0001798562--12-312026Q1false0000000000TMC the metals Co Inc.00-0000000100000001250000019000000220000000001798562tmc:PrivatePlacementWarrantsMemberus-gaap:MeasurementInputSharePriceMember2026-03-310001798562tmc:PrivatePlacementWarrantsMemberus-gaap:MeasurementInputRiskFreeInterestRateMember2026-03-310001798562tmc:PrivatePlacementWarrantsMemberus-gaap:MeasurementInputPriceVolatilityMember2026-03-310001798562tmc:PrivatePlacementWarrantsMemberus-gaap:MeasurementInputExpectedTermMember2026-03-310001798562tmc:PrivatePlacementWarrantsMemberus-gaap:MeasurementInputExpectedDividendRateMember2026-03-310001798562tmc:PrivatePlacementWarrantsMemberus-gaap:MeasurementInputExercisePriceMember2026-03-310001798562tmc:PrivatePlacementWarrantsMemberus-gaap:MeasurementInputSharePriceMember2025-12-310001798562tmc:PrivatePlacementWarrantsMemberus-gaap:MeasurementInputRiskFreeInterestRateMember2025-12-310001798562tmc:PrivatePlacementWarrantsMemberus-gaap:MeasurementInputPriceVolatilityMember2025-12-310001798562tmc:PrivatePlacementWarrantsMemberus-gaap:MeasurementInputExpectedTermMember2025-12-310001798562tmc:PrivatePlacementWarrantsMemberus-gaap:MeasurementInputExpectedDividendRateMember2025-12-310001798562tmc:PrivatePlacementWarrantsMemberus-gaap:MeasurementInputExercisePriceMember2025-12-310001798562tmc:TongaWarrantsMember2025-12-310001798562tmc:KoreaZincWarrantsMember2025-12-310001798562tmc:AtMarketMember2025-01-012025-03-310001798562tmc:TwentyTwentyOneIncentivePlanMember2026-01-012026-03-310001798562tmc:ShortTermIncentivePlanMember2026-01-012026-03-310001798562tmc:LongtermIncentivePlanMember2026-01-012026-03-310001798562tmc:LongtermIncentivePlanMember2025-01-012025-12-310001798562tmc:EmployeeSharePurchasePlanMemberus-gaap:CommonStockMember2026-01-012026-03-310001798562us-gaap:CommonStockMembertmc:AtMarketMember2025-01-012025-03-3100017985622023-08-142023-08-140001798562us-gaap:CommonStockMember2026-01-012026-03-310001798562us-gaap:RetainedEarningsMember2026-03-310001798562us-gaap:AdditionalPaidInCapitalMember2026-03-310001798562us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-03-310001798562us-gaap:RetainedEarningsMember2025-12-310001798562us-gaap:AdditionalPaidInCapitalMember2025-12-310001798562us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-12-310001798562us-gaap:RetainedEarningsMember2025-03-310001798562us-gaap:AdditionalPaidInCapitalMember2025-03-310001798562us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-03-310001798562us-gaap:RetainedEarningsMember2024-12-310001798562us-gaap:AdditionalPaidInCapitalMember2024-12-310001798562us-gaap:AccumulatedOtherComprehensiveIncomeMember2024-12-310001798562us-gaap:CommonStockMember2026-03-310001798562us-gaap:CommonStockMember2025-12-310001798562us-gaap:CommonStockMember2025-03-310001798562us-gaap:CommonStockMember2024-12-310001798562tmc:MetalsRoyaltyCompanyMemberus-gaap:EmployeeStockOptionMember2026-03-310001798562tmc:TwentyTwentyOneIncentivePlanMember2026-03-310001798562tmc:ShortTermIncentivePlanMember2026-03-310001798562tmc:LongtermIncentivePlanMember2026-03-310001798562tmc:TwentyTwentyOneIncentivePlanMember2025-12-310001798562tmc:ShortTermIncentivePlanMember2025-12-310001798562tmc:LongtermIncentivePlanMember2025-12-310001798562tmc:TwentyTwentyOneIncentivePlanMember2024-12-310001798562tmc:ShortTermIncentivePlanMember2024-12-310001798562tmc:LongtermIncentivePlanMember2024-12-310001798562tmc:TwentyTwentyOneIncentivePlanMember2025-01-012025-12-310001798562tmc:ShortTermIncentivePlanMember2025-01-012025-12-310001798562tmc:IncentiveEquityPlan2021Member2026-03-310001798562tmc:MetalsRoyaltyCompanyMemberus-gaap:RestrictedStockUnitsRSUMember2026-03-310001798562us-gaap:RestrictedStockUnitsRSUMember2024-12-310001798562us-gaap:RestrictedStockUnitsRSUMemberus-gaap:ShareBasedCompensationAwardTrancheTwoMember2025-01-012025-03-310001798562us-gaap:RestrictedStockUnitsRSUMemberus-gaap:ShareBasedCompensationAwardTrancheOneMember2025-01-012025-03-310001798562us-gaap:RestrictedStockUnitsRSUMembertmc:ShareBasedPaymentArrangementVestingBasedOnMarketConditionsMember2025-01-012025-03-310001798562us-gaap:RestrictedStockUnitsRSUMembertmc:SharebasedPaymentArrangementTrancheFourMember2025-01-012025-03-310001798562tmc:AllseasAndAffiliatesMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2026-01-012026-03-310001798562tmc:AllseasAndAffiliatesMembertmc:ProjectManagementTechnologyServicesMemberus-gaap:RelatedPartyMember2026-01-012026-03-310001798562country:NR2026-03-310001798562country:NR2025-12-310001798562us-gaap:GeneralAndAdministrativeExpenseMemberus-gaap:RelatedPartyMember2026-01-012026-03-310001798562us-gaap:RelatedPartyMember2025-01-012025-12-310001798562us-gaap:GeneralAndAdministrativeExpenseMemberus-gaap:RelatedPartyMember2025-01-012025-03-3100017985622025-01-012025-12-310001798562us-gaap:RetainedEarningsMember2026-01-012026-03-310001798562us-gaap:RetainedEarningsMember2025-01-012025-03-310001798562tmc:EquityMethodInvestment1554997B.c.LtdMember2026-03-310001798562tmc:MetalsRoyaltyCompanyMember2024-12-310001798562tmc:GerradBarronAndErasCapitalLlcMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2025-03-260001798562tmc:GerardBarronMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2025-03-260001798562tmc:ErasCapitalLlcMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2025-03-260001798562tmc:GerradBarronAndErasCapitalLlcMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2024-11-140001798562tmc:GerardBarronMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2024-11-140001798562tmc:ErasCapitalLlcMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2024-11-140001798562tmc:GerradBarronAndErasCapitalLlcMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2024-08-130001798562tmc:GerardBarronMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2024-08-130001798562tmc:ErasCapitalLlcMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2024-08-130001798562tmc:GerardBarronMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2024-03-220001798562tmc:ErasCapitalLlcMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2024-03-220001798562tmc:UnsecuredCreditFacilityMember2023-03-222023-03-220001798562tmc:GerradBarronAndErasCapitalLlcMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2025-03-262025-03-260001798562tmc:GerradBarronAndErasCapitalLlcMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2024-11-142024-11-140001798562tmc:AllseasAndAffiliatesMembertmc:UnsecuredCreditFacilityMemberus-gaap:RelatedPartyMember2026-01-012026-03-310001798562tmc:TwoThousandTwentyFourCreditFacilityMember2026-01-012026-03-310001798562tmc:AllseasAndAffiliatesMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2025-03-242025-03-240001798562tmc:TwoThousandTwentyFourCreditFacilityMember2025-01-012025-12-310001798562tmc:AllseasMemberus-gaap:CommonStockMember2026-03-310001798562tmc:AllseasMemberus-gaap:CommonStockMember2025-12-310001798562us-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2026-03-310001798562us-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2025-12-310001798562country:SG2026-03-310001798562country:SG2025-12-310001798562tmc:EquityMethodInvestment1554997B.c.LtdMember2026-01-012026-03-310001798562tmc:EquityMethodInvestment1554997B.c.LtdMember2025-10-012025-12-310001798562tmc:MetalsRoyaltyCompanyMember2025-01-012025-03-310001798562tmc:MetalsRoyaltyCompanyMember2025-01-012025-03-310001798562tmc:TravelAndOtherExpensesMember2026-01-012026-03-310001798562tmc:TransferAgentAndFilingFeesMember2026-01-012026-03-310001798562tmc:ShareBasedCompensationMember2026-01-012026-03-310001798562tmc:SalariesAndWagesMember2026-01-012026-03-310001798562tmc:ProfessionalAndConsultingFeesMember2026-01-012026-03-310001798562tmc:OfficeAndSundryMember2026-01-012026-03-310001798562tmc:InvestorRelationsMember2026-01-012026-03-310001798562tmc:DirectorFeesMember2026-01-012026-03-310001798562tmc:TravelAndOtherExpensesMember2025-01-012025-03-310001798562tmc:TransferAgentAndFilingFeesMember2025-01-012025-03-310001798562tmc:ShareBasedCompensationMember2025-01-012025-03-310001798562tmc:SalariesAndWagesMember2025-01-012025-03-310001798562tmc:ProfessionalAndConsultingFeesMember2025-01-012025-03-310001798562tmc:OfficeAndSundryMember2025-01-012025-03-310001798562tmc:InvestorRelationsMember2025-01-012025-03-310001798562tmc:DirectorFeesMember2025-01-012025-03-310001798562tmc:ProjectManagementTechnologyServicesMember2026-01-012026-03-310001798562tmc:ProjectManagementTechnologyServicesMember2025-01-012025-03-310001798562tmc:EquityMethodInvestment1554997B.c.LtdMember2026-01-012026-03-310001798562tmc:MetalsRoyaltyCompanyMember2026-03-310001798562tmc:MetalsRoyaltyCompanyMember2025-12-310001798562tmc:EquityMethodInvestment1554997B.c.LtdMember2025-12-310001798562us-gaap:RestrictedStockUnitsRSUMember2026-03-310001798562us-gaap:RestrictedStockUnitsRSUMember2025-12-310001798562tmc:PublicWarrantsMember2025-12-310001798562tmc:PrivatePlacementWarrantsMember2025-12-310001798562tmc:NauruWarrantsMember2025-12-310001798562tmc:ClassCWarrantsMember2025-12-310001798562tmc:ClassBWarrantsMember2025-12-310001798562tmc:ClassaWarrantMember2025-12-310001798562tmc:TongaWarrantsMember2026-03-310001798562tmc:PublicWarrantsMember2026-03-310001798562tmc:PrivatePlacementWarrantsMember2026-03-310001798562tmc:NauruWarrantsMember2026-03-310001798562tmc:KoreaZincWarrantsMember2026-03-310001798562tmc:ClassCWarrantsMember2026-03-310001798562tmc:ClassBWarrantsMember2026-03-310001798562tmc:ClassaWarrantMember2026-03-3100017985622024-12-310001798562tmc:MetalsRoyaltyCompanyMember2026-03-310001798562tmc:EquityMethodInvestment1554997B.c.LtdMember2025-12-310001798562tmc:MetalsRoyaltyCompanyMember2025-03-310001798562us-gaap:WarrantMember2026-01-012026-03-310001798562us-gaap:RestrictedStockMember2026-01-012026-03-310001798562us-gaap:EmployeeStockOptionMember2026-01-012026-03-310001798562tmc:SpecialSharesAndOptionsToPurchaseSpecialSharesMember2026-01-012026-03-310001798562tmc:EmployeeSharePurchasePlanMember2026-01-012026-03-310001798562us-gaap:WarrantMember2025-01-012025-03-310001798562us-gaap:RestrictedStockMember2025-01-012025-03-310001798562us-gaap:EmployeeStockOptionMember2025-01-012025-03-310001798562tmc:SpecialSharesAndOptionsToPurchaseSpecialSharesMember2025-01-012025-03-310001798562tmc:EmployeeSharePurchasePlanMember2025-01-012025-03-310001798562us-gaap:RestrictedStockUnitsRSUMemberus-gaap:GeneralAndAdministrativeExpenseMember2026-01-012026-03-310001798562us-gaap:RestrictedStockUnitsRSUMembertmc:ExplorationAndEvaluationActivitiesMember2026-01-012026-03-310001798562us-gaap:EmployeeStockOptionMemberus-gaap:GeneralAndAdministrativeExpenseMember2026-01-012026-03-310001798562tmc:EmployeeSharePurchasePlanMemberus-gaap:GeneralAndAdministrativeExpenseMember2026-01-012026-03-310001798562tmc:EmployeeSharePurchasePlanMembertmc:ExplorationAndEvaluationActivitiesMember2026-01-012026-03-310001798562tmc:EmployeeSharePurchasePlanMember2026-01-012026-03-310001798562tmc:ConsultantMemberus-gaap:RestrictedStockUnitsRSUMemberus-gaap:ShareBasedCompensationAwardTrancheThreeMember2025-01-012025-03-310001798562us-gaap:RestrictedStockUnitsRSUMemberus-gaap:GeneralAndAdministrativeExpenseMember2025-01-012025-03-310001798562us-gaap:RestrictedStockUnitsRSUMembertmc:ExplorationAndEvaluationActivitiesMember2025-01-012025-03-310001798562us-gaap:EmployeeStockOptionMemberus-gaap:GeneralAndAdministrativeExpenseMember2025-01-012025-03-310001798562tmc:EmployeeSharePurchasePlanMemberus-gaap:GeneralAndAdministrativeExpenseMember2025-01-012025-03-310001798562tmc:EmployeeSharePurchasePlanMembertmc:ExplorationAndEvaluationActivitiesMember2025-01-012025-03-310001798562tmc:EmployeeSharePurchasePlanMember2025-01-012025-03-310001798562us-gaap:AdditionalPaidInCapitalMember2026-01-012026-03-310001798562us-gaap:RestrictedStockUnitsRSUMemberus-gaap:ShareBasedCompensationAwardTrancheThreeMember2026-03-310001798562us-gaap:RestrictedStockUnitsRSUMemberus-gaap:ShareBasedCompensationAwardTrancheThreeMember2025-03-310001798562tmc:AllseasMember2026-03-310001798562tmc:AllseasMember2025-12-310001798562tmc:AllseasAndAffiliatesMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2025-12-310001798562tmc:PublicWarrantsMember2026-01-012026-03-310001798562tmc:RedemptionOfWarrantsWhenPricePerShareOfClassCommonStockEqualsOrExceeds18.00Member2026-01-012026-03-310001798562us-gaap:AdditionalPaidInCapitalMember2025-01-012025-03-310001798562us-gaap:CommonStockMember2025-01-012025-03-310001798562tmc:MetalsRoyaltyCompanyMember2026-01-012026-03-310001798562us-gaap:RestrictedStockUnitsRSUMemberus-gaap:ShareBasedCompensationAwardTrancheThreeMember2026-01-012026-03-310001798562us-gaap:RestrictedStockUnitsRSUMemberus-gaap:ShareBasedCompensationAwardTrancheThreeMember2025-01-012025-03-310001798562us-gaap:RestrictedStockUnitsRSUMember2025-01-012025-03-310001798562us-gaap:RestrictedStockUnitsRSUMember2026-01-012026-03-310001798562us-gaap:RestrictedStockUnitsRSUMember2025-01-012025-12-310001798562tmc:NauruOceanResourcesIncMembertmc:LowCarbonRoyaltiesMemberus-gaap:MeasurementInputDiscountRateMember2026-03-310001798562tmc:NauruOceanResourcesIncMembertmc:LowCarbonRoyaltiesMember2026-03-310001798562us-gaap:RelatedPartyMember2026-01-012026-03-310001798562us-gaap:RelatedPartyMember2025-01-012025-03-310001798562tmc:AllseasAndAffiliatesMembertmc:ProjectManagementTechnologyServicesMemberus-gaap:RelatedPartyMemberus-gaap:SubsequentEventMember2026-05-110001798562tmc:AllseasDeepseaMarineContractorsMembertmc:ProjectManagementTechnologyServicesMemberus-gaap:RelatedPartyMemberus-gaap:SubsequentEventMember2026-05-110001798562tmc:AllseasAndAffiliatesMembertmc:ProjectManagementTechnologyServicesMemberus-gaap:RelatedPartyMemberus-gaap:SubsequentEventMember2026-05-112026-05-110001798562tmc:EmployeeSharePurchasePlanMember2026-03-310001798562tmc:EquityMethodInvestment1554997B.c.LtdMember2025-10-012025-12-310001798562tmc:MetalsRoyaltyCompanyMember2026-01-012026-03-310001798562us-gaap:FairValueMeasurementsRecurringMember2026-03-310001798562us-gaap:FairValueMeasurementsRecurringMember2025-12-310001798562us-gaap:PrivatePlacementMember2026-03-310001798562us-gaap:PrivatePlacementMember2025-12-310001798562us-gaap:PrivatePlacementMember2026-01-012026-03-3100017985622025-03-310001798562tmc:MetalsRoyaltyCompanyMember2025-01-012025-12-310001798562tmc:EquityMethodInvestment1554997B.c.LtdMember2025-01-012025-12-310001798562tmc:GerradBarronAndErasCapitalLlcMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2024-03-220001798562tmc:AllseasAndAffiliatesMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2023-03-220001798562tmc:GerradBarronAndErasCapitalLlcMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2024-03-222024-03-220001798562tmc:AllseasAndAffiliatesMemberus-gaap:LineOfCreditMemberus-gaap:RelatedPartyMember2023-03-222023-03-2200017985622023-02-212023-02-2100017985622025-01-012025-03-310001798562tmc:IncentiveEquityPlan2021Member2026-01-012026-03-3100017985622025-04-280001798562tmc:AllseasDeepseaMarineContractorsMembertmc:ProjectManagementTechnologyServicesMemberus-gaap:RelatedPartyMemberus-gaap:SubsequentEventMember2026-05-112026-05-110001798562tmc:TongaWarrantsMember2025-01-012025-12-310001798562tmc:KoreaZincWarrantsMember2025-01-012025-12-310001798562tmc:TongaWarrantsMember2026-01-012026-03-310001798562tmc:NauruWarrantsMember2026-01-012026-03-310001798562tmc:KoreaZincWarrantsMember2026-01-012026-03-310001798562tmc:ClassCWarrantsMember2026-01-012026-03-310001798562tmc:ClassBWarrantsMember2026-01-012026-03-310001798562tmc:ClassaWarrantMember2026-01-012026-03-310001798562tmc:AllseasAndAffiliatesMembertmc:ProjectManagementTechnologyServicesMemberus-gaap:RelatedPartyMember2026-03-310001798562us-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMember2026-03-3100017985622026-03-310001798562us-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMember2025-12-3100017985622025-12-310001798562tmc:RedeemableWarrantsEachWholeWarrantExercisableForOneCommonShareEachAtExercisePriceOf11.50PerShareMember2026-01-012026-03-310001798562tmc:CommonSharesWithoutParValueMember2026-01-012026-03-3100017985622026-05-1400017985622026-01-012026-03-31xbrli:sharesiso4217:USDutr:sqkmxbrli:puretmc:itemtmc:Dutr:MTiso4217:USDxbrli:sharestmc:Y

