelerated filer☐Emerging growth company☐Accelerated filer☐Emerging growth company☐
Non-accelerated filer☐Non-accelerated filer☒
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
Hawaiian Electric Industries, Inc.☐Hawaiian Electric Company, Inc.☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
Hawaiian Electric Industries, Inc.Yes☐No☒Hawaiian Electric Company, Inc.Yes☐No☒
Securities registered pursuant to 12(b) of the Act:
APPLICABLE ONLY TO CORPORATE ISSUERS:
Indicate the number of shares outstanding of each of the issuers’ classes of common stock, as of the latest practicable date.
Class of Common Stock
Outstanding October 30, 2026
Hawaiian Electric Industries, Inc. (Without Par Value)172,728,004 Shares
Hawaiian Electric Company, Inc. ($6-2/3 Par Value)17,854,278 Shares (not publicly traded)
Hawaiian Electric Industries, Inc. (HEI) is the sole holder of Hawaiian Electric Company, Inc. (Hawaiian Electric) common stock.
HAWAIIAN ELECTRIC COMPANY, INC. MEETS THE CONDITIONS SET FORTH IN GENERAL INSTRUCTIONS H(1)(a) AND (b) OF FORM 10-Q AND IS THEREFORE FILING THIS FORM WITH THE REDUCED DISCLOSURE FORMAT.
This combined Form 10-Q is separately filed by HEI and Hawaiian Electric. Information contained herein relating to any individual registrant is filed by such registrant on its own behalf. No registrant makes any representation as to information relating to the other registrant, except that information relating to Hawaiian Electric is also attributed to HEI.



Hawaiian Electric Industries, Inc. and Subsidiaries
Hawaiian Electric Company, Inc. and Subsidiaries
Form 10-Q—Quarter ended September 30, 2026

TABLE OF CONTENTS
 
Page No.
three and nine months ended September 30, 2026 and 2025
three and nine months ended September 30, 2026 and 2025
three and nine months ended September 30, 2026 and 2025
nine months ended September 30, 2026 and 2025
three and nine months ended September 30, 2026 and 2025
three and nine months ended September 30, 2026 and 2025
three and nine months ended September 30, 2026 and 2025
nine months ended September 30, 2026 and 2025
 

i


Hawaiian Electric Industries, Inc. and Subsidiaries
Hawaiian Electric Company, Inc. and Subsidiaries
Form 10-Q—Quarter ended September 30, 2026
GLOSSARY OF TERMS
TermsDefinitions
ABL Facility
Asset-based lending facility
ARAAnnual revenue adjustment
AOCI
Accumulated other comprehensive income (loss)
ASB
American Savings Bank, F.S.B., previously a wholly owned subsidiary of ASB Hawaii, Inc. On December 31, 2024, American Savings Bank, F.S.B. was sold.
ASB Hawaii
ASB Hawaii, Inc., a wholly owned subsidiary of Hawaiian Electric Industries, Inc. and previously the parent company of American Savings Bank, F.S.B. On December 31, 2024, American Savings Bank, F.S.B. was sold.
ASUAccounting Standards Update
ATR
Affiliate Transaction Requirement
BESS
Battery Energy Storage System
CompanyHawaiian Electric Industries, Inc. and its direct and indirect subsidiaries, including, without limitation, Hawaiian Electric Company, Inc. and its subsidiaries (listed under Hawaiian Electric); ASB Hawaii, Inc.; and Pacific Current, LLC and its subsidiaries (listed under Pacific Current). Effective June 3, 2026, GLST1, LLC was dissolved and terminated.
Consumer AdvocateDivision of Consumer Advocacy, Department of Commerce and Consumer Affairs of the State of Hawaii
D&ODecision and order from the PUC
DOEU.S. Department of Energy
DRIPHEI Dividend Reinvestment and Stock Purchase Plan
ECRC
Energy Cost Recovery Clause
EIP
2010 Equity and Incentive Plan, as amended
EPAEnvironmental Protection Agency — federal
EPRMExceptional Project Recovery Mechanism
EPSEarnings per share
ESMEarnings Sharing Mechanism
Exchange ActSecurities Exchange Act of 1934
FASBFinancial Accounting Standards Board
Federal
U.S. Government
GAAPAccounting principles generally accepted in the United States of America
GDPPI
Gross Domestic Product Price Index
GLST1
GLST1, LLC, a former subsidiary of Hawaiian Electric Industries, Inc. Effective June 3, 2026, GLST1, LLC was dissolved and terminated.
Hamakua Energy
Hamakua Energy, LLC, previously an indirect subsidiary of Pacific Current. On March 10, 2025, Hamakua Holdings, LLC was sold and as a result, its wholly owned subsidiary, Hamakua Energy, LLC is no longer owned by Pacific Current as of such closing.
Hamakua Holdings
Hamakua Holdings, LLC, previously a direct subsidiary of Pacific Current and parent company of Hamakua Energy, LLC and HAESP, LLC. On March 10, 2025, Hamakua Holdings, LLC was sold.
Hawaii Electric LightHawaii Electric Light Company, Inc., an electric utility subsidiary of Hawaiian Electric Company, Inc.
Hawaiian ElectricHawaiian Electric Company, Inc., an electric utility subsidiary of Hawaiian Electric Industries, Inc. and parent company of Hawaii Electric Light Company, Inc., Maui Electric Company, Limited, Renewable Hawaii, Inc. and HE AR INTER LLC
HE AR BRWR
HE AR BRWR LLC, a direct subsidiary of HE AR INTER LLC
HE AR INTER
HE AR INTER LLC, a direct subsidiary of Hawaiian Electric Company, Inc. and parent company of HE AR BRWR LLC
HEIHawaiian Electric Industries, Inc., direct parent company of Hawaiian Electric Company, Inc., ASB Hawaii, Inc. and Pacific Current, LLC.
HEIRSPHawaiian Electric Industries Retirement Savings Plan
IPPIndependent power producer
Kaʻieʻie Waho
Kaʻieʻie Waho Company, LLC, a former subsidiary of Pacific Current
ii


GLOSSARY OF TERMS, continued
TermsDefinitions
kWhKilowatthour/s (as applicable)
LTIPLong-term incentive plan
MahipapaMahipapa, LLC, a subsidiary of Pacific Current
Maui ElectricMaui Electric Company, Limited, an electric utility subsidiary of Hawaiian Electric Company, Inc.
Maui windstorm and wildfires
The fires in the West Maui (Lahaina) and Upcountry Maui areas that caused fatalities and widespread property damage in Lahaina on August 8, 2023
Mauo
Mauo, LLC, a former subsidiary of Pacific Current
Moody’sMoody’s Ratings
MPIRMajor Project Interim Recovery
MRPMulti-year rate period
MWMegawatt/s (as applicable)
O&MOperation and maintenance
OPEB
Postretirement benefits other than pension
Pacific Current
Pacific Current, LLC, a wholly owned subsidiary of HEI and parent company of Kaʻaipuaʻa, LLC, Mahipapa, LLC, and Pacific Current, Solar and Storage Holding Company, LLC. On March 10, 2025, Hamakua Holdings, LLC was sold. In June 2025, all of Pacific Current’s membership interests in Mauo, LLC, Alenuihaha Developments, LLC, Kaʻieʻie Waho Company, LLC and Upena, LLC were transferred to PC Opco. On August 1, 2025, PC Opco was sold.
PC HoldcoPacific Current, Solar and Storage Holding Company, LLC, a wholly owned subsidiary of Pacific Current and previously the parent company of PC Opco. On August 1, 2025, PC Opco was sold.
PC Opco
Pacific Current, Solar and Storage Operating Company, LLC, previously a wholly owned subsidiary of PC Holdco. In June 2025, Pacific Current transferred all of the outstanding membership interests in Mauo, LLC, Alenuihaha Developments, LLC, Kaʻieʻie Waho Company, LLC and Upena, LLC to PC Opco. On August 1, 2025, PC Opco was sold.
PBRPerformance-based regulation
PIMs
Performance Incentive Mechanisms
PPAPower purchase agreement
PPAC
Purchased Power Adjustment Clause
PSPS
Public Safety Power Shutoff
PUCPublic Utilities Commission of the State of Hawaii
PVPhotovoltaic
RBARevenue balancing account
RFPs
Request for proposals
ROACEReturn on average common equity
RPSRenewable portfolio standards
S&PS&P Global Ratings
SAIDI
System Average Interruption Duration Index
SAIFI
System Average Interruption Frequency Index
SECSecurities and Exchange Commission
SeeMeans the referenced material is incorporated by reference
SOFRSecured Overnight Financing Rate
Stage 1
Request for proposal process to procure renewable projects governed by the PUC in February 2018
Stage 2
Request for proposal process to procure renewable projects governed by the PUC in August 2019
T&DTransmission and Distribution
UtilitiesHawaiian Electric Company, Inc., Hawaii Electric Light Company, Inc. and Maui Electric Company, Limited
VIEsVariable interest entities
WMP
Wildfire Mitigation Plan
iii


CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS
This report and other presentations made by Hawaiian Electric Industries, Inc. (HEI) and Hawaiian Electric Company, Inc. (Hawaiian Electric) and their subsidiaries contain “forward-looking statements,” which include statements that are predictive in nature, depend upon or refer to future events or conditions and usually include words such as “will,” “expects,” “anticipates,” “intends,” “plans,” “believes,” “predicts,” “estimates” or similar expressions. In addition, any statements concerning future financial performance, ongoing business strategies or prospects or possible future actions are also forward-looking statements. Forward-looking statements are based on current expectations and projections about future events and are subject to risks, uncertainties and the accuracy of assumptions concerning HEI and its subsidiaries (collectively, the Company), the performance of the industries in which they do business and economic, political and market factors, among other things. These forward-looking statements are not guarantees of future performance and actual results and financial condition may differ materially from those indicated in the forward-looking statements.
Risks, uncertainties and other important factors that could cause actual results to differ materially from those described in forward-looking statements and from historical results include, but are not limited to, the following:
•the potential for further trade policy changes under the current administration could disrupt our supply chains and increase costs, e.g., the Utilities’ capital goods and equipment purchases and those of its independent power producers (IPPs) that contain components, sub-components, or raw materials sources from outside the U.S. could experience increases in costs, which could threaten the viability of projects and impact our ability to meet customer demand and the Utilities’ ability to achieve renewable portfolio standards (RPS) goals;
•the impact of the Maui windstorm and wildfires, including potential liabilities in excess of settlement amounts and potential regulatory penalties, which may result in significant costs that may be unrecoverable (or not reimbursed on a timely basis) through insurance and/or rates;
•an increase in insurance premiums and the inability to fully recover premiums through rates or the potential inability to obtain wildfire and general liability insurance coverage at reasonable rates, if available at all;
•the ability to raise the amount of capital necessary on reasonable terms, if at all, for the Company’s and the Utilities’ contribution to the Maui wildfire tort litigation settlement in order to alleviate future conditions that may cause substantial doubt about HEI’s and the Utilities’ ability to continue as a going concern;
•potential further dilution to existing shareholders if the Company raises funds by issuing additional equity or equity-linked securities;
•the inability to execute financing plans to alleviate future conditions that may cause substantial doubt about HEI’s and the Utilities’ ability to continue as a going concern prior to the issuance of their respective annual financial statements, which could result in an event of default and an acceleration of the Company’s and the Utilities’ debt and lead to filing for bankruptcy protection if waivers from lenders are not received;
•extreme weather events, including windstorms and other natural disasters, particularly those driven or exacerbated by evolving climate dynamics, which could increase the risk of the Utilities’ equipment being damaged, becoming inoperable or contributing to a wildfire;
•future suspension, material reduction or extended delay in dividends or other distributions from operating subsidiaries to HEI;
•further downgrades by credit rating agencies in their ratings of the securities of HEI and Hawaiian Electric and their impact on results of financing efforts;
•the risks of suffering losses and incurring liabilities that are uninsured (e.g., damages to the Utilities’ transmission and distribution system and losses from business interruption) or underinsured (e.g., losses not covered as a result of insurance deductibles or other exclusions or exceeding policy limits), and the risks associated with the operation of transmission and distribution assets and power generation facilities, including public and employee safety issues, and assets causing or contributing to wildfires;
•international, national and local economic and political conditions—including the state of the Hawaii tourism, defense and construction industries; the strength or weakness of the Hawaii and continental U.S. real estate markets; decisions concerning the extent of the presence of the federal government and military in Hawaii; the implications and potential impacts of federal government shutdowns, including the impact to the Utilities’ customers’ ability to pay their electric bills and the impact on the State of Hawaii economy; the implications and potential impacts of U.S. and foreign capital and credit market conditions and federal, state and international responses to those conditions; the potential impacts of global and local developments (including global economic conditions and uncertainties, unrest, terrorist acts, wars, conflicts, political protests, deadly virus epidemic or other crisis); the effects of changes that have or may occur in U.S. policy, such as with respect to immigration and trade; and pandemics;
•the ability to adequately address risks and capitalize on opportunities related to the Company’s and the Utilities’ sustainability priority areas, which include safety, reliability and resilience, including relating to wildfires and other extreme weather events, decarbonization, economic health and affordability, secure digitalization, human capital management, employee engagement, and climate-related risks and opportunities;
•citizen activism, including civil unrest, especially in times of severe economic depression and heightened social and political divisions, which could negatively impact customers and employees, impair the ability of the Company and the Utilities to operate and maintain their facilities in an effective and safe manner, and citizen or stakeholder activism that could delay the construction, increase project costs or preclude the completion of third-party or Utility projects that are required to meet electricity demand, resilience and reliability objectives and RPS and other climate-related goals;
iv


•the effects of actions or inaction of the U.S. government or related agencies, including those related to the U.S. debt ceiling or budget funding, monetary policy, trade policy, energy and environmental policy, and other policy and regulatory changes advanced or proposed by the current administration;
•weather, natural disasters (e.g., hurricanes, earthquakes, tsunamis, lightning strikes, lava flows and the effects of evolving climate dynamics, such as more severe storms, flooding, droughts, heat waves, and rising sea levels) and wildfires, including their impact on the resilience and reliability and cost of the Company’s and Utilities’ operations, and the economy;
•the timing, speed and extent of changes in interest rates and the shape of the yield curve, which could result in higher borrowing costs and changes in market liquidity;
•the continued ability of the Company and the Utilities to access the credit and capital markets to fund necessary investments and expenditures (e.g., to obtain short-term and long-term debt financing, including lines of credit, and, in the case of HEI, to issue common stock) under volatile and challenging market conditions, and the potential higher cost of such financings, if available, and due to the uncertainties associated with the costs related to the Maui windstorm and wildfires;
•the risks inherent in changes in the value of the Company’s pension and other retirement plan assets, and the risks inherent in changes in the value of the Company’s pension liabilities, including changes driven by stock market values, interest rates and mortality improvements;
•changes in laws, regulations (including tax regulations), market conditions, interest rates and other factors that result in changes in assumptions used to calculate retirement benefits costs and funding requirements;
•the potential delay by the Public Utilities Commission of the State of Hawaii (PUC) in considering (and potential disapproval of actual or proposed) proposals related to rate rebasing, performance-based regulation (PBR), wildfire safety, renewable energy or grid resiliency, among others, and related costs; reliance by the Utilities on outside parties such as the State, IPPs and developers; supply-chain challenges; and uncertainties surrounding technologies, solar power, wind power, biofuels, liquefied natural gas, environmental assessments required to meet RPS and other climate-related goals; the impacts of implementation of the wildfire mitigation, renewable energy and resilience proposals on future costs of electricity and potential penalties imposed by the PUC for delays in the commercial operations of renewable energy projects;
•the ability of the Utilities to develop, execute and recover the implementation costs of the Utilities’ action plans included in their Integrated Grid Plan, which was accepted by the PUC in 2024, due to the recent issuance of the PUC’s 2024 Inclinations on the Future of Energy in Hawaii, Governor Josh Green’s Executive Order No. 25-01, Accelerating Hawaii’s Transition Toward 100 Percent Renewable Energy, and the Hawaii State Energy Office’s Alternative Fuel, Repowering and Energy Transition Study on the aforementioned plans of the Utilities;
•the ability of the Utilities to recover undepreciated cost of fossil fuel generating units, if they are required to be retired before the end of their expected useful life;
•capacity and supply constraints or difficulties, especially if generating units (utility-owned or IPP-owned) fail or measures such as demand-side management, distributed generation, combined heat and power or other firm capacity supply-side resources fall short of achieving their forecasted benefits or are otherwise insufficient to reduce or meet peak demand;
•high and/or volatile fuel prices, which increases working capital requirements and customer bills, or delivery of adequate fuel by suppliers (including as a result of the Iran war, Russia-Ukraine war and conflicts in the Middle East), which could affect the reliability of utility operations, and the continued availability to the Utilities of their Energy Cost Recovery Clauses (ECRCs);
•the continued availability to the Utilities or modifications of other cost recovery mechanisms, including the Purchased Power Adjustment Clauses (PPACs), annual revenue adjustment (ARA) and pension and postretirement benefits other than pensions (OPEB) tracking mechanisms, and the continued decoupling of revenues from sales to mitigate the effects of declining kilowatt-hour sales;
•the ability of the Utilities to recover increasing or additional costs (e.g., due to trade policies imposed by the current administration, tariffs, inflation, or other factors impacting prices) and earn a reasonable return on capital investments not covered by the ARA, while providing the customer dividend required by PBR;
•the impact from the PUC’s modification of the PBR for the Utilities pursuant to Act 005, Session Laws 2018, including the potential changes to existing and/or addition of new Performance Incentive Mechanisms (PIMs), third-party proposals adopted by the PUC, and the implications of not achieving performance incentive goals;
•the impact of fuel price levels and volatility on customer satisfaction and political and regulatory support for the Utilities;
•unfavorable changes in economic conditions, such as sustained inflation, higher interest rates or recession, that negatively impact the ability of the Company’s customers to pay their utility bills and increase operating costs of the Utilities that cannot be passed on to, or recovered, from customers;
•the risks associated with increasing reliance on renewable energy, including the availability and cost of non-fossil fuel supplies for renewable energy generation and the operational impacts and related cost impacts of adding intermittent sources of renewable energy to the electric grid;
•the growing risk that energy production from renewable generating resources may be curtailed and the interconnection of additional resources will be constrained as more generating resources are added to the Utilities’ electric systems and as customers reduce their energy usage;
•the ability of IPPs to deliver the firm capacity anticipated in their power purchase agreements (PPAs);
•the potential that, as IPP contracts near the end of their terms, there may be less economic incentive for the IPPs to make investments in their units to ensure the availability of their units;
•the ability of the Utilities to negotiate, periodically, favorable agreements for significant resources such as fuel supply contracts and collective bargaining agreements and avoid or mitigate labor disputes and work stoppages;
v


•new technological developments that could affect the operations and prospects of the Utilities or their competitors such as the commercial development of energy storage and microgrids;
•the potential that cyber or physical security incidents, including potential incidents at HEI, its subsidiaries (including at electric utility plants), third-party service providers, contractors and customers with whom they have shared data (IPPs, distributed energy resources aggregators and customers enrolled under distributed energy resources programs) and incidents at data processing centers used, to the extent not prevented by physical and cybersecurity protections, could result in operational disruption; the misappropriation or loss of confidential or proprietary assets, information or data, including customer, employee, financial, or operating system information, or intellectual property; corruption of data; or potential costs, lost revenues, litigation, or reputational harm;
•failure to achieve remaining cost savings commitment related to the management audit recommendations of $6.6 million per year during the multi-year rate period (MRP) from June 2021 to May 2026, and continuing until the second MRP begins;
•federal, state, county and international governmental and regulatory actions, such as existing, new and changes in laws, rules and regulations applicable to HEI and the Utilities (including changes in taxation and tax rates, increases in capital requirements, regulatory policy changes, environmental laws and regulations (including resulting compliance costs and risks of fines and penalties and/or liabilities), the regulation of greenhouse gas emissions, governmental fees and assessments, and potential carbon pricing or “cap and trade” legislation that may fundamentally alter costs to produce electricity and accelerate the move to renewable generation);
•the impact from the PUC’s implementation of wheeling for the Utilities, including cost shifting and customer equity considerations, the potential increased competition, and other legal and technical implications, pursuant to Act 266, which authorizes wheeling of renewable energy and requires the PUC to establish associated policies and procedures;
•the impact of competitive pressures from third-party alternative generation resources and regulatory changes affecting the Company’s utility franchise may negatively impact its growth prospects, market position, and stock price;
•developments in laws, regulations and policies governing protections for historic, archaeological and cultural sites, and plant and animal species and habitats, as well as developments in the implementation and enforcement of such laws, regulations and policies;
•discovery of conditions that may be attributable to historical chemical releases, including any necessary investigation and remediation, and any associated enforcement, litigation or regulatory oversight;
•decisions by the PUC in rate cases and other proceedings (including the risks of delays in the timing of decisions, adverse changes in final decisions from interim decisions and the disallowance of project costs as a result of adverse regulatory audit reports or otherwise);
•decisions by the PUC and by other agencies and courts on land use, environmental and other permitting issues (such as required corrective actions, restrictions and penalties that may arise, such as with respect to environmental conditions or RPS);
•the risks associated with the geographic concentration of HEI’s businesses;
•changes in accounting principles applicable to HEI and its subsidiaries, including the adoption of new U.S. accounting standards, the potential discontinuance of regulatory accounting related to PBR or other regulatory changes, the effects of potentially required consolidation of variable interest entities (VIEs), or required finance lease or on-balance-sheet operating lease accounting for PPAs with IPPs;
•the final outcome of tax positions taken by HEI and its subsidiaries;
•the ability to effectively utilize federal and state net operating loss carryforwards;
•the Company’s reliance on third parties and the risk of their non-performance; and
•other risks or uncertainties described elsewhere in this report (e.g., Item 1A. Risk Factors) and in other reports previously and subsequently filed by HEI and/or Hawaiian Electric with the Securities and Exchange Commission (SEC).
Forward-looking statements speak only as of the date of the report, presentation or filing in which they are made. Except to the extent required by the federal securities laws, HEI, Hawaiian Electric, Pacific Current and their subsidiaries undertake no obligation to publicly update or revise any forward-looking statements, whether written or oral and whether as a result of new information, future events or otherwise.
vi


PART I - FINANCIAL INFORMATION

Item 1.  Financial Statements

Hawaiian Electric Industries, Inc. and Subsidiaries
Condensed Consolidated Statements of Income (unaudited)
Three months ended September 30Nine months ended September 30
(in thousands, except per share amounts)2026202520262025
Revenues
Electric utility$1,007,104 $787,428 $2,688,008 $2,268,276 
Other1,606 3,182 6,852 12,796 
Total revenues1,008,710 790,610 2,694,860 2,281,072 
Expenses
Electric utility (includes $154 million benefit for the tort settlement remeasurement recorded in nine months ended September 30, 2026) (Note 2)
958,931 724,635 2,358,738 2,065,002 
Other8,562 13,929 37,314 47,857 
Total expenses967,493 738,564 2,396,052 2,112,859 
Operating income (loss)
Electric utility48,173 62,793 329,270 203,274 
Other(6,956)(10,747)(30,462)(35,061)
Total operating income
41,217 52,046 298,808 168,213 
Retirement defined benefits credit—other than service costs711 817 2,469 2,653 
Interest expense, net (Note 2)(47,726)(26,211)(127,237)(87,679)
Allowance for borrowed funds used during construction2,493 1,500 6,195 4,379 
Allowance for equity funds used during construction5,564 3,821 13,715 11,108 
Interest and dividend income
3,804 6,960 19,083 27,162 
Gain on sale of investment and net unrealized gain on investment measured at fair value64,146 — 64,146 — 
Gain (loss) on sale of subsidiaries and impairment losses on subsidiary assets sold and assets formerly classified as held for sale(50,736)1,013 (54,452)(12,376)
Income before income taxes19,473 39,946 222,727 113,460 
Income taxes(15,977)8,728 33,627 28,540 
Net income35,450 31,218 189,100 84,920 
Preferred stock dividends of subsidiaries— 471 — 1,417 
Net income for common stock$35,450 $30,747 $189,100 $83,503 
Basic earnings per common share$0.21 $0.18 $1.10 $0.48 
Diluted earnings per common share$0.20 $0.18 $1.09 $0.48 
Weighted-average number of common shares outstanding172,728 172,617 172,664 172,531 
Net effect of potentially dilutive shares (share-based compensation programs)780 299 914 408 
Weighted-average shares assuming dilution173,508 172,916 173,578 172,939 
This report should be read in conjunction with the Notes herein and the Notes to Consolidated Financial Statements appearing in the 2025 Form 10-K.
1


Hawaiian Electric Industries, Inc. and Subsidiaries
Condensed Consolidated Statements of Comprehensive Income (unaudited)
Three months ended September 30Nine months ended September 30
(in thousands)2026202520262025
Net income for common stock
$35,450 $30,747 $189,100 $83,503 
Other comprehensive loss, net of taxes:
Derivatives qualified as cash flow hedges:
Unrealized interest rate hedging gains (losses), net of taxes of nil, $46, nil and $(169), respectively
— 131 — (489)
Reclassification adjustment to net income, net of taxes of $(19), $(304), $(56) and $(339), respectively
(54)(877)(160)(977)
Retirement benefit plans:
Adjustment for amortization of net gains recognized during the period in net periodic benefit cost, net of taxes of $(154), $(187), $(471) and $(538), respectively
(442)(540)(1,357)(1,553)
Reclassification adjustment for impact of D&Os of the PUC included in regulatory accounts, net of taxes of $165, $192, $468 and $527, respectively
476 552 1,348 1,519 
Other comprehensive loss, net of taxes(20)(734)(169)(1,500)
Comprehensive income attributable to Hawaiian Electric Industries, Inc.$35,430 $30,013 $188,931 $82,003 
This report should be read in conjunction with the Notes herein and the Notes to Consolidated Financial Statements appearing in the 2025 Form 10-K.

2


Hawaiian Electric Industries, Inc. and Subsidiaries
Condensed Consolidated Balance Sheets (unaudited) 
(dollars in thousands)September 30, 2026December 31, 2025
Assets
Current assets:
Cash and cash equivalents$224,208 $501,778 
Restricted cash218 478,968 
Accounts receivable and unbilled revenues, net527,672 491,526 
Regulatory assets68,684 50,039 
Other477,022 305,999 
Assets held for sale
— 56,266 
Total current assets1,297,804 1,884,576 
Noncurrent assets:
Property, plant and equipment, net of accumulated depreciation of $3,679,581 and $3,518,501 at September 30, 2026 and December 31, 2025, respectively
6,493,269 6,188,372 
Operating lease right-of-use assets43,992 56,604 
Regulatory assets284,825 258,076 
Defined benefit pension and other postretirement benefit plans asset222,937 219,211 
Other201,755 316,040 
Total noncurrent assets7,246,778 7,038,303 
Total assets$8,544,582 $8,922,879 
Liabilities and shareholders’ equity
Current liabilities:
Accounts payable$353,082 $219,062 
Interest and dividends payable47,716 31,458 
Current portion of long-term debt, net14,370 124,959 
Regulatory liabilities56,138 51,997 
Wildfire related claims 423,275 530,000 
Other420,202 410,458 
Liabilities held for sale
— 59,803 
Total current liabilities1,314,783 1,427,737 
Noncurrent liabilities:
Long-term debt, net
2,298,264 2,285,016 
Operating lease liabilities39,499 43,278 
Finance lease liabilities496,613 505,590 
Regulatory liabilities1,437,117 1,392,147 
Defined benefit pension liability
23,570 23,656 
Wildfire tort-related claims
902,578 1,436,250 
Other230,312 203,286 
Total noncurrent liabilities
5,427,953 5,889,223 
Total liabilities6,742,736 7,316,960 
Commitments and contingencies (Notes 2 and 4)
Shareholders’ equity
Preferred stock, no par value, authorized 10,000,000 shares; issued: none
— — 
Common stock, no par value, authorized 400,000,000 shares; issued and outstanding: 172,728,004 shares and 172,620,476 shares at September 30, 2026 and December 31, 2025, respectively
2,275,183 2,268,187 
Retained earnings (deficit)(476,506)(665,606)
Accumulated other comprehensive income, net of taxes
3,169 3,338 
Total shareholders’ equity1,801,846 1,605,919 
Total liabilities and shareholders’ equity$8,544,582 $8,922,879 
This report should be read in conjunction with the Notes herein and the Notes to Consolidated Financial Statements appearing in the 2025 Form 10-K.
3


Hawaiian Electric Industries, Inc. and Subsidiaries
Condensed Consolidated Statements of Changes in Shareholders’ Equity (unaudited) 
Common stockRetained earnings (deficit)
Accumulated
other
comprehensive income
(in thousands)SharesAmountTotal
Balance, December 31, 2025172,620 $2,268,187 $(665,606)$3,338 $1,605,919 
Net income for common stock— — 30,450 — 30,450 
Other comprehensive loss, net of taxes— — — (74)(74)
Share-based expenses and other, net16 1,074 — — 1,074 
Balance, March 31, 2026172,636 2,269,261 (635,156)3,264 1,637,369 
Net income for common stock— — 123,200 — 123,200 
Other comprehensive loss, net of taxes— — — (75)(75)
Share-based expenses and other, net92 2,393 — — 2,393 
Balance, June 30, 2026172,728 2,271,654 (511,956)3,189 1,762,887 
Net income for common stock— — 35,450 — 35,450 
Other comprehensive loss, net of taxes— — — (20)(20)
Share-based expenses and other, net— 3,529 — — 3,529 
Balance, September 30, 2026172,728 $2,275,183 $(476,506)$3,169 $1,801,846 
Balance, December 31, 2024172,466 $2,264,544 $(788,916)$3,461 $1,479,089 
Net income for common stock— — 26,671 — 26,671 
Other comprehensive loss, net of taxes— — — (460)(460)
Share-based expenses and other, net28 576 — — 576 
Balance, March 31, 2025172,494 2,265,120 (762,245)3,001 1,505,876 
Net income for common stock— — 26,085 — 26,085 
Other comprehensive loss, net of taxes— — — (306)(306)
Share-based expenses and other, net118 2,777 — — 2,777 
Balance, June 30, 2025172,612 2,267,897 (736,160)2,695 1,534,432 
Net income for common stock— — 30,747 — 30,747 
Other comprehensive loss, net of taxes— — — (734)(734)
Share-based expenses and other, net8 (609)— — (609)
Balance, September 30, 2025172,620 $2,267,288 $(705,413)$1,961 $1,563,836 
This report should be read in conjunction with the Notes herein and the Notes to Consolidated Financial Statements appearing in the 2025 Form 10-K.

4


Hawaiian Electric Industries, Inc. and Subsidiaries
Condensed Consolidated Statements of Cash Flows (unaudited)

Nine months ended September 30
(in thousands)20262025
Cash flows from operating activities
Net income
$189,100 $84,920 
Adjustments to reconcile net income to net cash provided by (used in) operating activities
Depreciation of property, plant and equipment199,598 195,891 
Other amortization26,246 30,732 
Gain on sale of ASB investment(18,296)— 
Unrealized gain on remaining investment in ASB(45,850)— 
Loss on sale of subsidiaries and impairment loss on assets sold and assets previously classified as held for sale54,452 12,376 
Deferred income taxes56,433 (13,333)
Share-based compensation expense7,344 2,922 
Allowance for equity funds used during construction(13,715)(11,108)
Other(7,330)(4,528)
Changes in assets and liabilities
Increase in accounts receivable and unbilled revenues, net(98,590)(54,014)
Increase in fuel oil stock
(52,619)(13,200)
Increase in materials and supplies
(10,953)(14,412)
Decrease (increase) in regulatory assets(26,146)2,839 
Increase in regulatory liabilities36,203 65,674 
Increase in accounts, interest and dividends payable112,713 3,372 
Change in prepaid and accrued income taxes, tax credits and utility revenue taxes(3,211)(15,761)
Change in defined benefit pension and other postretirement benefit plans asset/liability
(5,821)(4,263)
Settlement payments(518,750)— 
Increase (decrease) in wildfire-related claims(118,147)47,750 
Change in other assets and liabilities6,329 (31,189)
Net cash provided by (used in) operating activities(231,010)284,668 
Cash flows from investing activities
Proceeds from sale of subsidiaries
— 13,781 
Proceeds from sale of assets33,889 — 
Capital expenditures(399,447)(255,450)
Other, net
2,286 4,316 
Net cash used in investing activities
(363,272)(237,353)
Cash flows from financing activities
Repayment of short-term debt— (50,000)
Proceeds from issuance of long-term debt— 500,000 
Repayment of long-term debt(150,760)(694,475)
Withheld shares for employee taxes on vested share-based compensation(128)(178)
Preferred stock dividends of subsidiaries— (1,417)
Other(11,150)(16,887)
Net cash used in financing activities
(162,038)(262,957)
Net decrease in cash, cash equivalents and restricted cash
(756,320)(215,642)
Cash, cash equivalents and restricted cash, beginning of period980,746 1,242,852 
Cash, cash equivalents and restricted cash, end of period224,426 1,027,210 
Less: Restricted cash(218)(478,968)
Cash and cash equivalents, end of period$224,208 $548,242 
This report should be read in conjunction with the Notes herein and the Notes to Consolidated Financial Statements appearing in the 2025 Form 10-K.
5


Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidated Statements of Income (unaudited)
Three months ended September 30Nine months ended September 30
(in thousands)2026202520262025
Revenues$1,007,104 $787,428 $2,688,008 $2,268,276 
Expenses
Fuel oil398,693 240,547 972,221 689,855 
Purchased power218,477 183,813 587,310 505,493 
Other operation and maintenance181,563 161,819 510,523 463,144 
Wildfire tort-related claims (Note 2)— — (162,383)— 
Depreciation66,421 64,022 199,314 192,015 
Taxes, other than income taxes93,777 74,434 251,753 214,495 
Total expenses958,931 724,635 2,358,738 2,065,002 
Operating income 48,173 62,793 329,270 203,274 
Allowance for equity funds used during construction5,564 3,821 13,715 11,108 
Retirement defined benefits credit—other than service costs797 998 2,896 3,101 
Interest expense and other charges, net (Note 2)(44,753)(22,114)(117,980)(66,272)
Allowance for borrowed funds used during construction2,493 1,500 6,195 4,379 
Interest income1,615 1,461 8,196 4,657 
Income before income taxes13,889 48,459 242,292 160,247 
Income taxes401 10,973 55,603 34,797 
Net income
13,488 37,486 186,689 125,450 
Preferred stock dividends of subsidiaries— 228 — 686 
Net income attributable to Hawaiian Electric13,488 37,258 186,689 124,764 
Preferred stock dividends of Hawaiian Electric— 270 — 810 
Net income for common stock$13,488 $36,988 $186,689 $123,954 
This report should be read in conjunction with the Notes herein and the Notes to Consolidated Financial Statements appearing in the 2025 Form 10-K.
Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidated Statements of Comprehensive Income (unaudited)
Three months ended September 30Nine months ended September 30
(in thousands)2026202520262025
Net income for common stock
$13,488 $36,988 $186,689 $123,954 
Other comprehensive income (loss), net of taxes:
Retirement benefit plans:
Adjustment for amortization of net gains recognized during the period in net periodic benefit cost, net of taxes of $(158), $(200), $(493) and $(568), respectively
(456)(576)(1,422)(1,637)
Reclassification adjustment for impact of D&Os of the PUC included in regulatory accounts, net of taxes of $165, $192, $468 and $527, respectively
476 552 1,348 1,519 
Other comprehensive income (loss), net of taxes20 (24)(74)(118)
Comprehensive income attributable to Hawaiian Electric Company, Inc.
$13,508 $36,964 $186,615 $123,836 
This report should be read in conjunction with the Notes herein and the Notes to Consolidated Financial Statements appearing in the 2025 Form 10-K.
6


Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidated Balance Sheets (unaudited)
(dollars in thousands, except par value)September 30, 2026December 31, 2025
Assets
Property, plant and equipment
Utility property, plant and equipment
Land$52,097 $52,107 
Plant and equipment8,907,100 8,719,617 
Right-of-use assets - finance lease539,485 539,485 
Less accumulated depreciation(3,671,030)(3,508,592)
Construction in progress660,436 382,147 
Utility property, plant and equipment, net6,488,088 6,184,764 
Nonutility property, plant and equipment, less accumulated depreciation of $1 as of September 30, 2026 and December 31, 2025
2,705 2,705 
Total property, plant and equipment, net6,490,793 6,187,469 
Current assets
Cash and cash equivalents175,970 486,220 
Customer accounts receivable, net216,698 172,894 
Accrued unbilled revenues, net241,679 192,033 
Other accounts receivable, net21,448 76,346 
Fuel oil stock, at average cost166,201 113,582 
Materials and supplies, at average cost143,776 132,803 
Prepayments and other90,680 57,980 
Regulatory assets68,684 50,039 
Total current assets1,125,136 1,281,897 
Other long-term assets
Operating lease right-of-use assets43,533 55,863 
Regulatory assets284,825 258,076 
Defined benefit pension and other postretirement benefit plans asset
223,307 219,477 
Investment in unconsolidated affiliate
— 287,250 
Other169,593 240,488 
Total other long-term assets721,258 1,061,154 
Total assets$8,337,187 $8,530,520 
(continued)
7


Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidated Balance Sheets (unaudited) (continued)
(dollars in thousands, except par value)September 30, 2026December 31, 2025
Capitalization and liabilities
Capitalization
Common stock ($6 2/3 par value, authorized 50,000,000 shares; outstanding 17,854,278 shares at September 30, 2026 and December 31, 2025)
$119,048 $119,048 
Premium on capital stock811,350 811,350 
Retained earnings516,990 362,301 
Additional paid-in capital
458,812 288,060 
Accumulated other comprehensive income, net of taxes-retirement benefit plans2,566 2,640 
Common stock equity1,908,766 1,583,399 
Long-term debt, net2,058,269 2,057,874 
Total capitalization3,967,035 3,641,273 
Commitments and contingencies (Notes 2 and 4)
Current liabilities
Current portion of operating lease liabilities14,646 17,565 
Current portion of long-term debt, net— 124,959 
Accounts payable349,175 217,203 
Interest and preferred dividends payable41,653 28,024 
Taxes accrued, including revenue taxes276,364 263,179 
Regulatory liabilities56,138 51,997 
Wildfire tort-related claims
375,525 482,250 
Other127,877 119,278 
Total current liabilities1,241,378 1,304,455 
Deferred credits and other liabilities
Operating lease liabilities32,529 42,753 
Finance lease liabilities496,214 505,590 
Deferred income taxes8,697 — 
Regulatory liabilities1,437,117 1,392,147 
Unamortized tax credits58,150 67,918 
Defined benefit pension liability13,181 6,909 
Wildfire tort-related claims
902,578 1,436,250 
Other180,308 133,225 
Total deferred credits and other liabilities3,128,774 3,584,792 
Total capitalization and liabilities$8,337,187 $8,530,520 
This report should be read in conjunction with the Notes herein and the Notes to Consolidated Financial Statements appearing in the 2025 Form 10-K.
8


Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidated Statements of Changes in Common Stock Equity (unaudited)
 
Common stockPremium
on
capital
RetainedAdditional paid-inAccumulated
other
comprehensive
(in thousands)SharesAmountstockearnings
capital
incomeTotal
Balance, December 31, 202517,854 $119,048 $811,350 $362,301 $288,060 $2,640 $1,583,399 
Net income for common stock— — — 35,343 — — 35,343 
Other comprehensive loss, net of taxes— — — — — (47)(47)
Common stock dividends
— — — (10,000)— — (10,000)
Balance, March 31, 202617,854 119,048 811,350 387,644 288,060 2,593 1,608,695 
Net income for common stock— — — 137,858 — — 137,858 
Other comprehensive loss, net of taxes— — — — — (47)(47)
Common stock dividends— — — (11,000)— — (11,000)
Additional paid-in capital (Note 11)— — — — 130,752 — 130,752 
Balance, June 30, 202617,854 119,048 811,350 514,502 418,812 2,546 1,866,258 
Net income for common stock
— — — 13,488 — — 13,488 
Other comprehensive income, net of taxes— — — — — 20 20 
Common stock dividends— — — (11,000)— — (11,000)
Additional paid-in capital (Note 11)— — — — 40,000 — 40,000 
Balance, September 30, 202617,854 $119,048 $811,350 $516,990 $458,812 $2,566 $1,908,766 
Balance, December 31, 202417,854 $119,048 $810,955 $223,896 $270 $2,786 $1,156,955 
Net income for common stock— — — 47,816 — — 47,816 
Other comprehensive loss, net of taxes— — — — — (47)(47)
Additional paid-in capital— — — — 287,520 — 287,520 
Balance, March 31, 202517,854 119,048 810,955 271,712 287,790 2,739 1,492,244 
Net income for common stock— — — 39,150 — — 39,150 
Other comprehensive loss, net of taxes— — — — — (47)(47)
Common stock dividends— — — (10,000)— — (10,000)
Additional paid-in capital— — — — 270 — 270 
Balance, June 30, 202517,854 119,048 810,955 300,862 288,060 2,692 1,521,617 
Net income for common stock— — — 36,988 — — 36,988 
Other comprehensive loss, net of taxes— — — — — (24)(24)
Common stock dividends— — — (10,000)— — (10,000)
Balance, September 30, 202517,854 $119,048 $810,955 $327,850 $288,060 $2,668 $1,548,581 
This report should be read in conjunction with the Notes herein and the Notes to Consolidated Financial Statements appearing in the 2025 Form 10-K.

9



Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidated Statements of Cash Flows (unaudited)
Nine months ended September 30
(in thousands)20262025
Cash flows from operating activities
Net income $186,689 $125,450 
Adjustments to reconcile net income to net cash provided by operating activities
Depreciation of property, plant and equipment199,314 192,015 
Other amortization25,965 28,904 
Deferred income taxes69,182 (8,875)
State refundable credit(9,756)(9,315)
Insurance recovery related to wildfire tort-related claim(8,512)— 
Bad debt expense2,091 2,375 
Allowance for equity funds used during construction(13,715)(11,108)
Other335 2,578 
Changes in assets and liabilities
Increase in accounts receivable(46,305)(564)
Increase in accrued unbilled revenues(49,671)(5,538)
Increase in fuel oil stock(52,619)(12,300)
Increase in materials and supplies(10,973)(14,316)
Decrease (increase) in regulatory assets(26,146)2,839 
Increase in regulatory liabilities36,203 65,674 
Increase in accounts payable89,384 1,593 
Change in prepaid and accrued income taxes, tax credits and revenue taxes1,144 (26,303)
Change in defined benefit pension and other postretirement
benefit plans asset/liability
(5,915)(4,209)
Decrease in wildfire tort-related claims(118,147)— 
Change in other assets and liabilities(14,456)(8,897)
Net cash provided by operating activities254,092 320,003 
Cash flows from investing activities
Capital expenditures(399,167)(253,927)
Other2,376 6,245 
Net cash used in investing activities(396,791)(247,682)
Cash flows from financing activities
Common stock dividends(32,000)(20,000)
Preferred stock dividends of Hawaiian Electric and subsidiaries— (1,496)
Proceeds from capital contribution from parent
— 540 
Repayment of short-term debt— (50,000)
Proceeds from issuance of long-term debt— 500,000 
Repayment of long-term debt(125,000)(166,000)
Payments of obligations under finance leases(8,527)(7,163)
Other(2,024)(8,479)
Net cash provided by (used in) financing activities(167,551)247,402 
Net increase (decrease) in cash and cash equivalents(310,250)319,723 
Cash and cash equivalents, beginning of period
486,220 184,148 
Cash and cash equivalents, end of period$175,970 $503,871 
This report should be read in conjunction with the Notes herein and the Notes to Consolidated Financial Statements appearing in the 2025 Form 10-K.

10


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (Unaudited)

Note 1 · Basis of presentation
The accompanying unaudited condensed consolidated financial statements have been prepared in conformity with accounting principles generally accepted in the United States of America (GAAP) for interim financial information, the instructions to SEC Form 10-Q and Article 10 of Regulation S-X. Accordingly, they do not include all of the information and footnotes required by GAAP for complete financial statements. In preparing the unaudited condensed consolidated financial statements, management is required to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the balance sheet and the reported amounts of revenues and expenses for the period. Actual results could differ significantly from those estimates. The accompanying unaudited condensed consolidated financial statements and the following notes should be read in conjunction with the audited consolidated financial statements and the notes thereto in HEI’s and Hawaiian Electric’s Form 10-K for the year ended December 31, 2025.
In the opinion of HEI’s and Hawaiian Electric’s management, the accompanying unaudited condensed consolidated financial statements contain all material adjustments required by GAAP to fairly state consolidated HEI’s and Hawaiian Electric’s financial positions as of September 30, 2026 and December 31, 2025, the results of their operations for the three and nine months ended September 30, 2026 and 2025, and cash flows for the nine months ended September 30, 2026 and 2025. All such adjustments are of a normal recurring nature, unless otherwise disclosed below or in other referenced material. Results of operations for interim periods are not necessarily indicative of results for the full year.
Assets held for sale and discontinued operations. In June 2025, the Company determined the net assets of Mahipapa, the remaining Pacific Current operating subsidiary, met the criteria for classification as held for sale. The Company reclassified these assets and liabilities as “Assets held for sale” and “Liabilities held for sale” in the condensed consolidated balance sheets as of December 31, 2025. In addition, the Company had also determined that the planned sale of this asset did not represent a strategic shift having a major effect on the Company’s operations and financial results, and therefore did not meet the criteria for classification as discontinued operations.
During the quarter, the Company determined Mahipapa to be an abandoned asset which no longer met the criteria for classification as held for sale. Accordingly, the related assets and liabilities were reclassified to held and used. Upon reclassification, these assets were written down to their estimated net salvage value at the date of the reclassification. For further discussion, see “Assets held for sale - Mahipapa” in Note 3.
Recent accounting pronouncements.
Income statement disclosures. In November 2024, the Financial Accounting Standards Board (FASB) issued Accounting Standards Update (ASU) No. 2024-03, Income Statement—Reporting Comprehensive Income—Expense Disaggregation Disclosures (Subtopic 220-40). The guidance requires more detailed information about specified categories of expenses included in certain captions presented on the face of the income statement. ASU No. 2024-03 is effective for annual periods beginning after December 15, 2026, and interim periods beginning after December 15, 2027. Early adoption is permitted. The Company is currently evaluating the impact of this amendment on the Company’s consolidated financial statements.
Accounting for Internal-use software. In September 2025, the FASB issued ASU No. 2025-06, Intangibles—Goodwill and Other—Internal-Use Software: Targeted Improvements to the Accounting for Internal-Use Software. The guidance removes all references to project stages in software development and requires capitalization of internal-use software costs to begin when management has authorized and committed to funding the project and it is probable the project will be completed and used to perform the intended function. ASU No. 2025-06 is effective for annual reporting periods beginning after December 15, 2027, and interim reporting periods within those annual reporting periods, with early adoption permitted. The Company is currently evaluating the impact of this amendment on the Company’s consolidated financial statements.
Accounting for government grants. In December 2025, the FASB issued ASU No. 2025-10, Accounting for Government Grants Received by Business Entities. The ASU adds guidance on the recognition, measurement and presentation of government grants received by business entities. ASU No. 2025-10 is effective for annual reporting periods beginning after December 15, 2028, and for interim reporting periods within those annual reporting periods, with early adoption permitted. The Company is currently evaluating the impact of this amendment on the Company’s consolidated financial statements.
Note 2 · Maui windstorm and wildfires
On August 8, 2023, a number of brush fires in the West Maui (Lahaina) and Upcountry Maui areas caused widespread property damage, including damage to property of the Utilities, and 102 confirmed fatalities in Lahaina (the Maui windstorm and wildfires). The Maui windstorm and wildfires were fueled by extreme winds and drought-like conditions in those parts of Maui.
11


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Restoration costs and recoveries. The Utilities are continuing restoration work to rebuild portions of the electric system in Lahaina to ensure safe and reliable power to customers. Restoration efforts include the rebuilding of electrical lines along former routes in the Lahaina area with the installation of new poles and electrical equipment. Ongoing work is focused on reestablishing electrical service to homes as they are being built.
The Public Utilities Commission of the State of Hawaii (PUC) has issued orders authorizing deferred accounting treatment for certain incremental non-labor expenses related to the Maui windstorm and wildfires incurred from August 8, 2023 through December 31, 2025. The approval pertains only to deferred cost treatment for expenses that are not already part of base rates; any actual recovery of deferred costs will be the subject of a separate application. As of September 30, 2026, the Utilities have deferred $79.1 million of these incremental costs to a regulatory asset.
Tort-related legal claims. HEI and the Utilities each were named in several thousand lawsuits related to the Maui windstorm and wildfires. These lawsuits (collectively, tort-related legal claims) named as defendants HEI, the Utilities, and others, including the County of Maui, the State of Hawaii and related state entities, private landowners and developers, and telecommunications companies. Most of these lawsuits alleged that the defendants were responsible for, and/or negligent in failing to prevent or respond to, the wildfires that led to property destruction and loss of life. The defendants filed lawsuits and/or asserted cross-claims against one another, and approximately 200 subrogation insurers brought actions against certain of the defendants, including HEI and the Utilities.
Effective November 1, 2024, HEI and Hawaiian Electric entered into two definitive settlement agreements (one with class plaintiffs and one with lawyers representing individual plaintiffs, collectively, the Settlement Agreements) to settle the tort-related legal claims in the litigation arising out of the Maui windstorm and wildfires on a global basis without any admission of liability. The Settlement Agreements, including mutual releases among the parties, became effective upon the satisfaction of the last remaining condition on April 10, 2026. Most of the thousands of lawsuits have now been dismissed.
Under the Settlement Agreements, HEI and Hawaiian Electric are obligated to contribute a total of $1.99 billion, including $75 million previously contributed to the One ‘Ohana Initiative, of the total defendant contribution of approximately $4.04 billion. HEI and Hawaiian Electric paid the first of four equal annual $479 million installments on April 10, 2026. In April 2026, HEI recorded a $479 million noncash equity contribution to Hawaiian Electric, which used it to relieve the current wildfire tort-related claim liability. See Note 11. The funds for the first installment were previously raised through HEI’s September 2024 equity offering and held in a special purpose vehicle formed specifically to hold the first payment pending satisfaction of all conditions to payment. The remaining installments are due in April 2027, April 2028, and April 2029. HEI and Hawaiian Electric have the option to accelerate the payments, in whole or in part, with such accelerated payments to be discounted at a rate of 5.5% per annum. HEI and Hawaiian Electric are also obligated to contribute a share to the settlement administration fees only if certain other sources are exhausted when such fees become due, for which $4.5 million was accrued as of September 30, 2026, based on the best estimate at this time.
The Settlement Agreements also provide that $500 million of the total settlement payments will be reserved and made available to defendants to defray the cost to resolve any claims brought by plaintiffs who do not release claims as part of either Settlement Agreement. Approximately 70 plaintiffs who “opted out” of the class Settlement Agreement have not signed individual agreements and releases to join the global settlement. Some of these opt outs are pursuing their claims through lawsuits in state and federal court, including two putative class actions pending in federal court; others have stated that they will accept settlements in line with the global settlement amount; and others have indicated they are abandoning their claims. The defendants are continuing in their efforts to resolve all of these claims through the $500 million holdback fund. Based on current projections, HEI and Hawaiian Electric believe that the $500 million holdback will be sufficient to resolve these claims.
The Company believes the tort-related legal claims arising out of the Maui windstorm and wildfires have been substantially concluded and that settlements or judgments from any remaining claims will be funded from the $500 million holdback. If additional liabilities were to be incurred, or if the holdback is insufficient to cover remaining claims, however, the losses could be material to the Company’s results of operations, financial position and cash flows and could result in violations of the financial covenants in the Company’s debt agreements. If any such losses were to be sufficiently high, the Company may not have liquidity or the ability to access liquidity at levels necessary to satisfy such losses. However, any possible loss in excess of the amount recorded cannot reasonably be estimated at this time.
After the final condition to payment under the Settlement Agreements was satisfied in the second quarter of 2026, the Utilities remeasured the remaining settlement liability at present value using their incremental borrowing rate, in accordance with Accounting Standards Codification Topic 835-30 Imputation of Interest. As of June 30, 2026, the remeasurement reduced Hawaiian Electric’s remaining settlement liability by $154 million and was recognized as a reduction to expense. The discounted settlement liability will accrete through interest expense under the effective interest method until the applicable settlement payment due dates, when its carrying amount is expected to equal the remaining gross settlement payment obligation. Accretion expense for the three and nine months ended September 30, 2026, was $18 million and $36 million, respectively and is reported in “Interest expense, net” and “Interest expense and other charges, net” on HEI’s and the Utilities’ Condensed Consolidated Statements of Income, respectively. On September 16, 2026, HEI made a partial prepayment of
12


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
$40 million towards the second installment amount due in April 2027. As of September 30, 2026, the remaining settlement liability, measured at present value, was classified as a current liability of $376 million and a noncurrent liability of $903 million on HEI’s and the Utilities’ Condensed Consolidated Balance Sheets. On October 28, 2026, HEI made another partial prepayment of $40 million towards the second installment amount due in April 2027.
Securities class action. On August 24, 2023, a putative securities class action was filed in the United States District Court for the Northern District of California claiming violations of the Securities Exchange Act of 1934 (the Exchange Act) and Rule 10b-5 promulgated thereunder against HEI and Hawaiian Electric and certain of HEI’s and Hawaiian Electric’s current and former officers, and Section 20(a) of the Exchange Act against certain current and former officers (the Securities Action). The lawsuit broadly alleges that the defendants made materially false and misleading statements or omissions regarding the wildfire prevention and safety protocols and related matters.
On November 5, 2025, the parties signed a binding term sheet to settle the Securities Action (the Securities Action Term Sheet) following negotiations facilitated by a mediator. On January 5, 2026, the parties executed a definitive stipulation of settlement (the Securities Action Stipulation of Settlement) that will provide for the complete resolution of the Securities Action in exchange for a payment by the Company of $47.8 million as part of the overall settlement described below. As of now, the only remaining condition is the final approval of the Securities Action Stipulation of Settlement and dismissal of the case. In connection with the settlement of the Securities Action, there will be no admission of liability by the Company or any defendants and the Company, the defendants, and related persons will receive a customary full release of all claims. On March 3, 2026, the United States District Court for the Northern District of California preliminarily approved the Securities Action Stipulation of Settlement. On October 15, 2026, the court held a hearing to finally approve the settlement. On October 23, 2026, the court issued its order finally approving the settlement. On November 5, 2026, the court entered its order of final judgment.
In connection with the execution of the Securities Action Term Sheet, HEI accrued $47.8 million in the third quarter of 2025, and recorded an insurance reimbursement receivable of an equivalent amount as the recovery of the agreed settlement payment under its directors and officers liability insurance policy is deemed probable. In the third quarter of 2025, HEI charged the accrued settlement to “Expenses-Other” in HEI and Subsidiaries’ Condensed Consolidated Statements of Income, which was offset by the probable insurance recovery. The accrued settlement and insurance receivable is included in “Wildfire related claims” and “Accounts receivable and unbilled revenues, net,” under current liabilities and current assets, respectively, in HEI and Subsidiaries’ Condensed Consolidated Balance Sheets.
Shareholder derivative lawsuits. Two putative shareholder derivative actions were filed in the Circuit Court of the First Circuit, State of Hawaii on September 11, 2023 and on November 6, 2024. In addition, three putative shareholder derivative actions were filed in the United States District Court for the Northern District of California between December 26, 2023 and February 8, 2024, and two putative shareholder derivative actions were filed in the United States District Court for the District of Hawaii between April 8, 2024 and June 8, 2024. All of the lawsuits were purportedly brought by shareholders on behalf of nominal defendants HEI and Hawaiian Electric against certain current and former officers and directors of HEI and Hawaiian Electric. In all of the cases, the plaintiffs generally alleged state law breaches of fiduciary duty, abuse of control, corporate waste, unjust enrichment, gross mismanagement and aiding and abetting breaches of fiduciary duty claims in connection with the Maui windstorm and wildfires and certain of the Company’s prior public disclosures, and some of them added claims based on purported violations of federal securities laws.
On November 5, 2025, the parties signed a binding term sheet (the Derivative Litigation Term Sheet) to settle all of the outstanding derivative actions described above (the Derivative Actions). The Derivative Litigation Term Sheet was signed following negotiations facilitated by a mediator. On December 31, 2025, the parties executed a definitive settlement agreement (the Derivative Litigation Settlement Agreement) that provides for a complete resolution of the claims asserted in the Derivative Actions in exchange for a payment on behalf of the individual defendants by the Company’s insurers in the amount of $100 million (the Derivative Litigation Settlement Proceeds, which was fully funded by the directors and officers’ liability insurance policies), which will be used in part to pay the $47.8 million for the Securities Action Stipulation of Settlement and fees and expenses for plaintiffs’ counsel. In connection with the settlement of the Derivative Actions, there were no admissions of liability, and the defendants and related persons received a customary full release of all claims. On March 9, 2026, the United States District Court for the District of Hawaii preliminarily approved the Derivative Litigation Settlement Agreement. On May 28, 2026, the United States District Court for the District of Hawaii issued an order of final approval of the Derivative Litigation Settlement Agreement and dismissal of the Derivative Actions with prejudice. The court granted plaintiffs’ award for attorneys’ fees (25% of the Derivative Litigation Settlement Proceeds), plus expenses, and service fees for the plaintiffs. On June 29, 2026, the judgment dismissing the Derivative Actions with prejudice became final. On July 14, 2026 and consistent with that final judgment and the Derivative Litigation Settlement Agreement, the Circuit Court of the First Circuit, State of Hawaii approved the parties’ notice of voluntary dismissal with prejudice of the last two Derivative Actions.
As noted above, $47.8 million of the $100 million Derivative Litigation Settlement Proceeds will be used to fund the settlement of the Securities Action. The remaining amount, the award in the Derivative Actions for the plaintiffs’ attorneys’
13


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
fees and expenses, and payment of other settlement-related expenses provided for in the term sheet, is accounted for as a contingent gain which will be recognized when realized or realizable.
Maui windstorm and wildfires costs. Legal costs in connection with the litigation and loss contingencies are expensed as incurred. The Company has $165 million of excess liability insurance and $25 million of professional liability insurance for third party claims, including claims related to wildfires, with a retention of $0.3 million and $1.0 million, respectively, and $145 million directors and officers liability insurance to cover claims related to the shareholder and derivative lawsuits, with a retention of $1.0 million. As of September 30, 2026, the Company’s insurance receivable totaled $48 million, related to the settlement of the Securities Action and the Utilities had no insurance receivable under the policies. As of September 30, 2026, HEI and its subsidiaries have approximately nil, nil and $71 million of insurance coverage remaining under the excess liability, professional liability, and directors and officers liability policies, respectively, after deducting applicable retention amounts, amounts that have been recovered under insurance policies (including the One ‘Ohana Initiative contribution), and amounts expected to be recovered for incurred costs and recognized as a receivable.
See table below for the incremental items related to the Maui windstorm and wildfires.
Three months ended September 30, 2026Nine months ended September 30, 2026
(in thousands)Electric utility
HEI consolidated
Electric utility
HEI consolidated
Maui windstorm and wildfires related expenses:
Legal expenses$1,028 $1,002 $3,592 $6,234 
Other expense— 31 1,116 1,409 
Total Maui windstorm and wildfires related expenses1,028 1,033 4,708 7,643 
Insurance recoveries1
(35)(207)(8,866)(9,381)
Settlement remeasurement2
— — (153,870)(153,870)
Accretion expense3
18,010 18,010 35,724 35,724 
Total Maui windstorm and wildfires related items, net
$19,003 $18,836 $(122,304)$(119,884)
Three months ended September 30, 2025Nine months ended September 30, 2025
(in thousands)Electric utilityHEI consolidatedElectric utilityHEI consolidated
Maui windstorm and wildfires related expenses:
Legal expenses$4,316 $5,794 $12,469 $20,532 
Wildfire securities-related claims— 47,750 — 47,750 
Other expense5,922 6,290 19,821 21,113 
Total Maui windstorm and wildfires related expenses10,238 59,834 32,290 89,395 
Insurance recoveries4
(430)(49,070)126 (53,374)
Deferral treatment approved by the PUC5
(6,237)(6,237)(21,809)(21,809)
Total Maui windstorm and wildfires related expenses, net of insurance recoveries and approved deferral treatment$3,571 $4,527 $10,607 $14,212 
1    Includes $8.5 million recognized as an adjustment to the Wildfire tort-related claims for the nine months ended September 30, 2026.
2    Represents an adjustment related to remeasuring the remaining settlement liability at present value in accordance with Accounting Standards Codification Topic 835-30 Imputation of Interest.
3    Represents accretion expense related to remeasuring the remaining settlement liability, which is included in “Interest expense, net” and “Interest expense and other charges, net” in HEI’s and the Utilities’ Condensed Consolidated Statements of Income, respectively.
4    HEI consolidated includes insurance recovery related to the settlement of the securities class action of $47.8 million for the three and nine months ended September 30, 2025. Also includes adjustments related to costs that are no longer probable of recovery under the insurance policies. For the three and nine months ended September 30, 2025, HEI consolidated and Electric utility adjustments amount to $1.0 million and $7.6 million, respectively, of which, $0.5 million and $4.5 million were deferred to a regulatory asset, respectively, and are reported on line “Deferral treatment approved by the PUC.”
5    Pursuant to the PUC order received on February 12, 2025, deferral accounting treatment limited to insurance premiums and outside services and legal costs associated with the asset-based lending facility credit agreement incurred in 2025 was granted. Applicable amounts were deferred to a regulatory asset.
14


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Note 3 · Segment financial information
Reportable segments are strategic business units of the Company that offer different products and services and operate in different regulatory environments. The Company operates and reports on one reportable segment: Electric utility. HEI and its other subsidiaries (ASB Hawaii, GLST1 up until its termination on June 3, 2026, and Pacific Current and its subsidiaries) which are not reportable segments are grouped and reported as an “all other” non-reportable segment.
(in thousands)
Electric utility
All other
Total
Three months ended September 30, 2026
Revenues$1,007,104 $1,606 $1,008,710 
Depreciation and amortization$74,839 $192 $75,031 
Interest and dividend income$1,615 $2,189 $3,804 
Interest expense, net$44,753 $2,973 $47,726 
Income before income taxes$13,889 $5,584 $19,473 
Income taxes401 (16,378)(15,977)
Net income for common stock$13,488 $21,962 $35,450 
Nine months ended September 30, 2026
Revenues$2,688,008 $6,852 $2,694,860 
Depreciation and amortization$225,279 $565 $225,844 
Interest and dividend income
$8,196 $10,887 $19,083 
Interest expense, net$117,980 $9,257 $127,237 
Income (loss) before income taxes
$242,292 $(19,565)$222,727 
Income taxes55,603 (21,976)33,627 
Net income for common stock$186,689 $2,411 $189,100 
Capital expenditures$399,167 $280 $399,447 
Total assets (at September 30, 2026)
$8,337,187 $207,395 $8,544,582 
Three months ended September 30, 2025
Revenues$787,428 $3,182 $790,610 
Depreciation and amortization$73,735 $221 $73,956 
Interest income$1,461 $5,499 $6,960 
Interest expense, net$22,114 $4,097 $26,211 
Income (loss) before income taxes
$48,459 $(8,513)$39,946 
Income taxes10,973 (2,245)8,728 
Net income (loss)
37,486 (6,268)31,218 
Preferred stock dividends of subsidiaries498 (27)471 
Net income (loss) for common stock
$36,988 $(6,241)$30,747 
Nine months ended September 30, 2025
Revenues$2,268,276 $12,796 $2,281,072 
Depreciation and amortization$220,919 $5,704 $226,623 
Interest income$4,657 $22,505 $27,162 
Interest expense, net$66,272 $21,407 $87,679 
Income (loss) before income taxes
$160,247 $(46,787)$113,460 
Income taxes34,797 (6,257)28,540 
Net income (loss)
125,450 (40,530)84,920 
Preferred stock dividends of subsidiaries1,496 (79)1,417 
Net income (loss) for common stock
$123,954 $(40,451)$83,503 
Capital expenditures
$253,927 $1,523 $255,450 
Total assets (at December 31, 2025)
$8,530,520 $392,359 $8,922,879 
15


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
 
Sales from Hamakua Energy to Hawaii Electric Light (a regulated affiliate), up until the close of its sale on March 10, 2025, are eliminated in consolidation.
ASB Hawaii. ASB Hawaii was formed in 1988 and served as the holding company for ASB prior to its sale on December 31, 2024. As part of the sale, ASB Hawaii retained a 9.9% noncontrolling investment in ASB amounting to $44.6 million. As of December 31, 2025, the ASB investment of $44.6 million was included in “Other noncurrent assets” on the Company’s Condensed Consolidated Balance Sheets.
On September 16, 2026, ASB’s common stock commenced trading on The Nasdaq Stock Market LLC (Nasdaq) following the completion of ASB’s initial public offering (IPO) at a price of $16 per share. In connection with the IPO, ASB effected a 7,222-to-1 forward stock split, and the Company sold 2,253,264 shares of ASB common stock, reducing its ownership interest in ASB to 6.43%. The Company received net cash proceeds of $33.9 million from the sale and recognized a pretax realized gain, net of transaction costs, of $18.3 million, and plans to use the cash proceeds to fund partial prepayments of the wildfire settlement. As of September 30, 2026, the Company remeasured its remaining investment in ASB at fair value based on the closing price of ASB’s common stock on Nasdaq. The Company’s remaining investment, consisting of 4,181,538 shares of ASB common stock, had a fair value of $74.8 million as of September 30, 2026, resulting in the recognition of a pretax unrealized gain of $45.9 million for the quarter then ended. In 2027, the Company plans to sell its remaining shares and use the cash proceeds to fund partial prepayments of the wildfire settlement. The realized gain on the sale of ASB common stock and the unrealized gain on the remeasurement of the Company’s remaining investment in ASB are included in “Gain on sale of investment and net unrealized gain on investment measured at fair value” in the Company’s Condensed Consolidated Statements of Income. As of September 30, 2026, the ASB investment of $74.8 million was included in “Other current assets” on the Company’s Condensed Consolidated Balance Sheets.
GLST1. GLST1 was formed in November 2024 for the purpose of holding the first installment payment pursuant to the settlement of the Maui windstorm and wildfire tort-related legal claims. HEI transferred the amount of the first settlement payment, $479 million, into GLST1, which was restricted from disbursing such funds except in connection with the initial payment to the settlement funds and was classified as “Restricted cash” on HEI’s Condensed Consolidated Balance Sheet as of December 31, 2025. Effective March 31, 2025, HEI assigned 60% of the membership interests of GLST1 to Hawaiian Electric. As of December 31, 2025, the assigned equity interests totaled $287.3 million, which was reported on “Investment in unconsolidated affiliate” on the Utilities’ Condensed Consolidated Balance Sheet. On April 10, 2026, HEI and Hawaiian Electric paid the first of four equal annual $479 million installments, and effective June 3, 2026, GLST1 was dissolved and terminated.
Pacific Current. Pacific Current was formed in 2017 to focus on investing in non-regulated renewable energy and sustainable infrastructure in the State of Hawaii to help achieve the state’s sustainability goals. As part of HEI’s comprehensive review of strategic options for Pacific Current, significant investments of Pacific Current that were made through its subsidiaries, Hamakua Energy, Mauo and Kaʻieʻie Waho were sold in 2025. Mahipapa is Pacific Current’s subsidiary, which owns a 7.5-MW renewable, firm dispatchable closed-loop biomass-to-energy facility on Kauai that provides electricity to Kauai Island Utility Cooperative (KIUC) under a PPA that was scheduled to expire in January 2036, but was mutually terminated by the parties effective October 1, 2026 as described below.
Assets held for sale-Mahipapa. In connection with the sale of Mauo, Kaʻieʻie Waho and other solar and battery assets (Solar Asset Disposition) and as part of the membership interest purchase agreement pursuant to which the Solar Asset Disposition was conducted (MIPA), but as a separate transaction, Pacific Current agreed to sell all of the membership interest in its biomass subsidiary, Mahipapa, to the same unaffiliated third party that is party to the MIPA (the Mahipapa Sale), with each of the parties’ obligations to complete the Mahipapa Sale subject to the conditions set forth in the MIPA. In September 2026, the proposed sale of Mahipapa to an unaffiliated third party was terminated because the parties were unable to resolve certain obligations required to complete the transaction. In addition, Mahipapa’s facility has remained offline since early September 2026, as damage from Hurricane Lowell continues to prevent the plant from restarting. These developments, along with other past issues, led Mahipapa and KIUC to agree to terminate their PPA effective October 1, 2026. As of September 30, 2026, the Company was evaluating strategic alternatives for Mahipapa, including a potential Chapter 7 bankruptcy filing. The Company therefore concluded Mahipapa to be an abandoned asset which no longer met the criteria for classification as held for sale and reclassified its related assets and liabilities as held and used.
Upon reclassification, the assets were written down to their estimated net salvage value, as of September 30, 2026. The Company recognized a pretax impairment charge of $50.7 million for the three months ended September 30, 2026, in connection with the reclassification, resulting in total pretax impairment charges of $54.5 million for the nine months ended September 30, 2026. These charges are included in “Gain (loss) on sale of subsidiaries and impairment losses on subsidiary assets sold and assets formerly classified as held for sale” in the Company’s Condensed Consolidated Statements of Income.
16


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
The net assets and liabilities of Mahipapa classified as held for sale in the Company’s Condensed Consolidated Balance Sheets as of December 31, 2025 were classified as current, and are summarized as follows:
(in thousands)December 31, 2025
Property, plant and equipment, net of accumulated depreciation$46,286 
Other assets9,980 
Assets held for sale-current$56,266 
Long-term debt, net$51,568 
Other liabilities8,235 
Liabilities held for sale-current$59,803 
Subsequent event-Mahipapa bankruptcy. On November 3, 2026, Mahipapa filed a voluntary petition for bankruptcy under Chapter 7 in the United States Bankruptcy Court for the District of Hawaii.
The decision to file under Chapter 7 followed the termination of the proposed sale of Mahipapa to an unaffiliated third party in September 2026 because the parties were unable to resolve certain obligations required to complete the transaction and the subsequent termination of Mahipapa’s PPA with KIUC. The terminated sale and other operating issues led Mahipapa and KIUC to terminate their PPA effective October 1, 2026.
Upon the filing of the Chapter 7 petition, Mahipapa’s assets will become part of its bankruptcy estate and a trustee will be appointed to administer and liquidate the bankruptcy estate. As of September 30, 2026, Mahipapa had long-lived assets amounting to approximately $2 million and outstanding long-term debt of $49 million. The ultimate disposition of Mahipapa’s assets and liabilities will depend upon the Chapter 7 proceedings. The anticipated completion date of the liquidation proceedings cannot be reasonably estimated at this time.
17


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Note 4 · Electric utility segment
Consolidated variable interest entities. The HE AR INTER LLC and its direct subsidiary, HE AR BRWR LLC, (collectively, the Special Purpose Entities or SPEs) are bankruptcy remote, direct and indirect wholly owned subsidiaries of the Utilities. Pursuant to the asset-based lending facility (ABL Facility) credit agreement, the Utilities sell certain accounts receivable to the SPEs as collateral, which in turn, obtain financing from financial institutions. As of September 30, 2026, the ABL Facility remains undrawn and the SPEs have $319.0 million of net accounts receivable, included in “Customer accounts receivable, net,” and “Accrued unbilled revenues, net” on the Utilities’ Condensed Consolidated Balance Sheets and “Accounts receivable and unbilled revenues, net” on the Company’s Condensed Consolidated Balance Sheets.
The SPEs are considered VIEs due to insufficient equity investment at risk. The most significant activities that impact the economic performance of the SPEs are cash and financing management. The Utilities are considered the primary beneficiary as the Utilities direct the activities related to cash and financing management and therefore, are required to consolidate the SPEs. Although the SPEs are direct and indirect wholly owned consolidated subsidiaries of the Utilities, the SPEs are legally separate from the Utilities. The assets of the SPEs (which are primarily accounts receivables) are not available to creditors of the Utilities.
Unconsolidated variable interest entities.
Power purchase agreements.  The Utilities have power purchase agreements (PPAs) with independent power producers (IPPs) and Schedule Q providers (i.e., customers with cogeneration and/or power production facilities who buy power from or sell power to the Utilities). As of September 30, 2026, the Utilities evaluated and concluded none of the IPPs or Schedule Q providers are currently required to be consolidated by reasons that i) no variable interests exist in the PPAs; ii) where variable interests are present, the Utilities are not deemed the primary beneficiary due to lack of power to direct the activities that most significantly impact the IPPs’ economic performance; or iii) the PPAs qualify for scope exceptions under current accounting standards for consolidation.
The carrying amounts of assets and liabilities related to the Utilities’ PPAs, where variable interests are present but the Utilities are not deemed the primary beneficiary, are limited to the purchased power and energy payments. As the Utilities recover such payments through the PUC-approved Purchased Power Adjustment Clause (PPAC) or the Energy Cost Recovery Clause (ECRC) mechanism, there is no significant potential exposure to loss to the Utilities as of September 30, 2026.
GLST1. GLST1 was formed in November 2024 for the purpose of holding the first installment payment pursuant to the settlement of the Maui windstorm and wildfire tort-related legal claims. Effective March 31, 2025, HEI assigned 60% of the membership interests of GLST1 to Hawaiian Electric. The Utilities are deemed to have a variable interest in GLST1 but concluded that the Utilities are not the primary beneficiary of GLST1. As the Utilities have the ability to exercise significant influence over GLST1, the Utilities accounted for the membership interests under the equity method of accounting. On April 10, 2026, HEI and Hawaiian Electric paid the first of four equal annual installments and subsequently dissolved and terminated GLST1 in June 2026.
Commitments and contingencies.
Contingencies. The Utilities are subject in the normal course of business to legal, regulatory and environmental proceedings. Excluding the liabilities from the Maui windstorm and wildfires, management does not anticipate that the aggregate ultimate liability arising out of these pending or threatened legal proceedings will be material to its financial position. However, the Utilities cannot rule out the possibility that such outcomes could have a material effect on the results of operations or liquidity for a particular reporting period in the future.
August 2023 Maui windstorm and wildfires. See Note 2.
Property insurer litigation. HEI and Hawaiian Electric were actively seeking recovery of damages to rebuild the covered electrical infrastructure from their insurers and, to date, have received insurance reimbursements of more than $22 million related to submitted claims under the $500 million property insurance coverage. On February 13, 2026, Hawaiian Electric Industries, Inc., Hawaiian Electric Company, Inc., and Maui Electric Company, Limited (collectively, the Hawaiian Electric Plaintiffs) filed suit against four of their property insurers: Defendants XL Insurance Company of America, Inc., Allianz Global Risks US Insurance Company, the Princeton Excess and Surplus Lines Insurance Company, and General Security Indemnity Company of Arizona (collectively, the HEI Insurers). The HEI Insurers are commercial property insurers that insured the Hawaiian Electric Plaintiffs at the time of the August 2023 Maui windstorm and wildfires. The Hawaiian Electric Plaintiffs also had commercial property insurance under policies issued by Associated Electric & Gas Insurance Services (AEGIS), Ascot Syndicate 1414, IQUW Syndicate 1856, Energy Insurance Mutual, QBE International Markets, and Certain Underwriters at Lloyd’s London (collectively, the AEGIS Insurers). Under the policies issued by the AEGIS Insurers, the Hawaiian Electric Plaintiffs and the AEGIS Insurers were required to engage in negotiation meetings, and if negotiation was
18


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
unsuccessful, mediation prior to litigation. Accordingly, the Hawaiian Electric Plaintiffs did not name the AEGIS Insurers as defendants in the complaint filed on February 13, 2026.
The HEI Insurers and AEGIS Insurers (jointly, the Property Insurers) acknowledged coverage under the policies at issue for loss or damage to the Hawaiian Electric Plaintiffs’ property in connection with the Maui windstorm and wildfires and paid a portion of the Hawaiian Electric Plaintiffs’ losses. However, the Property Insurers denied coverage and refused to pay for a substantial portion of the loss and expense claimed. In April 2026, the Hawaiian Electric Plaintiffs and the Property Insurers engaged in negotiations and finalized a partial settlement in the second quarter of 2026 (the Settlement). The Settlement resolved all disputes with the AEGIS Insurers with respect to coverage under the AEGIS policies for loss arising out of the Maui windstorm and wildfires, as well as a portion of the disputes between the Hawaiian Electric Plaintiffs and the HEI Insurers. As the proceeds from the Settlement will be used to offset the Utilities’ rebuild and/or replacement capital costs, the unapplied fund in excess of incurred costs are reflected in other non-current liabilities as of September 30, 2026. Litigation is ongoing in the federal district court for the District of Hawaii with respect to the remaining coverage disputes with the HEI Insurers that were not resolved by the Settlement. The Hawaiian Electric Plaintiffs seek declaratory relief regarding the extent of the HEI Insurers’ obligations under the policies, as well as a determination that the HEI Insurers have breached the policies by refusing to indemnify the Hawaiian Electric Plaintiffs for covered loss and expense. The Hawaiian Electric Plaintiffs and the HEI Insurers engaged in mediation on July 8, 2026, but the mediation was not successful. The Hawaiian Electric Plaintiffs filed an amended complaint in the litigation on July 29, 2026, seeking approximately $40.7 million in damages.
Hu Honua Bioenergy, LLC (Hu Honua). In 2013, Hu Honua filed a lawsuit in the U.S. District Court for the District of Hawaii based on Hawaii Electric Light’s termination of a PPA between the parties. The lawsuit asserted breach of contract and antitrust claims. On April 17, 2025, the U.S. District Court granted Hawaii Electric Light’s Motion to Dismiss in part, dismissing the Federal Antitrust claims, but declining to exercise jurisdiction over the State antitrust claim. The remaining State claims, including the contract claims and the State antitrust claim, were dismissed without prejudice.
On May 14, 2025, Hu Honua filed its notice of appeal in federal Ninth Circuit court. Due to ongoing negotiations between Hu Honua and Hawaii Electric Light on a new PPA, the appellate briefing schedule has been vacated, and the court issued an administrative closure until February 1, 2027, and Hu Honua must provide a status report to the court by January 25, 2027.
On May 16, 2025, Hu Honua filed its complaint in state court for the remaining State claims. Hu Honua has granted Hawaii Electric Light an open-ended extension to answer or otherwise respond to the State complaint while PPA negotiations are ongoing. The State court ordered a scheduling conference for August 12, 2025, which was subsequently postponed to January 14, 2027, to allow the parties to continue ongoing settlement discussions.
Molokai New Energy Partners (MNEP). In July 2018, the PUC approved Maui Electric’s PPA with MNEP to purchase solar energy from a photovoltaic (PV) plus battery storage project. The 4.88-MW PV and 3-MW Battery Energy Storage System (BESS) project was to deliver no more than 2.64 MW at any time to the Molokai system. On March 25, 2020, MNEP filed a complaint in the U.S. District Court for the District of Hawaii against Maui Electric claiming breach of contract. On June 3, 2020, Maui Electric provided a Notice of Default and Termination of the PPA to MNEP terminating the PPA with an effective date of July 10, 2020. Thereafter, MNEP filed an amended complaint to include claims relating to the termination and Hawaiian Electric filed its answer to the amended complaint on September 11, 2020, disputing the facts presented by MNEP and all claims within the original and amended complaint. Currently, the discovery phase is ongoing. Trial which was previously set to commence on September 16, 2025 was continued to February 18, 2026 and is now set to begin November 13, 2026.
Madison Energy v. Apparent Inc. lawsuits. In two similar lawsuits, third-party claims have been asserted against the Utilities concerning the Utilities’ purported approvals and alleged representations regarding customer-sited solar projects. The first matter concerns a project at the Kamehameha Schools Maui (KSM) campus, and the second concerns a project at a KTA Super Stores (KTA) location on Hawaii Island.
The first lawsuit, referred to as the KSM lawsuit, concerns a solar project at the KSM campus. The original developer, Apparent Inc. (Apparent), entered into a PPA with KSM and subsequently sold the project to Madison Energy, which retained Apparent to design, construct, and operate the project. Apparent purportedly received a conditional Permission to Operate letter (PTO) from Maui Electric and, in purported reliance on that letter and other alleged representations, interconnected the project to Maui Electric’s grid and began operations. Upon learning of the purported PTO and the project’s operation, Maui Electric determined that it had no record of creating, issuing, or transmitting the PTO and that several project items required prior to PTO remained outstanding. Accordingly, Maui Electric directed that the project be disconnected from the grid. KSM subsequently terminated the PPA, and Madison Energy terminated its agreement with Apparent. In December 2024, Madison Energy filed suit against Apparent in state court, asserting contract, quasi-contract and fraud claims relating to the purported PTO. Apparent denied liability and filed a counterclaim against Madison Energy for breach of contract, and asserted third-party
19


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
claims against Maui Electric and Hawaiian Electric. Apparent alleges, among other things, that the Utilities issued and subsequently disavowed the purported PTO. The discovery phase is ongoing, and trial is currently scheduled for March 8, 2027.
The second lawsuit, referred to as the KTA lawsuit, was filed by Madison Energy in February 2025 and concerns a solar project at a KTA location on Hawaii Island. The allegations and claims are substantially similar to those asserted in the KSM lawsuit. The discovery phase is ongoing.
The Utilities dispute the claims and intend to defend against them vigorously. The Utilities are unable to predict the ultimate outcomes of these matters or reasonably estimate the amount or range of any possible loss.
Environmental regulation. The Utilities are subject to environmental laws and regulations that regulate the operation of existing facilities, the construction and operation of new facilities and the proper cleanup and disposal of hazardous waste and toxic substances.
Hawaiian Electric, Hawaii Electric Light and Maui Electric, like other utilities, periodically encounter petroleum or other chemical releases associated with current or previous operations. The Utilities report and take action on these releases when and as required by applicable law and regulations. The Utilities believe the costs of responding to such releases identified to date will not have a material effect, individually or in the aggregate, on Hawaiian Electric’s consolidated results of operations, financial condition or liquidity.
Former Molokai Electric Company generation site.  In 1989, Maui Electric acquired Molokai Electric Company. Molokai Electric Company had sold its former generation site (Site) in 1983 but continued to operate at the Site under a lease until 1985 and left the property in 1987. The Environmental Protection Agency (EPA) has since identified environmental impacts in the subsurface soil at the Site. In cooperation with the State of Hawaii Department of Health and EPA, Maui Electric further investigated the Site and the adjacent parcel to determine the extent of impacts of polychlorinated biphenyls (PCBs), residual fuel oils and other subsurface contaminants. Maui Electric has a reserve balance of $2.4 million as of September 30, 2026, representing the probable and reasonably estimable undiscounted cost for remediation of the Site and the adjacent parcel based on presently available information; however, final costs of remediation will depend on the cleanup approach implemented.
Pearl Harbor sediment study. In July 2014, the U.S. Navy notified Hawaiian Electric of the Navy’s determination that Hawaiian Electric is a Potentially Responsible Party under Comprehensive Environmental Response, Compensation, and Liability Act responsible for the costs of investigation and cleanup of PCB contamination in sediment in the area offshore of the Waiau power plant as part of the Pearl Harbor Superfund Site. Hawaiian Electric was also required by the EPA to assess potential sources and extent of PCB contamination onshore at Waiau power plant.
As of September 30, 2026, the reserve account balance recorded by Hawaiian Electric to address the PCB contamination was $8.8 million. The reserve balance represents the probable and reasonably estimable undiscounted cost for the onshore and offshore investigation and remediation. The final remediation costs will depend on the actual onshore and offshore cleanup costs.
Endangered Species Act. The Utilities received a notice under the federal Endangered Species Act, from Earthjustice on behalf of the American Bird Conservancy and Conservation Council for Hawaii (Conservation Groups) in January 2024. The notice is the pre-cursor to a citizen’s suit under the Endangered Species Act. The notice alleges that the Utilities are out of compliance with the Act due to alleged impacts on endangered seabirds caused by the Utilities’ powerlines, street lights and facility lights on Maui and Lanai. At the time the notice was served, the Utilities were already in the process of drafting a Habitat Conservation Plan (HCP) with respect to the powerlines and will be applying for associated state and federal take/license permits. Notwithstanding, the notice asserts that the scope of the HCP should be broader and additional interim measures are necessary while the HCP and related permits are pending.
After negotiations among the parties, a complaint was filed on November 12, 2024 regarding the powerlines and on December 11, 2024, the court approved a settlement agreement. Pursuant to that agreement, the Utilities will continue the HCP process and take specific actions to minimize and mitigate the potential impact of the Utilities’ powerlines while the document is being prepared. The agreement also contains additional requirements that include coordination with the Conservation Groups with various aspects of the HCP and powerline operations, and continuing the Utilities’ commitment to a species mitigation project with University of Hawaii Foundation to monitor, protect and increase the population of Hawaiian Petrels.
The street and facility lights aspect of the notice was not resolved and a second complaint was filed on November 19, 2024, that includes the County of Maui as a party. Hawaiian Electric and Maui Electric answered the complaint on December 12, 2024, and at this time, the parties have completed discovery. On July 3, 2025, the parties executed an interim agreement eliminating the need for the Conservation Groups to file for injunctive relief related to the 2025 seabird fallout season, and a similar interim agreement was reached in September 2026 for the 2026 fallout season. The County of Maui’s and the
20


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Conservation Groups’ cross-motions for summary judgment were denied, and the trial was continued from September 2026 to March 2027 for scheduling reasons. The parties may engage in additional settlement discussions in an effort to resolve the matter. However, the Utilities are unable to determine the ultimate outcome or the amount of any possible loss.
Commitments.
Purchase commitments. As of December 31, 2025, the Utilities’ estimated future minimum payments pursuant to purchase obligations related to material contracts of $2.63 billion. See Note 4 of the Notes to the Consolidated Financial Statements in Item 8 of the 2025 Form 10-K.
As of September 30, 2026, a total of nine Stage 1 and Stage 2 renewable projects provide the Utilities with a capacity of 301.5 MW, with 1,771-MWh batteries.
Purchases from all IPPs were as follows:
Three months ended September 30Nine months ended September 30
(in millions)2026202520262025
Kalaeloa Partners, L.P.$103 $73 $273 $201 
Hamakua Energy21 11 51 24 
HPOWER17 16 48 55 
Puna Geothermal Venture6 12 25 31 
Kapolei Energy Storage6 6 18 18 
Solar IPPs30 31 87 82 
Wind IPPs33 33 81 90 
Other IPPs 1
2 1 4 4 
Total IPPs$218 $183 $587 $505 
1 Includes hydro power and other PPAs.
Utility projects.  Many public utility projects require PUC approval and various permits from other governmental agencies. Difficulties in obtaining, or the inability to obtain, the necessary approvals or permits or community support can result in significantly increased project costs or even cancellation of projects. In the event a project does not proceed, or if it becomes probable the PUC will disallow cost recovery for all or part of a project, or if PUC-imposed caps on project costs are expected to be exceeded, project costs may need to be written off in amounts that could result in significant reductions in Hawaiian Electric’s consolidated net income.
Waena battery energy storage system project. In September 2020, Maui Electric filed a PUC application to purchase and install a 40-MW BESS at its Waena Site in Central Maui. In December 2023, the PUC approved Maui Electric’s request to commit funds estimated at $82.1 million, for the purchase and installation of the project, and to recover costs for the project under Exceptional Project Recovery Mechanism (EPRM). In July 2025, the PUC approved the Utilities’ request to authorize recovery of costs in addition to the amounts approved in December 2023 due to the uncertainty of changes in law, limited to the lesser of either the actual costs or 20% over the approved estimated capital costs. Project costs incurred as of September 30, 2026, amount to $66.4 million.
Climate adaptation transmission and distribution resilience program. The Utilities maintain that improving resiliency of the electric grid is an urgent matter and recognizes that evolving climate dynamics are making Hawaii increasingly vulnerable to severe weather events. On January 31, 2024, the PUC approved the Utilities’ request to commit an estimated $189.7 million in funds for the climate adaptation transmission and distribution resilience program, over a project period of five years. The project will focus on, among other things, system hardening in wildfire risk areas including installing video camera and weather monitors in wildfire risk areas and strengthening transmission lines to help prevent ignition, enable quicker response and add situational awareness.
The project costs to be recovered through EPRM is subject to a cap of $95 million and any amount in excess will be subject to the PUC’s further review. On August 7, 2024, the Utilities received a notification from the U.S. Department of Energy (DOE) that their application for $95 million in federal funds under the Infrastructure Investment and Jobs Act was officially awarded. On August 20, 2024, the Utilities submitted a copy of their executed agreement with the DOE to the PUC. On July 16, 2026, the Utilities received a notification of an award modification from the DOE that updated certain terms and conditions including the removal of the scope related to community benefits plans and the associated funding for those deliverables. As a result, the federal share total was reduced from $95 million to $92.6 million. The $95 million EPRM cap is not impacted at this
21