Table of Contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 10-Q

(Mark One)

QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the quarterly period ended March 31, 2026

or

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from       to       

Commission File Number: 001-39281

TMC THE METALS COMPANY INC.

(Exact name of registrant as specified in its charter)

British Columbia, Canada

  ​ ​ ​

Not Applicable

(State or other jurisdiction of incorporation or organization)

(IRS Employer Identification No.)

1111 West Hastings Street, 15th Floor

  ​ ​ ​

Vancouver, British Columbia

V6E 2J3

(Address of principal executive offices)

(Zip Code)

(888) 458-3420

(Registrant’s telephone number, including area code)

Not applicable

(Former name, former address and former fiscal year, if changed since last report)

Securities registered pursuant to Section 12(b) of the Act:

Title of each class

  ​ ​ ​

Trading Symbol(s)

  ​ ​ ​

Name of each exchange on which registered

Common Shares, without par value

TMC

The Nasdaq Stock Market LLC

Redeemable warrants, each whole warrant
exercisable for one Common Share, each at an
exercise price of $11.50 per share

TMCWW

The Nasdaq Stock Market LLC

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes  No 

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes  No 

Indicate by check mark whether the registrant is a large-accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large-accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Large-accelerated filer 

    

Accelerated filer

  ​ ​ ​

Non-accelerated filer   

Smaller reporting company

Emerging growth company

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. 

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes  No 

As of May 14, 2026, the registrant had 433,221,138 common shares outstanding.

Table of Contents

TMC THE METALS COMPANY INC.

FORM 10-Q

For the quarterly period ended March 31, 2026

TABLE OF CONTENTS

  ​ ​ ​

  ​ ​ ​

Page

Cautionary Note Regarding Forward-Looking Statements

3

Part I

Financial Information

5

Item 1.

Financial Statements

5

Condensed Consolidated Balance Sheets as of March 31, 2026 and December 31, 2025 (Unaudited)

5

Condensed Consolidated Statements of Loss and Comprehensive Loss for the three months ended March 31, 2026 and 2025 (Unaudited)

6

Condensed Consolidated Statements of Changes in Equity for the three months ended March 31, 2026 and 2025 (Unaudited)

7

Condensed Consolidated Statements of Cash Flows for the three months ended March 31, 2026 and 2025 (Unaudited)

8

Notes to Interim Condensed Consolidated Financial Statements (Unaudited)

9

Item 2.

Management’s Discussion and Analysis of Financial Condition and Results of Operations

24

Item 3.

Quantitative and Qualitative Disclosures About Market Risk

39

Item 4.

Controls and Procedures

40

Part II

Other Information

42

Item 1.

Legal Proceedings

42

Item 1A.

Risk Factors

42

Item 2.

Unregistered Sales of Equity Securities and Use of Proceeds

43

Item 3.

Defaults Upon Senior Securities

43

Item 4.

Mine Safety Disclosures

43

Item 5.

Other Information

43

Item 6.

Exhibits

44

Signatures

45

2

Table of Contents

In this Quarterly Report on Form 10-Q, the terms “we,” “us,” “our,” the “Company” and “TMC” mean TMC the metals company Inc. and our subsidiaries, while km2 means square kilometers. TMC is incorporated under the laws of the province of British Columbia, Canada. The Company’s common shares and public warrants to purchase common shares trade on the Nasdaq Global Select Market (“Nasdaq”), under the symbols “TMC” and “TMCWW,” respectively.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

This Quarterly Report on Form 10-Q includes forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), that relate to future events, our future operations or financial performance, or our plans, strategies and prospects. These statements are based on the beliefs and assumptions of our management team. Although we believe that our plans, intentions and expectations reflected in or suggested by these forward-looking statements are reasonable, we cannot assure that we will achieve or realize these plans, intentions or expectations. Forward-looking statements are inherently subject to risks, uncertainties and assumptions. Generally, statements that are not historical facts, including statements concerning possible or assumed future actions, business strategies, events or performance, are forward-looking statements. These statements may be preceded by, followed by or include the words “believes,” “estimates,” “expects,” “projects,” “forecasts,” “may,” “will,” “should,” “seeks,” “plans,” “scheduled,” “anticipates” or “intends” or the negative of these terms, or other comparable terminology intended to identify statements about the future, although not all forward-looking statements contain these identifying words. The forward-looking statements are based on projections prepared by, and are the responsibility of, our management. Forward-looking statements contained in this Quarterly Report on Form 10-Q include, but are not limited to, statements about:

the commercial and technical feasibility of seafloor polymetallic nodule collection and processing;
our and our partners’ development and operational plans, including with respect to the planned uses of polymetallic nodules, where and how nodules will be obtained and processed, the expected environmental, social and governance (“ESG”) impacts thereof and our plans to assess these impacts and the timing and scope of these plans, including our commercialization plans;
the supply and demand for nickel, cobalt, copper, manganese ores and their end uses;
the future prices of nickel, cobalt, copper, manganese ores and their end uses;
the risks associated with the certification and Environmental Impact Statement (“EIS”) review stages of our consolidated application for an exploration license and commercial recovery permit filed with the National Oceanic and Atmospheric Administration (“NOAA”) under the Deep Seabed Hard Mineral Resources Act of 1980 (“DSHMRA”), including the risk that interagency consultations during the certification phase, preparation and review of the EIS, or the public comment period may result in conditions, delays, or denial of the requested licenses and permit, and the risk that the final issuance of such licenses and permit remains subject to NOAA’s determination following completion of these remaining review stages;
the timing and expectations with respect to the extension of our exploration contracts with the International Seabed Authority (“ISA”) and the receipt of exploitation contracts from the ISA;
international and national regulation of mineral extraction from the deep seafloor in the high seas and changes in mining laws and regulations;
technical, operational, environmental, social and governance risks of developing and deploying equipment to collect and ship polymetallic nodules at sea, and to process such nodules on land;
the sources and timing of potential revenue as well as the timing and amount of estimated future production, costs of production, other expenses, capital expenditures and requirements for additional capital;
cash flow provided by operating activities;
the expected activities of our partners under our key strategic relationships;

3

Table of Contents

the sufficiency of our cash on hand to meet our working capital and capital expenditure requirements, the need for additional financing and our ability to continue as a going concern;
our ability to raise financing in the future, the nature of any such financing and our plans with respect thereto;
any litigation to which we are a party;
claims and limitations on insurance coverage;
our plans to mitigate our material weakness in our internal control over financial reporting;
geological, metallurgical and geotechnical studies and opinions;
mineral reserve and resource estimates, and our ability to define and declare further mineral reserve estimates;
our status as a passive foreign investment company; and
our expected financial performance.

These forward-looking statements are based on information available as of the date of this Quarterly Report on Form 10-Q, and current expectations, forecasts and assumptions, and involve a number of judgments, risks and uncertainties. Important factors could cause actual results, performance or achievements to differ materially from those indicated or implied by forward-looking statements such as those described under the caption “Risk Factors” in Item 1A of Part I of our Annual Report on Form 10-K for the year ended December 31, 2025 as filed with the Securities and Exchange Commission (“SEC”) on March 31, 2026 (“2025 Annual Report on Form 10-K”). Such risks are not exhaustive. New risk factors emerge from time to time, and it is not possible to predict all such risk factors, nor can we assess the impact of all such risk factors on our business or the extent to which any factor or combination of factors may cause actual results to differ materially from those contained in any forward-looking statements. In particular, forward-looking statements regarding the timing and outcome of the NOAA regulatory review process are subject to material risks, including: (i) the risk that the certification stage (which involves interagency consultation with the Departments of State, War and the Environmental Protection Agency, among others) may result in conditions, delays or an adverse determination; (ii) the risk that the preparation of an Environmental Impact Statement and the associated public comment period may give rise to objections or conditions that affect the scope or terms of any permit ultimately issued; and (iii) the risk that NOAA may determine not to issue the requested exploration license and/or commercial recovery permit following the completion of the environmental review. The determination that TMC USA’s consolidated application is in full compliance with applicable requirements under DSHMRA is a procedural milestone and does not constitute, and should not be construed as, an approval or grant of the requested licenses or commercial recovery permit. Forward-looking statements are not guarantees of performance. You should not put undue reliance on these statements, which speak only as of the date hereof. All forward-looking statements attributable to us or persons acting on our behalf are expressly qualified in their entirety by the foregoing cautionary statements. We undertake no obligations to update or revise publicly any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.

4

Table of Contents

PART I – FINANCIAL INFORMATION

Item 1.Financial Statements

TMC the metals company Inc.

Condensed Consolidated Balance Sheets

(in thousands of US Dollars, except share amounts)

(Unaudited)

As at

As at

  ​ ​ ​

  ​ ​ ​

March 31, 

  ​ ​ ​

December 31, 

ASSETS

  ​ ​

Note

  ​ ​

2026

  ​ ​

2025

Current

 

 

  ​

Cash

$

119,682

 

$

117,633

Receivables and prepayments

 

3,097

 

3,049

 

122,779

 

120,682

Non-current

 

 

Exploration assets

 

 

42,951

 

42,951

Right of use asset

6

1,430

1,907

Equipment

 

480

 

519

Software

2,182

2,125

Investments

7

15,052

13,447

 

62,095

 

60,949

TOTAL ASSETS

$

184,874

 

$

181,631

LIABILITIES

 

 

Current

 

 

Accounts payable and accrued liabilities

 

11

 

53,858

 

46,048

Warrants liability

12

2,689

13,351

 

56,547

 

59,399

Non-current

 

 

Deferred tax liability

 

 

10,675

 

10,675

Royalty liability

8

145,000

145,000

155,675

155,675

TOTAL LIABILITIES

$

212,222

 

$

215,074

EQUITY

 

 

Common shares (unlimited shares, no par value – issued: 433,188,187 (December 31, 2025 –422,966,333))

 

 

705,287

 

681,343

Additional paid - in capital

 

240,446

 

237,696

Accumulated other comprehensive loss

 

(1,203)

 

(1,203)

Deficit

 

(971,878)

 

(951,279)

TOTAL EQUITY

 

(27,348)

 

(33,443)

TOTAL LIABILITIES AND EQUITY

$

184,874

 

$

181,631

Nature of Operations (Note 1)

Contingent Liabilities (Note 17)

Subsequent Event (Note 19)

The accompanying notes are an integral part of these unaudited interim condensed consolidated financial statements.

5

Table of Contents

TMC the metals company Inc.

Condensed Consolidated Statements of Loss and Comprehensive Loss

(in thousands of US Dollars, except share and per share amounts)

(Unaudited)

Three months ended

Three months ended

  ​ ​ ​

  ​ ​ ​

March 31, 

March 31, 

  ​ ​ ​

Note

  ​ ​ ​

2026

  ​ ​ ​

2025

Operating expenses

 

  ​

  ​

 

Exploration and evaluation expenses

 

9

$

13,257

 

$

9,515

General and administrative expenses

10

20,725

 

8,500

Operating loss

33,982

 

18,015

Other items

  ​

 

Equity-accounted investment loss

7

2,998

35

Gain on dilution of investment

7

(4,602)

Change in fair value of warrant liability

12

(10,662)

441

Foreign exchange loss (gain)

 

(690)

 

1,095

Interest income

(1,136)

 

(19)

Fees and interest on borrowings and credit facilities

16

665

 

1,021

Net loss and comprehensive loss for the period, before tax

$

20,555

 

$

20,588

Tax expense

44

Net loss and comprehensive loss for the period, after tax

$

20,599

 

$

20,588

Loss per share

  ​

 

- Basic and diluted

 

14

$

0.05

 

$

0.06

Weighted average number of common shares outstanding – basic and diluted

 

425,770,033

 

345,346,393

The accompanying notes are an integral part of these unaudited interim condensed consolidated financial statements.

6

Table of Contents

TMC the metals company Inc.

Condensed Consolidated Statements of Changes in Equity

(in thousands of US Dollars, except share amounts)

(Unaudited)

Accumulated

Additional

Other

Common Shares

Paid in

Comprehensive

Three months ended March 31, 2026

  ​ ​ ​

Shares

  ​ ​ ​

Amount

  ​ ​ ​

Capital

  ​ ​ ​

Loss

  ​ ​ ​

Deficit

  ​ ​ ​

Total

December 31, 2025

422,966,333

$

681,343

$

237,696

$

(1,203)

$

(951,279)

$

(33,443)

Exercise of stock options

2,045,126

10,248

(7,529)

 

 

 

2,719

Conversion of restricted share units, net of shares withheld for taxes (Note 13)

8,176,728

13,696

(13,696)

Share-based compensation and Expenses settled with equity (Note 13)

23,975

23,975

Loss for the period

 

 

(20,599)

 

(20,599)

March 31, 2026

433,188,187

$

705,287

$

240,446

 

$

(1,203)

 

$

(971,878)

 

$

(27,348)

Accumulated

Additional

  ​ ​ ​

Other

  ​ ​ ​

  ​ ​ ​

Common Shares

Paid in

Comprehensive

Three months ended March 31, 2025

  ​ ​ ​

Shares

  ​ ​ ​

Amount

  ​ ​ ​

Capital

  ​ ​ ​

Loss

  ​ ​ ​

Deficit

  ​ ​ ​

Total

Decemeber 31, 2024

340,708,460

$

477,217

$

138,303

$

(1,203)

$

(631,435)

$

(17,118)

Issuance of shares and warrants under Registered Direct Offering, net of expenses

 

5,000,000

2,237

2,763

 

 

 

5,000

Shares issued as per At-the-Market Equity Distribution Agreement

2,975,226

5,562

5,562

Conversion of restricted share units, net of shares withheld for taxes

7,933,336

10,788

(10,788)

Share-based compensation and Expenses settled with equity

 

10,378

 

 

 

10,378

Loss for the period

 

 

 

(20,588)

 

(20,588)

March 31, 2025

 

356,617,022

$

495,804

$

140,656

 

$

(1,203)

 

$

(652,023)

 

$

(16,766)

The accompanying notes are an integral part of these unaudited interim condensed consolidated financial statements.

7

Table of Contents

TMC the metals company Inc.

Condensed Consolidated Statements of Cash Flows

(in thousands of US Dollars)

(Unaudited)

Three months ended

Three months ended

  ​ ​ ​

  ​ ​ ​

March 31, 

  ​ ​ ​

March 31, 

  ​ ​ ​

Note

  ​ ​ ​

2026

  ​ ​ ​

2025

Cash provided by (used in)

 

  ​

  ​

 

  ​

Operating activities

 

Loss for the period

 

$

(20,599)

 

$

(20,588)

Items not affecting cash:

 

 

Amortization

39

58

Accrued interest on credit facilities

558

Lease expense

6

477

477

Share-based compensation and expenses settled with equity

13

23,975

10,378

Equity-accounted investment loss

 

7

2,998

 

35

Gain on dilution of investment

7

(4,602)

Change in fair value of warrants liability

12

(10,662)

441

Unrealized foreign exchange movement

(726)

2,345

Interest paid on short-term debt

16

(103)

Changes in working capital:

 

 

Receivables and prepayments

 

(48)

 

(3,161)

Accounts payable and accrued liabilities

 

8,533

 

213

Net cash used in operating activities

(615)

 

(9,347)

Investing activities

 

 

Acquisition of equipment and software

(35)

(70)

Net cash used in investing activities

(35)

 

(70)

Financing activities

 

 

Proceeds from exercise of stock options

13

2,719

Proceeds from registered direct offering

 

 

5,000

Expenses paid for registered direct offering

(472)

Proceeds from Shares issued from ATM

 

 

5,562

Repayment of Debt

(1,797)

Net cash provided by financing activities

2,719

8,293

Increase/(Decrease) in cash

 

$

2,069

 

$

(1,124)

Impact of exchange rate changes on cash

 

(20)

 

(10)

Cash - beginning of period

 

117,633

 

3,480

Cash - end of period

 

$

119,682

 

$

2,346

The accompanying notes are an integral part of these unaudited interim condensed consolidated financial statements.

8

Table of Contents

TMC the metals company Inc.

Notes to Interim Condensed Consolidated Financial Statements

(in thousands of US Dollars, except share, per share amounts and unless otherwise stated)

(Unaudited)

1.Nature of Operations

TMC the metals company Inc. (“TMC” or the “Company”) was incorporated as a Cayman Islands exempted company limited by shares on December 18, 2019. On September 9, 2021, the Company completed its business combination with DeepGreen Metals Inc. (“DeepGreen”), a Canadian-registered company founded in 2011, after which DeepGreen became a wholly - owned subsidiary and the combined company began operating as TMC the metals company Inc. and continued as a corporation under the laws of the province of British Columbia, Canada on September 9, 2021. The Company’s corporate office, registered address and records office is located at 1111 West Hastings Street, 15th Floor, Vancouver, British Columbia, Canada, V6E 2J3. The Company’s common shares and warrants to purchase common shares are listed for trading on the Nasdaq Global Select Market (“Nasdaq”) under tickers “TMC” and “TMCWW”, respectively.