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
time. On October 2, 2026, the Utilities filed their August 2026 - August 2027 Forward Looking Annual Report. Project costs incurred as of September 30, 2026, amount to $51.5 million.
In 2025, the President issued multiple executive orders that impact federal funding. The Utilities are not impacted at this time but will continue to monitor for any new executive orders and any changes that are passed down through the federal contracting officer for the resilience program.
Waiau repower project. On March 28, 2025, the Utilities filed an application to the PUC for their self-build project - Waiau repower project. The project, selected as part of a competitive bid process, was estimated at $847 million and involves replacing six existing turbines with six fuel-flexible combustion turbines that provide 253 MW of renewable firm generation, expected to be placed in service in stages from 2029 to 2033. The Utilities requested, among other things, approvals of 1) the commitment of funds for such project, and 2) recovery of project costs through the EPRM. On October 17, 2025, the Utilities filed an updated application reflecting revised costs of $1.16 billion, citing unavoidable and changed market conditions outside the Utilities’ control. On March 23, 2026, the PUC approved the commitment of funds and EPRM recovery for the Waiau repower project at the initial estimated cost of $847 million plus the lesser of a 10% increase or the difference in the Gross Domestic Product Price Index (GDPPI) between the date of the best and final offer submission and the date of the PUC’s decision and order (Inflationary Adjustment). On April 2, 2026, the Utilities filed a motion for reconsideration of the PUC’s decision and order. On April 17, 2026, the PUC issued an order addressing the Utilities’ motion for reconsideration which, among other things, affirmed that the project costs up to $847 million plus the Inflationary Adjustment can be recovered through EPRM and clarified that the Utilities may, after the project is in-service, seek recovery for project cost amounts greater than the approved amount in a general rate case or rate re-basing proceeding. Based on the estimated GDPPI for the first quarter of 2026 released by the Bureau of Economic Analysis on June 25, 2026, the project costs plus the Inflationary Adjustment are currently estimated at $908 million. Project costs incurred as of September 30, 2026, amount to $102.9 million.
On April 28, 2026, in connection with the Waiau repower project, Hawaiian Electric entered into three contracts to acquire a total of six gas turbine units from GE Vernova Operations, LLC to secure the manufacturing and staggered delivery of gas turbine units in pairs between 2029 and 2030. These contracts mitigate the risk of delayed turbine unit deliveries, remove the exposure to non-tariff price increases, and support the achievement of on-time commercial operations of the Waiau repower project.
In December 2025, Federal Emergency Management Agency issued a Letter of Final Determination on the preliminary updates to Oahu’s Flood Insurance Rate Maps. As a result of the updates, portions of the Waiau power plant will transition to a newly designated flood zone A, which is estimated to have a 1% chance of annual flooding. The new flood maps became effective on June 10, 2026. The Utilities are currently assessing the impact the change may have on the Waiau repower project.
Wildfire Mitigation Plan (WMP). In January 2025, the Utilities developed and filed with the PUC a 2025-2027 WMP (formerly referred to as Wildfire Safety Strategy), which identifies risk mitigation strategies to perform over the three years across their service territories. The strategies and actions include additional operational changes, grid hardening work, enhanced inspections and vegetation management, and risk modeling to inform and prioritize hardening work and operational actions. On December 31, 2025, the PUC approved the Utilities’ 2025-2027 WMP. On June 25, 2026, the PUC approved the Utilities’ request for EPRM cost recovery up to $350 million in project costs for 2025-2027. The PUC will condition recovery, among other things, on that the Utilities are not allowed to effectuate cost recovery for any of the approved 2025-2027 WMP project costs through the EPRM until the PUC has issued an order addressing the Utilities’ forthcoming securitization application for a financing order pursuant to Hawaii Revised Statutes Section 269G-2. All project costs that are approved for cost recovery through securitization shall not be recoverable through the EPRM. Any approved project costs that may be deemed ineligible for recovery through securitization may be recovered through the EPRM. Project costs incurred as of September 30, 2026, amount to approximately $125 million.
Regulatory proceedings.
Performance-based regulation framework (PBR Framework). The PUC issued a decision and order (PBR D&O) establishing the PBR Framework to govern the Utilities. The PBR Framework implemented a five-year multi-year rate period (MRP), during which there will be no general rate case applications. The first MRP ended on May 31, 2026, and the next MRP (MRP2) is scheduled to commence in 2027. The period between the end of the first MRP and the beginning of MRP2 is intended to be a transition period (see Phase 7 discussed below). PBR working group meetings started in 2024 to consider potential PBR changes for MRP2. The PBR Framework Review will continue with the following: (i) Phase 6: consideration and development of proposals for modifications to the PBR Framework, which focuses on the inflation factor, customer dividend, Earnings Sharing Mechanism (ESM), revenue opportunities afforded by the X-Factor and the EPRM guidelines, and Performance Incentive Mechanisms (PIMs) portfolio, and (ii) Phase 7: the finalization and documentation of approved PBR Framework modifications prior to MRP2 commencement. Regarding Phase 6, on October 23, 2026, the PUC issued an order
22


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
that introduced a proposal prepared by PUC staff, which identified possible modifications of certain PBR mechanisms in preparation for MRP2 (Staff Proposal). The PUC stated that the Staff Proposal is intended to be a starting point for discussion among the PBR parties, which may result in further modification(s) of mechanisms or development of entirely different mechanism structures. To facilitate an open discussion, the PUC instructed the PBR parties to file initial comments regarding the Staff Proposal by November 13, 2026, and that these initial comments will not be construed as a party’s statement of position. Following consideration of the PBR parties’ initial comments on the Staff Proposal, the PUC anticipates issuing an order by early January 2027, outlining its inclinations on some or all of the PBR mechanisms discussed in the Staff Proposal to provide guidance regarding the PUC’s priorities for the remainder of these proceedings. The PUC then plans to host a workshop with the PBR parties, followed by parties filing statements of position, a discovery period, a second workshop, an evidentiary hearing, and a briefing period. The dates for these procedural steps will be determined by the PUC.
Alternative re-basing. In an order issued on February 27, 2025, the PUC concluded that the Utilities’ target revenues should be re-based for MRP2 and allowed the Utilities to file a single, consolidated application that presents their requested adjustment to target revenues. The proceeding to re-base the Utilities’ target revenues for MRP2 shall be bifurcated into two tracks, with the first track focused on reaching a decision on the Utilities’ revenue requirements prior to the commencement of MRP2, and the second track focused on making a final determination on the revenue requirement and addressing the rate design component. On March 6, 2026, the Utilities filed a joint alternative re-basing proposal with Ulupono Initiative, requesting an increase of $170 million over annual target revenues at current effective rates, with $125 million phased into revenues in the first year of MRP2 and the remaining $45 million implemented in the second year of MRP2. In an order issued on June 15, 2026, the PUC directed the Utilities to re-submit their request for an increase in their revenue requirement, with supporting materials, in the form of a new application, and established a tentative procedural schedule for the new proceeding, with a final decision anticipated in mid to late April 2027. On June 25, 2026, the Utilities filed a motion for reconsideration of the PUC’s order on the Utilities’ alternative re-basing proposal. Specifically, the Utilities requested reconsideration of the PUC’s rejection of the Utilities’ reservation of rights provision and the procedural schedule established in the order. The Utilities are awaiting a decision from the PUC on the motion.
On July 17, 2026, the Utilities filed their application for approval of their re-basing proposal, which retained the March 6, 2026 joint alternative re-basing proposal’s requested $170 million revenue increase. The Utilities proposed to implement the requested increase in two phases: (1) an increase in annual revenues by approximately $125 million effective January 1, 2027 and (2) an increase in annual revenues by an additional approximately $45 million effective January 1, 2028. The requested increase consists primarily of adjustments for the difference between forecasted and actual inflation during the current performance-based regulation period, previously approved depreciation rates for certain steam generating units, increased insurance expenses, and a reduction to certain operating and maintenance expense increases. The Utilities requested an interim decision by December 18, 2026. The PUC held public hearings regarding the Utilities’ application on September 22, 2026, in Kona on Hawaii Island; September 29, 2026, on Maui; September 30, 2026, on Lanai; October 1, 2026, on Molokai, October 2, 2026, on Oahu; and November 4, 2026, in Hilo on Hawaii Island.
Earnings Sharing Mechanism. The PBR Framework established a symmetrical ESM for achieved rate-making return on average common equity (ROACE) outside of a 300 basis points deadband above or below the current authorized ROACE of 9.5% for each of the Utilities (i.e., above 12.5% or below 6.5%). There is a 50/50 sharing between customers and Utilities for the achieved rate-making ROACE falling within 150 basis points outside of the deadband in either direction, and a 90/10 sharing for any further difference. A reopening or review of the PBR terms may be triggered if the Utilities’ credit rating outlook indicates a potential credit downgrade below investment grade status, or if its achieved rate-making ROACE enters the outer most tier of the ESM.
On August 31, 2023, the PUC issued an order temporarily suspending the ESM until further notice. The intent of the order is to address the unintended consequence of customers potentially bearing the costs associated with the Maui windstorm and wildfires through the operation of the ESM without prior PUC review.
Exceptional Project Recovery Mechanism. The established EPRM Guidelines, formerly known as Major Project Interim Recovery (MPIR), permit the Utilities to include the full amount of approved costs in the EPRM for recovery in the first year the project goes into service, pro-rated for the portion of the year the project is in service. Deferred and other operation and maintenance (O&M) expense projects are also eligible for EPRM recovery under the EPRM Guidelines. EPRM recoverable costs are limited to the lesser of actual incurred project costs or the PUC‑approved amounts, net of savings. The recovery of the project costs previously approved under the MPIR continues within the PBR Framework.
As of September 30, 2026, the Utilities’ annualized MPIR and EPRM revenue amounts totaled $39.3 million, including revenue taxes. The PUC approved the Utilities’ recovery of the annualized MPIR and EPRM revenues effective June 1, 2026, through the Revenue Balancing Account (RBA) rate adjustment.
23


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
As of September 30, 2026, the PUC approved the recovery of six EPRM projects with an estimated amount of $1.40 billion in capital costs to the extent the project costs are not included in rates. See “Utility projects” section above. Currently, the Utilities are seeking EPRM recovery for two additional projects subject to PUC approval.
Performance Incentive Mechanisms. On December 18, 2024, and clarified on January 15, 2025, the PUC issued orders granting the Utilities’ request to suspend the Transmission and Distribution (T&D) System Average Interruption Duration Index (SAIDI) and T&D System Average Interruption Frequency Index (SAIFI) PIMs for wildfire risk circuits from January 1, 2024 to December 31, 2025. Separately, the Utilities submitted a request on December 16, 2025 to expand the suspension of T&D SAIDI and T&D SAIFI PIMs (T&D PIMs) to all circuits and extend the suspension to December 31, 2026, to consider modifications to the T&D PIMs. On April 21, 2026, the PUC issued an order denying the Utilities’ request to expand suspension of T&D PIMs to all circuits, but, on its own motion, extended the current suspension of the T&D PIMs for wildfire risk circuits through December 31, 2026. Consistent with the current suspension, this shall include continued exclusion of all Public Safety Power Shutoff (PSPS) program events from PIM performance metrics and targets. On October 1, 2026, the Utilities requested that the PUC continue the suspension of the T&D PIMs for wildfire risk circuits and exclusions of all PSPS program events from the performance metrics and targets across the Utilities’ service territories, to the extent necessary beyond December 31, 2026, while the PUC considers the Utilities’ revised T&D PIMs proposal that will be submitted by November 17, 2026. Absent PUC approval of any further extension, the T&D PIMs suspension will expire and no exclusions on any circuits will be valid after December 31, 2026.
For the 2025 evaluation period, the Utilities earned $7.5 million (nil for Hawaiian Electric, $5.4 million for Hawaii Electric Light and $2.1 million for Maui Electric) in rewards net of penalties. The net rewards related to 2025 were reflected in the 2026 PIMs annual report and 2026 spring revenue report filings with the exception of the Phase 1 Request for Proposal (RFP) PIM, which was reflected in the 2025 fall revenue report filing. For the 2026 evaluation period, the Utilities accrued $2.3 million in rewards for the Interconnection Requirements Study PIM (for Hawaiian Electric and Hawaii Electric Light), which were reflected in the 2026 fall revenue report filing.
Annual review cycle. Under the PBR Framework, target revenues are adjusted according to an index-driven annual revenue adjustment (ARA) based on: (i) an inflation factor, (ii) a predetermined X-factor to encompass productivity, which is set at zero, (iii) a Z-factor to account for exceptional circumstances not in the Utilities’ control and (iv) a customer dividend consisting of a negative adjustment of 0.22% of adjusted revenue requirements compounded annually and a flow through of the “pre-PBR” savings commitment from the management audit recommendations developed in a prior docket at a rate of $6.6 million per year from 2021 until the rate resets.
PBR D&O also established an annual review cycle for revenue adjustments under the PBR Framework, including the biannual submission of the revenue reports. The Utilities’ 2026 fall revenue report was filed on October 30, 2026, which is subject to PUC approval. The proposed net incremental amounts between the 2026 spring and 2026 fall revenue reports are shown in the following table. The amounts are to be collected (refunded) from January 1, 2027, through December 31, 2027, under the RBA rate tariffs, which were proposed in the 2026 fall revenue report filing.
(in millions)Hawaiian ElectricHawaii Electric LightMaui ElectricTotal
Incremental ARA revenues
$21.0 $5.1 $5.0 $31.1 
Annual change in accrued RBA balance through September 30, 2026(2.0)(4.8)(1.9)(8.7)
Incremental PIMs (net)
1.8 0.4 (0.3)1.9 
Net incremental amount to be collected under the RBA rate tariffs
$20.8 $0.7 $2.8 $24.3 
Note: Columns may not foot due to rounding.
Regulatory assets and liabilities.
Regulatory assets for Maui windstorm and wildfires related costs. The PUC has issued orders authorizing deferred accounting treatment for certain incremental non-labor expenses related to the Maui windstorm and wildfires incurred from August 8, 2023 through December 31, 2025. The approval pertains only to deferred cost treatment for expenses that are not already part of base rates; any actual recovery of deferred costs will be the subject of a separate application.
As of September 30, 2026, the Utilities have recorded $79.1 million in regulatory assets for the incremental costs incurred during the aforementioned period related to the Maui windstorm and wildfires event.
Requests for cost recovery of deferred costs will be the subject of a separate application at which time the PUC will evaluate whether such costs were prudently incurred and reasonable and determine the extent to which such costs will be eligible for recovery, and the period over which recovery will occur. If the PUC denies recovery of any deferred costs, such costs would be charged to expense in the period that those costs are no longer considered probable of recovery.
24


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Regulatory assets for Wildfire Mitigation Plan (WMP). On December 31, 2025, the PUC approved the Utilities’ 2025-2027 WMP (formerly referred to as Wildfire Safety Strategy). The Utilities’ 2025-2027 WMP is a three-year action plan that targets a material reduction in wildfire risk associated with utility infrastructure. The PUC also directed the Utilities to provide a WMP update bi-annually. On June 25, 2026, the PUC issued a decision and order approving cost recovery of the Utilities’ 2025-2027 WMP project costs through the EPRM. As of September 30, 2026, the Utilities have recorded a regulatory asset of $27.8 million. See “Utility projects—Wildfire Mitigation Plan” section above.
Regulatory assets for suspension of disconnections related costs. Based on circumstances related to the Maui windstorm and wildfires, on August 31, 2023 and subsequently on October 13, 2023, the PUC issued orders directing all regulated utilities located on, or providing utility service on Maui, among other things, (i) to suspend disconnections of services and associated disconnection fees beginning from August 8, 2023, through the end of the emergency relief period established by the Governor’s Emergency Proclamations related to the Maui windstorm and wildfires, which currently continues through December 15, 2026 (Suspension Period); (ii) to suspend any and all rules and provisions of individual utility tariffs that prevent or condition re-connection of disconnected customers during the Suspension Period; (iii) not to charge customers interest on past due payments or impose any late payment fees through the Suspension Period; (iv) to establish regulatory assets to record costs directly related to the suspension of disconnections, and to record receipt of governmental aid and donation-based aid, loans or grants, and/or all other assistance measures, and any cost savings realized; and (v) to file a notice with the PUC regarding any upcoming application or other request pursuant to Hawaii Revised Statutes Sections 269-16.3, -17, -17.5, -18, -19, or -19.5 and/or regarding any significant financial change to the Maui utility, at least 60 days prior to filing such application or other request with the PUC. The orders also discourage the filing of emergency or general rate increases in response to the emergency situation. On December 23, 2025, the PUC revised the notice of financial change reporting requirement (item v above) to apply only to the Utilities.
In future proceedings, the PUC will assess the utility’s request for recovery of these regulatory assets including whether it is reasonable and necessary, the appropriate period of recovery for the approved amount of regulatory assets, any amount of carrying costs thereon, any savings directly attributable to suspension of disconnects, and other related matters. As of September 30, 2026, the Utilities have recorded $8.0 million in regulatory assets for the incremental costs incurred due to the suspension of disconnections.
Condensed consolidating financial information. Condensed consolidating financial information for Hawaiian Electric and its subsidiaries are presented for the three and nine months ended September 30, 2026 and 2025, and as of September 30, 2026 and December 31, 2025.
Hawaiian Electric unconditionally guarantees Hawaii Electric Light’s and Maui Electric’s obligations (a) to the State of Hawaii for the repayment of principal and interest on Special Purpose Revenue Bonds issued for the benefit of Hawaii Electric Light and Maui Electric and (b) under their respective private placement note agreements and the Hawaii Electric Light notes and Maui Electric notes issued thereunder.
25


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Statement of Income
Three months ended September 30, 2026
(in thousands)Hawaiian ElectricHawaii Electric LightMaui Electric
Other subsidiaries
Consolidating adjustments
Hawaiian Electric
Consolidated
Revenues$742,499 126,715 138,430 3,794 (4,334)$1,007,104 
Expenses
Fuel oil308,504 28,290 61,899 — — 398,693 
Purchased power162,715 39,266 16,496 — — 218,477 
Other operation and maintenance114,937 37,040 33,058 862 (4,334)181,563 
Depreciation44,054 11,670 10,697 — — 66,421 
Taxes, other than income taxes69,024 11,921 12,832 — — 93,777 
   Total expenses699,234 128,187 134,982 862 (4,334)958,931 
Operating income (loss)43,265 (1,472)3,448 2,932 — 48,173 
Allowance for equity funds used during construction4,313 235 1,016 — — 5,564 
Equity in earnings of subsidiaries(1,808)— — — 1,808 — 
Retirement defined benefits credit (expense)—other than service costs666 162 (31)— — 797 
Interest expense and other charges, net(35,913)(4,954)(6,217)— 2,331 (44,753)
Allowance for borrowed funds used during construction1,958 65 470 — — 2,493 
Interest income3,591 330 25 — (2,331)1,615 
Income (loss) before income taxes16,072 (5,634)(1,289)2,932 1,808 13,889 
Income taxes2,584 (1,906)(1,032)755 — 401 
Net income (loss) for common stock$13,488 (3,728)(257)2,177 1,808 $13,488 

Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Statement of Comprehensive Income
Three months ended September 30, 2026
(in thousands)Hawaiian ElectricHawaii Electric LightMaui ElectricOther
subsidiaries
Consolidating
adjustments
Hawaiian Electric
Consolidated
Net income (loss) for common stock$13,488 (3,728)(257)2,177 1,808 $13,488 
Other comprehensive income (loss), net of taxes:
Retirement benefit plans:
Adjustment for amortization of net gains recognized during the period in net periodic benefit cost, net of taxes (456)(48)(68)— 116 (456)
Reclassification adjustment for impact of D&Os of the PUC included in regulatory accounts, net of taxes476 47 62 — (109)476 
Other comprehensive income (loss), net of taxes20 (1)(6)— 7 20 
Comprehensive income (loss) attributable to common shareholder$13,508 (3,729)(263)2,177 1,815 $13,508 
26


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Statement of Income
Three months ended September 30, 2025
(in thousands)Hawaiian ElectricHawaii Electric LightMaui Electric
Other subsidiaries
Consolidating adjustments
Hawaiian Electric
Consolidated
Revenues$560,118 115,499 112,352 3,000 (3,541)$787,428 
Expenses
Fuel oil178,209 22,419 39,919 — — 240,547 
Purchased power132,075 36,008 15,730 — — 183,813 
Other operation and maintenance103,940 26,742 33,816 862 (3,541)161,819 
Depreciation42,576 11,242 10,204 — — 64,022 
Taxes, other than income taxes53,071 10,779 10,584 — — 74,434 
   Total expenses509,871 107,190 110,253 862 (3,541)724,635 
Operating income50,247 8,309 2,099 2,138 — 62,793 
Allowance for equity funds used during construction2,800 390 631 — — 3,821 
Equity in earnings of subsidiaries6,123 — — — (6,123)— 
Retirement defined benefits credit (expense)—other than service costs867 161 (30)— — 998 
Interest expense and other charges, net(16,654)(2,744)(4,012)— 1,296 (22,114)
Allowance for borrowed funds used during construction1,172 106 222 — — 1,500 
Interest income2,404 320 33 — (1,296)1,461 
Income (loss) before income taxes46,959 6,542 (1,057)2,138 (6,123)48,459 
Income taxes9,701 1,407 (686)551 — 10,973 
Net income (loss)37,258 5,135 (371)1,587 (6,123)37,486 
Preferred stock dividends of subsidiaries— 133 95 — — 228 
Net income (loss) attributable to Hawaiian Electric37,258 5,002 (466)1,587 (6,123)37,258 
Preferred stock dividends of Hawaiian Electric270 — — — — 270 
Net income (loss) for common stock$36,988 5,002 (466)1,587 (6,123)$36,988 

Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Statement of Comprehensive Income
Three months ended September 30, 2025
(in thousands)Hawaiian ElectricHawaii Electric LightMaui ElectricOther
subsidiaries
Consolidating
adjustments
Hawaiian Electric
Consolidated
Net income (loss) for common stock$36,988 5,002 (466)1,587 (6,123)$36,988 
Other comprehensive income (loss), net of taxes:
Retirement benefit plans:
Adjustment for amortization of net gains recognized during the period in net periodic benefit cost, net of taxes(576)(31)(64)— 95 (576)
Reclassification adjustment for impact of D&Os of the PUC included in regulatory accounts, net of taxes552 33 57 — (90)552 
Other comprehensive income (loss), net of taxes(24)2 (7)— 5 (24)
Comprehensive income (loss) attributable to common shareholder$36,964 5,004 (473)1,587 (6,118)$36,964 
27


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Statement of Income
Nine months ended September 30, 2026
(in thousands)Hawaiian ElectricHawaii Electric LightMaui Electric
Other subsidiaries
Consolidating adjustments
Hawaiian Electric
consolidated
Revenues$1,952,719 360,812 376,097 9,864 (11,484)$2,688,008 
Expenses
Fuel oil736,267 75,509 160,445 — — 972,221 
Purchased power435,964 111,205 40,141 — — 587,310 
Other operation and maintenance333,419 91,906 93,902 2,780 (11,484)510,523 
Wildfire tort-related claims
(129,907)(16,238)(16,238)— — (162,383)
Depreciation132,212 35,011 32,091 — — 199,314 
Taxes, other than income taxes182,925 33,726 35,101 1 — 251,753 
   Total expenses1,690,880 331,119 345,442 2,781 (11,484)2,358,738 
Operating income
261,839 29,693 30,655 7,083 — 329,270 
Allowance for equity funds used during construction10,510 851 2,354 — — 13,715 
Equity in earnings of subsidiaries34,328 — — — (34,328)— 
Retirement defined benefits credit (expense)—other than service costs2,471 502 (77)— — 2,896 
Interest expense and other charges, net(94,330)(13,162)(17,410)— 6,922 (117,980)
Allowance for borrowed funds used during construction4,781 243 1,171 — — 6,195 
Interest income
13,947 1,062 109 — (6,922)8,196 
Income before income taxes
233,546 19,189 16,802 7,083 (34,328)242,292 
Income taxes46,857 4,008 2,914 1,824 — 55,603 
Net income for common stock
$186,689 15,181 13,888 5,259 (34,328)$186,689 

Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Statement of Comprehensive Income
Nine months ended September 30, 2026
(in thousands)Hawaiian ElectricHawaii Electric LightMaui Electric
Other subsidiaries
Consolidating adjustments
Hawaiian Electric consolidated
Net income for common stock
$186,689 15,181 13,888 5,259 (34,328)$186,689 
Other comprehensive loss, net of taxes:
Retirement benefit plans:
Adjustment for amortization of net gains recognized during the period in net periodic benefit cost, net of taxes
(1,422)(127)(196)— 323 (1,422)
Reclassification adjustment for impact of D&Os of the PUC included in regulatory accounts, net of taxes
1,348 118 169 — (287)1,348 
Other comprehensive loss, net of taxes(74)(9)(27)— 36 (74)
Comprehensive income attributable to common shareholder$186,615 15,172 13,861 5,259 (34,292)$186,615 
28


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Statement of Income
Nine months ended September 30, 2025
(in thousands)Hawaiian ElectricHawaii Electric LightMaui Electric
Other subsidiaries
Consolidating adjustments
Hawaiian Electric
consolidated
Revenues$1,609,625 334,783 325,811 8,808 (10,751)$2,268,276 
Expenses
Fuel oil498,376 75,910 115,569 — — 689,855 
Purchased power374,065 89,155 42,273 — — 505,493 
Other operation and maintenance298,628 80,525 91,654 3,088 (10,751)463,144 
Depreciation127,678 33,727 30,610 — — 192,015 
Taxes, other than income taxes152,587 31,330 30,577 1 — 214,495 
   Total expenses1,451,334 310,647 310,683 3,089 (10,751)2,065,002 
Operating income
158,291 24,136 15,128 5,719 — 203,274 
Allowance for equity funds used during construction8,432 1,088 1,588 — — 11,108 
Equity in earnings of subsidiaries23,615 — — — (23,615)— 
Retirement defined benefits credit (expense)—other than service costs2,678 497 (74)— — 3,101 
Interest expense and other charges, net(49,966)(8,229)(11,708)— 3,631 (66,272)
Allowance for borrowed funds used during construction3,525 297 557 — — 4,379 
Interest income
7,219 910 159 — (3,631)4,657 
Income before income taxes
153,794 18,699 5,650 5,719 (23,615)160,247 
Income taxes29,030 4,000 294 1,473 — 34,797 
Net income
124,764 14,699 5,356 4,246 (23,615)125,450 
Preferred stock dividends of subsidiaries— 401 285 — — 686 
Net income attributable to Hawaiian Electric
124,764 14,298 5,071 4,246 (23,615)124,764 
Preferred stock dividends of Hawaiian Electric810 — — — — 810 
Net income for common stock
$123,954 14,298 5,071 4,246 (23,615)$123,954 

Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Statement of Comprehensive Income
Nine months ended September 30, 2025
(in thousands)Hawaiian ElectricHawaii Electric LightMaui Electric
Other subsidiaries
Consolidating adjustments
Hawaiian Electric consolidated
Net income for common stock
$123,954 14,298 5,071 4,246 (23,615)$123,954 
Other comprehensive loss, net of taxes:
Retirement benefit plans:
Adjustment for amortization of net gains recognized during the period in net periodic benefit cost, net of taxes
(1,637)(86)(191)— 277 (1,637)
Reclassification adjustment for impact of D&Os of the PUC included in regulatory accounts, net of taxes
1,519 77 164 — (241)1,519 
Other comprehensive loss, net of taxes(118)(9)(27)— 36 (118)
Comprehensive income attributable to common shareholder
$123,836 14,289 5,044 4,246 (23,579)$123,836 

29


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Balance Sheet
September 30, 2026
(in thousands)Hawaiian ElectricHawaii Electric LightMaui Electric
Other
subsi-diaries
Consoli-
dating
adjustments
Hawaiian Electric
consolidated
Assets
Property, plant and equipment
Utility property, plant and equipment
Land$42,850 5,644 3,603 — — $52,097 
Plant and equipment5,761,974 1,603,145 1,541,981 — — 8,907,100 
Right-of-use assets - finance lease411,545 77,183 50,757 — — 539,485 
Less accumulated depreciation(2,284,297)(741,112)(645,621)— — (3,671,030)
Construction in progress486,346 53,688 120,402 — — 660,436 
Utility property, plant and equipment, net4,418,418 998,548 1,071,122 — — 6,488,088 
Nonutility property, plant and equipment, less accumulated depreciation1,146 115 1,444 — — 2,705 
Total property, plant and equipment, net4,419,564 998,663 1,072,566 — — 6,490,793 
Investment in wholly owned subsidiaries, at equity928,636 — — — (928,636)— 
Current assets
Cash and cash equivalents92,597 45,262 5,030 33,081 — 175,970 
Advances to affiliates45,500 — — — (45,500)— 
Customer accounts receivable, net32,461 10,387 13,961 159,889 — 216,698 
Accrued unbilled revenues, net62,977 12,785 6,772 159,145 — 241,679 
Other accounts receivable, net147,555 52,228 44,227 — (222,562)21,448 
Fuel oil stock, at average cost117,627 20,999 27,575 — — 166,201 
Materials and supplies, at average cost78,826 23,678 41,272 — — 143,776 
Prepayments and other68,762 10,134 14,319 — (2,535)90,680 
Regulatory assets57,867 6,566 4,251 — — 68,684 
Total current assets704,172 182,039 157,407 352,115 (270,597)1,125,136 
Other long-term assets
Operating lease right-of-use assets30,963 9,991 2,579 — — 43,533 
Regulatory assets187,908 35,528 61,389 — — 284,825 
Defined benefit pension and other postretirement benefit plans asset137,402 46,419 39,486 — — 223,307 
Other281,146 16,693 29,118 — (157,364)169,593 
Total other long-term assets637,419 108,631 132,572 — (157,364)721,258 
Total assets$6,689,791 1,289,333 1,362,545 352,115 (1,356,597)$8,337,187 
(continued)
30


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Balance Sheet (continued)
September 30, 2026
(in thousands)Hawaiian ElectricHawaii Electric LightMaui Electric
Other
subsi-diaries
Consoli-
dating
adjustments
Hawaiian Electric
consolidated
Capitalization and liabilities
Capitalization
Common stock equity$1,908,766 338,528 425,344 164,764 (928,636)$1,908,766 
Long-term debt, net1,619,764 261,675 291,830 — (115,000)2,058,269 
Total capitalization3,528,530 600,203 717,174 164,764 (1,043,636)3,967,035 
Current liabilities
Current portion of operating lease liabilities5,805 7,093 1,748 — — 14,646 
Short-term borrowings from affiliate— — 45,500 — (45,500)— 
Accounts payable215,555 62,442 71,178 — — 349,175 
Interest and preferred dividends payable34,692 4,489 6,148 — (3,676)41,653 
Taxes accrued, including revenue taxes197,490 39,743 38,471 3,195 (2,535)276,364 
Regulatory liabilities16,155 25,834 14,149 — — 56,138 
Wildfire tort-related claims
300,419 37,553 37,553 — — 375,525 
Other96,864 35,973 31,594 182,332 (218,886)127,877 
Total current liabilities866,980 213,127 246,341 185,527 (270,597)1,241,378 
Deferred credits and other liabilities
Operating lease liabilities28,554 3,040 935 — — 32,529 
Finance lease liabilities374,243 73,196 48,775 — — 496,214 
Deferred income taxes— 18,538 30,699 1,824 (42,364)8,697 
Regulatory liabilities1,016,659 257,874 162,584 — — 1,437,117 
Unamortized tax credits41,335 8,405 8,410 — — 58,150 
Defined benefit pension plans liability13,061 120 — — — 13,181 
Wildfire tort-related claims
722,062 90,258 90,258 — — 902,578 
Other98,367 24,572 57,369 — — 180,308 
Total deferred credits and other liabilities2,294,281 476,003 399,030 1,824 (42,364)3,128,774 
Total capitalization and liabilities$6,689,791 1,289,333 1,362,545 352,115 (1,356,597)$8,337,187 
31


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Balance Sheet
December 31, 2025
(in thousands)Hawaiian ElectricHawaii Electric LightMaui Electric
Other
subsi-diaries
Consoli-
dating
adjustments
Hawaiian Electric
consolidated
Assets
Property, plant and equipment
Utility property, plant and equipment
Land$42,860 5,644 3,603 — — $52,107 
Plant and equipment5,667,936 1,564,628 1,487,053 — — 8,719,617 
Right-of-use assets - finance lease
411,545 77,183 50,757 — — 539,485 
Less accumulated depreciation(2,165,110)(716,715)(626,767)— — (3,508,592)
Construction in progress283,687 34,021 64,439 — — 382,147 
Utility property, plant and equipment, net4,240,918 964,761 979,085 — — 6,184,764 
Nonutility property, plant and equipment, less accumulated depreciation1,146 115 1,444 — — 2,705 
Total property, plant and equipment, net4,242,064 964,876 980,529 — — 6,187,469 
Investment in wholly owned subsidiaries, at equity
734,296 — — — (734,296)— 
Current assets
Cash and cash equivalents396,215 56,563 8,572 24,870 — 486,220 
Customer accounts receivable, net7,278 2,987 3,942 158,687 — 172,894 
Accrued unbilled revenues, net24,826 7,462 600 159,145 — 192,033 
Other accounts receivable, net196,783 55,970 50,838 — (227,245)76,346 
Fuel oil stock, at average cost84,938 11,997 16,647 — — 113,582 
Materials and supplies, at average cost75,754 19,184 37,865 — — 132,803 
Prepayments and other38,321 9,657 12,451 — (2,449)57,980 
Regulatory assets32,461 10,279 7,299 — — 50,039 
Total current assets856,576 174,099 138,214 342,702 (229,694)1,281,897 
Other long-term assets
Operating lease right-of-use assets34,743 16,219 4,901 — — 55,863 
Regulatory assets177,678 28,245 52,153 — — 258,076 
Defined benefit pension and other postretirement benefit plans asset134,785 45,794 38,898 — — 219,477 
Investment in unconsolidated affiliate287,250 — — — — 287,250 
Other344,052 18,374 28,976 — (150,914)240,488 
Total other long-term assets978,508 108,632 124,928 — (150,914)1,061,154 
Total assets$6,811,444 1,247,607 1,243,671 342,702 (1,114,904)$8,530,520 
(continued)
32


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Balance Sheet (continued)
December 31, 2025
(in thousands)Hawaiian ElectricHawaii Electric LightMaui Electric
Other
subsi-diaries
Consoli-
dating
adjustments
Hawaiian Electric
consolidated
Capitalization and liabilities
Capitalization
Common stock equity$1,583,399 276,332 298,459 159,505 (734,296)$1,583,399 
Long-term debt, net1,619,482 261,614 291,778 — (115,000)2,057,874 
Total capitalization3,202,881 537,946 590,237 159,505 (849,296)3,641,273 
Current liabilities
Current portion of operating lease liabilities5,716 8,570 3,279 — — 17,565 
Current portion of long-term debt, net
61,980 7,997 54,982 — — 124,959 
Accounts payable150,843 34,072 32,288 — — 217,203 
Interest and preferred dividends payable22,582 3,440 3,114 — (1,112)28,024 
Taxes accrued, including revenue taxes184,339 40,720 37,374 3,195 (2,449)263,179 
Regulatory liabilities23,127 12,410 16,460 — — 51,997 
Wildfire tort-related claims
386,500 47,875 47,875 — — 482,250 
Other93,475 37,759 34,175 180,002 (226,133)119,278 
Total current liabilities928,562 192,843 229,547 183,197 (229,694)1,304,455 
Deferred credits and other liabilities
Operating lease liabilities32,974 7,932 1,847 — — 42,753 
Finance lease liabilities382,227 74,087 49,276 — — 505,590 
Deferred income taxes— 12,089 23,825 — (35,914)— 
Regulatory liabilities980,131 248,885 163,131 — — 1,392,147 
Unamortized tax credits47,973 9,794 10,151 — — 67,918 
Defined benefit pension plan liability6,788 121 — — — 6,909 
Wildfire tort-related claims
1,149,000 143,625 143,625 — — 1,436,250 
Other80,908 20,285 32,032 — — 133,225 
Total deferred credits and other liabilities2,680,001 516,818 423,887 — (35,914)3,584,792 
Total capitalization and liabilities$6,811,444 1,247,607 1,243,671 342,702 (1,114,904)$8,530,520 

33


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Statement of Changes in Common Stock Equity
Nine months ended September 30, 2026
(in thousands)Hawaiian ElectricHawaii Electric LightMaui Electric
Other
subsidiaries
Consolidating
adjustments
Hawaiian Electric
consolidated
Balance, December 31, 2025$1,583,399 276,332 298,459 159,505 (734,296)$1,583,399 
Net income for common stock
186,689 15,181 13,888 5,259 (34,328)186,689 
Other comprehensive loss, net of taxes(74)(9)(27)— 36 (74)
Common stock dividends(32,000)— — — — (32,000)
Issuance of common stock, net of expenses— — 66,000 — (66,000)— 
Additional paid-in capital170,752 47,024 47,024 — (94,048)170,752 
Balance, September 30, 2026$1,908,766 338,528 425,344 164,764 (928,636)$1,908,766 
 
Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Statement of Changes in Common Stock Equity
Nine months ended September 30, 2025
(in thousands)Hawaiian ElectricHawaii Electric LightMaui Electric
Other
subsidiaries
Consolidating
adjustments
Hawaiian Electric
consolidated
Balance, December 31, 2024$1,156,955 243,964 282,876 153,574 (680,414)$1,156,955 
Net income for common stock
123,954 14,298 5,071 4,246 (23,615)123,954 
Other comprehensive loss, net of taxes(118)(9)(27)— 36 (118)
Common stock dividends(20,000)— — — — (20,000)
Additional paid-in capital287,790 400 286 — (686)287,790 
Balance, September 30, 2025$1,548,581 258,653 288,206 157,820 (704,679)$1,548,581 

34


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Statement of Cash Flows
Nine months ended September 30, 2026
(in thousands)Hawaiian ElectricHawaii Electric LightMaui Electric
Other
subsidiaries
Consolidating
adjustments
Hawaiian Electric
consolidated
Net cash provided by operating activities$169,009 45,783 33,208 8,211 (2,119)$254,092 
Cash flows from investing activities
Capital expenditures(259,218)(48,050)(91,899)— — (399,167)
Advances to affiliates
(111,500)— — — 111,500 — 
Other1,403 (221)(925)— 2,119 2,376 
Net cash used in investing activities(369,315)(48,271)(92,824)— 113,619 (396,791)
Cash flows from financing activities
Common stock dividends(32,000)— — — — (32,000)
Net increase in short-term borrowings from affiliate
— — 111,500 — (111,500)— 
Repayment of long-term debt(62,000)(8,000)(55,000)— — (125,000)
Payments of obligations under finance leases(7,288)(813)(426)— — (8,527)
Other(2,024)— — — — (2,024)
Net cash provided by (used in) financing activities(103,312)(8,813)56,074 — (111,500)(167,551)
Net increase (decrease) in cash and cash equivalents(303,618)(11,301)(3,542)8,211 — (310,250)
Cash and cash equivalents, beginning of period
396,215 56,563 8,572 24,870 — 486,220 
Cash and cash equivalents, end of period$92,597 45,262 5,030 33,081 — $175,970 

Hawaiian Electric Company, Inc. and Subsidiaries
Condensed Consolidating Statement of Cash Flows
Nine months ended September 30, 2025
(in thousands)Hawaiian ElectricHawaii Electric LightMaui Electric
Other
subsidiaries
Consolidating
adjustments
Hawaiian Electric
consolidated
Net cash provided by operating activities
$228,320 54,543 40,655 (3,515)— $320,003 
Cash flows from investing activities
Capital expenditures (130,207)(49,738)(73,982)— — (253,927)
Advances to affiliates
(20,500)— — — 20,500 — 
Other4,073 1,163 1,009 — — 6,245 
Net cash used in investing activities(146,634)(48,575)(72,973)— 20,500 (247,682)
Cash flows from financing activities
Common stock dividends(20,000)— — — — (20,000)
Preferred stock dividends of Hawaiian Electric and subsidiaries(1,496)— — — — (1,496)
Proceeds from capital contribution from parent
540 — — — — 540 
Repayment of short-term debt(50,000)— — — — (50,000)
Proceeds from issuance of long-term debt500,000 — — — — 500,000 
Net increase in short-term borrowings from affiliate
— — 20,500 — (20,500)— 
Repayment of long-term debt(166,000)— — — — (166,000)
Payments of obligations under finance leases(6,087)(623)(453)— — (7,163)
Other(7,986)(142)(351)— — (8,479)
Net cash provided by (used in) financing activities248,971 (765)19,696 — (20,500)247,402 
Net increase (decrease) in cash and cash equivalents
330,657 5,203 (12,622)(3,515)— 319,723 
Cash and cash equivalents, beginning of period
118,367 31,534 16,456 17,791 — 184,148 
Cash and cash equivalents, end of period$449,024 36,737 3,834 14,276 — $503,871 

35


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Note 5 · Credit agreements and long-term debt
Credit agreements. The following table provides the credit agreement capacity, outstanding and undrawn components as of September 30, 2026 and December 31, 2025.
As of September 30, 2026
As of December 31, 2025
(in millions)CapacityOutstandingUndrawnCapacityOutstandingUndrawn
HEI corporate:
Unsecured revolving line of credit$300 $— $300 $300 $20 $280 
Hawaiian Electric:
Unsecured revolving line of credit300 — 300 300 — 300 
ABL Facility1
250 — 250 240 — 240 
Borrowing from HEI - standing commitment letter2
75 — 75 75 — 75 
Total Hawaiian Electric625 — 625 615 — 615 
Total Consolidated HEI2
$850 $— $850 $840 $20 $820 
1     Borrowing capacity is calculated based on eligible customer accounts receivable balance at the end of each period.
2     $75 million borrowing from HEI - standing commitment letter is eliminated in total consolidated HEI amounts.
Syndicated credit agreements. On September 5, 2025, HEI and Hawaiian Electric each entered into a fourth amended and restated senior unsecured revolving credit facility (the HEI Facility and the Hawaiian Electric Facility, respectively) with a syndicate of eight financial institutions. The aggregate amount of revolving commitments under the HEI Facility was increased to $300 million from $175 million and includes a $25 million letter of credit sub-facility and a $30 million swingline sub-facility. The HEI Facility’s commitment termination date was extended to September 5, 2030 from May 14, 2027. The aggregate amount of revolving commitments available under the Hawaiian Electric Facility was increased to $300 million from $200 million and includes a $40 million letter of credit sub-facility and a $30 million swingline sub-facility. On May 8, 2026, the PUC issued an order extending the term of the Hawaiian Electric Facility to September 5, 2030. The Hawaiian Electric Facility also allows for commitment increases of up to an additional $75 million, subject to customary conditions. None of the facilities are collateralized. As of September 30, 2026, HEI and Hawaiian Electric each had no draws on their revolving facilities.
Intercompany borrowing agreement. Under the HEI and Hawaiian Electric Intercompany Borrowing and Investment Policy effective October 3, 2025 (the Intercompany Borrowing Policy), HEI has committed to make revolving short-term loans to Hawaiian Electric pursuant to the terms set forth in the standing commitment letter dated December 5, 2025 (the 2025 Commitment Letter). For loans that mature on or before December 4, 2026, the 2025 Commitment Letter provides a borrowing limit of $75 million outstanding at any time and the applicable interest rate. Hawaiian Electric currently has no borrowings under the Intercompany Borrowing Policy and the 2025 Commitment Letter.
Asset-based lending facility credit agreement. On May 17, 2024, Hawaiian Electric, through a special-purpose subsidiary, entered into an ABL Facility credit agreement (ABL Credit Facility Agreement) with several banks, which, subject to the limitations and conditions set forth in such agreement, allows borrowings of up to $250 million on a revolving basis using certain accounts receivable as collateral. The ABL Facility was approved by the PUC, became effective on July 24, 2024 and will expire on July 24, 2027. As of September 30, 2026, total available capacity under the ABL Facility was $250 million and remains undrawn.
36


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Long-term debt. As of September 30, 2026, the Company and Hawaiian Electric were in compliance with all applicable financial covenants. The following table summarizes the long-term debt, net for the Company and Hawaiian Electric as of September 30, 2026 and December 31, 2025.
(in thousands)September 30, 2026
December 31, 2025
All other:
HEI 2.48%-6.10% senior notes due 2028-2052
$207,738 $207,738 
HEI revolving credit facility SOFR + 2.25%, due 20301
— 20,000 
Mahipapa 2.6% non-recourse loan, due 2034 to 20362
49,037 — 
Mahipapa 5.625% non-recourse loan, due 20272
132 — 
Less unamortized debt issuance costs and debt discount(2,542)(596)
Less current portion long-term debt, net of unamortized debt issuance cost(14,370)— 
All other long-term debt, net
239,995 227,142 
Hawaiian Electric:
Special purpose revenue bonds and unsecured senior notes2,070,000 2,195,000 
Less unamortized debt issuance costs(11,731)(12,167)
Less current portion long-term debt, net of unamortized debt issuance cost— (124,959)
Hawaiian Electric long-term debt, net
2,058,269 2,057,874 
HEI consolidated long-term debt, net
$2,298,264 $2,285,016 
1     HEI’s revolving credit facility’s term benchmark margin was 2.25% and 2.50%, as of September 30, 2026 and December 31, 2025, respectively, reduced in July 2026 as a result of improved credit ratings. As of December 31, 2025, the HEI revolving credit facility’s weighted-average interest rate was 6.32%. See “Syndicated credit agreements” above.
2     As of December 31, 2025, excludes Mahipapa’s non-recourse loans amounting to $54.0 million which were classified as “Liabilities held for sale” on the Company’s Condensed Consolidated Balance Sheets. See “Assets held for sale-Mahipapa” in Note 3.
Note 6 · Shareholders' equity
Accumulated other comprehensive income/(loss).  Changes in the balances of each component of accumulated other comprehensive income/(loss) (AOCI) were as follows:
HEI consolidated
Hawaiian Electric consolidated
 (in thousands) Unrealized gains (losses) on derivativesRetirement benefit plansAOCIAOCI-Retirement benefit plans
Balance, December 31, 2025$600 $2,738 $3,338 $2,640 
Current period other comprehensive loss(160)(9)(169)(74)
Balance, September 30, 2026$440 $2,729 $3,169 $2,566 
Balance, December 31, 2024$2,120 $1,341 $3,461 $2,786 
Current period other comprehensive loss(1,466)(34)(1,500)(118)
Balance, September 30, 2025$654 $1,307 $1,961 $2,668 
37


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Reclassifications out of AOCI were as follows:
Amount reclassified from AOCIAffected line item in the
 Statements of Income / Balance Sheets
Three months ended September 30Nine months ended September 30
(in thousands)2026202520262025
HEI consolidated
Net realized gains on derivatives qualifying as cash flow hedges$(54)$(877)$(160)$(977)Interest expense and gain (loss) on sale of subsidiaries and impairment losses on subsidiary assets sold and assets formerly classified as held for sale
Retirement benefit plans:
Amortization of net gains recognized during the period in net periodic benefit cost(442)(540)(1,357)(1,553)
See Note 8 for additional details
Impact of D&Os of the PUC included in regulatory accounts476 552 1,348 1,519 
See Note 8 for additional details
Total reclassifications$(20)$(865)$(169)$(1,011)
Hawaiian Electric consolidated
Retirement benefit plans:
Amortization of net gains recognized during the period in net periodic benefit cost$(456)$(576)$(1,422)$(1,637)
See Note 8 for additional details
Impact of D&Os of the PUC included in regulatory accounts476 552 1,348 1,519 
See Note 8 for additional details
Total reclassifications$20 $(24)$(74)$(118)

Note 7 · Revenues
The following tables disaggregate revenues by major source, timing of revenue recognition, and segment:
Three months ended September 30, 2026Nine months ended September 30, 2026
(in thousands) Electric utilityAll
other
Total
Electric utility
All
other
Total
Revenues from contracts with customers
Electric energy sales - residential$327,332 $— $327,332 $852,198 $— $852,198 
Electric energy sales - commercial312,578 — 312,578 824,180 — 824,180 
Electric energy sales - large light and power359,908 — 359,908 956,344 — 956,344 
Electric energy sales - other 5,301 — 5,301 15,181 — 15,181 
Other sales— 1,606 1,606 — 6,780 6,780 
Total revenues from contracts with customers1,005,119 1,606 1,006,725 2,647,903 6,780 2,654,683 
Revenues from other sources
Regulatory revenue(7,361)— (7,361)12,162 — 12,162 
Other9,346 — 9,346 27,943 72 28,015 
Total revenues from other sources1,985 — 1,985 40,105 72 40,177 
Total revenues$1,007,104 $1,606 $1,008,710 $2,688,008 $6,852 $2,694,860 
Timing of revenue recognition
Total revenues from contracts with customers - services/goods transferred over time$1,005,119 $1,606 $1,006,725 $2,647,903 $6,780 $2,654,683 
38


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Three months ended September 30, 2025Nine months ended September 30, 2025
(in thousands) Electric utilityAll
other
Total
Electric utility
All
other
Total
Revenues from contracts with customers
Electric energy sales - residential$261,780 $— $261,780 $735,308 $— $735,308 
Electric energy sales - commercial251,288 — 251,288 724,796 — 724,796 
Electric energy sales - large light and power278,484 — 278,484 801,179 — 801,179 
Electric energy sales - other4,284 — 4,284 12,989 — 12,989 
Other sales— 3,158 3,158 — 11,030 11,030 
Total revenues from contracts with customers795,836 3,158 798,994 2,274,272 11,030 2,285,302 
Revenues from other sources
Regulatory revenue(17,864)— (17,864)(33,522)— (33,522)
Other9,456 24 9,480 27,526 1,766 29,292 
Total revenues from other sources(8,408)24 (8,384)(5,996)1,766 (4,230)
Total revenues$787,428 $3,182 $790,610 $2,268,276 $12,796 $2,281,072 
Timing of revenue recognition
Total revenues from contracts with customers - services/goods transferred over time$795,836 $3,158 $798,994 $2,274,272 $11,030 $2,285,302 
There are no material contract assets or liabilities associated with revenues from contracts with customers existing at September 30, 2026 or December 31, 2025. Accounts receivable and unbilled revenues related to contracts with customers represent an unconditional right to consideration since all performance obligations have been satisfied. These amounts are disclosed as “Accounts receivable and unbilled revenues, net” on HEI’s Condensed Consolidated Balance Sheets and “Customer accounts receivable, net” and “Accrued unbilled revenues, net” on Hawaiian Electric’s Condensed Consolidated Balance Sheets.
As of September 30, 2026, the Company had no material remaining performance obligations due to the nature of the Company’s contracts with its customers. For the Utilities, performance obligations are fulfilled as electricity is delivered to customers.
39


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Note 8 · Retirement benefits
Defined benefit pension and other postretirement benefit plans information.  The Company contributed $10 million ($10 million by the Utilities) to its pension and other postretirement benefit plans during the first nine months of 2026, compared to $6 million ($6 million by the Utilities) during the first nine months of 2025. The Company’s current estimate of total contributions to its pension and other postretirement benefit plans in 2026 is $15 million ($15 million by the Utilities), compared to $12 million ($11 million by the Utilities) in 2025. In addition, the Company expects to pay directly $3 million ($1 million by the Utilities) of benefits in 2026, compared to $2 million ($1 million by the Utilities) paid in 2025.
The components of net periodic pension costs and net periodic benefit costs for HEI consolidated and Hawaiian Electric consolidated were as follows:
Three months ended September 30Nine months ended September 30
Pension benefitsOther benefitsPension benefitsOther benefits
(in thousands)20262025202620252026202520262025
HEI consolidated
Service cost$10,818 $10,900 $258 $245 $30,494 $30,796 $749 $741 
Interest cost28,219 27,999 1,792 1,819 83,347 80,608 5,349 5,461 
Expected return on plan assets(33,967)(33,845)(3,601)(3,512)(101,631)(101,558)(10,783)(10,532)
Amortization of net actuarial (gain)/losses104 79 (698)(808)235 209 (2,062)(2,300)
Net periodic pension/benefit cost (return)5,174 5,133 (2,249)(2,256)12,445 10,055 (6,747)(6,630)
Impact of PUC D&Os15,268 15,200 2,141 2,138 48,504 50,799 6,307 6,187 
Net periodic pension/benefit cost (return) (adjusted for impact of PUC D&Os)$20,442 $20,333 $(108)$(118)$60,949 $60,854 $(440)$(443)
Hawaiian Electric consolidated
Service cost$10,732 $10,655 $257 $242 $30,032 $30,065 $742 $732 
Interest cost27,547 27,101 1,717 1,731 80,880 77,960 5,115 5,212 
Expected return on plan assets(33,331)(33,041)(3,558)(3,464)(99,408)(99,142)(10,645)(10,387)
Amortization of net actuarial (gain)/losses79 34 (692)(811)128 81 (2,043)(2,285)
Net periodic pension/benefit cost (return)5,027 4,749 (2,276)(2,302)11,632 8,964 (6,831)(6,728)
Impact of PUC D&Os15,268 15,200 2,141 2,138 48,504 50,799 6,307 6,187 
Net periodic pension/benefit cost (return) (adjusted for impact of PUC D&Os)$20,295 $19,949 $(135)$(164)$60,136 $59,763 $(524)$(541)
HEI consolidated recorded retirement benefits expense of $33 million ($32 million by the Utilities) in the first nine months of 2026 and $35 million ($34 million by the Utilities) in the first nine months of 2025, and charged the remaining net periodic benefit cost primarily to electric utility plant.
The Utilities have implemented pension and OPEB tracking mechanisms under which all of their retirement benefit expenses (except for executive life and nonqualified pension plan expenses) determined in accordance with GAAP are recovered over time. Under the tracking mechanisms, any actual costs determined in accordance with GAAP that are over/under amounts allowed in rates are charged/credited to a regulatory asset/liability. The regulatory asset/liability for each utility will then be amortized over five years beginning with the respective utility’s next rate case.
Defined contribution plans information.  For the first nine months of 2026 and 2025, the Company’s expenses and cash contributions for its defined contribution plans under the Hawaiian Electric Industries Retirement Savings Plan (HEIRSP) were $8.3 million and $6.2 million, respectively. For the first nine months of 2026 and 2025, the Utilities’ expenses and cash contributions for its defined contribution plan under the HEIRSP were $8.1 million and $5.9 million, respectively.
40


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Note 9 · Share-based compensation
Under the 2010 Equity and Incentive Plan, as amended and restated effective February 9, 2024 (EIP), HEI can issue shares of common stock as incentive compensation to nonemployee directors and selected employees and consultants in the form of stock options, stock appreciation rights, restricted shares, restricted stock units, performance shares and other share-based and cash-based awards.
As of September 30, 2026, approximately 2.4 million shares remained available for future issuance under the terms of the EIP, assuming recycling of shares withheld to satisfy statutory tax liabilities relating to EIP awards, including an estimated 1.6 million shares that could be issued upon the vesting of outstanding restricted stock units and the achievement of performance goals for awards outstanding under long-term incentive plans (assuming that such performance goals are achieved at maximum levels).
Under the 2011 Nonemployee Director Stock Plan (2011 Director Plan), HEI can issue shares of common stock as compensation to nonemployee directors of HEI and its principal subsidiaries. As of September 30, 2026, there were no shares remaining available for future issuance under the 2011 Director Plan. After all of the shares remaining under the 2011 Director Plan were issued, shares for nonemployee director grants of common stock were, and going forward will be, made from available shares under the EIP, which was amended in 2024 to provide for nonemployee director grants.
Share-based compensation expense and the related income taxes were as follows:
Three months ended September 30Nine months ended September 30
(in millions)2026202520262025
HEI consolidated
Share-based compensation expense (benefit)1
$3.5 $(0.6)$7.3 $2.9 
Income taxes0.4 (0.1)1.0 0.4 
Hawaiian Electric consolidated
Share-based compensation expense (benefit)1
2.8 (0.2)4.9 1.6 
Income taxes0.4 — 0.8 0.3 
1    For the three and nine months ended September 30, 2026 and 2025, the Company has not capitalized any share-based compensation.
Stock awards. HEI granted HEI common stock to nonemployee directors under the 2011 Director Plan and EIP as follows:
Three months ended September 30Nine months ended September 30
(dollars in millions)2026202520262025
Shares granted— 8,623 92,380 126,213 
Fair value$— $0.1 $1.2 $1.3 
Income taxes— — 0.3 0.3 
The number of shares issued to each nonemployee director of HEI and Hawaiian Electric is determined based on the closing price of HEI common stock on the grant date.
Restricted stock units.  Information about HEI’s grants of restricted stock units was as follows:
Three months ended September 30Nine months ended September 30
2026202520262025
Shares(1)Shares(1)Shares(1)Shares(1)
Outstanding, beginning of period— $— 22,172 $42.41 22,172 $42.41 65,628 $42.09 
Granted— — — — — — — — 
Vested— — — — (22,172)42.41 (42,452)41.92 
Forfeited— — — — — — (1,004)42.41 
Outstanding, end of period— $— 22,172 $42.41 — $— 22,172 $42.41 
Total weighted-average grant-date fair value of shares granted (in millions)$— $— $— $— 
(1)    Weighted-average grant-date fair value per share based on the average price of HEI common stock on the date of grant.
41


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
For the nine months ended September 30, 2026 and 2025, total restricted stock units and related dividends that vested had a fair value of $0.4 million and $0.5 million, respectively, and the related tax benefits were nil and $0.1 million, respectively.
As of September 30, 2026, there was no unrecognized compensation cost related to restricted stock units.
Long-term incentive plan payable in stock.  The 2024-26, 2025-27 and 2026-28 long-term incentive plans (LTIP) provide for performance awards under the EIP of shares of HEI common stock based on the satisfaction of performance goals. The number of shares of HEI common stock that may be awarded is fixed on the date the grants are made, subject to the achievement of specified performance levels and calculated dividend equivalents. The potential payout varies from 0% to 220% of the number of target shares, depending on the achievement of the goals. The 2024-26 LTIP performance goals include a market condition goal. The market condition goal is based on HEI’s total shareholder return (TSR) compared to the Peer Group (the Company’s compensation peer group consisting of companies in the EEI Index and approved by the Company’s Compensation & Human Capital Management Committee), in each case over the relevant three-year period. The other performance condition goals relate to Hawaiian Electric’s credit rating, public safety, funds from operations to total adjusted debt ratio and customer experience. The 2025-27 and 2026-28 LTIPs include other performance goals (described above) and a relative TSR payout modifier, which may adjust the payout shares based on the relative TSR result. The relative TSR modifier is based on HEI’s TSR compared to the Peer Group.
LTIP linked to TSR.  Information about HEI’s LTIP grants linked to TSR was as follows:
Three months ended September 30Nine months ended September 30
2026202520262025
Shares(1)Shares(1)Shares(1)Shares(1)
Outstanding, beginning of period834,517 $13.85 543,467 $13.50 543,467 $13.50 98,441 $31.36 
Granted 3,604 17.04 — — 317,919 17.04 462,313 11.25 
Vested (issued or unissued and cancelled)— — — — (19,002)55.98 (17,287)54.92 
Forfeited(6,145)14.59 — — (10,408)15.69 — — 
Outstanding, end of period831,976 $13.86 543,467 $13.50 831,976 $13.86 543,467 $13.50 
Total weighted-average grant-date fair value of shares granted (in millions)$— $— $5.4 $5.2 
(1)    Weighted-average grant-date fair value per share determined using a Monte Carlo simulation model.
The grant date fair values of the LTIP awards linked to TSR were determined using a Monte Carlo simulation model utilizing actual information for the common shares of HEI and the Peer Group for the period from the beginning of the performance period to the grant date and estimated future stock volatility of HEI and the Peer Group over the remaining three-year performance period. The expected stock volatility assumptions for HEI and the Peer Group were based on the three-year historic stock volatility. A dividend assumption is not required for the Monte Carlo simulation because the grant payout includes dividend equivalents and projected returns include the value of reinvested dividends.
The following table summarizes the assumptions used to determine the fair value of the LTIP awards linked to TSR and the resulting fair value of LTIP awards granted:
20262025
Risk-free interest rate3.49%4.37%
Expected life in years33
Expected volatility65.3%64.7%
Range of expected volatility for Peer Group
16.8% to 65.3%
15.3% to 64.7%
Grant-date fair value (per share) (HEI)$17.04 $11.39 
Grant-date fair value (per share) (Hawaiian Electric)$17.04 $11.12 
There were no share-based LTIP awards linked to TSR with a vesting date in 2026 and 2025.
As of September 30, 2026, there was $6.3 million of total unrecognized compensation cost related to the nonvested performance awards payable in shares linked to TSR. The cost is expected to be recognized over a weighted-average period of 1.6 years.
42


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
LTIP awards linked to other performance conditions.  Information about HEI’s LTIP awards payable in shares linked to other performance conditions was as follows:
Three months ended September 30Nine months ended September 30
2026202520262025
Shares(1)Shares(1)Shares(1)Shares(1)
Outstanding, beginning of period345,912 $13.09 438,967 $18.17 362,963 $13.09 438,967 $18.17 
Granted — — — — — — — — 
Vested — — — — — — — — 
Increase above target/(cancelled) due to performance
183,886 13.09 (57,007)42.41 183,886 13.09 (57,007)42.41 
Forfeited(914)13.09 — — (17,965)13.09 — — 
Outstanding, end of period528,884 $13.09 381,960 $14.55 528,884 $13.09 381,960 $14.55 
Total weighted-average grant-date fair value of shares granted (at target performance levels) (in millions)$— $— $— $— 
(1)    Weighted-average grant-date fair value per share based on the average price of HEI common stock on the date of grant.
There were no share-based LTIP awards linked to other performance conditions with a vesting date in 2026 and 2025.
As of September 30, 2026, there was $0.6 million of total unrecognized compensation cost related to the nonvested shares linked to performance conditions other than TSR. The cost is expected to be recognized over a weighted-average period of 0.3 years.
Note 10 · Income taxes
The Company’s effective tax rate (combined federal and state income tax rates) for the nine months ended September 30, 2026 was 15%. This rate differs from the combined statutory rates, primarily due to the Utilities’ amortization of excess deferred income taxes related to the 2017 Tax Cuts and Jobs Act reduction in tax rate from 35% to 21%, valuation allowance release related to the gains on the ASB investment and research and development tax credit claims recognized in 2026; partially offset by higher executive compensation limitations and substantially higher pretax income related to the remeasurement of the wildfire tort-related settlement liability to present value (net of accretion) and investment in ASB to fair market value, net of the impairment of Pacific Current assets.
For the nine months ended September 30, 2025, the Company’s effective tax rate was 25%.
The Company’s effective tax rate was lower for the first nine months of 2026, compared to 2025, primarily due to discrete tax benefits recognized in 2026 from the valuation allowance release related to the gains on the ASB investment and research and development tax credit claims recognized; partially offset by the substantially higher pretax income related to the remeasurement of the wildfire tort-related settlement liability to present value (net of accretion) and investment in ASB to fair market value, net of the impairment of Pacific Current assets. The primary discrete tax item affecting the 2025 period was the recapture of investment tax credits.
The Utilities’ effective tax rate (combined federal and state income tax rates) for the nine months ended September 30, 2026 was 23%. This rate differs from the combined statutory rates, primarily due to the Utilities’ amortization of excess deferred income taxes related to the 2017 Tax Cuts and Jobs Act reduction in tax rate from 35% to 21%, and research and development tax credit claims recognized in 2026; partially offset by higher executive compensation limitations and substantially higher pretax income related to the remeasurement of the wildfire tort-related settlement liability to present value (net of accretion).
For the nine months ended September 30, 2025, the Utilities’ effective tax rate was 22%.
The Utilities’ effective tax rate was higher for the first nine months of 2026, compared to 2025, primarily due to a discrete tax expense recognized in 2026 resulting from the remeasurement of the Utilities’ remaining wildfire tort-related settlement liability at present value, partially offset by research and development credit claims recognized in 2026.
The Company regularly assesses the need for a valuation allowance on its deferred tax assets. In making this assessment, the Company considers both positive and negative evidence related to the likelihood of realization of its deferred tax assets to determine, based on the weight of all available evidence, whether it is more likely than not that some or all of the deferred tax
43


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
assets will not be realized. A valuation allowance release indicates that it is more likely than not that the deferred tax assets will be realized.
As of September 30, 2026, the Company released $15.9 million of valuation allowances recorded against its beginning-of-year deferred tax assets, representing a tax benefit of approximately 7%. Based on its analysis of all positive and negative evidence, the Company concluded that it is more likely than not that a portion of its U.S. federal and state deferred tax assets will be realized based on current and anticipated future earnings. When a change in a valuation allowance is recognized during an interim period, the portion resulting from current-year income is included in the annual effective tax rate, while the portion supported by projections of future taxable income is recognized as a discrete tax benefit in the interim period. The release of these valuation allowances resulted in a discrete tax benefit of $15.9 million for the quarter and nine months ended September 30, 2026.
The Company continues to maintain a valuation allowance against the remaining deferred tax assets that do not meet the more-likely-than-not realization criterion and assesses the need for a valuation allowance on a quarterly basis.
On July 4, 2025, federal tax legislation, commonly referred to as the One Big Beautiful Bill Act (OBBBA), which includes a broad range of tax reform provisions, was signed into law in the United States. The Company recognized the impact of OBBBA. The Company will continue to assess the legislation’s impact on future reporting periods; however, the legislation is not anticipated to have a material impact on the Company’s financial statements.
Currently, there are no active Internal Revenue Service income tax examinations. In January 2026, the Company was notified that the State of Hawaii would audit the Company’s income tax returns for tax years 2022 through 2024. In June 2026, the Company received a schedule of proposed income tax assessments from the Hawaii Department of Taxation. The proposed assessment relates to the capital goods excise tax credit claimed on the 2022 Hawaii State tax return, which the Company does not plan to dispute.
The Company recorded an additional $0.3 million of tax expense as a discrete item during the second quarter of 2026 related to this proposed assessment. No interest expense was recorded since the Company has sufficient tax credit carryforwards on its 2022 Hawaii State tax return and intends to use those carryforward credits to satisfy the proposed tax assessment.
As of September 2026, the tax auditor concurred that the proposed adjustment may be offset by available tax credit carryforwards. No other audit issues remain outstanding, and the filing of the amended returns for 2022 through 2024 represents the final step necessary to close the audit. The Company expects to file the amended returns by December 2026.

44


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Note 11 · Cash flows
Nine months ended September 3020262025
(in millions)
Supplemental disclosures of cash flow information
Cash payments (receipts):
HEI consolidated
Interest to non-affiliates, net of amounts capitalized$63 $71 
Interest on finance lease obligations33 29 
Federal income tax, net(5)24 
State of Hawaii income tax, net (including refundable credits)— (1)
Hawaiian Electric consolidated
Interest to non-affiliates, net of amounts capitalized58 53 
Interest on finance lease obligations33 29 
Federal income taxes, net(2)29 
State of Hawaii income taxes, net (including refundable credits)2 5 
Supplemental disclosures of noncash activities
HEI consolidated
Common stock issued (gross) for nonemployee director and executive/management compensation (financing)1
2 2 
Debt assumed by buyer - sale of subsidiaries (financing)— 67 
Hawaiian Electric consolidated
Capital contribution from parent related to installment payments of the wildfire tort-related claim liability (financing)2
519 — 
Capital distribution from former unconsolidated affiliate (financing)2
287 — 
Capital distribution to parent (financing)2
49 — 
Capital contribution from parent of a membership interest in a former unconsolidated affiliate (financing)— 287 
HEI consolidated and Hawaiian Electric consolidated
Property, plant and equipment
Unpaid invoices and accruals for capital expenditures, balance, end of period (investing)
115 66 
Right-of-use assets obtained in exchange for finance lease obligations (financing)— 51 
Estimated fair value of noncash contributions in aid of construction (investing)
4 5 
Reduction of long-term debt from funds previously transferred for repayment (financing)— 47 
1 The amounts shown represent the market value of common stock issued for nonemployee director and executive/management compensation and withheld to satisfy statutory tax liabilities.
2     Included in Hawaiian Electric change in additional paid-in capital. Change in additional paid-in capital represents the noncash capital contribution from parent related to installment payments of the tort-related settlement, net of noncash capital distribution from former unconsolidated affiliate, noncash capital distribution to parent and noncash transfer of operating liabilities from the parent of $12 million.
45


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
Note 12 · Fair value measurements
Fair value measurement and disclosure valuation methodology. The following are descriptions of the valuation methodologies used for assets and liabilities recorded at fair value and for estimating fair value for financial instruments not carried at fair value:
Money market mutual funds. The Company considers all liquid investments purchased with an initial maturity of three months or less and deposits in money market mutual funds that are readily convertible into cash to be cash equivalents. The carrying value of cash and cash equivalents approximates fair value due to the short-term nature of these instruments.
Marketable equity securities. Upon ASB becoming publicly traded in September 2026, the Company’s remaining investment in ASB no longer qualified for the measurement alternative for equity securities without readily determinable fair values and is measured at fair value on a recurring basis based on quoted market prices in an active market, a Level 1 input.
Long-term debt.  Fair value of fixed-rate long-term debt was obtained from third-party financial services providers based on the current rates offered for debt of the same or similar remaining maturities and from discounting the future cash flows using the current rates offered for debt of the same or similar risks, terms, and remaining maturities. The carrying amount of floating rate long-term debt approximated fair value because of the short-term interest reset periods. Long-term debt is classified in Level 2 of the valuation hierarchy.
The following table presents the carrying or notional amount, fair value and placement in the fair value hierarchy of the Company’s financial instruments.
Estimated fair value
(in thousands)Carrying or notional amountQuoted prices in
active markets
for identical assets
 (Level 1)
Significant
 other observable
 inputs
 (Level 2)
Total
September 30, 2026
Financial assets
HEI consolidated
Money market mutual funds$89,763 $89,763 $— $89,763 
Marketable equity securities1
74,808 74,808 — 74,808 
Hawaiian Electric consolidated
Money market mutual funds42,073 42,073 — 42,073 
Financial liabilities
HEI consolidated
Long-term debt, net2,312,634 — 1,902,851 1,902,851 
Hawaiian Electric consolidated
Long-term debt, net 2,058,269 — 1,675,574 1,675,574 
December 31, 2025
Financial assets
HEI consolidated
Money market mutual funds$839,380 $839,380 $— $839,380 
Hawaiian Electric consolidated
Money market mutual funds345,510 345,510 — 345,510 
Financial liabilities
HEI consolidated
Long-term debt, net2
2,409,975 — 2,098,593 2,098,593 
Hawaiian Electric consolidated
Long-term debt, net 2,182,833 — 1,895,680 1,895,680 
46


NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS - (Unaudited) continued
1    Included in “Other current assets” in HEI’s Condensed Consolidated Balance Sheets as of September 30, 2026.
2    Carrying or notional amount does not include $52 million related to Mahipapa long term debt, net which is included in “Liabilities held for sale” in HEI’s Condensed Consolidated Balance Sheets as of December 31, 2025. See Note 3 for more information.
Assets and liabilities measured at fair value on a recurring basis include money market mutual funds. Money market mutual funds are included in “Cash and cash equivalents” and “Restricted cash” in HEI’s Condensed Consolidated Balance Sheets.
There were no Level 3 assets or liabilities as of September 30, 2026 and December 31, 2025.
47


Item 2.  Management’s Discussion and Analysis of Financial Condition and Results of Operations
The following discussion updates “Management’s Discussion and Analysis of Financial Condition and Results of Operations” included in HEI’s and Hawaiian Electric’s 2025 Form 10-K and should be read in conjunction with such discussion and the 2025 annual consolidated financial statements of HEI and Hawaiian Electric and notes thereto included in HEI’s and Hawaiian Electric’s 2025 Form 10-K, as well as the quarterly condensed consolidated financial statements and notes thereto included in Item 1 of this Form 10-Q.
HEI consolidated
Recent developments. For discussion of the impacts of inflation and other macro-economic factors impacting the Utilities, see also “Recent developments” in Hawaiian Electric’s MD&A. See also “Economic conditions” below for further discussion of the economic impact of recent events, and Note 2 of the Condensed Consolidated Financial Statements for recent updates and disclosures relating to the Maui windstorm and wildfires.
RESULTS OF OPERATIONS
Three months ended September 30%
(in thousands)20262025change
Primary reason(s)1
Revenues$1,008,710 $790,610 28 Increase in the electric utility segment, partly offset by a decrease in the all other segment.
Operating income41,217 52,046 (21)Decrease in the electric utility segment, partly offset by an increase in the all other segment.
Net income for common stock35,450 30,747 15 Higher net income related to gain on sale of investment and net unrealized gain on investment measured at fair value, partially offset by higher impairment losses on assets formerly classified as held for sale, higher interest expense due to the accretion related to the remeasuring of the remaining settlement liability (see Note 2 of the Condensed Consolidated Financial Statements) and higher average debt balances and lower operating income. Also see effective tax rate explanations below.
Nine months ended September 30%
(in thousands)20262025change
Primary reason(s)1
Revenues$2,694,860 $2,281,072 18 Increase in the electric utility segment, partly offset by a decrease in the all other segment.
Operating income
298,808 168,213 78 Increase in the electric utility segment (primarily due to the adjustment related to remeasuring the remaining settlement liability (see Note 2 of the Condensed Consolidated Financial Statements)) and an increase in the all other segment.
Net income for common stock
189,100 83,503 126 Higher net income related to higher operating income, gain on sale of investment and net unrealized gain on investment measured at fair value, partially offset by higher impairment losses on assets formerly classified as held for sale, higher interest expense due to the accretion related to the remeasuring of the remaining settlement liability (see Note 2 of the Condensed Consolidated Financial Statements) and lower interest income due to the first installment payment of the tort-related settlement in April 2026. Also see effective tax rate explanations below.
1    Also, see the all other segment discussion below.
The Company’s effective tax rates for the first nine months of 2026 and 2025 were 15% and 25%, respectively. For the third quarters of 2026 and 2025, the Company’s effective tax rates were (82)% (tax benefit) and 22% tax expense, respectively. The lower effective tax rate for the first nine months of 2026, compared to the same period in 2025, was primarily due to discrete tax benefits recognized in 2026 from the valuation allowance release related to the gains on the ASB investment and research and development tax credit claims recognized; partially offset by the substantially higher pretax income related to the
48


remeasurement of the wildfire tort-related settlement liability to present value (net of accretion) and investment in ASB to fair market value, net of the impairment of Pacific Current assets. The lower effective tax rate for the third quarter of 2026, compared to the same period in 2025, was primarily due to discrete tax benefits recognized in third quarter of 2026 from the valuation allowance release related to the gains on the ASB investment, impairment of Pacific Current assets, accretion of the wildfire tort-related settlement liability, and research and development tax credit claims recognized.
Maui windstorm and wildfires related items, net. For the three and nine months ended September 30, 2026 and 2025, the Company’s incremental items related to the Maui windstorm and wildfires as discussed in Note 2 of the Condensed Consolidated Financial Statements, were as follows:
Three months ended September 30, 2026Nine months ended September 30, 2026
(in thousands)Electric utility
All other
HEI consolidated
Electric utility
All other
HEI consolidated
Maui windstorm and wildfires related expenses:
Legal expenses$1,028 $(26)$1,002 $3,592 $2,642 $6,234 
Other expense— 31 31 1,116 293 1,409 
Total Maui windstorm and wildfires related expenses
1,028 5 1,033 4,708 2,935 7,643 
Insurance recoveries1
(35)(172)(207)(8,866)(515)(9,381)
Settlement remeasurement2
— — — (153,870)— (153,870)
Accretion expense3
18,010 — 18,010 35,724 — 35,724 
Total Maui windstorm and wildfires related items, net
$19,003 $(167)$18,836 $(122,304)$2,420 $(119,884)

Three months ended September 30, 2025Nine months ended September 30, 2025
(in thousands)Electric utility
All other
HEI consolidated
Electric utility
All other
HEI consolidated
Maui windstorm and wildfires related expenses:
Legal expenses$4,316 $1,478 $5,794 $12,469 $8,063 $20,532 
Outside services expense
— — — — 135 135 
Wildfire securities-related claims— 47,750 47,750 — 47,750 47,750 
Other expense
5,791 101 5,892 17,278 401 17,679 
Interest expense131 267 398 2,543 756 3,299 
Total Maui windstorm and wildfires related expenses
10,238 49,596 59,834 32,290 57,105 89,395 
Insurance recoveries4
(430)(48,640)(49,070)126 (53,500)(53,374)
Deferral treatment approved by the PUC5
(6,237)— (6,237)(21,809)— (21,809)
Total Maui windstorm and wildfires related expenses, net of insurance recoveries and approved deferral treatment
$3,571 $956 $4,527 $10,607 $3,605 $14,212 
1 Includes $8.5 million recognized as an adjustment to the Wildfire tort-related claims for the nine months ended September 30, 2026.
2 Represents an adjustment related to remeasuring the remaining settlement liability at present value in accordance with Accounting Standards Codification Topic 835-30 Imputation of Interest.
3 Represents accretion expense related to remeasuring the remaining settlement liability, which is included in “Interest expense, net” and “Interest expense and other charges, net” in HEI’s and the Utilities’ Condensed Consolidated Statements of Income, respectively.
4    HEI consolidated includes insurance recovery related to the settlement of the securities class action of $47.8 million for the three and nine months ended September 30, 2025. Also includes adjustments related to costs that are no longer probable of recovery under the insurance policies. For the three and nine months ended September 30, 2025, HEI consolidated and Electric utility adjustments amount to $1.0 million and $7.6 million, respectively, of which, $0.5 million and $4.5 million were deferred to a regulatory asset, respectively, and are reported on line “Deferral treatment approved by the PUC.”
5    Pursuant to the PUC order received on February 12, 2025, deferral accounting treatment limited to insurance premiums and outside services and legal costs associated with the asset-based lending facility credit agreement incurred in 2025 was granted. Applicable amounts were deferred to a regulatory asset. See “Risk Factors” in Item 1A. for further discussion of regulatory risks. See Note 2 of the Condensed Consolidated Financial Statements.
49


Note: The all other segment Maui windstorm and wildfires related expenses (legal, outside services and other) and insurance recoveries are included in “Expenses-Other” and interest expense is included in “Interest expense, net” on the HEI and Subsidiaries Condensed Consolidated Statements of Income. See Electric utility section below for more detail.
From August 8, 2023 through September 30, 2026, HEI and its subsidiaries have incurred approximately $2.28 billion of Maui windstorm and wildfires related expenses, including the Utilities’ estimate of the losses related to a settlement of all wildfire tort-related legal claims and cross claims, the One ‘Ohana Initiative contribution and $47.8 million related to the securities class action settlement. Certain of these costs are reimbursable under excess liability insurance, professional liability insurance and directors and officers liability insurance policies. As of September 30, 2026, HEI and its subsidiaries have recovered the remaining unpaid insurance claim proceeds owed under its excess liability and professional liability insurance policies, and approximately $71 million of insurance coverage is remaining under the directors and officers liability policy, after deducting applicable retention amounts and amounts expected to be recovered for incurred costs such as the securities class action settlement that is recognized as a receivable as of the quarter end.
On April 10, 2026, the last condition to the finalization of the tort settlement agreements and first installment payment was satisfied when the last insurer agreed to a stipulation withdrawing with prejudice the appeal of the December 30, 2025 summary judgment entered in favor of HEI, Hawaiian Electric and other defendants. As a result, the Company paid the first of its four equal annual $479 million installments pursuant to the settlement agreements. In addition, on September 16, 2026, HEI made a partial prepayment of $40 million towards the second annual installment due in April 2027. On October 28, 2026, HEI made another partial prepayment of $40 million towards the second installment amount due in April 2027.
Economic conditions.
Note: The statistical data in this section is from public third-party sources that management believes to be reliable (e.g., Board of Governors of the Federal Reserve System, Department of Business, Economic Development and Tourism, University of Hawaii Economic Research Organization (UHERO), U.S. Bureau of Labor Statistics, and U.S. Energy Information Administration).
In the third quarter of 2026, the average daily passenger count was 1.6% lower than the comparable period in the prior year. The recovery in total passenger counts from the low levels in 2020, which occurred under COVID-19 restrictions, thus far has been driven by domestic travelers, with international traveler counts, including those from Japan, remaining at lower levels. In the third quarter, domestic passenger counts were 2.3% above 2019 levels, while international passenger counts (excluding Japan) remained 34.8% below 2019 levels. Due to the weak yen, Japanese visitors are 41.9% below 2019 levels.
Hawaii’s preliminary seasonally adjusted unemployment rate in September 2026 was 2.8%, which was an increase from the September 2025 rate of 2.1%. The national unemployment rate in September 2026 was 4.2%, slightly lower than the September 2025 rate of 4.4%. According to a recent forecast by UHERO, issued on September 25, 2026, jobs in the State will decrease by 0.2% in 2026.
Hawaii’s petroleum product prices are correlated to the crude oil price in international markets. The price of crude oil has increased 39.7% over the same quarter in the prior year.
At its September 16, 2026 meeting, the Federal Open Market Committee (FOMC) decided to raise the federal funds rate target range to 3.75% to 4.00%. The FOMC noted that while inflation remains elevated, domestic spending, productivity growth and capital investment are strong.
UHERO forecasts full year 2026 real GDP to increase 0.6%, real personal income to increase 1.1%, total visitor arrivals to decrease 0.7%, and an unemployment rate of 2.5% for the State. According to UHERO, Hawaii’s economy has slowed due to the war-driven oil prices and an active storm season. Gradual relief is expected as energy prices ease and storm recovery proceeds.
See also “Recent Developments” in the “Electric utility” section below for further discussion of the economic impact of recent events.
All other segment. The all other business segment loss includes results of the stand-alone corporate operations of HEI, ASB Hawaii and Pacific Current, including the results of Hamakua Energy and the solar and battery energy storage system facilities up until the close of their respective sales in 2025, and GLST1 up until its termination on June 3, 2026.
50


Three months ended September 30
(in thousands)20262025ChangePrimary reason(s)
Revenues$1,606 $3,182 $(1,576)Lower revenues primarily due to lower sales at Pacific Current subsidiaries.
Operating loss(6,956)(10,747)3,791 Lower operating loss primarily due to the transfer of the majority of corporate general and administrative costs to the Utilities as part of the June 2026 integration to combine the companies.
Net income (loss) 21,962 (6,241)28,203 Change in net income (loss) related to gain on sale of investment and net unrealized gain on investment measured at fair value and lower interest expense due to lower average debt balances, partly offset by higher impairment losses on assets formerly classified as held for sale and lower interest income due to the first installment payment of the tort-related settlement in April 2026. Also see effective tax rate explanations above.
Nine months ended September 30
(in thousands)20262025ChangePrimary reason(s)
Revenues$6,852 $12,796 $(5,944)
Lower revenues primarily due to lower sales at Pacific Current1 subsidiaries.
Operating loss(30,462)(35,061)4,599 Lower operating loss primarily due to lower Pacific Current losses and the transfer of the majority of corporate general and administrative costs to the Utilities as part of the June 2026 integration to combine the companies, partly offset by higher corporate consulting expense.
Net income (loss) 2,411 (40,451)42,862 Change in net income (loss) related to gain on sale of investment and net unrealized gain on investment measured at fair value and lower interest expense due to lower average debt balances, partly offset by higher impairment losses on assets formerly classified as held for sale and lower interest income due to the first installment payment of the tort-related settlement in April 2026. Also see effective tax rate explanations above.
1     As a subsidiary of Hamakua Holdings, Hamakua Energy’s sales to Hawaii Electric Light (a regulated affiliate) up until the close of its sale on March 10, 2025, are eliminated in consolidation.
The all other business segment loss includes results of the stand-alone corporate operations of HEI (including eliminations of intercompany transactions) and the results of HEI’s subsidiaries, GLST1 (up until its termination on June 3, 2026), ASB Hawaii and Pacific Current. Significant investments of Pacific Current made through its subsidiaries include: Pacific Current’s indirect subsidiary up until the close of its sale on March 10, 2025, Hamakua Energy, which owned a 60-MW combined cycle power plant on Hawaii Island that provides electricity to Hawaii Electric Light; Pacific Current’s solar project subsidiaries up until the close of the Solar Asset Disposition effective August 1, 2025, including Mauo, which owned solar-plus-storage projects totaling 8.6 MW on five University of Hawaii campuses, Alenuihaha Developments, LLC, which owned a collection of renewable energy assets on Oahu and Kauai, and Ka‘ie‘ie Waho which owned a 6-MW solar photovoltaic system that provides renewable energy to Kauai Island Utility Cooperative; Pacific Current’s subsidiary, Mahipapa, which owns a 7.5-MW nameplate biomass facility on Kauai; as well as eliminations of intercompany transactions.
In late February 2024, Hamakua Energy’s combustion turbine and its leased combustion turbine unexpectedly sustained damages from contaminated fuel resulting in a plant shut down through June 2024. In addition, in March 2024, a fire, which was ignited from a vendor’s welding activities during scheduled maintenance, destroyed the cooling tower at the Mahipapa facility on Kauai resulting in a plant shutdown through December 2024. The Company is currently working with its legal counsel on seeking recovery of its losses related to damages sustained to its plant facilities.
As part of HEI’s comprehensive review of strategic options for certain assets of Pacific Current, in March 2025, Pacific Current closed on the sale of Hamakua Holdings, a then wholly owned subsidiary of Pacific Current and parent company of Hamakua Energy, to an unaffiliated third party. In addition, in August 2025, Pacific Current, through an indirect subsidiary, sold all of its membership interests in Mauo, Alenuihaha Developments, LLC, Kaʻieʻie Waho and Upena, LLC. On November 3, 2026, Mahipapa filed a voluntary petition for bankruptcy under Chapter 7 in the United States Bankruptcy Court for the District of Hawaii. See Note 3 of the Condensed Consolidated Financial Statements for more information.
51


FINANCIAL CONDITION
Liquidity and capital resources.  See “Credit and Capital Market Risk” in Item 1A. Risk Factors in HEI’s and Hawaiian Electric’s 2025 Form 10-K and in Item 1A. Risk Factors below.
HEI’s and the Utilities’ future results of operations are subject to significant risks and uncertainties. Factors that could cause actual results to differ materially from expectations include, but are not limited to, access to lower-cost sources of capital, the ability to attract and retain key personnel, and pending or threatened litigation, including the wildfire-related litigation described above.
The Company remains focused on maintaining a strong and financially healthy enterprise and has taken additional measures to strengthen its financial position while continuing to provide reliable service to customers and support its long-term commitments to Hawaii and its communities. In September 2025, HEI and Hawaiian Electric each entered into a fourth amended and restated credit agreement with a syndicate of eight financial institutions, increasing each of their committed capacities to $300 million (see Note 5 of the Condensed Consolidated Financial Statements). As of September 30, 2026, neither HEI nor Hawaiian Electric had any borrowings outstanding under its revolving credit facility or any commercial paper outstanding.
In addition, in May 2024, Hawaiian Electric entered into an asset-based credit facility that allows borrowings of up to $250 million (see Note 5 of the Condensed Consolidated Financial Statements), and in September 2024, HEI registered with the SEC an at-the-market offering program under which HEI may offer and sell, from time to time at its sole discretion, its common stock, without par value, having an aggregate offering price of up to $250 million. To date, Hawaiian Electric has not drawn on its asset-based credit facility and HEI has not sold any common stock under its at-the-market offering program. Other proactive measures included suspending HEI’s quarterly common stock dividend after payment of the second quarter dividend in September 2023, repaying outstanding revolving credit facility borrowings and reducing or eliminating discretionary costs.
As of September 30, 2026, HEI consolidated had $2.3 billion of long-term debt and Hawaiian Electric had accrued estimated wildfire liabilities, at present value, of approximately $1.3 billion (pre-tax), related to the settlement of the Maui windstorm and wildfire tort-related legal claims (see Note 2 of the Condensed Consolidated Financial Statements). On April 10, 2026, HEI and Hawaiian Electric paid the first $479 million of four equal annual installments of the wildfire settlement liability using proceeds from HEI’s sale of 62.2 million shares of common stock in September 2024. In addition, on September 16, 2026, HEI made a partial prepayment of $40 million towards the second annual installment due in April 2027. As of September 30, 2026, Hawaiian Electric classified $376 million of the settlement as a current liability and $903 million as a noncurrent liability on HEI’s and the Utilities’ Condensed Consolidated Balance Sheets. On October 28, 2026, HEI made another partial prepayment of $40 million towards the second installment amount due in April 2027.
The following table provides the components of available liquidity as of September 30, 2026. See “Liquidity and capital resources” in Hawaiian Electric’s MD&A below for components of its available liquidity under existing credit facilities as of September 30, 2026.
As of September 30, 2026
(in millions)CapacityOutstandingUndrawn
Electric utility
Total credit, excluding standing commitment letter with HEI1
$550 $— $550 
Total available credit - Electric utility
$550 
All other
Unsecured revolving line of credit$300 $— $300 
At-the-market program250 — 250 
Total available credit and other liquidity - All other
$550 $— $550 
Consolidated cash and cash equivalents224 
Total available liquidity
$1,324 
1     Pursuant to an HEI and Hawaiian Electric Intercompany Borrowing and Investment Policy, Hawaiian Electric may borrow up to $75 million under its standing commitment letter. Hawaiian Electric currently has no borrowings under this commitment. See Note 5 of the Condensed Consolidated Financial Statements for a description of the HEI and Hawaiian Electric Intercompany Borrowing and Investment Policy.
Management believes the Company’s $224 million of cash and cash equivalents as of September 30, 2026, together with the available capacity under Hawaiian Electric’s ABL Facility, HEI’s and Hawaiian Electric’s syndicated credit facilities and
52


HEI’s registered at-the-market offering program, provides sufficient liquidity to meet the Company’s financial obligations and sustain operations in the short term. If additional short-term liquidity is needed, Hawaiian Electric may reduce the pace of capital spending related to non-essential projects, manage O&M expenses, seek additional borrowings, and/or explore asset sales.
The Company expects long-term liquidity will continue to be impacted by the remaining wildfire settlement payments; the Company’s below investment grade credit ratings, which may limit the Company from readily accessing low-cost unsecured, short-term borrowings and other sources of debt and equity financing on favorable terms; and higher working capital requirements resulting from inflation and elevated fuel prices. The Company is currently working with its financial advisors on a financing plan to raise the additional capital necessary to fund the remaining settlement payments for the wildfire tort claims. While management believes the Company will be able to raise the necessary capital, there is no assurance that management’s plans will be successful. If unsuccessful, the Company may pursue other strategic alternatives. See further discussion in “Risk Factors” in Item 1A.
Credit ratings. On April 21, 2026 and July 22, 2026, Moody’s and S&P, respectively, upgraded HEI’s credit ratings. On August 11, 2026, S&P withdrew HEI’s short-term and commercial paper ratings at the Company’s request due to lack of access to the commercial paper market. As of October 30, 2026, the Fitch, Moody’s, and S&P ratings of HEI were as follows:
FitchMoody’sS&P
From1
To
From1
To
From1
To
Long-term issuer default, long-term and issuer credit, respectivelyB+B+Ba3Ba2B+BB-
Short-term issuer default, commercial paper and commercial paper, respectivelyBBNPNPBWR
OutlookPositivePositivePositiveStableWatch PositiveStable
1     As of December 31, 2025. In March 2026, S&P revised HEI’s outlook to “Positive” from “CreditWatch Positive” and affirmed the “B+” issuer credit rating.
NP - Not Prime.
WR - Withdrawn rating.
Note: The above ratings reflect only the view, at the time the ratings are issued or affirmed, of the applicable rating agency, from whom an explanation of the significance of such ratings may be obtained. Such ratings are not recommendations to buy, sell or hold any securities; such ratings may be subject to revision or withdrawal at any time by the rating agencies; and each rating should be evaluated independently of any other rating.