The Company is a deep seabed minerals developer focused on the collection, processing and refining of polymetallic nodules found on the seafloor in international waters of the Clarion Clipperton Zone in the Pacific Ocean (“CCZ”), with NORI Area D located approximately 1,500 miles (or 2,400 kilometers) southwest of San Diego, California. These nodules contain high grades of four metals (nickel, copper, cobalt, manganese) and rare earth elements (REEs) which will initially be transformed into nickel, cobalt and copper-bearing intermediate and metal cathodes and cathode products, as well as a manganese silicate product of approximately 40% manganese comparable to medium-grade manganese ore. Once in production, the Company will explore expanding into other product formats including silicomanganese alloy, battery-grade sulfates and precursor Cathode Active Materials (pCAM), as well as extracting REEs contained in nodules.

On April 28, 2025, the Company’s wholly owned subsidiary, The Metals Company USA, LLC (“TMC USA”), formally submitted applications for two exploration licenses and one commercial recovery permit to the National Oceanic and Atmospheric Administration (“NOAA”) pursuant to the Deep Seabed Hard Mineral Resources Act of 1980 (“DSHMRA”). The submitted exploration license applications are to secure exploration rights over two areas in the CCZ, namely TMC USA-A and TMC USA-B, covering a total area of 187,017 km2. The submitted commercial recovery permit application is to secure commercial recovery rights for a subset of the TMC USA-A area covering over 25,160 square kilometers. The commercial recovery application is the first submission under DSHMRA for commercial recovery of polymetallic nodules. On January 22, 2026, TMC USA formally submitted a consolidated application to NOAA for an exploration license and a commercial recovery permit for polymetallic nodules in the CCZ. The application was filed under NOAA’s new consolidated application and review process. The consolidated application covers approximately 65,000 km2 exploration and commercial recovery area in the CCZ, compared to a commercial recovery area of 25,160 km2 in TMC USA’s initial commercial recovery permit application filed in April 2025. The consolidated application received substantial compliance on March 6, 2026 and full compliance on April 28, 2026. The application is now in the certification review stage. The review process under DSHMRA involves three stages: (i) a determination that the application is in compliance with applicable requirements; (ii) certification of the applicant and the proposed program, including an interagency consultation process; and (iii) an environmental review, including preparation of an Environmental Impact Statement and a public comment period, following which NOAA will determine whether to issue the requested licenses and permit and, if so, the applicable terms and conditions.

Two of the Company’s wholly owned subsidiaries, Nauru Ocean Resources Inc. (“NORI”) and Tonga Offshore Mining Limited (TOML) continue to hold and comply with the terms of their exploration contracts granted by the International Seabed Authority (ISA).

The realization of the Company’s assets and attainment of profitable operations is dependent upon many factors including, among other things: financing being arranged by the Company to continue the scaling of the nodule collection system for the recovery of polymetallic nodules from the seafloor and the processing technology for the treatment of polymetallic nodules at commercial scale, the continued establishment of mineable reserves, the commercial and technical feasibility of seafloor polymetallic nodule collection and processing, metal prices, and regulatory approvals and permitting for commercial operations. The outcome of these matters cannot presently be determined because they are contingent on future events and may not be fully under the Company’s control.

9

Table of Contents

TMC the metals company Inc.

Notes to Interim Condensed Consolidated Financial Statements

(in thousands of US Dollars, except share, per share amounts and unless otherwise stated)

(Unaudited)

2.Basis of Presentation

These unaudited condensed consolidated interim financial statements are prepared in accordance with U.S. Generally Accepted Accounting Principles (“U.S. GAAP”) for interim financial statements. Accordingly, certain information and footnote disclosures required by U.S. GAAP have been condensed or omitted in these unaudited condensed consolidated interim financial statements pursuant to such rules and regulations. In management’s opinion, these unaudited condensed consolidated interim financial statements include all adjustments of a normal recurring nature necessary for the fair presentation of the Company’s statement of financial position, operating results for the periods presented, comprehensive loss, shareholder’s equity and cash flows for the interim periods, but are not necessarily indicative of the results of operations to be expected for the full year ending December 31, 2026 or for any other period. These unaudited condensed consolidated interim financial statements should be read in conjunction with the audited annual consolidated financial statements for the year ended December 31, 2025. The Company has applied the same accounting policies as in the prior year.

3.Use of Estimates

The preparation of financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions that affect the reported amounts in the consolidated financial statements and the notes thereto. Significant estimates and assumptions reflected in these condensed consolidated interim financial statements include, but are not limited to, the evaluation of going concern, the valuation of share-based payments, including valuation of stock options (Note 13), as well as the valuation of private warrants (Note 12) and the valuation of the Royalty liability (Note 8). Actual results could differ materially from those estimates.

4.Fair Value of Financial Instruments

Fair value estimates of financial instruments are made at a specific point in time, based on relevant information about financial markets and specific financial instruments. As these estimates are subjective in nature, involving uncertainties and matters of significant judgment, they cannot be determined with precision. Changes in assumptions can significantly affect estimated fair value.

The Company measures fair value as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the reporting date. In accordance with U.S. GAAP, the Company utilizes a three-tier hierarchy, which prioritizes the inputs used in the valuation methodologies in measuring fair value:

Level 1 - Valuations based on quoted prices in active markets for identical assets or liabilities that an entity has the ability to access.
Level 2 - Valuations based on quoted prices for similar assets or liabilities, quoted prices for identical assets or liabilities in markets that are not active, or other inputs that are observable or can be corroborated by observable data for substantially the full term of the assets or liabilities.
Level 3 - Valuations based on inputs that are supported by little or no market activity and that are significant to the fair value of the assets or liabilities.

In some circumstances, the inputs used to measure fair value might be categorized within different levels of the fair value hierarchy. In those instances, the fair value measurement is categorized in its entirety in the fair value hierarchy based on the lowest level input that is significant to the fair value measurement.

There were no transfers between fair value measurement levels during the three months ended March 31, 2026, and 2025.

As at March 31, 2026, and December 31, 2025, the carrying values of cash, receivables, accounts payable and accrued liabilities approximate their fair values due to the short-term nature of these instruments. The financial instruments also include royalty liability and warrants which are recorded at fair value as disclosed in Note 8 and Note 12, respectively.

10

Table of Contents

TMC the metals company Inc.

Notes to Interim Condensed Consolidated Financial Statements

(in thousands of US Dollars, except share, per share amounts and unless otherwise stated)

(Unaudited)

5.Recent Accounting Pronouncements Issued and Adopted

There were no recent accounting pronouncements issued and adopted by the Company during the period.

6.Strategic Alliance with Allseas Group S. A. and Affiliates

Development of Project Zero Offshore Nodule Collection System

On March 16, 2022, NORI and Allseas Group S.A. (“Allseas”) entered into a non-binding term sheet for the development and operation of a commercial nodule collection system. For the three months ended March 31, 2026, Allseas provided the Company with engineering, project management and vessel use services consisting of lay-up costs totaling $0.6 million, as part of the development of the commercial nodule collection system. These costs were recorded as mining, technological and process development within exploration and evaluation expenses (Note 9) (For three months ended March 31, 2025: $2.3 million).

Exclusive Vessel Use Agreement with Allseas

On August 1, 2023, the Company entered into an Exclusive Vessel Use Agreement with Allseas pursuant to which Allseas will give exclusive use of the vessel (“Hidden Gem”) to the Company in support of the development of a commercial nodule collection system until the system is completed or December 31, 2026, whichever is earlier. In consideration of the exclusivity term, the Company, on August 14, 2023, issued 4.15 million common shares to Allseas. Allseas can terminate the agreement if the Company ceases normal operations, assigns assets to creditors, initiates bankruptcy proceedings, or faces unresolved bankruptcy-related actions.

For the three months ended March 31, 2026, the Company has recognized $0.5 million as lease expense recorded as exploration and evaluation expense (For the three months ended March 31, 2025: $0.5 million).

As at March 31, 2026, the net amount of right-of-use asset was as follows:

  ​ ​ ​

Right-of-use Asset

Balance as at December 31, 2024

$

3,814

Lease expense during the year

(1,907)

Balance as at December 31, 2025

$

1,907

Lease expense during the period

(477)

Balance as at March 31, 2026

$

1,430

2023 Credit Facility and Loan Agreements with Company Related to Allseas

On March 22, 2023, the Company entered into an Unsecured Credit Facility Agreement, which was amended on July 31, 2023 (“2023 Credit Facility”), with Argentum Cedit Virtuti GCV (the “Lender”), the parent of Allseas Investments S.A. (“Allseas Investments”) and an affiliate of Allseas, pursuant to which, the Company could borrow from the Lender up to $25 million in the aggregate, from time to time, subject to certain conditions. All amounts drawn under the 2023 Credit Facility bore interest based on the 6-month Secured Overnight Financing Rate, 180-day average plus a margin of 4.0% per annum payable in cash semi-annually (or plus a margin of 5% if paid-in-kind at maturity, at the Company’s election) on the first business day of each of June and January. The Company had to pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remained undrawn under the 2023 Credit Facility. The Company had the ability to settle certain charges under the 2023 Credit Facility in cash or in equity at the discretion of the Company. The 2023 Credit Facility also contained customary events of default. On March 24, 2025, the Company entered into a Letter Agreement with the Lender, pursuant to which the 2023 Credit Facility was cancelled with the only obligation remaining being the underutilization fees amounting to $2 million.

As at March 31, 2026, the total amount payable to Allseas and its affiliates was $34.1 million of which $32.1 million related to the development of the nodule collection system and $2 million related to the underutilization fees payable on the 2023 Credit facility.

11

Table of Contents

TMC the metals company Inc.

Notes to Interim Condensed Consolidated Financial Statements

(in thousands of US Dollars, except share, per share amounts and unless otherwise stated)

(Unaudited)

These amounts were recorded in accrued liabilities in the consolidated balance sheet which can be settled in cash or equity at the Company’s discretion (Note 11) (December 31, 2025: $34.2 million, recorded as accrued liabilities). As at March 31, 2026, Allseas and its affiliates owned 56.1 million common shares of the Company (2025: 56.1 million TMC common shares) which constituted 13.0% (December 31, 2025: 13.3%) of total common shares outstanding.

Subsequent to March 31, 2026, the Company entered into a Contract for Development Work and Commercial Production with Allseas Deepsea Marine Contractors, a wholly owned subsidiary of Allseas, as further described in Note 19.

7.Investments

The below table summarizes the changes in the Company’s investments during the year:

  ​ ​ ​

The Metals Royalty

  ​ ​ ​

1554997 B.C.

Company

Ltd.

Investment as at December 31, 2024

$

8,203

Spin-Out transaction

(3,739)

3,739

Return of capital

(346)

(346)

Dilution gain

5,649

Equity-accounted investment gain for the year ended 2025

287

Investment as at December 31, 2025

$

10,054

3,393

Equity-accounted investment loss for the three months ended March 31, 2026

(2,718)

(279)

Dilution gain

4,602

Investment as at March 31, 2026

11,938

3,114

Investment in The Metals Royalty Company

On February 21, 2023 (the “Closing Date”), the Company and its wholly-owned subsidiary, NORI, entered into an investment agreement (the “Royalty Agreement”) with The Metals Royalty Company Inc. (“The Metals Royalty Company”) formerly known as Low Carbon Royalties. In connection with the Royalty Agreement, NORI contributed a 2% gross overriding royalty (the “NORI Royalty”) (Note 8) on the Company’s NORI project area in the CCZ to The Metals Royalty Company.

As a condition of closing the Royalty Agreement, the parties entered into an agreement with The Metals Royalty Company to mitigate risks associated with the potential termination of the exploitation license granted for one of the royalty-producing natural gas fields in Latin America (the “Exploitation License”). As per the agreement, 5 million contingent value rights (“CVR”) were issued to NORI. The CVR would convert into 5 million additional shares of The Metals Royalty Company all of which would be issued to NORI, in the event the Exploitation License is found, in a final decision, to be invalid by the Colombian National Agency of Hydrocarbons prior to the earlier of (1) five years from the issuance of the CVR and (2) the date The Metals Royalty Company becomes a publicly listed entity.

During the three months ended March 31, 2026, The Metals Royalty Company issued 1,000,000 common shares as compensation expenses and 3,134,481 common shares upon release of the subscription receipts resulting in gross proceeds of $15.7 million. The Company did not participate in the offering, which reduced its ownership interest from 27.2% to 25.15%.(December 31, 2025: 27.2%). As the shares were issued at a price higher than The Metals Royalty Company’s book value per share, the Company recorded a dilution gain of $4.6 million. The Company also has representation on the board of directors of The Metals Royalty Company, providing the Company with the ability to exercise significant influence over The Metals Royalty Company’s operating and financial policies. Accordingly, the investment in The Metals Royalty Company is accounted for under the equity method in accordance with ASC 323 (Investments).

For the three months ended March 31, 2026, the Company’s share of the net loss generated by The Metals Royalty Company was $2.7 million (for the three months ended March 31, 2025, the Company’s share of The Metals Royalty Company’s net loss was: $35 thousand).

12

Table of Contents

TMC the metals company Inc.

Notes to Interim Condensed Consolidated Financial Statements

(in thousands of US Dollars, except share, per share amounts and unless otherwise stated)

(Unaudited)

As at March 31, 2026, The Metals Royalty Company had 872,250 stock options and 4,569,000 restricted share units outstanding, the settlement of which may significantly affect the Company’s share of reported earnings or losses.

Financial results of The Metals Royalty Company as at and for the three months ended March 31, 2026 and 2025 are summarized below:

  ​ ​ ​

As at March 31, 

  ​ ​ ​

As at December 31,

2026

2025

Current assets

$

31,985

 

$

18,853

Non-current assets

 

14,099

 

14,095

Current liabilities

 

3,507

 

1,763

  ​ ​ ​

Three months ended

March 31, 

March 31, 

 

2026

  ​ ​ ​

2025

Operating expenses from continuing operations

$

10,624

 

$

115

Net loss from continuing operations

$

10,071

 

98

Net loss from discontinued operations

 

11

Investment in 1554997 B.C. Ltd

In the fourth quarter of 2025, The Metals Royalty Company transferred its oil and gas royalty assets to 1554997 B.C. Ltd. (“the Investee”) in exchange for shares of 1554997 B.C. Ltd (“Spin-Out transaction”). As part of the Spin-Out transaction the Company holds 27.2% ownership interest (December 31, 2025: 27.2%) and has representation on the board of directors of the Investee, providing the Company with the ability to exercise significant influence over the Investee’s operating and financial policies. Accordingly, the investment is accounted for under the equity method in accordance with ASC 323 (Investments).

The Company records its share of the results in the Investee on a one-quarter reporting lag. As a result, the Company’s share of the net loss generated by the Investee in the three months ended December 31, 2025 was $0.3 million.

Financial results of 1554997 B.C. Ltd. as at and for the quarter ended December 31, 2025 are summarized below:

  ​ ​ ​

As at

December 31, 2025

Current assets

$

380

Non-current assets

 

12,173

Current liabilities

 

44

Non-current liabilities

 

1,057

Three months ended

December 31, 2025

Royalty Income

$

44

Operating Income

 

27

Net Loss

1,027

13

Table of Contents

TMC the metals company Inc.

Notes to Interim Condensed Consolidated Financial Statements

(in thousands of US Dollars, except share, per share amounts and unless otherwise stated)

(Unaudited)

8.Royalty Liability

The NORI Royalty (including Areas A to D) (Note 7) was recorded as a royalty liability in the consolidated Balance Sheet in accordance with ASC 470, Debt. The Company elected to account for the royalty liability at fair value through profit and loss. The fair value of Areas A to C was determined using a market approach which entails examining recent royalty transactions prior to the reporting date, focusing on those transactions that involve similar metals as contained in NORI’s polymetallic nodules. As at March 31, 2026, the Company compared the specific characteristics of these transactions and estimated the fair value for Areas A to C at $15 million, unchanged from December 31, 2025. The fair value of Area D was determined using an income approach following the Company’s completion and release of its PFS with respect to NORI Area D filed in August 2025 resulting with a fair value for Area D of $130 million as at March 31, 2026, unchanged from the end of 2025. The discounted cash flow fair value reflects updated operational and economic assumptions, including the use of forward metal prices and a discount rate of approximately 10.6%, related to the NORI Area D project used in support of the PFS.

9.Exploration and Evaluation Expenses

The detail of exploration and evaluation expenses is as follows:

Three months ended

March 31, 

  ​ ​ ​

2026

  ​ ​ ​

2025

Environmental studies

$

270

$

1,270

Exploration labor (1)

2,847

2,587

Share-based compensation (Note 13)

5,530

1,928

Mining, technological and process development

1,312

2,950

Prefeasibility studies

1,878

41

Sponsorship, training and stakeholder engagement

1,199

633

Other

221

106

$

13,257

$

9,515

(1)Reflects underlying project-related work performed by the Company’s personnel.

10.General and Administrative Expenses

The details of general and administrative expenses are as follows:

Three months ended

March 31, 

  ​ ​ ​

2026

  ​ ​ ​

2025

Professional and consulting fees(1)

$

2,505

$

2,050

Investor relations

 

382

 

220

Office and sundry

 

417

 

465

Salaries and wages(2)

 

1,763

 

1,363

Director fees

 

181

 

204

Share-based compensation (Note 13)

 

15,105

 

3,950

Transfer agent and filing fees

 

125

 

106

Travel and other expenses

 

247

 

142

$

20,725

$

8,500

(1)Professional and consulting fees include $0.2 million of expenses settled with RSUs (Three months ended March 31, 2025: $0.4 million) (Note 13).
(2)Reflects underlying corporate-related activities performed by the Company’s personnel.