HEI consolidated material cash requirements. Material cash requirements of HEI consolidated include: payments related to settlement of tort-related legal claims and cross claims; Utility-related capital expenditures (including capital expenditures related to wildfires and wildfire mitigations), labor and benefits costs, O&M expenses, fuel and purchase power costs, and debt and interest payments; HEI-related debt and interest payments; and HEI equity contributions to support Mahipapa, Pacific Current’s subsidiary.
The consolidated capital structure of HEI was as follows:
(dollars in millions)September 30, 2026December 31, 2025
Long-term debt, net, including current portion of long-term debt, net
$2,313 56%$2,410 60%
Common stock equity1,802 44 1,606 40 
$4,115 100%$4,016 100%
HEI also periodically makes short-term loans to Hawaiian Electric to meet Hawaiian Electric’s cash requirements, including the funding of loans by Hawaiian Electric to Hawaii Electric Light and Maui Electric, but no such short-term loans to Hawaiian Electric were outstanding as of September 30, 2026.
See Note 5 of the Condensed Consolidated Financial Statements for a brief description of the Company’s loans.
There were no new issuances of common stock through the DRIP or the HEIRSP for the nine months ended September 30, 2026 and 2025.
For the first nine months of 2026, net cash used in operating activities of HEI consolidated was $231 million, which included the first installment of the settlement payment. Net cash used in investing activities for the same period was $363 million, primarily due to capital expenditures. Net cash used in financing activities for the same period was $162 million, primarily due to repayment of long-term debt.
53


Dividends.  The payout ratios for the first nine months of 2026 and full year 2025 were nil. Each quarter, the HEI Board of Directors evaluates whether to declare a dividend and considers many factors in the evaluation including, but not limited to, the Company’s results of operations, liquidity, the long-term prospects for the Company, current and expected future economic conditions, and capital investment alternatives. In August 2023, in consideration of the potential impact from the Maui windstorm and wildfires, the HEI Board of Directors voted to suspend the quarterly cash dividend, starting after the second quarter 2023 dividend, and has not declared a cash dividend since that time. This action was intended to allow the Company to provide additional liquidity and allocate resources to reducing wildfire risk and rebuilding and restoring power and help ensure a strong future for the Utilities. In May 2025, after a temporary suspension of Hawaiian Electric’s quarterly cash dividend to HEI that began with the second quarter 2024 dividend, the Hawaiian Electric Board of Directors approved a $10 million dividend for each quarter of 2025 and an $11 million dividend for each of the first, second and third quarters of 2026. This decision was made after considering several factors, including the continued progress of the Maui windstorm and wildfire settlement, the Utilities’ results of operations and the Utilities’ liquidity position.
MATERIAL ESTIMATES AND CRITICAL ACCOUNTING POLICIES
In preparing financial statements, management is required to make estimates and assumptions that affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities and the reported amounts of revenues and expenses. Actual results could differ significantly from those estimates.
In accordance with SEC Release No. 33-8040, “Cautionary Advice Regarding Disclosure About Critical Accounting Policies,” management has identified the accounting policies it believes to be the most critical to the Company’s financial statements—that is, management believes that these policies are both the most important to the portrayal of the Company’s results of operations and financial condition, and currently require management’s most difficult, subjective or complex judgments.
For information about these material estimates and critical accounting policies, in addition to the critical policy discussed below, see pages 42, 43, 61 and 62 of the MD&A included in Part II, Item 7 of HEI’s and Hawaiian Electric’s 2025 Form 10-K.
Following are discussions of the results of operations, liquidity and capital resources of the electric utility segment.
Electric utility
Recent developments. See also “Recent developments” in HEI’s MD&A and Note 2 of the Condensed Consolidated Financial Statements, which includes disclosures relating to Maui windstorm and wildfires.
For the third quarter of 2026, the Utilities generated net income of approximately $13.5 million compared to $37.0 million for the same quarter of 2025. See “Results of operations” below for variance explanations.
In the third quarter of 2026, kWh sales volume increased 1.0% compared to the same period in 2025. The increase was primarily attributable to less sunny weather, which reduced production from rooftop solar and solar water heaters.
The price of crude oil has increased 39.7% over the same quarter in the prior year. The Utilities are able to pass through fuel costs to customers and have limited fuel cost exposure through a 2% fuel cost-risk sharing mechanism (approximately $3.7 million maximum penalty/reward exposure annually). However, the Utilities expect cash flow impacts from the timing of the disbursements for fuel inventories and subsequent collection of accounts receivable, resulting in higher working capital requirements.
In September 2026, the Consumer Price Index (CPI) increased 3.7% over the last 12 months. In Hawaii, the September 2026 Urban Hawaii (Honolulu) CPI increased 5.2% over the last 12 months. Under the PBR Framework, inflation risk for the Utilities is partially mitigated by an Annual Revenue Adjustment (ARA), which is based on a formula that includes a compounded and non-compounded portion.
•The compounded portion of the ARA includes an adjustment for the annual change in inflation based on the estimated change in Gross Domestic Product Price Index (GDPPI) for the upcoming year, less a predetermined annual productivity factor (currently set at zero), less a 0.22% customer dividend, applied to a basis equal to test year target revenues plus the Rate Adjustment Mechanism revenue in effect prior to the implementation of PBR, plus the prior adjustment year’s compounded portion of the ARA. The inflation factor percentage is the consensus projection of annual percentage change in GDPPI for the following calendar year published by Blue Chip Economic Indicators each October. For the 2026 calendar year, the forecasted 2026 GDPPI was 2.58% (net of the 0.22% customer dividend), measured in October 2025, and became effective in rates on January 1, 2026. For the 2027 calendar year, the forecasted 2027 GDPPI was 2.58% (net of the 0.22% customer dividend), measured in October 2026, and is scheduled to become effective in rates on January 1, 2027, subject to the approval by the Public Utilities Commission of the State of Hawaii (PUC).
54


•The non-compounded portion of the ARA includes a subtractive component, representing the management audit savings commitment, or refund to customers, which was approved by the PUC to supplement the 0.22% customer dividend discussed above to make up the total customer dividend that will be applied to the ARA formula during the multi-year rate period (MRP).
Recent regulatory and legislative developments.
Storm response and restoration costs. Beginning in the first quarter of 2026, the Utilities’ service territories experienced several severe weather events, including two Kona Low storms and an extraordinary period of tropical cyclone activity in the fall of 2026 involving Hurricanes Lala, Lowell and Nolo, that caused significant damage to the Utilities’ electric infrastructure, widespread electric service interruptions and ongoing emergency response and restoration activities. These events resulted in state emergency declarations. On October 21, 2026, the Utilities filed an application with the PUC requesting approval to defer qualifying incremental O&M costs incurred in connection with response and restoration efforts related to the Kona Low storms and the 2026 hurricane season, including related incident-management and general support costs. The requested deferral periods extend from March 13 through December 31, 2026 for the Kona Low storms and from August 14 through December 31, 2026 for the 2026 hurricane season. The application does not request approval to recover the costs, but is intended to preserve the Utilities’ ability to seek recovery through a separate application through the Z-factor mechanism. For the nine months ended September 30, 2026, the Utilities incurred $23 million of O&M costs related to these severe weather events. The Utilities are finalizing their assessment of the incremental portion of these costs and preliminarily estimate that approximately 75% to 85% of the total costs are incremental. The amount ultimately requested in the Utilities’ deferral application may differ from this preliminary estimate and will be subject to PUC approval.
Act 191 (2025). Act 191 allows the State to “step-in” for the Utilities in the case of utility financial distress, providing payment assurance to project owners and addressing concerns regarding some independent power producers’ ability to procure low-cost financing for new renewable energy and storage projects due to the Utilities’ credit ratings. The Utilities entered into a Master Agency Agreement with the State and Step-In Agreements for certain power purchase agreements, effective on September 1, 2026. Act 191 supports the Utilities’ ability to procure energy and gives IPP’s assurance to bid on projects in order to provide customers and communities with safe, reliable and affordable clean energy.
Act 258 (2025). Act 258 directs the PUC to evaluate the viability of a wildfire recovery fund, establish an aggregate liability cap on economic damages from future wildfires and authorizes securitization to finance wildfire safety and resilience infrastructure improvements. Act 258 is intended to support the Utilities’ financial stability and facilitate investment in wildfire mitigation and infrastructure resilience. On October 9, 2026, the Utilities filed an application with the PUC, requesting a financing order authorizing the issuance of approximately $531 million aggregate principal amount of infrastructure resilience bonds, reflecting up to approximately $500 million of infrastructure resilience costs, including carrying costs, and approximately $31 million of estimated upfront financing costs. The proposed costs include wildfire mitigation, grid modernization and related eligible operation and maintenance costs, certain of which remain subject to approval in separate PUC proceedings. The application proposes that the bonds would be issued by a bankruptcy-remote special-purpose entity and repaid through an irrevocable, nonbypassable Infrastructure Resilience Charge collected from customers over a period of up to 30 years. The proposed financing is subject to PUC approval, and the amount, timing, interest rates, customer charges, tax treatment, and other terms may differ from the amounts and assumptions included in the application.
Alternative re-basing. See “Regulatory proceedings” in Note 4 of the Condensed Consolidated Financial Statements.
Affiliate transactions. In June 2025, the Utilities submitted a request with the PUC to terminate or indefinitely suspend all or specific provisions of the Affiliate Transaction Requirements (ATRs). On October 31, 2025, following a September 2025 PUC order providing guidance on topics to be addressed in such a request, HEI and Hawaiian Electric filed a revised request. Beginning in 2024 and continuing into 2026, HEI has embarked on a strategy to divest all of its affiliated companies other than the Utilities, with the intent for the Utilities to be HEI’s sole operating companies. In their filing, HEI and Hawaiian Electric described how termination or suspension of the ATRs would allow implementation of a corporate integration, under which all HEI employees would move to Hawaiian Electric, a few officer positions would manage and operate both HEI and Hawaiian Electric (dual-hatted executives), and the HEI and Hawaiian Electric boards of directors would be composed of a single set of individuals. On March 23, 2026, the PUC issued an order approving the indefinite suspension of the ATR provisions requested by HEI and Hawaiian Electric. The PUC’s approval is subject to specified commitments, including HEI’s divestment of all remaining Pacific Current and affiliated assets, a prohibition on pursuing new diversification activities, continued compliance with Hawaii Revised Statutes Section 269-19.5 governing affiliated interests, and ongoing cooperation with the PUC, including reporting obligations. Pursuant to those reporting requirements, HEI filed a report establishing a divestment timeline for remaining affiliate assets and is providing monthly progress reports to the PUC. The order also requires advance notice to the PUC and the Consumer Advocate prior to seeking any change in recovery of HEI-related expenses in future re-basing or rate proceedings. The PUC subsequently issued an order confirming that all ATR compliance filings and reporting are likewise suspended and closed the docket. HEI and Hawaiian Electric implemented the integration in June 2026. For the three months
55


ended September 30, 2026, HEI’s integration costs incremental to Hawaiian Electric amounted to approximately $5.6 million (pretax).
System reliability. Since the August 2023 Maui windstorm and wildfires, the Utilities have implemented wildfire safety measures in areas identified as having higher wildfire risk across their service territories (Oahu, Maui County, and Hawaii Island). These measures include more sensitive protective settings that can interrupt service more quickly when potential faults are detected, blocking automatic reclosing in certain circumstances, and conducting visual patrols before restoring service. While these measures are intended to reduce wildfire ignition risk, they have increased, and may continue to increase, the frequency and duration of certain transmission and distribution outages and adversely affect Transmission and Distribution (T&D) System Average Interruption Duration Index (SAIDI) and System Average Interruption Frequency Index (SAIFI).
On January 10, 2025, the Utilities filed their 2025-2027 Wildfire Mitigation Plan (WMP), formerly referred to as the Wildfire Safety Strategy) with the PUC. The PUC approved the WMP on December 31, 2025 and directed the Utilities to submit a 2026-2027 WMP Update, which the Utilities filed on April 13, 2026. The WMP Update primarily reflects 1) maturation of the wildfire mitigation framework following the 2025-2027 WMP, 2) direct responses to the PUC’s areas of continuous improvement identified in a decision and order, and 3) other non-substantive revisions for clarity. The Utilities continue to refine these measures and deploy reliability mitigations while prioritizing the safety of customers and communities during elevated wildfire conditions. Public Safety Power Shutoff events, if initiated, could also result in extended service interruptions. For additional information regarding the Public Safety Power Shutoff program, see “Wildfire safety measures” below.
Hawaii Island has two generators out of service for extended maintenance, one of which is expected to return to service in the fourth quarter of 2026. While these units are unavailable for maintenance, during certain periods there may be reductions in generation reserve margins and failure of other generators, which could risk generation shortfalls.
For a discussion regarding the impact of the Maui windstorm and wildfires on the Utilities’ liquidity and capital resources, see discussion below under “Financial Condition–Liquidity and capital resources.”
56


RESULTS OF OPERATIONS
Three months ended September 30Increase
20262025(decrease)(dollars in millions, except per barrel amounts)
$1,007 $787 $220 
Revenues. Net increase largely due to:
$173 
higher fuel oil prices and higher kWh generated1
38 
higher purchased power energy cost and higher PPAC revenues, partially offset by lower kWh purchased1, 2
8 higher revenue from ARA
2 higher Performance Incentive Mechanisms revenue
1 higher MPIR/EPRM revenue
(2)lower fuel cost risk-sharing adjustment
399 241 158 
Fuel oil expense1. Net increase largely due to higher fuel oil prices, higher kWh generated, and worse fuel efficiency
218 184 34 
Purchased power expense1, 2. Net increase largely due to higher purchased power energy cost, and the settlement of liquidated damages with IPPs in 2025, offset in part by lower kWh purchased
182 162 20 
Operation and maintenance expenses. Net increase largely due to:
16 storm restoration and repairs and response cost
6 HEI integration costs
5 higher property and general liability insurance costs
4 higher employee benefits and incentive program costs
2 higher general claims
(2)lower IT system maintenance costs
(3)
lower wildfire mitigation program costs expensed3
(3)fewer generating facility overhauls performed
(4)write-off of preliminary engineering costs in 2025
160 138 22 
Other expenses. Increase due to higher revenue taxes and higher depreciation expense due to increasing investments to integrate more renewable energy and improve customer reliability and system efficiency
48 63 (15)
Operating income. Decrease largely due to higher operation and maintenance expenses, lower fuel cost risk-sharing adjustment, and higher depreciation, offset in part by higher revenue from ARA
14 48 (34)
Income before income taxes. Decrease largely due to lower operating income and higher interest expense, primarily due to the accretion related to the remaining wildfire tort-related settlement liability (see Note 2 of the Condensed Consolidated Financial Statements) and interest on the 2025 Notes started in September 2025, offset in part by higher AFUDC related to increased capital expenditures
13 37 (24)
Net income for common stock. Decrease due to lower income before income taxes. See below for effective tax rate explanation
2,257 2,234 23 
Kilowatthour sales (millions)4
$154.87 $98.20 $56.67 Average fuel oil cost per barrel
57


Nine months ended September 30Increase
20262025(decrease)(dollars in millions, except per barrel amounts)
$2,688 $2,268 $420 
Revenues. Net increase largely due to:
$306 
higher fuel oil prices and higher kWh generated1
89 
higher purchased power energy cost and higher PPAC revenues, partially offset by lower kWh purchased1, 2
23 higher revenue from ARA
3 higher Performance Incentive Mechanisms revenue
3 higher MPIR/EPRM revenue
(4)lower fuel cost risk-sharing adjustment
972 690 282 
Fuel oil expense1. Net increase due to higher fuel oil prices, higher kWh generated, and worse fuel efficiency
587 505 82 
Purchased power expense1, 2. Net increase largely due to higher purchased power energy cost, the addition of Stage 1 renewable projects, and the settlement of liquidated damages with IPPs in 2025, offset in part by lower kWh purchased
511 463 48 
Operation and maintenance expenses. Net increase largely due to:
23 storm restoration and repairs and response cost
19 higher generation and transmission and distribution operation and maintenance
12 higher property and general liability insurance costs
8 higher employee benefits and incentive program costs
6 HEI integration costs
3 higher general claims
(4)write-off of preliminary engineering costs in 2025
(19)
lower wildfire mitigation program costs expensed3
(162)— (162)
Wildfire tort-related claims. Decrease due to the remeasurement of the remaining wildfire tort-related settlement liability at present value and insurance recoveries (see Note 2 of the Condensed Consolidated Financial Statements)
451 407 44 
Other expenses. Increase due to higher revenue taxes and higher depreciation expense due to increasing investments to integrate more renewable energy and improve customer reliability and system efficiency
329 203 126 
Operating income. Increase largely due to the remeasurement of the wildfire tort-related claims, higher revenues from ARA, performance incentive mechanisms, and MPIR/EPRM, offset in part by higher operation and maintenance expenses, higher depreciation, and lower fuel cost risk-sharing adjustment
242 160 82 
Income before income taxes. Increase largely due to higher operating income, higher AFUDC related to increased capital expenditures, and higher interest income earned, partially offset by higher interest expense, primarily due to the accretion related to the remeasurement of the remaining wildfire tort-related settlement liability at present value (see Note 2 of the Condensed Consolidated Financial Statements) and interest on the 2025 Notes started in September 2025
187 124 63 
Net income for common stock. Increase due to higher income before income taxes. See below for effective tax rate explanation
6,244 6,231 13 
Kilowatt-hour sales (millions)4
$132.00 $101.00 $31.00 Average fuel oil cost per barrel
476,286 474,038 2,248 Customer accounts (end of period)
1The rate schedules of the Utilities currently contain Energy Cost Recovery Clauses (ECRCs) through which changes in fuel oil prices and certain components of purchased energy costs are passed on to customers.
2The rate schedules of the Utilities currently contain Purchased Power Adjustment Clauses (PPACs) through which changes in purchased power expenses (except purchased energy costs) are passed on to customers.
3 Starting in the fourth quarter of 2025, certain Wildfire Mitigation Plan costs were deferred and continued to be deferred in 2026.
58


4 kWh sales were higher compared to the same quarter in prior year. The increase was primarily attributable to less sunny weather, which reduced production from rooftop solar and solar water heaters.
The Utilities’ effective tax rates for the first nine months of 2026 and 2025 were 23% and 22%, respectively. For the third quarters of 2026 and 2025, the Utilities’ effective tax rates were 3% and 23%, respectively. The higher effective tax rate for the first nine months of 2026, compared to the same period in 2025, was primarily due to discrete tax expense from higher pretax income related to the remeasurement of the wildfire tort-related settlement liability to present value (net of accretion); partially offset by the research and development tax credit claims recognized. The lower effective tax rate for the third quarter of 2026, compared to the same period in 2025, was primarily due to discrete tax benefits recognized in the third quarter of 2026 from the lower pretax income related to the accretion of wildfire tort-related settlement liability, and the research and development tax credit claims recognized.
Hawaiian Electric’s consolidated return on average common equity (ROACE) was 13.4% and 12.8% for the twelve months ended September 30, 2026 and 2025, respectively.
For more information of the Utilities’ incremental items related to the Maui windstorm and wildfires for the three and nine months ended September 30, 2026 and 2025, see “Results of operations—Maui windstorm and wildfires related items, net” in HEI’s MD&A.
See “Economic conditions” in the “HEI consolidated” section above.
Executive overview and strategy.  The Utilities provide electricity on all the principal islands in the State of Hawaii, other than Kauai, to approximately 95% of the State’s population, and operate five separate grids. The Utilities’ mission is to empower their communities and customers with safe, reliable, resilient, affordable, and clean energy. The goal is to create a safe, modern, resilient, flexible, and dynamic electric grid that protects Hawaii from impacts of climate dynamics, position the Utilities to achieve the expectations of their customers and communities and earn their trust, and achieve Hawaii’s decarbonization goals that are aligned with the statutory goal of 100% renewable portfolio standard and net-negative carbon emissions by 2045.
Wildfire safety measures. In January 2025, the Utilities developed and filed with the PUC their 2025-2027 WMP, which identifies risk mitigation strategies to perform over the next three years across their service territories. The measures, including wildfire risk analysis, implementation of the Public Safety Power Shutoff (PSPS) program, grid design changes, and system hardening, have been integrated into the 2025-2027 WMP. The strategies and actions include additional operational changes, grid hardening work, enhanced inspections and vegetation management, and risk modeling to inform and prioritize hardening work and operational actions. On December 31, 2025, the PUC approved the Utilities’ 2025-2027 WMP and directed the Utilities to submit a WMP Update bi-annually. On April 13, 2026, the Utilities submitted their 2026-2027 WMP Update to the PUC. On June 25, 2026, the PUC approved the Utilities’ request for Exceptional Project Recovery Mechanism (EPRM) cost recovery estimated at $350 million. See also “Utility projects” in Note 4 of the Condensed Consolidated Financial Statements.
The PSPS program calls for the Utilities to preventatively de-energize circuits in areas identified as high fire risk during certain weather conditions. The PSPS program launched on July 1, 2024 has been used when it is needed, to protect customers, communities and employees. Since the July 2024 implementation, the Utilities have continued to mature the PSPS program as it has gained experience executing the program along with public safety partners, communities, and residents. For example, the Utilities now have an in-house meteorologist and a 24/7 watch office that monitor hazardous conditions through additional strategically placed weather stations to enhance their forecasting capability and an artificial intelligence wildfire detection camera for situational awareness of localized hazardous conditions. The PSPS protocols will evolve over time as more analytical, forecast, and situational awareness capabilities and wildfire mitigations are deployed. De-energizing circuits in high wildfire risk areas will lead to extended interruptions for many customers, even if not in a high wildfire risk area. The Utilities will continue to work with key stakeholders in balancing the risk of utility-related wildfires with the risk to the public arising from not having electricity.
Transition to a decarbonized and sustainable energy future.  The Utilities are fully committed to leading and enabling pathways to a decarbonized and sustainable energy future for Hawaii. A sustainable energy future is one that focuses on delivering electricity safely, reliably and affordably, strengthening resilience and shifting away from fossil-fueled resources. The Utilities believe that a holistic approach to evolving climate dynamics is needed, working on both climate mitigation efforts along with climate adaptation efforts. Climate mitigation requires achieving the Utilities’ decarbonization and renewable energy commitments, facilitating and promoting beneficial electrification, and deploying carbon removal and offsets among other levers to reduce statewide emissions.
Climate action plan. In the fourth quarter of 2021, the Utilities outlined their Climate Action Plan to cut carbon emissions from power generation 70% by 2030, compared to a 2005 baseline. The emissions covered by this goal include stack emissions from generation owned by Hawaiian Electric and independent power producers (IPPs) who sell electricity to the Utilities. Since
59


that time, delays and cancellations in the commercial operation of new renewable third-party generation resources and higher costs as a result of supply chain disruptions and inflationary pressures, as well as federal policies have slowed the pace of progress toward reducing greenhouse gas emissions. Also, see the “Developments in renewable energy efforts—New renewable PPAs” section below. The One Big Beautiful Act signed into law on July 4, 2025 may impact the ability of recently selected and new wind and solar projects to qualify for federal tax credits. Any loss in renewable energy tax credits could lead to project risk for new wind and solar projects in development and will likely result in higher prices for new renewable projects, which rely on such incentives to provide clean, affordable energy. Further, new tariffs imposed on equipment and materials used in the construction of renewable facilities will have an impact on pricing of new renewable projects. As a result of these challenges and the downgrade of Hawaiian Electric’s credit ratings after the Maui windstorm and wildfires, the Utilities expect the planned 70% reduction in carbon emissions to be achieved later than the original 2030 target date. However, the Utilities will continue to replace significant amounts of fossil fuel generation with renewable energy between now and 2030 RPS goals and expect to meet or exceed the State of Hawaii’s 2030 RPS goals. The Utilities estimate that 2025 carbon emissions were approximately 25% below the 2005 baseline, compared with approximately 27% below the baseline in 2024, reflecting an increase in emissions year over year due to higher customer electricity usage. This represented an increase in emissions compared to the 27% reduction in 2024 due to higher customer electric usage. As renewable energy replaces fossil fuel generation, carbon emissions are expected to continue to decline over time.
Hawaiian Electric has also committed to achieving net zero carbon emissions from power generation by 2045 or sooner. While the timing of the Utilities’ carbon reduction goals will be impacted by federal policies, key elements of the 2030 plan have already been completed or remain on track to be completed by 2030, including the closure of AES Hawaii, Inc., the State’s last coal-fired IPP plant, increasing rooftop solar capacity by more than 50% over 2021 levels, retiring six fossil fuel generating units, increasing grid-scale and customer-owned storage, expanding geothermal resources, and creating customer incentives for using clean, lower-cost energy at certain times of the day and using less fossil-fueled energy at night. The retirement of fossil-fueled generating units is consistent with state policy and supported by Hawaii state law.
State of Hawaii laws and policies. In January 2025, the State of Hawaii issued two key policy documents and an alternative fuel study. The PUC issued its 2024 Inclinations on the Future of Energy in Hawaii (2024 PUC Inclinations). The 2024 PUC Inclinations are intended to provide a guide for the completion of energy infrastructure upgrades for public safety, reliability and resiliency. This includes among other items, strategic hardening, diversification and enhancements of transmission and distribution systems, expedited replacement of older fossil fired generation, streamlined interconnection for renewable utility scale and distributed energy resources, including a specific goal to limit fossil fuel generation to no more than 40% on each island by 2030, software and hardware improvement to prevent cybersecurity threats, creation of resilience hubs, and integration of electric, gas, and renewable resources to support continuity of energy, telecommunications, water and wastewater services. The 2024 PUC Inclinations specifically state that “Strategic ownership of new generation (by the Utilities) may be beneficial, especially when such ownership stabilizes utility finances, benefits from low-interest federal loans or advances other objectives such as operational accountability, resilience and public safety.”
Governor Josh Green issued Executive Order No. 25-01, Accelerating Hawaii’s Transition Toward 100 Percent Renewable Energy (EO 25-01). EO 25-01 sets forth collective actions to accelerate the State’s decarbonization, stabilize and reduce energy costs, lower the State’s carbon footprint, strengthen energy security, and gain access to capital for the energy transition. Among other actions, EO 25-01 calls for 100% renewable electricity production in the counties of Hawaii and Maui by 2035 and achieving a 70% reduction of Oahu’s greenhouse gas emissions reductions from the electricity sector by 2035, using 2005 as a baseline, calls for the maximization of distributed solar energy paired with energy storage, including the installation of 50,000 new distributed energy resources by 2030, accelerating permitting tied to renewable energy, approving interconnection, and addressing energy burdens on low- and moderate-income residents.
The Hawaii State Energy Office’s Alternative Fuel, Repowering and Energy Transition Study (Alternative Fuel Study) expresses concern about the speed of the transition to renewable energy and cites the continued reliance on imported oil as a driver of high bills and intense carbon emissions. The report makes a case for the use of liquefied natural gas on Oahu to replace low sulfur fuel oil during the transition to 100% renewable energy, and names several entities as potential investors that could help speed the transition. On October 6, 2025, the Office of the Governor of the State of Hawaii, JERA Co., Inc. (JERA Co.), Japan’s largest power producer, and its U.S. subsidiary, JERA Americas Inc. (JERA Americas), signed a non-binding Strategic Partnering Agreement that establishes a framework for long-term collaboration to support Hawaii’s decarbonization goals and energy transition. The Strategic Partnering Agreement supports the implementation of the Hawaii State Energy Office’s Alternative Fuel Study to pursue fuel diversification, including liquified natural gas, to reduce near-term reliance on oil. On March 17, 2026, JERA Co. provided a proposal to the State of Hawaii to modernize Oahu’s energy system to accelerate the replacement of oil-fired generation with new energy assets, including an approximately 500-MW hybrid combined-cycle and simple-cycle power facility supported by offshore liquefied natural gas import infrastructure. On July 17, 2026, JERA Americas filed a notice of intent with the PUC to file a Certificate of Public Convenience and Necessity (CPCN) for the development, ownership, and operation of a new, proposed regulated power generation company (GenCo) and associated
60


utility-scale generation facilities on Oahu totaling 500 MW. In the notice, JERA Americas stated that it intends to file the CPCN application in the first quarter of 2027. JERA Americas’ notice indicated that its proposal is not intended to replace Hawaiian Electric’s role as the retail utility or system operator, or to displace Hawaiian Electric’s continued ownership and operation of existing generation resources, but is intended to provide regulated wholesale generation service within the existing integrated electric system. Hawaiian Electric believes that any significant new generation resource serving Oahu customers should be evaluated through a transparent, competitive procurement process designed to ensure that customers receive the best overall value and that all qualified market participants have an opportunity to compete. Hawaiian Electric believes that competition, together with oversight by the PUC and input from all stakeholders pursuant to the State’s competitive bidding framework, provides an effective mechanism to evaluate project costs, reliability benefits, operational characteristics, commercial viability, and customer impacts. Accordingly, on July 17, 2026, Hawaiian Electric filed a request with the PUC to open a new proceeding and establish an expedited process for approval of a request for proposals (RFP) for approximately 500 MW of fuel-flexible firm generation capacity on Oahu. Hawaiian Electric proposed that the RFP be administered concurrently with its Integrated Grid Planning (IGP) procurement process and that proposals received through the respective procurements be evaluated through a single integrated portfolio assessment to identify the resources that provide the greatest overall benefit to customers. On August 5, 2026 the PUC issued a letter responding to the Utilities’ July 17 request, with the PUC noting that a demonstration of need for the additional 500 MW of fuel‑flexible firm generation would be required, and without demonstrating need, it is not reasonable and in the public interest to open a docket or otherwise expedite review and approval of Hawaiian Electric’s Firm RFP request at this time. The timing, scope, and outcome of the PUC’s consideration of any future proceeding relating to JERA Americas’ proposed CPCN application, remain uncertain.
The Utilities are engaged in planning activities designed to support the State’s energy policy objectives, including the transition to a more affordable, reliable, and sustainable energy system. These planning efforts evaluate a range of resource, fuel, and technology options and are informed by state energy policy guidance and stakeholder input. Importantly, the 2024 PUC Inclinations, EO 25-01, and Alternative Fuel Study all recognize that to achieve the State’s ambitious goals is a collective effort that will require government agencies, electric utilities, and private stakeholders to work together, acknowledging that each of these groups has an important role to play. The 2024 PUC Inclinations for example state: “Energy utilities, government agencies and private stakeholders must embrace an ethos of collective responsibility to confront and effectively mitigate the vulnerabilities revealed by Lahaina’s heartbreaking tragedy, the COVID pandemic, ongoing global unrest, cybersecurity threats and the overarching climate crisis.” The PUC later states: “The Commission does not expect energy utilities to accelerate their transformation without regulatory assistance and third-party resources.” All three documents also recognize the progress made to date towards the State’s renewable energy goals. The Utilities remain committed to working with all stakeholders to support the State’s energy policy objectives and reach Hawaii’s ambitious renewable energy goals.
Hawaii’s renewable portfolio standard law requires electric utilities to meet an RPS of 30%, 40%, 70% and 100% by December 31, 2020, 2030, 2040 and 2045, respectively. Hawaii law has also established a target of sequestering more atmospheric carbon and greenhouse gases than emitted within the State by 2045. The Utilities’ strategies and plans are fully aligned in meeting these targets (see also “Integrated Grid Planning” below).
The Utilities have made significant progress on the path to clean energy and have been successful in achieving RPS goals. To date, the Utilities have met all of the statutory RPS goals, including exceeding the latest milestone RPS target of 30% for 2020, where it achieved an RPS of 34.5%. The Utilities expect to continue to meet the RPS milestones under the amended RPS law. See “Developments in renewable energy efforts” below.
If the Utilities are not successful in meeting the RPS targets as mandated by law, the PUC could assess a penalty of $20 for every megawatt-hour (MWh) that an electric utility is deficient. Based on the level of total generation in 2025, a 1% shortfall in meeting the 2030 RPS requirement of 40% would translate into a penalty of approximately $2.1 million. The PUC has the discretion to reduce the penalty due to events or circumstances that are outside an electric utility’s reasonable control, to the extent the event or circumstance could not be reasonably foreseen and ameliorated. In addition to penalties under the RPS law, failure to meet the mandated RPS targets would be expected to result in a higher proportion of fossil fuel-based generation than if the RPS target had been achieved, which in turn would be expected to subject the Utilities to limited commodity fossil fuel price exposure under a fuel cost risk-sharing mechanism. The fuel cost risk-sharing mechanism apportions 2% of the fuel cost risk to the Utilities (and 98% to ratepayers) and has a maximum exposure (or benefit) of $3.7 million. Conversely, the Utilities have incentives under PIMs that provide a financial reward for accelerating the achievement of renewable generation as a percentage of total generation, including customer supplied generation. In 2025, the Utilities achieved a 36.8% RPS accruing a reward of $1.9 million based on $10/MWh in exceedance of 35.0% RPS. In 2026, the Utilities are eligible for a reward of $10/MWh in exceedance of 36.0% RPS.
The Utilities are fully aligned with, and supportive of, state policy to achieve a decarbonized future and have made significant progress in reducing emissions through renewable energy and electrification. This alignment with state policy is reflected in management compensation programs and the Utilities’ long-range plans, which include aspirational targets in order to catalyze action and accelerate the transition away from fossil fuels throughout their operations at a pace more rapid than
61


dictated by current law. The long-range plans, including aspirational targets, serve as guiding principles in the Utilities’ continued transformation, and are updated regularly to adapt to changing technology, costs, and other factors. While there is no financial penalty for failure to achieve the Utilities’ long-range aspirational objectives, the Utilities recognize that there are environmental and social costs from the continued use of fossil fuels.
The State of Hawaii’s policy is supported by the regulatory framework and includes a number of mechanisms designed to maintain the Utilities’ financial stability during the transition toward the State’s decarbonized future. Under the sales decoupling mechanism, the Utilities are allowed to recover from customers, target test year revenues, independent of the level of kWh sales, which have generally trended lower over time as privately-owned distributed energy resources have been added to the grid and energy efficiency measures have been put into place. Other regulatory mechanisms under the PBR Framework reduce some of the regulatory lag during the multi-year rate plan, such as the annual revenue adjustment to provide annual changes in utility revenues, including inflationary adjustments, and the EPRM, which allows the Utilities to recover and earn on certain approved eligible projects placed into service. See “Regulatory proceedings” in Note 4 of the Condensed Consolidated Financial Statements.
Integrated grid planning. Achieving high levels of renewable energy and a carbon free electric system will require modernizing the grid through coordinated energy system planning in partnership with local communities and stakeholders. To accomplish this, the Utilities are implementing an innovative systems approach to energy planning intended to yield the most cost-effective renewable energy and decarbonization pathways that incorporates customer and stakeholder input.
The IGP process utilizes an inclusive and transparent stakeholder engagement model to provide an avenue for interested parties to engage with the Utilities and contribute meaningful input throughout the IGP process. The first cycle of the IGP was accepted by the PUC on March 7, 2024, and is the culmination of more than five years of partnership with stakeholders and community members across the islands. Together, they forecasted future energy needs and identified strategies to meet Hawaii’s growing energy demand with 100% renewable resources. The Integrated Grid Plan proposes actionable steps to decarbonize the electric grid on the State of Hawaii’s timeline, with a flexible framework that can adapt to future technologies. On January 2, 2026, the PUC opened the Second Cycle of the Integrated Grid Plan to continue to plan for future resources needed on the Utilities’ systems.
Demand response programs. Pursuant to PUC orders, the Utilities are developing an integrated Demand Response Portfolio Plan that will enhance system operations and reduce costs to customers. The reduction in cost for the customer will take the form of either rates or incentive-based programs that will compensate customers for their participation individually, or by way of engagements with turnkey service providers that contract with the Utilities to aggregate and deliver various grid services on behalf of participating customers and their distributed assets.
In 2022, the Utilities were approved to expand the Energy Demand Response Program (EDRP) on the islands of Maui and Oahu, which provides approximately 8 MW and 43 MW on Maui and Oahu, respectively. The PUC approved the cost recovery of the additional incentives for both Oahu and Maui through the Demand Side Management Surcharge.
During the time that EDRP was available, Bring Your Own Device Level 1 was launched on April 1, 2025, to succeed EDRP, which closed on July 1, 2024, on Oahu. The Bring Your Own Device Level 1 later evolved into Bring Your Own Device Plus, which began on May 15, 2025. Enrollment for the Bring Your Own Device Plus program will be available until total enrolled program capacity reaches 50 MW statewide, 3 MW of which is currently provided statewide.
Grid modernization. The overall goal of the Grid Modernization Strategy (GMS) is to deploy modern grid investments at an appropriate priority, sequence and pace to cost-effectively maximize flexibility, minimize the risk of redundancy and obsolescence, deliver customer benefits and enable greater resiliency, reliability, distributed energy resources and renewable energy integration.
After the Utilities were unsuccessful in securing federal funding for the project under the Infrastructure Investment and Jobs Act in 2024, the Utilities filed an amended PUC application for the second phase of Grid Modernization on September 21, 2026. The amended application proposes the establishment of a Distribution Operations Platform and other project components in place of an Advanced Distribution Management System and reduces the estimated total project costs from $215.2 million to $121.6 million, subject to PUC approval.
Investigation on the establishment of wheeling. On July 1, 2024, the PUC issued an order to institute a proceeding to investigate the establishment of electricity wheeling policies and procedures for the electric utilities for the State of Hawaii. The PUC stated that it intended to address matters using lessons learned in the initial three docket phases to explore implementation of an intragovernmental wheeling policy and an evaluation of retail wheeling in subsequent phases, as appropriate.
62


On August 29, 2025, the PUC issued an order dividing the proceeding into two tracks, Track A, focused on retail wheeling, and Track B, focused on an intragovernmental credit share program that was the subject of the prior procedural schedule in the docket.
On October 22, 2025, the Utilities filed feedback on the PUC’s proposed Track B, Intragovernmental Shared Credit Program. The Utilities support the program but emphasize that careful program design is necessary to ensure technical feasibility, administrative efficiency, and fairness for all customers. The Utilities agree that the program could support the development of renewable energy zones by unlocking government lands for renewable projects and enabling proactive transmission planning.
On November 10, 2025, the Utilities filed their Track A Retail Wheeling Straw Proposal. The Utilities’ Straw Proposal provides an overview for the application process, a discussion of technical standards for grid interconnection and monitoring, provisions for metering and monitoring and a discussion of pricing mechanisms in the tariff structure and how to appropriately allocate wheeling costs. The Consumer Advocate and stakeholders provided comments on the Utilities’ Straw Proposal by January 20, 2026. The Utilities filed responses to the comments of the Consumer Advocate and stakeholders on March 6, 2026. On April 7, 2026, the PUC held a technical conference and stakeholder workshop where the Utilities provided a presentation on the Track A Retail Wheeling Straw Proposal and addressed the various comments and questions raised by the PUC, Consumer Advocate, and stakeholders in the proceeding.
On July 29, 2026, the PUC issued an order providing guidance on the proposed Track A retail wheeling program and addressing procedural matters. The order established an Oahu-only Retail Wheeling Pilot Program framework intended to satisfy Act 266 by January 1, 2027, and directed the Utilities to file an updated Track A proposal, draft tariff, and proposed pilot framework by August 19, 2026. The updated proposal must address, among other things, cost allocation, customer protections, technical standards, reporting requirements, and considerations for future program enhancements and expansion. The PUC directed the Utilities to include an Oahu-only pilot proposal, with a recommended two- to five-year duration, a plan for data collection and reporting on billing impacts, lost utility revenues and developer profits, opportunities for stakeholder feedback, annual performance monitoring, and recommendations for future expansion. In addition, the order provided staff guidance that the updated proposal should address refinements to the application and interconnection processes, a draft wheeling agreement and consumer protection disclosures, necessary revisions to Rule 14H and interconnection requirements, wheeling fee and administrative metering fee methodologies, curtailment clarification, and sample bill credit and wheeling fee calculations. The PUC further adopted a statement of issues for Track A focused on whether the updated proposal and draft tariff comply with Act 266, and whether the proposed application process, technical standards, pricing mechanism, proposed allocation of wheeling costs, and proposed pilot framework are reasonable and in the public interest. The order also adopted a supplemental Track A procedural schedule to govern the remainder of Track A unless otherwise ordered by the PUC.
On September 2, 2026, the Utilities filed their updated proposal for Track A retail wheeling. The updated proposal establishes a 10 MW retail wheeling pilot on Oahu, supported by corresponding utility-scale storage intended to maintain grid reliability and minimize impacts to non-participating customers. The Consumer Advocate and other parties to the proceeding filed statements of position on the updated proposal, and the Utilities filed their reply statement of position on October 30, 2026. The Utilities stated that the updated proposal is intended to implement Act 266 through a measured pilot designed to facilitate additional renewable energy development while addressing grid reliability and potential cost impacts to non-participating customers. The Utilities also identified minimum requirements that would apply if wheeling generators were permitted to operate prior to implementation of the utility-scale storage resource and stated that such operation could result in cost shifting and operational risks. In their reply statement of position, the Utilities continued to support approval of the proposed storage and cost recovery framework.
The PUC issued an order on September 3, 2026 proposing an updated intragovernmental shared credit program, referred to as the Public Power Program, and established a procedural schedule for Track B of the proceeding. The order directed parties to the proceeding to respond to the PUC’s proposal within 45 days. Parties filed responses on October 19, 2026. On October 22, 2026, the PUC extended the response deadline to October 26, 2026, for all parties that had not yet responded. Parties that had not yet responded to the PUC’s proposal filed their responses on October 26, 2026.
Regulatory proceedings. On December 23, 2020, the PBR D&O was issued, establishing the PBR Framework. The PBR Framework implemented a five-year multi-year rate period (MRP), during which there will be no general rate case applications. On July 17, 2026, the Utilities filed their application for approval of their re-basing proposal. See “Regulatory proceedings” in Note 4 of the Condensed Consolidated Financial Statements for a discussion of re-basing, PBR Framework and decoupling.
Regulated returns. As part of the PBR Framework’s annual review cycle, the Utilities track their rate-making ROACEs as calculated under the earnings sharing mechanism, which includes only items considered in establishing rates. At year-end, each utility’s rate-making ROACE is compared against its ROACE allowed by the PUC to determine whether earnings sharing has been triggered. The D&O in the PBR proceeding modified the earnings sharing mechanism to a symmetric arrangement.
63


Effective with annual earnings for 2021, the earnings sharing will be triggered for achieved rate-making ROACE outside of a 300 basis points dead band above and below the current authorized rate-making ROACE of 9.5% for each of the Utilities (i.e., above 12.5% or below 6.5%). Earnings sharing credits or recoveries will be included in the biannual report (formally known as annual decoupling filing) to be filed with the PUC in the spring of the following year.
On August 31, 2023, the PUC issued an order temporarily suspending the Earnings Sharing Mechanism (ESM) until further notice. The intent of the order is to address the unintended consequence of customers potentially bearing the costs associated with the Maui windstorm and wildfires through the operation of the ESM without prior PUC review. In accordance with the order, the ESM remains suspended and there is no earnings sharing adjustment for 2026 as of September 30, 2026.
Actual and PUC-allowed returns, as of September 30, 2026, were as follows:
Ratio (%)
Rate-making
Return on rate base (RORB)1
Book ROACE2
Rate-making ROACE3
Twelve months ended 
September 30, 2026
Hawaiian ElectricHawaii Electric LightMaui ElectricHawaiian ElectricHawaii Electric LightMaui ElectricHawaiian ElectricHawaii Electric LightMaui Electric
Utility returns8.21 5.40 4.41 19.68 8.58 5.31 10.98 5.83 3.56 
PUC-allowed returns7.37 7.52 7.43 9.50 9.50 9.50 9.50 9.50 9.50 
Difference0.84 (2.12)(3.02)10.18 (0.92)(4.19)1.48 (3.67)(5.94)
1     Based on recorded operating income and average rate base, both adjusted for items not included in determining electric rates.
2     Based on recorded net income divided by average common equity.
3    Based on recorded net income adjusted to remove items not included in determining electric rates, divided by rate making equity.
Rate-making calculations remove the impacts of the Settlement Agreements and eliminate the balances for the asset-based lending facility (ABL Facility) on a stand-alone company basis. The Utilities have stated that customers will not be impacted by payments related to the Settlement Agreements for the Maui windstorm and wildfires, which totals $1.9 billion (see Note 2 of the Condensed Consolidated Financial Statements). The ABL Facility contains certain intercompany costs related to the ABL Facility that are eliminated on a consolidated basis, and these transactions are eliminated on a stand-alone company basis for rate-making. Therefore, the rate-making returns were adjusted to exclude these impacts.
The gap between PUC-allowed ROACEs and the ROACEs achieved is generally due to the exclusion of certain expenses from rates (for example, incentive compensation and charitable contributions), and depreciation, other O&M expense and return on rate base that are in excess of what is currently being recovered through rates (the last rate case plus authorized Rate Adjustment Mechanism revenue and ARA revenues). Maui Electric's returns are lower than authorized levels due to higher sustained maintenance and investments than what is recovered in current rates.
Developments in renewable energy efforts.  The Utilities continue to procure renewable energy ambitiously. The Utilities’ renewable energy goals depend, in large part, on the success of renewable projects developed and operated by independent power producers. Significant project delays or failures of these projects increase the risk of the Utilities not meeting the renewable portfolio standards or other climate related goals, eligibility for Performance Incentive Mechanisms associated with the speed of increasing renewable generation, and the ability to retire fossil fuel units. Developments in the Utilities’ efforts to further their renewable energy strategy include renewable energy projects discussed in Note 4 of the Condensed Consolidated Financial Statements and the following:
New renewable PPAs.
•Under a request for proposal process governed by the PUC and monitored by independent observers, the Utilities issued Stage 2 Renewable Request for Proposals (RFPs) for Oahu, Maui and Hawaii Island and Grid Services RFP on August 22, 2019. Of the 11 PPAs filed by the Utilities, six PPAs were declared null and void by the independent power producers and one PPA was mutually terminated. The four remaining projects have received PUC approval. The Utilities filed three requests with the PUC for approval of amendments related to previously-approved PPAs for changes in pricing and/or guaranteed commercial operations dates to support completion of the projects while maintaining system reliability. The PUC approved of all three amendments. To date, two Stage 2 projects have reached commercial operations. See also “Purchase commitments” in Note 4 of the Condensed Consolidated Financial Statements. Separately, the PUC approved the Utilities’ Waena Battery Energy Storage System project under Stage 2. See “Utility projects” in Note 4 of the Condensed Consolidated Financial Statements.
64


A summary of the remaining four approved Stage 2 PPAs and the self-build project is as follows:
UtilitiesNumber of contractsTotal photovoltaic size (MW)BESS Size (MW/MWh)Guaranteed commercial operation datesContract term (years)
Total projected annual lump sum payment (in millions)
PPAs
Hawaiian Electric37979/443
5/17/241, 6/7/24 & 9/1/241
20 & 25$31.4 
Hawaiian Electric1
N/A
185/56512/19/232024 
Self-build
Maui Electric140/16011/30/26— 
Total579304
/
1,168$55.4 
1     Project delays have resulted in guaranteed commercial operations date being missed.
The total projected annual payment of $55.4 million for these PPAs will be recovered through the PPAC to the extent such costs are not included in base rates.

Tariffed renewable resources.
•As of September 30, 2026, there were approximately 755 MW, 162 MW, and 167 MW of installed distributed renewable solar energy technologies at Hawaiian Electric, Hawaii Electric Light and Maui Electric, respectively, for tariff-based private customer generation programs, namely Standard Interconnection Agreement, Net Energy Metering, Net Energy Metering Plus, Customer Grid Supply, Customer Self Supply, Customer Grid Supply Plus, Interim Smart Export, Smart Distributed Energy Resources — Export, Smart Distributed Energy Resources — Non-Export, and Community-Based Renewable Energy. As of September 30, 2026, an estimated 45% of single-family homes on the islands of Oahu, Hawaii and Maui have installed private rooftop solar systems, and approximately 25% of the Utilities’ total customers have solar systems.
•The Utilities’ feed-in tariff program is designed to encourage the addition of more renewable energy projects in Hawaii. As of September 30, 2026, there were 44 MW, 2 MW and 6 MW of installed feed-in tariff capacity from renewable energy technologies at Hawaiian Electric, Hawaii Electric Light and Maui Electric, respectively.
Biofuel sources.
•On August 23, 2024, the Utilities issued an RFP for biodiesel fuel supply commencing February 1, 2026. Proposals were due on September 30, 2024, and the Utilities have completed negotiations with two suppliers and submitted an application to the PUC on April 3, 2025. On June 2, 2025, the Utilities and Pacific Biodiesel Technologies, LLC (PBT) signed an agreement for supply of biodiesel commencing February 1, 2026, which was approved by the PUC on January 14, 2026. On May 18, 2026, the Utilities and Par Hawaii Refining, LLC (PAR Hawaii) signed an agreement for supply of renewable diesel, which will become effective upon PUC approval.
•Hawaiian Electric also has a spot buy contract with PBT to purchase additional quantities of biodiesel at or below the price of diesel. Some purchases of “at parity” biodiesel have been made under the spot purchase contract, which was extended through June 2027.
•Hawaiian Electric has a contingency supply contract with REG Marketing & Logistics Group, LLC to also supply biodiesel to any generating unit on Oahu in the event PBT is not able to supply necessary quantities. This contingency contract has been extended to November 2027 and will continue with no volume purchase requirements.
Requests for renewable proposals, expressions of interest, and information.
•The Hawaii Island Stage 3 RFP, seeking 65 MW of renewable firm capacity and 325 gigawatt-hours (GWh) of renewable dispatchable energy annually, was issued on November 21, 2022. Proposals were received on April 20, 2023. The Stage 3 RFPs for Oahu and Maui opened for bids on January 20, 2023. For Oahu, the Utilities sought 500 to 700 MW of renewable firm capacity, and at least 965 GWh of renewable dispatchable energy annually. For Maui, the Utilities sought at least 40 MW of renewable firm capacity, and at least 425 GWh of renewable dispatchable energy annually. As of September 30, 2026, the Utilities have 12 active Stage 3 projects, including one self-build project. The Utilities obtained PUC approval for three solar-plus BESS projects with a combined capacity of 166 MW as of September 30, 2026. Additionally, in the third quarter of 2026, the Utilities executed a renewable firm capacity contract with Kalaeloa Partners L.P. for 208 MW of capacity on Oahu, which is the largest PPA under the Stage 3 RFP. The Utilities continue to advance the remaining selected projects through negotiations and execution and the PUC approval process.
65


On March 28, 2025, the Utilities filed an application to the PUC for their self-build project - Waiau repower project. See “Utility projects” in Note 4 of the Condensed Consolidated Financial Statements.
A summary of the Stage 3 PPAs and self-build project is as follows:
UtilitiesNumber of contractsTotal renewable energy size (MW)BESS Size (MW/MWh)Firm Generation (MW)
PPAs
Hawaiian Electric4126510307
Hawaii Electric Light38637460
Maui Electric49024040
Self-build project
Hawaiian Electric1——253
Total123021,124660
•On August 19, 2024, the PUC opened a docket for the Utilities’ Integrated Grid Planning RFP (IGP RFP). On August 26, 2024, the Utilities filed their draft IGP RFP for Oahu and Hawaii Island. The Oahu portion of the IGP RFP seeks 750 GWh per year of energy and 350 MW of grid forming resources by November 1, 2030, and 81 MW of renewable firm capacity by December 2033. The Hawaii Island portion of the IGP RFP seeks 435 GWh per year of energy and 115 MW of grid forming resources by November 1, 2030, and 30 MW of renewable firm capacity by December 2032. On August 18, 2025, the Utilities filed a request with the PUC for approval to not offer utility-owned sites to other potential bidders. On September 9, 2025, the Consumer Advocate filed a response indicating it did not object to the Utilities’ request and a party to the docket filed a response requesting that the PUC consider the broader market impacts that limiting available sites would have on the available interconnection capacity and market competitiveness. On December 12, 2025, and on February 6, 2026, the Utilities filed their responses to additional PUC information requests. On June 17, 2026, the PUC approved the IGP RFP with minor modifications. The Utilities filed their final IGP RFP on July 17, 2026. The IGP RFP was issued in August 2026. On August 31, 2026, the Utilities held a virtual technical conference. The deadline for submitting Preliminary Interconnection Report Meeting requests was September 18, 2026.
•On July 17, 2026, the Utilities also filed a letter requesting the PUC open a new proceeding for 500 MW of fuel-flexible firm generation on Oahu with an expedited timeline that would allow for issuance of the RFP by the end of 2026. The Utilities stated that a transparent, competitive RFP process supports customer affordability considerations and could accommodate technologies that may not fit within the framework of the ongoing IGP RFP process. On August 5, 2026 the PUC issued a letter responding to the Utilities’ July 17 request, with the PUC noting that a demonstration of need for the additional 500 MW of fuel‑flexible firm generation would be required, and without demonstrating need, it is not reasonable and in the public interest to open a docket or otherwise expedite review and approval of Hawaiian Electric’s Firm RFP request at this time.
Legislation and regulation. Congress and the Hawaii legislature periodically consider legislation that could have positive or negative effects on the Utilities and their customers. Also see “Environmental regulation” in Note 4 of the Condensed Consolidated Financial Statements.
State legislation. Act 301 (2025) appropriates funds to address the State of Hawaii’s share in the settlement of claims related to the Maui wildfire and windstorm tort litigation settlement and provides a resolution to those affected by the Maui windstorm and wildfires and provides assurance for a global settlement to move forward.
Act 266 (2025), among other things, authorizes wheeling of renewable energy and requires the PUC to establish policies and procedures to implement wheeling of renewable electricity for a capacity of not more than two megawatts, as well as microgrid service tariffs, by January 1, 2027. Act 266 also requires the PUC to establish an installation goal for new customer-sited distributed energy resources and establish tariffs to achieve the installation goal and for grid service programs, microgrids, and community-based renewable energy. The Utilities are currently assessing the potential impact related to wheeling as the PUC works to establish the provisions and terms for the implementation of wheeling in compliance with Act 266. For more information on wheeling, see discussion in “Investigation on the establishment of wheeling” above.
Federal legislation. The One Big Beautiful Act signed into law on July 4, 2025 by the President may impact the ability of the Utilities’ recently selected and new wind and solar projects to qualify for federal tax credits. Federal regulations continue to be developed, so the complete scope of potential impacts remains unknown at this time. Any loss in renewable energy tax
66


credits could lead to project risk for new wind and solar projects in development and will likely result in higher prices for such projects, developers of which rely extensively on federal tax credits to finance such projects. It is also possible that the sunsetting of these tax credits will impact the supply chain for projects throughout the U.S. as developers rush to meet the four-year safe harbor timeline.
Trade policies. U.S. trade policies continue to evolve as existing tariff programs are modified and new measures are implemented. The impact on the Utilities from trade policies imposed by the U.S. or its trading partners remains uncertain at this time. The Utilities estimated that the majority of the Utilities’ capital goods are purchased domestically at this time. However, the Utilities and their independent power producers procure capital goods that flow through global supply chains and may include raw materials, sub-components, or components sourced or assembled outside the U.S. Utility capital costs and the cost of power procured from independent power producers may increase due to new trade policies and changes in trade policy from the U.S. and its trading partners, based on the amount of foreign content of capital goods. It is also possible that trade policies could impact commodities and raw materials costs, leading to inflation of utility capital costs indirectly through the broader supply chain. Utility-scale battery projects planned by both Hawaiian Electric and independent power producers may see significant cost increases or supply chain challenges, as the majority of battery components are currently manufactured in, or have significant supply chain exposure to, the People’s Republic of China. The Utilities continue to assess the potential impact of evolving trade policies.
Federal grant. On August 7, 2024, the Utilities received a notification from the U.S. Department of Energy that their climate adaption transmission and distribution resilience program application for $95 million in federal funds was officially awarded. On July 16, 2026, the Utilities received a notification of an award modification from the DOE that updated certain terms and conditions including the removal of the scope related to community benefits plans and the associated funding for those deliverables. As a result, the federal share total was reduced from $95 million to $92.6 million. See “Utility projects” in Note 4 of the Condensed Consolidated Financial Statements for additional discussions. There is no assurance that the federal government will reimburse in a timely manner or may dispute reimbursement.
Fuel contracts. On February 1, 2022, the Utilities and PAR Hawaii entered into a fuel supply contract (Supply Agreement) commencing January 1, 2023, which was approved by the PUC on December 1, 2022. On August 14, 2024, the Utilities entered into a second amendment of the Supply Agreement, extending the term by an additional three years through January 31, 2029 and creating savings in fuel costs. The second amendment became effective on June 18, 2025, upon the issuance of the PUC’s final decision and order.
On March 3, 2022, as part of economic sanctions amid the Russia-Ukraine war, PAR Hawaii announced that it was suspending all purchases of Russian crude oil, which accounted for at least 25% of Hawaii’s supply. To help ensure adequate fuel supply, the Utilities entered into a backup fuel supply contract with Vitol Inc. (Vitol), effective December 1, 2022 through June 30, 2023, with annual extensions if mutually agreed by both parties. The fuel supply contract has been extended through June 30, 2027. On December 1, 2022, the PUC issued a final decision and order approving the Vitol backup fuels supply contract, and costs incurred under the contract are recovered through the Utilities’ respective ECRCs.
Fuel barge contract. On July 8, 2026, the Utilities entered into a ten-year contract with Sause Bros., Inc. for inter-island fuel transportation, which is expected to commence on April 1, 2027, pending PUC approval.
FINANCIAL CONDITION
Liquidity and capital resources. The Utilities’ future results of operations are subject to significant risks and uncertainties. Factors that could cause actual results to differ materially from expectations include, but are not limited to, access to capital, ability to attract and retain key personnel, and pending or threatened litigation, including the wildfire-related litigation described above.
Hawaiian Electric remains focused on operating a strong, financially healthy enterprise that supports a thriving future for Hawaii. While the fundamentals of their business remain strong, the Utilities have taken prudent, measured actions to strengthen their financial position while continuing to provide reliable service to their customers and reinforcing their long-term commitment to serving the community. In September 2025, HEI and Hawaiian Electric each entered into a fourth amended and restated credit agreement with a syndicate of eight financial institutions, increasing each of their committed capacities to $300 million (see Note 5 of the Condensed Consolidated Financial Statements) and in May 2024, the Utilities entered into an asset-based credit facility that allows borrowings of up to $250 million (see Note 5 of the Condensed Consolidated Financial Statements). As of September 30, 2026, there were no outstanding borrowings under the credit agreements or asset-based credit facility. Other measures include re-prioritizing capital spending and reducing certain O&M, issuing unsecured debt, and conducting asset sales, among others. In October 2026, the Utilities filed a request with the PUC for approval to issue securitized bonds to finance $500 million of wildfire mitigation and other resilience work.
67


The following table provides the components of Hawaiian Electric’s available liquidity under existing facilities.
As of September 30, 2026
(in millions)
Capacity
Outstanding
Undrawn
Unsecured revolving line of credit$300 $— $300 
ABL Facility250 — 250 
Borrowing from HEI - standing commitment letter75 — 75 
Total credit$625 $— $625 
Cash and cash equivalents176 
Total available liquidity from cash and under existing facilities$801 
As of September 30, 2026, Hawaii Electric Light and Maui Electric had short-term borrowings from Hawaiian Electric in the amount of nil and $45.5 million, respectively, and had long-term intercompany loans from Hawaiian Electric in the amount of $25 million and $90 million, respectively.
See Note 5 of the Condensed Consolidated Financial Statements for a brief description of Hawaiian Electric’s loans.
Management believes that HEI’s and the Utilities’ current cash and cash equivalents balances, as of September 30, 2026, amounting to $47.9 million and $176.0 million, respectively, the available capacity on Hawaiian Electric’s ABL Facility and revolving line of credit (see Note 5 of the Condensed Consolidated Financial Statements), and the additional liquidity from HEI’s at-the-market offering program, provide sufficient liquidity to fund operations and satisfy their other obligations for the short term.
On April 10, 2026, the final condition to payment under the Settlement Agreements was satisfied when the December 30, 2025 judgment obtained by HEI and Hawaiian Electric on the subrogation claims brought by insurers became final and unappealable. Accordingly, on April 10, 2026, HEI and Hawaiian Electric paid the first of four equal annual $479 million installments. And subsequently on September 16, 2026, HEI made a partial prepayment of $40 million towards the second annual installment due in April 2027. On October 28, 2026, HEI made another partial prepayment of $40 million towards the second installment amount due in April 2027. See Note 2 of the Condensed Consolidated Financial Statements for additional information.
The rebuilding of Lahaina will be a community-led effort and will occur over an extended period of time. The cost of rebuilding Maui Electric’s infrastructure is not yet known, but could be significant because the infrastructure that may be required is expected to be different than what previously existed. For example, to mitigate wildfire risk, grid hardening strategies, such as undergrounding of lines in high-risk locations will be significantly more expensive than using overhead lines and will thus result in increased costs.
The price of crude oil has increased 39.7% over the same quarter in the prior year, which has moderately impacted the Utilities’ liquidity. The Utilities have a fuel pass-through mechanism with limited fuel cost-risk sharing. However, the Utilities expect cash flow impacts from the timing of the disbursements for fuel inventories and subsequent collection of accounts receivable, resulting in higher working capital requirements.
Hawaiian Electric utilizes cash on hand to support normal operations and will draw on its revolving line of credit or ABL Facility, as needed, to supplement any operational needs. Hawaiian Electric may also borrow short-term from HEI for itself and on behalf of Hawaii Electric Light and Maui Electric, and Hawaiian Electric may borrow from or loan to Hawaii Electric Light and Maui Electric on a short-term basis. The intercompany borrowings among the Utilities, but not the borrowings from HEI, are eliminated in the consolidation of Hawaiian Electric’s financial statements. The Utilities also utilize long-term debt, borrowings of the proceeds of special purpose revenue bonds issued by the State of Hawaii Department of Budget and Finance, the issuance of privately placed unsecured senior notes bearing taxable interest, and high yield capital markets, to finance the Utilities’ capital improvement projects, or to repay short-term borrowings used to finance such projects. The downgrades of Hawaiian Electric’s credit ratings will continue to adversely impact the Utilities’ ability to access lower cost sources of capital.
As of September 30, 2026, the Utilities are in compliance with all applicable financial covenants and expect to continue to be in compliance with all the financial covenants in the next 12 months. The Utilities’ liquidity has improved, but continues to be impacted from the downgrades of their credit ratings, which result in higher credit spreads compared to investment grade credit spreads. However, the Utilities cannot predict the future effects on the Utilities’ ability to access additional capital or the future impacts on the Utilities’ financial position, results of operations, and cash flows.
Credit ratings. On April 21, 2026 and July 22, 2026, Moody’s and S&P, respectively, upgraded the credit ratings of Hawaiian Electric. On August 11, 2026, S&P withdrew its ‘B’ short-term and commercial paper rating at Hawaiian Electric’s
68


request due to the lack of access to the commercial paper market. As of October 30, 2026, the Fitch, Moody’s, and S&P ratings of Hawaiian Electric were as follows:
FitchMoody’sS&P
From1
To
From1
To
From1
To
Long-term issuer default, long-term and issuer credit, respectivelyBB-BB-Ba2Ba1B+BB-
Short-term issuer default, commercial paper and commercial paper, respectivelyBBNPNPB
WR3
Senior unsecured debt/special purpose revenue bondsBBBBBa2Ba1**
Cumulative preferred stock (selected series)**
WR2
WR2
**
OutlookPositivePositivePositiveStableWatch PositiveStable
1     As of December 31, 2025. In March 2026, S&P revised Hawaiian Electric’s outlook to “Positive” from “CreditWatch Positive” and reaffirmed the “B+” issuer credit rating.
2    Rating withdrawn due to preferred stock redemption in the fourth quarter of 2025.
3    Rating withdrawn due to lack of access to the commercial paper market.
*    Not rated.
NP - Not Prime.
WR - Withdrawn rating.
Note: The above ratings reflect only the view, at the time the ratings are issued or affirmed, of the applicable rating agency, from whom an explanation of the significance of such ratings may be obtained. Such ratings are not recommendations to buy, sell or hold any securities; such ratings may be subject to revision or withdrawal at any time by the rating agencies; and each rating should be evaluated independently of any other rating.
Taxable debt. On July 24, 2025, the Utilities received PUC approval to issue during the three-year period of 2025 through 2027, unsecured obligations bearing taxable interest (Hawaiian Electric up to $900 million, Hawaii Electric Light up to $115 million and Maui Electric up to $150 million), to finance capital expenditures, repay long-term and/or short-term debt used to finance or refinance capital expenditures, and/or to reimburse funds used for payment of capital expenditures. Pursuant to the approval, on September 18, 2025, Hawaiian Electric issued $500 million in unsecured senior notes with an interest rate of 6.00% (2025 Notes). A portion of the proceeds was used to repay the outstanding balance of the Utilities’ revolving and term loan facilities and the remaining proceeds are intended to be used to 1) finance capital expenditures, 2) repay long-term debt and short-term debt used to finance or refinance capital expenditures, and 3) reimburse funds used for the payment of capital expenditures. The 2025 Notes will mature on October 1, 2033.
On November 3, 2025, Hawaiian Electric made long-term intercompany loans to Hawaii Electric Light and Maui Electric in the amount of $25 million and $90 million, respectively. The interest rate and term of the loans are the same as Hawaiian Electric’s 2025 Notes. The long-term intercompany loans are eliminated in the total consolidated Hawaiian Electric amounts. See summary table below for remaining authorized amounts as of September 30, 2026 for each respective utility.
(in millions)Hawaiian ElectricHawaii Electric LightMaui Electric
Total “up to” amounts of taxable debt authorized from 2025 through 2027$900 $115 $150 
Less: taxable debt executed on September 18, 2025/ long-term intercompany loans500 25 90 
Remaining authorized amounts$400 $90 $60 
As of September 30, 2026, the Utilities have $2.06 billion of long-term debt, of which nil is due or expected to be repaid within 12 months.
Equity. On October 28, 2025, the Utilities received PUC approval to issue and sell each utility’s common stock over a three-year period from January 1, 2025 through December 31, 2027 (Hawaiian Electric sale/s to HEI of up to $210 million, Hawaii Electric Light sale/s to Hawaiian Electric of up to $70 million, and Maui Electric sale/s to Hawaiian Electric of up to $145 million) and the purchase of Hawaii Electric Light and Maui Electric common stock by Hawaiian Electric. As of September 30, 2026, Hawaiian Electric, Hawaii Electric Light, and Maui Electric have $210 million, $70 million, and $79 million, respectively, of remaining common stock authorization.
Securitization. Act 258 authorizes the PUC to approve securitization financing for certain utility costs. On October 9, 2026, the Utilities filed for PUC approval to request a financing order authorizing the issuance of approximately $531 million aggregate principal amount of infrastructure resilience bonds, reflecting up to approximately $500 million of infrastructure
69


resilience costs, including carrying costs, and approximately $31 million of estimated upfront financing costs. The proposed costs include wildfire mitigation, grid modernization and related eligible operation and maintenance costs, certain of which remain subject to approval in separate PUC proceedings. Securitization is expected to result in lower financing costs than traditional financing alternatives available to the Utilities. See “Recent regulatory and legislative developments” section above for more information.
Cash flows. The following table reflects the changes in cash flows for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025:
Nine months ended September 30
(in thousands)20262025Change
Net cash provided by operating activities$254,092 $320,003 $(65,911)
Net cash used in investing activities(396,791)(247,682)(149,109)
Net cash provided by (used in) financing activities(167,551)247,402 (414,953)
Net cash provided by operating activities. The decrease in net cash provided by operating activities was primarily driven by higher cash paid for fuel oil stock, and higher customer bills due to higher fuel oil prices.
Net cash used in investing activities. The increase in net cash used in investing activities was primarily driven by an increase in capital expenditures related to construction activities.
Net cash provided by (used in) financing activities. The decrease in net cash provided by financing activities was largely driven by proceeds from the issuance of long-term debt in 2025, partially offset by debt repayments.
Material cash requirements. Material cash requirements of the Utilities include payments related to settlement of tort-related legal claims and cross claims to the extent HEI does not make such payments, O&M expenses, labor and benefits costs, fuel and purchase power costs, debt and interest payments, operating and finance lease obligations, their forecasted capital expenditures (including capital expenditures related to wildfires and wildfire mitigations) and investments, their expected retirement benefit plan contributions and other short-term and long-term material cash requirements. The cash requirements for O&M, fuel and purchase power costs, debt and interest payments, and operating and finance lease obligations are generally funded through the collection of the Utilities’ revenue requirement established in the last rate case and other mechanisms established under the regulatory framework. The cash requirements for capital expenditures are generally funded through operating cash flows, the issuance of debt, and contributions of equity from HEI and generally recovered through the Utilities’ revenue requirement or other capital recovery mechanisms over time.
Hawaiian Electric’s consolidated capital structure was as follows:
(dollars in millions)September 30, 2026December 31, 2025
Long-term debt, net, including current portion of long-term debt, net
$2,058 52%$2,183 58%
Common stock equity1,909 481,583 42
$3,967 100%$3,766 100%
Note: Columns may not foot due to rounding.
The Utilities’ credit rating downgrades related to the Maui windstorm and wildfires will continue to limit their ability to readily access low-cost sources of capital. Through the sale of common stock in September 2024, HEI raised sufficient cash to pay for the first installment of the settlement of wildfire tort claims and paid for the first installment on April 10, 2026. HEI is currently working with its financial advisors on a financing plan to raise the additional capital required to fund the remaining settlement payments for the wildfire tort claims. While management believes that HEI will be able to raise the necessary capital, there is no assurance that management’s plans will be successful. The damages and losses related to the Maui windstorm and wildfires and related lawsuits (see further information in Note 2 of the Condensed Consolidated Financial Statements), the economic impact of higher fuel prices, inflation, higher interest rates, tightening of monetary policy, and geopolitical situations, create significant uncertainty, and the Utilities cannot predict the extent or duration of these conditions, the future effects that these conditions will have on the Utilities’ financing plan, cost of capital and their ability to access additional capital, or the future impacts on the Utilities’ financial position, results of operations, and cash flows.
Item 3. Quantitative and Qualitative Disclosures About Market Risk
There have been no significant changes in HEI’s and Hawaiian Electric’s exposure to market risk during the quarter ended September 30, 2026. For discussion of our exposure to market risk, see page 62 included in Part II. Item 7A. of HEI’s and Hawaiian Electric’s 2025 Form 10-K.
70


Item 4. Controls and Procedures
HEI:
Disclosure Controls and Procedures
The Company maintains a set of disclosure controls and procedures designed to provide reasonable assurance that information required to be disclosed by the Company in reports that it files or submits under the Securities Exchange Act of 1934, as amended (Exchange Act), is recorded, processed, summarized and reported within the time periods specified in SEC’s rules and forms, and that such information is accumulated and communicated to the Company’s management, including its Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.
An evaluation was performed under the supervision and with the participation of the Company’s management, including the Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the Company’s disclosure controls and procedures, as defined in Rule 13a-15(e) or Rule 15d-15(e) of the Exchange Act. Management, including the Company’s Chief Executive Officer and Chief Financial Officer, concluded that the Company’s disclosure controls and procedures were effective, as of the end of the period covered by this report, at the reasonable assurance level.
Changes in Internal Control Over Financial Reporting
There have been no changes in internal control over financial reporting during the third quarter of 2026 that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.
Hawaiian Electric:
Disclosure Controls and Procedures
Hawaiian Electric maintains a set of disclosure controls and procedures designed to provide reasonable assurance that information required to be disclosed by Hawaiian Electric in reports that it files or submits under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in SEC’s rules and forms, and that such information is accumulated and communicated to Hawaiian Electric’s management, including its Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.
An evaluation was performed under the supervision and with the participation of Hawaiian Electric’s management, including the Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of Hawaiian Electric’s disclosure controls and procedures, as defined in Rule 13a-15(e) or Rule 15d-15(e) of the Exchange Act. Management, including Hawaiian Electric’s Chief Executive Officer and Chief Financial Officer, concluded that Hawaiian Electric’s disclosure controls and procedures were effective, as of the end of the period covered by this report, at the reasonable assurance level.
Changes in Internal Control Over Financial Reporting
There have been no changes in internal control over financial reporting during the third quarter of 2026 that have materially affected, or are reasonably likely to materially affect, Hawaiian Electric’s internal control over financial reporting.
71



PART II - OTHER INFORMATION

Item 1. Legal Proceedings
The descriptions of legal proceedings (including judicial proceedings and proceedings before the PUC and environmental and other administrative agencies) in HEI’s and Hawaiian Electric’s 2025 Form 10-K (see “Part I. Item 3. Legal Proceedings” and proceedings referred to therein) and this Form 10-Q (see “Management’s Discussion and Analysis of Financial Condition and Results of Operations” and Notes 2 and 4 of the Condensed Consolidated Financial Statements) are incorporated by reference in this Item 1. With regard to any pending legal proceeding, alternative dispute resolution, such as mediation or settlement, may be pursued where appropriate, with such efforts typically maintained in confidence unless and until a resolution is achieved. Certain HEI subsidiaries (including Hawaiian Electric and its subsidiaries and Pacific Current and its subsidiaries) may also be involved in ordinary routine PUC proceedings, environmental proceedings and litigation incidental to their respective businesses.
Item 1A. Risk Factors
For information about Risk Factors, see pages 14 to 26 of HEI’s and Hawaiian Electric’s 2025 Form 10-K and “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” “Quantitative and Qualitative Disclosures about Market Risk” and the Condensed Consolidated Financial Statements herein. Also, see “Cautionary Note Regarding Forward-Looking Statements” on pages iv through vi herein.
Item 2. Unregistered Sales of Equity Securities, Use of Proceeds, and Issuer Purchases of Equity Securities
(c) Purchases of HEI common shares were made on the open market during the third quarter of 2026 to satisfy the requirements of certain plans as follows:
ISSUER PURCHASES OF EQUITY SECURITIES
Period1

Total Number of Shares Purchased2
 
Average
Price Paid
per Share2
 Total Number of Shares Purchased as Part of Publicly Announced Plans or Programs
Maximum Number (or Approximate Dollar Value) of Shares that May Yet Be Purchased Under the Plans or Programs
July 1 to 31, 202615,463$13.43—NA
August 1 to 31, 202615,857$12.13—NA
September 1 to 30, 202629,924$9.95—NA
NA - Not applicable.
1     Trades (total number of shares purchased) are reflected in the month in which the order is placed.
2    The purchases were made to satisfy the requirements of the HEI Dividend Reinvestment and Stock Purchase Plan (DRIP) and the Hawaiian Electric Industries Retirement Savings Plan (HEIRSP) for shares purchased for cash or by the reinvestment of dividends by participants under those plans and none of the purchases were made under publicly announced repurchase plans or programs. Average prices per share are calculated exclusive of any commissions payable to the brokers making the purchases for the DRIP and the HEIRSP. Of the “Total number of shares purchased,” 3,653 of the 15,463 shares, 5,177 of the 15,857 shares and 11,563 of the 29,924 shares were purchased for the DRIP; the remaining shares were purchased for the HEIRSP. The repurchased shares were issued for the accounts of the participants under registration statements registering the shares issued under these plans.
72



Item 5. Other Information
During the three months ended September 30, 2026, no director or officer of HEI or Hawaiian Electric (as defined in Exchange Act Rule 16a-1(f)) adopted or terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408 of Regulation S-K.

Election of Director
On November 5, 2026, the Company’s Board of Directors (the “Board”) elected Peter Ho as a director of the Company, effective immediately, to serve until the Company’s 2027 Annual Meeting of Shareholders. Mr. Ho was also appointed as a member of the Company’s Audit & Risk Committee.
There are no arrangements or understandings between Mr. Ho and any other person pursuant to which he was selected as a director of the Company and no transactions involving Mr. Ho that are required to be disclosed pursuant to Item 404(a) of Regulation S-K.
Mr. Ho will participate in the Company’s standard non-employee director compensation program, as described in the Company’s Proxy Statement dated April 29, 2026, and will enter into substantially the same indemnity agreement that the Company entered into with each of its existing directors, the form of which is filed as Exhibit 10.17 to the Company’s Annual Report on Form 10-K for fiscal year 2025.
Compensatory Arrangements of Certain Officers
On November 5, 2026, upon recommendation from the Company’s Compensation and Human Capital Management Committee, the Board approved an increase to the annual base salary of the Company’s and Hawaiian Electric’s Chief Financial Officer (“CFO”), Paul K. Ito, from $517,900 to $580,000, retroactive to September 1, 2026. The increase recognizes the dual roles Mr. Ito has performed as the CFOs of both the Company and Hawaiian Electric since April of 2026.
73


Item 6. Exhibits
 
Revised Amendment 2024-1 to the Hawaiian Electric Industries Retirement Savings Plan, restatement effective January 1, 2025.
Amendment 2026-1 to the Hawaiian Electric Industries Retirement Savings Plan, restatement effective January 1, 2025.
Ninth Amendment effective October 1, 2026 to Trust Agreement (dated as of September 4, 2012) between HEI and Fidelity Management Trust Company.
Letter Amendment effective October 2, 2026 to Trust Agreement (dated as of September 4, 2012) between HEI and Fidelity Management Trust Company
Certification Pursuant to Rule 13a-14 promulgated under the Securities Exchange Act of 1934 of Scott W. H. Seu (HEI Chief Executive Officer)
Certification Pursuant to Rule 13a-14 promulgated under the Securities Exchange Act of 1934 of Paul K. Ito (HEI Chief Financial Officer)
HEI Certification Pursuant to 18 U.S.C. Section 1350
HEI Exhibit 101.INSXBRL Instance Document - the instance document does not appear on the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document
HEI Exhibit 101.SCHInline XBRL Taxonomy Extension Schema Document
HEI Exhibit 101.CALInline XBRL Taxonomy Extension Calculation Linkbase Document
HEI Exhibit 101.DEFInline XBRL Taxonomy Extension Definition Linkbase Document
HEI Exhibit 101.LABInline XBRL Taxonomy Extension Label Linkbase Document
HEI Exhibit 101.PREInline XBRL Taxonomy Extension Presentation Linkbase Document
HEI Exhibit 104Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101)
Inter-Island Fuel Transportation Contract between Sause Bros., Inc. and Hawaiian Electric dated July 8, 2026 (certain confidential information has been omitted).
First Amendment dated July 27, 2026 to Amended and Restated Power Purchase Agreement between Hawaiian Electric and Kalaeloa Partners, L.P., dated October 29, 2021.
Power Purchase Agreement between Hawaiian Electric and Kalaeloa Partners, L.P., dated July 27, 2026.
Certification Pursuant to Rule 13a-14 promulgated under the Securities Exchange Act of 1934 of Scott W. H. Seu (Hawaiian Electric Chief Executive Officer)
Certification Pursuant to Rule 13a-14 promulgated under the Securities Exchange Act of 1934 of Paul K. Ito (Hawaiian Electric Chief Financial Officer)
Hawaiian Electric Certification Pursuant to 18 U.S.C. Section 1350

74


SIGNATURES
 
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrants have duly caused this report to be signed on their behalf by the undersigned, thereunto duly authorized. The signature of the undersigned companies shall be deemed to relate only to matters having reference to such companies and any subsidiaries thereof.
 
HAWAIIAN ELECTRIC INDUSTRIES, INC.HAWAIIAN ELECTRIC COMPANY, INC.
(Registrant)(Registrant)
By/s/ Scott W. H. SeuBy/s/ Scott W. H. Seu
Scott W. H. SeuScott W. H. Seu
Chief Executive OfficerChief Executive Officer
(Principal Executive Officer of HEI)(Principal Executive Officer of Hawaiian Electric)
By/s/ Paul K. ItoBy/s/ Paul K. Ito
Paul K. ItoPaul K. Ito
Senior Vice President and
Senior Vice President,
 Chief Financial Officer
 Chief Financial Officer and Treasurer
(Principal Financial Officer of HEI)(Principal Financial Officer of Hawaiian Electric)
Date: November 6, 2026Date: November 6, 2026

75
HEI Exhibit 4.1
REVISED AMENDMENT 2024-1 TO THE
HAWAIIAN ELECTRIC INDUSTRIES RETIREMENT SAVINGS PLAN

This amendment to the Hawaiian Electric Industries Retirement Savings Plan (the “Plan” or “HEIRS Plan”) is made to further clarify the Catch-up Contribution limits for participants who attain ages 60, 61, 62, and 63. This amendment is effective January 1, 2025.
Effective January 1, 2025, Section 3.2(b) is amended to state in its entirety as follows: Section 3.2(b) Dollar Limit on Catch-up Contributions.
No catch-up eligible Participant shall be permitted to make Catch-up Contributions during any calendar year in excess of the amount permitted under Section 414(v)(2)(B)(i) of the Code, as adjusted for cost-of-living increases, specifically excluding any increase in the applicable dollar limitation for Participants who attain ages 60, 61, 62, and 63 in such year, as permitted by the amendment to Code section 414(v) under section 109 of SECURE 2.0.
TO RECORD the adoption of this Revised Amendment 2024-1, Hawaiian Electric Industries, Inc. has executed this document September 2, 2026.
HAWAIIAN ELECTRIC INDUSTRIES, INC.
By/s/ Kurt K. Murao
Its Vice President – Legal & Administration
and Corporate Secretary
9057502
HEI Exhibit 4.2
AMENDMENT 2026-1 TO THE
HAWAIIAN ELECTRIC INDUSTRIES RETIREMENT SAVINGS PLAN

This amendment to the Hawaiian Electric Industries Retirement Savings Plan (the “Plan” or “HEIRS Plan”) is made to make the Plan’s loan program available to Participants, regardless of whether they are actively employed by a Participating Employer. This amendment is made pursuant to authority under Internal Revenue Service Revenue Procedure 2021-30, Section 4.05(2)(a), and is effective for new Participant loans as set forth below.
Effective for Participant loans originated on and after October 6, 2025, the first paragraph of Section 4.5 of the Plan is amended to state in its entirety as follows:
Section 4.5 Participant Loans
A Plan loan program is available to Plan Participants, regardless of whether they are employed by a Participating Employer. The loan program is administered by the Trustee in accordance with procedures approved by the Administrative Committee. The loan procedures are incorporated herein by this reference and may be amended at any time without notice and without further amendment to the Plan. If there is any conflict between the loan procedures and this Section 4.5, the loan procedures shall control.
TO RECORD the adoption of this Amendment 2026-1, Hawaiian Electric Industries, Inc. has executed this document September 2, 2026.
HAWAIIAN ELECTRIC INDUSTRIES, INC.
By/s/ Kurt K. Murao
Its Vice President – Legal & Administration
and Corporate Secretary

HEI Exhibit 4.3
NINTH AMENDMENT TO TRUST AGREEMENT
BETWEEN HAWAIIAN ELECTRIC INDUSTRIES, INC. AND
FIDELITY MANAGEMENT TRUST COMPANY

    THIS NINTH AMENDMENT TO THE TRUST AGREEMENT is made and entered into effective October 1, 2026, unless otherwise stated herein (the “Ninth Amendment”), by and between Hawaiian Electric Industries, Inc. (the “Sponsor”) and Fidelity Management Trust Company (the “Trustee”);

WITNESSETH:
    WHEREAS, the Trustee and the Sponsor heretofore entered into a trust agreement for the Hawaiian Electric Industries Retirement Savings Plan (the “Plan”) dated September 4, 2012 (the “Trust Agreement”), and amended by a First Amendment effective March 1, 2015, a Second Amendment effective January 1, 2018, a Third Amendment effective July 1, 2018, a Fourth Amendment effective June 26, 2019, a Fifth Amendment effective March 1, 2020, a Sixth Amendment effective January 1, 2023, a Seventh Amendment effective December 31, 2024, a restated Seventh Amendment effective January 1, 2025, an Eighth Amendment effective July 1, 2025, and letters of direction executed by the parties that are agreed to serve as amendments thereto; and

WHEREAS, the Trustee and the Sponsor now desire to further amend said Trust Agreement as provided for in Section 13 thereof;

NOW THEREFORE, in consideration of the above premises, the Trustee and the Sponsor hereby amend the Trust Agreement by:

(1)    Deleting from Schedule B, Fee Schedule, the “Offsets” and “Revenue Credit” sections in their entireties and all references thereto and adding instead to the Schedule B, the following new “Participant Revenue Credit – Fund Level Allocation” and “Plan Level Revenue/Revenue Credit” sections:

PARTICIPANT REVENUE CREDIT – FUND LEVEL ALLOCATION

1.    Calculation. Trustee or its affiliates (“Fidelity”) shall fund a “Participant Revenue Credit” as described and subject to the terms of this “Participant Revenue Credit – Fund Level Allocation” section, for each quarter calculated as the sum of the following:

A.    Amounts attributable to Fidelity investment products:
    Average daily balances held in the Plan of Fidelity investment products multiplied by one-quarter (1/4) of the following rates respectively:

(a)    Actively managed (non-Class K) Fidelity equity Mutual Funds: 35 basis points per annum;

(b)    Actively managed (Class K) Fidelity equity Mutual Funds: 20 basis points per annum;

(c)    Fidelity Freedom K® Funds: 20 basis points per annum;

(d)    Fidelity Enhanced Equity Index Funds: 10 basis points per annum;
Hawaiian Electric Industries, Inc. – Large    1    Confidential Information
DCQ Trust – Ninth Amendment
56566 PRC



(e)    Actively managed Fidelity fixed income and money market Mutual Funds, except for certain Fidelity institutional money market Mutual Funds (e.g. FIMM Funds): 20 basis points per annum;

(f)    Actively managed Fidelity Institutional Asset Management (FIAM) Service Series commingled pools: 10 basis points per annum;

(g)    Managed Income Portfolio I: 20 basis points per annum.

B.    Amounts attributable to non-Fidelity investment products:
    Average quarterly balances held by the Plan in any non-Fidelity investment product, multiplied by the quarterly rate at which FIIOC receives service payments from the asset manager or its affiliates in connection with Plan holdings in that particular investment product. Amounts will not include any other payments that Fidelity may receive from asset managers or their affiliates.

C.    Amounts attributable to BrokerageLink®:
    No amounts are provided for assets held in BrokerageLink®.

2.    Allocation. The Participant Revenue Credit shall be allocated to Eligible Participants (defined below) as follows:

A.    Crediting Date. Participant Revenue Credits shall be allocated to Eligible Participant accounts as soon as administratively feasible (generally within 15 Business Days) after a quarterly recordkeeping invoice reflecting such Participant Revenue Credit has been issued and sent (the “Crediting Date”). In the event an invoice is issued and sent with respect to a portion of a quarter, the amount of the Participant Revenue Credit for such quarter may be appropriately adjusted as set forth on such invoice.

B.    Allocation Method. Allocations for the Participant Revenue Credit amount attributable to amounts described above shall be made to Eligible Participants pro rata based on the ratio of each Participant’s average daily balance in a fund during the quarter to the total average daily balances for all Participants in such fund during the quarter. The allocation to Eligible Participants will be used to purchase whole and fractional shares of the investments in the Eligible Participant Accounts. Any remaining Participant Revenue Credit amount following the allocation to Eligible Participants shall be allocated to the Revenue Credit Account described below and be subject to the provisions governing the Revenue Credit. In the event a residual amount is insufficient to purchase a fractional share it will not be funded.

C.    Eligible Participants. Solely for purposes of allocations pursuant to this section, “Eligible Participant” means any participant or beneficiary with a balance in a mutual fund option to which the Participant Revenue Credit relates, at any time during the quarter and has a balance greater than zero in the Plan at the time of allocation. The Administrator acknowledges and understands that the exclusion of any participants from an allocation may subject the plan to “benefits, rights and features testing” under Code Section 401(a)(4).

D.    Investment of Allocations. Amounts allocated to Eligible Participant accounts shall be invested in the fund to which the Participant Revenue Credit relates, and allocated proportionately for each Participant. If a participant no longer has a balance in the

Hawaiian Electric Industries, Inc. – Large    2    Confidential Information
DCQ Trust – Ninth Amendment
56566 PRC


fund or is not permitted to invest further in such fund, amounts shall be invested in accordance with Eligible Participants’ elections for future contributions, or if no such election is on file, in the Plan’s designated default investment.

E.    Directions. The Administrator represents to Trustee that the Administrator or Named Fiduciary has concluded that allocations hereunder are permissible under the Plan and meet the requirements of applicable laws, including ERISA and the Code. The Administrator directs that allocations of Participant Revenue Credits to Eligible Participants’ Accounts shall not be included as contributions or annual additions for any testing or reporting purposes. The Trustee shall be responsible for implementing directions timely received from the Administrator or Named Fiduciary as soon as administratively feasible in accordance with the Trust Agreement. Subject to its obligations under Section 23 (Compliance with Laws) of the Trust Agreement, the Trustee has no responsibility for the legality or appropriateness of such directions. The Administrator or Named Fiduciary may alter its direction to the Trustee at any time in writing and any resulting changes needed with respect to the Trust Agreement will be effected via mutual amendment.

F.    12b-1 Payments. To the extent any Participant Revenue Credits or Revenue Credits below are deemed to be attributable to investments in Fidelity Mutual Funds that have adopted a plan pursuant to Rule 12b-1 under the Investment Company Act of 1940 (“1940 Act”) at the time such Participant Revenue Credits or Revenue Credits are made, such Participant Revenue Credits or Revenue Credits shall be made available pursuant to such plan (“12b-1 Payments”), and the following conditions shall apply:

(a)    The obligation to make 12b-1 Payments shall continue in effect for one year from the Effective Date of the Ninth Amendment to the Trust Agreement, and shall continue for successive annual periods only upon at least annual approval by a vote of the majority of the trustees for each of those Fidelity Mutual Funds that have adopted such plans, including a majority of those trustees that are not “interested persons” (as defined in the 1940 Act) of such Mutual Funds and who have no direct or indirect financial interest in the operation of the plan or any agreement related thereto (“Qualified Trustees”).

(b)    Notwithstanding any provision hereof to the contrary, the obligation to make these 12b-1 Payments with respect to any plan may be terminated without penalty at any time, upon either a vote of a majority of the Qualified Trustees, or upon a vote of a majority of the outstanding voting securities (as defined in the 1940 Act) of the applicable Fidelity Mutual Fund to terminate or not continue the plan for the applicable Fidelity Mutual Fund.

(c)    Upon assignment of this Trust Agreement (as defined under the 1940 Act), the obligation to make 12b-1 Payments shall automatically terminate.

PLAN LEVEL ACCOUNT/REVENUE CREDIT
1.    Calculation. The Trustee shall calculate a Revenue Credit for each quarter equal to the following, as applicable:

A.    The net float earnings attributable to the Plan for the quarter;

Hawaiian Electric Industries, Inc. – Large    3    Confidential Information
DCQ Trust – Ninth Amendment
56566 PRC


B.    Any unallocated amounts referenced in (2)(B) of the “Participant Revenue Credit – Fund Level Allocation” section above.

2.    Funding. The Trustee shall pay quarterly in arrears the calculated Revenue Credit, in accordance with the above, for such quarter as soon as administratively feasible (generally within 15 Business Days) after a quarterly invoice reflecting the Participant Revenue Credit has been issued and sent.
3.    Investment. Deposits in the Revenue Credit Account will be invested in the first available source in the Plan’s source hierarchy, which can be viewed on Fidelity Plan Sponsor Webstation®. (Please note that the source used will not impact testing and reporting.) The Named Fiduciary hereby directs the Trustee to create a Revenue Credit Account in the Trust and that the assets deposited in the Revenue Credit Account shall be invested in the default fund listed on Schedule C, as applicable.

4.    Application of Account to Pay Expenses. The Administrator or Named Fiduciary may direct the Trustee through Fidelity’s internet application for sponsors to use amounts held in the Revenue Credit Account to reimburse the Sponsor for fees and expenses associated with services provided to the Plan, or to pay vendors, including the Trustee or third parties, directly. Notwithstanding the foregoing, the Revenue Credit Account may not be used to offset, reimburse or pay: (a) individual expenses that have been deducted from Participant accounts or (b) expenses that are accrued in the net asset value or mil rate of an investment option. Upon receipt of payment instructions In Good Order, the Trustee shall redeem shares or units of investment options held in the Revenue Credit Account necessary to make such payments and shall issue payment as soon as administratively feasible thereafter (typically within 5 Business Days). The Trustee shall not be liable for, nor shall it be responsible for separately including in any payment, any late charges, interest or penalties that may accrue owing to untimely submission to the Trustee of directions In Good Order or the Trustee’s processing of any payment instructions in accordance herewith. A direction from the Administrator or Named Fiduciary to pay expenses shall constitute a representation to the Trustee that the Administrator or Named Fiduciary, as appropriate, has concluded that the payments are permissible under the Plan and meet the requirements of applicable laws, including ERISA and the Code.

5.    Allocation to Participant Accounts.
A.    General. Effective October 1, 2026, the Administrator or Named Fiduciary, as applicable, may direct the Trustee to allocate amounts in the Revenue Credit Account to Eligible Participant accounts, provided that any such direction may be provided no more frequently than once per calendar quarter, unless such direction is with respect to a final allocation to be made in the last month of the plan year. Directions shall be submitted through a service request through the Trustee’s internet application for sponsors and shall include the dollar amount to be allocated from the Revenue Credit Account, provided that if such amount exceeds the balance held in the Revenue Credit Account on the date on which the allocation is to be performed (the “Crediting Date”), such amount shall be deemed to be the total balance of the Revenue Credit Account on the Crediting Date. The applicable Crediting Date shall occur as soon as administratively feasible (and in no event later than 15 calendar days) following receipt of a direction In Good Order.
B.    Method of Allocation. The dollar amount directed to be allocated from the Revenue

Hawaiian Electric Industries, Inc. – Large    4    Confidential Information
DCQ Trust – Ninth Amendment
56566 PRC


Credit Account shall be divided among Eligible Participant accounts pro rata based on Eligible Participant account balances, exclusive of outstanding loan balances.
C.    Eligible Participants. Solely for purposes of allocations pursuant to this section, “Eligible Participant” means any Participant or beneficiary with a balance greater than zero.
D.    Investment of Allocations. Amounts allocated to Eligible Participant accounts from the Revenue Credit Account shall be invested in accordance with Eligible Participants’ elections for future contributions, or if no such election is on file, in the Plan’s designated default investment pro rata across existing sources.
E.    Directions. A direction from the Administrator or Named Fiduciary to allocate amounts to participant accounts shall constitute a representation to the Trustee that the Administrator or Named Fiduciary, as appropriate, has concluded that the allocations are permissible under the Plan and meet the requirements of applicable laws, including ERISA and the Code. Without limiting the foregoing, the Administrator or Named Fiduciary, as appropriate, directs that allocations of amounts from the Revenue Credit Account to Eligible Participants’ Accounts shall not be included as contributions or annual additions for any testing or reporting purposes. The Trustee shall be responsible for implementing the directions of the Administrator or Named Fiduciary, as appropriate, but has no responsibility for the legality or appropriateness of such directions. The Administrator or Named Fiduciary may alter its directions at any time with reasonable advance notice and after consultation concerning the administrative feasibility of alternative directions.

To the extent to which there was an immediately preceding credit program established under this Ninth Amendment to the Trust Agreement, no amounts under the preceding credit program shall continue to accrue after the effective date of this Ninth Amendment; however, to the extent there are any unused amounts in such preceding program as of the effective date of this Ninth Amendment, the procedures for utilization of such amounts shall continue to be those in effect under the Trust Agreement pertaining to that program, until such amounts are used in their entirety.”



Hawaiian Electric Industries, Inc. – Large    5    Confidential Information
DCQ Trust – Ninth Amendment
56566 PRC


IN WITNESS WHEREOF, the Trustee and the Sponsor have caused this Ninth Amendment to be executed by their duly authorized officers effective as of the day and year first above written. By signing below, the undersigned represent that they are authorized to execute this document on behalf of the respective parties. Notwithstanding any contradictory provision of the Trust Agreement, each party may rely without duty of inquiry on the foregoing representation. The Sponsor acknowledges that this Ninth Amendment may contain service and/or compensation information intended by the Trustee to satisfy the disclosure requirements of Department of Labor regulation section 2550.408b-2(c)(1).

HAWAIIAN ELECTRIC INDUSTRIES, INC.    FIDELITY MANAGEMENT TRUST
    COMPANY
BY: HAWAIIAN ELECTRIC INDUSTRIES,
INC. PENSION INVESTMENT COMMITTEE



By: /s/ Scott W. H. Seu ___________9/17/2026     By: /s/ Joseph Ciccariello__________9/18/2026    
Authorized Signatory Date        Authorized Signatory Date
Name: Scott W. H. Seu____________________

Title: Chairman__________________________



By: /s/ Kurt K. Murao _____________9/17/2026         
Authorized Signatory Date

Name: Kurt K. Murao_____________________

Title: Secretary___________________________


Hawaiian Electric Industries, Inc. – Large    6    Confidential Information
DCQ Trust – Ninth Amendment
56566 PRC
HEI Exhibit 4.4
08/12/2026
Letter Amendment to Change Investment Options with respect to the plan specified below (the "Plan")
Legal Plan Name (as specified in the service agreement)Fidelity Plan NumberPlan Type (reference only)
Hawaiian Electric Industries Retirement Savings Plan 56566Qualified Plan
This letter, along with its attachments (collectively, the "Letter"), relates to the Plan and is made pursuant to the Trust Agreement for the Plan entered into between Hawaiian Electric Industries, Inc. (the “Sponsor”) and Fidelity Management Trust Company ("Fidelity") dated as of September 4, 2012 (the “Agreement”), and amended by a First Amendment effective March 1, 2015, by a Second Amendment effective January 1, 2018, by a Third Amendment effective July 1, 2018, by a Fourth Amendment effective June 26, 2019, by a Fifth Amendment effective March 1, 2020, by a Sixth Amendment effective January 1, 2023, by a Seventh Amendment effective December 31, 2024, by a restated Seventh Amendment effective January 1, 2025, by an Eighth Amendment effective July 1, 2025, and further amended by letters of direction executed by Sponsor and Fidelity which specifically state that both parties intend and agree that each such letter of direction shall constitute an amendment to the Agreement. Sponsor and Fidelity (the “Parties”) intend and agree that this Letter shall constitute a further amendment to the Agreement to the extent the direction contained herein modifies the investment options available under the Plan.
Direction. Sponsor hereby (i) directs Fidelity to act in accordance with the following attachments, and (ii) acknowledges its receipt and understanding of, and agreement with, all included terms and disclosures:
    Attachment A - Summary of Additions to Plan Investments
    Attachment B - Summary of Removed Plan Investment(s)
    Attachment C - Additional Terms and Disclosures
    Attachment D - Strategy to Communicate Changes
Sponsor Affirmation. Sponsor affirms that the Hawaiian Electric Industries, Inc. Pension Investment Committee (the “Named Fiduciary”) (i) is capable of evaluating investment risks independently, and (ii) has exercised independent judgment for all decisions concerning the Plan’s investment line-up and investment strategies, including, but not limited to, evaluations of information provided by Fidelity or its affiliates.
Time is of the Essence. Sponsor must deliver this signed Letter to Fidelity on or before 08/18/2026. Upon receipt of Sponsor's properly signed Letter, Fidelity will begin implementation.
Authorization. The undersigned represent that they are authorized to execute this Letter on behalf of the respective parties. The Parties may rely without duty of inquiry on the foregoing representation.
Importance of Review. The Named Fiduciary will promptly review any reports Fidelity may from time to time provide, including reports posted to Plan Sponsor Workstation, and notify Fidelity as soon as it becomes aware of any errors and/or omissions.
Sponsor understands that Fidelity (i) is available to discuss and explain any of the terms herein before Sponsor provides the completed form to Fidelity, and (ii) will remain available to review the actions taken based on the directions provided.
Sponsor recognizes the importance of changes to a Plan's investment choices and the significant risks (financial and otherwise) associated with any incorrect actions in this regard. Sponsor confirms that it (i) has read this Letter fully, (ii) has sought clarification to the extent necessary, and (iii) understands its terms. Sponsor is responsible for any incomplete, inaccurate, or inconsistent information supplied to Fidelity by Sponsor, its consultants or other designees.

1
Fidelity Confidential Project Number W552285-05JAN24


Hawaiian Electric Industries, Inc.
By: Hawaiian Electric Industries, Inc. Pension Investment Committee
By:_/s/ Scott W. H. Seu_____________________     By:_/s/ Kurt K. Murao_______________________
(Signature of Authorized Individual)             (Signature of Authorized Individual)
Name: Scott W. H. Seu                     Name: Kurt K. Murao     
Title: Chairman                         Title: Secretary
Date: _8/13/2026_____________________________     Date: _8/13/2026___________________________
A copy of the Letter will be returned to Sponsor after it has been countersigned by Fidelity.
Agreed to and accepted by:
Fidelity Management Trust Company
By:_/s/ Kevin Wright___________
(Signature of Fidelity Authorized Individual)
Name:_Kevin Wright___________
(Printed Name)
Title:_Director_______________
Date:_8/18/2026_____________


2
Fidelity Confidential Project Number W552285-05JAN24


Attachment A - Summary of Additions to Plan Investments
A.    Added Investments
The funds listed below will be added after 4:00 PM ET on the business day immediately preceding the Live Date.
Plan
#
Live DateTicker/
Cusip
Legal Fund NameFidelity
Code
Redemption/
Short-Term
Trading Fees
5656610/02/202614214T109Eagle Mid Cap Growth CIT Founders ClassOD0UN/A
5656610/02/202697183V387Great Gray Trust T. Rowe Price Stable Value CIT SO2QSN/A
5656610/02/202697181T889PIMCO RAE US Small CIT Class SO8MPN/A
5656610/02/202684679P306Spartan® 500 Index Pool Class C3951N/A
5656610/02/202684679P801Spartan® Extended Market Index Pool Class C3986N/A
5656610/02/2026TRSSXT. Rowe Price Institutional Small-Cap Stock FundOLDNN/A
References to "Fidelity Codes" in this document are used to identify the fund on Fidelity's system and Fidelity is not requesting Sponsor to confirm such codes.
Because of the number of funds/options available and the similarity among many of their names, the possibility for oversight or error is high. Fidelity requires therefore that you take the time to confirm the exact fund/investment name, share class, Ticker/CUSIP, the timing of the additions, and all other information specified above and indicate that you have confirmed that each investment option specified is correct after a word-for-word check.
Please initial here to confirm the above additions: ACM
B.    Restrictions
All added investment options will be opened for all money-in and money-out, Rebalance, Investment Election transactions, and will not be restricted from any transaction.
Please initial here to confirm the above restriction(s): ACM
C.    Investment-Specific Acknowledgments
1.    Outside CITs.  Sponsor has determined to offer collective investment funds maintained by an institution unaffiliated with Fidelity. Please be aware that the unaffiliated collective investment provider may require documentation to be completed by Sponsor prior to the Plan's investment. Please reach out directly to such provider to determine if there is any required documentation and complete as soon as possible. Failure to do so may result in trades not being accepted in a timely manner and/or a delay in this project. Fidelity is not responsible for any delays and/or losses resulting from any party's failure to complete documents required by the collective investment provider. All transactions involving the Eagle Mid Cap Growth CIT Founders Class, Great Gray Trust T. Rowe Price Stable Value CIT S and PIMCO RAE US Small CIT Class S will be performed in accordance with separate Operating Procedures between the Trustee/Fidelity, or its affiliate, and Alta Trust and Great Gray Trust Company, LLC.
2.    Geode Capital Management Trust Company (GTC) CITs.  Sponsor has received a copy of the Spartan Group Trust for Employee Benefit Plans established and maintained by GTC pursuant to IRS guidance (the "Group Trust"), the participation agreement for the Group Trust (the "Participation Agreement"), and the declaration of separate fund for Spartan® 500 Index Pool Class C and Spartan® Extended Market Index Pool Class C (the "Declaration of Separate
3
Fidelity Confidential Project Number W552285-05JAN24


Fund"). Sponsor adopted the terms of the Group Trust, the Participation Agreement and the Declaration of Separate Fund by signing and returning the applicable documentation to GTC, as applicable.
3.    Sponsor Electronic Prospectus Delivery Election.  In lieu of receiving a printed copy of the prospectus for each Fidelity and Non-Fidelity Mutual Fund selected by the Named Fiduciary as a Plan investment option or short-term investment fund. Sponsor hereby consents to receiving such documents electronically. The Named Fiduciary shall access each prospectus as described below after receiving notice from Fidelity that a current version is available online at a website maintained by Fidelity or its affiliate. Sponsor, on behalf of itself or the Named Fiduciary, as applicable, acknowledges that on the effective date of this Letter amendment prospectuses are on Fidelity NetBenefits at https://nb.fidelity.com/public/nb/401k/home/library. Fidelity may from time to time notify the Named Fiduciary or Sponsor as applicable that prospectuses are available at alternative website locations. Sponsor on behalf of itself or the Named Fiduciary, as applicable, represents that it has accessed each such prospectus by the effective date. In the event a prospectus for a Plan investment option cannot be accessed, the Named Fiduciary will contact Fidelity to receive (or if applicable to ensure Named Fiduciary's receipt of) the prospectus.
Please initial here to confirm and agree to the above Investment-Specific Acknowledgments: ACM

4
Fidelity Confidential Project Number W552285-05JAN24


Attachment B - Summary of Removed Plan Investment(s)
A.    Removed Investments and Mapping
As indicated in the chart below, the Plan specified will be (i) redirecting future contributions, or (ii) reallocating the balances in frozen funds in the Plan (whether frozen within this or a previous direction), or (iii) both. "Redirecting" means freezing and redirecting contributions with respect to the "From" fund specified. "Reallocating" means transferring fund balances from the "From" fund specified to the "To" fund specified.
Redirecting and Reallocating will become effective as of the market close (generally 4:00 PM ET) on the applicable dates specified below.
Plan
#
Indicate
"Redirection",
"Reallocation"
or
"Both"
Re-Direct
Trade
Date
Re- Allocate
Trade
Date
Fidelity
(FROM)
Code &
Ticker/
CUSIP
From
Legal
Name
To
Legal
Name
Fidelity
(TO)
Code &
Ticker/
CUSIP
Redemption/
Short-Term
Trading Fees
on From
Fund
56566Both10/02/202610/02/2026OL4W ASVGX American Century Small Cap Value Fund R5 Class
]
PIMCO RAE US Small CIT Class S O8MP 97181T889 N/A
56566Both10/02/202610/02/2026OYAR HAGIX Carillon Eagle Mid Cap Growth Fund Class I
]
Eagle Mid Cap Growth CIT Founders Class OD0U 14214T109 N/A
56566Both10/02/202610/02/20262328 FXAIX Fidelity® 500 Index Fund
]
Spartan® 500 Index Pool Class C 3951 84679P306 N/A
56566Both10/02/202610/02/20262365 FSMAX Fidelity® Extended Market Index Fund
]
Spartan® Extended Market Index Pool Class C 3986 84679P801 N/A
56566Both10/02/202610/02/2026OFTH OTCFX T. Rowe Price Small-Cap Stock Fund
]
T. Rowe Price Institutional Small-Cap Stock Fund OLDN TRSSX N/A
56566Both10/02/202610/02/2026O9MZ 87281W304 T. Rowe Price Stable Value Common Trust Fund K
]
Great Gray Trust T. Rowe Price Stable Value CIT S O2QS 97183V387 N/A
References to Fidelity "Codes" in this document are used to identify the fund on Fidelity's system and Fidelity is not requesting Sponsor to confirm such codes.
Because of the number of funds/options available and the similarity among many of their names, the possibility for oversight or error is high. Fidelity requires therefore that you take the time to confirm the
5
Fidelity Confidential Project Number W552285-05JAN24


exact fund/investment name, share class, Ticker/CUSIP, the timing of the changes, and all other information specified above and indicate that you have confirmed that each investment option specified is correct after a word-for-word check.
Please initial here to confirm: ACM
B.    Restrictions
1.    All of the "From Fund" investment options will be closed for all money-in and money-out transactions and will be restricted from all transactions.
Please initial here to confirm above restriction(s): ACM

6
Fidelity Confidential Project Number W552285-05JAN24


Attachment C - Additional Terms and Disclosures
I.     Additions To Plan Investment(s)
A.    Performance
Fund Performance will be made available to Plan Participants on NetBenefits and on Statements and is also available through a Customer Service Representative. Fidelity displays certain investment-performance-related and holdings-based data for investment products on NetBenefits that may be based on data received from various third-party sources including but not limited to Morningstar, LLC, investment managers, trustees, or plan sponsors. Depending on such source and type of underlying data and the particular investment product, information may not be available or updated on NetBenefits for several days after receipt; for custom investment options where past performance is not available, at least thirty days may be required for performance history to be generated and calculated.
The following Standard Performance will be made available, where applicable
    1, 3, 5, 10 Year Average Annual
    Life Of Fund Average Annual
    3 Month Cumulative
    Year-To-Date Cumulative
    52 Week High
    52 Week Low
B.    Distribution And Fee Redemption Methodology
The new funds will be added to the redemption methods for all withdrawals, loans and/or fee processing, as currently provided in the Agreement and Plan Administration Manual.
    For redemption methods and/or fee processing using hierarchal method, the new funds will be added in the last position and/or,
    For redemption methods and/or fee processing using a pro-rata method, the new funds will be added to the list.
II.     Removed Plan Investment(s)
A.    Liquidations
All assets will be liquidated and processed as a cash transaction.
B.    Fidelity Personalized Planning & Advice ("FPP&A")
For Plan 56566, which has elected FPP&A, SAI, which serves as discretionary investment manager for certain electing Participants, will (as soon as administratively feasible after the fund action effective date) rebalance Participant account balances among the offerings in the new investment line-up, excluding any assets identified in the FPP&A terms and conditions as excluded from the advisory service.
7
Fidelity Confidential Project Number W552285-05JAN24


C.    Real Time Traded Stock Restrictions
The Hawaiian Electric Industries Retirement Savings Plan (56566) offers Real Time Traded Stock. Exchanges out of HEI Common Stock (RT3L) into funds listed in the "From Fund" column above will be restricted after 4:00 PM ET on 10/01/2026.
Please notify your Fidelity Implementation Project Manager if you have any questions regarding the above Additional Terms and Disclosures.
8
Fidelity Confidential Project Number W552285-05JAN24


Attachment D - Strategy to Communicate Changes
Sponsor requests that Fidelity draft the fund change notification for the Named Fiduciary's review and approval. The Named Fiduciary has confirmed that all status codes should be included with the fund change notifications. Fidelity will distribute the approved fund change notification electronically, via email and NetBenefits and via print to Participants for whom electronic delivery cannot occur. Communications will be sent out at least 30 days prior to the earliest effective date unless otherwise directed by the Named Fiduciary or unless the Named Fiduciary fails to approve notification with sufficient time for Fidelity to so distribute. The Named Fiduciary has considered whether the directions herein implicate the Sarbanes-Oxley Act of 2002 and, to the extent implicated, has determined that any applicable requirements have been or will be satisfied.
Please notify your Fidelity Service Team if you have any questions regarding this section.
9
Fidelity Confidential Project Number W552285-05JAN24
 
 

9
Fidelity Confidential Project Number W552285-05JAN24

Hawaiian Electric Exhibit 10.1
CERTAIN CONFIDENTIAL INFORMATION CONTAINED IN THIS DOCUMENT, MARKED BY BRACKETS, HAS BEEN OMITTED BECAUSE IT IS BOTH (I) NOT MATERIAL AND (II) WOULD BE COMPETITIVELY HARMFUL IF PUBLICLY DISCLOSED.

INTER-ISLAND FUEL TRANSPORTATION CONTRACT




BY AND BETWEEN

SAUSE BROS., INC.

AND

HAWAIIAN ELECTRIC COMPANY, INC.



1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract







        



TABLE OF CONTENTS
Page
1.TERM1
1.1TERM1
1.2INITIAL VOYAGE2
1.3FINAL VOYAGE2
2.VESSELS2
2.1WARRANTY2
2.2BARGE2
2.3TUG3
2.4VESSEL CLARIFICATION3
2.5[...]3
2.6SEAWORTHINESS4
2.7TANK CALIBRATION AND GAUGING5
2.8CARGO TRANSFER EQUIPMENT5
3.VESSEL PERSONNEL AND LOGISTICS6
3.1COMPLEMENT6
3.2TANKERMEN7
3.3EMPLOYEE RESPONSIBILITY AND TRAINING7
3.4MASTER’S DUTIES8
3.5SAFETY MANAGEMENT8
3.6DRUGS AND ALCOHOL8
3.7EQUAL OPPORTUNITY9
3.8DOCUMENTED PROCEDURES9
3.9SAFETY PROGRAM9
3.10ASSIST TUGS10
3.11PORTS10
3.12SAFE BERTH10
3.13MARINE FACILITIES10
3.14BARGE MAKEUP10
3.15PUMPING IN AND OUT10
3.16CARGO HOSE MARKINGS11
3.17CARGO HANDLING11
3.18CARGO AND BUNKER SAMPLE AND SURVEY12
3.19CLEANING12
3.20VOYAGE COURSE AND SPEED12
3.21OTHER TRADES13
4.RATES, CHARGES, AND EXPENSES13
4.1HIRE13
4.2SHIPMENTS MADE IN CONJUNCTION WITH THIRD PARTIES13
4.3ENVIRONMENTAL COMPLIANCE EXPENSES13


i


4.4BUNKERS ON DELIVERY AND REDELIVERY; BARGE HEATING OF-CARGO14
4.5ADDITIONAL BERTHS/PORTS15
4.6PORT, DUES, TAXES, AND OTHER CHARGES15
4.7HIRE EARNED16
4.8BILLING, PAYMENT, AND DISPUTES16
4.9WAIVER OF CLAIMS16
5.SCHEDULING16
5.1SCHEDULING16
5.2NOTICE OF CANCELLATION OR DELAY16
6.MAINTENANCE SERVICES AND OTHER REQUIREMENTS17
6.1MAINTENANCE OF THE TUG AND BARGE17
6.2SCHEDULED DRYDOCKING18
6.3EMERGENCY DRYDOCKING18
6.4LAY-UP19
6.5OTHER REQUIRED SERVICES19
7.INSURANCE19
7.1CARRIER’S INSURANCES19
7.2CONDITIONS APPLICABLE TO CARRIER INSURANCES20
7.3FAILURE TO PROCURE CARRIER INSURANCE21
7.4SHIPPER INSURANCE21
8.LIABILITY AND INDEMNITY22
8.1CARRIER22
8.2SHIPPER24
8.3GENERAL CONDITIONS24
8.4INDEMNIFICATION24
9.LIBERTIES24
10.FORCE MAJEURE25
10.1FORCE MAJEURE EVENTS25
10.2CARRIER’S OBLIGATION26
10.3SHIPPER’S OBLIGATION26
11.LIMITATION OF LIABILITY27
11.1LIMITATION OF LIABILITY27
11.2NOT A DEMISE27
12.GENERAL AVERAGE27
13.POLLUTION27
13.1COMPLIANCE27
13.2OIL SPILL RESPONSE PLAN28
13.3POLLUTION MITIGATION29
ii


14.CHANGE OF OWNERSHIP OF CARRIER29
15.TERMINATION29
15.1TERMINATION BASED UPON DEFAULT29
15.2TERMINATION IN SPECIFIC INSTANCES29
15.3TERMINATION FOR SUBSTANDARD PERFORMANCE30
15.4TERMINATION FOR [...]31
15.5TOTAL LOSS OF BARGE32
15.6CHANGE OF OWNERSHIP/CONTROL32
15.7TERMINATION IN THE EVENT OF BANKRUPTCY32
15.8TERMINATION BY ASSENT32
15.9OTHER CONDITIONS, CONSEQUENTIAL DAMAGES DISCLAIMER32
16.DEFINITIONS32
17.GOVERNING LAW, JURISDICTION, AND VENUE35
17.1LAW35
17.2GOOD FAITH RESOLUTION35
17.3LITIGATION35
18.GENERAL PROVISIONS35
18.1AUDIT35
18.2SHIPPER’S REPRESENTATIVES35
18.3LIENS UPON THE CARGO36
18.4BUSINESS POLICY36
18.5BUSINESS LOCATION36
18.6NOTICES36
18.7CAPTIONS, WORD USAGE37
18.8ASSIGNMENT37
18.9EXTENSION OF BENEFITS37
18.10ENTIRE CONTRACT37
18.11SEVERABILITY37
18.12REGULATORY APPROVAL37
EXHIBITS
A.Barge Requirements
B.Tug Requirements
C.Manning Requirements
D.Diesel Fuel Characteristics
E.ULSD Fuel Characteristics
F.HSFO Characteristics
G.Biofuel Characteristics
H.Ports of Call
I.Carrier’s Schedule of Rates
iii



1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 1 of 40



INTER-ISLAND FUEL TRANSPORTATION CONTRACT

        This Contract (“Contract”) is made on 7/8/2026 | 3:30:39 PM HAST, (“Execution Date”) by and between SAUSE BROS., INC. (“Carrier”), whose principal place of business and address is 3710 NW Front Street, Portland OR 97210, and a Hawai’i operating office address of 499 N Nimitz Highway, Pier 21, Honolulu, HI 96817, and HAWAIIAN ELECTRIC COMPANY, INC., (“Shipper” or “Hawaiian Electric”), a Hawai’i corporation. Shipper and Carrier are each a party (“Party”) and collectively the parties (“Parties”) to this Contract.
RECITALS

A.    Shipper and its subsidiaries, Maui Electric Company, Limited, and Hawai‘i Electric Light Company, Inc., are operating public utilities in the business of generation, distribution, purchase and sale of electrical power on the Islands of O‘ahu, Maui, Hawai‘i, Moloka‘i, and Lāna‘i.

B.    Shipper utilizes large quantities of diesel and high sulfur fuel oil (“HSFO”) (and in the future, potentially biofuels) in its generation process.

C.    Shipper is in need of reliable and economical transportation of such diesel and HSFO (and in the future, potentially biofuels) between O‘ahu and Maui County and Hawai‘i Island.

D.    Shipper’s needs can best be met by the use of specialized vessels (“Vessels”) dedicated primarily to serving Shipper.

E.    Carrier is in the business of transporting liquid fuel products in bulk among and between the Hawaiian Islands.

F.    Carrier has such Vessels that can effectively meet Shipper’s needs.

AGREEMENT
In consideration of these premises and of the mutual promises herein contained, Carrier agrees to provide the Vessels identified herein for the purpose of transporting Shipper’s Cargo (“Cargo”) of diesel and HSFO and performing related services as described in this Contract (“Services”) between the Island of O‘ahu and Maui County and Hawai‘i Island subject to the following terms and conditions:
1.Term.
1.1Term. The term (“Term”) of this Contract shall commence on the effective date (“Effective Date”) as defined in Section 18.12 G and continue through and including March 31, 2037, unless terminated earlier as provided in this Contract. Subject to the effectiveness of this Contract as set forth in Section 18.12 (Regulatory Approval), Carrier shall have the Vessels




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 2 of 40


necessary pursuant to this Contract ready and tendered for service to Shipper on O‘ahu on the 1st day of April 2027.

A.[…]. No […] than […] will […] a […] of […], including […] and […] and […]. Based on the foregoing, […] may […] by […] to […] no […] than […]. Within […] of […] of the […], […] shall […] in […] if it […] the same. The […] will […] if […] by […]. If […] does not […] an […] to […] by […], the […] as set forth in […] shall […] in […]. If […] an […] to […] as set for herein but […] does not […] the […], this […] will […] on […].

1.2Initial Voyage. If the initial voyage of the Vessels shall commence from a US West Coast port designated by Carrier. Shipper shall be responsible for the costs associated with repositioning the Vessels to Oahu for service starting April 1, 2027. The Hire rate outlined in Exhibit I shall apply to the repositioning voyage.

1.3Final Voyage. Should the Vessels be on a voyage laden with Shipper’s Cargo upon the expiry of the Initial Term or any Extended Term of this Contract, Carrier’s obligation to provide the Services shall continue at the same rate and on the same conditions for such extended time as may be necessary for the completion of the delivery of the Cargo. At the expiration or termination of this Contract, the Vessels shall be returned in ballast to a US West Coast port designated by Carrier. Shipper shall be responsible for the costs associated with repositioning the Vessels in ballast to the designated US West Coast port. The Hire rate outlined in Exhibit H shall apply to the repositioning voyage. At Carrier’s option, the Final Voyage may be with cargo. Carrier shall be responsible for the Final Voyage with cargo to the designated US West Coast port.

2.Vessels.

2.1Warranty. Carrier warrants that as of the Effective Date and at all times during the term of this Contract, including any extension hereof, the Vessels, being the barge (“Barge”) identified in Section 2.2 (Barge) and tug (“Tug”) identified in Section 2.3 (Tug), shall conform to the specifications, descriptions, particulars, capabilities, outfitting, and operational requirements set forth in Section 2.2 (Barge) and Section 2.3 (Tug), including all exhibits hereto. Carrier shall tender the Barge to Shipper fully fit for service hereunder on or before April 1, 2027. Subject to the requirements of Section 18.12 (Regulatory Approval), Carrier shall tender the Barge to Shipper fully fit for service hereunder on or before April 1, 2027.

2.2Barge. The Barge shall be as identified in Exhibit A, attached hereto and incorporated herein, and shall be outfitted in accordance with Exhibit A and Exhibit C, attached hereto and incorporated herein.




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 3 of 40


2.3Tug. The Tug shall be as identified in Exhibit B, attached hereto and incorporated herein, and shall be outfitted in accordance with Exhibit B and Exhibit C, attached hereto and incorporated herein.

2.4Vessel Clarification. For purposes of clarification, it is understood that the Tug and Barge shall include […] provided by […] in accordance with Section 2.5 (Substitution).

2.5[…]. Carrier shall make the Vessels available to Shipper as required by Shipper pursuant to this Contract throughout the term of this Contract. Except as provided in Section 6.1 (Maintenance of the Tug and Barge), During any period in which a […] is […] for […] as set forth in this Contract, regardless of the […] of such […] or whether or not the […] was […] or […], […] shall […] to […] a […] of […] and […] to […] and […] the […] set forth in this […], for […].

A.[…] Due to […].

(1)[…]. If a […] is […] by […] during a […], such […] will be […] to […] for […] within […] of the […] that the […]. […] will […] such […] at […] to […].

(2)[…]. If a […] is […] by […] during a […], […] will […] to […] such […] from […] to […] for […]. If […] and […] in […] a […], […] shall be […] for those […], which in […] shall be […] the […] would […] its […]. If […] is […] to […] a […] from its […] to […], […] will […] its […] to […] a […] at the […] at the […] for […] to […]. All […] and […] for the […], including […] as […] above, […] and […], and […] and […] for […] and […] of […] from […], […] be […] to […] and […] to […].

B.[…] Due to […].

(1)[…]. There will be […] in the […] of a […] for […] during a […] for […] as […] in […] and […] will […] such […] at […] to […].




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 4 of 40



(2)[…]. […] will […] to […] a […] from […] to […] for […] with […] of […] and […] of […] to […] to […] the […] during […] that the […]. If […] is […] to […] a […] from its […] to […] will […] its […] to […] a […] at the […] at the […] for […] to […]. The […] will be […] for […] by […] to a […] as mutually agreed upon by Shipper and Carrier. At the […] of […] will be […] for […] by […] to a […] to that at which the […] was […] following the […] of its […] for […] during such […]. If the […] of the […] will not […] of […] to the […] of […], can […] to […] a S[…]. […] shall […] of […] of the […] to such […] and shall […] until the […] and […] are both again […] and […] to the […] or an […] along the […] to […]. […] is solely […] for all […] and […] of any […] in the […] or […] of the […]. […] shall […] for the […] and […] of […] that result from […] of the […] without […] and subject to […].

C.[…] Vessel Standards. […] warrants that any […] or […] shall be […] and […] to […] the […] when […] for […] and shall be […] to […] in […] with the […] in this […], […], but […] to, having […] and other […] and the […] to […] a […] and […] consistent with the […] and […] set forth in […]. An […] all of the […] to a […] under […], except for […] as to […], and […] to […]. A […] must […] of the […] to the […] under […], except for […] as to […], and […] for the […], as stated in […]. […] and […] in this […] do not apply to […] with […].

2.6Seaworthiness. With respect to any Vessel (including any […]) provided by Carrier to Shipper pursuant to this Contract, Carrier shall be bound to exercise due diligence at all times during the entirety of the Contract term to:

A.make the Vessel seaworthy, tight, staunch, strong, fit and in a thoroughly efficient state, order, and condition;





1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 5 of 40


B.properly man the Vessel in accordance with Article 3 (Vessel Personnel and Logistics), and Exhibit C, attached hereto and incorporated herein;

C.make the tanks and all other parts of the Barge in which the Cargo is carried or to be carried fit and safe for the receipt, loading, stowage, carriage, preservation, and discharge of the Cargo;

D.equip the Barge in accordance with the provisions of Exhibit A (except as otherwise provided in Section 2.5.B.(2) (Barge)) and Exhibit C;

E.equip the Tug in accordance with the provisions of Exhibit B and Exhibit C;

F.ensure that the Vessel is fully rigged with appropriate towing gear, fenders, hoses, reducers and all other necessary and/or appropriate equipment for the safe, efficient, and proper (i) loading of the Cargo at Honolulu Harbor Pier 30 or Barbers Point Harbor in accordance with Exhibit A, Exhibit B, and Exhibit C and (ii) discharging of the Cargo at all ports in the Hawaiian Islands contemplated by this Contract;

G.ensure (i) that the Plan is approved by and filed with all appropriate government authorities (“Government Authorities”) and is in accordance with the Vessel’s configuration and equipment as well as the nature and amount of the Cargo carried or to be carried on board the Vessel; (ii) that the Plan provides for adequate response capability at the ports, places and marine facilities called and for seas and places of transit; (iii) that a current copy of the Plan is carried on board the Vessel at all times; and (iv) that the Vessel’s master (“Master”), mates (“Mates”), engineers (“Engineers”), crew (“Crew”) and tankermen (“Tankermen”) are familiar and experienced with the Plan’s implementation; and

H.ensure that all required USCG certifications for the Vessel are and remain in full force and effect throughout the term of this Contract.

2.7Tank Calibration and Gauging. Carrier shall have all cargo tanks of the Barge calibrated and ullage tables prepared in accordance with applicable API and ASTM standards by a reputable independent inspector acceptable to Shipper. The Barge shall have clearly legible and accurate draft markings both fore and aft. The ullage tables shall provide trim corrections. The wedge volume tables shall also be provided by Carrier to Shipper. The reference point for gauging the striking height at the gauging point, and the compartment number shall be clearly indicated on the gauging hatch of each cargo tank. Legible copies of the above-mentioned ullage tables shall be provided by Carrier to Shipper prior to commencement of service hereunder, and be made available on the Barge during loading and discharge of the Cargo.

2.8Cargo Transfer Equipment. Carrier will supply all necessary hoses, fittings, reducers, and couplings (American and Metric) required for the USCG approved transfer of the Cargo to any and all loading and discharge headers and will ensure that such hoses, fittings, and couplings will be available on a timely basis so as to meet Shipper’s delivery schedule. All manifold valves and fittings, outboard of the last fixed support to the Barge’s deck, that are used




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 6 of 40


in the transfer of Cargo and ballast, shall be made of steel, malleable iron, or other suitable material. Cast iron valves or fittings are not acceptable and Carrier shall not use such valves or fittings in its performance under this Contract.

Carrier shall provide a sufficient number of cargo hoses on the Vessel of sufficient length and diameter, of a type appropriate for the nature of the Cargo, and suitable for the Cargo’s efficient loading and discharging (“Cargo Hose”). All Cargo Hoses used by the Vessel shall be appropriately inspected by an inspector acceptable to Shipper, hydrotested according to industry standards and marked no earlier than twelve (12) months (“Months”) preceding their use hereunder. Further, Carrier warrants that any and all Cargo Hoses used in service hereunder shall be inspected and hydrotested at intervals not to exceed twelve (12) Months. The Cargo Hose used on the Vessel shall be considered the primary Cargo Hose for the purposes of this Section 2.8 (Cargo Transfer Equipment). In addition to the […] shall […] a […] that has been […] and is […] at […] in […], for […] its […], as a […]. The […] may be […] as a […] on the […] if the […] is […] or is otherwise […] because it […] provided in this Section 2.8 (Cargo Transfer Equipment). Such […] shall be […] the […] is […] as […]. If the […] has been […] as a […] to the […] and is therefore […] as a […], […] will promptly […] to […] a […].

3.Vessel Personnel and Logistics.

3.1Complement. Carrier warrants that throughout the term of this Contract: (i) the Vessel shall have a full and efficient complement of Master, Mates, and Engineers with adequate training and experience in operating all of the Vessels’ equipment; (ii) the Master, Mates, and Engineers shall each possess all valid and current certificates, licenses and other required documentation consistent with their respective duties in performance of the Services issued and approved by the USCG and any other applicable Government Authority; and (iii) All of Carrier’s personnel performing the Services shall be trained, experienced, certificated and proficient in accordance with Exhibit C.

Prior to the initiation of the Services, Carrier shall provide Shipper with documentation detailing the relevant professional qualifications, including the requisite education, training and experience of the Master and crew serving on board the Vessels. Such documentation shall also be provided by Carrier to Shipper for any new or replacement Master or crew assigned to the Vessels. Due to the critical nature of Shipper’s operations, Carrier agrees that if Shipper, in its sole discretion and after reasonable consultation with Carrier, determines that the Master, Mates, or Engineer serving on board the Vessels are unsuitable for the performance of the Services or otherwise not consistent with the best interest of Shipper, Shipper may request that Carrier replace such Master, Mate, or Engineer and Carrier shall comply with such request promptly and at no additional cost to Shipper.

The Master of the Tug, including any relief or substitute Master, shall have a minimum of




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 7 of 40


five (5) years of experience in the towing of ocean-going barges in and among the Hawaiian Islands in the capacity of Master, and each Mate of the Tug, including any relief or substitute Mate, shall have a minimum of three (3) years of experience in the towing of ocean-going barges in and among the Hawaiian Islands in the capacity of a Master or Mate. In addition, the Master shall have a minimum of five (5) previous arrivals and five (5) previous departures for any port at which the Tug and Barge call. These arrivals and departures must have been made while serving in the capacity of Mate, Master, or observer on vessels of equivalent size and characteristics as the Vessels required hereunder.

3.2Tankermen. Carrier will furnish the necessary personnel for loading and discharging the Barge, including but not limited to providing or arranging for a minimum of two (2) trained, dedicated, licensed, and certificated Tankermen to attend the Barge at all times when the Barge is arriving and departing the places of Cargo loading or discharging, during Cargo operations and at all times when the Barge is at berth in a laden condition.

Carrier shall assign sufficient Tankermen to maintain two (2) alert and rested Tankermen on board at all times during Cargo transfer operations. The Tankermen shall manipulate all Barge valves and shall handle all tow lines and connections at the places of Cargo loading and discharging, as well as the necessary pumping facilities to affect the discharge of the Cargo. Carrier shall furnish all mooring lines for the Barge.

Upon arrival at the [...] at each [...] or [...], [...] shall [...] to [...] a [...] by [...] or [...] that the [...] is [...] or [...], [...] or [...]; provided that if [...] is [...] to [...] with [...] by [...], [...] shall [...] the [...] by [...] after [...]. Except as the parties may otherwise [...], [...] shall [...] the [...] of [...] of the [...], or [...] upon the [...]. For the avoidance of doubt, [...] in the [...] of this Section 3.2 (Tankermen) [...] the [...] of [...] when at the [...] or [...] and [...] when [...] or [...] a [...] or [...] at an [...] or [...].

Should the [...] not be [...] to [...] or [...] by [...] on the [...] in [...], the [...] or [...] may [...] the [...] by [...] of such [...] within [...] after the [...]; otherwise the [...] shall [...] in [...].
[...] shall [...] to [...] the [...] stated in [...]. [...] shall apply for the [...] that the [...] is [...] at [...] and [...]. The foregoing notwithstanding, [...] shall [...] to all [...] of [...] in [...] or [...] attributable to or [...]. [...] by the [...] a [...], [...] on [...], and [...] shall [...] as [...].

3.3Employee Responsibility and Training. Carrier warrants that the formal job descriptions of the Vessels’ Master, Mates, and Engineers, and Tankermen include the




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 8 of 40


satisfactory performance of all duties and responsibilities applicable to Carrier’s performance of Services. Carrier also warrants that the duties and responsibilities of the Master, Mates, and Engineers in such areas as seaworthiness of the Vessels, safe navigation, weather and sea conditions, tow wires, preventing leakage, towing and deck machinery, condition of the tanks, training and readiness, compliance with laws and regulations, including manning laws and regulations, and the display of documents are set forth in written procedure documents which have been reviewed by such personnel and which are maintained on the Vessels. Carrier further warrants that as of the date of Carrier’s commencement of the Services under this Contract, the Master, Mates, Engineers and Tankermen have received formal instruction and training in conformity with the requirements of Shipper and Shipper’s Cargo suppliers’ terminal (“Terminal”) facilities in the following areas: general safety practices and procedures; firefighting, oil spill control and other emergency procedures; health hazards including hazardous materials handling; and, for Tankermen, tank barge operations.

3.4Master’s Duties. The Master of the Tug shall determine whether operations requested by Shipper can safely be undertaken and whether the Vessels are capable of undertaking or being employed to carry out the directions and orders of Shipper with respect to shipment of the Cargo, provided that the Master shall not unreasonably refuse any request to undertake or carry out such directions and orders. The Master, although appointed by and in the employ of Carrier and subject to Carrier’s direction and control, shall prosecute voyages with the utmost dispatch, render all reasonable assistance with the Tug’s Mates and Engineers and equipment, and shall carry out the requests of Shipper in connection with Shipper’s agencies and arrangements, including but not limited to Shipper’s Cargo suppliers and receivers, the Terminal and marine facility personnel of Shipper’s Cargo suppliers and receivers, and the Cargo inspectors. It is agreed that nothing in this Contract, however, shall be construed as vesting Shipper or its agents with any control over the physical operation or navigation of the Vessels.

3.5Safety Management. Carrier shall obtain and maintain throughout the Initial Term and any Extended Term, full certification under the then current American Waterways Operators Responsible Carrier Program (or equivalent) as well as ISO 9001 (or standards which supersede them).

3.6Drugs and Alcohol. Carrier warrants that it has a policy on substance abuse (“Substance Abuse Policy”) applicable to all individuals performing the Services that meets or exceeds the standards of the USCG, including the requirement that all Carrier personnel involved in the shipment of the Cargo be tested for use of illegal or illicit substances. Such testing and screening shall include reasonable cause testing, random testing, and pre-employment testing. Carrier warrants that the Substance Abuse Policy will remain in effect throughout the term of this Contract, and that Carrier shall ensure that the Substance Abuse Policy is fully complied with.

3.7Equal Opportunity. To the extent applicable, Carrier shall comply with the following:

A.Equal Employment Opportunity. (Applicable to all contracts of $10,000 or more in the whole or aggregate. 41 C.F.R. 60-1.4 & 41 C.F.R. 60-741.5(a)). Carrier is aware and fully informed of Carrier’s responsibilities under Executive Order




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 9 of 40


11246 (reference to which includes amendments and orders superseding, in whole or in part) and shall be bound by and agrees to the provisions as contained in Section 202 of said Executive Order and the Equal Opportunity Clause as set forth in 41 C.F.R. 60-1.4 and 41 C.F.R. 60-741.5 (a), which clauses are hereby incorporated by reference.

B.Equal Opportunity for Veterans. (Applicable to each federal government contract of $100,000 or more for the purchase, sale or use of personal property or non-personal services (including construction). 41 C.F.R. 60-300.4).  If applicable, Carrier agrees that it is, and shall remain, in compliance with the rules and regulations promulgated under The Vietnam Era Veterans Readjustment Assistance Act of 1974, as amended by the Jobs for Veterans Act of 2002, including the requirements of 41 C.F.R. 60-300.5(a), which are incorporated herein by reference.

C.Employee Rights under the National Labor Relations Act. (Applicable to (i) all prime contracts of $100,000 or more and (ii) subcontracts of $10,000 or more resulting from solicitations issued on or after June 21, 2010). If applicable, Carrier agrees that it shall comply with Executive Order 13496 (Notification of Employee Rights under Federal Labor Laws) and 29 C.F.R. Part 471 regarding employees’ rights under the National Labor Relations Act to form, join and assist a union and to bargain collectively with their employers.

3.8Documented Procedures. Carrier warrants that it has formal written procedures governing safety in performance of the Services including but not limited to: the use of work vests, hard hats and breathing apparatus; safe access; smoking; lighting; and lifesaving equipment. Carrier also warrants that it has formal written procedures governing operational matters including but not limited to: emergency procedures; Vessel towing gear, lights, machinery, cargo tanks, cargo gear, engine room and deck fittings; cargo integrity; cargo transfer equipment connections; pre-transfer conference; cargo inspection and gauging procedures; trim and stress; static hazard procedures; cargo transfer; cargo heating, topping off; tank stripping operations; transfer shutdown; startup transfer; operating logs; pollution control; cargo tank ventilation and tank entry hazards; and damaged barge management. Carrier further warrants that it has an audit or review program in place which includes provision for penalties or other disciplinary actions to assure compliance with such procedures.

Copies of these procedures and the results of audits of the same shall be provided to Shipper at or prior to the Execution Date, and promptly upon any revision or change to such procedures or as audit results are received by Carrier. Carrier’s warranties set forth in this Section 3.8 (Documented Procedures) concerning Carrier’s documented procedures shall not relieve Carrier of its obligation to comply with all applicable present and future federal, state, and local laws, rules, regulations, orders, ordinances, permit conditions, and other actions of governmental or quasi-governmental authorities (collectively, “Laws”) concerning such documented procedures.

3.9Safety Program. Throughout the term of this Contract, Carrier shall maintain a formal written safety program concerning all aspects of its performance of the Services, including, but not limited to, navigation, operations, cargo handling, tank cleaning, voyage repairs, and documented monthly safety meetings.




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 10 of 40


Carrier shall maintain formal written procedures to track all shipments under this Contract and communicate to Shipper all events involving Carrier or its affiliates engaged in similar services as provided under this Contract that require notification to the USCG.

3.10Assist Tugs. Should the Vessel require support, escort or assist tugs, Carrier shall utilize tugs and tug companies of their choosing approved by Shipper, which shall not be unreasonably withheld. Charges for assist or escorts to be paid directly by Carrier and rebilled to Shipper without mark-up with full supporting documentation.
3.11Ports. The Cargo shall be loaded, transported and discharged by Carrier at and between the ports identified on Exhibit H.

3.12Safe Berth. Carrier shall be responsible for determining the safety of each port and berth applicable to the Services, including entry into, laying afloat at, and egress from each such port and berth by the Vessels at all seasons, times, and stages of tide. The ports and berths identified in Exhibit H are agreed by Carrier to be safe for such purposes. In the event substitute or other ports or berths are nominated by Shipper, Carrier shall promptly inspect such ports and berths to determine whether the Vessels can safely enter, lay at and depart from such ports and berths at all seasons, times and stages of tide, and shall immediately notify Shipper in writing if the Vessels or either of them cannot do so, identifying the deficiencies with particularity. Should any port or berth become, in the reasonable opinion of Carrier, unsafe during the term of this Contract, Carrier shall immediately notify Shipper in writing with full particulars of the hazards and/or dangers and shall await Shipper’s instructions. Carrier shall be responsible for the safe navigation operation and berthing of the Tug and Barge at all times.

3.13Marine Facilities. The Vessels shall operate in compliance with all applicable Laws, including operating, pollution abatement, and safety regulations or requirements of the operator or Government Authority of any marine Terminal facility, wharf, berth, or dock for which the Vessels are nominated by Shipper to load or discharge Cargo at, including when the Vessels are approaching, alongside or departing said facility, wharf, berth, or dock. Should the Vessels fail to comply with such Laws or requirements or should the Terminal representative determine that an unsafe condition exists with respect to either or both Vessels, the Terminal representative shall have the right to order the Vessels to immediately cease loading or unloading operations and leave the place of mooring. Any and all time lost and expenses incurred as a result of such Vessel non-compliance, shall be the sole responsibility of the Carrier.

3.14Barge Makeup. Carrier shall be responsible for making up the Tug and Barge and for determining the method and position in which the Barge shall be towed.

3.15Pumping In and Out. All Cargo shall be loaded into the Barge by shore pumps as designated by Shipper, which shall have sole responsibility and risk for such operations. The Cargo is loaded at the expense and risk of Shipper up to the point the Cargo passes through the connection of the Barge hose flange from the shore riser, at which point Carrier’s period of responsibility, including the risk of loss with respect to the Cargo commences. Carrier is responsible for making the connection between the Barge hose and the shore riser at the loading end unless the practice at a particular Terminal is for on-shore Terminal personnel to make this connection. Carrier’s period of responsibility and risk of loss with respect to the Cargo that has




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 11 of 40


passed through the connection of the Barge hose flange from the shore riser as provided in this Section 3.15 (Pumping In and Out) continues upon such receipt during loading, as well as during stowage and transportation and until the Cargo has passed from the Barge hose flange connection to the shore riser at the place of discharge.
At discharge, all Cargo shall be discharged by the Barge pumps at the sole expense and risk of Carrier up to the point the Cargo passes through the connection of the Barge hose flange to the shore riser at the place of discharge. Carrier is responsible for making the connection between the Barge hose and the shore riser at the discharge end unless the practice at a particular Terminal is for on-shore terminal personnel to make this connection. Carrier shall provide all necessary and sufficient pumps, power, hoses, reducers and hands required on board for safely mooring and unmooring, connecting and disconnecting of hoses and loading and discharging of the Cargo. The Barge shall be capable of receiving on board at loading up to three (3) grades of Cargo simultaneously. At discharge, the Barge shall be capable of discharging up to three (3) grades of Cargo simultaneously.

Carrier shall arrange and be solely responsible for providing and deploying oil booms and any other pollution abatement equipment required by regulation or policy for petroleum transfers at Kalaeloa/Barbers Point Harbor, Pier 5 or 6. If deploying oil booms or other pollution abatement equipment is or becomes required by Law or policy at other Terminals in the loading and discharging ports listed on Exhibit H, Carrier will arrange for deployment of such equipment and Shipper shall be solely responsible for the cost thereof, either by direct payment or reimbursement to Carrier at Carrier’s cost for such equipment. The Barge shall load the Cargo at the rates requested by Shipper, its agents and/or the Terminal facility personnel, having due regard for the safety of the Barge and the environment. Carrier warrants that the Barge shall at all times be able to discharge Cargo at the rate indicated in Exhibit A or maintain a minimum pressure at the Barge’s manifold of 100 psi in accordance with Exhibit A or the maximum pressure permitted by the Terminal, whichever is lower.

3.16 Cargo Hose Markings. To avoid contamination or mixtures of the Cargo, before making hose connections for loading or discharging, or before changing the Cargo type to be transferred through the same hose, or when two or more hoses are used simultaneously, both ends of each hose shall be marked with the Cargo type and checked by Carrier’s and Shipper’s representative before any Cargo is moved.

3.17Cargo Handling.

A.The types of Cargo carried under this Contract shall be liquid fuel products, always within the vessel’s cargo authority certification, including, but not limited to, jet, naphtha, gasoline, diesel, ultra-low sulfur diesel (“ULSD”), HSFO, and biofuels. It is the intention of Shipper that the Cargo transported under this Contract will include but not be limited to diesel, ULSD, HSFO, and biofuels which are approximately described in Exhibits D - G, attached hereto and incorporated herein, respectively.

B.When transporting gasoline or gasoline components, the use of cargo heating systems will be restricted.




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 12 of 40


C.Carrier shall receive on board, handle, stow, carry and discharge the Cargo in compliance with all applicable Laws and, at a minimum, exercising that degree of skill and care required by the generally-accepted standards for such work.
Shipper and Carrier agree that the Cargo as set forth in this Contract does not constitute an unreasonable hazard to the Barge, its equipment or the safe operation thereof nor does the Cargo pose any risk of seizure, capture or penalty by any Government Authority or constitute contraband of war. Shipper will not tender for shipment any cargo, thing or substance which, due to its composition, size, shape, weight or any combination thereof, constitutes an unreasonable hazard to the Barge, its equipment, or the safe operation thereof. Carrier shall not undertake any voyage or receive for carriage any goods or cargo that would involve any risk of seizure, capture or penalty by any Government Authority, nor shall any contraband of war be carried by Carrier.
3.18Cargo and Bunker Sample and Survey. Carrier shall allow an independent inspector appointed with the approval of Shipper to survey and take samples of the Cargo, bunker tanks, cofferdams, ballast, slop tanks, or any other void space on the Barge prior to, during (but only in a manner so as not to interrupt current loading operations) and after the loading and discharge of the Cargo.
3.19Cleaning. Upon commencement of Services, the Barge tanks shall either (a) be completely clean and free of all retains and residues, or (b) contain only retains and residue of prior cargo that are compatible with Shipper’s Cargo, and Shipper may sample the residue of prior cargo in the Barge before loading the Cargo to determine the suitability of the Barge. Subsequent to initial tender of the Barge to Shipper, where the Barge has transported third-party cargo or been other than in dedicated service to Shipper, Shipper shall have the right to sample the residue of prior cargo in the Barge before loading the Cargo to determine the suitability of the Barge. Carrier warrants that in each instance in which Carrier has transported third-party cargo, before loading the Cargo onto the Barge, the tanks, lines and pumps will be free of any residue and retain not compatible with Shipper’s Cargo to be loaded or which may cause contamination to or loss or damage of Shipper’s Cargo. Shipper may inspect the Barge to ensure compliance with the foregoing. The time required for such sampling or inspection shall not interfere with Shipper’s required schedule. If, as a result of such sampling and inspection, the Barge is found to be unsuitable, Shipper may order cleaning, or, if in Shipper’s judgment cleaning will not make the Barge suitable, Shipper may reject the Barge at no cost to Shipper. The costs of such cleaning, including the disposal of residues, shall be Carrier’s responsibility, and the time required for such initial cleaning shall not interfere with Shipper’s required schedule. Subsequent to initial presentation of the Barge and provided the Barge remains in dedicated service to Shipper, the cost and time required to undertake such cleaning, including the disposal of residues is Shipper’s responsibility.
3.20Voyage Course and Speed. The Parties intend and Carrier expects voyage speed to be as specified in Exhibit B. Carrier warrants that it will prosecute voyages with reasonable dispatch, proceed safely to designated ports of loading and discharge and, in any event, take whatever steps may be necessary, consistent with prudent seamanship, to make prompt and scheduled delivery of the Cargo. Carrier shall have the sole discretion to determine the prudent speed and course of voyages, taking into consideration factors including, but not limited to, sea




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 13 of 40


and weather conditions, Vessel capacities and capabilities, crew safety, other vessel traffic, port conditions, and environmental safety. In no event, except in an emergency, will the Barge be navigated within five (5) miles of a lee shore or three (3) miles from any shore at any time, except on approaching or departing a harbor.

3.21Other Trades. Except as provided in Section 4.2 (Shipments Made in Conjunction with Third Parties) with respect to third-party petroleum products, Carrier shall have the right to employ the Barge in other trades so long as its obligations under this Contract are fully met, with Shipper to have first priority at all times with respect to the use of the Tug and Barge. In the event Carrier has the opportunity to transport such third-party cargo (“Third-Party Cargo”), it shall inform Shipper of the particulars thereof and obtain Shipper’s written permission prior to agreeing to transport such third-party cargoes, which permission shall not be unreasonably withheld. Shipper shall be entitled to offset the amounts payable by Shipper to Carrier under this Contract for any such transport of Third-Party Cargo.

4.Rates, Charges, and Expenses.

4.1[…].

A.The […] by Shipper to Carrier for the […], including the […], are set forth in […], attached hereto and incorporated herein. […] also […] for […] and […] that are in […] to […].

B.[…]. The […], set forth in […] will be […] on […] by […] the […], and […] each […] thereafter by […] the […].

4.2Shipments Made in Conjunction with Third Parties. Subject to the prior written permission of Shipper, which permission may be withheld in Shipper’s sole and absolute discretion, Carrier may transport petroleum products in bulk as cargo for parties other than Shipper on voyages for Shipper performed under this Contract so long as Carrier’s obligations under this Contract are fully met with Shipper having first priority at all times with respect to the use of the Tug and Barge. Shipper shall be entitled to offset the amount payable to Carrier by Shipper under this Contract for any such transportation of Third Party Cargo.

4.3Environmental Compliance Expenses. Except as otherwise set forth in this Section 4.3 (Environmental Compliance Expenses), Carrier shall comply with all of the requirements of the Oil Pollution Act of 1990 (33 U.S.C. 40 § 2701) (“OPA”), and be solely responsible for all expenses, fees, and costs associated with such compliance, including obtaining and maintaining a USCG Certificate of Financial Responsibility and retaining an Oil Spill Removal Organization (“OSRO”) throughout the term of this Contract. Shipper shall pay pollution compliance fees charged on a per call or per year basis, at any loading or discharge locations, including those of the Marine Spill Response Corporation (“MSRC”) and similar national, state and local OSRO fees. The Hire rates are based in part on environmental compliance expenses, fees, and costs (collectively, “Environmental Compliance Costs”) incurred by Carrier in its performance of the Services and in effect as of the Execution Date. If, during the Initial Term and




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 14 of 40


any Extended Term, a change in Law directly results in specifically identifiable increased Environmental Compliance Costs and such change in Law is applicable to all similarly situated carriers performing services such as the Services performed by Carrier, then Carrier will notify Shipper of such Environmental Compliance Cost increase(s) and if approved by Shipper, such increase(s) will be passed on by Carrier to Shipper with no markup by Carrier as of the date that Carrier actually incurs such increase(s). If Shipper does not approve of the increase, the Parties shall enter into good faith negotiations.
4.4Bunkers on Delivery and Redelivery; Barge Heating of Cargo.
A.Tug.     Shipper shall survey the Bunker upon delivery of the Tug to Shipper to verify Carrier’s invoiced Bunker cost. Upon verification of Carrier’s invoiced cost, Shipper shall pay such Bunker cost to Carrier. Upon completion of the service and return of the Tug to Carrier shall survey the Bunker to verify Shipper’s invoiced Bunker cost. Upon verification of Shipper’s invoiced cost, Carrier shall pay such Bunker cost to Shipper. Shipper shall undertake commercially reasonable efforts to return the Tug to Carrier with approximately the same quantity of Bunker that was provided upon delivery of the Tug to Shipper. Unless otherwise mutually agreed upon, all delivery Bunker surveys performed on Shipper’s behalf pursuant to this Section 4.4.A (Tug) shall be held at the location of delivery of the Tug to Shipper and all return Bunker surveys performed on Shipper’s behalf pursuant to this Section 4.4.A (Tug) shall be held at the location of return of the Tug to Carrier at the conclusion of the service. Each Party shall be equally responsible for the time and cost of all surveys conducted pursuant to this Section 4.4.A (Tug). Upon delivery of the Tug to Shipper, title to the Bunker shall pass from Carrier to Shipper. Upon return of the Barge to Carrier at the conclusion of the service, title to the Bunker shall pass from Shipper to Carrier. If the results of any survey performed pursuant to this Section 4.4.A (Tug) are inconsistent with a Party’s invoice, the Parties shall undertake to resolve such inconsistency based on a review of the survey methodology and process as well as all records pertaining to the surveyed Bunker. If the Parties are unable to resolve the inconsistency through such a review, the Parties shall submit the matter to the dispute resolution process set forth in Article 17 (Governing Law, Jurisdiction, and Venue).
B.Barge. Shipper and Carrier may elect to treat the Barge cargo heating system fuel in the same manner as Bunker on board the Tug. If Shipper elects to utilize the Barge’s cargo heating system during service, Shipper shall survey the amount of heating system fuel upon delivery of the Barge to Shipper to verify Carrier’s invoiced heating system fuel cost. Upon verification of Carrier’s invoiced cost, Shipper shall pay such heating system fuel cost to Carrier. Upon completion of the service and return of the Barge to Carrier, Carrier shall survey the heating system fuel to verify Shipper’s invoiced heating system fuel cost. Upon verification of Shipper’s invoiced cost, Carrier shall pay such heating system fuel cost to Shipper. Shipper shall undertake commercially reasonable efforts to return the Barge to Carrier with approximately the same quantity of heating system fuel that was provided upon delivery of the Barge to Shipper. Unless otherwise mutually agreed upon, all delivery heating system fuel surveys performed on Shipper’s behalf pursuant to this Section 4.4.B (Barge) shall be held at the location of delivery of the




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 15 of 40



Barge to Shipper and all return heating system fuel surveys performed on Shipper’s behalf pursuant to this Section 4.4.B (Barge) shall be held at the location of return of the Barge to Carrier at the conclusion of the service. Each Party shall be equally responsible for the time and cost of all surveys conducted pursuant to this Section 4.4.B (Barge). Upon delivery of the Barge to Shipper, title to the heating system fuel shall pass from Carrier to Shipper. Upon return of the Barge to Carrier at the conclusion of the service, title to the heating system fuel shall pass from Shipper to Carrier. If the results of any survey performed pursuant to this Section 4.4.B (Barge) are inconsistent with a Party’s invoice, the Parties shall undertake to resolve such inconsistency based on a review of the survey methodology and process as well as all records pertaining to the surveyed heating system fuel. If the Parties are unable to resolve the inconsistency through such a review, the Parties shall submit the matter to the dispute resolution process set forth in Article 17 (Governing Law, Jurisdiction, and Venue). Alternatively, Shipper may elect to reimburse Carrier for the actual documented cost of fuel consumed by the Barge’s cargo heating system when operated in response to Shipper’s instructions.
4.5Additional Berths/Ports. When more than one berth within a port is required to complete the loading or discharge of the Cargo, Shipper shall pay the actual, documented additional costs and expenses incurred by Carrier by reason of calling at such additional berth. Such additional expenses shall include, but not be limited to, shifting expense, dockage, assist tug costs for additional berths and pilotage.
When more than one port is called to complete the loading of the Cargo, Shipper shall reimburse Carrier for the amount of the actual, documented additional costs and expenses incurred by Carrier by reason of calling at such additional loading port. Such additional expenses shall include, but not be limited to, normal port costs, shifting expense, dockage, assist tug costs for additional berths and pilotage.
4.6Port, Dues, Taxes, and Other Charges.
A.Carrier shall be responsible for providing and paying for the following, which shall be deemed included within the applicable Hire: all provisions, wages and other expenses of the Master, Mates, Engineers and Tankermen; all drydocking, overhaul, maintenance and repairs to the Vessels, water, engine room stores, costs of maintaining and operating the Vessel and repairing same to assure compliance with the requirements of this Contract and the Hawai‘i General Excise Tax, to the extent applicable, on any of the foregoing costs, but excepting costs allocated to Shipper under this Contract.
B.Shipper shall be responsible for all charges directly and specifically assessed upon the Cargo as well as independent inspection and gauging of the Cargo, wharfage, booming and pipeline tolls (“Pipeline Tolls”) except as otherwise provided in this Contract.
C.Except as otherwise provided in this Contract, Shipper is responsible for, and Vessel Hire rates exclude, port costs, pilotage, taxes as provided in Section 4.6.A, required clearance or entry permits for the Vessels and expenses upon or in connection with the tow, line handling charges, service of assist tugs at the Discharge Ports and at any




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 16 of 40


other port not listed on Exhibit H, escort vessels (if required by applicable Law) and standby vessels.
D.Except as provided in Section 4.6.A, Shipper shall be solely responsible for Hawai’i General Excise Tax, to the extent applicable, on the Hire of the Vessel and on other costs that are specifically allocated to Shipper under this Contract.
E.Carrier shall be solely responsible for the expenses set forth in Section 4.6.B, Section 4.6.C, and Section 4.6.D when such expenses are incurred for Carrier’s purposes only, or when the Vessels are Off-Hire.
4.7[…]. […] is […] by […] on a […] basis, […] when the […] or […] are […].
4.8[…]. […] shall […] on a […] basis in […], with such […] being […] on the […] of each […]. […] shall […] to […] within […] after […] of […]. Invoices for charges must be accompanied by appropriate supporting documents. In cases of dispute as to the amount of payment due, Shipper shall not withhold any amounts due Carrier except for those amounts in dispute. Shipper will notify Carrier in writing of any such disputed amounts within fifteen (15) Days following Shipper’s receipt of Carrier’s invoice. Disputes as to invoices shall be resolved pursuant to Article 17 (Governing Law, Jurisdiction, and Venue).
4.9Waiver of Claims. Any claim for Hire and/or charges pursuant to Article 4 (Rates, Charges, and Expenses), only, shall be deemed waived, extinguished and absolutely barred if such claim is not received by Shipper or Carrier, as the case may be, in writing with supporting documentation within one hundred eighty (180) Days from the date of final discharge of the Cargo on the voyage with respect to which said claim arises. This provision shall not apply with respect to any other claims which might arise under this Contract.
5.Scheduling.
5.1Scheduling. Carrier and Shipper understand and agree that to meet Shipper’s requirement for the most efficient scheduling, loading and discharging of the Barge will require the general cooperation of each party. To facilitate this objective, Shipper shall submit in writing to Carrier by the 20th of every Month (or the next business day (“Business Day”) thereafter) during the term of this Contract a proposed voyage schedule for the following Month stating the anticipated Cargo loading and discharging times and locations. Carrier shall make the appropriate berth reservations and other such arrangements consistent with said schedule. Carrier shall confirm to Shipper within three (3) Business Days of Carrier’s receipt of Shipper’s schedule the making of such reservations and arrangements. It is understood and agreed that this proposed voyage schedule is not binding on Shipper and is to be used only as a best-efforts estimate of Shipper’s requirements.
5.2Notice of Cancellation or Delay. Shipper will endeavor to advise Carrier, as promptly as is reasonably practical, of the cancellation or delay of previously scheduled and




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 17 of 40


confirmed service, giving at least twenty-four (24) hours notice for cancellation or delay of a scheduled and confirmed service and at least twenty-four (24) hours notice for cancellation or delay of scheduled and confirmed shifting service. If less than twenty-four (24) hours notice of cancellation or delay of scheduled and confirmed services is given to Carrier, then Shipper will pay for costs actually incurred by Carrier for Carrier’s Crew and Tankermen to travel to the discharge port, including wages earned during such travel. Carrier shall exercise its best efforts to minimize such costs by employing such mobilized Tankermen and Crew on its other vessels or otherwise utilizing their services. Carrier will advise all affected parties, as promptly as is reasonably practical, of the cancellation or delay of previously scheduled and confirmed service.

6.Maintenance Services and Other Requirements.

6.1Maintenance of the Tug and Barge. Carrier shall be solely responsible for the maintenance of the Tug and Barge and all cost associated therewith to ensure that the Vessels are in full compliance with the requirements set forth in this Contract at all times. Carrier specifically covenants and agrees that it will maintain the Vessels, their appliances and appurtenances, in a state of repair that will allow for safe and efficient operation throughout the term of this Contract, including, without limitation, keeping the Vessels in full unexpired certification as may be required by the USCG or any other Government Authority having jurisdiction over the safe and efficient operation of the Vessels. Carrier shall, at its sole expense, regularly drydock the Vessels for the purpose of keeping the Vessels in full unexpired certification and assuring that the Vessels meet all USCG requirements and are in compliance with all applicable Laws, with all charges incurred in connection therewith to be for Carrier’s account. In addition to regular scheduled drydocking, Carrier, at its sole expense, may also schedule and perform regular maintenance on or minor repair to the Vessels that requires Carrier to remove the Vessels from service without drydocking. Shipper and Carrier agree to arrange scheduled shipments to accommodate required maintenance periods exclusive of drydockings, of up to ten (10) continuous Days, but not to exceed twenty (20) total Days, annually. If any single period of scheduled or unscheduled maintenance or repair that prevents the Vessels from providing service exceeds thirty-six (36) continuous hours, then at the expiration of such thirty-six (36) hours, the Vessels will go Off-Hire until the Vessels are returned to service. The Vessels will remain on Hire if the Barge remains in service for loading or discharge during maintenance or repairs to the Tug. Carrier will make best efforts to provide Shipper with a minimum of thirty (30) Days’ advance notice of each scheduled required maintenance period; provided, however, that Carrier must notify Shipper in writing no later than ninety (90) Days prior to the first Day of any period when the Vessels are expected to be out of service and unavailable for service hereunder because of scheduled drydocking in order to permit arrangement of scheduled shipments. Carrier shall designate a company representative to liaise with Shipper and report on the fulfillment of Carrier’s responsibility to carry out routine hull and equipment inspections, preventative maintenance and schedule of Vessel repair, maintenance and drydocking. For all scheduled and unscheduled repairs, scheduled drydockings, or emergency drydockings under Article 6 (Maintenance Services and Other Requirements), Carrier must comply with the substitution requirements set forth in Section 2.5 (Substitution).




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 18 of 40


6.2Scheduled Drydocking.

A.[…] shall […] a […] in accordance with the […] stated in […], to […] the […] that […] all of the […] for the […] set forth in this […] during […] that the […]. The […] will be […] for […] by […] to a […] to that at which the […] was […] to […] the […] of its […] for […] prior to […]. At the […] of […], the […] will be […] by […] for […] by […] to a […] to that at which the […] was […] to […] immediately following the […] of its […] for […] during such […]. […] is solely […] for […] and […] of any […] in the […] of the […] or […] of the […].

B.[...] shall [...] a [...] in [...] with the [...] stated in [...], to [...] the [...] that [...] all of the [...] for the [...] as set forth in [...] during [...] that the [...]. The [...] will be [...] for [...] by [...] to a [...] as mutually agreed upon by Shipper and Carrier. At the [...] of [...] the [...] will be [...] for [...] by [...] to a [...] to that at which the [...] was [...] to [...] the [...] of its [...] for [...] during such [...]. If [...] does [...] a [...] during the [...], [...] shall [...] upon [...] of [...] of the [...] to such [...] and shall [...] until the [...] and [...] are [...] and [...] to the [...] or an [...] the [...] to [...] next [...]. [...] is solely responsible for all [...] and [...] of any [...] in the [...] of the [...] or [...] of the [...] and [...]. [...] shall [...] for the [...] of [...] of [...] that are [...] as a result of [...] of the [...] and [...] while [...] the [...] for [...].

6.3Emergency Drydocking. If a Vessel requires emergency drydocking while under hire by Shipper, the Vessel may proceed to an appropriate port upon Carrier’s determination that such emergency drydocking is required. Provided the cause for the emergency drydocking is not solely attributable to Shipper’s negligence, Carrier is solely responsible for all cost and expense associated with placing the Vessel in emergency drydock including, without limitation, all towing, pilotage and fuel expenses, from the time that Carrier proceeds to emergency drydock up to the time that the Vessel is redelivered to Shipper for service. The cost of fuel used during such emergency drydocking will be charged to Carrier by Shipper at the price charged to Shipper by its bunker supplier at the last supply port and reimbursed by Carrier to Shipper within thirty (30) Days of Carrier’s receipt of Shipper’s invoice. If the cause of the emergency drydocking is solely attributable to Shipper’s negligence, the cost and time required for such emergency drydocking shall be the same as for a scheduled drydocking under Section 6.2 (Scheduled Drydocking).

If emergency drydocking occurs at a port where the Vessel is to load, discharge or bunker




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 19 of 40


for Shipper, Hire will be suspended from the time the Vessel receives free pratique on arrival, if in ballast, or upon completion of discharge of the Cargo, if loaded, up to the time that the Vessel is redelivered to Shipper for service. If emergency drydocking occurs at a port other than where the Vessel loads, discharges or Bunkers for Shipper, the following time and Bunkers shall be deducted from Hire: total time and Bunkers, including the time and Bunkers spent at the port of call where the emergency drydocking occurs from the actual voyage from last port of call under Shipper’s order to next port of call under Shipper’s orders, less historical voyage time and Bunkers for the direct voyage from last port of call to next port of call.
6.4Lay-up. Subject to Carrier’s approval which will not be unreasonably withheld, Shipper may lay-up the Barge (“Lay-up”) at a safe place for all or any portion of the Shipper’s use thereof Shipper shall continue to pay Hire during such Lay-up period. Notwithstanding the foregoing, any amount that Carrier saves during a Lay-up period as a result of the Vessels not being actively engaged in the Services for Shipper, including without limitation, operating expenses, less any extra expenses that Carrier incurs as a result of the Lay-up, including without limitation, crew repatriation expenses and expenses to keep the Vessels well and properly maintained during the Lay-up period shall be credited to Shipper against the Hire. Shipper is solely responsible for all applicable reactivation from Lay-up expenses, including crew joining expenses.
6.5Other Required Services. As part of the Services, Carrier shall provide the following to Shipper: coordinating with Shipper and consignees for the loading and discharge of the Cargo from the Barge; making scheduling arrangements for berthing and pilotage at ports or places of call; making follow-up arrangements when necessary due to schedule changes, weather and other operational considerations, whether anticipated or unanticipated; scheduling the loading and discharge of the Cargo from the Barge to meet required arrival and sailing times; preparing Cargo loading plans for the Barge; and other such services as may be reasonably contemplated to fall within the scope of the Services and are mutually agreed upon by the Parties. Shipper shall be solely responsible for all Pipeline Toll amounts, either by Shipper making direct payment to the toll assessing entity or as a reimbursement to Carrier.
7.Insurance.
7.1Carrier’s Insurances. Carrier shall, at its sole expense including the expense of deductibles, premiums, calls and policy charges, procure and maintain the following insurances for the duration of this Contract.
A.Hull and Machinery Insurance shall be placed and maintained with reputable marine underwriters and insured for an agreed value as between Carrier and Carrier’s underwriters subject to The American Institute Hull Clauses (June 2, 1977). The Hull and Machinery Insurance shall include coverage for War Risks, Strikes, Riots, and Civil Commotions.
B.Protection and Indemnity Insurance ("P&I Insurance") for the Vessel, which P&I Insurance shall be placed and maintained with full P&I indemnity cover in the ordinary course from a P&I Club that is a member of the International Group of P&I Clubs (“IG”) with coverage at as contemplated by the rules of the Carrier’s IG P&I Club, or with a commercial insurance company(ies) per Form SP-23 or equivalent and in which




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 20 of 40


the so called “Other than Owner/As Owner” clause shall be deleted, with navigation limits adequate for the Vessel’s trade and covering Carrier’s Vessels used under this Contract. The P&I Insurance shall include coverage for injury to or death of passengers, master, mates, and crew, including, but not limited to transportation, wages, maintenance and cure, the Jones Act and Death on the High Seas Act; collision and towers liability; pollution liability; war risks; and removal of wreck/debris with a total limit not less than $1,000,000,000 per occurrence. If pollution liability coverage is not provided by the P&I Insurance, coverage may be provided per the Water Quality Insurance Syndicate or Safe Harbor Pollution Insurance forms, or equivalent, including, but not limited to all such liability arising under international, federal, state or local laws, rules or regulations with a total limit not less than $1,000,000,000 per occurrence. Such coverage shall include misdirected arrow protection in favor of Shipper and Shipper to have the option of requiring that it be named as a co-assured or as a joint member under Carrier’s P&I Club entry, but only to the extent permitted by the rules of the Carrier’s IG P&I Club. The P&I Insurance, (together with Carrier’s other liability insurance), must also include cargo legal liability for cargo loss/damage, with a total limit, primary and excess, not less than $25,000,000 per occurrence.
C.Standard Workers Compensation, Employers Liability, and Maritime Employers Liability insurance endorsed to be applicable to the State of Hawaiʻi as well as the Longshore Act, with statutory limits for workers compensation and Employers’ liability with minimum limits of $5,000,000 each accident, $1,000,000 disease each employee, and $1,000,000 disease policy limit of liability.
D.Marine General Liability Insurance with minimum limits of $10,000,000 per occurrence.
E.Contractual Legal Liability Insurance, through the P&I Insurance and other liability insurance, with minimum limits, primary and excess, of $25,000,000 per occurrence.
7.2Conditions Applicable to Carrier Insurances. The foregoing insurances shall be subject to the following additional conditions.
A.Carrier’s insurances shall be subject to review and approval by Shipper with respect to insuring forms, conditions, deductibles, limits and underwriting security, at the inception of the initial term of this Contract as well as at any renewal or reissuance thereafter.
B.Carrier will cause its insurers to waive all rights of subrogation which Carrier or its insurers may have against Shipper to the extent of the liabilities and responsibilities allocated under this Contract and subject to the rules of the Carrier’s IG P&I Club.
C.Carrier’s insurance policies (except for Workers Compensation insurance) providing the insurance coverage required in this Contract must be endorsed to (i) name Shipper as an additional insured to the extent of the liabilities and responsibilities




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 21 of 40


allocated under this Contract and (ii) be primary in respect to the insurance carried by Shipper, each to the extent of the liabilities and responsibilities allocated under this Contract but only to the extent permitted by the rules of the Carrier’s IG P&I Club (with additional cost, if any, for Shipper’s account).
D.Before performance of this Contract, Carrier shall file with Shipper’s designated representative certificates of insurance, or other documentary evidence acceptable to Shipper, certifying that each of the foregoing insurance coverages is in force, and further providing that Shipper will be given thirty (30) Days’ written notice of any material change in, cancellation of, or intent not to renew any of the required policies. Carrier shall provide new insurance certificates reflecting the required policies prior to the expiration date of any coverage. Receipt of any certificate showing less coverage than required is not a waiver of Carrier’s obligation to fulfill the coverage requirements.
7.3Failure to Procure Carrier Insurance. In the event Carrier fails to procure and/or maintain an insurance as required above, an insurance fails for any reason (including, without limitation, breach of policy condition or warranty) and/or an insurer otherwise refuses or is unable to pay, the Carrier shall be deemed an insurer or self-insurer, shall accept and pay claims which would have otherwise been submitted to the failed insurance and shall indemnify and hold harmless (including legal fees and costs) the Shipper of and from any loss, damage, expense, claim, liability and/or suit resulting from such failure.
7.4Shipper Insurance. Without prejudice to, or otherwise diminishing Carrier’s or Shipper’s duties under any Indemnity Clause(s) stated in this Contract, Shipper shall, at its sole expense including the expense of deductibles, premiums, and policy charges, procure and maintain the following insurances for the duration of this Contract:
A.All Risk Cargo Insurance upon all Cargo, including coverage for shortage and containment (except for claims for contamination pursuant to Section 8.1.D.(3), to the full delivered values of such Cargo including freight and insurance;
B.Standard Workers Compensation, Employers Liability, and Maritime Employers Liability Insurance endorsed to be applicable to the State of Hawaiʻi as well as the Longshore Act, with statutory limits for workers compensation and Employers’ liability with minimum limits of $5,000,000 each accident, $1,000,000 disease each employee, and $1,000,000 disease policy limit of liability
C.Industry standard Contractual Legal Liability Insurance insuring Shipper’s obligations pursuant to this Contract, with minimum limits, primary and excess, of $25,000,000 per occurrence.
Shipper will cause its insurers to waive all rights of subrogation that Shipper or its insurers may have against Carrier to the extent of the liabilities and responsibilities allocated under this Contract. Shipper’s insurance policies required in this Contract (except for Workers Compensation insurance) must be endorsed to (i) name Carrier as an additional insured (except for All Risk Cargo insurance) and (ii) be primary in respect to the insurance carried




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 22 of 40


by Carrier, but only to the extent of the liabilities and responsibilities allocated under this Contract.
Shipper to provide Carrier certificates of insurance, or other documentary evidence acceptable to Carrier, certifying that each of the foregoing insurance coverages is in force, and further providing that Shipper will be given thirty (30) days’ written notice of any material change in, cancellation of, or intent not to renew any of the required policies. Shipper shall provide new insurance certificates reflecting the required policies prior to the expiration date of any coverage. Receipt of any certificate showing less coverage than required is not a waiver of Shipper’s obligation to fulfill the coverage requirements.
Shipper may elect to self-insure in whole or in part with respect to the obligation to provide All Risk Cargo Insurance. In the event that Shipper chooses to self-insure or fails to procure the required All Risk Cargo Insurance, Shipper will be deemed the insurer or self-insurer, shall accept and pay all claims which would otherwise be covered, and shall indemnify and hold harmless (including costs and legal fees) the Carrier from any loss, damage, claim, liability and/or suit which would have been covered by such insurance. Shipper shall be solely responsible for all uninsured loss of cargo.
8.Liability and Indemnity.
8.1Carrier.
A.Assist Tugs and Pilots. In addition to any other indemnification obligations Carrier may have elsewhere in this Contract, Carrier shall indemnify, defend and hold harmless Shipper, its successors, permitted assigned, affiliates, controlling persons, directors, officers, employees, servants and agents (including but not limited to contractors, subcontractors and the employees of any of them) as well as the Cargo suppliers, receivers and any other contractors, subcontractors and the employees, representatives, servants and agents of all of the foregoing of and from (including legal fees and costs) any and all losses, damages, expenses, liabilities, claims and/or suits of any type or nature whatsoever, whether to third parties or otherwise, arising from or relating to the acts or omissions of any assist tugs, escort tugs, or standby vessels, or of the Master, officers or crew of any of them. If pilots licensed by the State of Hawai‘i are carried on the Vessels, or if the same are Law or custom, the foregoing indemnity shall also apply to such pilots, who shall be deemed the servants of and in the service of Carrier and under Carrier’s instructions.
B.Hazardous Materials. Should Shipper incur any liability under Chapter 128D, of the Hawai‘i Revised Statutes or other relevant state or federal laws or regulations as a result of an escape or discharge of oil occurring during Carrier’s period of responsibility or otherwise arising out of or relating to responsibilities which Carrier has assumed pursuant to this Contract, Carrier shall indemnify, defend and hold harmless Shipper of and from all damage, loss, fine, penalty, claim, demand, suit, cost or expense (including reasonable attorneys’ fees and costs as well as court costs) arising out of such liability.