14

Table of Contents

TMC the metals company Inc.

Notes to Interim Condensed Consolidated Financial Statements

(in thousands of US Dollars, except share, per share amounts and unless otherwise stated)

(Unaudited)

11.Accounts Payable and Accrued Liabilities

Accounts payable and accrued liabilities outstanding at March 31, 2026, and December 31, 2025 are as follows:

  ​ ​ ​

March 31, 

  ​ ​ ​

December 31, 

2026

2025

Accounts Payable(1)

$

9,058

$

2,277

Accrued Liabilities(2)

 

44,800

 

43,771

$

53,858

$

46,048

(1)

The accounts payable balance includes $0.7 million of underutilization fees payable to the related parties under 2024 Credit facility (Note 16).

(2)

As at March 31, 2026, accrued liabilities totaled $44.8 million (December 31, 2025 - $43.8 million), of which $34.1 million relates to Allseas (Note 6) (December 31, 2025 - $34.2 million).

12.Warrants

Public Warrants

As at March 31, 2026, 15,000,000 Public Warrants were outstanding (December 31, 2025 – 15,000,000). Public Warrants may only be exercised for a whole number of shares. The exercise price for the Public Warrants is $11.50 per common share. The Public Warrants will expire on September 9, 2026 or earlier upon redemption or liquidation.

As at March 31, 2026, the value of outstanding Public Warrants of $19.5 million was recorded in additional paid in capital (December 31, 2025: $19.5 million).

Private Warrants

As at March 31, 2026, 9,500,000 Private Warrants were outstanding (December 31, 2025 – 9,500,000). The exercise price for the Private Warrants is $11.50 per common share. The Private Warrants will expire on September 9, 2026 or earlier upon redemption or liquidation.

The Private Warrants were valued using a Black-Scholes model, which resulted in a Level 3 fair value measurement. The primary unobservable input utilized in determining the fair value of the Private Warrants was the expected volatility of the Company’s common shares. The expected volatility was estimated using a binomial model that assigned equal weight to the implied volatility of the Company’s Public Warrants, adjusted for the call feature triggered at prices above $18.00 over 20 trading days within any 30-day period, and the historical volatility of the common share price.

As at March 31, 2026, the fair value of outstanding Private Warrants of approximately $2.7 million is recorded as warrants liability. The following table presents the changes in the fair value of warrants liability:

  ​ ​ ​

Private

Warrants

Warrants liability as at December 31, 2025

$

13,351

Decrease in fair value of warrants liability

 

(10,662)

Warrants liability as at March 31, 2026

$

2,689

15

Table of Contents

TMC the metals company Inc.

Notes to Interim Condensed Consolidated Financial Statements

(in thousands of US Dollars, except share, per share amounts and unless otherwise stated)

(Unaudited)

As at March 31, 2026, the fair value of the Private Warrants was estimated using the following assumptions:

March 31, 

December 31, 

  ​ ​ ​

2026

  ​ ​ ​

2025

Exercise price

$

11.50

$

11.50

Share price

$

4.67

$

6.17

Volatility

110.21

%

 

124.72

%

Term

0.44

years

 

0.69

years

Risk-free rate

3.65

%

 

3.49

%

Dividend yield

0.0

%

 

0.0

%

Class A Warrants

As at March 31, 2026, 4,317,500 Class A warrants were outstanding (December 31, 2025 – 4,317,500). Each whole Class A Warrant entitles the holder to purchase one common share at an exercise price of $2.00 per share and will expire on December 31, 2027.

During the three months ended March 31, 2026, there were no exercises of Class A warrants. As at March 31, 2026, the value of outstanding Class A Warrants of $3.6 million was recorded in additional paid in capital (December 31, 2025: $3.6 million).

Class B Warrants

As at March 31, 2026, 15,000 Class B warrants were outstanding (December 31, 2025 – 15,000). Each whole Class B Warrant entitles the holder to purchase one common share at an exercise price of $2.00 per share and will expire on November 19, 2029.

During the three months ended March 31, 2026, there had been no exercises of Class B warrants. As at March 31, 2026, the value of outstanding Class B Warrants of $9 thousand was recorded in additional paid in capital (December 31, 2025: $9 thousand).

Class C Warrants

As at March 31, 2026, 10,003,333 Class C warrants were outstanding (December 31, 2025 – 10,003,333). Each whole Class C Warrant entitles the holder to purchase one common share at an exercise price of $4.50 per share. The Class C warrants expire on May 12, 2028.

During the three months ended March 31, 2026, there had been no exercises of Class C warrants. As at March 31, 2026, the value of outstanding Class C Warrants of $10.2 million was recorded in additional paid in capital (December 31, 2025: $10.2 million).

Warrants issued to Korea Zinc

As at March 31, 2026, 6,868,181 warrants issued to Korea Zinc were outstanding (December 31, 2025 – 6,868,181). The exercise price for the warrants is $7.00 per common share and the warrants expire on June 25, 2028.

During the three months ended March 31, 2026, there had been no exercises of the warrants issued to Korea Zinc and as at March 31, 2026, the value of outstanding warrants of $11.5 million was recorded in additional paid in capital (December 31, 2025: $11.5 million).

Warrants issued to Republic of Nauru

As at March 31, 2026, 9,146,268 warrants issued to the Republic of Nauru (“Nauru Warrants”) were outstanding (December 31, 2025 – 9,146,268). The Nauru Warrants allow the purchase of common shares of the Company at an exercise price of $4.72 per share with an expiration date of May 30, 2030. The Nauru Warrants cannot be exercised through a cashless or net exercise.

16

Table of Contents

TMC the metals company Inc.

Notes to Interim Condensed Consolidated Financial Statements

(in thousands of US Dollars, except share, per share amounts and unless otherwise stated)

(Unaudited)

The Nauru Warrants cannot be exercised until the following conditions have been met:

A subsidiary of the Company other than NORI obtains a permit, license or other authorization from the United States for the conduct of deep seabed mineral activities; and
The subsidiary other than NORI commences commercial recovery activities of deep seabed minerals pursuant to that permit, license or other authorization.

During the three months ended March 31, 2026, there has been no exercises of the Nauru Warrants. As at March 31, 2026, the value of outstanding Nauru Warrants of $33.1 million was recorded in additional paid in capital (December 31, 2025: $33.1 million).

Warrants issued to the Kingdom of Tonga

As at March 31, 2026, 1,000,000 warrants issued to the Kingdom of Tonga (“Tonga Warrants”) were outstanding (December 31, 2025 – 1,000,000). The Tonga Warrants allow the purchase of common shares of the Company at an exercise price of $5.87 per share, with an expiration date of August 4, 2033. The Tonga Warrants cannot be exercised through a cashless or net exercise.

The Tonga Warrants cannot be exercised until the following conditions have been met:

A subsidiary of the Company other than TOML obtains a permit, license or other authorization from the U.S. for the conduct of deep seabed mineral activities; and
The subsidiary other than TOML commences commercial recovery activities of deep seabed minerals pursuant to that permit, license or other authorization.

During the three months ended March 31, 2026, there has been no exercises of the Tonga Warrants. As at March 31, 2026, the value of outstanding Tonga Warrants of $5 million was recorded in additional paid in capital (December 31, 2025: $5 million).

13.Share-Based Compensation

The Company’s 2021 Incentive Equity Plan (the “Incentive Plan”) provides an aggregate number of common shares reserved for future issuance under the Incentive Plan. As at March 31, 2026, there were a total of 28,001,961 common shares reserved for issuance under the Incentive Plan. These amounts include 16,918,653 shares added to the Incentive Plan in January 2026 pursuant to the Incentive Plan’s automatic annual increase provision, provided that 2,243,853 of the outstanding common shares shall only be available for awards made to non-employee directors of the Company. On the first day of each fiscal year from 2022 to 2031, the number of common shares that may be issued pursuant to the Incentive Plan is automatically increased by an amount equal to the lesser of 4% of the number of outstanding common shares or an amount determined by the board of directors.

Share-based awards consisting of RSUs and options under the Short-Term Incentives Plan (“STIP”) and Long-Term Incentives Plan (“LTIP”) have been issued under the 2021 Incentive Equity Plan.

Prior to the 2021 Incentive Plan, the Company had granted share-based awards under the 2018 Stock Option Plan (“2018 Plan”).

17

Table of Contents

TMC the metals company Inc.