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 23 of 40


C.Environmental/Pollution Risks. Carrier is responsible for and shall indemnify, defend and hold harmless Shipper, its directors, officers, employees and agents from and against all liabilities, damages, losses, fines, penalties, claims, demands, suits, costs, expenses (including legal fees and costs), and proceedings of any nature whatsoever directly or indirectly arising from pollution damage (“Pollution Damage”). Pollution Damage means loss or damage caused by the escape or discharge of the Cargo or any pollutant from the Vessels, wherever such escape or discharge may occur during Carrier’s period of responsibility for the Cargo, and includes the costs or preventative measures, wherever taken, and further loss or damage caused by such preventative measures or disposal of oil or hazardous materials. This obligation to indemnify, defend and hold Shipper harmless also applies to:

(1)damages and claims as defined in the OPA;

(2)the reasonable costs of any required or necessary repair, cleanup or detoxification of an area of oil or hazardous material and the preparation and implementation of any closure, remedial or other required plans;

(3)the reasonable costs of the investigation of any environmental claims by Shipper;

(4)the reasonable cost of Shipper’s enforcement of this Contract; and,

(5)all reasonable costs and expenses incurred by Shipper in connection with Section 8.1.C.(1), Section 8.1.C.(2), and Section 8.1.C.(4), including, without limitation, reasonable attorneys’ fees and costs as well as court costs.

D.Other. In addition, Carrier shall also be solely responsible for:

(1)all loss or damage to the Vessel(s), howsoever caused and regardless of whether resulting from Shipper’s negligence or otherwise;

(2)all liabilities for bodily injury, illness or death of Carrier’s employees, howsoever caused and regardless of whether resulting from Shipper’s negligence or other legal fault;

(3)notwithstanding Carrier’s period of responsibility, all liabilities occurring after the Cargo has passed the Barge hose flange connection to the shore riser at discharge arising out of or relating to Carrier’s misidentification of the type of Cargo being pumped, or Carrier pumping incorrect Cargo or Carrier pumping from the incorrect tank; and

(4)all liabilities resulting from Carrier’s operation of the Vessels under this Contract.




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 24 of 40


8.2Shipper. Shipper’s responsibility is limited to the following:
A.loss or damage to the Cargo, including shortage and contamination of the Cargo (other than contamination pursuant to Section 8.1.D.(3), arising out of or relating to the transportation and/or handling of the Cargo by Carrier or others, specifically to include general average and salvage contributions, howsoever caused and regardless of whether resulting from Carrier’s negligence, deviation, the unseaworthiness of a Vessel or otherwise;
B.all liabilities for bodily injury, illness and/or death of Shipper’s employees, howsoever caused, and regardless of whether resulting from Carrier’s negligence or other legal fault, or the unseaworthiness of a Vessel; and
C.loss, damage, or liability caused solely by Shipper’s negligence that is not allocated to Carrier under Section 8.1 (Carrier).
8.3General Conditions. To the extent any other provision of this Contract specifically allocates liability, such provision shall be deemed included herein, except in the event of conflict between such other provision and this Section 8.3 (General Conditions), such other specific provision shall override the liability allocation set forth in this Section 8.3 (General Conditions). To the extent no provision of this Contract addresses a specific liability which has arisen, the allocation of that liability shall be based upon the respective fault and/or legal responsibility of each Party.
For purposes of this Article 8 (Liability and Indemnity): the term "liability(ies)" shall be deemed to include all third party liabilities or legal obligations of the party to whom such liability is allocated, including, without limitation, demand, claim, proceeding, suit, fine and/or penalty; the term "loss or damage" shall be deemed to include first party claims for loss or damage, including, without limitation, physical damage as well as direct economic loss (not otherwise excluded in this Contract) but shall not include any "liability(ies)"; and, the term "transportation and handling" shall be interpreted comprehensively to include Carrier’s receiving the Cargo at loading locations, stowage, trimming, securing, transportation, delivery, discharge and all other handling by Carrier with respect to the Cargo.
8.4Indemnification. Each party shall indemnify, defend and hold the other party harmless (including attorneys’ fees and costs as well as court costs) of and from any charge, loss, damage, claim, liability and/or suit allocated to it pursuant to this Article 8 (Liability and Indemnity) or elsewhere in this Contract; in furtherance of the foregoing, each party shall waive any exclusivity of remedy or immunity from suit afforded by any workers compensation or similar law. The Parties intend for the allocation of liabilities stated in this Article 8 (Liability and Indemnity) to apply to claims based on allegations of gross negligence to the extent permitted by applicable Law; but claims based on willful or intentional misconduct are excluded from the above stated allocation of liabilities and indemnity.
9.Liberties. The Vessels shall have liberty to sail with or without pilots, tow or be towed, and to deviate for the purpose of assisting vessels in distress, saving life or property at sea, landing any ill or injured person on board or taking on fuel, supplies or other necessaries, or for




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 25 of 40


repair, provided that if it is necessary for the Tug to leave the Barge during any such deviation, the Barge shall be left in a position of safety and the service shall be resumed immediately upon completion of the deviation, except Carrier may at any time without penalty take such reasonable action as necessary for the saving of life at sea. Shipper shall not be responsible for any charge, cost or expense incurred by Carrier, the Vessels and/or the Cargo during the period of any such deviation.
10.Force Majeure.
10.1Force Majeure Events.
A.The term force majeure (“Force Majeure”) as used in this Contract means any occurrence that: i) in whole or in part delays or prevents a Party’s performance under this Contract; ii) is not the direct result of the fault or negligence of that Party; iii) is not within the control of that Party notwithstanding such Party having taken all reasonable precautions and measures in order to prevent or avoid such event; and iv) the Party has not been able to overcome by the exercise of due diligence.
B.Subject to the foregoing, events that could qualify as Force Majeure include, but are not limited to: i) acts of God, flooding, lightning, landslide, earthquake, fire, drought, explosion, epidemic, pandemic, quarantine, storm, hurricane, tornado, volcano, other natural disaster or unusual or extreme adverse weather-related events; ii) war (declared or undeclared), riot or similar civil disturbance, acts of the public enemy (including acts of terrorism), sabotage, blockade, insurrection, revolution, expropriation or confiscation; iii) except as otherwise provided in this Contract, a direction of any Governmental Authority limiting Shipper’s recovery of all allowable costs incurred under this Contract; or iv) except as otherwise provided in this Contract, strikes, work stoppage or other labor disputes (in which case the affected Party shall have no obligation to settle the strike or labor dispute on terms it deems unreasonable).
C.Force Majeure, however, does not include: i) a strike, work stoppage, or labor dispute by a third party engaged by Carrier in support of its performance pursuant to this Contract; ii) any acts or omissions of any third party, including, without limitation, any vendor, materialman, customer, or supplier of Carrier, unless such acts or omissions are themselves caused by an event of Force Majeure as herein defined; iii) changes in market conditions that affect the cost of Carrier’s supplies, or that otherwise render this Contract uneconomic or unprofitable for Carrier; iv) Carrier’s inability to obtain government approvals or approvals of any type concerning the Services to be performed by Carrier hereunder, or Carrier’s loss of any such governmental approvals once obtained; or v) litigation or administrative or judicial action pertaining to Carrier’s interest in this Contract or any government approval required for Carrier to perform the Services.
D.Section 10.1.F defers or limits certain liabilities of a Party for delay and/or failure in performance to the extent such delay or failure is the result of conditions or events of Force Majeure; provided, however, that a non-performing Party is only entitled to such limitations or deferrals of liabilities as and to the extent the following conditions are satisfied: i) the non-performing Party gives the other Party, within seventy-two (72)




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 26 of 40


hours after the Force Majeure condition or event begins, written notice stating that such non-performing Party considers such condition or event to constitute a Force Majeure and describing the particulars of such Force Majeure condition or event; ii) The non-performing Party gives the other Party, within fourteen (14) Days after the Force Majeure condition or event begins, a written explanation of the Force Majeure condition or event and its effect on the non-performing Party’s performance, which explanation shall include evidence reasonably sufficient to establish that the occurrence constitutes Force Majeure; iii) the suspension of performance is of no greater scope and of no longer duration than is required by Force Majeure; iv) the non-performing Party proceeds with due diligence to remedy its inability to perform and provides weekly progress reports to the other Party describing actions taken to end or minimize the effects of the Force Majeure and the anticipated duration of the Force Majeure; and v) when the non-performing Party is able to resume performance of its obligations under this Contract, such Party shall give the other Party written notice to that effect.
E.The Party excused from performance under this Contract shall make all reasonable efforts to cure, mitigate or remedy such Force Majeure event.
F.Neither Party shall be liable in any manner for any delays or failures in its performance under this Contract as and to the extent (i) such failures or delays are substantially caused by conditions or events of Force Majeure, and (ii) the conditions of Section 10.1.E are satisfied. Except as otherwise expressly provided for in this Contract, the existence of an event of Force Majeure shall not relieve the Parties of any payment obligations under this Contract, or relieve any other obligations under this Contract to the extent that performance of such obligations is not precluded by the event of Force Majeure.
G.Either Party may terminate this Contract should an event or act of Force Majeure continue uninterruptedly for a period of sixty (60) Days, upon five (5) Days’ advance notice to the other Party. An event of Force Majeure limited by location or impact to less than all loading and discharging ports designated in Exhibit H, will not affect this Contract for loading and discharging ports that are not affected by Force Majeure.
10.2Carrier’s Obligation. Carrier’s obligations, including, but not limited to, performing the Services, shall be reduced or suspended for any period in which an event or act of Force Majeure exists as to Carrier and which cannot be overcome by Carrier through providing Shipper with a suitable substitute service as identified in Section 2.5 (Substitution), above. In the event of any reduction or suspension of Carrier’s obligation to render service due to Force Majeure, Shipper may obtain services from another operator for the period of such Force Majeure.
10.3Shipper’s Obligation. Shipper’s obligations under this Contract shall be reduced or suspended for any period in which an event or act of Force Majeure exists as to Shipper, or Shipper’s supplier, either singularly or collectively. However, nothing in this Section 10.3 (Shipper’s Obligation) shall excuse Shipper from its obligation to make payments of monies due hereunder for services rendered prior to said act or event of Force Majeure.




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 27 of 40



11.Limitation of Liability.
11.1Limitation of Liability. Except as otherwise agreed in this Contract, Carrier and Shipper shall be entitled to assert by way of limitation of liability any principle of law or provision of any statute or regulation of the United States that would afford either Carrier or Shipper a limitation of such liability. For purposes of such limitation of liability, Shipper and Carrier waive any claim that this Contract or anything contained herein is a personal contract of the other party.
11.2Not a Demise. The Parties agree that this Contract shall be construed as a contract for private carriage and not a demise or bareboat charter, and that no provision of this Contract shall be construed as creating a demise or bareboat charter of the Vessels or either of them to Shipper.
12.General Average. In the event of imminent danger, peril, disaster, damage or accident before or after the commencement of the voyage, subjecting the Tug, Barge and Cargo to a common peril, resulting from any cause whatsoever, whether due to negligence or not, for which, or for the consequences of which, Carrier is not responsible by statute, contract or otherwise, Shipper and the owners of the Cargo shall contribute with Carrier in general average to the payment of any sacrifices, losses or expenses of a General Average nature that may be made or incurred and shall pay salvage and special charges incurred in respect of the Cargo. If a salving ship is owned or operated by Carrier or its affiliates, salvage shall be paid for based upon the regular hourly rates hereunder.
General Average shall be adjusted, stated, and settled according to York/Antwerp Rules 1994 at Honolulu or such other place as the Parties may agree, and as to matters not therein provided for, according to laws and usages of the port selected (except that any payment made by Carrier to Shipper pursuant to Section 8.1.B and Section 8.1.C, and Article 13 (Pollution), or to any governmental agency (whether federal, state or local) or to others to remove oil or a threat of oil pollution, as well as any other payments, with respect to the Vessel or Carrier’s liability for the release of oil, shall not be deemed to be General Average sacrifices or expenditures).
If a General Average statement is required, it shall be prepared by adjusters jointly appointed by Carrier and Shipper, who are to attend to the settlement and collection of the General Average, subject to customary charges. General Average Agreements and/or security shall be furnished by Carrier and/or Shipper, if requested. Any cash deposit being made as security to pay General Average and/or salvage shall be remitted in a duly authorized and licensed bank at the place where the General Average statement is prepared.
13.Pollution.
13.1Compliance.
A.Throughout the term of this Contract, Carrier and the Vessels will comply with all applicable Laws with respect to oil spills or other water pollution liability or prevention applicable to the Vessels loading at, discharging at, entering, leaving, remaining or passing through ports, places or waters in the performance of the Services.




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 28 of 40


Carrier shall indemnify, defend and hold harmless Shipper against Pollution Damage as required under Section 8.1.C (Environmental/Pollution Risks) resulting from Carrier's failure to comply with all applicable Laws as set forth in this Section 13.1 (Compliance).

B.Carrier, at its sole risk and expense, shall comply with all applicable Laws concerning equipping the Vessels, insurance, bonds, securities or other evidence of financial responsibility, capability or security, USCG approved Vessel-specific oil spill response plan and related employee training, formal drills and exercises, and otherwise and shall obtain all such certificates and documentary evidence and take all such other action as may be necessary to satisfy such Laws including, but not limited to, those found at 33 CFR parts 151, 153, 154, 155, 156 and 157 and the U.S. Federal Water Pollution Control Act (Clean Water Act) 33 U.S.C. §1251 et seq. (1972), and the OPA as amended. The Vessels shall carry onboard a current USCG Certificate of Financial Responsibility (Water Pollution). Carrier agrees to indemnify, defend and hold harmless Shipper against any and all claims, damages, losses, liabilities and expenses, including, but not limited to, reasonable attorneys’ fees and costs as well as court costs and all other consequences resulting from its failure to accomplish the foregoing.
13.2Oil Spill Response Plan. Carrier shall provide Shipper with copies of the contingency and spill response plans approved by and on file with the USCG and other Government Authorities having jurisdiction over such matters. The spill response plan must include a first aid response within the first thirty (30) minutes of an incident and a reliable source of follow-up clean up supplies (e.g. booms, skimmers, vacuum trucks, manpower, etc.). As evidence of its ability to access such oil spill response resources, Carrier warrants that it will provide sufficient oil spill response capability with respect to minor, medium and major oil spill events occurring in near-shore and open-ocean environments by maintaining contracts for spill response service with the MSRC or National Response Corporation throughout the term of this Contract and any Extended Term, all of which shall be at Carrier’s sole expense, including the expense of any assessment by such organizations based upon the Cargo or the quantities and/or types of Cargo transported.
Information provided to Shipper with respect to Carrier’s oil spill response plan should include, but not be limited to, the following:
A.Carrier’s Incident Command System (ICS) response team format.
B.The communication flow chart including names and 24-hour contacts of Carrier’s Qualified Individual and other key participating company personnel.
C.The procedures for assembly of Carrier’s response team.
D.The check list for reporting minor oil spill events and the check list that assists shore personnel in obtaining accurate information about major spill events from the Vessel.
E.The contact reference data for oil spill responders contracted to provide assistance to Carrier.




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 29 of 40


13.3Pollution Mitigation. When a release, escape or discharge of petroleum product (including the Cargo) or any other hazardous substance into the surrounding environment occurs from the Tug or the Barge at any time, or from the Vessels during Carrier’s period of responsibility or while such petroleum product or other hazardous substance is in Carrier’s care, custody and control, or is otherwise caused by the Vessels or Carrier’s personnel, Carrier is obligated and agrees to immediately take, at its sole expense, whatever measures are necessary to retrieve and/or remove such petroleum product or other hazardous substance from the environment, clean up and restore the affected environment and assume and respond to every loss, damage, expense, claim, liability, suit, fine, penalty and/or other consequence of any type or nature, whether involving Carrier, Shipper or others arising out of or relating to such release, escape or discharge. Carrier shall immediately inform Shipper of any such release, escape or discharge, of measures taken in response as well as any loss, damage, expense, claim, liability, suit, fine, penalty and other consequence arising therefrom. No Vessel or other charges will be incurred for Shipper’s account with respect to such release, escape or discharge.
14.Change of Ownership of Carrier. Carrier shall provide Shipper with sixty (60) Days advance written notice of any change of ownership or control of Carrier from that in existence on the Execution Date that either separately or cumulatively in conjunction with all other changes occurring from the Execution Date involves more than forty nine percent (49%) of the ownership interest/stock of Carrier, including voting rights associated with such ownership interests/stock. Shipper shall have the right to request reasonable information with respect to such change of ownership or control, and Carrier shall provide such information promptly to Shipper.
15.Termination.
15.1Termination Based Upon Default. This Contract may be terminated by a Party upon the default of the other Party as set forth in this Section 15.1 (Termination Based Upon Default). A Party contending that the other Party is in breach of this Contract shall provide written notice thereof to such other Party, identifying with particularity the breach which, if left uncured, would constitute a default under this Contract. The other Party shall have thirty (30) Days following its receipt of such notice of breach or such other period of time as may be mutually agreed upon by the parties to cure the claimed breach. Should the other Party fail to cure the breach within the time allowed that Party shall be considered in default under this Contract and the Party invoking this Section 15.1 (Termination Based Upon Default) may terminate this Contract for default by the other Party.
15.2Termination in Specific Instances. This Contract may be terminated by Shipper upon the occurrence of any of the following:

Failure of Carrier to maintain:

(1)insurances as required under this Contract;

(2)certification under American Waterways Operators Responsible Carrier Program (or equivalent);




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 30 of 40


(3)certification under ISO 9001 (or standards which supersede them);

(4)classification by the American Bureau of Shipping; or

(5)certification of the Barge by the USCG;

(6)suitable equipment, including substitute Vessels, pursuant to Article 2;
(7)seaworthiness under provisions of Section 2.6 (Seaworthiness);

(8)drug and alcohol testing procedures for Tug personnel and Tankermen; and,
(9)recommended and required inspection and maintenance of the Tug and Barge.
B.     Total loss or constructive total loss of the Barge pursuant to Section 15.5 (Total Loss of Barge).
C.     The Vessels suffering more than three (3) minor oil spills (less than 10,000 gallons but more than 1,000 gallons) in a Year.
D.     The Vessels suffering more than one (1) medium oil spill (10,000 to 100,000 gallons) in a Year.
E.     The Vessels suffering a single large oil spill (over 100,000 gallons) during the term of this Contract.
In the event any of the above should occur, Shipper may terminate this Contract upon five (5) Days advance written notice to Carrier.
15.3Termination for Substandard Performance.
A.This Contract may be terminated by Shipper based upon the substandard performance by Carrier of its obligations hereunder. Should Shipper believe Carrier’s performance is substandard and wish to terminate this Contract pursuant to Section 15.3 (Termination for Substandard Performance), Shipper shall inform Carrier accordingly by providing to Carrier Shipper’s written statement of substandard performance that shall include a detailed explanation, with particulars and documentation available to Shipper of each instance in which it alleges Carrier’s performance was substandard. Carrier shall have thirty (30) Days from Carrier’s receipt of Shipper’s written statement of substandard performance in which to respond to the same in writing. If Carrier fails to respond in writing within said thirty (30) Days, Shipper may terminate this Contract by providing Carrier with written notification of such termination, specifying in such notice




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 31 of 40


the precise date for termination. If Carrier responds in writing within thirty (30) Days of receipt of Shipper’s written statement of substandard performance, proposing to cure the instance(s) of substandard performance, including the specifics of such cure, Shipper shall have the option, which must be exercised promptly, of accepting such cure and agreeing with a date by which such cure must be completed, or rejecting the proposed cure and requiring resolution pursuant to Article 17 (Governing Law, Jurisdiction, and Venue). Should Carrier contest Shipper’s allegations of substandard performance and do so in writing to Shipper within thirty (30) Days of receipt of Shipper’s written statement of substandard performance, either Party may compel resolution of the dispute pursuant to Article 17 (Governing Law, Jurisdiction, and Venue).
B.Substandard performance by Carrier as contemplated in Section 15.3.A may include but is not be limited to:
(1)Carrier’s failure to maintain suitable equipment, including substitute Vessels, pursuant to Section 2.5 (Substitution);
(2)Carrier’s failure to maintain and apply satisfactory drug and alcohol testing procedures for Tug personnel and Tankermen;
(3)Carrier’s failure to obtain and perform both recommended and required inspections and maintenance of the Tug and Barge;

(4)Carrier’s failure to meet any seaworthiness requirement as set forth in Section 2.6 (Seaworthiness);

(5)Carrier’s failure to timely report events to Shipper as set forth in Section 3.9 (Safety Program);

(6)Carrier’s failure to provide two (2) alert, rested and certified Tankermen onboard during all cargo operations;

(7)the Vessels suffering more than three (3) minor oil spills (less than 10,000 gallons) in a Year; or

(8)the Vessels suffering more than two (2) marine casualties, reportable under 46 C.F.R. 4.05-1, in a Year.

15.4Termination for […]

. This Contract may be […] by […] based upon […] to […] a […] to […] within the […] stated in Section , following […] to do so. In the such event, […] may terminate this Contract upon […] to […]. […] will not be liable to […] for any […] resulting from such […] or […] to […] and […] total possible […] to […] for […] pursuant to this Section 15.4 (Termination for […]) shall not




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 32 of 40


[…] the […] of […].

15.5Total Loss of Barge. It is understood and agreed that in the event of a declaration of total loss or constructive total loss of the Barge during the Contract term, Carrier shall be entitled to utilize a Substitute Barge for a period of one hundred and twenty (120) Days following the casualty giving rise to such declaration. Within thirty (30) Days following the event which caused such declaration of total loss or constructive total loss, Carrier shall declare in writing to Shipper whether it will provide a replacement Barge for service under this Contract, meeting the requirements set forth herein, including without limitation Article 2 (Vessels). Such replacement Barge shall be tendered for delivery to and approval of Shipper in accordance with this Contract within ninety (90) Days following such declaration, failing which, Shipper shall have the unilateral right to terminate this Contract by written notice to Carrier, notwithstanding anything herein to the contrary.

15.6Change of Ownership/Control. In the event of change of ownership or control of Carrier as set forth in Article 14 (Change of Ownership of Carrier), above, Shipper shall have the right to terminate this Contract upon thirty (30) Days written notice to Carrier, which right may be exercised at any time from Carrier’s receipt of such notice up to one (1) Year thereafter.
15.7Termination in the Event of Bankruptcy. This Contract shall terminate upon the appointment of a receiver for a Party, the making by a Party of a general arrangement for the benefit of creditors, or the filing of any type of bankruptcy proceeding by or against a Party unless the same is withdrawn within thirty (30) Days of the filing date.
15.8Termination by Assent. This Contract may be terminated at any time by the mutual written agreement of Carrier and Shipper.
15.9Other Conditions, Consequential Damages Disclaimer. Termination of this Contract by a Party pursuant to this Section shall not waive or estop that Party from asserting any other right or claim which that Party may have under applicable Law or this Contract. Except with respect to indemnification obligations or claims due to the fraud, gross negligence or willful misconduct of a Party, neither Party shall be responsible to the other for any indirect, consequential or special damages, including, without limitation, extra expenses, loss of profits, loss of use of property, delay or damages consequential upon loss of use, arising out of or relating to its performance or failure to perform under this Contract.
16.Definitions. The following terms shall be defined as follows:
“API” means the American Petroleum Institute, a long-established petroleum industry organization.
“Appeal Period” is defined in Section 18.12.B.
“ASTM” means the American Society for Testing and Materials, a long-established source of standard testing and evaluation methods for petroleum.
“Barge” is defined in Section 2.2 (Barge).




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 33 of 40


“Bunker” or “Bunkering” means the supplying of fuel for use by ships and the storage of the same thereupon.
“Business Day” means any calendar day that in not a Saturday, a Sunday or a federal or Hawai’i state holiday.
“Cargo” is defined in the Contract preamble paragraph on Page 1 and in Section 3.17 (Cargo Handling).
“Clean Product” is defined in Section 2.5.A.(2) (Substitute Vessel Standards).
“Commission” means the Public Utilities Commission of the State of Hawai’i.
“Commission Approval Date” is defined in Section 18.12.D.
“Commission Approval Order” is defined in Section 18.12.A.
“Crew” is defined in Section 3.1 (Complement).
“[…]” means […] for or within the […] of […].
“Day” means a calendar day.
“Effective Date” is defined in Section 1.1 (Term).
“Environmental Compliance Costs” is defined in Section 4.3 (Environmental Compliance Expenses).
“Execution Date” means the date stated in the preamble of this Contract.
“Force Majeure is defined in Section 10.1 (Force Majeure Events).
“General Average” is defined in Article 12 (General Average).
“Government Authority” or “Government Authorities” is defined in Section 2.6.G.
“[…]” is defined in Section 4.1.A.
“Laws” is defined in Section 3.8 (Documented Procedures).
“Lay-up” is defined in Section 6.4 (Lay-up).
“Master” is defined in Section 3.1 (Complement).
“Mate” is defined in Section 3.1 (Complement).
“Month” means a calendar month.
“MSRC” means the Marine Spill Response Corporation.
“Non-Appealable Commission Order” is defined in Section 18.12.B.
“[…]” means the […] by […] to […] a […] at […] for […] and […]. The […] shall, at a





1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 34 of 40


minimum, […].
“[…]” is defined in Section 4.7 ([…]).
“Officers” is defined in Section 3.1 (Complement).
“OSRO” means an Oil Spill Removal Organization.
“Plan” is defined in Section 2.5 (Substitution).
“Period of Responsibility” means Carrier’s period of responsibility associated with the Cargo which shall commence when the Cargo passes through the Barge hose flange from the shore riser and shall continue as the Cargo is received on board the Barge, distributed throughout the Barge, transported through to destination and until the Cargo passes the Barge hose flange connection to the shore riser upon discharge. The Cargo shall be deemed completely within Carrier’s care, custody and control during the foregoing period.
“Pipeline Tolls” means the wharfage rates (per barrel) set by the State of Hawaiʻi Department of Transportation Harbors Division for the incoming and outgoing of petroleum products at state harbors.
“Residual Products” means HSFO, LSFO and similar residual fuel oils within the Barge’s cargo carrying capabilities.
“Services” is defined in the Contract preamble paragraph on Page 1.
“Substance Abuse Policy” is defined in Section 3.6 (Drugs and Alcohol).
“[…]” is defined in Section 2.4 (Vessel Clarification) and Section 2.5 ([…]).
“[…]” is defined in Section 2.4 (Vessel Clarification) and Section 2.5 ([…]).
“[…]” is defined in Section 2.5 ([…]).
“Tankermen” is defined in Section 3.1 (Complement).
“Term” is defined in Section 1.1 (Term).
“Terminal” means the facility at which the Cargo is loaded or discharged.
“Third-Party Cargo” is defined in Section 3.21 (Other Trades) and Section 4.2 (Shipments Made in Conjunction with Third Parties).
“Tug” is defined in Section 2.3 (Tug).
“Unfavorable Commission Order” is defined in Section 18.12.E.
“Updated Pricing Proposal” is defined in Section 1.1.A.




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 35 of 40


“USCG” means the United States Coast Guard.
“Vessel(s)” is defined in Recital D.
“Year” means a calendar year.
17.Governing Law, Jurisdiction, and Venue.
17.1Law. This Contract is made under and shall be governed by and construed in accordance with the general maritime law of the United States or, in the event there is no general maritime rule of law that is applicable, by the laws of the State of Hawai‘i, without regard to choice of law principles.
17.2Good Faith Resolution. In the event that a dispute or disagreement arises out of or relating to this Contract, the Party alleging such dispute or disagreement shall give written notice to the other Party that a dispute exists and the Parties will then attempt in good faith to resolve their differences through a meeting between the designated representatives of each Party as soon as practicable. If the dispute or disagreement cannot be resolved by such a meeting of the designated representatives of each Party within twenty (20) Days following such written notice, either Party may proceed with resolution of such dispute or disagreement in accordance with Section 17.3 (Litigation). Notwithstanding the foregoing, nothing in this Section 17.2 (Good Faith Resolution) shall excuse the Parties from performing their obligations pursuant to this Contract except as otherwise set forth in this Contract.
17.3Litigation. Any dispute arising out of this Contract, however defined, shall be brought in the State of Hawai‘i in a court of competent jurisdiction, and each Party agrees and irrevocably consents to the exercise of personal jurisdiction by such courts and waives any right to plead, claim, or allege that the State of Hawai‘i is an inconvenient forum or improper venue. Notwithstanding the foregoing, Shipper or Carrier may elect to first submit any such dispute to mediation by a neutral third-party mediator that is mutually agreed upon by the Parties (which agreement shall not be unreasonably withheld); provided, however, that in the event the Parties are unable to resolve the dispute contemplated by this Section 17.3 (Litigation) within thirty (30) Days of initiation of mediation (or such other period of time as is mutually agreed upon by the Parties), either Party may present such dispute for judicial resolution as provided in this Section 17.3 (Litigation). The Parties shall be equally responsible for the expense and cost of any mediator retained pursuant to this Section 17.3 (Litigation).
18.General Provisions.
18.1Audit. Shipper, at its sole discretion, may conduct its own audit of Carrier’s policies and procedures and may inspect the Tug and Barge at any time during the term of this Contract for the limited purpose of verifying compliance with the terms and conditions set forth in this Contract. No such audit or inspection, however, shall increase Shipper’s liabilities or responsibilities nor shall relieve Carrier of any liability or responsibility which it has assumed pursuant to this Contract.
18.2Shipper’s Representatives. Shipper shall have the right and privilege of having its representative(s) visit the Vessels and observe operations while at port or sea. Shipper’s




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 36 of 40


representative(s) shall have access to the entirety of the Vessels, and the Master, Mates, Engineers, and Tankermen shall cooperate with such representative(s) and to render any reasonable assistance that such representative(s) may require.

18.3Liens upon the Cargo. Neither Carrier nor any of Carrier’s subcontractors, independent contractors or employees shall assert any liens upon the Cargo.
18.4Business Policy. Carrier agrees to comply with all Laws applicable to any activities carried out in the name, or otherwise on behalf, of Shipper under the provisions of this Contract. Carrier agrees that all financial settlements, billings and reports rendered by Carrier to Shipper, as provided for in this Contract, shall, in reasonable detail, accurately and fairly reflect the facts about all activities and transactions handled by Carrier pursuant to this Contract.

18.5Business Location. Carrier shall maintain a physical office on the island of O‘ahu in the State of Hawai‘i. Carrier’s office staff shall include but not be limited to operations, maintenance, and management personnel who manage and support Carrier’s daily Barge operations within the State of Hawai‘i.
18.6Notices.
A.Ordinary business communications regarding the administration of this Contract may be made telephonically, by electronic means, or by other standard and usual forms of communication.
B.All demands, claims, and notices of breach under this Contract must be in writing and must be given by (i) hand delivery personally to the party to whom it is directed (or any officer or agent of such party), (ii) by a commercial overnight courier, (iii) by certified or registered mail, postage prepaid, or (iv) by email including in the subject field: “FORMAL LEGAL NOTICE TO [as the case may be, Shipper or Carrier]” with return receipt email confirmation, to the following respective addresses:

Shipper:Hawaiian Electric Company, Inc.
Manager, Power Supply Fuels Operations Department
P.O. Box 2750
Honolulu, Hawai'i 96840
PHONE: [...]
Email: [...]
With copy to:Hawaiian Electric Company, Inc.
ATTN : Director, Legal Department
P.O. Box 2750
Honolulu, Hawai'i 96840
Email : legalnotices@hawaiianelectric.com





1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 37 of 40


Carrier:Sause Bros., Inc.
499 N Nimitz Highway
Honolulu, Hawai'i 96817
Attn: [...]
Email: [...]
With copy to:Sause Bros., Inc.
3710 NW Front Street
Portland Oregon 97210
Attn.: [...]
Email: [...]
A Party may change their address or other relevant information by giving notice in writing to the other Party as provided in this Section 18.6.B.
18.7Captions, Word Usage. Captions used herein are for convenience of reference only and shall have no force or effect or legal meaning in the construction or enforcement of this Contract. As used in this Contract, the word “shall” has the same meaning as “will”.
18.8Assignment. This Contract shall not be assigned by either Party without the prior written consent of the other Party, which consent shall not be unreasonably withheld.
18.9Extension of Benefits. All limitation upon or exemptions from liability granted to a Party pursuant to this Contract shall be deemed extended to the directors, officers, members, and employees of that Party.
18.10Entire Contract. This document, including all exhibits and attachments referenced or otherwise incorporated herein, constitutes the entire agreement between the Parties and expressly supersedes and negates all prior or contemporaneous negotiations, communications, understandings and agreements, whether written or oral. This Contract shall not be modified or amended except through a writing signed by both Shipper and Carrier.
18.11Severability. Carrier and Shipper agree that if, and in the event, any term or provision of this Contract shall be rendered or declared invalid or unenforceable by reason of any existing or subsequently enacted legislation or by decree or judgment of any court which shall have or acquire jurisdiction over the parties and each of them or jurisdiction “in rem” of the Vessels, the invalidation or unenforceability of such term or provision of this Contract shall not thereby affect the remaining terms, provisions, rights and obligations herein contained.
18.12Regulatory Approval.
A.The Parties acknowledge and agree that this Contract is subject to approval by the Public Utilities Commission of the State of Hawai‘i (“Commission”) and the Parties’ respective obligations hereunder are conditioned upon receipt of such approval, except as specifically provided otherwise herein. Upon execution of this Contract, the Parties shall use good faith efforts to obtain, as soon as practicable, an order from the Commission (“Commission Approval Order”) that does not contain terms and conditions




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 38 of 40


deemed to be unacceptable to Shipper, and is in a form deemed to be reasonable by Shipper, in its sole discretion, ordering that (i) this Contract is approved; (ii) the amounts to be paid by Shipper to Carrier as a result of this Contract are reasonable; (iii) Shipper’s procurement of Carrier’s services pursuant to this Contract is prudent and in the public interest; (iv) Shipper may include the costs incurred by Shipper pursuant to this Contract in Shipper’s revenue requirements for ratemaking purposes
B.A non-appealable Commission approval order (“Non-appealable Commission Approval Order”) means a Commission Approval Order that is not subject to appeal to any Circuit Court of the State of Hawai‘i, the Intermediate Court of Appeals of the State of Hawai‘i, or the Supreme Court of the State of Hawai‘i, because the period permitted for such an appeal (“Appeal Period”) has passed without the filing of notice of such an appeal, or that was affirmed on appeal to any Circuit Court of the State of Hawai‘i, the Intermediate Court of Appeals of the State of Hawai‘i, or the Supreme Court of the State of Hawai‘i, or was affirmed upon further appeal or appellate process, and that is not subject to further appeal, because the jurisdictional time permitted for such an appeal and/or further appellate process such as a motion for reconsideration or an application for writ of certiorari has passed without the filing of notice of such an appeal or the filing for further appellate process.
C.Not later than thirty (30) Days after the issuance of a Commission Approval Order, Shipper shall provide Carrier with a copy of such Commission Approval Order together with a written statement as to whether the conditions set forth in Section 18.12.A and Section 18.12.B have been satisfied.
D.As used in this Contract, the term “Commission Approval Date” shall be defined as follows: If Shipper provides the written statement referred to in Section 18.12.C to the effect that the conditions referred to in Section 18.12.A and Section 18.12.B have been satisfied, the Commission Approval Date shall be the date of the issuance of the Commission Approval Order; or if Shipper provides the written statement referred to in Section 18.12.C to the effect that only the conditions referred to in Section 18.12.A have been satisfied, the Commission Approval Date shall be as follows: (i) if a Commission Approval Order is issued and is not made subject to a motion for reconsideration filed with the Commission or an appeal, the Commission Approval Date shall be the date one Day after the expiration of Appeal Period following the issuance of the Commission Approval Order; (ii) if the Commission Approval Order became subject to a motion for reconsideration, and the motion for reconsideration is denied or the Commission Approval Order is affirmed after reconsideration, and such order is not made subject to an appeal, the Commission Approval Date shall be deemed to be the date one Day after the expiration of the Appeal Period following the order denying reconsideration of or affirming the Commission Approval Order; or (iii) if the Commission Approval Order, or an order denying reconsideration of the Commission Approval Order or affirming approval of the Commission Approval Order after reconsideration, becomes subject to an appeal, then the Commission Approval Date shall be the date upon which the Commission Approval Order becomes a non-appealable order within the meaning of the definition of a Non-Appealable Commission Approval Order in Section 18.12.B.




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 39 of 40


E.The term “Unfavorable Commission Order” means an order from the Commission concerning this Contract that: (i) dismisses Shipper’s application; (ii) denies Shipper’s application; or (iii) approves Shipper’s application but contains terms and conditions deemed unacceptable by Shipper in its sole discretion and therefore does not meet the definition of a Commission Approval Order as set forth in Section 18.12 .A. If Shipper receives an Unfavorable Commission Order, Shipper may, but is not required to, file a motion for reconsideration and/or an appeal. If Shipper files a motion for reconsideration or an appeal, the Parties’ respective obligations remain conditioned upon the receipt of the items enumerated in Section 18.12.A and Section 18.12.B. If, after receipt of an Unfavorable Commission Order, Shipper files neither a motion for reconsideration nor an appeal, this Contract is null and void, and neither Party owes any further obligation to each other.

F.If Shipper has not received the Commission Approval Order within three hundred sixty-five (365) Days of the execution date of this Contract, or if Shipper’s request for Commission approval of this Contract is denied in whole or in part, then either Carrier or Shipper may terminate this Contract by providing written notice of such termination delivered to the other prior to the Effective Date, as it is defined in Section 18.12.G. In such event of termination, each Party shall bear its own respective fees, costs and expenses incurred prior to termination, if any, in preparation for performance hereunder, and the Parties shall have no further obligation to each other with respect to this Contract except for indemnity and any confidentiality obligations assumed by the Parties hereunder.

G.The Effective Date of this Contract shall be upon satisfaction of the relevant conditions set forth in Section 18.12.D, as such conditions are applicable. Alternatively, the Parties may mutually agree in writing that some other date shall be deemed the Effective Date. Except for the obligations and provisions described herein, neither Party shall have any binding obligations under this Contract until the Effective Date, except that the Parties agree upon the Execution to be bound by Sections 18.12 (Regulatory Approval), Article 8 (Liability and Indemnity), Article 10 (Force Majeure) and Article 18 (General Provisions).

[Signature page follows.]




1608 – Hawaiian Electric Company, Inc. / Inter-Island Fuel Transportation Contract
Page 40 of 40


IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed as of the day and year first above written.


SAUSE BROS., INC.
"Carrier"
By/s/ Matt Hainley
Its Chief Financial Officer
HAWAIIAN ELECTRIC COMPANY, INC.
"Shipper"
By/s/ Shelee Kimura
Its President & CEO
By/s/ Jim Alberts
Its Sr. Vice President & COO




EXHIBIT A
BARGE REQUIREMENTS
Carrier makes the following representations, warranties, and covenants with respect to the Barge and its equipment and machinery used pursuant to this Contract.

GENERAL

The Barge shall be a double-hulled and OPA-90 qualified tank barge with a total capacity of at least 65,000bbls. The barge shall have at least 25,000bbls dedicated to carry black oil and at least 40,000bbls dedicated to two diesel grades with volume segregation flexibility on every voyage.

REQUIRED PORTS OF CALL (all fuel piers)

Hawai‘i Island - Hilo, Kawaihae
Maui – Kahului
Moloka‘i – Kaunakakai
O‘ahu – Barber’s Point, Honolulu Pier 30

CARGO SEGREGATION

The Barge used in service to Shipper shall be equipped with a system of cargo tanks and piping that will provide for the segregation of at least three grades of petroleum product as required by Shipper. There shall be regular segregation of Clean Product and Residual Products. The cross connection of other grades of petroleum product shall be double blocked.

Piping shall be configured to allow future conversion of the cargo tanks from dedicated Residual Product service to Clean Product service at a date to be determined by Shipper.

Tanks shall be arranged to allow for proper trim control with any single cargo type loaded on board.


Carrier to provide Tank Layout and piping arrangement diagram showing segregations, pipelines, and valves.



DISCHARGE PUMPING RATES
Carrier shall discharge product at the following rates:
Residual Products: 3,000 barrels per hour (BPH) at 110 Degrees F minimum.
Clean Product: 2,500 BPH minimum
Multi Product Average: 2,200
Rail pressure: 60 psi at manifold

MANIFOLDS

The Barge used in service to Shipper shall be equipped with cargo manifolds, piping valves, hoses, cranes and other equipment sufficient to accommodate loading and/or discharge operations for each cargo on both the port and starboard side.

MULTIPLE GRADES

The Barge used in service to Shipper shall be equipped with cargo manifolds, pumps and piping sufficient to permit the loading and discharge of each of the three petroleum products specified herein simultaneously.

EMERGENCY SHUTDOWN

The Barge used in service to Shipper shall be equipped to permit emergency shutdown of the pumping system from more than one location, of which at least one shall be on deck and situated such that no point on the barge deck is more than 75 feet from a shutdown device.
DECK CONTAINMENT
The Barge used in service to Shipper shall be equipped with a deck containment coaming to reduce the likelihood that cargo spilled from cargo hatches, hose connections, oil loading manifolds, hose storage trough, above-deck lines and valves and transfer connections may enter the water or land environment. Appropriate measures shall be taken to ensure that rainwater draining from the Barge deck shall not carry contaminates overboard.
HEATING

The Barge used in service to Shipper shall be fitted with heating coils in all cargo tanks in which residual fuel oil type cargo, such as HSFO, is to be carried. The coils shall be supplied with heat by a diesel fired retort system of 5.0 million BTU/hr capacity or equivalent

ELECTRICITY



The Barge used in service to Shipper shall have diesel generators of sufficient capacity to safely provide electrical power to all Barge equipment and machinery in any and all operations including full operation of pumps and other equipment necessary to loading/discharging of cargo with one generator out of service.

Diesel engines are to be inspected by Carrier or Carrier’s designee to ensure that all components are within manufacturer’s tolerances; maintenance records are to be available for confirmation of PMS.

An overhaul shall be conducted on the generator engines of the Interim Barge prior to tendering for delivery to Shipper pursuant to this Contract if over 50 percent of the engine hours (based on manufacturer’s recommendation for periods between overhauls) have been exhausted since the last overhaul period.

HOSE PRESSURIZATION

The Barge used in service to Shipper shall be fitted with equipment of sufficient capacity and piping to safely clear cargo hoses of retained Cargo after completion of Cargo operations.

ALARMS/LEVEL INDICATORS

The Barge used in service to Shipper shall be fitted with electronic and mechanical high level alarms (high and high-high) in all cargo tanks. Void spaces shall be fitted with bilge alarms. These alarms shall include audible and visible signals to alert the Barge tankermen or Tug crew.


OIL SPILL ABATEMENT EQUIPMENT

The Barge used in service to Shipper shall have oil spill abatement equipment and supplies. Equipment and supplies shall include, but not be limited to 1,500 feet (minimum) of oil spill boom, boom deployment skiff, spare bridles and two lines anchor/buoy system, sweeps, sorbent sheets, transfer pumps, and skimmer. In addition, personal protective gear and other related emergency oil spill cleanup equipment consistent with the Vessel's oil spill response plan and all USCG requirements shall be supplied on board the Barge.

EMERGENCY TOW WIRE

The Barge used in service to Shipper shall be rigged for towing operations with an emergency towing pennant or insurance wire. A pickup line with buoy shall be attached to the insurance wire and streamed when underway. The emergency tow wire and the shackles used to make the centerline tow pad at the bow need to be of comparable size to the Tug’s tow gear.



WINCHES (preferred)
The Barge used in service to Shipper shall have bow and stern winches to safety secure Barge to dock during adverse inner harbor conditions.
CARGO COMPARTMENT STRIPPING (preferred)
The Barge used in service to Shipper shall have capability to effectively strip all cargo tanks, pump well, and pipelines to maintain product integrity when switching from one Clean Product service to another.
SPARES
Carrier shall maintain adequate spare parts in Hawai‘i to facilitate immediate repairs to major components necessary to the operation, loading and discharge of the Barge. These may include, without limitation, cargo pumps, generators, retort, valves, compressors, ventilation fans, alarms, sensors, etc.
CERTIFICATION
Applicable Laws of the United States for a Vessel of U.S. Registry
U.S. Coast Guard Certification of Inspection for ocean service as an unmanned tank barge, including compliance with 33 CFR 157.10d: Double Hulls on tank vessels
American Bureau of Shipping Rules for Building and Classing Steel Barges, Maltese Cross A1 and Circle E
International Load Line Certificate. IMCO Rules for Tonnage Measurement
International Convention for Prevention of Pollution from Ships (MARPOL), Including Requirements Pertaining to the Issuance of International Oil Pollution Prevention Certificates
International Convention for Prevention of Collisions

Oil Companies International Marine Forum (OCIMF) Recommendations for Oil Tanker Manifolds and Associated Equipment for Category “A” Vessels (16,000 to 25,000 DWT)
Oil Pollution Act of 1990
American Waterways Operators (AWO) - Responsible Carrier Program (or equivalent), ISO 9001 (or standards which supersede them).

CARGO TANKS

The Barge used in service to Shipper shall have cargo tanks equipped with suction wells



(recessed into the double bottom), butterworth plates, ullage openings, b-valves for revenue gauging, and pressure/vacuum valves.

Tank bottoms and tank outboard side bulkheads shall have their plate stiffeners located in the double hull void spaces.

HULL

The fore end of the Barge shall be designed to reduce the stresses induced by slamming, especially in the light condition. Additional strength should be provided in the Barge hull in way of areas that the Tug uses while maneuvering alongside or docking.

VAPOR CONTROL

The Barge must comply with the vapor control, closed gauging and overfill protection requirements set forth in 46 CFR, Chapter 1, Subchapter D, Part 39, and must specifically comply with 46 CFR 39.20-7, rather than 46 CFR 39.20 -9.

SURVEY

The Barge used in service to Shipper shall undergo a condition survey by an independent inspection company prior to final acceptance to ensure safe operability of the Barge. Carrier shall, at its expense and at the inception of the Contract term and each thirty (30) months thereafter, provide Shipper with a condition survey of the Barge which states that the Barge is in conformity with Contract requirements and is otherwise safe and suitable for the intended operation.

COMPLIANCE

The Barge used in service to Shipper shall comply with IEEE Std. No. 45, Recommended Practice for Electrical Installations on Shipboard and International Electro Technical Commission (IEC).



EXHIBIT B
TUG REQUIREMENTS
[...] will […] or […], always subject to […], that are […] to […] and […], both of which […] to […] for […] this […]. […] is the […] for […], […]. Also […] is the […] for […], […], whose […] and […] are […] to that of the […].



[…]



[…]



[…]



EXHIBIT C
MANNING REQUIREMENTS


    The following are warranted by Carrier with respect to the Vessel’s Master, Mates, Engineers and Tankermen employed under this Contract.


ALL OPERATING PERSONNEL: TRAINING/PROFICIENCY

All operating personnel including Vessel’s Master, Mates, Engineers, and Tankermen and the immediate supervisors of the foregoing, are to receive training and exhibit proficiency in such areas as including, but not limited to, mandatory compliance with the various federal and State laws concerning safety and hazardous materials (OSHA, USCG, Hawaii DOH, Hawaii DOT), oil transfer procedures, firefighting, oil spill prevention, oil spill contingency planning, oil spill response and other emergency operations and such proficiency and state of readiness shall be assessed through a program of continuous planning review, periodic exercises and drills.


TUG PERSONNEL: LICENSES/ENDORSEMENTS/QUALIFICATIONS

The Master, Mate and Engineers of any Tug providing service to Shipper shall have the appropriate licenses and endorsements, have received the appropriate experience and training for the seas, ports cargo and size and capability of the equipment employed in the performance of this Contract.

In addition, such personnel are to continue to receive whatever further training and experience is required to ensure that towing operations are conducted in a safe, efficient and professional manner consistent with the highest standards in the industry.

Inasmuch as the Master shall be held responsible for the quality of overall voyage operations, management and safety, it is a requirement that he/she have the appropriate USCG license and endorsement.

The Master shall be appropriately qualified by education at a college level or at an accredited maritime academy or by the equivalent progressive experience in navigation, pilotage, engine room operations, vessel classes, making/breaking tow, barge mooring, cargo transfer operations and safety procedures and shall have experience or the appropriate formal training in such areas as hazardous materials operations, firefighting, oil spill clean-up and mitigation and other situations requiring emergency response.



Carrier agrees and understands that a Master appointed to any Tug used in service to Shipper under this Contract shall have demonstrated reliability, leadership, crew management ability and evidence the very highest regard for the safety of Vessel and its crew, cargo and the environment.

The Master of the Tug and at least one of the Tankermen assigned to the Barge shall have completed a course of instruction in the Incident Command Systems conducted by the USCG or other relevant governmental agency. All personnel assigned to the Tug and Barge shall have completed a course in HAZWOPER instruction.

The Shipper may at any time require an audit of Carrier’s compliance with this contract and the policies and procedures required for the certification under the AWO Responsible Carrier Program (or equivalent), ISO 9001 (or standards which supersede them).


TOW PERSONNEL, TRAINING AND PROFICIENCY

The operators of the Barge providing service to Shipper shall have the appropriate certificates and endorsements, have received the appropriate experience and training for the seas, ports, cargo and size and capability of the equipment employed in the performance of this Contract.

In addition, such personnel are to continue to receive whatever further training and experience is required to ensure that towing operations are conducted in a safe, efficient and professional manner consistent with the highest standards in the industry. All Tankermen assigned to the Barge shall be fully certificated by the USCG and qualified for service aboard the Barge.

Tankermen are to receive (as a minimum) training in the following subjects every two (2) Years or less:

    Company Policies and Procedures;
    First Aid;
    CPR;
    Confined Space Hazard Awareness;
    Injury prevention;
    Lock out/tag and procedures;
    HAZWOPER;
    Cargo knowledge / hazards;
    Federal and State regulations;
    Marine firefighting; and
    First Responder / spill mitigation.





The following drills are to be conducted annually in conjunction with terminal personnel, USCG, spill cleanup firms and harbor authorities (as appropriate):

    Fire drill (each load port);
    Oil spill (each load port); and
    Personal injury.

The Master of the Tug and at least one of the Tankermen assigned to the Barge shall have completed a course of instruction in the Incident Command Systems conducted by the USCG or other governmental agency. All personnel assigned to the Tug and Barge shall have completed a course in HAZWOPER instruction.

Shipper may at any time require an audit of Carrier’s compliance with this contract and the policies and procedures required for the certification under the AWO Responsible Carrier Program (or equivalent), ISO 9001 (or standards which supersede them).

Shipper may reject the assigned Master and/or the Lead Tankerman for cause, upon three (3) Days notice to Carrier.



EXHIBIT D

DIESEL CHARACTERISTICS


    The Diesel to be transported hereunder shall have the following approximate characteristics:


ItemUnitsLimits
Gravity @
60 deg. F.
Degrees API 30.0 Min.
Viscosity @
40 deg. C.
cst1.9-4.1
Flash Point, PMDegrees F.150 Min.
AshPPM, Wt.100 Max.
Cetane Index40 Min.
Carbon Residue, 10% Residuum%, Wt.0.35 Max.
Sediment & Water%, Vol.0.05 Max.
Sulfur%, Wt.0.40 Max.
Distillation, 90% RecoveredDegrees F.540-640
Sodium + PotassiumPPM, Wt.0.5 Max
NitrogenPPM, Wt.150



EXHIBIT E

ULSD CHARACTERISTICS


    The ULSD to be transported hereunder shall have the following approximate characteristics:


ItemUnitsLimits
Viscosity @
40 deg. C.
cst1.9-4.1
Flash Point, PMDegrees F.125 Min.
AshPPM, Wt.100 Max.
Cetane Index40 Min.
Carbon Residue, 10% Residuum%, Wt.0.35 Max.
Sediment & Water%, Vol.0.05 Max.
Sulfurppm, Wt.15 Max.
Distillation, 90% RecoveredDegrees C.282-338
Lubricity, 60 deg. C, WSDMicrons520 Max.
ConductivitypS/m25 Min.



EXHIBIT F

HSFO CHARACTERISTICS
    The HSFO to be transported hereunder shall have the following approximate characteristics:


ItemUnitsLimits
Gravity @
60 deg. F.
Degrees API6.5 Min.
Viscosity @
122 deg. F.
cst380-480
Pour PointDegrees F.55 Max.
Flash Point, PMDegrees F.150 Min.
BS & W%, Vol0.50 Max.
Sulfur%, Wt.2.00 Max.



EXHIBIT G


BIOFUEL CHARACTERISTICS


The Biofuel to be transported hereunder shall have the following approximate characteristics:


ItemUnitsLimits
Calcium & Magnesiumppm5 max
Flash point (closed cup)°C93 min
Alcohol Content
One of the following shall be met:
1. Methanol contentmass %0.2 max
2. Flash point°C130 min
Water and Sediment% volume0.050 max
Kinematic viscosity, 40°Cmm2/s1.9-6.0
Sulfated Ash% mass0.020 max
Sulfur% mass 0.0015 max
Cooper strip corrosionNo. 3 max
Cetane number47 min
Cloud point°CReport
Carbon residue% mass0.050 max
Acid numbermg KOH/g0.50 max
Cold soal filterabilityseconds380 max
Free glycerin% mass0.020 max
Total glycerin% mass0.240 max
Phsophorous content% mass0.001 max
Distillation temperature, 90% recovered°C360 max
Sodium & Potassiumppm5 max
Oxidation stabilityhours3 min



EXHIBIT H


PORTS OF CALL



LOADING PORTS:

    1. Honolulu Harbor, Pier 30

    2. Barber’s Point Harbor, Pier 5 or 6

    
DISCHARGING PORTS:

1.Hilo

2.Kawaihae (as requested)

3.Kahului

4.Kaunakakai




EXHIBIT I

[…]


Hawaiian Electric Exhibit 10.2
EXECUTION VERSION

FIRST AMENDMENT TO
AMENDED AND RESTATED POWER PURCHASE AGREEMENT FOR FIRM
DISPATCHABLE CAPACITY AND ENERGY

This First Amendment to Amended and Restated Power Purchase Agreement for Firm Dispatchable Capacity and Energy ("Amendment") is made and entered into effective as of July 27, 2026 ("Execution Date"), by and between HAWAIIAN ELECTRIC COMPANY, INC., a Hawaii corporation ("Hawaiian Electric" or "Company"), and KALAELOA PARTNERS L.P., a Delaware limited partnership ("Seller") (Company and Seller are jointly referred to as the
"Parties".)

WHEREAS, Company and Seller are parties to that certain Amended and Restated Power Purchase Agreement for Firm Dispatchable Capacity and Energy dated October 29, 2021 ("A&R PPA");

WHEREAS, the A&R PPA provides that its terms shall expire on December 31, 2032;

WHEREAS, Company and Seller intend to continue operations of the Facility beyond the term of the A&R PPA pursuant to that certain Power Purchase Agreement for Firm Capacity Renewable Dispatchable Generation ("Stage 3 PPA"), executed concurrently herewith by Company and Seller;

WHEREAS, pursuant to the terms thereto, the Facility is set to commence Partial Commercial Operation under the Stage 3 PPA on or about April 10, 2033;

WHEREAS, the Parties now intend to execute this Amendment to include terms and conditions that (1) extend the term of the A&R PPA to the date on which the Facility commences Partial Commercial Operation pursuant to the Stage 3 PPA; and (2) account for adjusted payment terms under the A&R PPA during such extension period; and

WHEREAS, the Parties agree that they shall have the right to declare this Amendment null and void under certain circumstances as specified herein;

NOW, THEREFORE, in consideration of the respective promises contained in this Amendment, and for other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the Parties hereby agree as follows:

    1


1.DEFINITIONS

Initially capitalized terms used in this Amendment not otherwise defined in the context in which they first appear shall have the meanings given them in the A&R PPA.

2.PUC APPROVAL; AMENDMENT EFFECTIVE DATE

a.Company shall submit the application for approval of the Amendment to the PUC as part of its application for approval of the Stage 3 PPA.

b.The Parties acknowledge and agree that this Amendment shall be effective as of the Execution Date, except that Section 3 (Amendment of A&R PPA) shall not become effective until the date that the PUC issues a PUC Approval Order, and such order has become final and non-appealable. For purposes of this Section 2 (PUC Approval; Amendment Effective Date), a "PUC Approval Order" is an order issued by the PUC concerning this Amendment that approves Company’s request for approval and does not contain any terms or conditions deemed unacceptable to Company, and is in a form deemed to be reasonable by Company, in its sole discretion.

3.AMENDMENT OF A&R PPA

a.Article 1 (Definitions) of the A&R PPA is hereby amended by adding the following new terms:

"Stage 3 PPA" – Shall mean that certain Power Purchase
Agreement for Firm Capacity Renewable Dispatchable Generation, dated July 27, 2026, by and between Company and Seller.

"Transition Outage #1" – Shall mean the period of time, not to commence prior to January 1, 2033, during which Seller will operate the Facility with one combustion turbine in combined cycle mode with the steam turbine while the Facility’s other combustion turbine is on a planned outage to allow necessary work to be performed in connection with supporting the Facility’s capability to operate on biofuels pursuant to the Stage 3 PPA.

"Transition Outage #2" – Shall mean the period of time immediately following the end of Transition Outage #1, during which the entire Facility will be on a planned outage to allow necessary work to be performed in connection with supporting the Facility’s capability to operate on biofuels pursuant to the

    2


Stage 3 PPA.

b.The first sentence of Section 2.2(A) (Term) of the A&R PPA is hereby deleted in its entirety and replaced with the following:

Subject to Section 2.2(B) (Effectiveness of Certain Obligations) of this Agreement, the initial term of this Agreement shall commence on the Execution Date and shall remain in effect until the Partial Commercial Operation Date, as such term is defined in the Stage 3 PPA ("Initial Term").

c.Section B(1) (Capacity Charge Formula) of Attachment J (Energy Charge and Capacity Charge Payment Formulas) is hereby deleted in its entirety and replaced with the following:

(1) Capacity Charge Formula.

(a)Commencing on the later of the Effective Date and the Capacity Rate Inclusion Date, and continuing until the start of Transition Outage #1, the Capacity Charge shall be computed by the following formula:

Capacity Charge = Contract Firm Capacity x
(Capacity Charge Rate + Fixed O&M Component Rate)

(b)Upon the commencement of Transition Outage #1, and continuing until the start of Transition Outage #2, the Capacity Charge shall be computed in accordance with Section 5.1(D) (Capacity Charge). In connection with the foregoing, the Parties agree that the work performed on the Facility during such time period shall not be considered "routine scheduled maintenance preapproved by Company" as used in said Section 5.1(D).

(c)Upon the commencement of Transition Outage #2, and continuing until the Partial Commercial Operation Date, the Capacity Charge shall be computed by the following formula:

Capacity Charge = [(0 kW × Capacity Charge Rate) +
(208,000 kW × Fixed O&M Component Rate)] × (a ÷ b)

Where:

a = number of days in Transition Outage #2 for the applicable month

    3


b = number of days in the applicable month

d.Section B (Capacity Charge) of Attachment J (Energy Charge and Capacity Charge Payment Formulas) is hereby amended by adding new subsection (7) as follows:

(7) Sample Calculation (Capacity Charge for Transition Outage #2). A sample of the Capacity Charge payment calculation for Transition Outage #2 is provided below:

Sample Calculation assumptions:

GDPIPDCURRENT = 125
GDPIPDBASE = 112

From February 13, 2033 to March 19, 2033 the full plant is on outage in preparation for Stage 3 PPA operations (Transition Outage #2).

Calculation:

Capacity Charge = [(0 kW × Capacity Charge Rate) +
(208,000 kW × Fixed O&M Component Rate)] × (a ÷ b)

Capacity Charge Rate = $8.33 per kW per month

Fixed O&M Component Rate = $7.50 per kW per month x
GDPIPDCURRENT/GDPIPDBASE = $7.50 per kW per month x
125/112

For February 2033, a = 16 and b = 28.

For March 2033, a = 19 and b = 31.

For February 2033,

Capacity Charge = [(0 kW x ($8.33 per kW per month)) +
(208,000 kW x $7.50 per kW per month x 125/112)] x
(16/28)
= $994,897.96

For March 2033,

Capacity Charge = [(0 kW x ($8.33 per kW per month)) +
(208,000 kW x $7.50 per kW per month x 125/112)] x

    4


(19/31)
= $1,067,108

4.AUTHORITY AND REPRESENTATIONS

Both Company and Seller represent that as of the Execution Date:

a.Each respective Party has all necessary right, power and authority to execute, deliver and perform this Amendment.

b.The execution, delivery and performance of this Amendment by each respective Party will not result in a violation of any Laws, or conflict with, or result in a breach of, or cause a default under, any agreement or instrument to which such Party is also a party or by which it is bound. No consent of any person or entity not a Party to this Amendment, including any Governmental Authority (other than agencies whose approval is necessary for the development, construction, operation and maintenance of the Facility and the Company-Owned Interconnection Facilities or the PUC), is required for such execution, delivery and performance by either Party.

5.MISCELLANEOUS

a.All of the terms and conditions of the A&R PPA that are not altered, amended or replaced by this Amendment shall remain in full force and effect. This Amendment, together with the A&R PPA (including all Attachments thereto), constitute the entire understanding and agreement between the Parties with respect to the subject matter hereof.

b.This Amendment shall be governed by and construed in accordance with the laws of the State of Hawai‘i. The venue for a civil action related to the A&R PPA and Amendment shall be the judicial circuit in which the Facility is located.

c.This Amendment may be executed in counterparts, each of which shall be deemed an original, and all of which shall together constitute one and the same instrument binding all parties notwithstanding that all of the parties are not signatories to the same counterparts. For all purposes, duplicate unexecuted and unacknowledged pages of the counterparts may be discarded and the remaining pages assembled as one document.

d.The Parties agree that this Amendment may be executed and delivered by exchange of executed copies via electronic mail

    5


("email") or other acceptable electronic means, and in electronic formats such as Adobe PDF or other formats mutually agreeable between the Parties which preserve the final terms of this Amendment or such writing. A party's signature transmitted by email or other acceptable electronic means shall be considered an "original" signature which is binding and effective for all purposes of this Amendment.

[Signature Page Follows]

    6


IN WITNESS WHEREOF, the Parties have executed this Amendment to be effective as of the date first stated above.

HAWAIIAN ELECTRIC COMPANY, INC.
a Hawaii corporation
By:
/s/ Scott W. H. Seu
Name:
Scott W. H. Seu
Its:
Chief Executive Officer
By:
/s/ Paul K. Ito
Name:
Paul K. Ito
Its:
Senior Vice President, Chief
Financial Officer & Treasurer
("Company")
KALAELOA PARTNERS L.P.
a Delaware limited partnership
By:
/s/ Daniel J. Muxie
Name:
Daniel J. Muxie
Its:
Authorized Representative
("Seller")

    7

Hawaiian Electric Exhibit 10.3
EXECUTION VERSION
image_0a.jpg


Power Purchase Agreement
For
Firm Capacity Renewable Dispatchable Generation


Kalaeloa Partners L.P.
a Delaware limited partnership


Dated: July 27, 2026




TABLE OF CONTENTS

ARTICLE 1- DEFINITIONS3
ARTICLE 2- SCOPE OF AGREEMENT30
ARTICLE 3- SPECIFIC RIGHTS AND OBLIGATIONS OF THE PARTIES43
ARTICLE 4- SUSPENSION OR REDUCTION OF DELIVERIES57
ARTICLE 5- RATES FOR PURCHASE59
ARTICLE 6- BILLING AND PAYMENT61
ARTICLE 7- CREDIT ASSURANCE AND SECURITY64
ARTICLE 8- DEFAULT68
ARTICLE 9- LIQUIDATED DAMAGES78
ARTICLE 10- COMPANY’S USE OF AND ACCESS TO FACILITY85
ARTICLE 11- AUDIT RIGHTS87
ARTICLE 12- REPRESENTATIONS, WARRANTIES AND COVENANTS88
ARTICLE 13- INDEMNIFICATION95
ARTICLE 14- CONSEQUENTIAL DAMAGES99
ARTICLE 15- INSURANCE100
ARTICLE 16- SET OFF103
ARTICLE 17- DISPUTE RESOLUTION104
ARTICLE 18- FORCE MAJEURE105
ARTICLE 19- ELECTRIC SERVICE SUPPLIED BY COMPANY109
ARTICLE 20- TRANSFERS, ASSIGNMENTS AND FINANCING DEBT110
ARTICLE 21- SALE OF FACILITY BY SELLER112
ARTICLE 22- SALE OF ENERGY TO THIRD PARTIES113
ARTICLE 23- EQUAL EMPLOYMENT OPPORTUNITY114
ARTICLE 24- PROCESS FOR ADDRESSING REVISIONS TO PERFORMANCE
      STANDARDS
115
ARTICLE 25- MISCELLANEOUS119









TABLE OF CONTENTS
OF ATTACHMENTS

The attachments to this Agreement have been omitted pursuant to Item 601(a)(5) of Regulation S-K. The Registrant agrees to furnish supplementally a copy of any omitted attachments to the Securities and Exchange Commission upon request.

Attachment A.Facility Description
Attachment B.Facility Owned by Seller
Attachment C.Methods and Formulas for Measuring Performance Standards/Selected Portions
of NERC GADS
Attachment D.Consultants List – Qualified Independent Engineering Companies
Attachment E.Single-Line Diagram and Interface Block Diagram
Attachment F.Relay List and Trip Scheme
Attachment G.Company-Owned Interconnection Facilities
Attachment H.[RESERVED]
Attachment I.[RESERVED]
Attachment J.Energy Charge and Capacity Charge Payment Formulas
Attachment K.Guaranteed Project Milestones
Attachment K-1.Seller’s Conditions Precedent and Company Milestones
Attachment L.Reporting Milestones
Attachment M.Form of Standby Letter of Credit
Attachment N.Interconnection Acceptance Test General Criteria
Attachment O.Control System Acceptance Test Criteria
Attachment P.Sale of Facility by Seller
Attachment Q.[RESERVED]
Attachment R.Required Insurance
Attachment S.Form of Monthly Progress Report
Attachment T.[RESERVED]
Attachment U.[RESERVED]
Attachment V.Summary of Maintenance and Inspection Performed in Prior Calendar Year
Attachment W.Capacity Test Procedures
Attachment X.Unit Incident Report
Attachment Y.Operation and Maintenance of the Facility
Attachment Z.Critical Spare Parts
Attachment AA.Renewable Portfolio Standards and Emissions
Attachment BB.Generator Acceptance Test General Criteria
Attachment CC.[RESERVED]
Attachment DD.Seller Fuel Supply
Attachment EE.Company Fuel Supply





POWER PURCHASE AGREEMENT
For Firm Capacity Renewable Dispatchable Generation
THIS POWER PURCHASE AGREEMENT FOR FIRM CAPACITY RENEWABLE DISPATCHABLE GENERATION (“Agreement”) is made on July 27, 2026 (“Execution Date”), by and between HAWAIIAN ELECTRIC COMPANY, INC. (hereinafter referred to as “Company”), a Hawai‘i corporation, with principal offices in Honolulu, State of Hawai‘i, and KALAELOA PARTNERS L.P. (hereinafter referred to as “Seller”), a Delaware limited partnership, with principal offices in North Brunswick, New Jersey, and doing business in 91-111 Kalaeloa Boulevard, Kapolei, Hawai‘i 96707.
W I T N E S S E T H:
WHEREAS, Company is an operating electric public utility on the O’ahu, subject to the State of Hawai‘i Public Utilities Law (Hawai‘i Revised Statutes (“HRS”), Chapter 269) and the rules and regulations of the Hawai‘i Public Utilities Commission (“PUC”); and

WHEREAS, the Company operates the Company System as an independent power grid and must maximize system reliability for its customers by ensuring that sufficient generation is available and that its system (including transmission and distribution) meets the requirements for voltage stability, frequency stability, and reliability standards; and

WHEREAS, Company desires to minimize fluctuations in its purchased power costs by acquiring firm renewable dispatchable generation at a fixed energy price; and

WHEREAS, Seller currently owns and operates its LSFO-fired combined cycle electrical cogeneration facility pursuant to that certain Amended and Restated Power Purchase Agreement for Firm Dispatchable Capacity and Energy dated October 29, 2021, by and between Company and Seller (the “A&R PPA”); and

WHEREAS, Seller desires to build, own, and operate a renewable firm capacity and dispatchable energy facility capable of producing renewable electrical energy as defined by Hawai‘i’s Renewable Portfolio Standards Law, codified as HRS sections 269-91 through 269-95 (the “RPS Law”), following the expiration of the A&R PPA; and

WHEREAS, Seller understands the need to use commercially reasonable efforts to maximize the overall reliability of the Facility and the Company System; and

WHEREAS, the Facility will continue to be located in Kapolei, County of Honolulu, State of Hawai‘i, and is more fully described in Attachment A (Facility Description) attached hereto and made a part hereof; and

WHEREAS, Seller desires to sell to Company electric capacity and energy generated by the Facility, and Company, at its dispatch and subject to PUC approval, agrees to purchase such capacity and energy from Seller, upon the terms and conditions set forth herein;

EXECUTION VERSION
Kalaeloa Partners L.P.
Hawaiian Electric Company, Inc.    
1



NOW, THEREFORE, in consideration of the premises and the respective promises herein, Company and Seller hereby agree as follows:


EXECUTION VERSION
Kalaeloa Partners L.P.
Hawaiian Electric Company, Inc.
2


ARTICLE 1 - DEFINITIONS

For the purposes of this Agreement, the following capitalized terms shall have the meanings as set forth below:
“Acceptance Tests” – Shall mean all acceptance tests set forth in Section 2.3(A)(4)(c) (Acceptance Tests).
“Agreement” – Shall have the meaning set forth in the first paragraph of the first page of this agreement.
“Appeal Period” – Shall have the meaning set forth in Section 25.12(B) (Non-Appealable PUC Approval Order).

“Appraised Fair Market Value of the Facility” – Shall have the meaning set forth in Section 3(d) of Attachment P (Sale of Facility by Seller).

“Attachments” – Shall have the meaning set forth in Section 25.21 (Attachments).

“Available Capacity Factor” – Shall have the meaning set forth in Section 1.B(4) (Available Capacity Factor Formula) of Attachment J (Energy Charge and Capacity Charge Payment Formulas).

“Available Capacity” – The maximum amount of net energy export available to the Company at the Point of Interconnection from the Facility. The Facility will provide the Available Capacity via telemetry and will be used as the upper dispatch limit.

“Average Available Capacity” – Shall mean the average Available Capacity for the period reported using the telemetry measured levels provided from the Facility for the period being measured. Available Capacity during an annual maintenance overhaul period shall be excluded from any calculation of Average Available Capacity.

“BAFO Capacity Charge Rate” – Shall mean the dollar amount per kW per month provided by Seller as the Best and Final Offer Capacity Charge Rate as defined per the RFP.

“Business Day” – Any Day other than a Saturday, Sunday or legal holiday of either the United States or the State of Hawai‘i.

“Calendar Month” – The period commencing at 12:00 a.m. on the first Day of any month and terminating at 11:59 p.m. on the last Day of the same month.

“Capacity Charge” – The amount to be paid by Company to Seller pursuant to Section 5.1(D) (Capacity Charge) of this Agreement for the capacity available to the Company System from the Facility.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
3



“Capacity Rate Inclusion Date” – The earlier of (i) the effective date of an interim or final rate increase authorized by an interim or final order (whichever is first) of the PUC in a Company general rate case that includes in Company’s electric rates the additional purchased power costs (including the costs incurred as a result of the Capacity Charge and the Variable O&M Component of the Energy Charge) incurred by Company pursuant to this Agreement that are not recovered through the Energy Cost Recovery Clause, or equivalent; (ii) the date upon which Company is allowed to begin recovering such additional purchased power costs through the Purchased Power Adjustment Clause; (iii) the date upon which Company is allowed to begin recovering such additional purchased power costs through the Energy Cost Recovery Clause, or equivalent, or (iv) the effective date of an interim increase in rates authorized by the PUC pursuant to HRS § 269-27.2(d) by which the Company begins recovering such additional purchased power costs.

“Capacity Test” – The test performed by Seller in accordance with Section 5.1(E) (Capacity Test) and Attachment W (Capacity Test Procedures) to determine Demonstrated Firm Capacity.

“Change in Control” – Shall have the meaning set forth in Section 1(b) (Change in Ownership Interests and Control of Seller) of Attachment P (Sale of Facility by Seller) to this Agreement.

“Claim” – Any claim, suit, action, demand or proceeding.

“Claiming Entity” – Shall mean Seller and any direct or indirect owner of a membership and/or ownership interest in Seller which is eligible to claim a Refundable Tax Credit or Non-Refundable Tax Credit in a given year.
“Closing Date” – The date on which the closing of long-term construction financing of the Facility under the Financing Documents occurs.
“Commercial Operation” – Upon satisfaction of the following conditions, the Facility shall be considered to have achieved Commercial Operation on the Day specified in Seller's written notice described below: (i) satisfactory completion of the requirements of Section 5.1(E) (Capacity Test) and Attachment W (Capacity Test Procedures), (ii) each of the Generator Acceptance Test and Control System Acceptance Test for Commercial Operation has been passed, (iii) Seller has submitted to Company a certificate executed by a duly authorized officer of Seller certifying that construction of the Facility is substantially complete, that the Facility has been constructed substantially in compliance with the terms of this Agreement, and that all applicable acceptance tests have been satisfactorily accomplished for purposes of achieving Commercial Operation, (iv) Seller has complied with the Required Models requirements of Section 6 (Modeling) of Attachment B (Facility Owned by Seller), and (v) Seller provides Company with written notice that (aa) Seller is ready to declare the Commercial Operation Date based on actual operation of the Facility at an electric output level of at least ninety percent

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
4


(90%) of the Contract Firm Capacity applicable during Commercial Operation, and (bb) the Commercial Operation Date will occur within 24 hours (i.e., the next Day).

“Commercial Operation Date” – The date on which the Facility first achieves Commercial Operation.
“Commercial Operation Date Deadline” – The date specified in Attachment K (Guaranteed Project Milestones) of this Agreement, by which Seller guarantees that it will achieve the Commercial Operation Date.

“Company” – Shall mean Hawaiian Electric Company, Inc., a Hawaii corporation.

“Company Dispatch” – Company’s right, through supervisory equipment or otherwise, to direct or control the energy output of the Facility consistent with this Agreement. This includes net MW output (active power) from the minimum dispatch limit to Available Capacity, reactive power, voltage target, the droop setting, the Ramp Rate, and other characteristics of such electric energy output whose parameters are normally controlled or accounted for in a utility dispatching system. The Company shall also provide a determination to cycle the Facility offline or restart the Facility, in whole or in part, in accordance with the terms of this Agreement.

“Company-Owned Interconnection Facilities” – Shall have the meaning set forth in Section 1.a (General) of Attachment G (Company-Owned Interconnection Facilities).

“Company Site Representative” – Company’s representative as described in Section 10.5 (Company Site Representative).

“Company Supply” – The status during which Company is responsible for the purchase and delivery to Seller of all Fuel required by the Facility for the generation of electricity as required by the Agreement, as further described in Section 2.1(F) (Fuel and Other Consumables) and Attachment EE (Company Fuel Supply).

“Company System” – The electric system owned and operated by Company (to include any non-utility owned facilities) consisting of power plants, transmission and distribution lines, and related equipment for the production and delivery of electric power to the public.

“Company System Operator” – The individual(s) designated by job position(s) as Company’s representative(s) to act on behalf of Company on all issues regarding the daily dispatch of all generation being supplied to the Company System.

“Competitive Bidding Framework” – The Framework for Competitive Bidding contained in Decision and Order No. 23121 issued by the Public Utilities Commission on December 8, 2006 and any subsequent orders providing for modifications from those set forth in Decision & Order No. 23121.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
5



“Consent to Assignment” – Shall have the meaning in Section 20.2 (Company’s Consent and Acknowledgment).

“Construction Milestones” – The Reporting Milestones set forth in Attachment L (Reporting Milestones) and the Guaranteed Milestones set forth in Attachment K (Guaranteed Project Milestones).

“Consumer Advocate” – The Division of Consumer Advocacy of the Department of Commerce and Consumer Affairs of the State of Hawaii which represents the interests of consumers in proceedings involving the Company.

“Consumer Price Index” – The Consumer Price Index for All Urban Consumers (CPI-U).

“Contract Firm Capacity” – Shall mean the required electric energy to be made available to Company during Partial Commercial Operation and Commercial Operation in the amount and manner specified in Section 5(b) of Attachment A (Facility Description).

“Contract Year” – A twelve (12) Calendar Month period which begins on the first Day of the month coincident with or (in the event the Commercial Operation Date is not the first Day of a Calendar Month) next following the Commercial Operation Date and, thereafter during the Term, each anniversary thereof; provided, however, that, in the event the Commercial Operation Date is not the first Day of the Calendar Month, the initial Contract Year shall also include the Days from the Commercial Operation Date to the first Day of the succeeding month.

“Control System Acceptance Test(s)” or “CSAT” – Shall mean the test or tests performed on the centralized and collective control systems and Active Power Control Interface of the Facility, which includes successful completion of the Control System Telemetry and Control List, in accordance with procedures set forth in Section 1.h (Control System Acceptance Test Procedures) of Attachment B (Facility Owned by Seller). Attachment O (Control System Acceptance Test Criteria) provides general criteria to be included in the written protocol for the Control System Acceptance Test.
“Control System Telemetry and Control List” – The Control System Telemetry and Control List includes, but is not limited to, all of the Facility’s equipment and generation performance/quality parameters that will be monitored, alarmed and/or controlled by Company’s SCADA throughout the Term of this Agreement.
Examples of the Control System Telemetry and Control List include:
•Seller’s substation/equipment status – breaker open/closed status, equipment normal/alarm operating status, running/stopped, etc.
•Seller’s generation data (analog values) – generators, voltage, current, MW, MVAR, etc.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
6


•Seller’s generation performance (status and/or analog values) – available Ramp Rate, generator frequency, etc.
•Dispatch Active Power control interface – MW setpoint, Available Capacity, Minimum dispatch limit, etc.
•Reactive Power control interface – reactive power mode (AVR, PF, constant MVAR), voltage kV setpoint feedback, voltage raise/lower, etc.

This Control System Telemetry and Control List is necessary for the effective operation of the Company System and will be tested during the Control System Acceptance Test.

“Daily Delay Damages” – Shall have the meaning set forth in Section 2.4(D)(1)(b) (Daily Delay Damages).

“Day” – A calendar day.

“Demonstrated Firm Capacity” – The amounts of capacity that Seller demonstrates for the Facility in accordance with Section 5.1(E) (Capacity Test) and in accordance with the procedures set forth in Attachment W (Capacity Test Procedures), but not to exceed the applicable Contract Firm Capacity.

“Development Period Security” – Shall have the meaning set forth in Section 7.1(B) (Development Period Security).

“Disconnection Event” – A Partial Unit Trip, a Unit Trip or a Full Plant Trip.

“Dispatch Range” – The range of real power output through which the Facility can be dispatched by remote control under Company’s EMS, in accordance with and as described in Section 3.3(A) (Dispatch of Facility Power). Notwithstanding anything to the contrary, the Dispatch Range shall be provided between 60 MW and the Available Capacity of the Facility.

“Dispute” – Shall have the meaning set forth in Section 17.1 (Good Faith Negotiations).

“DoH” – The State of Hawai‘i Department of Health.

“Dollars” – The lawful currency of the United States of America.

“DPR” – Shall have the meaning set forth in Section 17.2(A) (Mediation).

“EAF” or “Equivalent Availability Factor” – The ratio (in percent) calculated in accordance with the formula, terms and concepts defined by NERC GADS, as set forth in Attachment C (Methods and Formulas for Measuring Performance Standards/Selected Portions of NERC GADS), based on the Net Maximum Capacity of the Facility, unless otherwise defined in this Agreement.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
7



“Effective Date” – The same date as the Non-appealable PUC Approval Order Date.

“EFOR” or “Equivalent Forced Outage Rate” – The ratio (in percent) calculated in accordance with the formula, terms and concepts defined by NERC GADS, as set forth in Attachment C (Methods and Formulas for Measuring Performance Standards/Selected Portions of NERC GADS), based on the Net Maximum Capacity of the Facility, unless otherwise defined in this Agreement.
“Emissions Change in Law” – Any enactment, adoption, promulgation, modification, or repeal after the Effective Date of this Agreement of any applicable Laws which would require Seller to pay, without being reimbursed by Company for such payments, any payment by Seller to the State of Hawaiʻi Department of Health or U.S. EPA or any state, federal, county or municipal regulatory agency, as applicable, of any applicable carbon or greenhouse gas tax or any substantially similar tax or imposition (however such tax or imposition may be termed) imposed on Seller in connection with the emissions produced as a result of operation of the Facility.
“Emissions Modifications” – Any capital improvements, additions, enhancements, replacements, repairs or other operational modifications to the Facility and/or to changes in Seller's operations or maintenance practices necessary to avoid or otherwise reasonably mitigate the additional costs to Seller stemming from an Emissions Change in Law.

“EMS” or “Energy Management System” – The real-time, computer-based control system, or any successor thereto, used by Company to manage the supply and delivery of electric energy to its consumers. It provides the Company System Operator with an integrated set of manual and automatic functions necessary for the operation of the Company System under both normal and emergency conditions. The EMS provides the interfaces for the Company System Operator to perform real-time monitoring and control of the Company System, including but not limited to monitoring and control of the Facility for system balancing, supplemental frequency control and economic dispatch as prescribed in this Agreement.
“Energy Charge” – The amount to be paid by Company to Seller pursuant to Section 5.1(C) (Energy Charge) of this Agreement for the Net Electric Energy Output.

“Energy Cost Recovery Clause” – The provision in Company’s rate schedules that allows Company to pass through to its customers Company’s costs of fuel and purchased power.
“Environmental Credits” – Any environmental credit, offset, or other benefit allocated, assigned or otherwise awarded by any Governmental Authority, international agency or non-governmental renewable energy certificate accounting and verification organization to Company or Seller based in whole or in part on the fact that Facility is a non-fossil fuel facility. Such Environmental Credits shall include, but not be limited to, the non-energy attributes of renewable energy including, but not limited to, any avoided emissions of pollutants to the air, soil, or water such as sulfur dioxide, nitrogen oxides, carbon monoxide, particulate matter, and hazardous air

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
8


pollutants; any other pollutant that is now or may in the future be regulated under the pollution control laws of the United States; and avoided emissions of carbon dioxide and any other greenhouse gas, along with the renewable energy certificate reporting rights to these avoided emissions, but in all cases shall not mean any existing and future tax credits (however those tax credits may be styled, including, without limitation, energy, production, investment and other such tax credits or abatements or any other or similar tax benefits under federal, state or local tax laws), including any cash grants available in lieu of tax credits.
“Environmental Policy” – Shall mean, collectively, that certain Hawaiian Electric Companies' Procurement of Biofuel from Sustainably Produced Feedstock (prepared by Hawaiian Electric and NRDC, dated August 2013) and the Roundtable on Sustainable Biofuels (RSB) Principles and Criteria for Sustainable Biofuel Production (prepared by the Roundtable on Sustainable Biofuels 2010) (RSB reference code: [RSB-STD-01-001 (Version 2.0)]).
“Event of Default” – An event or occurrence specified in Section 8.1(A) (Default by Seller) or Section 8.1(B) (Default by Company).

“Exclusive Negotiation Period” – Shall have the meaning set forth in Section 2(b) (Negotiations) of Attachment P (Sale of Facility by Seller).

“Execution Date” – The date referred to in the first paragraph of the first page of this Agreement.
“Facility” – Seller’s renewable firm capacity and dispatchable energy combined cycle electrical cogeneration facility that is capable of producing renewable electrical energy as defined in the RPS Law and is the subject of this Agreement and as more fully described in Attachment A (Facility Description), including the Seller-Owned Interconnection Facilities, Seller’s Fuel supply facilities (including all facilities required for importation, receipt, storage and handling of Fuel and other necessary consumables, waste collection, interim and final waste disposal, cooling water and any other facilities necessary for proper operation of the Facility), the Fuel, the Site, the Land Rights and all other real property, equipment, fixtures and personal property owned, leased, controlled, operated or managed in connection with the production and delivery of electric energy by Seller to the Company System.

“Facility Conditions Precedent” – The conditions listed in Section 2.3(A) (Seller’s Facility Conditions Precedent).

“Facility Description” – Shall have the meaning set forth in Attachment A (Facility Description).

“Facility Lender” – Any and all lenders and equity investors providing the Financing Debt for the construction financing or permanent financing (including refinancing) for the Facility and any and all nominees, trustees and collateral agents associated therewith. For purposes of any notices herein required to be delivered by Company to the Facility Lender, it

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
9


shall be sufficient for Company to deliver such notices to the Party designated under the Financing Documents as the collateral agent, agent, trustee or nominee for such Facility Lender.

“FASB” – Shall have the meaning set forth in Section 3.2(I)(1) (Financial Compliance).
“FASB ASC 810” – Shall have the meaning set forth in Section 3.2(I)(1) (Financial Compliance).

“FASB ASC 842” – Shall have the meaning set forth in Section 3.2(I)(1) (Financial Compliance).

“Federal Non-Refundable Tax Credit” – Shall mean any U.S. federal tax credit for which the federal government is not required to refund any tax credit which exceeds the tax payments due to the federal government by the Claiming Entity or to provide a cash rebate in lieu of such credit to the Claiming Entity.

“Federal Refundable Tax Credit” – Shall mean any U.S. federal tax credit for which the federal government is required to refund any tax credit which exceeds the tax payments due to the federal government by the Claiming Entity or to provide a cash rebate in lieu of such credit to the Claiming Entity.

“Financial Compliance Information” – Shall have the meaning set forth in Section 3.2(I)(1) (Financial Compliance).

“Financing Debt” – The financing obligations of Seller and its affiliates to any lender pursuant to the Financing Documents, including without limitation, principal of, premium and interest on indebtedness, fees, expenses or penalties, amounts due upon acceleration, prepayment or restructuring, swap or interest rate hedging breakage costs and any claims or interest due with respect to any of the foregoing.

“Financing Documents” – The loan and credit agreements, notes, indentures, security agreements and other agreements, documents and instruments relating to the Financing Debt for the construction financing and permanent financing (including refinancing and amendments) entered into by Seller for the Facility, as the same may be modified or amended from time to time in accordance with the terms thereof.

“Fixed O&M Component Rate” – Shall have the meaning set forth in Section 1.B(2) (Fixed O&M Component Rate) of Attachment J (Energy Charge and Capacity Charge Payment Formulas).

“Force Majeure” – An event that satisfies the requirements of Section 18.1 (Definition of Force Majeure), is consistent with Section 18.2 (Events That Could Qualify as Force Majeure) but not excluded by Section 18.3 (Exclusions From Force Majeure).

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
10



“Fossil Fuel” – Shall mean the Fossil Fuel designated in Section 2 (Fuel Designation) of Attachment DD (Seller Fuel Supply) to be used at the Facility as an alternative to the Renewable Fuel and the Fuel Blend.
“Fuel” – The type of Fuel to be used in the Facility shall be based upon the then current Fuel designation by Company under Attachment EE (Company Fuel Supply) (in the case of Company Supply) or Attachment DD (Seller Fuel Supply) (in the case of Seller Supply), and specified in Seller’s Fuel Report during Seller Supply periods. The Fuel shall be suitable for the operation of the Facility in accordance with this Agreement, the Company’s Environmental Policy, applicable Governmental Approvals and equipment manufacturer specifications relating to the Facility.
“Fuel Blend” – Shall mean a blend of the Renewable Fuel and the Fossil Fuel as described in Section 2 (Fuel Designation) of Attachment DD (Seller Fuel Supply) to be used at the Facility as an alternative to the Fossil Fuel and the Renewable Fuel.

“Fuel Change” – Shall have the meaning set forth in Section 4.A (Fuel Change Option) of Attachment DD (Seller Fuel Supply).
“Fuel Change Amendment” – Shall mean the agreement between Seller and Company as described in Section 4.B(3) (Discussion of Fuel Change Proposal) of Attachment DD (Seller Fuel Supply) specifying a Fuel Change and setting forth the changes to the Agreement necessary to implement such Fuel Change, including changes to Energy Charge provisions and changes to performance guarantees and Liquidated Damages, if appropriate.

“Fuel Change Option” – Shall have the meaning set forth in Section 4.A (Fuel Change Option) of Attachment DD (Seller Fuel Supply).

“Fuel Change Proposal” – Shall have the meaning set forth in Section 4.B(2) (Fuel Change Proposal) of Attachment DD (Seller Fuel Supply).

“Fuel Component” – Shall have the meaning set forth in Section 1.A(1) (Energy Charge Formula) of Attachment J (Energy Charge and Capacity Charge Payment Formulas).

“Fuel Emergency” – Shall mean the condition defined in Section 3.A(4) (Seller-Requested Fuel Switch) of Attachment DD (Seller Fuel Supply).
“Fuel Report” – During periods of Seller Supply, the annual Fuel plan which shall be delivered in a format acceptable to Company pursuant to Section 2.3(A)(2) (Executed Project Documents) and which demonstrates that Seller has secured sufficient Fuel and other necessary consumables to support the operation of the Facility pursuant to the terms and conditions of the Agreement for the Term. Where the Fuel for the Facility is biomass, the Fuel Report shall include but not be limited to, as applicable, a forestry development plan, crop rotation plan, harvesting and regeneration rates and schedule, description of silviculture practices in-place, and

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
11


tree condition inventory. Where the Fuel for the Facility is biogas, biofuel, or hydrogen produced from renewable energy sources, the Fuel Report shall include but not be limited to, as applicable, any and all Fuel supply agreements and/or agreements for the supply of the raw material required to produce the Fuel.

“Fuel Supply Agreements” – The agreements, a copy of which are delivered to Company pursuant to Section 2.3(A)(2) (Executed Project Documents) or Section 1(B)(2) (Procurement of Fuel Supply Agreements) of Attachment DD (Seller Fuel Supply), under which Seller obtains Fuel for the Facility during Seller Supply periods or on a contingency basis during Company Supply periods.

“Fuel Switch” – Shall mean the change from the Fuel currently being used at the Facility as directed by Company, at any time, in its sole discretion, and as described in Section 3 (Fuel Switching) of Attachment DD (Seller Fuel Supply).

“Full Plant Trip” – The unscheduled removal from service of the Facility’s two combustion turbine generators within the timeframes to constitute a Full Plant Trip (Category I) or Full Plant Trip (Category II). For avoidance of doubt, if more than one hundred eighty (180) minutes elapse between the unscheduled removal from service of the first and second combustion turbines (i.e., exceeding the timeframe to constitute a Full Plant Trip (Category II)), such unscheduled removal from service of such combustion turbines shall each constitute a separate Unit Trip.
“Full Plant Trip (Category I)” – A Full Plant Trip in which not more than twenty-five (25) minutes and no seconds elapse between the unscheduled removal from service of the first of the combustion turbines to be so removed during such Full Plant Trip and the unscheduled removal from service of the second of the combustion turbines to be so removed.
“Full Plant Trip (Category II)” – A Full Plant Trip (other than a Full Plant Trip (Category I)) in which not more than one hundred eighty (180) minutes and no seconds elapse between the unscheduled removal from service of the first of the combustion turbines to be so removed during such Full Plant Trip and the unscheduled removal from service of the second of the combustion turbines to be so removed.
“Generator Acceptance Test” – Shall mean the test conducted by Seller and, at Company's option, witnessed by Company (a) within ten (10) Days of successful completion of the Interconnection Acceptance Test, and (b) no later than sixty (60) Days prior to the Commercial Operation Date Deadline, each in accordance with criteria and test procedures determined by Company and Seller as set forth in Attachment BB (Generator Acceptance Test General Criteria), to determine conformance with Seller’s obligations in the specific subsections of Attachment B (Facility Owned by Seller) and Good Engineering and Operating Practices. Successful completion of the Generator Acceptance Test shall be a condition precedent for the performance of a Control System Acceptance Test and achieving the Partial Commercial Operation Date and Commercial Operation Date.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
12



“GDPIPD” or “Gross Domestic Product Implicit Price Deflator” – Shall mean the index value shown in the United States Department of Commerce, Bureau of Economic Analysis (“BEA”) publication entitled “Implicit Price Deflators for Gross Domestic Product”, Table 1.1.9, Line 1, for each quarter of the calendar year (BEA Interactive Data Application), or a successor publication or index, which may be used to adjust the BAFO Capacity Charge Rate.

“GDPIPDBAFO Submission” – 122.768, which represents the GDPIPD as of the calendar quarter in which Seller submitted its BAFO Capacity Charge Rate.

“GDPIPDPUC Approval” – Shall mean the latest GDPIPD released as of the PUC Approval Order Date.

“GDPIPD Compare Rate” – Shall have the meaning set forth in Section 5.1(D)(1) (BAFO Capacity Charge Rate Adjustment).

“GHG Letter Agreement” – Shall mean the letter agreement and any written, signed amendments thereto, between Company and Seller that collectively describe the scope, schedule, and payment arrangements for the greenhouse gas emissions analysis to be completed in connection with the application with the PUC for regulatory approval of this Agreement.

“Good Engineering and Operating Practices” – The practices, methods and acts engaged in or approved by a significant portion of the electric utility industry for similarly situated U.S. facilities, considering Company’s isolated island setting, that at a particular time, in the exercise of reasonable judgment in light of the facts known or that reasonably should be known at the time a decision is made, would be expected to accomplish the desired result in a manner consistent with law, regulation, reliability for an island system, safety, and expedition. With respect to the Facility, Good Engineering and Operating Practices include, but are not limited to, taking reasonable steps to ensure that:

1.    Adequate materials, resources and supplies, including Fuel and necessary consumables, are available to meet the Facility’s needs under normal conditions and reasonably foreseeable abnormal conditions.

2.    Sufficient operating personnel are available and are adequately experienced and trained to operate the Facility properly, efficiently and within manufacturer’s guidelines and specifications and are capable of responding to emergency conditions.

3.    Preventive, predictive, routine and non-routine maintenance and repairs are performed on a basis that ensures reliable, long-term and safe operation, and are performed by knowledgeable, trained and experienced personnel utilizing proper equipment, tools, and procedures.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
13



4.    Appropriate monitoring and testing is done to ensure that equipment is functioning as designed and to provide assurance that equipment will function properly under both normal and reasonably foreseeable abnormal conditions.

5.    Equipment is operated in a manner safe to workers, the general public and the environment and in accordance with equipment manufacturer’s specifications, including, without limitation, defined limitations such as steam pressure, temperature, moisture content, chemical content, quality of make-up water, operating voltage, current, frequency, rotational speed, polarity, synchronization, control system limits, etc.

6.     Facility design and operation meets the Contract Firm Capacity under natural conditions reasonably anticipated to occur during the life of this Agreement including consideration of probable seismic events, tropical storms, hurricanes, and volcanic eruptions.

“Governmental Approvals” – All permits, licenses, approvals, certificates, entitlements and other authorizations issued by Governmental Authorities, as well as any agreements with Governmental Authorities, required to fulfill its obligations under this Agreement, including the construction, ownership, operation and maintenance of the Facility and the Company-Owned Interconnection Facilities, and all amendments, modifications, supplements, general conditions and addenda thereto.

“Governmental Authority” – Any federal, state, local or municipal governmental body; any governmental, quasi-governmental, regulatory or administrative agency, commission, body or other authority exercising or entitled to exercise any administrative, executive, judicial, legislative, policy, regulatory or taxing authority or power; or any court or governmental tribunal.

“Guaranteed Milestones” – Each of the events described as Guaranteed Milestones in Attachment K (Guaranteed Project Milestones).

“Guaranteed Procurement Payment Date” – The date specified in Attachment K (Guaranteed Project Milestones) that Seller shall make payment to Company of the amount required under Section 3.b.iii (Balance of Company-Owned Interconnection Facilities Prepayment) of Attachment G (Company-Owned Interconnection Facilities).

“Hawai‘i General Excise Tax” – The tax on gross income codified under HRS Chapter 237 and administered by the State of Hawai‘i Department of Taxation and all other similar taxes imposed by any Governmental Authority with respect to payments in the nature of a gross receipts tax, sales tax, privilege tax or the like, but excluding federal or state net income tax.


EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
14


“Hawai‘i Investment Tax Credit” – Shall mean a credit against Hawaii source income for which Seller is eligible on the Partial Commercial Operation Date or thereafter because of investment in renewable energy technologies incorporated into the Facility.

“Hawai‘i Non-Refundable Tax Credit” – Shall mean any Hawai‘i Investment Tax Credit for which the State of Hawai‘i is not required to refund any tax credit which exceeds the tax payments due to the State of Hawai‘i by the Claiming Entity or to provide a cash rebate in lieu of such credit to the Claiming Entity.

“Hawai‘i Production Tax Credit” – Shall mean a credit against Hawaii source income for which Seller is eligible on the Partial Commercial Operation Date or thereafter because of the energy produced by the Facility.

“Hawai‘i Refundable Tax Credit” – Shall mean any Hawai‘i Investment Tax Credit for which the State of Hawai‘i is required to refund any tax credit which exceeds the tax payments due to the State of Hawai‘i by the Claiming Entity or to provide a cash rebate in lieu of such credit to the Claiming Entity.

“Hawai‘i Renewable Energy Tax Credit” – The Hawai‘i Investment Tax Credit and the Hawai‘i Production Tax Credit.

“HEI” – Hawaiian Electric Industries, Inc., a Hawaii corporation.

“HERA” – The Hawaii Electricity Reliability Administrator.

“HERA Law” – Act 166 (Haw. Leg. 2012), which was passed by the 27th Hawaii Legislature in the form of S.B. No. 2787, S.D. 2, H.D.2, C.D.1 on May 2, 2012 and signed by the Governor on June 27, 2012.  The effective date for the law is July 1, 2012.  The HERA Law authorizes (i) the PUC to develop, adopt, and enforce reliability standards and interconnection requirements, (ii) the PUC to contract for the performance of related duties with a party that will serve as the HERA, and (iii) the collection of a Hawaii electricity reliability surcharge to be collected by Hawaii's electric utilities and used by the HERA.  Reliability standards and interconnection requirements adopted by the PUC pursuant to the HERA Law will apply to any electric utility and any user, owner, or operator of the Hawaii electric system.  The PUC also is provided with the authority to monitor and compel the production of data, files, maps, reports, or any other information concerning any electric utility, any user, owner or operator of the Hawaii electric system, or other person, business, or entity, considered by the PUC to be necessary for exercising jurisdiction over interconnection to the Hawaii electric system, or for administering the process for interconnection to the Hawaii electric system.

“HST” – Hawai‘i Standard Time.

“HRS” – Means the Hawai‘i Revised Statutes, as may be amended.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
15



“Indemnified Company Party” – Shall have the meaning set forth in Section 13.1(A) (Indemnification Against Third Party Claims).

“Indemnified Seller Party” – Shall have the meaning set forth in Section 13.2(A) (Indemnification Against Third Party Claims).
“Independent Engineering Assessment” – The determination and recommendations made by a Qualified Independent Engineering Company regarding the operation and maintenance practices of Seller at the Facility pursuant to Section 3.3(B)(1) (Implementation of Independent Engineering Assessment).

“Independent Evaluator” – The person selected to resolve a dispute under Section 24.10 (Dispute).
“Independent Tax Expert” – Shall mean a person (i) with experience and knowledge in the field of tax equity project finance for utility scale electric generating facilities and in the field of the Hawai‘i Renewable Energy Tax Credit and (ii) who is neutral, impartial and not predisposed to favor either Party.
“Initial Fuel” – Shall have the meaning set forth in Section 1.B(1) (Notice to Seller) of Attachment DD (Seller Fuel Supply).
“Interconnection Acceptance Test” – Shall mean the test conducted by Seller and witnessed by Company, within thirty (30) Days of completion of all Interconnection Facilities and in accordance with criteria and test procedures determined by Company and Seller as set forth in Attachment N (Interconnection Acceptance Test General Criteria), to determine conformance with Seller’s obligations in Attachment B (Facility Owned by Seller) and Good Engineering and Operating Practices. Successful completion of the Interconnection Acceptance Test shall be a condition precedent for the performance of the Generator Acceptance Test and achieving the Partial Commercial Operation Date and Commercial Operation Date.

“Interconnection Facilities” – The equipment and devices required to permit the Facility to operate in parallel with, and deliver electric energy to the Company System and provide reliable and safe operation of, and power quality on, the Company System (in accordance with the PUC’s General Order No. 7, Company tariffs, operational practices and planning criteria), such as, but not limited to, transmission lines, transformers, switches, circuit breakers and telecommunication, as may be further described in the Attachment B (Facility Owned by Seller) and Attachment G (Company-Owned Interconnection Facilities). Interconnection Facilities include Company-Owned Interconnection Facilities and Seller-Owned Interconnection Facilities.
“IRS” – The interconnection requirements study, performed in accordance with the terms of the IRS Letter Agreement and with Section 1.c (IRS) of Attachment G (Company-Owned Interconnection Facilities) to assess, among other things, (a) the system requirements and equipment requirements to interconnect the Facility with the Company System, (b) the

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
16


Performance Standards of the Facility, and (c) an estimate of interconnection costs and project schedule for interconnection of the Facility.
“IRS Letter Agreement” – The letter agreement and any written, signed amendments thereto, between Company and Seller that describes the scope, schedule, and payment arrangements for the IRS.
“Interface Block Diagram” – The visual representation of the signals between Seller and Company, including but not limited to, RTU points, digital fault recorder settings, telecommunications and protection signals.

“kVAr” – Kilovar(s).

“kVArh” – Kilovarhour(s).

“kW” – Kilowatt(s). Unless expressly provided otherwise, all kW values stated in this Agreement are alternating current values and not direct current values.

“kWh” – Kilowatthour(s).

“Land Rights” – All easements, rights of way, licenses, leases, surface use agreements and other interests or rights in real estate.

“Laws” – Shall have the meaning set forth in Section 3.2(E) (Compliance with Laws).

“Liquidated Damages” – Any of the damages provided for in Article 9 (Liquidated Damages) and Attachment B (Facility Owned by Seller) and Attachment J (Energy Charge and Capacity Charge Payment Formulas).
“Losses” – Any and all direct, indirect or consequential damages, fines, penalties, deficiencies, losses, liabilities (including settlements and judgments), costs, expenses (including reasonable attorneys' fees and court costs) and disbursements.

“Major Generating Equipment Overhaul” – Overhaul, replacement or other major scheduled maintenance of the major generating equipment component of the Facility, e.g., combustion turbine, internal combustion engine, electrical generator conducted (i) in accordance with the equipment manufacturer’s recommendations or (ii) otherwise in the judgment of Seller in accordance with Good Engineering and Operating Practices.

“Malware” – Computer software, code or instructions that: (a) intentionally, and with malice intent by a third party, adversely affect the operation, security or integrity of a computing, telecommunications or other digital operating or processing system or environment, including without limitation, other programs, data, databases, computer libraries and computer and communications equipment, by altering, destroying, disrupting or inhibiting such operation,

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
17


security or integrity; (b) without functional purpose, self-replicate written manual intervention; (c) purport to perform a useful function but which actually performs either a destructive or harmful function, or perform no useful function other than utilize substantial computer, telecommunications or memory resources with the intent of causing harm; or (d) without authorization collect and/or transmit to third parties any information or data; including such software, code or instructions commonly known as viruses, Trojans, logic bombs, worms, adware and spyware.

“Management Meeting” – Shall have the meaning set forth in Section 17.1 (Good Faith Negotiations).

“Metering Point(s)” – The physical point(s) located on the high voltage side of the step up transformer(s), as depicted in Attachment E (Single-Line Diagram And Interface Block Diagram), at which Company’s metering is connected to the Facility for the purpose of measuring the output of the Facility in kW, kWh, kVAr and kVArh.

“Milestone Date(s)” – The date(s) in Attachment K (Guaranteed Project Milestones) and Attachment L (Reporting Milestones) for completion of the applicable Construction Milestone(s).

“Milestone Date Delay LD Period” – Shall have the meaning set forth in Section 2.4(D)(1)(a) (Milestone Delay Damages).

“Milestone Delay Damages” – Shall have the meaning set forth in Section 2.4(D)(1)(a) (Milestone Delay Damages).

“Modification Pricing Impact” – Any reimbursement, adjustment in rates for purchase set forth in Article 5 (Rates for Purchase) in $/kWh and/or $/kW per month and/or the calculation of Liquidated Damages, as may be necessary to specifically reflect the recovery of the net costs and/or net lost revenues specifically attributable to any RPS Modification or Emissions Modification, which shall consist of the following: (i) recovery of, and return on, any capital investment (aa) made over a cost recovery period starting after the RPS Modification or Emissions Modification is made effective following a PUC Revision Order through the end of the Term and (bb) based on a proposed capital structure that is commercially reasonable for such an investment and the return on investment is at market rates for such an investment (or similar investment); (ii) recovery of reasonably expected net additional operating and maintenance costs; (iii) recovery of reasonably expected applicable federal or state tax credits lost or not obtainable which are directly attributable to the RPS Modification or Emissions Modification; and (iv) an adjustment in pricing or warranties of performance under Section 3.2(B) (Warranties and Guarantees of Performance), as applicable, necessary to compensate Seller for reasonably expected reductions, if any, in the Capacity Charge or reasonably expected increases in Liquidated Damages directly related to the RPS Modification or Emissions Modification.


EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
18


“Modifications Document” – Each RPS Modifications Document and Emissions Modifications Document, as applicable.

“Modifications Proposal” – Each Seller's RPS Modifications Proposal and Seller's Emissions Modifications Proposal, as applicable.

“Monthly Invoice” – Shall have the meaning set forth in Section 6.1 (Monthly Invoice).

“Monthly Progress Report” – Shall have the meaning set forth in Section 3.2(A)(7) (Monthly Progress Reports).

“MVAR” – Megavar(s).

“MW” – Megawatt(s).

“MWh” – Megawatthour(s).

“NERC GADS” or “North American Electric Reliability Council Generating Availability Data System” – The data collection system called “Generating Availability Data System” which is utilized by the North American Electric Reliability Council, a voluntary organization formed by the electric utility industry to promote the reliability and adequacy of the bulk power supply of the electric utility systems in North America. For purposes of this Agreement, the most current version of NERC GADS (selected portions of which are attached hereto as Attachment C (Methods and Formulas for Measuring Performance Standards/Selected Portions of NERC GADS)) shall be used whenever reference is made to NERC GADS. In the event that the definition of a term contained in this Article 1 (Definitions) is inconsistent with the definition of the term under NERC GADS, the definition contained in this Article 1 (Definitions) shall control.

“Net Amount” – Shall mean, with respect to any Hawai‘i Renewable Tax Credit, the amount remaining after deducting any documented and reasonable financial, legal, administrative and other costs and expenses of applying for, pursuing, monetizing and receiving the applicable Hawai‘i Renewable Tax Credit, and all payments to or reserves required by Seller's lenders or other financing parties in connection with the application for or receipt of such Hawai‘i Renewable Tax Credit.
“Net Electric Energy Output” – For any period of time, the total electric energy output of the Facility in kWh (net of auxiliaries and transformer losses) delivered to Company as measured at the Metering Point of the Facility.
“Net Maximum Capacity” – The maximum capacity the Facility can sustain over a specified period of time when not restricted by seasonal or other deratings less capacity utilized for the Facility’s station service or auxiliaries and less transformer losses, as measured at the Metering Point.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
19



“NOI” – Shall have the meaning set forth in Section 4.B(1) (Notice of Intent to Exercise Fuel Change Option) of Attachment DD (Seller Fuel Supply).

“Nomination Period” – Shall mean the period of time, that is generally not less than twelve (12) months, during which Company designates in writing the Fuel that Seller shall obtain and use as the primary Fuel for the operation of the Facility, as described in Attachment DD (Seller Fuel Supply).

“Non-appealable PUC Approval Order” – Shall have the meaning set forth in Section 25.12(B) (Non-appealable PUC Approval Order).

“Non-appealable PUC Approval Order Date” – Shall have the meaning set forth in Section 25.12(D) (Non-appealable PUC Approval Order Date).

“Non-Refundable Tax Credit” – Shall mean any U.S. Federal Tax Credit and State of Hawaiʻi Tax Credit (including both a Hawai‘i Investment Tax Credit and a Hawai‘i Production Tax Credit) for which the federal government or State of Hawaii is not required to refund any tax credit which exceeds the tax payments due to the federal government or State of Hawaiʻi by the Claiming Entity or to provide a cash rebate in lieu of such credit to the Claiming Entity.

“Operating Period Security” – Shall have the meaning set forth in Section 7.1(D) (Operating Period Security).

“Partial Commercial Operation” – Upon satisfaction of the following conditions, the Facility shall be considered to have achieved Partial Commercial Operation on the Day specified in Seller's written notice described below: (i) satisfactory completion of the Facility Conditions Precedent and the requirements of Section 5.1(E) (Capacity Test) and Attachment W (Capacity Test Procedures), (ii) the Acceptance Tests have been passed, (iii) Seller has complied with the Required Models requirements of Section 6 (Modeling) of Attachment B (Facility Owned by Seller), and (iv) Seller provides Company with written notice that (aa) Seller is ready to declare the Partial Commercial Operation Date based on actual operation of the Facility at an electric output level of at least ninety-five percent (95%)of the Contract Firm Capacity applicable during Partial Commercial Operation, and (bb) the Partial Commercial Operation Date will occur within 24 hours (i.e., the next Day).

“Partial Commercial Operation Date” – The date on which the Facility first achieves Partial Commercial Operation.

“Partial Commercial Operation Date Deadline” – The date specified in Attachment K (Guaranteed Project Milestones) of this Agreement, by which Seller guarantees that it will achieve the Partial Commercial Operation Date.


EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
20


“Partial Unit Trip” – The unscheduled removal from service, as a result of immediate mechanical/electrical/hydraulic control system trips or operator initiated trips/shutdowns, that causes the loss of 35 MW or more of the Net Electric Energy Output of the Facility, but not the removal of any of the Facility’s generators, provided, however that Partial Unit Trips shall not include: (A) any such removal which occurs within one (1) hour of the time at which a Facility generator is resynchronized following a planned or forced outage (including forced outages resulting from Unit Trips); (B) trips caused or initiated by Company other than (i) pursuant to Section 4.1 (Initiation by Company), or (ii) due to the Facility’s failure to comply with Company Dispatch, any of the Performance Standards, Good Engineering and Operating Practices, Governmental Approvals, or Seller's other obligations under this Agreement; or (C) any such removal caused by events outside of the Facility.

The exclusion from the definition of “Partial Unit Trip” of trips/shutdowns “caused by events outside of the Facility” shall not operate to preclude from the “Partial Unit Trips” definition trips/shutdowns caused by events occurring outside the Facility through which a Facility like the Facility should reasonably be expected, as a result of employing Good Engineering and Operating Practices, to remain synchronized and continue operation without the occurrence of a trip/shutdown event.

“Partial Unit Trip (Category I)” – A Partial Unit Trip for which Seller has not provided Company’s Load Dispatcher with notice at least one (1) hour prior to the Partial Unit Trip, indicating that the Facility is likely to experience a Partial Unit Trip. In order to qualify as a notice of the type referred to in the preceding sentence, the notice must (a) be made in a direct and two-way communication between Seller or its operator’s personnel and Company’s Load Dispatcher through such media as the “hot line” between the Facility’s control room and that of Company’s Load Dispatcher, (b) clearly and specifically state that there is likely to be a Partial Unit Trip, and (c) be acknowledged by Company’s Load Dispatcher as conveying the message that there is likely to be a Partial Unit Trip.

“Partial Unit Trip (Category II)” – A Partial Unit Trip for which Seller has provided Company’s Load Dispatcher with notice at least one (1) hour prior to the Partial Unit Trip, indicating that the Facility is likely to experience a Partial Unit Trip. In order to qualify as a notice of the type referred to in the preceding sentence, the notice must (a) be made in a direct and two-way communication between Seller or its operator’s personnel and Company’s Load Dispatcher through such media as the “hot line” between the Facility’s control room and that of Company’s Load Dispatcher, (b) clearly and specifically state that there is likely to be a Partial Unit Trip, and (c) be acknowledged by Company’s Load Dispatcher as conveying the message that there is likely to be a Partial Unit Trip.

“Party” – Each of Seller or Company.

“Parties” – Seller and Company, collectively.


EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
21


“Per Hour Variable Component” – Shall have the meaning set forth in Attachment J (Energy Charge and Capacity Charge Payment Formulas).

“Performance Standards” – The various performance standards for the operation of the Facility and the delivery of electric energy from the Facility to the Company specified in Section 3 (Performance Standards) of Attachment B (Facility Owned by Seller), as such standards may be revised from time to time pursuant to Article 24 (Process for Addressing Revisions to Performance Standards) of this Agreement.

“Performance Standards Information Request” – A written notice from Company to Seller proposing revisions to one or more of the Performance Standards then in effect and requesting information from Seller concerning such proposed revision(s).

“Performance Standards Modifications” – For each Performance Standards Revision, any capital improvements, additions, enhancements, replacements, repairs or other operational modifications to the Facility and/or to changes in Seller's operations or maintenance practices necessary to enable the Facility to achieve the performance requirements of such Performance Standards Revision.
“Performance Standards Pricing Impact” – Any reimbursement, adjustment in rates for purchase set forth in Article 5 (Rates for Purchase) in $/kWh and/or $/kW per month and/or the calculation of Liquidated Damages, as may be necessary to specifically reflect the recovery of the net costs and/or net lost revenues specifically attributable to any Performance Standards Modification necessary to comply with a Performance Standard Revision, which shall consist of the following: (i) recovery of, and return on, any capital investment (aa) made over a cost recovery period starting after the Performance Standards Revision is made effective following a PUC Performance Standards Revision Order through the end of the Term and (bb) based on a proposed capital structure that is commercially reasonable for such an investment and the return on investment is at market rates for such an investment or similar investment); (ii) recovery of reasonably expected net additional operating and maintenance costs; (iii) recovery of reasonably expected applicable federal or state tax credits lost or not obtainable which are directly attributable to the Performance Standards Modification; and (iv) an adjustment in pricing or warranties of performance under Section 3.2(B) (Warranties and Guarantees of Performance), as applicable, necessary to compensate Seller for a reasonably expected reduction, if any, in the Capacity Charge or reasonably expected increases in Liquidated Damages directly related to the Performance Standards Modifications or Performance Standards Revision.
“Performance Standards Proposal” – A written communication from Seller to Company detailing the following with respect to a proposed Performance Standards Revision: (i) a statement as to whether Seller believes that it is technically feasible to comply with the Performance Standards Revision and the basis therefor; (ii) the Performance Standards Modifications proposed by Seller to comply with the Performance Standards Revision; (iii) the capital and incremental operating costs of any necessary technical improvements, and any other incremental net operating or maintenance costs associated with any necessary operational

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
22


changes, and any expected lost revenues associated with expected reductions in electric energy delivered to Company; (iv) the Performance Standards Pricing Impact of such costs and/or lost revenues; (v) information regarding the effectiveness of such technical improvements or operational modifications; (vi) proposed contractual consequences for failure to comply with the Performance Standard Revision that would be commercially reasonable under the circumstances; and (vii) such other information as may be reasonably required by Company to evaluate Seller's proposals. A Performance Standards Proposal may be issued either in response to a Performance Standards Information Request or on Seller's own initiative.

“Performance Standards Revision” – A revision, as specified in a Performance Standards Information Request or a Seller-initiated Performance Standards Proposal, to the Performance Standards in effect as of the date of such request or proposal.

“Performance Standards Revision Document” – A document specifying one or more Performance Standards Revisions and setting forth the changes to the Agreement necessary to implement such Performance Standards Revision(s). A Performance Standards Revision Document may be either a written agreement executed by Company and Seller or as directed by the Independent Evaluator pursuant to Section 24.10 (Dispute) of this Agreement, in the absence of such written agreement.

“Per kWh Variable Component” – Shall have the meaning set forth in Attachment J (Energy Charge and Capacity Charge Payment Formulas).

“Point of Interconnection” – The point of delivery of energy output supplied by Seller to Company, depicted on Attachment E (Single-Line Diagram and Interface Block Diagram), based on the results of the IRS, where the facilities owned by Seller interconnect with the facilities owned by Company. Seller shall own and maintain the facilities from the Facility to the Point of Interconnection. Company shall own and maintain the facilities from the Point of Interconnection to the Company System.

“Post-COD Termination Damages” – Shall have the meaning set forth in Section 9.3(B) (Post-COD Termination Damages).
“Pre-COD Termination Damages” – Shall have the meaning set forth in Section 9.3(A) (Pre-COD Termination Damages).
“Prime Rate” – The United States "prime rate" of interest, as published from time to time by The Wall Street Journal in the “Money Rates” section of its Western Edition Newspaper (or the average prime rate if a high and a low prime rate are therein reported). The Prime Rate shall change without notice with each change in the prime rate reported by The Wall Street Journal, as of the date such change is reported. Any such rate is a general reference rate of interest, may not be related to any other rate, may not be the lowest or best rate actually charged by any lender to any customer or a favored rate and may not correspond with future increases or decreases in interest rates charged by lenders or market rates in general.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
23



“Project Documents” – This Agreement, any ground lease or other lease in respect of the Site and/or Land Rights, all construction contracts to which Seller is or becomes a party, Fuel Supply Agreements to which Seller is or becomes a party, operation and maintenance agreements, and all other agreements, documents and instruments to which Seller is or becomes a party thereto in respect of the Facility, other than the Financing Documents and the Security Documents, as the same may be modified or amended from time to time in accordance with the terms thereof.

“Proprietary Rights” – Shall have the meaning set forth in Section 25.17 (Proprietary Rights).

“PUC” or “Public Utilities Commission” – Shall mean the State of Hawai‘i Public Utilities Commission.

“PUC Application Period” – Shall have the meaning set forth in Section 2.2(F)(2) (Time Period for PUC Approval).

“PUC Approval Order” – Shall have the meaning set forth in Section 25.12(A) (PUC Approval Order).

“PUC Approval Order Date” – Shall have the meaning set forth in Section 25.12(C) (Company’s Written Statement).

“PUC Fuel Change Order” – Shall mean the decision and order from the PUC approving the application or motion by the Parties seeking (i) approval of the Fuel Change and the associated Fuel Change Amendment, (ii) finding that the impact of the changes to the contract pricing on Company’s revenue requirements is reasonable, and (iii) approval to include the costs arising out of pricing changes in Company’s Energy Cost Recovery Clause (or equivalent).

“PUC Performance Standards Revision Order” – An order issued by the PUC with respect to a Performance Standard Revision Document pursuant to Section 24.6 (PUC Performance Standards Revision Order).

“PUC Revision Order” – Shall mean the decision and order of the PUC (i) approving the application or motion by the Parties seeking approval of the Modifications Document in question, (ii) finding that the impact of the changes to the pricing terms of the Agreement on Company's revenue requirements is reasonable (if applicable), and (iii) approving the inclusion of the costs arising out of pricing changes in Company's Energy Cost Recovery Clause and/or Company's Purchase Power Adjustment Clause (or equivalent).

“PUC Submittal Date” – The date of submittal of Company’s complete application or motion for approval of this Agreement pursuant to Section 2.2(C) (PUC Approval).

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
24



“Purchased Power Adjustment Clause” – The Company’s cost recovery mechanism incorporated into Company’s tariff rules as approved by the PUC in Docket No. 2009-0164, Decision and Order No. 30168 (filed February 8, 2012) (or such successor provision that may be established from time to time), which permits Company to recover all capacity, operations and maintenance, and other non-energy payments incurred by the Company pursuant to a purchased power agreement.

“Qualified Independent Engineering Company” – Any company listed on Attachment D (Consultants List - Qualified Independent Engineering Companies), as such list is amended from time to time.

“Qualified Independent Engineers List” – The list of Qualified Independent Engineering Companies attached hereto as Attachment D (Consultants List - Qualified Independent Engineering Companies) and created and modified from time to time pursuant to Section 3.3(B)(2) (Qualified Independent Engineering Companies).

“Ramp Rate” – The rate at which the active power output of the Facility is changed in a constant manner over a fixed time in units of MW/minute.  See Attachment B (Facility Owned by Seller) for the specifications and limits to the Facility Ramp Rate.

“Recipient” – Shall have the meaning set forth in Section 3.2(I)(2) (Confidentiality).
“Reference Year” – Shall refer to the base year specifically referred to within the agreement as the starting point for escalation as set forth in Attachment J (Energy Charge and Capacity Charge Payment Formulas).
“Refundable Tax Credit” – Shall mean any U.S. Federal Tax Credit or State of Hawaii Tax Credit (including both a Hawai‘i Investment Tax Credit and a Hawai‘i Production Tax Credit) for which the federal government or State of Hawaii is required to refund any tax credit which exceeds the tax payments due to the federal government or State of Hawaii by the Claiming Entity or to provide a cash rebate in lieu of such credit to the Claiming Entity.
“Remote Terminal Unit” or “RTU” – The interface between Company’s SCADA and the physical equipment at the Facility.
“Renewable Fuel” - Shall mean the Renewable Fuel designated in Section 2 (Fuel Designation) of Attachment DD (Seller Fuel Supply) to be used at the Facility as the designated renewable fuel satisfying the requirements to be deemed a “biofuel” under the RPS Law.
“Reporting Milestones” – Each of the events identified as Reporting Milestones in Attachment L (Reporting Milestones).

“Required Model” – Shall have the meaning set forth in Section 6.a (Seller's Obligation to Provide Models) of Attachment B (Facility Owned by Seller) of this Agreement.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
25



“Revenue Metering Package” – The primary revenue meter, backup revenue meter (if required by Company), revenue metering PTs and CTs, secondary wiring, terminal blocks, test switches and fuses for secondary wiring.

“RFP” – Company’s Request for Proposals for Renewable Dispatchable Generation and Energy Storage, Island of Oahu, issued on January 20, 2023.

“RFP Proposal” – The documents and submissions comprising Seller’s proposal selected in the Final Award Group in response to the RFP.

“Right of First Negotiation Period” – Shall have the meaning set forth in Section 1(a) (Right of First Negotiation) of Attachment P (Sale of Facility by Seller).

“RPS Amendment” – Any amendment to the RPS subsequent to Effective Date that revises the definition of "renewable electric energy" under the RPS such that the electric energy delivered from the Facility no longer comes within such revised definition.

“RPS Law” – The Hawai‘i law that mandates that Company and its subsidiaries generate or purchase certain amounts of renewable electrical energy, excluding customer-sited, grid connected generation that does not produce renewable energy. The Renewable Portfolio Standards or “RPS” requirements of the RPS Law are currently codified as HRS §§ 269-91 through 269-95.

“RPS Modifications” – Any capital improvements, additions, enhancements, replacements, repairs or other operational modifications to the Facility and/or to changes in Seller's operations or maintenance practices necessary to enable the electric energy delivered from the Facility to come within the revised definition of "renewable electrical energy" resulting from a RPS Amendment.

“RPS Modifications Document” – Shall have the meaning set forth in Section 4 (Modifications Document) of Attachment AA (Renewable Portfolio Standards and Emissions).

“Second Notice” – Shall have the meaning set forth in Section 3.3(B)(1)(c).

“Security Funds” – Shall have the meaning set forth in Section 7.1(E) (Form of Security).

“Seller” – Shall have the meaning set forth in the first paragraph of the first page of this Agreement.

“Seller-Owned Interconnection Facilities” – The Interconnection Facilities constructed and owned by Seller as described in Section 1 (The Facility) of Attachment B (Facility Owned by Seller).

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
26



“Seller-Requested Fuel Switch” – Shall have a meaning set forth in Section 3.A(4) (Seller-Requested Fuel Switch) of Attachment DD (Seller Fuel Supply).

“Seller's Emissions Modifications Proposal” – Shall have the meaning set forth in Section 2.1(H) (Emissions).

“Seller’s General Manager” – The person appointed by Seller to act as the principal on-site person who is responsible for the Facility.

“Seller's RPS Modifications Proposal” – Shall have the meaning set forth in Section 2.1(G) (Renewable Portfolio Standards).

“Seller Supply” – The status during which Seller is responsible for the purchase and delivery of all Fuel required by the Facility for the generation of electricity as required by the Agreement, as further described in Section 2.1(F) (Fuel and Other Consumables) and Attachment DD (Seller Fuel Supply).

“Single Point of Failure Violation” – Any immediate and unscheduled loss of greater than 142 MW measured at the Point of Interconnection due to a common (single) cause.

“Site” – The parcel of real property, or any portion thereof, on which the Facility will be constructed and located, together with any Land Rights reasonably necessary for the construction, ownership, operation and maintenance of the Facility by Seller, as further described in Section 2.1(D) (Site) and Attachment A (Facility Description).

“SOX 404” – Shall have the meaning set forth in Section 3.2(I)(1) (Financial Compliance).

“Start-up” – The action of bringing any generator from non-operation to operation at the minimum load capability for the generating unit associated with the operating configuration of the Facility at the time, adjusted for ambient conditions.

“Subsequent Capacity Test” – A Capacity Test, requested by Seller and agreed to by Company in its sole and absolute discretion, that may be conducted (1) after the initial Capacity Test prior to the Partial Commercial Operation Date and the Commercial Operation Date, as applicable, which establishes the Demonstrated Firm Capacity, or (2) after a Capacity Test in which Demonstrated Firm Capacity is reduced pursuant to Section 8 (Permanent Reduction in Firm Capacity) of Attachment W (Capacity Test Procedures). Other than with respect to a Capacity Test conducted after the Partial Commercial Operation Date in order to achieve Commercial Operation, a Subsequent Capacity Test may be requested no earlier than one (1) year after such initial Capacity Test or later Capacity Test unless agreed to by Company in its sole and absolute discretion.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
27



“Supervisory Control and Data Acquisition” or “SCADA” – The Company system that provides remote control and monitoring of Company’s transmission and sub-transmission systems and enables Company to perform real-time control of equipment in the field and to monitor the conditions and status of the Company System.
“Supply Change Notice” – Shall have the meaning set forth in Section 1(B)(1) (Notice to Seller) of Attachment DD (Seller Fuel Supply).
“Term” – Shall have the meaning set forth in Section 2.2(A) (Term).
“Third Party” – Any person or entity other than Company or Seller, and includes, but is not limited to, any subsidiary or affiliate of Seller.
“Unfavorable PUC Order” – Shall have the meaning set forth in Section 25.12(E) (Unfavorable PUC Order).

“U.S. EPA” – The United States Environmental Protection Agency.
“Unit Trip” – The unscheduled removal from service of one of the Facility’s generators as a result of immediate mechanical/electrical/hydraulic control system trips or operator-initiated trips/shutdowns, provided, however that Unit Trips shall not include: (A) any such removal which occurs within one (1) hour of the time at which a Facility generator is resynchronized following a planned or forced outage (including forced outages resulting from Unit Trips); (B) trips caused or initiated by Company other than (i) pursuant to Section 4.1 (Initiation by Company), or (ii) due to the Facility’s failure to comply with Company Dispatch, any of the Performance Standards, Good Engineering and Operating Practices, Governmental Approvals, or Seller's other obligations under this Agreement; (C) any such removal caused by events outside of the Facility; or (D) Full Plant Trips.

The exclusion from the definition of “Unit Trip” of trips/shutdowns “caused by events outside of the Facility” shall not operate to preclude from the “Unit Trips” definition trips/shutdowns caused by events occurring outside the Facility through which a Facility like the Facility should reasonably be expected, as a result of employing Good Engineering and Operating Practices, to remain synchronized and continue operation without the occurrence of a trip/shutdown event.

“Unit Trip (Category I)” – A Unit Trip for which Seller has not provided Company’s Load Dispatcher with notice at least one (1) hour prior to the Unit Trip, indicating that the Facility is likely to experience a Unit Trip. In order to qualify as a notice of the type referred to in the preceding sentence, the notice must (a) be made in a direct and two-way communication between Seller or its operator’s personnel and Company’s Load Dispatcher through such media as the “hot line” between the Facility’s control room and that of Company’s Load Dispatcher, (b) clearly and specifically state that there is likely to be a Unit Trip, and (c) be acknowledged by Company’s Load Dispatcher as conveying the message that there is likely to be a Unit Trip.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
28



“Unit Trip (Category II)” – A Unit Trip for which Seller has provided Company’s Load Dispatcher with notice at least one (1) hour prior to the Unit Trip, indicating that the Facility is likely to experience a Unit Trip. In order to qualify as a notice of the type referred to in the preceding sentence, the notice must (a) be made in a direct and two-way communication between Seller or its operator’s personnel and Company’s Load Dispatcher through such media as the “hot line” between the Facility’s control room and that of Company’s Load Dispatcher, (b) clearly and specifically state that there is likely to be a Unit Trip, and (c) be acknowledged by Company’s Load Dispatcher as conveying the message that there is likely to be a Unit Trip.

“Variable O&M Component” – Shall have the meaning set forth in Attachment J (Energy Charge and Capacity Charge Payment Formulas).

“60-Month Schedule” – Shall have the meaning set forth in Section 8.a (60-Month Schedule) of Attachment Y (Operation and Maintenance of the Facility).


EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 1
29


ARTICLE 2 - SCOPE OF AGREEMENT
2.1    General Description of the Facility.
(A)    Overview. Seller will design, construct, permit, own, operate and maintain the Facility to provide the Contract Firm Capacity at the point of Company interconnection, in compliance with the RPS Law when utilizing Renewable Fuel and the terms and conditions of this Agreement. The Demonstrated Firm Capacity and the Net Electric Energy Output of the Facility will be sold to Company under Company Dispatch for use in the Company System in accordance with the terms of this Agreement. Seller will carry out its obligations under this Agreement in all respects in a manner that gives full recognition to the fact that, in order for Company to meet its obligation under the RPS Law and to provide service to its customers, the Facility must be designed, constructed, operated, permitted, and maintained by Seller so energy produced by the Facility will comply with the RPS Law when the Facility operates using Renewable Fuel, achieve the Partial Commercial Operation Date by the Partial Commercial Operation Date Deadline, and the Commercial Operation Date by the Commercial Operation Date Deadline, and in each case thereafter be available for service in accordance with the terms of this Agreement.
(B)    Facility Specifications. The Facility shall be designed and constructed in accordance with Good Engineering and Operating Practices and the RPS Law. The Facility Description is attached to this Agreement as Attachment A (Facility Description). The single-line diagrams in Attachment E (Single-Line Diagram and Interface Block Diagram) shall expressly identify the Point of Interconnection of the Facility to the Company System. The Facility shall be operated and maintained in accordance with the requirements of Attachment Y (Operation and Maintenance of the Facility).
(C)    Interconnection Facilities. A description of the Interconnection Facilities and the terms and conditions related to the Interconnection Facilities shall be set forth in Attachment B (Facility Owned by Seller) and Attachment G (Company-Owned Interconnection Facilities).
(D)    Site. The Site for the Facility is located at 91-111 Kalaeloa Boulevard, Kapolei, Hawai‘i 96707.
(E)    Requirements for Electric Energy Supplied by Seller. Electric energy supplied by Seller hereunder shall meet the specifications required by this Agreement. The Facility shall be designed to operate continuously and shall be designed to remain on-line and available to meet the requirements of Attachment B (Facility Owned by Seller) during events caused by natural forces, including but not limited to tropical storms, hurricanes, floods, earthquakes and volcanic eruptions, unless such events are of a severity as to exceed the specifications the Facility was designed to under Section 2.1(B) (Facility Specifications) except during planned outages, unplanned outages and outages pursuant to Article 4 (Suspension or Reduction of Deliveries). During events caused by natural forces, it is the intention of the Parties that the Facility shall be online and available to the greatest extent reasonably practicable within the then existing

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 2
30


circumstances and conditions of operation and taking into account the Seller’s determination, consistent with Good Engineering and Operating Practices, of whether the continued operation of the Facility (1) is likely to endanger the safety of persons and or property, and (2) is likely to endanger the integrity of the Facility.
(F)    Fuel and Other Consumables. The Parties intend for the Company to contract for, acquire or otherwise provide to Seller a continuous reliable supply of Fuel necessary to operate the Facility at full Contract Firm Capacity or at other dispatch determined by Company (i.e., Company Supply). During Company Supply periods, the provisions of Attachment EE (Company Fuel Supply) shall apply to this Agreement. Notwithstanding the foregoing, Company may change from Company Supply to Seller Supply under the conditions set forth in Section 1(B) (Change from Company Supply to Seller Supply) of Attachment DD (Seller Fuel Supply), in which case Seller will contract for, acquire or otherwise provide for a continuous reliable supply of Fuel necessary to operate the Facility at full Contract Firm Capacity (i.e., Seller Supply). During Seller Supply periods, the provisions of Attachment DD (Seller Fuel Supply) shall apply to this Agreement. Regardless of Company Supply or Seller Supply status, Seller will contract for, acquire or otherwise provide for a continuous reliable supply of all consumables necessary to operate the Facility at full Contract Firm Capacity. No changes to the type of Fuel or the supply requirements of such Fuel and other necessary consumables as set forth herein shall be permitted without the prior written consent of Company.
(G)    Renewable Portfolio Standards. If, as a result of any RPS Amendment, the electric energy delivered from the Facility should no longer qualify as “renewable electrical energy,” Seller shall, at the request of Company, develop and recommend to Company within a reasonable period of time following Company’s request, but in no event more than ninety (90) Days after Seller’s receipt of such request (or such other period of time as Company and Seller may agree in writing) reasonable measures to cause the electric energy delivered from the Facility to come within such revised definition of “renewable electrical energy” (“Seller’s RPS Modifications Proposal”). Such Seller’s RPS Modifications Proposal shall be in accordance with the provisions of Attachment AA (Renewable Portfolio Standards and Emissions).
(H)    Emissions. Within thirty (30) Days of any Emissions Change in Law, Seller shall provide written notice to Company if such Emissions Change in Law has a significant and material adverse financial impact on Seller’s costs under this Agreement, with such notice describing the adverse financial impacts to Seller with specificity. Within ninety (90) Days of such notice (or such other period of time as Company and Seller may agree in writing), Seller shall develop and recommend to Company reasonable measures to avoid or otherwise reasonably mitigate the additional costs to Seller stemming from an Emissions Change in Law (“Seller’s Emissions Modifications Proposal”). Such Seller’s Emissions Modifications Proposal shall be in accordance with the provisions of Attachment AA (Renewable Portfolio Standards and Emissions).
(I)    Parallel Operation. Company agrees to allow Seller to interconnect and operate the Facility to provide firm renewable dispatchable capacity and energy in parallel with the Company System; provided, however, that such interconnection and operation shall not: (i)

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 2
31


adversely affect Company's property or the operations of its customers and customers' property; (ii) present safety hazards to the Company System, Company's property or employees or Company's customers or the customers' property or employees; or (iii) otherwise fail to comply with this Agreement. Such parallel operation shall be contingent upon the satisfactory completion, as determined solely by Company, of the Interconnection Acceptance Test, the Generator Acceptance Test, and the Control System Acceptance Test in accordance with Good Engineering and Operating Practices.
2.2    Term; PUC Approval; Null and Void Rights and Company’s Option to Purchase Facility.
(A)    Term. The term of this Agreement shall commence on the Execution Date and shall remain in effect for thirty (30) years following the Commercial Operation Date (the “Term”), unless terminated earlier as provided herein. Upon expiration of the Term, the Parties hereto shall no longer be bound by the terms and conditions of this Agreement, except as set forth in Section 25.23 (Survival of Obligations).
(B)    Effectiveness of Certain Obligations.
(1)    Prior to the Effective Date: (i) in no event shall Seller be obligated to sell capacity or electric energy to Company (except as provided in Section 2.2(B)(2) below), or have any other obligations to Company other than those set forth in this Section 2.2 (Term; PUC Approval; Null and Void Rights and Company’s Option to Purchase Facility), Section 2.3(A) (Seller’s Facility Conditions Precedent), Section 3.2(A)(1) (General) (only as to obligations with respect to design and acquiring Land Rights), Section 3.2(A)(2) (Milestone Dates), Section 3.2(A)(4) (Seller’s Governmental Approvals and Land Rights) and Section 3.2(A)(5) (Review of Facilities), Section 3.2(E) (Compliance with Laws), Article 7 (Credit Assurance and Security), Article 13 (Indemnification), Article 15 (Insurance), Article 17 (Dispute Resolution), Article 18 (Force Majeure), Article 20 (Transfers, Assignments and Financing Debt), Article 21 (Sale of Facility by Seller), Article 25 (Miscellaneous) and Section 1.d (Seller Payment Obligations) of Attachment G (Company-Owned Interconnection Facilities); and (ii) in no event shall Company be obligated to make any payments provided for herein to Seller or have any other obligations to Seller other than those set forth in this Section 2.2 (Term; PUC Approval; Null and Void Rights and Company’s Option to Purchase Facility), Section 2.3(B) (Failure of Seller’s Facility Conditions Precedent), Section 3.2(A)(4) (Seller’s Governmental Approvals and Land Rights) and Section 3.2(A)(5) (Review of Facilities), and Article 13 (Indemnification), Article 17 (Dispute Resolution), Article 18 (Force Majeure), Article 20 (Transfers, Assignments and Financing Debt), Article 21 (Sale of Facility by Seller), and Article 25 (Miscellaneous).
(2)    Prior to the Partial Commercial Operation Date, the terms, conditions and obligations of Seller and Company with respect to the Facility, including the acceptance and payment for energy from the Facility, shall be governed by the A&R PPA which, notwithstanding the execution of this Agreement and effectiveness of certain obligations as described in Section 2.2(B)(1) above, shall continue in full force and effect until the Partial Commercial Operation Date.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 2
32


(3)    Upon the Partial Commercial Operation Date, the A&R PPA shall be superseded by this Agreement and the terms and conditions of the A&R PPA shall be of no force and effect except for disputes already subject to dispute resolution under the A&R PPA, which shall continue until resolution under the terms of the A&R PPA.
(C)    PUC Approval.
(1)    Notwithstanding any other provisions of this Agreement that might be construed to the contrary, Company’s purchase of electric energy under this Agreement and Company’s payment of the Capacity Charge, and any and all terms and conditions of this Agreement that are ancillary to that purchase and that payment, are all contingent upon obtaining the Non-appealable PUC Approval Order and the occurrence of the Capacity Rate Inclusion Date. Upon the execution of this Agreement, the Parties shall use good faith efforts to obtain, as soon as practicable, a satisfactory PUC Approval Order that satisfies the requirements of Section 25.12(A) (PUC Approval Order). Company shall submit to the PUC an application for a satisfactory PUC Approval Order but does not extend any assurance that a PUC Approval will ultimately be obtained. Seller will provide reasonable cooperation to expedite obtaining a PUC Approval Order including timely providing information requested by Company to support its application, including information for Company and its consultant to conduct a greenhouse gas emissions analysis for the PUC application, as well as information requested by the PUC and parties to the PUC proceeding in which approval is being sought. Seller understands that lack of cooperation may result in Company's inability to file an application with the PUC and/or a failure to receive a PUC Approval Order. For the avoidance of doubt, Company has no obligation to seek reconsideration, appeal, or other administrative or judicial review of any Unfavorable PUC Order. The Parties agree that neither Party has control over whether or not a PUC Approval Order will be issued, and each Party hereby assumes any and all risks arising from, or relating in any way to, the inability to obtain a satisfactory PUC Approval Order and hereby releases the other Party from any and all claims relating thereto.
(2)    Seller shall seek participation without intervention in the PUC docket for approval of this Agreement pursuant to applicable rules and orders of the PUC. The scope of Seller's participation shall be determined by the PUC. However, Seller expressly agrees to seek participation for the limited purpose and only to the extent necessary to assist the PUC in making an informed decision regarding the approval of this Agreement. If the Seller chooses not to seek participation in the docket, then Seller expressly agrees and knowingly waives the right to claim, before the PUC, in any court, arbitration or other proceeding, that the information submitted and the arguments offered by Company in support of the application requesting the PUC Approval Order are insufficient to meet Company's burden of justifying that the terms of this Agreement are just and reasonable and in the public interest, or otherwise deficient in any manner for purposes of supporting the PUC's approval of this Agreement. Seller shall not seek in the docket and Company shall not disclose any confidential information to Seller that would provide Seller with an unfair business advantage or would otherwise harm the position of others with respect to their ability to compete on equal and fair terms.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 2
33


(D)    [RESERVED]
(E)    Prior to Effective Date. Company may, by written notice delivered prior to the Effective Date, declare the Agreement null and void if any one or more of the following conditions applies:
(1)    Seller implements a material change to the Facility without following the requirements of Section 5(f) of Attachment A (Facility Description).
(2)    Seller is in material breach of any of its representations, warranties and covenants under the Agreement, which, in Company’s reasonable judgment, has a material adverse effect on Seller’s ability to perform its obligations under the Agreement or materially increases Company’s operational, financial or reputational risk associated with this Agreement.
(3)    Seller, subsequent to making the payment to Company required under Section 3.b.ii (Company-Owned Interconnection Facilities Prepayment) of Attachment G (Company-Owned Interconnection Facilities), requests in writing that Company stop or otherwise delay the performance of the work for which Company received such payment.
(4)    [RESERVED]
(5)    [RESERVED]
(F)    Time Periods for PUC Submittal Date and for PUC Approval.
(1)    Time Period for PUC Submittal Date. If the PUC Submittal Date has not occurred within one hundred twenty (120) Days of the Execution Date, or such longer period as Company and Seller may agree to by a subsequent written agreement, Company may, by written notice delivered within thirty (30) Days of the expiration of such period, declare the Agreement null and void if the reason the application has not been filed is (i) any one or more of the conditions set forth in Section 2.2(E) (Prior to Effective Date) or (ii) Seller's failure to provide in a timely manner information reasonably requested by Company to support such application.
(2)    Time Period for PUC Approval. If the PUC issues an Unfavorable PUC Order or if a satisfactory PUC Approval Order is not issued within twelve (12) months of the PUC Submittal Date, or within such longer period as Company and Seller may agree to by a written agreement (the “PUC Application Period”), then Company or Seller may, by written notice delivered within one hundred eighty (180) Days of (i) in the case that an Unfavorable PUC Order has been issued, the date the Unfavorable PUC Order becomes non-appealable or (ii) in the case that a PUC Approval Order is not issued within twelve (12) months of the PUC Submittal Date, or the expiration of the PUC Application Period, as applicable, declare this Agreement null and void. If a PUC Approval Order or an Unfavorable PUC Order is issued within the PUC Application Period, but that Order is appealed, and a Non-appealable PUC Approval Order is not obtained within twenty-four (24) months of the PUC Submittal Date, or within such longer period as Company and Seller may agree to by a subsequent written

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 2
34


agreement (the “PUC Order Appeal Period”), then Company or Seller may, by written notice delivered within ninety (90) Days after the expiration of the PUC Order Appeal period, declare this Agreement null and void.
(G)    Obligations of Parties Upon Declaration of the Agreement as Null and Void. If this Agreement is declared null and void pursuant to Section 2.2(E) (Prior to Effective Date), or Section 2.2(F) (Time Periods for PUC Submittal Date and PUC Approval), the Parties shall be free of all obligations hereunder, other than as provided in this in this Section 2.2(G) (Obligations of Parties Upon Declaration of the Agreement as Null and Void), Section 7.1(C) (Return of the Development Period Security) and in Section 25.23 (Survival of Obligations), to the extent such obligations are applicable at the time the Party exercises its right to declare this Agreement null and void. Notwithstanding the foregoing, if in response to Seller's request and Seller's offer of adequate assurance of reimbursement, Company agrees in writing to incur costs associated with Company-Owned Interconnection Facilities prior to the Non-appealable PUC Approval Order Date, Seller shall pay Company the actual costs and cost obligations incurred by Company as of the date the Agreement is declared null and void for Company-Owned Interconnection Facilities and any reasonable costs incurred thereafter; provided, however, that nothing in this Agreement shall obligate Company to incur such costs and cost obligations unless and until Seller provides Company with security that is adequate, as determined by Company in its sole discretion, to secure Seller’s obligation to pay Company for such costs and cost obligations as set forth herein.
(H)    Termination Rights. Notwithstanding any of the foregoing, the right of Company or Seller to terminate the Agreement at any time upon the occurrence of any Event of Default described in Section 8.1 (Events of Default) shall remain in full force and effect.
(I)    Option to Purchase Facility and Right of First Negotiation. Company shall have the right of first negotiation prior to the end of the Term and option to purchase the Facility at the end of the Term, as provided in Attachment P (Sale of Facility by Seller).
2.3    Facility Conditions Precedent.
(A)    Seller’s Facility Conditions Precedent. Company’s obligation to purchase electric energy and/or capacity from Seller pursuant to this Agreement, and any and all obligations of Company which are ancillary to that purchase, are contingent upon the following (collectively, the “Facility Conditions Precedent”):
(1)    Following the Execution Date. Within sixty (60) Days after the PUC Submittal Date, Seller shall submit to Company the then available detailed design materials and specifications for the Facility generally described in Attachment A (Facility Description) and Attachment B (Facility Owned by Seller), including but not limited to the prime mover(s), generator(s), main step-up transformer(s), condenser(s), resource handling equipment, electric energy storage equipment, as applicable, reasonably demonstrating to Company's satisfaction that the Facility, if constructed, operated and maintained pursuant to such design materials and in

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 2
35


accordance with Good Engineering and Operating Practices, can be reasonably expected to have a useful life at least equal to the Term.
(2)    Executed Project Documents. Commencing two (2) years prior to the Partial Commercial Operation Date Deadline, Seller shall submit to Company the Fuel Report, which shall be updated annually and submitted to Company on January 1 of each Calendar Year this Agreement is in force; provided, that the foregoing obligation shall only apply during Seller Supply periods. No later than three hundred sixty-five (365) Days prior to the Partial Commercial Operation Date Deadline, Seller shall submit to Company any contracts entered into by Seller for the purchase of critical materials and services necessary for the operation and maintenance of the Facility. Following the Effective Date, Seller shall submit Fuel Supply Agreements (during Seller Supply periods or contingency Fuel Supply Agreements during Company Supply periods) (with commercial terms redacted to protect suppliers’ confidential information) to Company for its review and consent in accordance with the timeframes and other terms set forth in Attachment DD (Seller Fuel Supply) and Attachment EE (Company Fuel Supply).
(3)    On or Before the Commencement of Construction. On or before the commencement of construction of all or any portion of the Facility, Seller shall submit to Company the following:
(a)    Governmental Approvals and Land Rights- Construction. Documents or other evidence that Seller obtained all required Governmental Approvals and Land Rights needed to commence construction of the Facility.
(b)    Governmental Approvals and Land Rights- Operations. Documents or other evidence that Seller has obtained all currently required Governmental Approvals and Land Rights needed to operate the Facility following completion of the Facility.
(c)    Proof of Insurance. Copies of any and all then-required insurance policies (or binders as appropriate) procured by Seller in accordance with Article 15 (Insurance) relating to the construction and operations of the Facility, as the case may be.
(d)    Officer’s Certificate. A certificate executed by a duly authorized officer of Seller certifying that: (i) Seller has the right to locate the Facility at the Site for the Term and that such right may be transferred or assigned to Company so as not to limit or interfere with Company's exercise of its rights under this Agreement; and (ii) Seller has obtained all then-required Governmental Approvals and Land Rights needed to commence construction of the Facility; and
(4)    On or before the Partial Commercial Operation Date. On or before the Partial Commercial Operation Date, which shall in no event be later than the Partial Commercial Operation Date Deadline, Seller shall:

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 2
36


(a)    Proof of Insurance. Submit to Company copies of any and all then-required insurance policies (or binders as appropriate) provided by Seller required pursuant to Article 15 (Insurance) to be in effect prior to operation of the Facility; and
(b)    Officer’s Certificate. Submit to Company a certificate executed by a duly authorized officer of Seller certifying that: (i) Seller has obtained all then-required Governmental Approvals and Land Rights needed to operate the Facility throughout the Term or, if one or more of such Governmental Approvals or Land Rights is not available at that time for the full Term, for such lesser period as is available; and (ii) construction of the Facility for Partial Commercial Operation is substantially complete, that the Facility has been constructed substantially in compliance with the terms of this Agreement and with the information submitted pursuant to this Section 2.3(A) (Seller Facility Conditions Precedent), and that all Acceptance Tests have been satisfactorily accomplished for purposes of Partial Commercial Operation and the Facility is ready to begin producing power on a commercial basis under the terms and conditions of this Agreement.
(c)    Acceptance Tests. Cause the Facility to pass each of the following acceptance tests:
(i)    Interconnection Acceptance Test;
(ii)    Generator Acceptance Test applicable for Partial Commercial Operation; and
(iii)    Control System Acceptance Test applicable for Partial Commercial Operation.
(5)    On or before Commencement of Capacity Charge Payments. On or before the commencement of Capacity Charge payments by Company, the Facility shall pass the Capacity Test.
Evidence required under this Section 2.3(A) (Seller Facility Conditions Precedent) shall be submitted or made available by Seller during or upon the completion of each phase of development (for example, completion of detailed engineering, completion of as-built drawings and receipt of manufacturers’ guarantee performance data). To allow Company to evaluate the information provided by Seller, Seller shall cooperate in such physical inspections of the Facility pursuant to Section 10.4 (Inspection of Facility Operation) of this Agreement as may be reasonably required by Company during and after completion of the Facility. In no event shall Company’s technical review and inspection of the Facility be deemed to be an endorsement of the design thereof or as any warranty of the safety, durability or reliability of the Facility nor a waiver of any of Company’s rights.
(B)    Failure of Seller’s Facility Conditions Precedent.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 2
37


(1)    Seller’s Remedial Action Plan. If Seller misses any of the submission deadlines required by the Facility Conditions Precedent in Section 2.3(A) (Seller’s Facility Conditions Precedent), Seller shall, within ten (10) Business Days of such missed submission deadline, provide Company a remedial action plan which shall set forth a detailed description of Seller’s course of action and plan to provide Company with the required submission and to meet all subsequent submission deadlines, the Partial Commercial Operation Date Deadline, and the Commercial Operation Date Deadline; provided, that delivery of any remedial action plan shall not relieve Seller of its obligation to meet any subsequent submission deadlines, the Partial Commercial Operation Date Deadline, and the Commercial Operation Date Deadline.
(2)    Seller’s Certification Requirements. Not later than ninety (90) Days after the PUC Submittal Date, Seller shall submit to Company a certificate executed by a duly authorized officer of Seller declaring whether Seller considers that it has complied with the submission requirements of Section 2.3(A)(1) (Following the Execution Date), identifying with particularity the submissions on which such declaration relies, and certifying that such submissions are true and correct in all material respects and in no way materially misleading. On or before the Closing Date, Seller shall submit to Company a certificate executed by a duly authorized officer of Seller declaring whether Seller has determined that it has complied with the submission requirements of Section 2.3(A)(2) (Executed Project Documents), identifying with particularity the submissions on which such declaration relies, and certifying that such submissions are true and correct in all material respects and in no way materially misleading. Within thirty (30) Days of receiving each of Seller’s certificates pursuant to this Section 2.3(B)(2) (Seller’s Certification Requirements), Company shall provide Seller with either (i) a written statement that Seller has satisfied the submission requirements of Section 2.3(A)(1) (Following the Execution Date) and Section 2.3(A)(2) (Executed Project Documents) identified in such certificate, or (ii) a written statement setting forth the requirement(s) Company believes have not been met by Seller. Seller shall comply substantially with the requirements set forth in the Company’s statement within thirty (30) Days of receiving Company’s statement. Unless and until Seller substantially complies with the Company’s requirements for satisfying the Facility Conditions Precedent in Section 2.3(A) (Seller’s Facility Conditions Precedent) to the reasonable satisfaction of the Company, Seller shall not be deemed to have achieved the Partial Commercial Operation Date or the Commercial Operation Date, as applicable.
(C)    Seller’s Conditions Precedent. Seller shall complete the Seller’s Conditions Precedent by the dates specified for such Seller’s Conditions Precedent in Attachment K-1 (Seller’s Conditions Precedent and Company Milestones). Such Seller’s Conditions Precedent shall be a condition precedent to Company’s obligation to complete the Company Milestones by the dates specified for such Company Milestones in Attachment K-1 (Seller’s Conditions Precedent and Company Milestones).
(D)    Company Milestones. Company's obligation to achieve the Company Milestones is contingent upon Seller completing the Seller's Conditions Precedent set forth in Attachment K-1 (Seller’s Conditions Precedent and Company Milestones). Company shall achieve each of the Company Milestones by the date set forth for such Company Milestones in Attachment K-1 (Seller's Conditions Precedent and Company Milestones) of this Agreement (each such date, a

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 2
38


"Company Milestone Date"), as such date may be extended in accordance with Section 2.4(B) (Construction Milestones Extensions) and this Section 2.3(D) (Company Milestones); provided, however in the event Seller does not complete a Seller's Conditions Precedent on or before the applicable date set forth in Attachment K-1 (Seller's Conditions Precedent and Company Milestones) (each such date, a "Seller’s Conditions Precedent Date"), subject to the extensions set forth in Section 2.4(B) (Construction Milestones Extensions), Company shall be entitled to an extension of affected Company Milestone Dates as follows: (i) for the commencement of Interconnection Acceptance Testing, the new Company Milestone Date shall be as set forth in clause "(gg)" of Section 2.f.i of Attachment G (Company-Owned Interconnection Facilities); and (ii) for any other Company Milestone Date, the extension shall be for the period of time reasonably necessary to meet any such Company Milestone Date adversely affected by Seller's failure but no shorter than a day-for-day extension.
2.4    Failure to Meet Milestone Dates.
(A)    Time is of the Essence. Time is of the essence of this Agreement, and Seller's ability to achieve the Construction Milestones is critically important.
(B)    Construction Milestones Extensions. Seller shall achieve each Construction Milestone by the Milestone Date, subject (to the extent applicable) to the following extensions/grace periods:
(1)    PUC Approval Order Date. If the failure to achieve the Partial Commercial Operation Date by the Partial Commercial Operation Date Deadline is the result of the PUC Approval Order Date occurring more than one hundred eighty (180) Days after the Execution Date, Seller shall be entitled to an extension of the Partial Commercial Operation Date Deadline and the Commercial Operation Date Deadline equal to the lesser of (i) the number of Days that elapse between the end of the aforesaid 180-Day period and the PUC Approval Order Date, or (ii) the number of Days following the Partial Commercial Operation Date Deadline that are reasonably necessary for Seller, using reasonable diligence to achieve the Partial Commercial Operation Date in the shortest period of time;
(2)    Force Majeure. If the failure to achieve the Guaranteed Milestone by the applicable Milestone Date is the result of Force Majeure (which, for purposes of this Section 2.4(B)(2) (Force Majeure) excludes any delay in obtaining the PUC Approval Order because that contingency is addressed in Section 2.4(B)(1) (PUC Approval Order Date) above), and if and so long as the conditions set forth in Section 18.4(A) are satisfied, Seller shall be entitled to an extension of the applicable Milestone Date equal to the lesser of two hundred seventy (270) Days or the duration of the delay caused by the Force Majeure.
(3)    Company’s Untimely Performance. If the failure to achieve the Guaranteed Milestone by the applicable Milestone Date is the result of any failure by Company in the timely performance of its obligations under this Agreement, including achievement of its Company Milestones by the Company Milestone Dates as set forth on Attachment K-1 (Seller's Conditions Precedent and Company Milestones), as such dates may be extended in accordance

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 2
39


with Section 2.4(B) (Construction Milestones Extensions) and Section 2.3(D) (Company Milestones), Seller shall, provided Seller has satisfied the Seller's Conditions Precedent set forth in Attachment K-1 (Seller's Conditions Precedent and Company Milestones) by the respective Seller's Conditions Precedent Date set forth in said Attachment K-1 (Seller's Conditions Precedent and Company Milestones), be entitled to an extension of the applicable Guaranteed Milestone Date equal to the duration of the period of delay directly caused by such failure in Company's timely performance. Such extension on the terms described above shall be Seller's sole remedy for any such failure by Company. For purposes of this Section 2.4(B)(3) (Company’s Untimely Performance), Company's performance will be deemed to be "timely" if it is accomplished within the time period specified in this Agreement with respect to such performance or, if no time period is specified, within a reasonable period of time. If the performance in question is Company's review of plans, the determination of what is a "reasonable period of time" will take into account Company's past practices in reviewing and commenting on plans for similar facilities.
(C)    Reporting Milestones. If Seller fails to achieve any Reporting Milestone on or before the applicable Milestone Date as set forth in Attachment L (Reporting Milestones):
(1)    Seller’s Plan. Seller shall submit to Company, within ten (10) Business Days of any such missed Reporting Milestone, a remedial action plan which shall provide a detailed description of Seller's course of action and plan to achieve (i) the missed Reporting Milestone date as soon as practicable, and (ii) all subsequent Construction Milestones, provided that delivery of any remedial action plan shall not relieve Seller of its obligation to meet any subsequent Construction Milestones;
(2)    Monthly Progress Reports. Seller shall provide Company within the Monthly Progress Reports to Company the status of Seller's efforts to achieve such Reporting Milestone(s) that remain outstanding;
(3)    Consequences. Unless and until Seller substantially completes each Reporting Milestone to the reasonable satisfaction of the Company, Seller shall not be deemed to have achieved the Partial Commercial Operation Date or the Commercial Operation Date.
(D)    Guaranteed Milestones; Damages and Termination.
(1)    Damages.
(a)    Milestone Delay Damages. If Seller fails to achieve any such Guaranteed Milestone (other than Partial Commercial Operation and Commercial Operation) on or before the applicable Milestone Date set forth in Attachment K (Guaranteed Project Milestones), as the same may be extended as provided in Section 2.4(B) (Construction Milestones Extensions), and such failure remains unachieved for ten (10) Days after such applicable Milestone Date, Company shall collect and Seller shall pay Liquidated Damages in the amount of $208,000.00 per Day (“Milestone Delay Damages”) commencing on the eleventh (11th) Day after such missed Milestone Date, as extended in accordance with Section 2.4(B)

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 2
40


(Construction Milestones Extensions), and continuing for each Day thereafter that Seller fails to achieve the Guaranteed Milestone; provided, that the number of Days for which Company shall collect and Seller shall pay Milestone Delay Damages shall not exceed sixty (60) Days (the “Milestone Date Delay LD Period”).
(b)    Daily Delay Damages. If Seller fails to achieve the Partial Commercial Operation Date on or before the Partial Commercial Operation Date Deadline, or the Commercial Operation Date on or before the Commercial Operation Date Deadline, as applicable, as the same may be extended as provided in Section 2.4(B) (Construction Milestones Extensions), and in addition to any Milestone Delay Damages collected pursuant to Section 2.4(D)(1)(a) (Milestone Delay Damages), Company shall collect and Seller shall pay Liquidated Damages in the amounts set forth below, as applicable (“Daily Delay Damages”):
(i)    $134,160 for each Day following the twentieth (20th) Day after the Partial Commercial Operation Date Deadline that Seller fails to achieve Partial Commercial Operation; and
(ii)    $312,000 for each Day following the tenth (10th) Day after the Commercial Operation Date Deadline that Seller fails to achieve the Commercial Operation Date;
provided, however, that the number of Days for which Company shall collect and Seller shall pay Daily Delay Damages for failing to achieve the Partial Commercial Operation Date or Commercial Operation Date shall not exceed one hundred eighty (180) Days (the "COD Delay LD Period"). For avoidance of doubt, once Seller has achieved the Partial Commercial Operation Date, no additional Daily Delay Damages under clause (i) above will be imposed on Seller in addition to those imposed under clause (ii) above in the event Seller subsequently fails to achieve the Commercial Operation Date by the Commercial Operation Date Deadline.
(2)    Termination Right. If, upon the expiration of the Milestone Date Delay LD Period or the COD Delay LD Period, as applicable, Seller has not achieved such missed Milestone Date, Company shall have the right, notwithstanding any other provision of this Agreement to the contrary, to terminate this Agreement with immediate effect by declaring an Event of Default pursuant to Section 8.1(A)(1) and issuing a written termination notice to Seller pursuant to Section 8.2(B) (Right to Terminate; Forward Contract). If the Agreement is terminated by Company pursuant to this Section 2.4(D)(2) (Termination Right), Company shall have the right to collect Pre-COD Termination Damages and/or Post-COD Termination Damages, as provided in Section 9.3 (Damages in the Event of Termination by Company) of this Agreement. Unless and until Seller completes each Guaranteed Milestone to the reasonable satisfaction of the Company, Seller shall not be deemed to have achieved the Partial Commercial Operation Date or Commercial Operation Date.
(E)    Notices and Reports. If Seller fails to achieve the Partial Commercial Operation Date by the Partial Commercial Operation Date Deadline, or the Commercial Operation Date by

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 2
41


the Commercial Operation Date Deadline, or has reasonable grounds for concluding that it is unlikely to achieve that objective:
(1)    Not Force Majeure. If such failure or anticipated failure is not the result of Force Majeure, Seller shall:
(a)    promptly give Company written notice of such failure or anticipated failure in writing;
(b)    expeditiously provide Company with a written explanation of the reason for such failure or anticipated failure; and
(c)    provide Company with written weekly progress reports describing the actions taken to achieve the Partial Commercial Operation Date or Commercial Operation Date, as applicable, and the estimated time frame for completion of such actions.
(2)    Force Majeure. If such failure or anticipated failure is the result of Force Majeure, Seller shall, without limitation to the generality of Article 18 (Force Majeure), provide the notice, explanation and weekly progress reports required under Section 18.4 (Satisfaction of Certain Conditions).
(F)    Development Period Security. Company shall draw upon the Development Period Security established pursuant to Section 7.1 (Security Fund) on a monthly basis for payment of the total Milestone Delay Damages and Daily Delay Damages incurred by Seller during the preceding Calendar Month. If the Development Period Security is at any time insufficient to pay the amount of the draw to which Company is then entitled, Seller shall pay any such deficiency to Company promptly upon demand.
2.5    No Waiver.
(A)    Facility Conditions Precedent and Construction Milestones. Except as otherwise provided herein, failure by Company to invoke its rights under Section 2.3(B) (Failure of Seller’s Facility Conditions Precedent) or Section 2.4 (Failure to Meet Milestone Dates) with respect to any particular Facility Conditions Precedent, Seller’s Conditions Precedent or Construction Milestone shall in no way diminish Company’s rights upon the failure of Seller to achieve any subsequent Facility Conditions Precedent or any subsequent Construction Milestone.
(B)    Event of Default. Notwithstanding any other provision herein to the contrary, Company’s failure to declare an Event of Default during the time periods provided for in this Agreement shall not constitute a waiver if such failure is the direct or indirect result of Seller’s misstatement of a material fact or Seller’s omission of a material fact which is necessary to make any representation, warranty, certification, guarantee or statement made (or notice delivered) by Seller to Company in connection with this Agreement (whether in writing or otherwise) not misleading.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 2
42


ARTICLE 3 - SPECIFIC RIGHTS AND OBLIGATIONS OF THE PARTIES
3.1    Rights and Obligations of Both Parties.
(A)    Sale and Purchase of Energy and Capacity. Seller shall produce, supply and sell to Company and Company shall take from and pay Seller for the Demonstrated Firm Capacity and Net Electric Energy Output as determined in accordance with the terms and conditions of this Agreement.
(B)    Good Engineering and Operating Practices.
(1)    Each Party agrees to install, operate and maintain its respective equipment and facility and to perform all obligations required to be performed by such Party under this Agreement in accordance with Good Engineering and Operating Practices and applicable Laws.
(2)    Wherever in this Agreement Company has the right to give specifications, determinations or approvals, such specifications, determinations or approvals shall be given in accordance with Company’s standard practices, policies and procedures. Any such specifications, determinations, or approvals shall not be deemed to be an endorsement, warranty, or waiver of any right of Company.
(C)    Interconnection Facilities. The terms and conditions related to the Company-Owned Interconnection Facilities and Seller-Owned Interconnection Facilities are set forth in Attachment B (Facility Owned by Seller) and Attachment G (Company-Owned Interconnection Facilities).
3.2    Rights and Obligations of Seller.
(A)    Design and Construction of Facility.
(1)    General. Seller shall furnish all financial resources, labor, tools, materials, equipment, transportation, supervision, and other goods and services necessary to completely design and build the Facility to fulfill the requirements of this Agreement. Seller shall also be responsible for acquiring any and all necessary Land Rights for the Facility as well as for Fuel handling and waste disposal infrastructures. The design and construction of the Facility as well as the acquisition of other necessary infrastructures shall take place using Good Engineering and Operating Practices. The Facility design and specifications must conform to Company design specifications and standards, where applicable. It is the intent and expectation of the Parties that the Facility have a plant life equal to at least the Term of this Agreement. To the extent practicable, all new equipment shall be designed and constructed by Seller in a manner consistent with that objective.
(2)    Milestone Dates. Due to the critical nature of Company’s energy needs, Seller’s attainment of all Construction Milestones, including Partial Commercial Operation and Commercial Operation, on or prior to applicable Milestone Dates specified in Attachment K (Guaranteed Project Milestones) and Attachment L (Reporting Milestones), is essential. Any

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 3
43


failure to achieve a Construction Milestone by its Milestone Date shall be treated in accordance with the provisions of Section 2.4 (Failure to Meet Milestone Dates).
(3)    [RESERVED]
(4)    Seller’s Governmental Approvals and Land Rights.
(a)    Seller’s Responsibilities. Seller is responsible for the acquisition and continuous maintenance of all Governmental Approvals and Land Rights required for the construction and operation of the Facility during the Term under conditions which allow Seller to meet the requirements of this Agreement including, but not limited to, Company’s right to control the Facility through Company Dispatch. Seller shall obtain the necessary Governmental Approvals to allow Company to start up and shut down Seller’s generating units as necessary in accordance with this Agreement and to dispatch Seller’s generating units at maximum continuous output twenty-four (24) hours per day for as long as needed to satisfy the Company System demand, as Company deems appropriate, in its reasonable discretion.
(b)    Duration of Governmental Approvals and Land Rights. All Governmental Approvals and Land Rights shall be acquired at least for the Term of this Agreement; provided, however, that if the pertinent Governmental Authority does not issue a specific Governmental Approval for at least a period equal to the Term, Seller shall obtain the Governmental Approval for the longest time period generally allowed by law. All Governmental Approvals shall be obtained and renewed by Seller in accordance with procedures set by the pertinent Governmental Authority. Seller must comply with all provisions in operating Governmental Approvals and with all site-specific requirements imposed by any Governmental Authority. Seller shall be responsible for all costs related to any violations by Seller, its employees, agents or representatives, of any provisions of any of the Governmental Approvals or Land Rights, and in no situation shall Company be held responsible for violations of Seller’s Permits or Land Rights.
(5)    Review of Facilities.
(a)    Drawings and Calculations. Seller shall make readily available to Company a complete set of all detailed engineering, vendor and manufacturing and as-built drawings and calculations relating to the design and construction of the Facility, including the documentation required by Section 1.b.iii(G) (Cybersecurity and Critical Infrastructure Protection) of Attachment B (Facility Owned by Seller), within a reasonable time after such drawings are available, but in no event later than seven (7) Days following the date on which the application for the required Governmental Approvals for construction of the Facility are submitted to the appropriate Governmental Authority and, with respect to the as-built drawings, no later than one hundred (120) Days after the Facility achieves the Commercial Operation Date. Such drawings and calculations shall be submitted in electronic format, if requested by Company, in a format compatible with Company’s computer hardware and software.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 3
44


(b)    Review, Observation and Inspection. Company shall have an opportunity to (i) review and comment on the design of the Facility, (ii) to observe the construction of the Facility and the equipment to be installed therein, and (iii) to inspect the Facility and related equipment following the completion of construction and during the course of this Agreement, provided that such activities do not materially interfere with Seller’s construction or operation of the Facility.
(c)    No Endorsement, Warranty or Waiver. In no event shall any review, comment or failure to comment by Company be deemed to be an endorsement, warranty or waiver of any right by Company. In no event shall any failure by Company to exercise its rights under this Section 3.2(A)(5) (Review of Facilities) constitute a waiver by Company of, or otherwise release Seller from, any other provision of this Agreement.
(d)    Areas of Common Concern. In areas of common concern, such as the type and settings of Seller’s protective relaying equipment, Seller shall submit such concerns, designs and settings for Company’s review and acceptance. Protective relay settings must coordinate with the Company System as Company, within its sole discretion, designs and operates the Company System.
(6)    Facility Protection and Control Equipment.
(a)    Seller’s Obligations. Seller shall, at its own cost, furnish, install, operate and maintain internal breakers, relays, switches, synchronizing equipment and other associated protective and control equipment necessary to maintain the standard of reliability, quality and safety of electric energy production suitable for parallel operation with the Company System as required by this Agreement and Good Engineering and Operating Practices.
(b)    Company’s Right to Review the Design. Company shall have the right, but not the obligation, to review and accept the design of all such equipment, protective relay settings, and control logic as soon as practicable, and in no event later than thirty (30) Days after the receipt of all Governmental Approvals for construction of the Facility and shall present any comments relating thereto to Seller, as soon as practicable and in no event later than sixty (60) Days after receiving such design information.
(c)    Company’s Right to Review Modifications. Company shall have the right, but not the obligation, to review and accept any proposed future action by Seller to modify or replace such equipment, or change such settings, as soon as practicable, and in no event later than forty-five (45) Days prior to such future action; provided, however, that Company shall present any comments relating thereto to Seller as soon as practicable, and in no event later than fifteen (15) Days after receiving information relating to such future action.
(d)    Company’s Right to Review Installation. Company shall have the right, but not the obligation, to review, inspect and accept the installation, construction and setting of all such equipment in order to ensure consistency with the design submitted by Seller for Company’s review. If Company exercises such right, Company shall inform Seller as soon

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 3
45


as practicable, and in no event later than forty-five (45) Days after such review or inspection, of any problems it believes exist and any recommendations it has for correcting such problems.
(e)    No Endorsement, Warranty or Waiver. Company’s inspection and acceptance of Seller’s equipment and settings shall not be construed as endorsing the design thereof, nor as any warranty of the safety, durability or reliability of said equipment and settings, nor as a waiver of any of Company’s rights. In no event shall any failure by Company to exercise its rights under this Section 3.2(A)(6) (Facility Protection and Control Equipment) constitute a waiver by Company of, or otherwise release Seller from, any other provision of this Agreement.
(f)    Cooperation. Seller and Company shall cooperate with each other in good faith in agreeing upon design standards for any equipment or settings referred to in this Section 3.2(A)(6) (Facility Protection and Control Equipment).
(g)    Timing for Implementation of Company Proposals. Within a reasonable time after receipt of Company’s comments referred to in this Section 3.2(A)(6) (Facility Protection and Control Equipment) or notification by Company of problems related to Seller’s obligations under this Section 3.2(A)(6) (Facility Protection and Control Equipment), but no later than ninety (90) Days after such notification (unless such condition is causing a safety hazard or damage to the Company System or the facilities of any of Company’s customers, in which event the correction must be promptly made by Seller), Seller shall implement Company’s proposals.
(h)    Relay Settings and Control Logic. Notwithstanding the foregoing, Seller shall utilize relay settings and control logic prescribed by Company, which may be changed over time within the design capability of the equipment as the requirements of the Company System change. If Seller demonstrates to the satisfaction of Company that the utilization of such relay settings and control logic would likely result or have resulted in an event normally requiring Liquidated Damages or an Event of Default, Seller shall be excused from same. If Seller and Company disagree as to whether the utilization of such relay settings resulted in an event that required Liquidated Damages or an Event of Default, a Qualified Independent Engineering Company will be chosen from the Qualified Independent Engineers List pursuant to Section 3.3(B)(1)(b) and the Qualified Independent Engineering Company will determine if the utilization of such relay settings resulted in the event that gave rise to Liquidated Damages or an Event of Default pursuant to the Independent Engineering Assessment. The Seller and Company shall abide by the Qualified Independent Engineering Company’s determination.
(7)    Monthly Progress Reports. Commencing upon the Execution Date of this Agreement, Seller shall submit to Company, on the tenth (10th) Business Day of each Calendar Month until the Commercial Operation Date is achieved, progress reports in a form set forth on Attachment S (Form of Monthly Progress Report) (the “Monthly Progress Report”). These progress reports shall notify Company of the current status of each specific Facility Conditions Precedent contained in Section 2.3(A) (Seller’s Facility Conditions Precedent) and the status of efforts to meet each Milestone Date contained in Attachment K (Guaranteed Project Milestones)

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 3
46


and Attachment L (Reporting Milestones). Seller shall include in such report a list of all letters, notices, applications, filings and Governmental Approvals sent to or received from any Governmental Authority and shall provide any such documents as may be reasonably requested by Company. In addition, Seller shall advise Company as soon as reasonably practicable of any problems or issues of which it is aware which may materially impact its ability to meet the Facility Conditions Precedent or Construction Milestones. Seller shall provide Company with any requested documentation to support the achievement of Facility Conditions Precedent or Construction Milestones within ten (10) Business Days of receipt of such request from Company. At Company’s request, Seller shall provide an opportunity for Company to meet with appropriate personnel of Seller or its contractors to discuss and assess any such Monthly Progress Report. Upon the occurrence of a Force Majeure, Seller shall also comply with the requirements of Section 18.4 (Satisfaction of Certain Conditions) to the extent such requirements provide for communications to Company beyond those required under this Section 3.2(A)(7) (Monthly Progress Reports).
(B)    Warranties and Guarantees of Performance.
(1)    Equivalent Availability Factor. Seller warrants and guarantees that, during the Term, the Facility will achieve an EAF, on a rolling twelve-month basis, of 90% or greater. If a Force Majeure event(s) occurs, the Force Majeure period shall not count for the purposes of calculating EAF to compute Liquidated Damages or Event of Default criteria, but only to the extent that Seller’s inability to perform is caused by one (1) or more Force Majeure event(s). If Company requests an accommodation to the 60-Month Schedule that results in a “C” inspection (or any portion thereof) being rescheduled to within twelve (12) months of the most recent prior “C” inspection, the rescheduled “C” inspection period shall not count for the purposes of calculating EAF to compute Liquidated Damages or Event of Default criteria, but (a) only for so long as such rescheduled “C” inspection period (or portion thereof) falls within the same rolling twelve-month period as the most recent prior “C” inspection and (b) only to the extent such rescheduled “C” inspection period (or portion thereof) would otherwise not have fallen within the same rolling twelve-month period. For avoidance of doubt, if the most recent prior “C” inspection was completed on December 31, 2025, and the Company requests an accommodation to the 60-Month Schedule that results in another “C” inspection being rescheduled to November 1, 2026 – December 20, 2026, only the November 2026 portion of the rescheduled “C” inspection period will be subject to a deferred accounting (until the January 1, 2026 to December 31 2026 12-month period) for the purposes of calculating EAF to compute Liquidated Damages or Event of Default criteria (for the December 1, 2025 to November 30, 2026 period)—as the December 2026 portion of the rescheduled “C” inspection period does not fall within the same rolling twelve-month period as the most recent prior “C” inspection, it shall not be subject to the aforementioned deferred accounting. The December 2026 portion will fall within the immediately following 12-month period (i.e., January 1, 2026 to December 31, 2026) and shall begin to be counted for EAF calculation purposes in such immediately following 12-month period.
(2)    Equivalent Forced Outage Rate. Seller warrants and guarantees that, during the Term, the Facility will not exceed a 4% EFOR on a rolling twelve month basis. If a

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 3
47


Force Majeure event(s) occurs, the Force Majeure period shall not count for the purposes of calculating EFOR to compute Liquidated Damages or Event of Default criteria, but only to the extent that Seller’s inability to perform is caused by one (1) or more Force Majeure event(s).
(3)    Demonstrated Firm Capacity. Seller warrants and guarantees that the Facility will have and maintain the capability to produce and deliver to the Metering Point the Demonstrated Firm Capacity in accordance with the terms of this Agreement.
(4)    Power Quality. Seller warrants and guarantees that the Facility will produce electric energy that meets the quality standards in Section 3.a (Reactive Power Control), Section 3.b (Reactive Amount), Section 3.m (Primary Frequency Response), and Section 3.l (Harmonics) of Attachment B (Facility Owned by Seller).
(5)    Unit Trips. Seller warrants and guarantees that Unit Trips will not exceed three (3) in any twelve-month period.
(6)    Partial Unit Trips. Seller warrants and guarantees that Partial Unit Trips will not exceed three (3) in any twelve-month period.
(7)    Full Plant Trip. Seller warrants and guarantees that there shall be no Full Plant Trips during any Contract Year.
(8)    Single Point of Failure Violation. Seller warrants and guarantees that there shall be no Single Point of Failure Violation during any Contract Year.
(9)    Liquidated Damages. In the event Seller fails to satisfy the warranties and guarantees of performance in this Section 3.2(B) (Warranties and Guarantees of Performance), Seller shall be liable for Liquidated Damages as provided in Article 9 (Liquidated Damages).
(10)    Exclusive Warranties. The foregoing warranties and guarantees of performance constitute the exclusive warranties and guarantees under this Agreement and operate in lieu of all other warranties and guarantees, whether oral or written. Seller and Company disclaim any other warranty and guarantee, express or implied, including without limitation, warranties of merchantability or fitness for a particular purpose.
(C)    Waste Handling. Seller shall be responsible for the handling and proper disposal of any waste products produced by the Facility, including but not limited to wastewater and ash, and for any costs associated therewith.
(D)    Emissions. Subject to Attachment AA (Renewable Portfolio Standards and Emissions), Seller shall be responsible for the control and consequences of any and all emissions produced as a result of operation of the Facility and for all costs and expenses associated therewith.
(E)    Compliance with Laws. Seller shall at all times comply with all applicable federal, state and local laws, rules, regulations, orders (including but not limited to executive

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 3
48


orders), ordinances, permit conditions and other governmental actions (collectively “Laws”) and shall be responsible for all costs associated therewith.
(F)    Adequate Spare Parts. Seller shall at all times keep on hand or have ready access to sufficient spare parts, which shall include, but not be limited to, the critical spare parts shown in Attachment Z (Critical Spare Parts), to maintain the Facility in a manner which provides reasonable assurance, consistent with Good Engineering and Operating Practices, that the performance of the Facility will meet the requirements of this Agreement.
(G)    Periodic Meetings. The Seller’s General Manager or an alternate satisfactory to Company shall attend periodic meetings with appropriate Company representatives and be prepared to discuss Facility operations and maintenance and interface with the Company System operations. Such meetings may be regularly scheduled or called by Company specifically to address particular problem areas.
(H)    Notice of Certain Events. To the extent any of the following events occur and could reasonably be likely to have a material adverse effect on Seller’s performance under this Agreement, Seller shall provide Company with immediate notice of the occurrence of such event and Seller’s proposed measures to ensure that such event will not lead to an Event of Default or otherwise materially impair Seller’s ability to perform its obligations under this Agreement:
(1)    Obligations Related to Borrowed Money. Seller shall fail to comply with any provision with respect to any obligations for borrowed money in excess of One Million Dollars ($1,000,000) if the effect of such failure to comply is to cause, or to permit the holder or holders of such obligations (or a trustee on their behalf), to cause such obligations to become due prior to their stated maturity, except to the extent that such failure to comply shall have been cured or waived prior to any acceleration of such obligations thereunder and said cure or waiver shall not have involved the receipt by any such holder or holders of any additional consideration, financial or otherwise
(2)    Order for Payment of Money. Any final order, judgment or decree is entered in any proceeding, which final order, judgment or decree provides for the payment of money in excess of One Hundred Thousand Dollars ($100,000) by Seller, and Seller shall not discharge the same or provide for its discharge in accordance with its terms, or procure a stay of execution thereon within sixty (60) Days from the entry thereof, and within such period of sixty (60) Days, or such longer period during which execution on such judgment shall have been stayed, appeal therefrom and cause the execution thereof to be stayed during such appeal.
(3)    Payments for Materials or Labor. Seller shall fail to make any payment for materials or labor used in the engineering, design, construction, maintenance or operation of the Facility within ninety (90) Days after the due date thereof, except for payment obligations contested in good faith by Seller or adequately bonded to the reasonable satisfaction of Company or contract retentions withheld during Seller’s review of a contractor’s performance.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 3
49


(4)    Financing Documents. The Facility Lender shall declare an event of default under the Financing Documents.
(5)    Governmental Approvals and Land Rights. Seller shall have received any notice that it is not in compliance with any of the Governmental Approvals and/or Land Rights that enable Seller to operate the Facility.
(I)    Financial Compliance.
(1)    Financial Compliance. Seller shall provide or cause to be provided to Company on a timely basis, as reasonably determined by Company, all information, including but not limited to information that may be obtained in any audit referred to below (the “Financial Compliance Information”), reasonably requested by Company for purposes of permitting Company and its parent company, HEI, to comply with the requirements (initial and on-going) of (i) the accounting principles of Financial Accounting Standards Board (“FASB”) Accounting Standards Codification 810, Consolidation (“FASB ASC 810”), (ii) the accounting principles of FASB ASC 842 Leases (“FASB ASC 842”), (iii) Section 404 of the Sarbanes-Oxley Act of 2002 (“SOX 404”) and (iv) all clarifications, interpretations and revisions of and regulations implementing FASB ASC 810, SOX 404, and FASB ASC 842 issued by the FASB, Securities and Exchange Commission, the Public Company Accounting Oversight Board, Emerging Issues Task Force or other Governmental Authorities. In addition, if required by Company in order to meet its compliance obligations, Seller shall allow Company or its independent auditor to audit, to the extent reasonably required, Seller’s financial records, including its system of internal controls over financial reporting; provided, however, that Company shall be responsible for all costs associated with the foregoing, including but not limited to Seller’s reasonable internal costs. Company shall limit access to such Financial Compliance Information to persons involved with such compliance matters and restrict persons involved in Company’s monitoring, dispatch or scheduling of Seller and/or the Facility, or the administration of this Agreement, from having access to such Financial Compliance Information (unless approved in writing in advance, by Seller).
(2)    Confidentiality. Company shall, and shall cause HEI to, maintain the confidentiality of the Financial Compliance Information as provided in this Section 3.2(I) (Financial Compliance). Company may share the Financial Compliance Information on a confidential basis with HEI and the independent auditors and attorneys for HEI and Company. (Company, HEI, and their respective independent auditors and attorneys are collectively referred to in this Section 3.2(I) (Financial Compliance) as “Recipient”). If either Company, or HEI, in the exercise of their respective reasonable judgments, concludes that consolidation or financial reporting with respect to Seller and/or this Agreement is necessary, Company, and HEI each shall have the right to disclose such of the Financial Compliance Information as Company or HEI, as applicable, reasonably determines is necessary to satisfy applicable disclosure and reporting or other requirements and give Seller prompt written notice thereof (in advance to the extent practicable under the circumstances). If Company or HEI disclose Financial Compliance Information pursuant to the preceding sentence, Company and HEI shall, without limitation to the generality of the preceding sentence, have the right to disclose Financial Compliance

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 3
50


Information to the PUC and the Consumer Advocate in connection with the PUC’s rate making activities for Company and other HEI affiliated entities, provided that, if the scope or content of the Financial Compliance Information to be disclosed to the PUC exceeds or is more detailed than that disclosed pursuant to the preceding sentence, such Financial Compliance Information will not be disclosed until the PUC first issues a protective order to protect the confidentiality of such Financial Compliance Information. Neither Company nor HEI shall use the Financial Compliance Information for any purpose other than as permitted under this Section 3.2(I) (Financial Compliance).
(3)    Required Disclosure. In circumstances other than those addressed in the immediately preceding paragraph, if any Recipient becomes legally compelled under applicable law or by legal process (e.g., deposition, interrogatory, request for documents, subpoena, civil investigative demand or similar process) to disclose all or a portion of the Financial Compliance Information, such Recipient shall undertake reasonable efforts to provide Seller with prompt notice of such legal requirement prior to disclosure so that Seller may seek a protective order or other appropriate remedy and/or waive compliance with the terms of this Section 3.2(I) (Financial Compliance). If such protective order or other remedy is not obtained, or if Seller waives compliance with the provisions of this Section 3.2(I) (Financial Compliance), Recipient shall furnish only that portion of the Financial Compliance Information which it is legally required to so furnish and to use reasonable efforts to obtain assurance that confidential treatment will be accorded to any disclosed material.
(4)    Exclusions from Confidentiality. The obligation of nondisclosure and restricted use imposed on each Recipient under this Section 3.2(I) (Financial Compliance) shall not extend to any portion(s) of the Financial Compliance Information which (i) was known to such Recipient prior to receipt, or (ii) without the fault of such Recipient is available or becomes available to the general public, or (iii) is received by such Recipient from a third party not bound by an obligation or duty of confidentiality.
(5)    Consolidation. Company does not want to be subject to consolidation set forth in FASB ASC 810, as issued and amended from time to time by FASB. Company represents that, as of the Execution Date, it is not required to consolidate Seller into its financial statements in accordance with relevant accounting guidance under U.S. generally accepted accounting principles ("GAAP"). If, due to a change in applicable Law or accounting guidance under U.S. GAAP, or as a result of a material amendment to the Agreement, in each case, after the Execution Date, Company determines, in its sole but good faith discretion, that it is required to consolidate Seller into its financial statements in accordance with relevant accounting guidance in accordance with U.S. GAAP, then Seller, upon Company’s written request, shall, as soon as reasonably practicable (but in no event longer than fifteen (15) Days) provide audited financial statements (including footnotes) in accordance with U.S. GAAP (and as of the reporting periods Company is required to report thereafter) in order for Company to consolidate and file its financial statements within the reporting deadlines of the Securities and Exchange Commission. If Seller does not normally prepare audited financial statements for the periods requested, Company shall reimburse Seller fifty percent (50%) of the reasonable and verifiable costs of having necessary audits performed and preparation of the audited financial statements;

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 3
51


provided that the foregoing reimbursement shall not include the costs, whether actual or estimated, of preparing unaudited financial statements. Notwithstanding the foregoing requirement that Seller provide audited financial statements to Company, the Parties will take all commercially reasonable steps, which may include modification of this Agreement, to eliminate the consolidation treatment, while preserving the economic “benefit of the bargain” to both Parties. If the Parties are unable to eliminate the consolidation treatment by other means, the Parties shall, if requested by Company, negotiate and may effectuate a sale of the Facility to Company at the fair market value determined pursuant to Section 3 (Procedure to Determine Fair Market Value of the Facility) of Attachment P (Sale of Facility by Seller) under a Purchase and Sale Agreement to be negotiated based on the terms and conditions set forth in Section 4 (Purchase and Sale Agreement) of Attachment P (Sale of Facility by Seller).
(J)    Seller’s Obligation to Deliver Facility. Upon the exercise by Company of its rights under Section 8.2(B)(2)(a) (Company’s Assumption of Seller’s Interest), Seller shall deliver the Facility to Company in proper working order in accordance with then current electric utility standards for a facility similar to the Facility. If Seller fails to meet this obligation, Company shall have the right to put the Facility in proper working order in accordance with such standards either directly or through a qualified contractor. Seller shall reimburse Company within thirty (30) Days of written demand for payment in immediately available funds for any and all reasonable costs incurred by Company in connection with such work. Where such payments are reimbursements for amounts paid by Company to third parties prior to receipt of payment from Seller, interest shall be paid thereon at the Prime Rate for the period between payment by Company and receipt of payment from Seller. The obligations of Seller under this Section 3.2(J) (Seller’s Obligation to Deliver Facility) shall survive the expiration or termination of this Agreement.
(K)     Allowed Capacity. The Available Capacity from the Facility may exceed the Contract Firm Capacity. Company may dispatch up to Available Capacity in accordance with Section 3.3(A)(1) (Routine Dispatch) of this Agreement. Company may limit the Net Electric Energy Output pursuant to, but not limited to, Section 4.1(A) (Safety of Persons and Property), Good Engineering and Operating Practices, Attachment B (Facility Owned by Seller), and Attachment Y (Operation and Maintenance of the Facility). Company shall pay for any Net Electric Energy Output of the Facility up to the Available Capacity, so long as such energy is accepted pursuant to Company Dispatch, in accordance with the Energy Charge provisions of Attachment J (Energy Charge and Capacity Charge Payment Formulas). Company shall not be required to pay any additional Capacity Charge for energy dispatched by Company up to the Available Capacity.
3.3    Rights and Obligations of Company.
(A)    Dispatch of Facility Power.
(1)    Routine Dispatch.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 3
52


(a)    Company shall have the right to dispatch all real power up to the Available Capacity, and specify reactive power delivered from the Facility to the Company System, as it deems appropriate in its reasonable discretion, subject only to and consistent with Good Engineering and Operating Practices, the requirements set forth in this Section 3.3(A) (Dispatch of Facility Power), Attachment B (Facility Owned by Seller) and Seller’s maintenance schedule determined in accordance with Section 8 (Schedule of Outages) of Attachment Y (Operation and Maintenance of the Facility). Company shall not pay for reactive power.
(b)    Company Dispatch will either be by Seller’s manual control under the direction of the Company System Operator or by computerized control via SCADA as provided in Attachment B (Facility Owned by Seller) and Section 3 (Communications, Telemetering and Generator Remote Control Equipment) of Attachment Y (Operation and Maintenance of the Facility), in each case at Company’s reasonable discretion, within the Dispatch Range and subject to the minimum dispatch requirements of Section 3.3(A)(2) (Minimum Dispatch). Unless otherwise agreed to, Company may request the maximum real power output at 0.85 lagging to 0.90 leading power factor from the Facility as measured at the Metering Point to maintain system operating parameters as specified by the Company. Notwithstanding anything to the contrary, the power produced by the Facility shall always be subject to remote, automatic or manual dispatch by Company.
(c)    Refusal or inability of the Seller to provide the output required by the Company Dispatch shall result in the assumption that the Available Capacity is equal to the actual net energy delivered from the Facility. This shall be considered at reduced Available Capacity for the purpose of calculating the Seller’s EAF and EFOR. The size of the derating will be determined by subtracting the Available Capacity from the Demonstrated Firm Capacity, from the time the inability to meet the dispatch request occurs until such time as the Seller demonstrates the Demonstrated Firm Capacity as requested by Company. Seller shall utilize the full capability of the Facility to satisfy its obligation to deliver Demonstrated Firm Capacity in accordance with Company Dispatch by taking necessary actions, including but not limited to ensuring adequate access and control of Seller’s renewable resources, means of delivery (piping, valves, etc.) of the resource to conversion equipment and functionality of the conversion equipment and generators.
(2)    Minimum Dispatch. The minimum dispatch under remote control by the Company shall be the Minimum Load Capability as further described in Section 3.n (Minimum Load Capability) of Attachment B (Facility Owned by Seller).
(3)    Dispatch Forecast. Company will work with Seller to support development of forecasts needed for informing long term procurement of consumables (if any) and maintenance.
(B)    Company Right to Require Independent Engineering Assessment.
(1)    Implementation of Independent Engineering Assessment.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 3
53


(a)    If (i) Seller is failing to operate the Facility in accordance with Section 2.1(E) (Requirements for Electric Energy Supplied by Seller), Section 3.2(A)(6) (Facility Protection and Control Equipment), Section 4.1(A) (Safety of Persons and/or Property), Attachment B (Facility Owned by Seller), and Section 1 (Standards) and Section 4 (Protective Equipment) of Attachment Y (Operation and Maintenance of the Facility), or is otherwise failing to comply with Good Engineering and Operating Practices, and fails to remedy such failure within ninety (90) Days of written notice thereof from Company, or fails to comply with Section 10.4(B) (Correction of Certain Conditions), and Company reasonably believes that such failure is likely to result in a failure to meet the performance standards set forth in Section 3 (Performance Standards) of Attachment B (Facility Owned by Seller); (ii) Seller is in breach of this Agreement with respect to the performance or operation of the Facility and has not cured such breach within the time limits specified in Article 8 (Default); (iii) otherwise required by Section 8.2(C) (Right to Demand Independent Engineering Assessment and Modification); or (iv) as required by Section 3.3(B)(1) (Implementation of Independent Engineering Assessment), Company may require that the practices in question be assessed by a qualified professional engineering firm to be chosen from Attachment D (Consultants List – Qualified Independent Engineering Companies) and revised from time to time under Section 3.3(B)(2) (Qualified Independent Engineering Companies).
(b)    The Parties shall promptly undertake to agree on a firm to be used from the Qualified Independent Engineers List; provided, however, that if such agreement is not reached within seven (7) Days after Company gives notice to Seller that it is invoking its rights under this Section 3.3(B) (Company Right to Require Independent Engineering Assessment), the firm shall be chosen from the Qualified Independent Engineers List by Company. Seller may, at its sole expense, contract with its chosen firm (from the Qualified Independent Engineers List) to provide a second assessment of the practices in question. Company’s chosen firm may review Seller’s assessment and choose, in its sole discretion, to use all, some or none of Seller’s recommendations in such assessment. Notwithstanding Seller’s assessment, and whether or not Company’s Qualified Independent Engineering Company has used any of Seller’s recommendations from its Qualified Independent Engineering Company, the Independent Engineering Assessment completed by Company’s Qualified Independent Engineering Company and the Recommendations contained therein shall be used in connection with respect to the actions required Section 3.3(B)(1)(c) immediately below.
(c)    The Qualified Independent Engineering Company selected shall make an Independent Engineering Assessment as to whether the practices in question conform to Good Engineering and Operating Practices as promptly as possible under the circumstances. If such determination is that the practices in question do not so conform, the engineering firm shall recommend necessary actions by Seller to bring it within Good Engineering and Operating Practices (the “Recommendations”). If the Recommendations require action by Seller to change its practices, Seller shall take such actions. Where the Recommendations require action by Seller, the engineering firm shall determine, after reasonable consultation with Seller within thirty (30) Days (or such longer period as deemed appropriate by such engineering firm) after its Recommendations are first made, whether Seller has taken adequate action to carry out such Recommendations. If the engineering firm then certifies that Seller has failed to take adequate

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 3
54


action, Company shall notify Seller and the Facility Lender in writing of such certification and the basis therefor. Such notice shall state in bold letters that failure to commence implementation of the Recommendations on or before the date that is thirty (30) Days from the date of such notice (the “Implementation Date”) may lead to termination of this Agreement. If neither Seller nor the Facility Lender has begun to implement the Recommendations on or before the Implementation Date, such failure shall constitute an Event of Default under Section 8.1(A)(6). If either Seller or any Financing Party begins to implement the Recommendations on or before the Implementation Date, the engineering firm shall monitor whether the implementation thereof is being diligently pursued. If, after reasonable consultation with the parties involved in such implementation, the engineering firm determines that such implementation is not being diligently pursued, it shall promptly so certify to Company. Company shall thereupon promptly notify Seller and the Facility Lender in writing of such certification, the basis therefor and the remedial steps that must be taken to cure (the “Second Notice”). Such Second Notice shall state in bold letters that failure to implement the remedial steps identified in the Second Notice (the “Remedial Steps”) on or before the date that is thirty (30) Days from the date of the Second Notice may lead to termination of this Agreement. If at any time after the date that is thirty (30) Days from the date of the Second Notice, the engineering firm again certifies to Company that implementation of Recommendation is not being diligently pursued and/or the Remedial Steps are not being implemented, such certification shall constitute an Event of Default by Seller under Section 8.1(A)(6). Seller shall bear all costs of the engineering firm’s services unless the Independent Engineering Assessment determined that the practices in question were in accordance with Good Engineering and Operating Practices, in which case Company shall bear all costs of the Independent Engineering Assessment.
(2)    Qualified Independent Engineering Companies. The Company and Seller shall agree on the Qualified Independent Engineers List which shall be attached hereto as Attachment D (Consultants List – Qualified Independent Engineering Companies) containing the names of engineering firms which both Parties agree are fully qualified to perform the Independent Engineering Assessment under Section 3.3(B)(1) (Implementation of Independent Engineering Assessment). At any time, except when an Independent Engineering Assessment is being made under Section 3.3(B)(1) (Implementation of Independent Engineering Assessment), either Party may remove a particular company from the Qualified Independent Engineers List by giving written notice of such removal to the other Party. However, neither Party may remove a company or companies from the Qualified Independent Engineers List without approval of the other Party if such removal would leave the Qualified Independent Engineers List with less than two (2) companies. During January of each calendar year, both Parties shall review the current Qualified Independent Engineers List and give notice to the other Party of any proposed additions to the Qualified Independent Engineers List and any intended deletions. Intended deletions shall be effective upon receipt of notice by the other Party, provided that such deletions do not leave the Qualified Independent Engineers List with less than two (2) companies. Proposed additions to the Qualified Independent Engineers List shall automatically become effective thirty (30) Days after notice is received by the other Party unless written objection is made by such other Party within said thirty (30) Days. By mutual agreement between the

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 3
55


Parties, a new company or companies may be added to the Qualified Independent Engineers List at any time.


EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 3
56


ARTICLE 4 - SUSPENSION OR REDUCTION OF DELIVERIES
4.1    Initiation by Company. This section shall apply to suspensions or reductions of electric energy deliveries from the Facility directly resulting from instructions or remote-control actions by the Company System Operator. This section does not apply to changes in electric energy output of the Facility within the normal Dispatch Range. This section does not apply to suspensions and/or reductions of energy output from the Facility initiated by Facility personnel and/or equipment in response to conditions on the Company System, such as by the action of protective equipment or primary frequency or reactive power response to Company System conditions.

(A)    Safety of Persons and/or Property. If the Company System Operator determines that an adverse condition exists that is likely to endanger the safety of persons and/or property, and/or endanger the integrity of the Company System or have an adverse effect on Company customer’s electric service, the Company System Operator may remotely separate the Facility from the Company System by tripping the Facility’s synchronizing breakers via SCADA without prior notice. If Company disconnects the Facility from the Company System, it shall immediately notify Seller by telephone or hotline and thereafter confirm in writing the reasons for the disconnection.
(B)    Reclosing. If the Facility is separated from the Company System for any reason, under no circumstances shall Seller reclose into the Company System without first obtaining specific approval to do so from the Company System Operator which approval shall be granted promptly upon the removal of the adverse condition stated above.
(C)    Duration of Disconnection. The Facility shall remain disconnected until such time that the adverse condition has been corrected.
(D)    Facility Problems. If the operation of the Facility is causing or substantially contributing to an adverse condition due to the failure to meet any of the requirements of this Agreement, Seller shall, at its own cost, modify its electric equipment or operations to the extent necessary to promptly resume full deliveries of electric energy at the quality of electric service required.
4.2    No Obligation to Accept Energy.
(A)    General. During periods in which Seller has reduced or suspended deliveries of electric energy as requested or required by Company under Section 4.1(A) (Safety of Persons and/or Property), Company shall have no obligation to accept any electric energy which might otherwise have been received from the Facility during such period, and Company shall have no obligation to pay for electric energy which otherwise would have been available or received from the Facility during such period, and, except as provided in Section 4.2(B) (Review by Seller), the Facility shall be considered unavailable during such period for purposes of calculating Seller’s EAF, EFOR, and Disconnection Events.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 4
57


(B)    Review by Seller. The claim of occurrence of any of the adverse conditions described above in Section 4.1(A) (Safety of Persons and/or Property) or Section 4.1(D) (Facility Problems) shall be subject to verification by Seller. If it is determined that Company did not have a valid reason for disconnecting the Facility or that the Facility was not causing or contributing to the adverse condition requiring the disconnection under Section 4.1(A) (Safety of Persons and/or Property) or Section 4.1(D) (Facility Problems), Company shall still have no obligation to accept any electric energy which otherwise would have been received from the Facility during such period, and Company shall still have no obligation to pay for electric energy which otherwise would have been available or received from the Facility during such period, however, the duration of the period of separation will not be counted against EAF, EFOR or Disconnection Events.
4.3    Initiation by Seller. If Seller suspends, or can reasonably anticipate the need to suspend or substantially reduce, deliveries of electric energy below the level called for by Company Dispatch pursuant to Section 3.3(A) (Dispatch of Facility Power) for any reason other than a request by Company pursuant to Section 4.1 (Initiation by Company), it shall provide immediate oral notice and subsequent written notice to Company as soon as practicable, containing a reasonably detailed statement of the reasons for such suspension or reduction and the likely duration thereof. Seller shall use commercially reasonable efforts to restore full deliveries of electric energy as soon as practicable.


EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 4
58


ARTICLE 5 - RATES FOR PURCHASE
5.1    Capacity and Energy Purchased by Company.
(A)    Energy and Capacity. Subject to the other provisions of this Agreement, Company shall accept and pay for the Net Electric Energy Output generated by the Facility and delivered to Company and make capacity payments to Seller when such capacity is available as set forth herein. The Net Electric Energy Output and capacity (demand) shall be metered in accordance with Section 13 (Metering) of Attachment Y (Operation and Maintenance of the Facility), and Section 3 (Communications, Telemetering and Generator Remote Control Equipment) of Attachment Y (Operation and Maintenance of the Facility) and such metering shall constitute the official and legal measurements for any payments hereunder.
(B)    Seller’s Start-up Plan. Prior to the Partial Commercial Operation Date and the Commercial Operation Date, Company will use reasonable efforts to accept electric energy from the Facility during the Capacity Test conducted pursuant to Section 5.1(E) (Capacity Test). Seller shall provide to Company a written, detailed, and comprehensive Start-up plan thirty (30) Days in advance of delivering any electric energy to Company and shall provide written notice to Company of any changes to such Start-up plan as soon as reasonably practicable, but no less than three (3) Days in advance of implementing those changes. Seller shall use reasonable efforts to coordinate such Start-up and testing so as to minimize any additional costs to Company as a result of departing from economic dispatch in the operation of the Company System and shall reimburse Company for such additional costs. Net Electric Energy Output delivered to and accepted by Company pursuant hereto shall be considered non-firm, unscheduled energy, but must meet all of the quality standards established in this Agreement. Company shall only pay Energy Charges for any such Net Electric Energy Output actually delivered from the Facility.
(C)    Energy Charge. Subject to the terms of this Agreement, and provided that the Facility has achieved Partial Commercial Operation, Company shall pay Seller for electric energy delivered to the Point of Interconnection in response to Company’s dispatch in accordance with the formulas set forth in Attachment J (Energy Charge and Capacity Charge Payment Formulas).
(D)    Capacity Charge. Subject to the terms of this Agreement, Capacity Charge Payments shall be calculated in accordance with the formulas specified in Attachment J (Energy Charge and Capacity Charge Payment Formulas).
(1)    BAFO Capacity Charge Rate Adjustment. To provide inflation protection to the Seller, the Company will allow Seller a one-time pricing adjustment to its BAFO Capacity Charge Rate, not to exceed ten percent (10%) of the BAFO Capacity Charge Rate, based on the increase, if any, in the GDPIPD index between the submission date of Seller’s BAFO Capacity Charge Rate and the PUC Approval Order Date. Any change in the GDPIPD index value (“GDPIPD Compare Rate”) shall be determined by dividing the GDPIPDPUC Approval by the GDPIPDBAFO Submission. If there is no change in the index value or if the index value decreases (i.e., the GDPIPD Compare Rate is less than or equal to 1.0) during the period between Seller’s

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 5
59


BAFO Capacity Charge Rate submission date and the PUC Approval Order Date, Seller will not be permitted an adjustment to its BAFO Capacity Charge Rate. If the GDPIPD Compare Rate is greater than 1.0, the adjustment to the BAFO Capacity Charge Rate shall be calculated by multiplying the BAFO Capacity Charge Rate by the GDPIPD Compare Rate (which shall not exceed 1.10). Any GDPIPD Compare Rate exceeding 1.10 shall be adjusted to be 1.10 in order to determine the Capacity Charge Rate.
(E)    Capacity Test. After successful completion of the Interconnection Acceptance Test, Seller shall be allowed to conduct Capacity Tests (subject to inspection by Company) in accordance with the testing procedures set forth in Attachment W (Capacity Test Procedures), as a condition to achieving Partial Commercial Operation and Commercial Operation, to determine the Demonstrated Firm Capacity of the Facility and whether Capacity Charge payments may be adjusted in accordance with Section 5.1(F) (Capacity Shortfall) and should begin in accordance with Section 5.1(G) (Commencement of Capacity Charge Payments).
(F)    Capacity Shortfall. If, after determining the Demonstrated Firm Capacity applicable to Commercial Operation, as provided in Section 5.1(E) (Capacity Test), such Demonstrated Firm Capacity is less than the applicable Contract Firm Capacity, the Capacity Charge payment to Seller shall be reduced in accordance with Section 4 (Initial Capacity Shortfall; Corrective Period) of Attachment W (Capacity Test Procedures).
(G)    Commencement of Capacity Charge Payments. The Capacity Charge payments under Section 5.1(D) (Capacity Charge) shall begin when the Facility has successfully completed the Capacity Test prior to Partial Commercial Operation referred to in Section 5.1(E) (Capacity Test), the Facility has achieved Partial Commercial Operation and the Capacity Rate Inclusion Date has occurred.
(H)    Demonstrated Firm Capacity. After the Partial Commercial Operation Date, Seller may only increase the Demonstrated Firm Capacity of the Facility following a Subsequent Capacity Test conducted pursuant to Section 7 (Subsequent Capacity Test) of Attachment W (Capacity Test Procedures).
(I)    Hawai‘i General Excise Tax. Company shall not be liable for payment of the applicable Hawai‘i General Excise Tax levied and assessed against Seller as a result of this Agreement. The rates and charges in this Article 5 (Rates for Purchase) shall not be adjusted by reason of any subsequent increase or reduction of the applicable Hawai‘i General Excise Tax.
(J)    No Payment of Emission Fees. Company shall not be liable for payment of the applicable air pollutant emission fees imposed by the DoH or U.S. EPA on Seller as a result of operating or having the potential to operate the Facility.
(K)    No Payment of Other Taxes or Fees. Company shall not be liable for payment of nor reimbursement of any Seller payment of any new or modified tax or fee imposed by any Governmental Authority.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 5
60


ARTICLE 6 - BILLING AND PAYMENT
6.1    Monthly Invoice. As soon as practicable, but not later than the fifth (5th) Business Day of each Calendar Month, Company shall provide Seller with the appropriate data for Seller to compute the payment due for capacity provided and electric energy delivered to Company in the preceding Calendar Month as determined in accordance with this Agreement. Seller shall compute the (i) Energy Charge for the preceding month using actual fuel costs; and (ii) an estimated Capacity Charge for the current Calendar Month, adjusted in accordance with Attachment J (Energy Charge and Capacity Charge Payment Formulas), if appropriate, together with a statement of any Capacity Charge credits owed by Seller to Company for any preceding months; and promptly thereafter, but not later than the tenth (10th) Business Day of each Calendar Month, submit an invoice (“Monthly Invoice”) for the Capacity Charge to be paid to Seller for the current Calendar Month, and the Energy Charge to be paid to Seller for the preceding Calendar Month. Each Monthly Invoice shall include Seller's backup data for the computation of the Capacity Charge and the Energy Charge. Unless and until Company designates a different address, the Monthly Invoice shall be delivered to:
Hawaiian Electric Company, Inc.
P. O. Box 2750
Honolulu, Hawaii 96840-2750
Attention: Energy Contract Manager
6.2    Payment.
(A)    Date Payment Due. No later than the twentieth (20th) Business Day of each Calendar Month (or the last Business Day of that month if there are less than twenty (20) Business Days in that month), Company shall pay, in immediately available funds, such monthly Capacity Charge and Energy Charge payments as computed in Article 5 (Rates for Purchase), or provide to Seller an itemized statement of its objections to all or any portion of such Monthly Invoice and pay any undisputed amount. Notwithstanding the foregoing, the Day by which the Company shall make payment to Seller hereunder shall be increased by one (1) Day for each Day that Seller is delinquent in providing to Company the information required under Section 6.1 (Monthly Invoice) of this Agreement. However, if Company is not timely in providing data required in Section 6.1 (Monthly Invoice) and this directly causes Seller to be unable to deliver its invoice in accordance with the time frame set forth in Section 6.1 (Monthly Invoice), then Company shall still meet the payment date of the twentieth (20th) Business Day of that Calendar Month. If Seller is unable to provide a complete invoice for the reasons set forth in the preceding sentence, an estimated payment, subject to reconciliation with the complete invoice, may be made by Company as an interim provision until a complete invoice can be prepared by Seller and received by Company.
(B)    Notwithstanding all or any portion of such invoice in dispute, simple interest shall accrue on any invoiced amount that remains unpaid following the twentieth (20th) Business Day of each Calendar Month (or the last Business Day of that month if there are less than twenty Business Days in that month), or following the due date for such payment if

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 6
61


extended, at the average daily Prime Rate for the period commencing on the Day following the Day such payment is due such until the invoiced amounts (or amounts due to Seller if determined to be less than the invoiced amounts) are paid in full. Partial payments shall be applied first to outstanding interest and then to outstanding invoice amounts.
(C)    Set Off. Company at any time may set off against any and all amounts that may be due and owed to Seller under this Agreement, any and all undisputed amounts, including damages, Liquidated Damages, insurance premiums, and other payments, that are owed by Seller to Company pursuant to this Agreement or are past due under other accounts Seller has with Company for other services. Undisputed and non-set off portions of amounts invoiced under this Agreement shall be paid on or before the due date.
(D)    Other Payments. Any amounts due from either Party under this Agreement other than monthly Energy Charges and Capacity Charges, including (i) all amounts pursuant to Attachment G (Company-Owned Interconnection Facilities), (ii) all amounts pursuant to Section 13.a (Meters) and Section 13.b (Meter Testing) of Attachment Y (Operation and Maintenance of the Facility), (iii) a monthly metering charge of $25.00 per month, which is in addition to any charges due Company for sales of electric energy by Company to Seller pursuant to the applicable rate schedule; and (iv) such other costs to be incurred by Company and reimbursed by Seller as set forth in this Agreement, shall be paid or objected to within thirty (30) Days following receipt from either Party of an itemized invoice from the other Party setting forth, in reasonable detail, the basis for such invoice.
6.3    Billing Disputes. Either Party may dispute invoiced amounts but shall pay to the other Party at least the undisputed portion of invoiced amounts on or before the invoice due date. To resolve any billing dispute, the Parties shall use the procedures set forth in Article 17 (Dispute Resolution). When the billing dispute is resolved, the Party owing shall pay the amount owed within five (5) Business Days of the date of such resolution, with simple interest from the date that such disputed amount was payable until the date that the amount owed is paid at the average daily Prime Rate for the period.
6.4    Adjustments. In the event adjustments are required to correct inaccuracies in Monthly Invoices, the Party requesting adjustment shall use the method described in Section 13.c (Corrections) of Attachment Y (Operation and Maintenance of the Facility), if applicable, to determine the correct measurements, and shall recompute the amounts due during the period of such inaccuracies. Except as noted below, the difference between the amount paid and that recomputed for each Monthly Invoice affected shall be paid, or repaid, with interest from the date that such Monthly Invoice was payable until the date that such recomputed amount is paid at the average daily Prime Rate for the period or objected to by the Party responsible for such payment within thirty (30) Days following its receipt of such request. The difference between the amount paid and that recomputed for the invoice, along with the allowable amount of interest, shall either be (i) paid to Seller or set-off by Company, as appropriate, in the next invoice payment to Seller, or (ii) objected to by the Party responsible for such payment within thirty (30) Days following its receipt of such request. If the Party responsible for such payment objects to the request, then the Parties shall work together in good faith to resolve the objection.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 6
62


If the Parties are unable to resolve the objection, the matter shall be resolved pursuant to Article 17 (Dispute Resolution). All claims for adjustments shall be waived for any deliveries of electric energy made more than thirty-six (36) months preceding the date of any such request.







EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 6
63


ARTICLE 7 - CREDIT ASSURANCE AND SECURITY
7.1    Security Fund.
(A)    General. Seller is required to post and maintain Development Period Security and Operating Period Security based on the requirements of this Article 7 (Credit Assurance and Security).
(B)    Development Period Security. To guarantee the performance of Seller's obligations under the Agreement for the period prior to the Partial Commercial Operation Date (including but not limited to Seller's obligation to meet the Partial Commercial Operation Date Deadline), Seller shall provide financial security to Company within ten (10) Days of the Execution Date of the Agreement in an amount equal to $100/kW of the Contract Firm Capacity applicable during Commercial Operation (the “Development Period Security”).
(C)    Return of the Development Period Security. The Development Period Security shall be returned to Seller, subject to Company’s right to draw from the Development Period Security as set forth in Section 7.1(G) (Company’s Right to Draw From Security Funds), in the following circumstances: (1) this Agreement is declared null and void pursuant to Section 2.2(E) (Prior to Effective Date), or Section 2.2(F) (Time Periods for PUC Submittal Date and PUC Approval), (2) the PUC issues an order denying approval for an application for a PUC Approval Order, which does not become subject to appeal, (3) the PUC issues an Unfavorable PUC Order, which does not become subject to appeal, (4) a Non-Appealable PUC Approval Order is not obtained within the time periods specified in Section 2.2(F)(2) (Time Period for PUC Approval), or (5) following Company’s receipt of the Operating Period Security pursuant to Section 7.1(D) (Operating Period Security), the Development Period Security of this Agreement.
(D)    Operating Period Security. To guarantee the performance of Seller’s obligations under the Agreement for the period starting from the Partial Commercial Operation Date to the expiration or termination of this Agreement, Seller shall provide financial security to Company in the amount equal to $175/kW of the Contract Firm Capacity based on the Contract Firm Capacity applicable during Commercial Operation (the “Operating Period Security”). Seller shall provide such Operating Period Security to Company within ten (10) Business Days after the Partial Commercial Operation Date, provided that, at all times, some form of Security Funds shall be in place and available to Company, whether Development Period Security or Operating Period Security.
(E)    Form of Security. Seller shall supply the Development Period Security and Operating Period Security required in the form of an irrevocable standby letter of credit substantially in the form attached to this Agreement as Attachment M (Form of Standby Letter of Credit) from a bank doing business in the United States and subject to United States state or federal regulation, with a credit rating of “A-” or better from Standard & Poor’s or A3 or better from Moody’s (any such qualifying bank being referred to herein as an “LC Bank”); provided, that, solely with respect to the Development Period Security, Seller shall be permitted to provide an irrevocable standby letter of credit, as aforesaid, which secures Seller’s obligations to

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 7
64


Company under both the A&R PPA and this Agreement. If the credit rating of the LC Bank falls below A- or A3 (as applicable), Company may require Seller to replace, within thirty (30) Days’ notice by Company, such letter of credit with an irrevocable standby letter of credit from another bank meeting the requirements stated above. Any such letter of credit must be issued for a minimum term of one (1) year. Furthermore, at the end of each year, the security shall be renewed for an additional one (1) year term so that at the time of such renewal, the remaining term of any such security shall not be less than one (1) year. The letter of credit shall include a provision for at least thirty (30) Days advance notice to Company of any expiration or earlier termination of the letter of credit so as to allow Company sufficient time to exercise its rights under said security if Seller fails to extend or replace the security. In all cases, the reasonable costs and expenses of establishing, renewing, substituting, canceling, increasing, reducing, or otherwise administering the letter of credit shall be borne by Seller. In the event Company receives notice from the LC bank that a letter of credit for the Development Period Security or Operating Period Security will be cancelled or is set to expire and will not be extended, Company shall endeavor, but shall not be obligated, to provide Seller with notice of such cancellation or termination. Company shall not be responsible for any lack of notice to Seller of such letter of credit’s cancellation or termination and the events resulting therefrom, provided, however, that if Company draws upon the then full amount remaining under the letter of credit, the provisions of Section 7.1(H) (Failure to Renew or Extend Letter of Credit) and Section 7.1(I) (L/C Proceeds Escrow) shall apply. In the event the letter of credit for Development Period Security or Operating Period Security ever expires or is terminated without Company drawing on such full amount remaining under the letter of credit prior to its expiration, and Seller has not been afforded the opportunity to replace the letter of credit prior to its expiration or termination because of lack of notice, Seller shall be provided a grace period of five (5) Business Days from any notice of such expiration or termination of the letter of credit to obtain and provide to Company a substitute letter of credit meeting the requirements of this Article 7 (Credit Assurance and Security).
(F)    Security Funds. The Development Period Security and Operating Period Security, including L/C Proceeds therefrom (collectively referred to as the “Security Funds”) established, funded, and maintained by Seller pursuant to the provisions of this Article 7 (Credit Assurance and Security) shall provide security for the performance of Seller’s obligations under this Agreement and shall be available to be drawn on by Company as provided in Section 7.1(G) (Company's Right to Draw from Security Funds). Seller shall maintain the Security Funds at the contractually required level throughout the Term of this Agreement, and Seller shall replenish the Security Funds to such required level within fifteen (15) Business Days after any draw on the Security Funds by Company or any reduction in the value of Security Funds below the required level for any other reason.
(G)    Company’s Right to Draw from Security Funds. In addition to any other remedy available to it, Company may, before or after termination of this Agreement, draw from the Security Funds such amounts as are necessary to recover amounts Company is owed pursuant to this Agreement or the IRS Letter Agreement or the GHG Letter Agreement, including, without limitation, any damages due Company, any interconnection costs owed pursuant to Attachment G (Company-Owned Interconnection Facilities), and any amounts for which Company is entitled

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 7
65


to indemnification under this Agreement. Company may, in its sole discretion, draw all or any part of such amounts due Company from any Security Funds to the extent available pursuant to this Article 7 (Credit Assurance and Security), and from all such forms, and in any sequence Company may select. Any failure to draw upon the Security Funds or other security for any damages or other amounts due Company shall not prejudice Company’s rights to recover such damages or amounts in any other manner.
(H)    Failure to Renew or Extend Letter of Credit. If the letter of credit is not renewed or extended at least thirty (30) Days prior to its expiration or earlier termination, Company shall have the right to draw immediately upon the full amount of the letter of credit and to place the proceeds of such draw (the "L/C Proceeds"), at Seller's cost, in an escrow account in accordance with Section 7.1(I) (L/C Proceeds Escrow), until Seller provides a substitute form of irrevocable standby letter of credit meeting the requirements of this Article 7 (Credit Assurance and Security), which substitute letter of credit shall be procured no later than five (5) Business Days after expiration of the letter of credit.
(I)    L/C Proceeds Escrow. If Company draws on the letter of credit pursuant to Section 7.1(H) (Failure to Renew or Extend Letter of Credit), and for so long as a substitute letter of credit meeting the requirements of this Article 7 (Credit Assurance and Security) is not obtained and provided to Company, Company shall, in order to avoid comingling the L/C Proceeds, have the right but not the obligation to place the L/C Proceeds in an escrow account as provided in this Section 7.1(I) (L/C Proceeds Escrow) with a reputable escrow agent acceptable to Company ("Escrow Agent"). Without limitation to the generality of the foregoing, a federally insured bank shall be deemed to be a "reputable escrow agent." Company shall have the right to apply the L/C Proceeds as necessary to recover amounts Company is owed pursuant to this Agreement, the IRS Letter Agreement or the GHG Letter Agreement, including, without limitation, any damages due Company, any interconnection costs owed pursuant to Attachment G (Company-Owned Interconnection Facilities) and any amounts for which Company is entitled to indemnification under this Agreement. To that end, the documentation governing such escrow account shall be in form and content satisfactory to Company and shall give Company the sole authority to draw from the escrow account. Seller shall not be a party to such documentation and shall have no rights to the L/C Proceeds. Upon the issuance of a substitute letter of credit satisfying the requirements of this Article 7 (Credit Assurance and Security) or full satisfaction of Seller's obligations under this Agreement, including recovery by Company of amounts owed to it under this Agreement, Company shall instruct the Escrow Agent to remit to the bank that issued the letter of credit that was the source of the L/C Proceeds the remaining balance (if any) of the L/C Proceeds. If there is more than one escrow account with L/C Proceeds, Company may, in its sole discretion, draw on such accounts in any sequence Company may select. Any failure to draw upon the L/C Proceeds for any damages or other amounts due Company shall not prejudice Company's rights to recover such damages or amounts in any other manner. In all cases, the reasonable costs and expenses of establishing, renewing, substituting, canceling, increasing reducing, or otherwise administering the Security Funds through the L/C Proceeds Escrow shall be borne by Seller.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 7
66



7.2    Release of Security Funds. Promptly following the end of the Term and the complete performance of all of Seller’s obligations under this Agreement, including, but not limited to, the obligation to pay any and all damages owed by Seller to Company, under this Agreement, Company shall release the Security Funds (including any accumulated interest, if applicable) to Seller.


EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 7
67


ARTICLE 8 - DEFAULT
8.1    Events of Default.
(A)    Default by Seller. The occurrence of any of the following events at any time during the Term of this Agreement shall constitute an Event of Default by Seller:
(1)    Company declares an Event of Default pursuant to Section 2.4(D)(2) (Termination Right);
(2)    [RESERVED];
(3)    Seller shall fail to pay Company any amount as and when due under this Agreement (less any amounts disputed in good faith pursuant to Article 17 (Dispute Resolution)) and neither Seller nor the Facility Lender remedy such non-payment within thirty (30) Days after written demand therefor by Company served upon Seller with a copy served upon the Facility Lender;
(4)    Seller shall fail to operate, maintain or repair the Facility in accordance with the terms of this Agreement such that a condition exists in the Facility which has an adverse physical impact on the Company System or the equipment of Company’s customers or which Company reasonably determines presents an immediate danger to personnel or equipment, and Seller shall fail to initiate and diligently pursue reasonable action to cure such failure within seven (7) Days after actual receipt by Seller and the Facility Lender of demand therefor by Company, provided, that Company may, after providing written notice to Seller and Facility Lender, enter upon the Site, and undertake such reasonable action on behalf of Seller, consistent with Good Engineering and Operating Practices, until either such adverse effect or danger is eliminated or Company is reasonably satisfied that Seller has, within the aforesaid seven (7) Day period, initiated and is diligently pursuing such reasonable action. Seller shall bear or reimburse Company, as the case may be, for all reasonable, documented, out-of-pocket costs incurred by Company in connection with such reasonable actions taken by Company on behalf of Seller as provided herein, and shall cooperate in good faith with Company in providing access to the Facility and the Site, in the event Company elects to undertake such action as provided herein;
(5)    Seller shall (i) abandon the Facility prior to the Commercial Operation Date or (ii) fail to maintain continuous service to the extent required by this Agreement for a period of seven (7) or more consecutive Days, the last twenty-four (24) hours of which shall be after notice by Company to Seller that it is not in compliance with this provision, unless such abandonment or failure is caused by Force Majeure or an Event of Default by Company. For purposes of Section 8.1(A)(5)(i), abandonment of the Facility prior to the Commercial Operation Date shall mean the failure by Seller, after the Non-appealable PUC Approval Order Date, to proceed with or prosecute in a diligent manner the planning, design, engineering, permitting, completion (including, without limitation, purchasing, accounting, training and administration) and Start-up of at least two (2) of the generators of the Facility for a consecutive period of thirty

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 8
68


(30) Days, the last ten (10) Days of which shall be after notice from Company to Seller that it is not in compliance with this provision;
(6)    Company declares an Event of Default in accordance with Section 3.3(B)(l)(c) or Section 1.j (Demonstration of Facility) of Attachment B (Facility Owned by Seller);
(7)    Seller shall fail to deliver the Facility in accordance with Section 3.2(J) (Seller’s Obligation to Deliver Facility);
(8)    Seller shall fail to meet the warranties and guarantees of performance specified in Section 3.2(B)(1) (Equivalent Availability Factor) or Section 3.2(B)(2) (Equivalent Forced Outage Rate) by more than ten (10) percentage points on a twelve-month rolling average basis; provided, that to the extent such failure of performance is attributable to an event of Force Majeure, the contribution of such event of Force Majeure to such failure of performance shall be eliminated from the EAF calculation for the purposes of, and only for the purposes of, establishing an Event of Default of Seller pursuant to this Section 8.1(A)(8), and provided further, that the event of Force Majeure contributing, in whole or in part, to such failure of performance is subject to the provisions of Article 18 (Force Majeure);
(9)    Seller shall fail to meet the warranty and guarantee of performance specified in Section 3.2(B)(5) (Unit Trips) by more than seventeen (17) Unit Trips in any twelve-month period;
(10)    Seller shall fail to meet the warranty and guarantee of performance specified in Section 3.2(B)(6) (Partial Unit Trips) by more than seventeen (17) Partial Unit Trips in any twelve-month period;
(11)    Without the prior written consent of Company, such consent not to be unreasonably withheld:
(a)    Kalaeloa GP, LLC is replaced as general partner of Seller, through either forced or voluntary withdrawal; provided, however, that to the extent that the grant of consent by Company is dependent upon qualifications to carry out the role of general partner, Company’s consent shall be granted if Company is reasonably satisfied that the substitute general partner: (i) has the qualifications to carry out the role of general partner and (ii) has provided Company with evidence satisfactory to Company of its creditworthiness and ability to perform its financial obligations hereunder (including such guarantees as Company deems appropriate) in a manner consistent with the terms and conditions of this Agreement; or
(b)    GE Vernova, Inc. is no longer the operator of the Facility (“Facility Operator”); provided, however, that to the extent that the grant of consent by Company is dependent upon qualifications to carry out the role of Facility Operator, Company’s consent shall be granted if Company is reasonably satisfied that the substitute Facility Operator: (i) has the qualifications or has contracted with an entity having the qualifications to operate the Facility

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 8
69


in a manner consistent with the terms and conditions of this Agreement and (ii) has provided Company with evidence satisfactory to Company of its creditworthiness and ability to perform its financial obligations hereunder (including such guarantees as Company deems appropriate) in a manner consistent with the terms and conditions of this Agreement.
(12)    Seller becomes insolvent, or makes an assignment for the benefit of creditors or fails generally to pay its debts as they become due; or such Party shall have an order for relief in an involuntary case under the bankruptcy laws as now or hereafter constituted entered against it, or shall commence a voluntary case under the bankruptcy laws as now or hereafter constituted, or shall file any petition or answer seeking for itself any arrangement, composition, adjustment, liquidation, dissolution or similar relief to which it may be entitled under any present of future statue, law or regulation, or shall file any answer admitting the material allegations of any petition filed against it in such proceeding; or such Party seeks or consents to or acquiesces in the appointment of or taking possession by, any custodian, trustee, receiver or liquidator of it or of all or a substantial part of its properties or assets; or such Party takes action looking to its dissolution or liquidation; or within ninety (90) days after commencement of any proceedings against such Party seeking any arrangement, composition, adjustment, liquidation, dissolution or similar relief under any present or future statue, law or regulation, such proceedings shall not have been dismissed; or within ninety (90) days after the appointment of, or taking possession by, any custodian, trustee, receiver or liquidator or any or of all or a substantial part of the properties or assets of such Party, without the consent or acquiescence of such Party, any such appointment or possession shall not have been vacated or terminated; or;
(13)    Without the application, approval or consent of Seller, a receiver, trustee, examiner, liquidator or similar official shall be appointed for Seller, or any part of its property, or a proceeding described in Section 8.1(A)(11) immediately above shall be instituted against Seller and such appointment shall continue undischarged or such proceeding shall continue undismissed or unstayed for a period of sixty (60) consecutive Days or Seller shall fail to file in a timely manner, an answer or other pleading denying the material allegations filed against it in any such proceeding;
(14)    Without the prior written consent of Company, Seller shall transfer, convey, lose or relinquish its right to own or operate the Facility or to occupy the Site to any person, except an entity to whom Seller may assign this Agreement under Article 20 (Transfers, Assignments and Financing Debt);
(15)    [RESERVED]
(16)    Seller fails to satisfy the requirements of Article 7 (Credit Assurance and Security) of this Agreement;
(17)    Seller delivers or attempts to deliver to the Point of Interconnection for sale under this Agreement electric energy that was not generated by the Facility;

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 8
70


(18)    The Facility Lender declare an event of default under the Financing Documents and then fail to initiate, within sixty (60) Days thereafter, such actions as may be legally necessary (such as foreclosure) to take possession of the Facility and to thereafter diligently prosecute such actions to conclusion;
(19)    Seller shall fail to perform a material obligation of this Agreement not otherwise specifically referred to in this Section 8.1(A) (Default by Seller), which failure has or may reasonably be anticipated to have a material adverse effect on Seller’s delivery of capacity and energy to Company in accordance with the terms of this Agreement and which failure shall continue for forty-five (45) Days after written demand by Company for performance thereof;
(20)    Seller makes any representation or warranty to Company required by, or relating to Seller’s performance of, this Agreement that is false and misleading in any material respect when made; or
(21)    Seller shall fail to provide new and/or updated Required Models within 30 Days’ notice from Company of a breach of Section 6.a (Seller's Obligation to Provide Models) of Attachment B (Facility Owned by Seller).
(B)    Default by Company. The occurrence of any of the following at any time during the Term of this Agreement shall constitute an Event of Default by Company:
(1)    Company shall fail to pay Seller any amount as and when due under this Agreement (less any amounts disputed in good faith pursuant to Section 6.2 (Payment)) and shall fail to remedy such non-payment within forty-five (45) Days after demand therefor from Seller;
(2)    Company shall (i) be dissolved, be adjudicated as bankrupt, or become subject to an order for relief under any federal bankruptcy law; (ii) fail to pay, or admit in writing its inability to pay, its debts generally as they become due; (iii) make a general assignment of substantially all its assets for the benefit of creditors; (iv) apply for, seek, consent to, or acquiesce in the appointment of a receiver, custodian, trustee, examiner, liquidator or similar official for itself or any substantial part of its property; (v) institute any proceedings seeking an order for relief or to adjudicate it as bankrupt or insolvent, or seeking dissolution, winding up, liquidation, reorganization, arrangement, adjustment or composition of it or its debts under any law relating to bankruptcy, insolvency, reorganization, or relief of debtors; or (vi) take any action to authorize or effect any of the foregoing actions;
(3)    Without the application, approval or consent of Company, a receiver, trustee, examiner, liquidator or similar official shall be appointed for Company or any part of its respective property, or a proceeding described in Section 8.1(B)(2) shall be instituted against Company and such appointment shall continue undischarged or such proceeding shall continue undismissed or unstayed for a period of sixty (60) consecutive Days or Company shall fail to file timely an answer or other pleading denying the material allegations filed against it in any such proceeding;

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 8
71



(4)    Company shall fail to perform a material obligation of this Agreement not otherwise specifically referred to in this Section 8.1(B) (Default by Company), which failure shall have a material adverse effect on its ability to accept and pay for, or Seller’s ability to deliver, capacity and energy in accordance with the terms of this Agreement and which failure shall continue for forty-five (45) Days after written demand by Seller for performance thereof; or
(5)    Company makes any representation or warranty to Seller required by, or relating to Company’s performance of, this Agreement that is false and misleading in any material respect when made.
(C)    Cure Periods and Force Majeure Exceptions. Before becoming an Event of Default, the occurrences set forth in Section 8.1(A) (Default by Seller) and Section 8.1(B) (Default by Company) are subject to cure periods and Force Majeure exceptions as follows:
(1)    Under Section 8.1(A)(1) (Events of Default, Default by Seller), cure periods and the consequences of Force Majeure are addressed in Section 2.4(B) (Construction Milestones Extensions) and Section 18.5 (Effect of Force Majeure on Milestone Dates and Commercial Operation Date Deadlines) and no further opportunity to cure or Force Majeure exceptions are applicable;
(2)    Under Section 8.1(A)(11) through Section 8.1(A)(13), Section 8.1(A)(18), Section 8.1(A)(20), Section 8.1(B)(2), and Section 8.1(B)(3), no opportunities to cure or Force Majeure exceptions are applicable; or
(3)    Under Section 8.1(A)(3), Section 8.1(A)(4), Section 8.1(A)(5), Section 8.1(A)(6), Section 8.1(A)(7), Section 8.1(A)(8), Section 8.1(A)(9), Section 8.1(A)(10), Section 8.1(A)(14), Section 8.1(A)(15), Section 8.1(A)(16), Section 8.1(A)(17), Section 8.1(A)(19), Section 8.1(B)(1), and Section 8.1(B)(5):
(a)    If the occurrence is not the result of Force Majeure, the non-performing Party shall be entitled to a cure period, if any, to the limited extent expressly set forth in each section; or
(b)    If the occurrence is the result of Force Majeure, and if and so long as the conditions set forth in Section 18.4 (Satisfaction of Certain Conditions) are satisfied, the non-performing Party shall be entitled to a grace period as provided in Section 18.6 (Effect of Force Majeure on Other Events of Default), which shall apply in lieu of any cure periods provided in Section 8.1(A) (Default by Seller) and Section 8.1(B) (Default by Company).
8.2    Rights and Obligations of the Parties Upon Default.
(A)    Notice of Default. Upon the occurrence of an Event of Default specified in Section 8.1 (Events of Default), the non-defaulting Party shall deliver to the defaulting Party (with a copy to the Facility Lender and/or the collateral agent designated therefor) a written notice which (i) declares that an Event of Default has occurred under Section 8.1 (Events of

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 8
72


Default) of this Agreement; and (ii) identifies the specific provision or provisions of such Section under which such Event of Default shall have occurred.
(B)    Right to Terminate; Forward Contract.
(1)    Notice of Termination. If an Event of Default under Section 8.1 (Events of Default) shall have occurred and not been cured within the cure periods provided in Section 8.1(C) (Cure Periods and Force Majeure Exceptions), or, as to Events of Default under Section 8.1(A)(6) or Section 8.1(A)(7) pursuant to the remedial provisions described therein, or such other cure periods provided under the Financing Documents to which Company is a party, as applicable, the non-defaulting Party shall have the right to terminate this Agreement by delivering a written notice of termination which shall be effective thirty (30) Days from the date such notice is delivered.
(2)    Termination by Company.
(a)    Company's Assumption of Seller's Interest. If an Event of Default by Seller occurs, and if Company delivers to Seller the notice required under Section 8.2(B) (Right to Terminate; Forward Contract) stating that Company has elected to exercise its rights hereunder, Company shall promptly assume all right, title and interest of Seller in the Facility and the Interconnection Facilities, this Agreement, the Project Documents and the Financing Documents to the extent it is legally capable of doing so, to take over the construction or operation of the Facility and the Interconnection Facilities forthwith and to construct or operate the Facility and the Interconnection Facilities during the period in which the foregoing assumption is being perfected, and to complete the construction of and/or operate the same, provided that Company also assumes all of Seller's obligations (except any default charges or similar penalties) under the Financing Documents and the Project Documents (other than this Agreement). Upon such assumption, Company shall have no obligation to remedy or cause to be remedied the events which gave rise to the Event of Default under Section 8.1(A) (Default by Seller) or to pay any delinquent principal, interest, penalties, or other amounts which, but for such Event of Default or any default or Event of Default under the Financing Documents or the Project Documents (whether or not declared), would not have become due. The Financing Documents and the Project Documents shall specify that Company has the assumption rights described in this Section 8.2(B)(2) (Termination by Company), and that such rights shall have priority over the exercise by the Facility Lender of their security interest in, and mortgage on, this Agreement, the other Project Documents and/or the Facility. Despite such assumption of rights by Company, Seller shall continue to be liable to Company for all obligations to Company arising from events which occurred through the date of Company's assumption; provided, however, that such obligations shall be reduced for this purpose by an amount equal to the lesser of either (i) the market value of the Facility at the time rights under this Section 8.2(B)(2) (Termination by Company) are exercised, (ii) the original capital cost of the Facility and the Interconnection Facilities or otherwise assumed by Company as of the time rights under this Section 8.2(B)(2) (Termination by Company) are exercised, or (iii) the net present value of this Agreement (not including Fuel). Seller shall take all action and provide all information necessary to facilitate Company's decision whether to exercise its rights under this Section

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 8
73


8.2(B)(2) (Termination by Company) and to implement the exercise of those rights if Company so chooses.
(b)    Seller’s Obligations Upon Termination. If Company elects to exercise its rights under this Section 8.2(B)(2) (Termination by Company), Seller shall take all actions as may be necessary (i) to convey to Company free and clear of all liens and encumbrances (other than those of Company and the Facility Lender) all of Seller's right, title and interest in and to the Facility and the Interconnection Facilities and any and all materials, equipment, design materials and supplies relating to the Facility and the Interconnection Facilities, including without limitation, any such materials, equipment, design materials or supplies located at the Site or in transit to the Site, whether or not completed or ready for use or incorporated into the Facility and the Interconnection Facilities, and any such materials, equipment, design materials or supplies being processed, fabricated, assembled or prepared off the Site for installation in the Facility and the Interconnection Facilities or for use at or in connection with the Facility and the Interconnection Facilities, and (ii) to assign to Company, with such consents and undertakings as may be necessary to make such assignments fully effective, all of Seller's interests under the Financing Documents and the Project Documents (other than this Agreement). Seller's obligations under this Section 8.2(B)(2) (Termination by Company) shall survive any exercise by Company of its remedies under Section 8.2(B)(1) (Notice of Termination) or any termination of this Agreement by Company pursuant to Section 8.2(B)(2) (Termination by Company).
(c)    Other Assumption of Seller's Interest. If Company elects not to acquire all of Seller's interests, rights, and obligations in accordance with Section 8.2(B)(2)(a) (Company’s Assumption of Seller’s Interest), and if, and only if, the Event of Default declared by Company shall have occurred under Section 8.1(A)(8), Section 8.1(A)(9), the Facility Lender (and/or the collateral agent designated therefor) shall have 60 Days from receipt of the notice delivered by Company pursuant to Section 8.2(A) (Notice of Default), subject to the requirements of this Section 8.2(B)(2)(c) (Other Assumption of Seller’s Interest), to cause an affiliate of the Facility Lender or a new purchaser or lessee of the Facility to assume all of the right, title and interest of Seller under this Agreement and the Project Documents. The right of the Facility Lender (and/or collateral agent) to provide such affiliate or new purchaser or lessee shall be subject to Company's consent, not to be unreasonably withheld, and to satisfaction of the following conditions: (i) the affiliate or new purchaser or lessee shall have the qualifications or has contracted with an entity having the qualifications to operate the Facility in a manner consistent with the terms and conditions of this Agreement; (ii) the affiliate or new purchaser or lessee shall have provided Company with adequate assurances of its creditworthiness (including such guarantees as Company deems appropriate) and ability to perform its financial obligations hereunder in a manner consistent with the terms and conditions of this Agreement; and (iii) the affiliate and/or Facility Lender shall remedy or cause to be remedied the event which gave rise to the Event of Default under Section 8.1(A) (Default by Seller) within sixty (60) Days of the Facility Lender' receipt of the notice delivered by Company under Section 8.2(A) (Notice of Default). Notwithstanding such assumption by the affiliate or new purchaser or lessee, Seller shall continue to be liable to Company for all obligations to Company arising from events which occur through the date on which the affiliate or new purchaser or lessee makes such assumption

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 8
74


effective. The performance or non-performance of the terms of this Agreement by the affiliate or new purchaser or lessee shall be measured from the date of such assumption. During the pendency of such assumption, Seller shall cooperate with the Facility Lender and shall take all actions as may be necessary (aa) in the case of a new purchaser or an affiliate of the Facility Lender which is to acquire the Facility, to convey to the affiliate or new purchaser all right, title and interest in the Facility and any and all materials, equipment, design materials and supplies relating to the Facility, including without limitation, any such materials, equipment, design materials or supplies located at the Site or incorporated into the Facility, and any such materials, equipment, design materials or supplies being processed, fabricated, assembled or prepared off the Site for installation in the Facility or for use at or in connection with the Facility, and (bb) to assign to such new purchaser or affiliate or to a lessee, with such consents and undertakings as may be necessary to make such assignments fully effective, all of Seller's interests under this Agreement, the other Project Documents and the Financing Documents. If the assumption of rights, interests and obligations by the affiliate or new purchaser or lessee occurs strictly in accordance with this Section 8.2(B)(2)(c) (Other Assumption of Seller’s Interest), Company shall continue this Agreement with the affiliate or new purchaser or lessee substituted in the place of Seller hereunder.
(d)    Effective Date. Without limitation to the generality of the preceding subsections of this Section 8.2(B)(2) (Termination by Company), the earliest Day upon which a termination of this Agreement can be effective as a result of a failure to achieve the Partial Commercial Operation Date Deadline or the Commercial Operation Date Deadline, as applicable, would be the Day following expiration of the one hundred eighty (180) Day COD Delay LD Period provided in Section 2.4(D)(1)(b) (Daily Delay Damages).
(e)    Termination Damages. If the Agreement is terminated by Company because of one or more of the Events of Default by Seller, Company shall have the right, in addition to the rights set forth above in this Section 8.2(B) (Right to Terminate; Forward Contract), to collect all damages, including liquidated damages ("Termination Damages"), in accordance with Article 9 (Liquidated Damages).
(3)    Forward Contract. Without limitation to the generality of the foregoing provisions of this Section 8.2 (Rights and Obligations of the Parties Upon Default), the Parties agree that, under 11 U.S.C. §362(b)(6), this Agreement is a "forward contract" and the Company is a "forward contract merchant" such that upon the occurrence of an Event of Default by Seller under Section 8.1(A) (Events of Default by Seller) , this Agreement may be terminated by Company as provided in this Agreement notwithstanding any bankruptcy petition affecting Seller.
(C)    Right to Demand Independent Engineering Assessment and Modification.
(1)    Notice of Default. If an Event of Default described in Section 8.1(A)(8) or Section 8.1(A)(9) occurs, Company shall, prior to exercising its rights under Section 8.2(A) (Notice of Default) or Section 8.2(B) (Right to Terminate; Forward Contract) on the basis thereof, give written notice to Seller that it will obtain an Independent Engineering Assessment

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 8
75


concerning the failure to meet the specified warranted levels. Within thirty (30) Days after receipt by Seller of such notice, a president, vice president, or other authorized delegate of Company and Seller, both having full authority to settle the matter, shall personally meet in Hawai‘i and attempt in good faith to make the determination described in Section 8.2(C)(2) (Changes Based on Independent Engineering Assessment). If these officials reach agreement on a determination, the provisions of Section 8.2(C)(3) (Determination That There Are No Commercially Reasonable Changes) and Section 8.2(C)(4) (Determination That There Are Commercially Reasonable Changes) shall apply thereto. If no meeting takes place within thirty (30) Days of Seller’s receipt of the aforesaid written notice, or if agreement between these officials is not reached within forty-five (45) Days of Seller’s receipt of such notice, Company may at any time thereafter require that an Independent Engineering Assessment be conducted in accordance with Section 3.3(B) (Company Right to Require Independent Engineering Assessment) except that in every instance all costs and expenses of such Independent Engineering Assessment shall be borne by Seller.
(2)    Changes Based on Independent Engineering Assessment. The representatives of the Parties or the Qualified Independent Engineering Company based on the Independent Engineering Assessment, as applicable, shall determine whether there are commercially reasonable changes in the Facility, or in the manner in which Seller operates the Facility, which (i) could be implemented within two hundred and seventy (270) Days (or such other time period which Company and Seller mutually agree upon) after such findings are made by the Parties or the Qualified Independent Engineering Company, as the case may be, and (ii) could reasonably be expected to result in future operation of the Facility at the guaranteed levels for EAF, EFOR, Demonstrated Firm Capacity, power quality, Unit Trips, Partial Unit Trips, Full Plant Trips and Single Point of Failure Violations, as specified in Section 3.2(B) (Warranties and Guarantees of Performance).
(3)    Determination That There Are No Commercially Reasonable Changes. If the representatives of the Parties or the Qualified Independent Engineering Company based on the Independent Engineering Assessment, as applicable, determine that there are no commercially reasonable changes meeting the requirements of Section 8.2(C)(2) (Changes Based on Independent Engineering Assessment), Company may thereafter declare an Event of Default on the basis of the failure described in Section 8.1(A)(8) or Section 8.1(A)(9) which preceded Company’s request for an Independent Engineering Assessment.
(4)    Determination That There Are Commercially Reasonable Changes. If the representatives of the Parties or the Qualified Independent Engineering Company based on the Independent Engineering Assessment, as applicable, determine that there are commercially reasonable changes meeting the requirements of Section 8.2(C)(3) (Determination That There Are No Commercially Reasonable Changes) above, Company may not declare an Event of Default on the basis of the failure described in Section 8.1(A)(8) or Section 8.1(A)(9) which preceded Company’s request for an Independent Engineering Assessment unless Seller either (i) fails to diligently carry out such recommended changes as determined in accordance with the procedures and requirements set forth in Section 3.3(B) (Company Right to Require Independent Engineering Assessment) or (ii) implements such changes but the Facility nevertheless does not

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 8
76


meet the standards of Section 8.2(C)(2) (Changes Based on Independent Engineering Assessment) in the first full Contract Year after such changes are implemented; provided that, if such right to declare an Event of Default is not exercised within three (3) months after such first full Contract Year, Company shall be deemed to have waived such right.
8.3    Equitable Remedies. Seller acknowledges that Company is a public utility and is relying upon Seller’s performance of its obligations under this Agreement, and that Company and/or its customers may suffer irreparable injury as a result of the failure of Seller to perform any of such obligations, whether or not such failure constitutes an Event of Default or otherwise gives rise to one or more of the remedies set forth in Section 8.2 (Rights and Obligations of the Parties Upon Default). Accordingly, the remedies set forth in Section 8.2 (Rights and Obligations of the Parties Upon Default) shall not limit or otherwise affect Company’s right to seek specific performance, injunctions or other available equitable remedies for Seller’s failure to perform any of its obligations under this Agreement, irrespective of whether such failure constitutes an Event of Default.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 8
77


ARTICLE 9 - LIQUIDATED DAMAGES
9.1    Liquidated Damages. Recognizing that Company must provide the ultimate service to its customers and that the capacity and energy produced by the Facility is needed to meet the requirements of Company’s customers, and in order to avoid the difficulties of proof in connection with the damages Company would incur in the event of a failure of the Facility to meet the performance standards herein, the Parties agree that the following Liquidated Damages for failure by Seller to attain required performance (i) constitute a reasonable and good faith estimate of the anticipated or actual loss or damage which would be incurred by Company as a result of such failure, (ii) are not intended as a penalty, (iii) may be invoked by Company to ensure that the Facility meets the performance standards established under this Agreement and (iv) constitute Company’s sole and exclusive monetary remedy with respect to the matters set forth in Section 9.2 (Calculation and Payment of Liquidated Damages) and Section 9.3 (Damages in the Event of Termination by Company), provided, however, that the Company’s invoking Liquidated Damages shall not limit or otherwise affect Company’s right to seek (aa) monetary damages when Liquidated Damages are not applicable under the terms of this Agreement and when Company has not terminated this Agreement (or damages with respect to losses arising independent of a termination of this Agreement), and (bb) specific performance or injunctive relief when monetary damages will not provide adequate relief.
9.2    Calculation and Payment of Liquidated Damages.
(A)    Equivalent Availability Factor. For each one-tenth (1/10) of a percentage point, when rounded to the nearest one-tenth of a percent (0.1%), that the rolling 12-month average Equivalent Availability Factor of the Facility falls below the guarantee level specified in Section 3.2(B)(1) (Equivalent Availability Factor) for each month, Seller shall pay to Company Liquidated Damages in the amount set forth in the following table (on a progressive basis) upon proper demand after the end of the applicable month.
EAF Damages Schedule Amount Below Guaranteed Level
EAFLiquidated Damages
90.0% - 100% -0-
85.0% - 89.9%$3,000 per 0.1%
80.0% - 84.9%$4,000 per 0.1%
75.0% - 79.9%$5,000 per 0.1%
Below 75.0%$6,000 per 0.1%
All such Liquidated Damages shall be due within thirty (30) Days after the first to occur of the end of the applicable month or the end of Term. In the event Seller fails to pay Company undisputed amounts of Liquidated Damages due under this Section 9.2(A) (Equivalent

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 9
78


Availability Factor) within thirty (30) Days of receipt of Company’s written demand, Company may set off such undisputed amounts due against payments it is otherwise obligated to make under this Agreement.
(B)    Equivalent Forced Outage Rate. For each one-tenth (1/10th) of a percentage point that the rolling 12 month average EFOR, when rounded to the nearest one-tenth of a percent (0.1%), exceeds the guaranteed level of four percent (4%) as specified in Section 3.2(B)(2) (Equivalent Forced Outage Rate) for each month, Seller shall pay Company Liquidated Damages in the amount set forth in the following table (on a progressive basis) upon proper demand after the end of the applicable month.
EFOR Damages Schedule Amount Above Guaranteed Level
EFORLiquidated Damages
0.0% - 4.0% -0-
4.1% - 7.0%$3,000 per 0.1%
Above 7.0%$5,000 per 0.1%
All such Liquidated Damages shall be due within thirty (30) Days after the first to occur of the end of the applicable month or the end of Term. In the event Seller fails to pay Company undisputed amounts of Liquidated Damages due under this Section 9.2(B) (Equivalent Forced Outage Rate) within thirty (30) Days of receipt of Company’s written demand, Company may set off such undisputed amounts due against payments it is otherwise obligated to make under this Agreement.

(C)    Excessive Unit Trips. For each Unit Trip that exceeds the guaranteed amount set forth in Section 3.2(B)(5) (Unit Trips), Seller shall pay Company Liquidated Damages in the amount set forth in the following table (on a progressive basis) upon proper demand at the end of the applicable month.
Unit TripsLiquidated Damages
1 - 3 Unit Trips -0-
4 - 6 Unit Trips
•Category I
$6,500 per event
•Category II
$3,250 per event
7 - 10 Unit Trips

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 9
79


•Category I
$9,500 per event
•Category II
$4,750 per event
Above 10 Unit Trips
•Category I
$12,500 per event
•Category II
$6,250 per event
For avoidance of doubt, each Single Point of Failure Violation may also count as a Unit Trip or Full Plant Trip.
All such Liquidated Damages shall be due within thirty (30) Days after the first to occur of the end of the applicable month or the end of Term. In the event Seller fails to pay Company undisputed amounts of Liquidated Damages due under this Section 9.2(C) (Excessive Unit Trips) within thirty (30) Days of receipt of Company’s written demand, Company may set off such undisputed amounts due against payments it is otherwise obligated to make under this Agreement.
(D)    Excessive Partial Unit Trips. For each Partial Unit Trip that exceeds the guaranteed amount set forth in Section 3.2(B)(6) (Partial Unit Trips), Seller shall pay Company Liquidated Damages in the amount set forth in the following table (on a progressive basis) upon proper demand at the end of the applicable month.
Partial Unit TripsLiquidated Damages
1 - 3 Partial Unit Trips -0-
4 - 6 Partial Unit Trips
•Category I
$3,250 per event
•Category II
$1,625 per event
7 - 10 Partial Unit Trips
•Category I
$4,750 per event
•Category II
$2,375 per event
Above 10 Partial Unit Trips
•Category I
$6,250 per event





EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 9
80


•Category II
$3,125 per event

All such Liquidated Damages shall be due within thirty (30) Days after the first to occur of the end of the applicable month or the end of Term. In the event Seller fails to pay Company undisputed amounts of Liquidated Damages due under this Section 9.2(D) (Excessive Partial Unit Trips) within thirty (30) Days of receipt of Company’s written demand, Company may set off such undisputed amounts due against payments it is otherwise obligated to make under this Agreement.

(E)    Full Plant Trips.
(1)    For each Full Plant Trip (Category I), Seller shall pay Company Liquidated Damages of $100,000.
(2)    For each Full Plant Trip (Category II), Seller shall pay Company Liquidated Damages of $50,000.
(3)    Seller shall earn a grace period to be used in determining whether an event is a Full Plant Trip (Category I) or Full Plant Trip (Category II) by providing Company’s Load Dispatcher, prior to the unscheduled removal from service of the first generator to be so removed, with notice that the Facility is likely to experience a Full Plant Trip. In order to qualify as a notice of the type referred to in the preceding sentence, the notice must (a) be made in a direct and two-way communication between Seller or its operator’s personnel and Company’s Load Dispatcher through such media as the “hot line” between the Facility’s control room and that of Company’s Load Dispatcher, (b) clearly and specifically state that there is likely to be an unscheduled removal from service of the two combustion turbines at the Facility, and (c) be acknowledged by Company’s Load Dispatcher as conveying the message that there is likely to be an unscheduled removal from services of the two combustion turbines at the Facility. If Seller provides notice which satisfies the requirements set forth in the first two sentences of this Section 9.2(E)(3), the number of minutes that elapse between the receipt of such notice by Company’s Load Dispatcher and the actual unscheduled removal from service of the Facility’s first combustion turbine (the “Grace Period”) shall, for purposes of determining whether the event in question is to be classified as a Full Plant Trip (Category I) or Full Plant Trip (Category II) for purposes of assessing the liquidated damages set forth in Section 9.2(E)(1) or Section 9.2(E)(2), be added to the number of minutes that actually elapsed between the unscheduled removal from service of the first combustion turbine and the unscheduled removal from service of the second combustion turbine.
(4)    If three (3) or more Full Plant Trip (Category I) events occur during any twelve (12) month period (regardless of whether or not, by virtue of the Grace Period provided under Section 9.2(E)(3), such events were treated as Full Plant Trip (Category I) events for purposes of assessing liquidated damages), the occurrence of the third Full Plant Trip (Category I) event within such twelve (12) month period shall result in a twenty-five percent (25%) deduction from the amount payable as Capacity Charge for the period commencing with the date

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 9
81


of such third Full Plant Trip (Category I) event until such time as Seller has adequately addressed, to Company’s satisfaction in Company’s sole but non-arbitrary discretion, the circumstances giving rise to the Full Plant Trip problem, as evidenced by Company’s written notice to Seller to that effect. If Seller is not satisfied with the exercise of Company’s sole discretion in determining whether Seller has adequately addressed such circumstances or Company is not prompt in responding to Seller, Seller may, at its own expense, submit the issue of whether or not Seller has addressed the circumstances giving rise to the Full Plant Trip problem to a Qualified Independent Engineering Company from the Qualified Independent Engineer’s List maintained pursuant to Section 3.3(B)(2) (Qualified Independent Engineering Companies). If Seller decides to submit such issue to the assessment of a Qualified Independent Engineering Company, Seller shall provide Company with written notice to that effect. If Company and Seller do not agree within seven (7) Days of the date of Company’s receipt of the aforementioned notice from Seller upon the Qualified Independent Engineering Company from the Qualified Independent Engineer List to be retained by Seller for such purpose, Seller shall designate the Qualified Independent Engineering Company from the Qualified Independent Engineer List and the assessment of such Qualified Independent Engineering Company shall be binding on the Parties. If such Qualified Independent Engineering Company determines that Seller has adequately addressed the problem, such Qualified Independent Engineering Company shall also decide the date upon which Seller achieved this result so that the Parties will know that date from which the aforesaid twenty-five percent (25%) deduction from the Capacity Charge ceased to apply. The provisions of Article 17 (Dispute Resolution) shall not apply to the selection of the Qualified Independent Engineering Company under this Section 9.2(E)(4) or the conduct of the engineering assessment under this Section 9.2(E)(4).
(5)    The twenty-five percent (25%) deduction from the portion of the amount payable as Capacity Charge pursuant to the provisions of Section 9.2(E)(4) is intended to correlate to the portion of the amount payable as a Capacity Charge to take into account the unreliability of the Capacity as evidenced by the occurrence of Full Plant Trip (Category I) events and is not intended to compensate Company for the Full Plant Trip events themselves. Accordingly, Liquidated Damages shall still be payable as provided in Section 9.2(E)(1) through Section 9.2(E)(3) for all Full Plant Trip (Category I) and/or Full Plant Trip (Category II) events that occur during a period for which there has been a deduction from the Capacity Charge pursuant to Section 9.2(E)(4).
(F)    Damages in the Event Seller Fails to Maintain Workforce. The amounts payable by Seller under Section 11 (Seller’s Obligation to Maintain Workforce) of Attachment Y (Operation and Maintenance of the Facility) shall constitute Liquidated Damages under this Article 9 (Liquidated Damages). Seller shall pay such Liquidated Damages upon demand from Company within thirty (30) Days after the first to occur of the end of such Contract Year or the end of Term. In the event Seller fails to pay Company undisputed amounts of Liquidated Damages due under this Section 9.2(F) (Damages in the Event Seller Fails to Maintain Workforce) within thirty (30) Days of receipt of Company’s written demand, Company may set off such undisputed amounts due against payments it is otherwise obligated to make under this Agreement.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 9
82


(G)    Milestone Delay Damages. The amounts payable by Seller under Section 2.4(D) (1)(a) (Milestone Delay Damages) shall constitute Liquidated Damages under this Article 9 (Liquidated Damages) and Seller shall be pay such amounts in accordance with the provisions of Section 2.4(D)(1)(a) (Milestone Delay Damages).
(H)    Daily Delay Damages. The amounts payable by Seller under Section 2.4(D)(1)(b) (Daily Delay Damages) shall constitute Liquidated Damages under this Article 9 (Liquidated Damages) and Seller shall be pay such amounts in accordance with the provisions of Section 2.4(D)(1)(b) (Daily Delay Damages).
(I)    Termination Damages. The amounts payable by Seller under Section 9.3 (Damages in the Event of Termination by Company) shall constitute Liquidated Damages under this Article 9 (Liquidated Damages). Seller shall pay such Liquidated Damages upon demand from Company within thirty (30) Days after such demand and in accordance with any applicable provisions of Section 8.2 (Rights and Obligations of the Parties Upon Default). In the event Seller fails to pay Company undisputed amounts of Liquidated Damages due under this Section 9.2(I) (Termination Damages) within thirty (30) Days of receipt of Company’s written demand, Company may set off such undisputed amounts due against payments it is otherwise obligated to make under this Agreement.
(J)    Damages in the Event Seller Fails to Provide Required Models. The amounts payable by Seller under Section 6.b (Remedies) of Attachment B (Facility Owned by Seller) shall constitute Liquidated Damages under this Article 9 (Liquidated Damages). Seller shall pay such Liquidated Damages upon demand from Company within thirty (30) Days after such demand. In the event Seller fails to pay Company undisputed amounts of Liquidated Damages due under this Section 9.2(J) (Damages in the Event Seller Fails to Provide Required Models) within thirty (30) Days of receipt of Company’s written demand, Company may set off such undisputed amounts due against payments it is otherwise obligated to make under this Agreement.
9.3    Damages in the Event of Termination by Company.
(A)    Pre-COD Termination Damages. If the Agreement is terminated by Company in accordance with this Agreement before the Partial Commercial Operation Date due to an Event of Default where Seller is the defaulting Party, Company shall be entitled to liquidated damages in the amount of $500,000 (“Pre-COD Termination Damages”) in addition to any Milestone Delay Damages and Daily Delay Damages paid by Seller.
(B)    Post-COD Termination Damages. If the Agreement is terminated by Company in accordance with this Agreement after the Partial Commercial Operation Date due to an Event of Default where Seller is the defaulting Party, Company shall be entitled to liquidated damages calculated by multiplying the Demonstrated Firm Capacity by $75 per kW (“Post-COD Termination Damages”).

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 9
83


(C)    Liquidated Damages Appropriate. Each Party agrees and acknowledges that (i) the damages that Company would incur due to early termination of the Agreement pursuant to Section 8.2(B) (Right to Terminate; Forward Contract) would be difficult or impossible to predict with certainty, and (ii) the Pre-COD Termination Damages and Post-COD Termination Damages, as applicable, are an appropriate approximation of such damages.
9.4    Other Rights Upon Default. Upon the occurrence of an Event of Default by either Party, the non-defaulting Party, subject to the rights described in this Agreement, including, but not limited to, Section 8.1(C) (Cure Periods and Force Majeure Exceptions), Section 8.2(B) (Right to Terminate; Forward Contract), Section 8.2(C) (Right to Demand Independent Engineering Assessment and Modification), may exercise, at its election, any rights and claim and obtain any remedies it may have at law or in equity, including, but not limited to, compensation for monetary damages, injunctive relief and specific performance.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 9
84


ARTICLE 10 - COMPANY’S USE OF AND ACCESS TO FACILITY
10.1    Entry for Work on Site. Seller shall permit Company, its employees and agents (including but not limited to affiliates and contractors and their employees) to enter upon the Facility, with such prior notice as is reasonable under the circumstances, to take such action as may be necessary in the reasonable opinion of Company to: (i) maintain, inspect, read and test meters and other Company equipment pursuant to Section 13 (Metering) of Attachment Y (Operation and Maintenance of the Facility), and Section 3 (Communications, Telemetering and Generator Remote Control Equipment) of Attachment Y (Operation and Maintenance of the Facility), (ii) interconnect, interrupt (including, but not limited to, operating the manual disconnect device provided by Seller in accordance with Section 4.1(A) (Safety of Persons and/or Property) and Section 1.d (Disconnect Device) of Attachment B (Facility Owned by Seller), monitor or measure electric generation produced at the Facility in accordance with the terms of this Agreement, and (iii) exercise any other rights Company may have under this Agreement.
10.2    Provision of Site Space. Seller shall provide without charge suitable space on the Site for all Company equipment to be placed on the Site under this Agreement. Suitable space as used herein means space appropriate for the intended use with adequate electric power, air conditioning, telecommunication wiring, security, and other necessary building services. In addition, Seller shall provide a means for reasonable access by Company to the Site, also without charge to Company. If Company exercises its rights to have a Company Site Representative under Section 10.5 (Company Site Representative), Seller will provide suitable office space at the Site for such Company Site Representative.
10.3    No Ownership Interest. Neither Seller nor any Financing Party shall acquire any ownership interest or security interest in or lien or mortgage on any equipment installed, owned, and maintained at the Site by Company pursuant to this Agreement, and Company shall have a reasonable time after termination of this Agreement in which to remove such equipment.
10.4    Inspection of Facility Operation.
(A)    Company’s Right to Inspect. Seller shall permit Company, its employees and agents (including but not limited to affiliates and contractors and their employees), from the Execution Date, to enter upon and inspect the Facility and the Facility’s design manuals and drawings, its operating and maintenance manuals, and Seller’s construction, operation and maintenance thereof from time to time, upon reasonable prior notice.
(B)    Correction of Certain Conditions. If Company observes a condition during such inspections which it believes may have an adverse impact on Seller’s ability to fulfill its obligations under this Agreement, Company may make a written request for Seller to correct such condition and Seller shall provide a written report on such condition within thirty (30) Days. If Company disagrees with the Seller’s proposal to remedy the condition, a Qualified Independent Engineering Company will be chosen from the Qualified Independent Engineer’s List pursuant to Section 3.3(B)(1)(b) and the Qualified Independent Engineering Company will

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 10
85


make a recommendation to remedy the situation. The Seller shall abide by the Qualified Independent Engineering Company’s recommendation. Both Parties shall equally share in the cost for the independent engineering assessment. However, Seller shall pay all costs associated with implementing the recommendation. Company’s inspection of Seller’s equipment or operation shall not be construed as endorsing the design thereof nor as any warranty of the safety or reliability of said equipment or operation nor as a waiver of any right by Company.
10.5    Company Site Representative. Company may, at its sole discretion, assign a Company employee or representative as a “Company Site Representative” for the Facility. Such assignment of a Company Site Representative would become effective upon ten (10) Days’ written notice to Seller. Upon the exercise by Company of the rights provided in this Section 10.5 (Company Site Representative), Seller shall provide at no cost to Company suitable office space at the Site for the Company Site Representative to conduct business. Once established, the Company Site Representative shall have free access at all times to any and all operational areas of the Facility. Seller shall comply with any reasonable request of the Company Site Representative for information concerning the design, construction, operation (including fueling) and maintenance of the Facility.





    


EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 10
86


ARTICLE 11 - AUDIT RIGHTS
11.1    Rights of Company. Company shall have the right throughout the Term and for a period of three (3) years following the end of the Term, as extended, upon reasonable prior notice, to audit the books and records of Seller to the limited extent necessary to verify the basis for any claim by Seller for payments from Company or to determine Seller’s compliance with the terms of this Agreement. Company shall not have the right to audit other financial records of Seller. Seller shall make such records available at its offices in Kapolei, the State of Hawai‘i during normal business hours. Company shall pay Seller’s reasonable actual, verifiable costs for such audits, including allocated overhead.
11.2    Rights of Seller. Seller shall have the right throughout the Term and for a period of three (3) years following the end of the Term, as extended, upon reasonable prior notice, to audit the books and related records of Company to the limited extent necessary to verify the basis for charges invoiced by Company to Seller under this Agreement. Seller shall not have the right to audit other records of Company. Company shall make such information available during normal business hours at its offices in Honolulu, the State of Hawai‘i. Seller shall pay Company’s reasonable actual, verifiable costs for such audits, including allocated overheads.


EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 11
87



ARTICLE 12 - REPRESENTATIONS, WARRANTIES AND COVENANTS
12.1    By Seller. Seller represents, warrants and covenants, as of the Execution Date and for extent of the Term, as follows:
(A)    Duly Organized. Seller is a limited partnership duly organized, validly existing and in good standing under the laws of the State of Delaware. Seller has full power, authority and legal right to execute and deliver and perform its obligations under this Agreement. This Agreement has been duly executed and delivered by Seller and constitutes a legal, valid and binding obligation of Seller, enforceable in accordance with its terms, except to the extent that such enforcement may be limited by any bankruptcy, reorganization, insolvency, moratorium or similar laws affecting generally the enforcement of creditors' rights from time to time in effect.
(B)    Land Rights and Governmental Approvals.
(1)    Seller shall obtain all Land Rights and Governmental Approvals necessary for the construction, ownership, operation and maintenance of the Facility and the interconnection of the Facility to the Company System.
(2)    As of the commencement of construction, Seller shall have obtained all Land Rights and Governmental Approvals necessary for the construction, ownership, operation and maintenance of the Facility and the Company-Owned Interconnection Facilities.
(C)    No Conflict. The execution and delivery of, and performance by Seller of its obligations under this Agreement will not result in a violation of, or be in conflict with, any provision of its organizational documents, including, without limitation, its partnership agreement, or result in a violation of, or be in conflict with, or constitute a default or an event which would, with notice or lapse of time, or both, become a default under, any mortgage, indenture, contract, agreement or other instrument to which Seller is a party or by which it or its property is bound, where such violation, conflict, default or potential default would materially adversely affect Seller's ability to perform its obligations under this Agreement, or result in a violation of any statute, rule, order of any court or administrative agency, or regulation applicable to Seller or its property or by which it or its property may be bound, or result in a violation of, or be in conflict with, or result in a breach of, any term or provision of any judgment, order, decree or award of any court, arbitrator or governmental or public instrumentality binding upon Seller or its property, where such violation, conflict, or breach would have a material adverse effect on Seller's ability to perform its obligations under this Agreement.
(D)    No Default. Seller is not in default, and no condition exists which, with notice or lapse of time, or both, would constitute a default by Seller under any mortgage, loan agreement, deed of trust, indenture or other agreement with respect thereto, evidence of indebtedness or other instrument of a material nature, to which it is party or by which it is bound, or in violation of, or in default under, any rule, regulation, order, writ, judgment, injunction or decree of any

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 12
88


court, arbitrator or federal, state, municipal or other governmental authority, commission, board, bureau, agency, or instrumentality, domestic or foreign, where such default, condition or violation would have a material adverse effect on Seller's ability to perform its obligations under this Agreement.
(E)    No Litigation. There is no action, suit, proceeding, inquiry or investigation, at law or in equity, or before or by any court, public board or body, pending against such Seller, or of which Seller has otherwise received official notice, or which to the knowledge of Seller is threatened against Seller, wherein an adverse decision, ruling or finding would have a material adverse effect on Seller's ability to perform its obligations under this Agreement.
(F)    Experience, Qualifications and Resources. Seller has entered into this Agreement in connection with the conduct of its business and it has the experience, qualifications and financial resources necessary to operate and maintain the Facility in accordance with the terms and conditions of this Agreement.
(G)    Substitute Principal. In the event Seller proposes a substitute general partner to avoid an Event of Default under Section 8.1(A)(11)(a), the qualifications of such substitute general partner to carry out the role of General Partner and financial substance shall be reasonably satisfactory to Company; provided further, however, that if Company's grant of consent is dependent upon any valid business consideration not related to the general partner's qualifications or financial substance, Company shall specify such concern to the Seller and shall grant its consent if the Seller provides a general partner which is a reasonably satisfactory substitute meeting such concern.
(H)    Substitute Facility Operator. In the event Seller proposes a substitute Facility Operator to avoid an Event of Default under Section 8.1(A)(11)(b), (i) the substitute Facility Operator shall have the qualifications or has contracted with an entity having the qualifications to operate the Facility in a manner consistent with the terms and conditions of this Agreement and (ii) the substitute Facility Operator shall have the creditworthiness and ability to perform its financial obligations hereunder (including such guarantees as Company deems appropriate) in a manner consistent with the terms and conditions of this Agreement.
(I)    Adequate Fuel Supply. During Seller Supply periods, Seller shall maintain at the Facility a supply of Fuel and other necessary consumables adequate to give Seller the ability to support the operation of the Facility pursuant to the terms and conditions of the Agreement for the Term of the Agreement. During Company Supply periods, Seller shall maintain at the Facility a supply of necessary consumables adequate to give Seller the ability to support the operation of the Facility pursuant to the terms and conditions of the Agreement for the Term of the Agreement.
(J)    [RESERVED]
(K)    Own Account. Seller is acting for its own account and its decision to enter into this Agreement is based upon its own judgment, not in reliance upon the advice or

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 12
89


recommendations of the Company and it is capable of assessing the merits of and understanding, and understands and accepts the terms, conditions and risks of this Agreement. It has not relied upon any promises, representations, statements or information of any kind whatsoever that are not contained in this Agreement in deciding to enter into this Agreement.
(L)    Community Outreach Plan. The Parties acknowledge that, prior to the Execution Date, Seller provided to Company a comprehensive community outreach and communications plan to work with and inform neighboring communities and stakeholders to gain their support for the Project ("Community Outreach Plan").
(1)    General Requirements. Seller agrees to work with the Host Community and neighboring communities and stakeholders and provide them timely information during all phases of the Project, including but not limited to the following information: Project description, Project stakeholders, community concerns and Seller's efforts to address such concerns, Project benefits, Governmental Approvals, Project schedule, plan for reporting construction related updates, labor and prevailing wage commitment (if any), and a Community Outreach Plan which factor in monthly Project status updates. The “Host Community” shall refer generally to the residential community in the immediate vicinity of the Project that would be affected by the ongoing development, construction, operation and maintenance of the Project, including but not limited to increased traffic, construction noise, odors, dust and debris, modified or affected view planes and other environmental effects. Seller’s determination of the Host Community shall be subject to review by Company to ensure that the Host Community has been satisfactorily identified and that the benefits of Seller’s Community Benefits Program are targeting specific needs identified by the Host Community.
(2)    Community Benefits Program. Seller’s Community Outreach Plan shall also include Seller’s plan for the creation of the mandatory community benefits package (the "Community Benefits Program") required under the RFP.
(a)    The Community Benefits Program shall be designed to specifically benefit the needs identified by the Host Community affected by the Project by addressing the Host Community’s identified needs, including but not limited to, one or more of the following: infrastructure improvements, enhanced educational opportunities, jobs and job training, historical and/or cultural protection, neighborhood beautification, identified mitigation of Project effects on the Host Community, and any other similar community benefit. Any material revision(s) to the Community Benefits Program (from that proposed in Seller’s RFP Proposal, with appropriate modifications and supplements thereto agreed to by the Parties prior to the Execution Date) shall be subject to Company’s prior review and approval before implementation and funding by Seller.
(b)    Seller shall implement the Community Benefits Program no later than six (6) months after the Partial Commercial Operation Date, with the requirement that decisions on the community benefits and distribution of the first annual payment of funds be completed no later than six (6) months after program implementation.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 12
90


(c)    Annually, Seller shall re-fund the Community Benefits Program with the required amount even if all or any portion of prior year’s funds remains to be distributed. The annual funding amount for Seller’s Community Benefit Program shall be no less than $3,000 per MW per year of Contract Firm Capacity applicable during Commercial Operation, provided however, that proposals may commit to fund a higher amount above the applicable minimum at Seller’s option (the "Community Benefits Funding Amount"). With Company’s review and prior approval, other methods and timing of funding the Community Benefits Funding Amount may be proposed provided that such alternative methods do not materially alter or diminish the intended effects of an annual funding requirement. Approval will be at Company’s sole discretion.
(d)    Results of the Community Benefits Program, including but not limited to, disclosure of the community benefit(s) funded, the recipients and amounts distributed and a summary of the community benefit(s) to be expected from such funding, shall be annually reported and publicly available for review at any time on Seller’s website and upon request.
(e)    It shall be Seller’s sole responsibility to ensure that the Community Benefits Program is properly funded by Seller and that funds are distributed for the benefit of the needs identified by the Host Community on a timely basis. The Community Benefits Program shall be subject to audit by Company no more than once every two years during the Term to ensure compliance by Seller, provided, however, that if Company receives credible evidence and/or reports of abuse or neglect of the Community Benefits Program by Seller or any of its partners administering the program (a "Program Complaint"), Company may conduct an immediate audit notwithstanding that a prior audit had been conducted in the year immediately preceding the Program Complaint. Seller shall cooperate with Company’s reasonable requests to Seller in its efforts to complete any audit. Seller shall reimburse Company for actual expenses incurred in completing any audit (whether biennial or as a result of a Program Complaint) of Seller’s Community Benefits Program. Seller shall additionally pay Company for Company’s time and effort, e.g., labor and overhead, to complete an audit necessitated by a Program Complaint.
(f)    If Seller fails to fund any annual funding requirement for the Community Benefits Program, then Seller, upon demand by Company, shall make the required annual funding within thirty (30) Days of Company’s demand. If Seller does not make such funding after demand by Company within the time required, Company shall be entitled to, at Company’s sole option, setoff the funding requirement from amounts due to Seller or draw upon Operating Period Security in the amount necessary so that Company can direct such funds to the Community Benefits Program.
(g)    If an audit discovers and confirms that funds previously distributed under the Community Benefits Program were misused or otherwise not expended for the benefit of the needs identified by the Host Community in accordance with the program, Seller shall, in addition to the annual funding requirement for the next year of the program, also re-fund the program with the amount of the misused funds for reallocation and distribution.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 12
91


(h)    If Seller, with Company’s prior approval, administers its own Community Benefits Program (including any program administered by an affiliate or non-profit foundation of Seller), and it is discovered and confirmed that Seller has not funded its Community Benefits Program and/or has not distributed such funds in accordance with the program (as such may be revised with Company’s prior review and approval) in any year during the Term, Seller shall double its funding to and distribution of funds from the program in the subsequent year. If Seller fails to properly fund or distribute funds in accordance with the program for two (2) years or more, Company may disqualify Seller’s Community Benefits Program and require Seller to administer a new program with a Host Community-based non-profit entity capable of administering a new Community Benefits Program for and on behalf of Seller.
(3)    Seller's Community Outreach Plan is a public document and shall remain available to members of the community on the Seller's website for the Term of this Agreement and upon request. Seller shall also provide Company with links to its Project website and Community Outreach Plan.
(4)    The Parties also acknowledge that, prior to the Execution Date, Seller provided reasonable advance notice and hosted a public meeting for community and neighborhood groups in and around the vicinity of the Project site that provided neighboring community, stakeholders, and the general public with: (i) a reasonable opportunity to learn about the proposed Project; (ii) an opportunity to engage in a dialogue about concerns, mitigation measures, and potential community benefits of the proposed Project; (iii) an update regarding Seller’s cultural impact plan, including any findings made and mitigations identified to-date as part of the Archaeological Literature Review and Field Inspection Report as required by the RFP, and (iv) information concerning the process and/or intent for the public's input and engagement, including advising attendees that they will have thirty (30) Days from the date of said public meeting to submit written comments to Company and/or Seller for inclusion in the Company's submission to the PUC of its application for a satisfactory PUC Approval Order. Seller shall collect all public comments, and then provide Company copies of all comments received in their original, unedited form, along with copies of all comments with personal information redacted and ready for filing. Seller agrees that Company may submit any and all public comments (presented in its original, unedited form) as part of its PUC application for this Project.
(5)    Seller acknowledges and agrees that subsequent to the PUC Submittal Date and prior to the date when the Parties' statements of position are to be filed in the docketed PUC proceeding for this Project, Seller will solicit public comments concerning the Project a second time. Seller will submit to the PUC as part of the docketed PUC proceeding for this Project, any and all public comments (presented in its original, unedited form) received by Company and/or Seller regarding the Project that are not received in time to include as part of the Company's application for a satisfactory PUC Approval Order.
(6)    The Parties acknowledge and agree that Seller is responsible for community outreach and engagement for the Project, and that the public meeting and comment

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 12
92


solicitation process described in this Section 12.1(L) (Community Outreach Plan) do not represent the only community outreach and engagement activities that can or should be performed by Seller.
(a)    Without limitation to the generality of the preceding sentence, Seller agrees to take into account the Project's potential impacts on historical and cultural resources and, at a minimum, Seller shall describe: (i) any valued cultural, historical, or natural resources in the area in question, including the extent to which traditional and customary native Hawaiian rights are exercised in the area; (ii) the extent to which those resources – including traditional and customary native Hawaiian rights – will be affected or impaired by the Project; and (iii) the feasible action, if any, to be taken to reasonably protect native Hawaiian rights if they are found to exist. Seller shall determine and implement such additional means as may be reasonably necessary to share information with and involve the community and neighborhood groups in and around the vicinity of the Facility during the Project planning and development process through the Term of this Agreement and shall timely inform Company of its plans and activities in this regard.
(b)    Seller shall also implement an adequate community outreach and notification process and procedure to notify and engage the surrounding community adjacent to the Facility in the event of any Force Majeure event or other Facility issue which causes or may result in adverse impacts and effects upon such community, including inhabitants, livestock and other property of the community.
(7)    Upon the Execution Date and at all times during the Term of this Agreement, Seller shall designate an individual as the "Seller's Community Representative." The Seller's Community Representative shall be the primary contact between the community and the Seller and shall be available during the Term of this Agreement to receive and answer questions from the community. As of the Execution Date, the Seller's Community Representative shall be:
Name: Ruedi (Hans) Tobler
Contact Information: hans.tobler@kalaeloapartners.com
Seller shall notify Company in writing upon designation of any new Seller's Community Representative.
(M)    Tax Credits. Company acknowledges and agrees that the Federal Refundable Tax Credit and Federal Non-Refundable Tax Credit shall inure to the benefit of the Claiming Entity; provided, however, that regardless of whether or not Seller’s Facility gains any benefit from the Federal Refundable Tax Credit and/or Federal Non-Refundable Tax Credit, Seller expressly acknowledges and agrees that it shall not seek to amend the Energy Charge.
12.2    By Company. Company represents and warrants, as of the Execution Date and for the extent of the Term, as follows:

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 12
93


(A)    Duly Organized. Company is a corporation duly organized, validly existing and in good standing under the laws of the State of Hawaii. Company has full power, authority and legal right to execute and deliver and perform its obligations under this Agreement. This Agreement has been duly authorized, executed and delivered by Company and constitutes a legal, valid and binding obligation of Company, enforceable in accordance with its terms, except to the extent that such enforcement may be limited by any bankruptcy, reorganization, insolvency, moratorium or similar laws affecting generally the enforcement of creditors' rights from time to time in effect.
(B)    No Conflict. The execution and delivery of, and performance by Company of its obligations under this Agreement will not result in a violation of, or be in conflict with, any provision of the articles of incorporation or bylaws of Company, or result in a violation of, or be in conflict with, or constitute a default or an event which would, with notice or lapse of time, or both, become a default under, any mortgage, indenture, contract, agreement or other instrument to which Company is a party or by which it or its property is bound, where such violation, conflict, default or potential default would materially adversely affect Company's ability to perform its obligations under this Agreement, or result in a violation of any statute, rule, order of any court or administrative agency, or regulation applicable to Company or its property or by which it or its property may be bound, or result in a violation of, or be in conflict with, or result in a breach of, any term or provision of any judgment, order, decree or award of any court, arbitrator or governmental or public instrumentality binding upon Company or its property, where such violation, conflict, or breach would have a material adverse effect on Company's ability to perform its obligations under this Agreement.
(C)    No Default. Company is not in default, and no condition exists which, with notice or lapse of time, or both, would constitute a default by Company under any mortgage, loan agreement, deed of trust, indenture or other agreement with respect thereto, evidence of indebtedness or other instrument of a material nature, to which it is party or by which it is bound, or in violation of, or in default under, any rule, regulation, order, writ, judgment, injunction or decree of any court, arbitrator or federal, state, municipal or other governmental authority, commission, board, bureau, agency, or instrumentality, domestic or foreign, where such default, condition or violation would have a material adverse effect on Company's ability to perform its obligations under this Agreement.
(D)    No Litigation. There is no action, suit, proceeding, inquiry or investigation, at law or in equity, or before or by any court, public board or body, pending against such Company, or of which Company has otherwise received official notice, or which to the knowledge of Company is threatened against Company, wherein an adverse decision, ruling or finding would have a material adverse effect on Company's ability to perform its obligations under this Agreement.


EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 12
94


ARTICLE 13 - INDEMNIFICATION
13.1    Indemnification of Company.
(A)    Indemnification Against Third Party Claims. Seller shall indemnify, defend, and hold harmless Company, its successors, permitted assigns, affiliates, controlling persons, directors, officers, employees and agents, including but not limited to contractors, subcontractors and their the employees of any of them (collectively referred to as an "Indemnified Company Party"), from and against any Losses suffered, incurred or sustained by any Indemnified Company Party or to which any Indemnified Company Party becomes subject, resulting from, arising out of, or relating to, any Claim due to any Claim (whether or not well founded, meritorious or unmeritorious) by a third party not controlled by, or under common ownership and/or control with, Company (whether or not well founded, meritorious or unmeritorious) relating to (i) Seller's development, permitting, construction, ownership, operation and/or maintenance of the Facility and Company-Owned Interconnection Facilities (excluding the construction, ownership, operation and/or maintenance of such portion(s) of the Company-Owned Interconnection Facilities constructed by Company); or (ii) any actual or alleged personal injury or death or damage to property, in any way arising out of, incident to, or resulting directly or indirectly from the acts or omissions of any Indemnified Seller Party or its agents or subcontractors, except as and to the extent that any of the foregoing such Loss is attributable to the gross negligence or willful misconduct of an Indemnified Company Party.
(B)    Compliance with Laws. Any Losses incurred by an Indemnified Seller Party for noncompliance by Seller or an Indemnified Seller Party with applicable Laws shall not be reimbursed by Company but shall be the sole responsibility of Seller. Seller shall indemnify, defend and hold harmless each Indemnified Company Party from and against any and all Losses in any way arising out of, incident to, or resulting directly or indirectly from the failure of Seller to comply with any Laws.
(C)    Notice. If Seller shall obtain knowledge of any Claim subject to Section 13.1(A) (Indemnification Against Third Party Claims), Section 13.1(B) (Compliance with Laws) or otherwise under this Agreement, Seller shall give prompt notice thereof to Company, and if Company shall obtain any such knowledge, Company shall give prompt notice thereof to Seller.
(D)    Indemnification Procedures.
(1)    Notice. In case any Claim subject to Section 13.1(A) (Indemnification Against Third Party Claims) or Section 13.1(B) (Compliance with Laws) or otherwise under this Agreement, shall be brought against an Indemnified Company Party, Company shall notify Seller of the commencement thereof and, provided that Seller has acknowledged in writing to Company its obligation to an Indemnified Company Party under this Section 13.1 (Indemnification of Company), Seller shall be entitled, at its own expense, acting through counsel acceptable to Company, to participate in and, to the extent that Seller desires, to assume and control the defense thereof; provided, however, that Seller shall not compromise or settle a

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 13
95


Claim against an Indemnified Company Party without the prior written consent of Company which consent shall not be unreasonably withheld.
(2)    No Right to Assume. Seller shall not be entitled to assume and control the defense of any such Claim subject to Section 13.1(A) (Indemnification Against Third Party Claims), Section 13.1(B) (Compliance with Laws) or otherwise under this Agreement, if and to the extent that, in the opinion of Company, such Claim involves the potential imposition of criminal liability on an Indemnified Company Party or a conflict of interest between an Indemnified Company Party and Seller, in which case Company shall be entitled, at its own expense, acting through counsel acceptable to Seller to participate in any Claim, the defense of which has been assumed by Seller. Company shall supply, or shall cause an Indemnified Company Party to supply, Seller with such information and documents requested by Seller as are necessary or advisable for Seller to possess in connection with its participation in any Claim to the extent permitted by this Section 13.1(D)(2) (No Right to Assume). Company shall not enter and shall restrict any Indemnified Company Party from entering, into any settlement or other compromise with respect to any Claim without the prior written consent of Seller, which consent shall not be unreasonably withheld or delayed.
(3)    Subrogation. Upon payment of any Losses by Seller pursuant to this Section 13.1 (Indemnification of Company) or other similar indemnity provisions contained herein to or on behalf of Company, Seller, without any further action, shall be subrogated to any and all claims that an Indemnified Company Party may have relating thereto.
(4)    Cooperation. Company shall fully cooperate and cause all Indemnified Company Parties to fully cooperate, in the defense of or response to any Claim subject to Section 13.1 (Indemnification of Company).
13.2    Indemnification of Seller.
(A)    Indemnification Against Third Party Claims. Company shall indemnify, defend, and hold harmless Seller, its successors, permitted assigns, affiliates, controlling persons, directors, officers, employees and agents, including but not limited to contractors, subcontractors and their employees of any of them (collectively referred to as an "Indemnified Seller Party"), from and against any Losses suffered, incurred or sustained by any Indemnified Seller Party or to which any Indemnified Seller Party becomes subject, resulting from, arising out of, or relating to, due to any Claim by a third party not controlled by or under common ownership and/or control with Seller (whether or not well founded, meritorious or unmeritorious) relating to (i) the construction, ownership, operation, and/or maintenance of such portion(s) of the Company-Owned Interconnection Facilities constructed by Company and (ii) any actual or alleged personal injury or death or damage to property, in any way arising out of, incident to, or resulting directly or indirectly from the acts or omissions of any Indemnified Company Party, except to the extent that any such Loss is attributable to the negligence or willful misconduct of an Indemnified Seller Party.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 13
96


(B)    Compliance with Laws. Any Losses incurred by an Indemnified Company Party for noncompliance by Company or an Indemnified Company Party with applicable Laws shall not be reimbursed by Seller but shall be the sole responsibility of Company. Company shall indemnify, defend and hold harmless each Indemnified Seller Party from and against any and all Losses in any way arising out of, incident to, or resulting directly or indirectly from the failure of Company to comply with any Laws.
(C)    Knowledge of Claim. If Company shall obtain knowledge of any Claim subject to Section 13.2(A) (Indemnification Against Third Party Claims), Section 13.2(B) (Compliance with Laws) or otherwise under this Agreement, Company shall give prompt notice thereof to Seller, and if Seller shall obtain any such knowledge, Seller shall give prompt notice thereof to Company.
(D)    Indemnification Procedures.
(1)    Notice. In case any action, suit or proceeding subject to Section 13.2(A) (Indemnification Against Third Party Claims), Section 13.2(B) (Compliance with Laws) or otherwise under this Agreement, shall be brought against an Indemnified Seller Party, Seller shall notify Company of the commencement thereof and, provided that Company has acknowledged in writing to Seller its obligation to an Indemnified Seller Party under this Section 13.2 (Indemnification of Seller), Company shall be entitled, at its own expense, acting through counsel acceptable to Seller, to participate in and, to the extent that Company desires, to assume and control the defense thereof, provided, however, Company shall not compromise or settle a Claim against an Indemnified Seller Party without the prior written consent of Seller which consent shall not be unreasonably withheld.
(2)    Assumption and Control of Defense. Company shall not be entitled to assume and control the defense of any such Claim subject to Section 13.2(A) (Indemnification Against Third Party Claims), Section 13.2(B) (Compliance with Laws), or otherwise under this Agreement, if and to the extent that, in the opinion of Seller, such Claim involves the potential imposition of criminal liability on an Indemnified Seller Party or a conflict of interest between an Indemnified Seller Party and Company, in which case Seller shall be entitled, at its own expense, acting through counsel acceptable to Company, to participate in any Claim the defense of which has been assumed by Company. Seller shall supply, or shall cause an Indemnified Seller Party to supply, Company with such information and documents requested by Company as are necessary or advisable for Company to possess in connection with its participation in any Claim, to the extent permitted by this Section 13.2(D)(2) (Assumption and Control of Defense). Seller shall not enter and shall restrict any Indemnified Seller Party from entering, into any settlement or other compromise with respect to any Claim without the prior written consent of Company, which consent shall not be unreasonably withheld or delayed.
(3)    Subrogation. Upon payment of any Losses by Company pursuant to this Section 13.2 (Indemnification of Seller) or other similar indemnity provisions contained herein to or on behalf of Seller, Company, without any further action, shall be subrogated to any and all claims that an Indemnified Seller Party may have relating thereto.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 13
97


(4)    Cooperation. Seller shall fully cooperate and cause all Indemnified Seller Parties to fully cooperate, in the defense of or response to any Claim subject to Section 13.2 (Indemnification of Seller).


EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 13
98


ARTICLE 14 - CONSEQUENTIAL DAMAGES
Neither Party shall be liable for damages incurred by the other Party for any loss of profit or revenues, loss of product, loss of use of products or services or associated equipment, interruption of business, cost of capital, downtime costs, increased operating costs, or for any special, consequential, incidental, indirect or punitive damages; provided, however, that nothing in this Article 14 (Consequential Damages) shall limit any of (i) the indemnification obligations of either Party under Article 13 (Indemnification) of this Agreement, (ii) the liability of either Party for liquidated damages as set forth in this Agreement, (iii) the liability of either Party for direct damages for breach of this Agreement as and to the extent such damages have not been liquidated as set forth in this Agreement or (iv) the liability of either Party for gross negligence or intentional misconduct.



EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 14
99


ARTICLE 15 - INSURANCE
15.1    Required Coverage. Seller, and anyone acting under its direction or control or on its behalf, shall, at its own expense, acquire and maintain, or cause to be maintained in full effect, commencing with the start of construction of the Facility, as applicable, and continuing throughout the Term, as applicable, the minimum insurance coverage set forth in Attachment R (Required Insurance), or such higher amounts as the Seller and/or the Facility Lender reasonably determine to be necessary during construction and operation of the Facility. The insurance coverage required hereunder shall provide that it is primary with respect to Seller and Company. Seller's indemnity and other obligations shall not be limited by the foregoing insurance requirements.
15.2    Waiver of Subrogation. Seller, and anyone acting under its direction or control or on its behalf, shall cause its insurers to waive all rights of subrogation which Seller or its insurers may have against Company, Company’s agents, or Company’s employees.
15.3    Additional Insureds. The insurance policies specified in Section 2 (General Liability Insurance) and Section 3 (Automobile Liability Insurance) of Attachment R (Required Insurance) shall include Company as an additional insured, as its interest may appear, with respect to any and all third party bodily injury and/or property damage claims arising from Seller’s performance of this Agreement and Seller shall submit to Company a copy of such additional insured endorsement with evidence of insurance as required herein. Seller shall promptly, and in no event later than five (5) Days after such cancellation, modification or non-renewal, provide written notice to Company should any of the insurance policies required under this Agreement be cancelled, materially modified, or not renewed upon expiration. Company acknowledges that Facility Lender shall be entitled to receive and distribute any and all loss proceeds as stipulated by any Financing Documents related to any policy described in this Article 15 (Insurance) and Attachment R (Required Insurance).
15.4    Evidence of Policies Provided to Company. Evidence of insurance for the coverage specified in this Article 15 (Insurance) shall be provided to Company within thirty (30) Days after Seller has bound coverage of the related policies or by the date specified in Section 2.3(A) (Seller’s Facility Conditions Precedent), whichever is later. Within thirty (30) Days of any change of any policy and upon renewal of any policy Seller shall provide certificates of insurance to Company. During the Term, Seller, upon Company’s reasonable request, shall make available to Company for its inspection at Seller’s designated location, certified copies of the insurance policies described in this Article 15 (Insurance) and Attachment R (Required Insurance). Receipt of any evidence of insurance showing less coverage than requested is not a waiver of Seller's obligations to fulfill the requirements.
15.5    Deductibles. Company acknowledges that any policy required herein may contain reasonable deductibles or self-insured retentions, the amounts of which will be reviewed for acceptance by Company. Acceptance will not be unreasonably withheld. Any deductible shall be the responsibility of Seller.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 15
100


15.6    Application of Proceeds from All Risk Property/Comprehensive Mechanical and Electrical Breakdown Insurance. Seller shall use commercially reasonable efforts to obtain provisions in the Financing Documents, on reasonable terms, providing for the insurance proceeds from All Risk Property/Comprehensive Mechanical and Electrical Breakdown Insurance to be applied to repair of the Facility.
15.7    Annual Review by Company. The coverage limits shall be reviewed annually by Company and if, in Company's discretion, Company determines that the coverage limits should be increased, Company shall so notify Seller. The amount of any increase of the coverage limits, when considered as a percentage of the then existing coverage limits, shall not exceed the cumulative amount of increase in the Consumer Price Index occurring after the coverage limits herein were last set. Seller shall within thirty (30) Days of notice from Company increase the coverage as directed in such notice and the costs of such increased coverage limits shall be borne by Seller.
15.8    No Representation of Coverage Adequacy. By requiring insurance herein, Company does not represent that coverage and limits will necessarily be adequate to protect Seller, and such coverage and limits shall not be deemed as a limitation on Seller's liability under the indemnities granted to Company in this Agreement.
15.9    Subcontractors. Seller shall ensure that (a) its EPC Contractor is separately covered by liability insurance policies equivalent in type and monetary limits as those required of Seller, as specified in Attachment R (Required Insurance) excluding, however, the Failure to Supply endorsement required under Section 2(i)(h) of Attachment R (Required Insurance); and (b) its EPC Contractor has required each of its subcontractors performing tasks directly related to the engineering, procurement, construction, energizing, pre-Partial Commercial Operation and pre-Commercial Operation testing and/or commissioning of the Facility are covered by insurance policies in type and in monetary amounts appropriate for the type of work such subcontractor is performing, including commercial general liability insurance that shall not be less than the greater of $500,000 or the value of work to be performed by such subcontractor. All such insurance shall be provided at the sole cost of Seller or EPC Contractor or its aforementioned subcontractors.
15.10    General Insurance Requirements.
(A)    Each policy and certificate of insurance shall also specifically provide the following: "This policy shall be considered to be primary liability insurance which shall apply to any loss or claim before any contribution by any insurance which Company, its employees and/or agents may have in force."
(B)    Each policy is to be written by an insurer with a rating by A.M. Best Company, Inc. of "A-VII" or better.
(C)    If any policy required herein is written on a claims-made basis, the Seller warrants that any retroactive date applicable to coverage under the policy precedes the Execution Date;

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 15
101


and that continuous coverage will be maintained, or an extended discovery period will be exercised for a period of three (3) years beginning from the end of Term
(D)    If the limits of available liability coverage required herein become substantially reduced as a result of claim payments, Seller shall promptly, and in no event later than thirty (30) Days after such substantial reduction, at its own expense, purchase additional liability insurance (if such coverage is available at commercially reasonable rates) to increase the amount of available coverage to the limits of liability coverage required herein.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 15
102


ARTICLE 16 - SET OFF
Company shall have the right to set off any payment due and owing by Seller, including but not limited to any payment due under this Agreement and any amounts due as awarded in any action pursuant to this Agreement, against Company's payments of subsequent Monthly Invoices as necessary.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 16
103


ARTICLE 17 - DISPUTE RESOLUTION
17.1    Good Faith Negotiations. Except as otherwise expressly set forth in this Agreement, before submitting any claims, controversies or disputes (“Dispute(s)”) under this Agreement to the Dispute Resolution Procedures set forth in Section 17.2 (Dispute Resolution Procedures), the presidents, vice presidents, General Manager or authorized delegates from both Seller and Company having full authority to settle the Dispute(s), shall personally meet in Hawai‘i and attempt in good faith to resolve the Dispute(s) (the “Management Meeting”).
17.2    Dispute Resolution Procedures.
(A)    Mediation. Except as otherwise expressly set forth in this Agreement and subject to Section 17.1 (Good Faith Negotiations), any and all Dispute(s) arising out of or relating to this Agreement, (i) which remain unresolved for a period of twenty (20) Days after the Management Meeting takes place or (ii) for which the Parties fail to hold a Management Meeting within sixty (60) Days of the date that a Management Meeting was requested by a Party, may upon the agreement of the Parties, first be submitted to confidential mediation in Honolulu, Hawai‘i pursuant to the administration by, and in accordance with the Mediation Rules, Procedures and Protocols of, Dispute Prevention & Resolution, Inc. (or its successor) or, in their absence, the American Arbitration Association (“DPR”) then in effect. If the Parties agree to submit the Dispute to confidential mediation, the parties shall each pay 50% of the cost of the mediation (i.e., the fees and expenses charged by the mediator and DPR) and shall otherwise each bear their own costs and attorney’s fees. If the Parties do not submit the Dispute(s) to mediation, or if they do submit the Dispute(s) to mediation but settlement of the Dispute(s) is not reached within 60 Days after commencement of the mediation, either Party may initiate legal proceedings in a court of competent jurisdiction in the State of Hawai‘i subject to Section 25.9 (Governing Law, Jurisdiction and Venue) herein.
(B)    Procedures for Appointing a Mediator. The Parties hereby agree that the choice of mediator, process and procedure for the mediation and any desired outcome from the mediation shall be as the Parties agree in conjunction with their agreement to enter into a mediation. If the Parties cannot agree upon such matters within sixty (60) Days (or as the Parties may subsequently agree), either Party may withdraw from the mediation process and proceed to initiate formal action in a court of competent jurisdiction in the State of Hawai‘i subject to Section 25.9 (Governing Law, Jurisdiction and Venue) herein.
17.3    Exclusion. The provisions of this Article 17 (Dispute Resolution) shall not apply to any disputes within the authority of an Independent Evaluator under Article 24 (Process for Addressing Revisions to Performance Standards) or under Section 9 (Dispute) of Attachment AA (Renewable Portfolio Standards and Emissions).

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 17
104


ARTICLE 18 - FORCE MAJEURE
18.1    Definition of Force Majeure. The term “Force Majeure” as used in this Agreement means any occurrence that:
(A)    In whole or in part delays or prevents a Party’s performance under this Agreement;
(B)    Is not the direct or indirect result of the fault or negligence of that Party;
(C)    Is not within the control of that Party notwithstanding such Party having taken all reasonable precautions and measures in order to prevent or avoid such event; and
(D)    The Party has been unable to overcome by the exercise of due diligence.
18.2    Events That Could Qualify as Force Majeure. Subject to the foregoing, events that could qualify as Force Majeure include, but are not limited to, the following:
(A)    acts of God, flooding, lightning, landslide, earthquake, fire, drought, explosion, epidemic, pandemic, quarantine, storm, hurricane, tornado, volcano, other natural disaster or unusual or extreme adverse weather related events;
(B)    war (declared or undeclared), riot or similar civil disturbance, acts of the public enemy (including acts of terrorism), sabotage, blockade, insurrection, revolution, expropriation or confiscation; or
(C)    except as set forth in Section 18.3(A), strikes, work stoppage or other labor disputes (in which case the affected Party shall have no obligation to settle the strike or labor dispute on terms it deems unreasonable).
18.3    Exclusions From Force Majeure. Force Majeure does not include:
(A)    A strike work stoppage or labor dispute limited only to any one or more of the Indemnified Seller Parties or any other third party employed by Seller to work on the Project;
(B)    any acts or omissions of any third party, including, without limitation, any vendor, materialman, customer, or supplier of Seller, unless such acts or omissions are themselves caused by an event of Force Majeure as herein defined;
(C)    any full or partial reduction in the electric output of the Facility that is caused by or arises from (1) a mechanical or equipment breakdown or (2) other mishap or events or conditions attributable to normal wear and tear or defects;
(D)    changes in market conditions that affect the cost of the Seller’s supplies, or that affect demand or price for any of Seller’s products, or that otherwise render this Agreement uneconomic or unprofitable for the Seller;

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 18
105


(E)    Seller’s inability to obtain Governmental Approvals, Land Rights or approvals of any type for the construction, ownership, operation, or maintenance of the Facility and the Company-Owned Interconnection Facilities, or Seller’s loss of any such Governmental Approvals or Land Rights once obtained, except, in the case of Seller’s inability to obtain Governmental Approvals, such inability is attributable solely to the Governmental Authority responsible for issuing such approval where Seller has provided satisfactory evidence that: (i) all commercially reasonable measures have been taken by Seller to timely apply for such Governmental Approval and to timely respond to questions, revisions and clarifications required by such Governmental Authority in connection with such Governmental Approval; and (ii) all required information, requirements and conditions necessary to issue such Governmental Approval have been met;
(F)    [RESERVED]
(G)    During Seller Supply periods, Seller’s inability to obtain sufficient Fuel, necessary consumables, power or materials to operate the Facility, except if Seller’s inability to obtain sufficient Fuel, necessary consumables, power or materials is caused by an event of Force Majeure as herein defined;
(H)    During Company Supply periods, Seller’s inability to obtain sufficient necessary consumables, power or materials (other than Fuel) to operate the Facility, except if Seller’s inability to obtain sufficient necessary consumables, power or materials (other than Fuel) is caused by an event of Force Majeure as herein defined;
(I)    Seller’s failure to obtain additional funds, including funds authorized by a state or the federal government or agencies thereof, to supplement the payments made by the Company pursuant to this Agreement;
(J)    a Forced Outage except where such Forced Outage is caused by an event of Force Majeure as herein defined;
(K)    litigation or administrative or judicial action pertaining to this Agreement, the Site, Land Rights, the Facility, any Governmental Approvals, or the design, construction, ownership, maintenance or operation of the Facility, the Company-Owned Interconnection Facilities or the Company System; or
(L)    any full or partial reduction in either the ability of the Facility to deliver its Demonstrated Firm Capacity or in the ability of the Company to accept the Demonstrated Firm Capacity which is caused by any action or inaction of a third party, including but not limited to any vendor or supplier of the Seller or the Company, except to the extent such action or inaction is caused by an event of Force Majeure.
18.4    Satisfaction of Certain Conditions. Section 18.5 (Effect of Force Majeure on Milestone Dates and Commercial Operation Date Deadlines), Section 18.6 (Effect of Force Majeure on Other Events of Default) and Section 18.7 (Effect of Force Majeure) defer or limit certain

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 18
106


liabilities of a Party for delay and/or failure in performance to the extent such delay or failure is the result of conditions or events of Force Majeure; provided, however, that a non-performing Party is only entitled to such limitations or deferrals of liabilities as and to the extent the following conditions are satisfied:
(A)    The non-performing Party gives the other Party, within five (5) Days after the non-performing Party becomes aware or should have become aware of the Force Majeure condition or event, but in any event no later than thirty (30) Days after the Force Majeure condition or event begins, written notice (the “Force Majeure Notice”) stating that such non-performing Party considers such condition or event to constitute a Force Majeure and, describing the particulars of such Force Majeure condition or event, including the date the Force Majeure commenced;
(B)    The non-performing Party gives the other Party, within fourteen (14) Days after the Force Majeure Notice was or should have been provided, a written explanation of the Force Majeure condition or event and its effect on the non-performing Party's performance, which explanation shall include evidence reasonably sufficient to establish that the occurrence constitutes Force Majeure;
(C)    The suspension of performance is of no greater scope and of no longer duration than is required by the Force Majeure;
(D)    The non-performing Party exercises commercially reasonable efforts to remedy its inability to perform and provides weekly progress reports to the other Party describing actions taken to end or minimize the effects of the Force Majeure and the anticipated duration of the Force Majeure; and
(E)    When the condition or event of Force Majeure ends and the non-performing Party is able to resume performance of its obligations under this Agreement, such Party shall give the other Party written notice to that effect.
18.5    Effect of Force Majeure on Milestone Dates and Commercial Operation Date Deadlines. A Force Majeure affecting the achievement of a Milestone Date, including the Partial Commercial Operation Date Deadline or the Commercial Operation Date Deadline, shall not relieve Seller from liability for either, (1) any applicable Daily Delay Damages under Section 2.4(D)(1) (Damages) or (2) Termination Damages for early termination under Section 2.4(D)(2) (Termination Right), although such Force Majeure shall, if and for so long as the conditions of Section 18.4 (Satisfaction of Certain Conditions) are satisfied, have the effect of deferring such liabilities to the extent of the applicable grace period (if any) provided in Section 2.4(B) (Construction Milestones Extensions).
18.6    Effect of Force Majeure on Other Events of Default. If an occurrence of Force Majeure results in what would otherwise be deemed an Event of Default under Section 8.1 (Events of Default), no Event of Default shall be deemed to have occurred if and for so long as the conditions set forth in Section 18.4 (Satisfaction of Certain Conditions) are satisfied, as long as

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 18
107


the condition or event that would otherwise be an Event of Default is cured within the lesser of (i) the duration of the Force Majeure plus any additional time reasonably necessary to remedy the effects of the Force Majeure or (ii) three hundred sixty-five (365) Days from the occurrence or inception of the Force Majeure, as noticed pursuant to Section 18.4(A).
18.7    Effect of Force Majeure. Other than as provided in Section 18.5 (Effect of Force Majeure on Milestone Dates and Commercial Operation Date Deadlines) and Section 18.6 (Effect of Force Majeure on Other Events of Default), neither Party shall be responsible or liable for any delays or failures in its performance under this Agreement as and to the extent (i) such delays or failures are substantially caused by conditions or events of Force Majeure, and (ii) the conditions of Section 18.4 (Satisfaction of Certain Conditions) are satisfied.

18.8    Obligations Remaining After Event of Force Majeure. No monetary obligations of either Party which arose before the occurrence of an event of Force Majeure causing the suspension of performance shall be excused as a result of such occurrence. In the event of a Force Majeure which (a) reduces or limits the Facility’s capability to deliver capacity and/or energy or (b) reduces or limits Company’s capability to accept and purchase energy, Company shall be not be obligated to pay for capacity and/or energy so long as the event of Force Majeure prevents the delivery of capacity and/or energy by Seller or prevents acceptance and purchase of capacity and/or energy by Company. Except as otherwise expressly provided for in this Agreement, the existence of a condition or event of Force Majeure shall not relieve the Parties of their obligations under this Agreement (including, but not limited to, payment obligations, except as limited above) to the extent that performance of such obligations is not precluded by the condition or event of Force Majeure.
18.9    No Extension of the Term. In no event will any delay or failure of performance caused by any conditions or events of Force Majeure extend this Agreement beyond its stated Term.
18.10    Termination for Force Majeure. If Force Majeure delays or prevents a Party's performance for more than three hundred sixty-five (365) Days from the occurrence or inception of the Force Majeure, as stated in the Force Majeure Notice, and such delay or failure of performance would have otherwise constituted an Event of Default under Article 8 (Default), the other Party shall have the right to terminate this Agreement by written notice. Such notice shall designate the date such termination is to be effective, which date shall be no later than thirty (30) Days after such notice is deemed to be received by the Party whose performance has been delayed or prevented. In the event of termination pursuant to this Section 18.10 (Termination for Force Majeure), neither Party shall be liable for any damages or have any obligations to the other, except as provided in Section 25.23 (Survival of Obligations) other than as provided in Section 25.23(E).

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 18
108


ARTICLE 19 - ELECTRIC SERVICE SUPPLIED BY COMPANY
This Agreement does not provide for any electric services by Company to Seller. If Seller requires any electric services from Company, Company shall provide such service on a non-discriminatory basis in accordance with Company’s applicable tariff schedule, as of the Partial Commercial Operation Date Deadline, as amended or revised from time to time by Company or successors thereof.



EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 19
109


ARTICLE 20 - TRANSFERS, ASSIGNMENTS AND FINANCING DEBT
20.1    Assignment by Seller. This Agreement may not be assigned by Seller without the prior written consent of Company (such consent not to be unreasonably withheld, conditioned or delayed), provided that Seller shall have the right, without the consent of Company, to assign its interest in this Agreement (i) to a wholly-owned subsidiary or to an affiliated company under common control with Harbert Pacific Holdings, LLC, a Delaware limited liability company, provided that such assignment does not impair the ability of Seller to perform its obligations under this Agreement; and (ii) as collateral security for purposes of arranging or rearranging debt and/or equity financing for the Facility, or for sale-leaseback financing, to assign all or any part of its rights or benefits, but not its obligations, to any lender providing debt financing for the Facility. Seller shall promptly provide written notice to Company of any assignment of all or part of this Agreement and Seller shall provide to Company information about the assignee and the assignee's operational experience reasonably requested by Company. Company shall not be required to incur any duty or obligation as a result of, or in connection with, such assignment made without its consent beyond those duties and obligations set forth in this Agreement, unless otherwise agreed to by Company in writing.
20.2    Company's Consent and Acknowledgment. In connection with any assignment relating to the Financing Debt to which Company consents pursuant to Section 20.1 (Assignment by Seller), Company shall, if requested by Seller and if its reasonable costs (including internal staff time and legal fees of outside counsel) in responding to such request are paid by Seller, execute and deliver on or before the Closing Date a consent to assignment of this Agreement and other related agreements (“Consent to Assignment”) as may be reasonably requested by such Facility Lender. The Consent to Assignment shall (i) be governed by Hawai‘i law; (ii) be in form and content reasonably satisfactory to Company; (iii) acknowledge the assignment and/or pledge/mortgage and the right of the Facility Lender to receive notice of Events of Default where Seller is the defaulting party; and (iv) provide the Facility Lender a reasonable opportunity to cure such Events of Default and to exercise remedies to assume Seller's obligations under this Agreement.
20.3    Financing Document Requirements. Seller shall include in the terms of the Financing Documents, as provisions for Company's benefit, to provide that, as a condition to the Facility Lender, or any purchaser, successor, assignee and/or designee of the Facility Lender ("Subsequent Owner"), succeeding to ownership or possession of the Facility as a result of the exercise of remedies under the Financing Documents, and thereafter operating the Facility to generate electric energy, such Facility Lender or Subsequent Owner shall, prior to operating the Facility for such purpose, have provided to Company, evidence reasonably acceptable to Company that such Subsequent Owner has (a) the qualifications, or has contracted with an entity having the qualifications, to operate the Facility in a manner consistent with the terms and conditions of this Agreement; and (b) assumed all of Seller's rights and obligations under this Agreement.
20.4    Reimbursement of Company Costs. Seller shall reimburse Company for costs and expenses incurred by Company (including reasonable attorneys' fees of outside counsel) in

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 20
110


responding to a Facility Lender's requests or as a result of any event of default by Seller under the Financing Documents, including but not limited to any assumption of Seller's obligations under Section 20.3 (Financing Document Requirements).

20.5    Assignment by Company. This Agreement shall not be assignable by Company without the prior written consent of Seller (which consent shall not be unreasonably withheld, conditioned or delayed); provided, however, that Company shall have the right, without the consent of Seller, to assign its interest in this Agreement to any affiliated company owned in whole or in part by Hawaiian Electric Industries, Inc. (“HEI”) so long as such assignee (a) shall have assumed all obligations of Company under this Agreement; and (b) is a utility regulated by the PUC.
20.6    Binding on Assigns. This Agreement and all of its covenants, terms and provisions shall be binding upon and shall inure to the benefit of and be enforceable by the Parties and their respective successors and assigns.
20.7    Transfer Without Consent is Null and Void. Any attempt to make any pledge, mortgage, grant of a security interest or collateral assignment for which consent is required under Section 20.1 (Assignment by Seller) or Section 20.5 (Assignment By Company), as applicable, without fulfilling the requirements of this Article 20 (Transfers, Assignments and Financing Debt) shall be null and void and shall constitute an Event of Default pursuant to Article 8 (Default).


EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 20
111


ARTICLE 21 - SALE OF FACILITY BY SELLER
    Seller shall comply with the requirements of Attachment P (Sale of Facility by Seller) before Seller's right, title or interest in the Facility, in whole or in part, including a Change in Control, may be disposed of (other than the disposition of equipment in the ordinary course of operating and maintaining the Facility). Any attempt by Seller to make any such disposition or Change in Control without fulfilling the requirements of Attachment P (Sale of Facility by Seller) shall be deemed null and void and shall constitute an Event of Default pursuant to Article 8 (Default).

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 21
112


ARTICLE 22 - SALE OF ENERGY TO THIRD PARTIES
Seller shall not sell any energy from the Facility to any Third Party; provided, that if during the Term, Seller is requested by Par (or a successor entity) to provide steam for use in its refinery operations, and Seller desires to do so, Seller shall so notify Company and Company and Seller agree to review such request and the terms under which Seller can produce and provide steam to Par. Notwithstanding the foregoing, neither Company nor Seller shall be under any obligation to agree to any amendment to this Agreement that allows Seller to sell steam to any Third Party.







EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 22
113


ARTICLE 23 - EQUAL EMPLOYMENT OPPORTUNITY
23.1    Equal Employment Opportunity. (Applicable to all contracts of $10,000 or more in the whole or aggregate. 41 CFR 60-1.4 and 41 CFR 60-741.5.) Seller is aware of and is fully informed of Seller's responsibilities under Executive Order 11246 (reference to which include amendments and orders superseding in whole or in part) and shall be bound by and agrees to the provisions as contained in Section 202 of said Executive Order and the Equal Opportunity Clause as set forth in 41 CFR 60-1.4 and 41 CFR 60-741.5(a), which clauses are hereby incorporated by reference.
23.2    Equal Opportunity for Disabled Veterans, Recently Separated Veterans, Other Protected Veterans and Armed Forces Service Medal Veterans. (Applicable to (i) contracts of $25,000 or more entered into before December 31, 2003 (41 CFR 60-250.4) or (ii) each federal government contract of $100,000 or more, entered into or modified on or after December 31, 2003 (41 CFR 60 300.4) for the purchase, sale or use of personal property or nonpersonal services (including construction).) If applicable to Seller under this Agreement, Seller agrees that is, and shall remain, in compliance with the rules and regulations promulgated under The Vietnam Era Veterans Readjustment Assistance Act of 1974, as amended by the Jobs for Veterans Act of 2002, including the requirements of 41 CFC 60-250.5(a) (for orders/contracts entered into before December 31, 2003) and 41 CFR 60-300.5(a) (for orders/contracts entered into or modified on or after December 31, 2003) which are incorporated into this Agreement by reference.


EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 23
114


ARTICLE 24 - PROCESS FOR ADDRESSING REVISIONS
TO PERFORMANCE STANDARDS
24.1    Revisions to Performance Standards. The Parties acknowledge that, during the Term, certain Performance Standards may be revised or added to facilitate necessary improvements in integrating intermittent renewable energy resources into the Company System and operations. Such revisions or additions may be attributable to, without limitation, the following: changes in penetration levels of intermittent renewable resources on the Company System, changes to the state of commercially available technology, changes to Company-owned generation resources, changes in customer electrical usage (such as changes in average hourly load profiles), and changes in Laws (e.g., new environmental constraints, which may limit Company's ability to start/stop its generators in response to integration of intermittent generation, or constraints impacting the power quality standards for and/or operation of the Company System, such as constraints imposed by the HERA Law or by the PUC under the HERA Law). Changes in Facility characteristics achieved through control system configuration, settings, or other tunable parameters shall not be considered a revision to performance standards. These types of changes should be implemented by Seller in response to Company request unless it can be shown that the changes negatively impact Seller’s ability to meet its obligations under this Agreement.
24.2    Performance Standards Information Request. If Company concludes that a Performance Standards Revision is necessary or important for the operation of the Company System and is capable of being complied with by Seller, Company shall have the right to issue to Seller a Performance Standards Information Request with respect to such Performance Standards Revision. Seller shall, within a reasonable period of time following Seller's receipt of such Performance Standards Information Request, but in no event more than ninety (90) Days after Seller's receipt of such Request (or such other period of time as Company and Seller may agree in writing), submit to Company a Performance Standards Proposal responsive to the Performance Standards Revision proposed in such Performance Standards Information Request.
24.3    Performance Standards Proposal. Upon receipt of a Performance Standards Proposal submitted in response to a Performance Standards Information Request, Company will evaluate such Performance Standards Proposal and Seller shall assist Company in performing such evaluation as and to the extent reasonably requested by Company (including, but not limited to, providing such additional information as Company may reasonably request and participating in meetings with Company as Company may reasonably request). Company shall have no obligation to evaluate a Performance Standards Proposal submitted at Seller's own initiative.
24.4    Performance Standards Revision Document. If, following Company's evaluation of a Performance Standards Proposal, Company desires to consider implementing the Performance Standards Revision addressed in such Proposal, Company shall provide Seller with written notice to that effect, such notice to be issued to Seller within one hundred eighty (180) Days of receipt of the Performance Standards Proposal, and Company and Seller shall proceed to negotiate in good faith a Performance Standards Revision Document setting forth the specific changes to the Agreement that are necessary to implement such Performance Standards Revision. A decision by Company to initiate negotiations with Seller as aforesaid shall not

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 24
115


constitute an acceptance by Company of any of the details set forth in Seller's Performance Standards Proposal for the Performance Standards Revision in question, including but not limited to the Performance Standards Modifications and the Performance Standards Pricing Impact. Any adjustment to the rates for purchase set forth in Article 5 (Rates for Purchase) in $/kWh (for amendments to the Energy Charge) and/or $/kW (for amendments to the Capacity Charge) pursuant to such Performance Standards Revision Document shall be limited to the Performance Standards Pricing Impact (other than with respect to the financial consequences of non-performance as to a Performance Standards Revision). The time periods set forth in such Performance Standards Revision Document as to the effective date for the Performance Standards Revision shall be measured from the date the PUC Performance Standards Revision Order becomes non-appealable as provided in Section 24.6 (PUC Performance Standards Revision Order).
24.5    Failure to Reach Agreement. If Company and Seller are unable to agree upon and execute a Performance Standards Revision Document within one hundred eighty (180) Days of Company's written notice to Seller pursuant to Section 24.4 (Performance Standards Revision Document), Company shall have the option of declaring the failure to reach agreement on and execute such Document to be a dispute and submit such dispute to an Independent Evaluator for the conduct of a determination pursuant to Section 24.10 (Dispute) of this Agreement. Any decision of the Independent Evaluator rendered as a result of such dispute shall include a form of a Performance Standards Revision Document as described in Section 24.4 (Performance Standards Revision Document).
24.6    PUC Performance Standards Revision Order. No Performance Standards Revision Document shall constitute an amendment to the Agreement unless and until a PUC Performance Standards Revision Order issued with respect to such Document has become non-appealable. Once the condition of the preceding sentence has been satisfied, such Performance Standards Revision Document shall constitute an amendment to this Agreement. To be “non-appealable” under this Section 24.6 (PUC Performance Standards Revision Order), such PUC Performance Standards Revision Order shall be either (a) not subject to appeal to any Circuit Court of the State of Hawai‘i, Intermediate Court of Appeals of the State of Hawai‘i, or the Supreme Court of the State of Hawai‘i, because the thirty (30) Day period (accounting for weekends and holidays, as appropriate) permitted for such an appeal has passed without the filing of notice of such an appeal, or (b) affirmed on appeal to any Circuit Court of the State of Hawai‘i, Intermediate Court of Appeals of the State of Hawai‘i, or the Supreme Court of the State of Hawai‘i, or affirmed upon further appeal or appellate process, and that is not subject to further appeal, because the jurisdictional time permitted for such an appeal (and/or further appellate process such as a motion for reconsideration or an application for writ of certiorari) has passed without the filing of notice of such an appeal (or the filing for further appellate process).
24.7    Company’s Rights. The rights granted to Company under Section 24.4 (Performance Standards Revision Document) and Section 24.5 (Failure to Reach Agreement) above are exclusive to Company. Seller shall not have a right to initiate negotiations of a Performance Standards Revision Document or to initiate dispute resolution under Section 24.10 (Dispute), as a result of a failure to agree upon and execute any Performance Standards Revision Document.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 24
116


24.8    Seller’s Obligation. Notwithstanding any provision of this Article 24 (Process for Addressing Revisions to Performance Standards) to the contrary, Seller shall have no obligation to respond to more than one Performance Standards Information Request during any 12-month period.
24.9    Limited Purpose. This Article 24 (Process for Addressing Revisions to Performance Standards) is intended to specifically address necessary revisions to the Performance Standards to enhance integration of intermittent resources onto the Company System, or to comply with future Laws which may be driven in part by higher integration of intermittent resources and is not intended for either Party to provide a means for renegotiating any other terms of this Agreement. Revisions to the Performance Standards in accordance with the provisions of this Article 24 (Process for Addressing Revisions to Performance Standards) are not intended to materially increase Seller's risk of non-performance or default.
24.10    Dispute. If Company decides to declare a dispute as a result of the failure to reach agreement and execute a Performance Standards Revision Document pursuant to Section 24.5 (Failure to Reach Agreement), it shall provide written notice to that effect to Seller. Within twenty (20) Days of delivery of such notice Seller and Company shall agree upon an Independent Evaluator to resolve the dispute regarding a Performance Standards Revision Document. The Independent Evaluator shall be reasonably qualified and expert in renewable energy power generation, matters relating to the Performance Standards, financing, and power purchase agreements. If the Parties are unable to agree upon an Independent Evaluator within such twenty (20) Day period, Company shall apply to the PUC for the appointment of an Independent Evaluator. If an Independent Observer retained under the Competitive Bidding Framework is qualified and willing and available to serve as Independent Evaluator, the PUC shall appoint one of the persons or entities qualified to serve as an Independent Observer to be the Independent Evaluator; if not, the PUC shall appoint another qualified person or entity to serve as Independent Evaluator. In its application, Company shall ask the PUC to appoint an Independent Evaluator within thirty (30) Days of the application.
(A)    Independent Evaluator. Promptly upon appointment, the Independent Evaluator shall request the Parties to address the following matters within the next fifteen (15) Days:
(1)    The Performance Standard Revision(s);
(2)    The technical feasibility of complying with the Performance Standard Revision(s) and likelihood of compliance;
(3)    How Seller would comply with the Performance Standard Revision(s);
(4)    Reasonably expected net costs and/or lost revenues associated with the Performance Standards Revision(s);
(5)    The appropriate level, if any, of Performance Standards Pricing Impact in light of the foregoing; and

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 24
117


(6)    Contractual consequences for non-performance that are commercially reasonable under the circumstances.
(B)    Decision. Within ninety (90) Days of appointment, the Independent Evaluator shall render a decision unless the Independent Evaluator determines it needs to have additional time, not to exceed forty-five (45) Days, to render a decision.
(C)    Assistance. The Parties shall assist the Independent Evaluator throughout the process of preparing its review, including making key personnel and records available to the Independent Evaluator, but neither Party shall be entitled to participate in any meetings with personnel of the other Party or review of the other Party's records. However, the Independent Evaluator will have the right to conduct meetings, hearings or oral arguments in which both Parties are represented. The Parties may meet with each other during the review process to explore means of resolving the matter on mutually acceptable terms.
(D)    Standard to be Applied in Rendering Decision. The following standards shall be applied by the Independent Evaluator in rendering his or her decision: (i) if it is not technically or operationally feasible for Seller to comply with a Performance Standard Revision, the Independent Evaluator shall determine that the Agreement shall not be amended to incorporate such Performance Standard Revision (unless the Parties agree otherwise); (ii) if it is technically or operationally feasible for Seller to comply with a Performance Standard Revision, the Independent Evaluator shall incorporate such Performance Standard Revision into a Performance Standards Revision Document including (aa) Seller's Performance Standards Modifications, (bb) pricing terms that incorporate the Performance Standards Pricing Impact, and (cc) contract terms and conditions that are commercially reasonable under the circumstances, especially with respect to the consequences of non-performance by Seller as to Performance Standards Revision(s). In addition to the Performance Standards Revision Document, the Independent Evaluator shall render a decision which sets forth the positions of the Parties and Independent Evaluator's rationale for his or her decisions on disputed issues.
(E)    Fees and Costs. The fees and costs of the Independent Evaluator shall be paid by Company up to the first $30,000 of such fees and costs; above those amounts, the Party that is not the prevailing Party shall be responsible for any such fees and costs; provided, if neither Party is the prevailing Party, then the fees and costs of the Independent Evaluator above $30,000, shall be borne equally by the Parties. The Independent Evaluator in rendering his or her decision shall also state which Party prevailed over the other Party, or that neither Party prevailed over the other.
24.11    HERA Law.  The provisions of this Article 24 (Process for Addressing Revisions to Performance Standards) are without limitation to the obligations of the Parties under the HERA Law and the reliability standards and interconnection requirements developed and adopted by the PUC pursuant to the HERA Law.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 24
118


ARTICLE 25 - MISCELLANEOUS
25.1    Notices.
(A)    Method of Delivery. All notices, consents and waivers under this Agreement shall be in writing and will be deemed to have been duly given when (i) delivered by hand, (ii) sent by electronic mail (“E-mail”) (provided receipt thereof is confirmed via E-Mail or in writing by the recipient), (iii) sent by certified mail, return receipt requested, or (iv) when received by the addressee, if sent by a nationally recognized oversight delivery service (receipt requested), in each case to the appropriate addresses and E-Mail addresses set forth below (or to such other addresses or E-mail addresses as a Party may designate by notice to the other Party):
Company:
By Mail:

Hawaiian Electric Company, Inc.
P.O. Box 2750
Honolulu, Hawaii 96840
Attention: Manager, Energy Contract Management

Delivered by Hand or Overnight Delivery:

Attention: Renewable Acquisition, AL 12-IC
Hawaiian Electric Company, Inc.
Ward Receiving
799 S. King St.
Honolulu, HI 96813
By E-mail to:

Hawaiian Electric Company, Inc.
Attention: Manager, Energy Contract Management
Email: PPANotices@hawaiianelectric.com

With A Copy To:
By Mail:

Hawaiian Electric Company, Inc.
Legal Division
P.O. Box 2750
Honolulu, Hawai‘i 96840
By E-mail to:

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 25
119



Hawaiian Electric Company, Inc.
Legal Division
Email: Legalnotices@hawaiianelectric.com

Seller:

The contact information listed in Attachment A (Facility Description) hereto.

(B)    Date of Delivery. Notice sent by mail shall be deemed to have been given on the date of actual delivery or at the expiration of the fifth (5th) Day after the date of mailing, whichever is earlier. Any Party hereto may change its address for written notice by giving written notice of such change to the other Party.
(C)    E-mail Notice. Any notice delivered by E-mail shall request a receipt thereof confirmed by E-mail or in writing by the recipient and followed by personal or mail delivery of such correspondence and any attachments as may be requested by the recipient, and the effective date of such notice shall be the date of receipt, provided such receipt has been confirmed by the recipient.
(D)    Additional Means. The Parties may agree in writing upon additional means of providing notices, consents and waivers under this Agreement in order to adapt to changing technology and commercial practices.
25.2    Entire Agreement. This Agreement, including all Attachments, the IRS Letter Agreement and the GHG Letter Agreement (together with any confidentiality or non-disclosure agreements entered into by the Parties during the process of negotiating this Agreement and/or discussing the specifications of the Facility) constitutes the entire agreement between the Parties relating to the subject matter hereof, superseding all prior agreements, understandings or undertakings, oral or written. Each of the Parties confirms that in entering into this Agreement, it has not relied on any statement, warranty or other representation (other than those set out in this Agreement) made or information supplied, by or on behalf of the other Party.
25.3    Binding Effect. This Agreement shall be binding upon and inure to the benefit of the Parties hereto and their respective successors, legal representatives, and permitted assigns.
25.4    Relationship of the Parties. Nothing in this Agreement shall be deemed to constitute either Party hereto as partner, agent or representative of the other Party or to create any fiduciary relationship between the Parties. Seller does not hereby dedicate any part of Facility to serve Company, Company's customers or the public.
25.5    Further Assurances. If either Party determines in its reasonable discretion that any further instruments, assurances or other things are necessary or desirable to carry out the terms of

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 25
120


this Agreement, the other Party will execute and deliver all such instruments and assurances and do all things reasonably necessary or desirable to carry out the terms of this Agreement.
25.6    Severability. If any term or provision of this Agreement or the application thereof to any person, entity or circumstance shall to any extent be invalid or unenforceable, the remainder of this Agreement, or the application of such term or provision to persons, entities or circumstances other than those as to which it is invalid or unenforceable, shall not be affected thereby, and each term and provision of this Agreement shall be valid and enforceable to the fullest extent permitted by law, and the Parties will take all commercially reasonable steps, including modification of the Agreement, to preserve the economic “benefit of the bargain” to both Parties notwithstanding any such aforesaid invalidity or unenforceability.
25.7    Non-Waiver. Except as otherwise provided in this Agreement, no delay or forbearance of Company or Seller in the exercise of any remedy or right will constitute a waiver thereof, and the exercise or partial exercise of a remedy or right shall not preclude further exercise of the same or any other remedy or right.
25.8    Modification or Amendment. Any amendment or modification of this Agreement or any part hereof shall not be valid unless in writing and signed by both Parties. Any waiver hereunder shall not be valid unless in writing and signed by the Party against whom waiver is asserted. Seller shall not modify or amend or consent to a modification or amendment to any of the Financing Documents or Project Documents without the prior written consent of Company, which consent shall not be unreasonably withheld. Notwithstanding the foregoing, administrative changes mutually agreed by Company and Seller, such as changes to settings shown in Attachment E (Single-Line Diagram and Interface Block Diagram) and Attachment F (Relay List and Trip Scheme) and changes to numerical values in Section 3 (Performance Standards) of Attachment B (Facility Owned by Seller), shall not be considered amendments to this Agreement requiring PUC approval.
25.9    Governing Law, Jurisdiction and Venue. Interpretation and performance of this Agreement shall be in accordance with, and shall be controlled by, the laws of the State of Hawai‘i, other than the laws thereof that would require reference to the laws of any other jurisdiction. By entering into this Agreement, Seller submits itself to the personal jurisdiction of the courts of the State of Hawai‘i and agrees that the proper venue for any civil action arising out of or relating to this Agreement shall be Honolulu, Hawai‘i.
25.10    Electronic Signatures and Counterparts. The Parties agree that this Agreement and any subsequent writings, including amendments, may be executed and delivered by exchange of executed copies via E-mail or other acceptable electronic means, and in electronic formats such as Adobe PDF or other formats mutually agreeable between the Parties which preserve the final terms of this Agreement or such writing. A Party's signature transmitted by facsimile, email or other acceptable electronic means shall be considered an "original" signature which is binding and effective for all purposes of this Agreement. This Agreement may be executed in counterparts, each of which shall be deemed an original, and all of which shall together constitute one and the same instrument binding all Parties notwithstanding that all of the Parties

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 25
121


are not signatories to the same counterparts. For all purposes, duplicate unexecuted and unacknowledged pages of the counterparts may be discarded, and the remaining pages assembled as one document.
25.11    Computation of Time. In computing any period of time prescribed or allowed under this Agreement, the Day of the act, event or default from which the designated period of time begins to run shall not be included. If the last Day of the period so computed is not a Business Day, then the period shall run until the end of the next Day which is a Business Day.
25.12    PUC Approval.
(A)    PUC Approval Order. The term “PUC Approval Order” means an order from the PUC that does not contain terms and conditions deemed to be unacceptable to Company, and is in a form deemed to be reasonable by Company, in its sole, but nonarbitrary, discretion, ordering that:
(1)    This Agreement is approved;
(2)    The purchased power costs (which costs include without limitation the Energy Charge payments and the Capacity Charge payments) to be incurred by Company as a result of this Agreement are reasonable;
(3)    Company’s purchased power arrangements under this Agreement, pursuant to which Company will purchase energy and Demonstrated Firm Capacity from Seller, are prudent and in the public interest;
(4)    Company may include the power purchase costs (and applicable revenue taxes) incurred by Company pursuant to this Agreement, including Capacity Charge and Energy Charge in Company’s revenue requirements for ratemaking purposes and for the purposes of determining the reasonableness of Company’s rates during the Term of this Agreement; and
(5)    The purchased power costs (and applicable revenue taxes) to be incurred by the Company pursuant to this Agreement may be included in the Company’s Energy Cost Recovery Clause and/or the Purchase Power Adjustment Clause, as applicable, to the extent such costs are not included in base rates for the Term.
(B)    Non-appealable PUC Approval Order. The term “Non-appealable PUC Approval Order” means a PUC Approval Order (i) that is not subject to appeal to any Circuit Court of the State of Hawai‘i, Intermediate Court of Appeals of the State of Hawai‘i, or the Supreme Court of the State of Hawai‘i, because the period permitted for such an appeal (the “Appeal Period”) has passed without the filing of notice of such an appeal, or (ii) that was affirmed on appeal to any Circuit Court of the State of Hawai‘i, Intermediate Court of Appeals of the State of Hawai‘i, or the Supreme Court of the State of Hawai‘i, or was affirmed upon further appeal or appellate process, and that is not subject to further appeal, because the jurisdictional time permitted for such an appeal and/or further appellate process such as a motion for reconsideration or an

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 25
122


application for writ of certiorari has passed without the filing of notice of such an appeal or the filing for further appellate process.
(C)    Company's Written Statement. Not later than thirty-five (35) Days after the issuance of a PUC Approval Order, Company shall provide Seller with a copy of such PUC Approval Order together with, or separately, a written statement as to whether the conditions set forth in Section 25.12(A) (PUC Approval Order) have been satisfied and the order constitutes a PUC Approval Order. If Company's written statement declares that the conditions set forth in Section 25.12(A) (PUC Approval Order) have been satisfied, the date of the issuance of the PUC Approval Order shall be the "PUC Approval Order Date".
(D)    Non-Appealable PUC Approval Order Date. If Company provides the written statement referred to in Section 25.12(C) (Company's Written Statement) to the effect that the conditions referred to in Section 25.12(A) (PUC Approval Order) have been satisfied, the term "Non-appealable PUC Approval Order Date" shall be defined as follows:
(1)    If a PUC Approval Order is issued and is not made subject to a motion for reconsideration filed with the PUC or an appeal, the Non-appealable PUC Approval Order Date shall be the date one (1) Day after the expiration of the Appeal Period following the issuance of the PUC Approval Order, or the date of Company’s written statement as required under Section 25.12(C) (Company’s Written Statement), whichever is later;
(2)    If the PUC Approval Order became subject to a motion for reconsideration or clarification, and the motion for reconsideration and clarification is denied or the PUC Approval Order is affirmed after reconsideration or clarification, and such order is not made subject to an appeal, the Non-appealable PUC Approval Order Date shall be deemed to be the date one (1) Day after the expiration of the Appeal Period following the order denying reconsideration of or clarification of, or affirming the PUC Approval Order; or
(3)    If the PUC Approval Order, or an order denying reconsideration or clarification of the PUC Approval Order or affirming approval of the PUC Approval Order after reconsideration or clarification, becomes subject to an appeal, then the Non-appealable PUC Approval Order Date shall be the date upon which the PUC Approval Order becomes a non-appealable order within the meaning of the definition of a Non-Appealable PUC Approval Order in Section 25.12(B) (Non-appealable PUC Approval Order).
(E)    Unfavorable PUC Order. The term "Unfavorable PUC Order" means an order from the PUC concerning this Agreement that: (i) dismisses Company's application; (ii) denies Company's application; or (iii) approves Company's application but contains terms and conditions deemed unacceptable by Company in its sole discretion and therefore does not meet the definition of a PUC Approval Order as set forth in Section 25.12(A) (PUC Approval Order).
25.13    Change in Standard System or Organization.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 25
123


(A)    Consistent with Original Intent. If, during the Term of this Agreement, any standard, system or organization referenced in this Agreement should be modified or replaced in the normal course of events, such modification or replacement shall from that point in time be used in this Agreement in place of the original standard, system or organization, but only to the extent such modification or replacement is generally consistent with the original spirit and intent of this Agreement.
(B)    Eliminated or Inconsistent with Original Intent. If, during the Term of this Agreement, any standard, system or organization referenced in this Agreement should be eliminated or cease to exist or is modified or replaced and such modification or replacement is inconsistent with the original spirit and intent of this Agreement, then in such event the Parties will negotiate in good faith to amend this Agreement to a standard, system or organization that would be consistent with the original spirit and intent of this Agreement.
25.14    Effect of Section and Attachment Headings. The Table of Contents and paragraph headings of the various sections and attachments have been inserted in this Agreement as a matter of convenience for reference only and shall not modify, define or limit any of the terms or provisions hereof and shall not be used in the interpretation of any term or provision of this Agreement.
25.15    Definitions. Capitalized terms used in this Agreement and not otherwise defined in the context in which they first appear are defined in the Article 1 (Definitions).
25.16    No Third-Party Beneficiaries. Nothing expressed or referred to in this Agreement will be construed to give any person or entity other than the Parties any legal or equitable right, remedy, or claim under or with respect to this Agreement or any provision of this Agreement. This Agreement and all of its provisions and conditions are for the sole and exclusive benefit of the Parties and their successors and permitted assigns.
25.17    Proprietary Rights. Seller agrees that in fulfilling its responsibilities under this Agreement, it will not use any process, program, design, device or material that infringes on any United States patent, trademark, copyright or trade secret (“Proprietary Rights”). Seller agrees to indemnify, defend and hold harmless the Indemnified Company Party from and against all losses, damages, claims, fees and costs, including but not limited to reasonable attorneys' fees and costs, arising from or incidental to any suit or proceeding brought against the Indemnified Company Party for infringement of Third Party Proprietary Rights arising out of Seller's performance under this Agreement, including but not limited to patent infringement due to the use of technical features of the Facility to meet the requirements of Section 3.2(B) (Warranties and Guarantees of Performance), Attachment Y (Operation and Maintenance of the Facility) and the Performance Standards specified in the Agreement.
25.18    Limitations. Nothing in this Agreement shall limit Company's ability to exercise its rights as specified in Company's tariff as filed with the PUC, or as specified in General Order No. 7 of the PUC's Standards for Electric Utility Service in the State of Hawai‘i, as either may be amended from time to time.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 25
124


25.19    Settlement of Disputes. Except as otherwise expressly provided, any dispute or difference arising out of this Agreement or concerning the performance or the non-performance by either Party of its obligations under this Agreement shall be determined in accordance with the dispute resolution procedures set forth in Article 17 (Dispute Resolution) of this Agreement.
25.20    Environmental Credits and RPS. To the extent not prohibited by law, Company shall have the sole and exclusive right to use the electric energy purchased hereunder to meet the RPS and any Environmental Credit shall be the property of Company; provided, however, that such Environmental Credits shall be to the benefit of Company's ratepayers in that the value must be credited “above the line.” Seller shall use all commercially reasonable efforts to ensure such Environmental Credits are vested in Company, and shall execute all documents, including, but not limited to, documents transferring such Environmental Credits, without further compensation; provided, however, that Company agrees to pay for all reasonable costs associated with such efforts and/or documentation.
25.21    Attachments. Each attachment to this Agreement (the “Attachments”) constitutes an essential and necessary part of this Agreement.
25.22    Hawai‘i General Excise Tax. Seller shall, when making payments to Company under this Agreement, pay such additional amount as may be necessary to reimburse Company for the Hawai‘i General Excise tax on gross income and all other similar taxes imposed on Company by any Governmental Authority with respect to payments in the nature of gross receipts tax, sales tax, privilege tax or the like (including receipt of any payment made under this Section 25.22 (Hawai‘i General Excise Tax)), but excluding federal or state net income taxes. By way of example and not limitation, as of the Execution Date, all payments subject to the Hawai‘i General Excise tax plus surcharge on Oahu (totaling 4.5% as of the Execution Date) would include an additional 4.7120% so that the underlying payment will be net of such tax liability.
25.23    Survival of Obligations. The rights and obligations that are intended to survive a termination of this Agreement are all of those rights and obligations that this Agreement expressly provides shall survive any such termination and those that arise from Seller’s or Company’s covenants, agreements, representations, and warranties applicable to, or to be performed, at or during any time prior to or as a result of the termination of this Agreement, including, without limitation:
(A)    The obligation to pay Milestone Delay Damages under Section 2.4(D)(1)(a) (Milestone Delay Damages);
(B)    The obligation to pay Daily Delay Damages under Section 2.4(D)(1)(b) (Daily Delay Damages);
(C)    The obligation to deliver the Facility under Section 3.2(J) (Seller’s Obligation to Deliver Facility);
(D)    Seller’s obligations under Section 8.2(B)(2) (Termination by Company);

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 25
125


(E)    The obligation to pay Termination Damages under Section 9.3(A) (Pre-COD Termination Damages) and Section 9.3(B) (Post-COD Termination Damages);
(F)    The requirements of Article 11 (Audit Rights);
(G)    The indemnity obligations to the extent provided in Article 13 (Indemnification), Section 25.17 (Proprietary Rights) and in Attachment P (Sale of Facility by Seller);
(H)    The requirements of Article 17 (Dispute Resolution);
(I)    The limitation of damages under Article 14 (Consequential Damages);
(J)    The obligations under Section 1(f) (Right of First Refusal), Section 2(d) (Right of First Refusal) and applicable provisions of Section 3 (Procedure to Determine Fair Market Value of the Facility), Section 4 (Purchase and Sale Agreement), and Section 5 (PUC Approval) of Attachment P (Sale of Facility by Seller);
(K)    The provisions of Article 25 (Miscellaneous);
(L)    Land restoration requirements under Section 7 (Land Restoration) of Attachment G (Company-Owned Interconnection Facilities); and
(M)    Seller’s obligations under Section 3 (Seller Payment to Company for Company-Owned Interconnection Facilities and Review of Facility) of Attachment G (Company-Owned Interconnection Facilities) to pay interconnection costs and Section 4 (Ongoing Operation and Maintenance Charges) of Attachment G (Company-Owned Interconnection Facilities) to pay operation and maintenance costs incurred up to the date of termination of the Agreement.
25.24    Negotiated Terms. The Parties agree that the terms and conditions of this Agreement are the result of negotiations between the Parties and that this Agreement shall not be construed in favor of or against any Party by reason of the extent to which any Party or its professional advisors participated in the preparation of this Agreement.
25.25    Certain Rules of Construction. For purposes of this Agreement:
(A)    The phrase “breach of a representation” includes a misrepresentation and the failure of a representation to be accurate.
(B)    “Including” and any other words or phrases of inclusion will not be construed as terms of limitation, so that references to “included” matters will be regarded as non-exclusive, non-characterizing illustrations.
(C)    “Copy” or “copies” means that the copy or copies of the material to which it relates are true, correct and complete.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 25
126


(D)    When “Article,” “Section,” “Schedule” or “Attachment” is capitalized in this Agreement, it refers to an article, section, schedule or attachment to this Agreement.
(E)    “Will” has the same meaning as “shall” and, thus, connotes an obligation and an imperative and not a futurity.
(F)    Titles and captions of or in this Agreement, the cover sheet and table of contents of this Agreement, and language in parenthesis following section references are inserted only as a matter of convenience and in no way define, limit, extend or describe the scope of this Agreement or the intent of any of its provisions.
(G)    Whenever the context requires, the singular includes the plural and plural includes the singular, and the gender of any pronoun includes the other genders.
(H)    Each Attachment to this Agreement is hereby incorporated by reference into this Agreement and is made a part of this Agreement as if set out in full in the first place that reference is made to it.
(I)    Any reference to any statutory provision includes each successor provision and all applicable Law as to that provision.
(J)    Acknowledging that the Parties have participated jointly in the negotiation and drafting of this Agreement, if an ambiguity or question or intent or interpretation arises as to any aspect of this Agreement, then it will be construed as if drafted jointly by the Parties and no presumption or burden of proof will arise favoring or disfavoring any Party by virtue of the authorship of any provision of this Agreement.
25.26    Agreement is Not a Design or Construction Contract. This Agreement is not a design or construction contract. The Parties acknowledge and agree that Seller will finance and develop the Facility for Seller to own and operate. Seller is not a design professional or a contractor. Seller is not hereby undertaking to perform and is not holding itself out or offering to perform any work for which a professional or contractor's license may be required under the laws of the State of Hawai‘i. Notwithstanding anything to the contrary, all work related to the design, engineering, and construction of the Facility shall be performed by design professionals and contractors who hold the appropriate licenses issued by the State of Hawai‘i and intend to develop the Facility in full compliance with all applicable state laws. For the avoidance of doubt, in all instances where this Agreement refers to Seller performing the acts of constructing, building or installing, said language shall be interpreted to mean that such work will be performed by duly licensed contractors properly retained by Seller in accordance with laws of the State of Hawai‘i.

EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.
ARTICLE 25
127


IN WITNESS WHEREOF, Company and Seller have caused this Agreement to be executed by their respective duly authorized officers as of the date first above written.


Company:HAWAIIAN ELECTRIC COMPANY, INC., a
Hawai‘i corporation
By:/s/ Scott W. H. Seu
Name:Scott W. H. Seu
Its:Chief Executive Officer
By:/s/ Paul K. Ito
Name:Paul K. Ito
Its:Senior VP, Chief Financial Officer & Treasurer
Seller:KALAELOA PARTNERS L.P., a Delaware limited
partnership
By:/s/ Daniel J. Muxie
Name:Daniel J. Muxie
Its:Authorized Representative


EXECUTION VERSION
Kalaeloa Partners L.P.        
Hawaiian Electric Company, Inc.


HEI Exhibit 31.1
 
CERTIFICATION
 
I, Scott W. H. Seu, certify that:
 
1. I have reviewed this report on Form 10-Q for the quarter ended September 30, 2026 of Hawaiian Electric Industries, Inc. (“registrant”);
 
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
 
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
 
4. The registrant’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:
 
(a)   Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
 
(b)   Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
 
(c)   Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
 
(d)   Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting; and
 
5. The registrant’s other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
 
(a)   All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
 
(b)   Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.
 
Date: November 6, 2026
/s/ Scott W. H. Seu
Scott W. H. Seu
Chief Executive Officer
 



HEI Exhibit 31.2
 
 
CERTIFICATION
 
I, Paul K. Ito, certify that:
 
1. I have reviewed this report on Form 10-Q for the quarter ended September 30, 2026 of Hawaiian Electric Industries, Inc. (“registrant”);
 
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
 
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
 
4. The registrant’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:
 
(a)   Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
 
(b)   Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
 
(c)   Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
 
(d)  Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting; and
 
5. The registrant’s other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
 
(a)   All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
 
(b)   Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.
 
Date: November 6, 2026
/s/ Paul K. Ito
Paul K. Ito
Senior Vice President and Chief Financial Officer
 


Hawaiian Electric Exhibit 31.3
 
CERTIFICATION
 
I, Scott W. H. Seu, certify that:
 
1. I have reviewed this report on Form 10-Q for the quarter ended September 30, 2026 of Hawaiian Electric Company, Inc. (“registrant”);
 
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
 
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
 
4. The registrant’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:
 
(a)   Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
 
(b)   Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
 
(c)   Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
 
(d)   Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting; and
 
5. The registrant’s other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
 
(a)   All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
 
(b)   Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.
 
Date: November 6, 2026
/s/ Scott W. H. Seu
Scott W. H. Seu
Chief Executive Officer



Hawaiian Electric Exhibit 31.4
 
CERTIFICATION
I, Paul K. Ito, certify that:
1.I have reviewed this report on Form 10-Q for the quarter ended September 30, 2026 of Hawaiian Electric Company, Inc. (“registrant”);
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
 3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
 4. The registrant’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:
 
(a)   Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
 
(b)   Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
 
(c)   Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
 
(d)   Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting; and
 
5. The registrant’s other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
 
(a)   All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
 
(b)   Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.
Date: November 6, 2026
/s/ Paul K. Ito
Paul K. Ito
Senior Vice President, Chief Financial Officer and Treasurer



HEI Exhibit 32.1
 
Hawaiian Electric Industries, Inc.
 
Certification Pursuant to
18 U.S.C. Section 1350
 
In connection with the Quarterly Report of Hawaiian Electric Industries, Inc. (HEI) on Form 10-Q for the quarter ended September 30, 2026, as filed with the Securities and Exchange Commission (the Report), each of Scott W. H. Seu and Paul K. Ito, Chief Executive Officer and Chief Financial Officer, respectively, of HEI, certify, pursuant to 18 U.S.C. Section 1350, that to the best of our knowledge:
 
(1)   The Report complies with the requirements of section 13(a) of the Securities Exchange Act of 1934, as amended; and
 
(2)   The information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of HEI and its subsidiaries as of, and for, the periods presented in this report.

 
Date: November 6, 2026
/s/ Scott W. H. Seu
Scott W. H. Seu
Chief Executive Officer
/s/ Paul K. Ito
Paul K. Ito
Senior Vice President and Chief Financial Officer
 
A signed original of this written statement has been provided to HEI and will be retained by HEI and furnished to the Securities and Exchange Commission or its staff upon request.
 



Hawaiian Electric Exhibit 32.2
 
Hawaiian Electric Company, Inc.
 
Certification Pursuant to
18 U.S.C. Section 1350
 
In connection with the Quarterly Report of Hawaiian Electric Company, Inc. (Hawaiian Electric) on Form 10-Q for the quarter ended September 30, 2026, as filed with the Securities and Exchange Commission (the Hawaiian Electric Report), each of Scott W. H. Seu and Paul K. Ito, Chief Executive Officer and Chief Financial Officer, respectively, of Hawaiian Electric, certify, pursuant to 18 U.S.C. Section 1350, that to the best of our knowledge:
 
(1)   The Hawaiian Electric Report complies with the requirements of section 13(a) of the Securities Exchange Act of 1934, as amended; and
 
(2)   The Hawaiian Electric information contained in the Hawaiian Electric Report fairly presents, in all material respects, the financial condition and results of operations of Hawaiian Electric and its subsidiaries as of, and for, the periods presented in this report. 


 
Date: November 6, 2026
/s/ Scott W. H. Seu
Scott W. H. Seu
Chief Executive Officer
/s/ Paul K. Ito
Paul K. Ito
Senior Vice President, Chief Financial Officer and Treasurer
 
A signed original of this written statement has been provided to Hawaiian Electric and will be retained by Hawaiian Electric and furnished to the Securities and Exchange Commission or its staff upon request.