Notes to Interim Condensed Consolidated Financial Statements

(in thousands of US Dollars, except share, per share amounts and unless otherwise stated)

(Unaudited)

Stock options

A continuity schedule summarizing the movements in the Company’s stock options under the various plans is as follows:

  ​ ​ ​

Number of

  ​ ​ ​

Number of

  ​ ​ ​

Short-Term

Long-Term

Number of

Options

Options

Options

Outstanding

Outstanding

Outstanding

under 2018

under 2018

under

 

Plan

Plan

Incentive Plan

Outstanding – December 31, 2024

14,300,575

 

9,644,874

 

3,940,000

Granted

 

 

7,750,000

Expired/ Forfeited

 

(11,578)

 

 

(500,000)

Exercised

 

(4,051,304)

 

(695,242)

 

Outstanding – December 31, 2025

 

10,237,693

8,949,632

11,190,000

Exercised

 

(1,594,041)

 

(284,418)

 

(166,667)

Outstanding – March 31, 2026

 

8,643,652

 

8,665,214

 

11,023,333

During the three months ended March 31, 2026, the Company recognized $0.5 million of share-based compensation expense for stock options as general and administrative expenses in the statement of loss and comprehensive loss (For the three months ended March 31, 2025, the Company recognized $0.5 million of share-based compensation expense for stock options as general and administrative expenses). The Company has not granted any options under the 2018 Plan since September 9, 2021 (date of the Business Combination) and has fully recognized the fair value of the options issued under the 2018 Plan in prior periods.

Restricted Share Units

The Company may, from time to time, grant RSUs to directors, officers, employees, and consultants of the Company and its subsidiaries under the Incentive Plan. On each vesting date, RSU holders are issued common shares equivalent to the number of RSUs held provided the holder is providing service to the Company on such vesting date.

A continuity schedule summarizing the RSU activity is as follows:

  ​ ​ ​

Number of RSUs 

Outstanding

Outstanding – December 31, 2024

 

34,312,655

Granted

 

35,381,992

Forfeited

 

(1,076,371)

Exercised

 

(20,296,128)

Outstanding - December 31, 2025

48,322,148

Granted

543,920

Exercised

(8,176,728)

Outstanding - March 31, 2026

 

40,689,340

18

Table of Contents

TMC the metals company Inc.

Notes to Interim Condensed Consolidated Financial Statements

(in thousands of US Dollars, except share, per share amounts and unless otherwise stated)

(Unaudited)

The details of RSUs granted by the Company during the three months ended March 31, 2026 and 2025 are as follows:

  ​ ​ ​

Three months ended

Three months ended

March 31, 

March 31, 

Vesting Period

  ​ ​

2026

  ​ ​ ​

2025

Vesting Immediately (1)

543,920

2,619,585

Vesting fully within the first anniversary of the grant date

 

 

60,000

Vesting in thirds on each anniversary of the grant date

 

 

8,818,935

Vesting in fourths on each anniversary of the grant date

 

 

176,302

Vesting based on performance conditions

324,184

Total Units Granted

543,920

11,999,006

(1)During the three months ended March 31, 2026, 539,437 RSUs were issued to settle liabilities with a carrying amount of $3.2 million, at a weighted average grant date fair value of $5.87 per RSU. (During the three months ended March 31, 2025, 2,469,585 RSUs were issued to settle liabilities with a carrying amount of $4.1 million, at a weighted average grant date fair value of $1.68 per RSU and 150,000 RSUs, were issued to consultants resulting in $0.3 million charged as general and administrative expenses).

The grant date fair value of all RSUs granted in three months ended March 31, 2026, is equivalent to the closing share price of the Company’s common shares on the date of grant. During the three months ended March 31, 2026, a total of $20.1 million was charged to the statement of loss and comprehensive loss as share-based compensation expense for RSUs (three months ended March 31, 2025: $5.4 million) of which share-based compensation expense related to general and administration matters amounted to $14.6 million (three months ended March 31, 2025 - $3.5 million) and share-based compensation expense related to exploration and evaluation activities amounted to $5.5 million (three months ended March 31, 2025 - $1.9 million). As at March 31, 2026, the total unrecognized share-based compensation expense for RSUs was $71.2 million (December 31, 2025- $91.5 million).

As at March 31, 2026, an aggregate of 81,761 vested RSUs were being processed and due to be converted into common shares (December 31, 2025: 81,198 units).

Employee Stock Purchase Plan

On May 31, 2022, TMC’s 2021 Employee Stock Purchase Plan (“ESPP”) was approved at the Company’s 2022 annual shareholders meeting. As at March 31, 2026, there were 18,246,245 common shares reserved for issuance under the ESPP. This included 4,229,663 shares added to the ESPP in January 2025 pursuant to the ESPP’s automatic annual increase provision. Under the ESPP, the number of shares reserved for issuance is subject to an annual increase provision which provides that on the first day of each of the Company’s fiscal years starting from 2022 to 2031, common shares equal to the lesser of (i) 1% of the common shares outstanding on the last day of the immediately preceding fiscal year, or (ii) such lesser number of shares as is determined by the board of directors will be added to the ESPP.

During the three months ended March 31, 2026, a total of $13 thousand was charged to the statement of loss and comprehensive loss as share-based compensation expense for ESPP (three months ended March 31, 2025: $1 thousand) of which share-based compensation expense related to general and administration matters amounted to $6 thousand (three months ended March 31, 2025 - $ nil) and share-based compensation expense related to exploration and evaluation activities amounted to $7 thousand (three months ended March 31, 2025 - $1 thousand).

14.Loss per Share

Basic loss per share is computed by dividing the loss by the weighted-average number of common shares of the Company outstanding during the period. Diluted loss per share is computed by giving effect to all common share equivalents of the Company, including outstanding stock options, RSUs, warrants, Special Shares and options to purchase Special Shares, to the extent these are dilutive. Basic and diluted loss per share was the same for each period presented as the inclusion of all common share equivalents would have been anti-dilutive.

19

Table of Contents

TMC the metals company Inc.

Notes to Interim Condensed Consolidated Financial Statements

(in thousands of US Dollars, except share, per share amounts and unless otherwise stated)

(Unaudited)

Anti-dilutive equivalent common shares were as follows:

Three months ended

Three months ended

March 31, 

March 31, 

  ​ ​ ​

2026

  ​ ​ ​

2025

Outstanding options to purchase common shares

28,332,199

  ​

29,135,449

Outstanding RSUs

40,689,340

  ​

37,921,412

Outstanding shares under ESPP

9,330

4,499

Outstanding warrants

55,850,282

40,680,770

Outstanding Special Shares and options to purchase Special Shares

136,004,597

136,011,413

Total anti-dilutive common equivalent shares

260,885,748

  ​

243,753,543

15. Financial Instruments

The following table presents the Company’s financial instruments, including those measured at fair value on a recurring basis and their classification within the fair value hierarchy.

  ​ ​ ​

Fair Value

  ​ ​ ​

March 31, 

  ​ ​ ​

December 31, 

Categories of Financial Instruments

Hierarchy

2026

2025

Financial assets

 

  ​

 

  ​

Amortized cost

 

  ​

 

  ​

Cash

 

 

$

119,682

 

$

117,633

Commodity taxes and other receivables

 

727

664

 

$

120,409

 

$

118,297

Financial liabilities

Amortized cost

Accounts payable and accrued liabilities (Note 11)

 

 

$

53,858

 

$

46,048

Fair value through profit or loss

Royalty liability (Note 8)

 

Level 3

145,000

145,000

Warrants liability (Note 12)

 

Level 3

2,689

13,351

 

$

201,547

 

$

204,399

20

Table of Contents

TMC the metals company Inc.

Notes to Interim Condensed Consolidated Financial Statements

(in thousands of US Dollars, except share, per share amounts and unless otherwise stated)

(Unaudited)

16.Related Party Transactions

On March 22, 2024, the Company entered into an Unsecured Credit Facility (the “2024 Credit Facility”) with Gerard Barron, the Company’s Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of one of the Company’s directors, (collectively, the “2024 Lenders”), pursuant to which, the Company may borrow from the 2024 Lenders up to $20 million in the aggregate ( $10 million from each of the 2024 Lenders), from time to time, subject to certain conditions. All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi - annually (or plus 5% if paid - in - kind at maturity, at our election) on the first business day of each of June and January. The Company will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility. The 2024 Credit Facility also contains customary events of default. On August 13, 2024, the Company entered into the First Amendment to the 2024 Credit Facility with the 2024 Lenders, to increase the borrowing limit of the 2024 Credit Facility to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders). On November 14, 2024, the Company entered into the Second Amendment to the 2024 Credit Facility with the 2024 Lenders, to increase the borrowing limit to $38 million in the aggregate ($19 million from each of the 2024 Lenders) and to extend the maturity of the 2024 Credit Facility to December 31, 2025. As per the Second Amendment, the rate of underutilization fee was retroactively increased from March 22, 2024, to 6.5% on any undrawn amounts under the 2024 Credit Facility. On March 26, 2025, the Company entered into the Third Amendment to the 2024 Credit Facility with the 2024 Lenders, to, among other things, increase the borrowing limit to $44 million in the aggregate ($22 million from each of the 2024 Lenders) and extend the maturity of the 2024 Credit Facility to June 30, 2026 with the 2024 Lenders having an option to extend the maturity date by up to two additional one year periods. As per the Third Amendment to the 2024 Credit Facility, the underutilization fees are to be paid quarterly in cash or shares at the 2024 Lenders election and the 2024 Lenders have an option to terminate the credit facility upon certain financing events. On March 25, 2026, the 2024 Lenders extended the maturity date of the 2024 Credit Facility by one year, expiring on June 30, 2027, subject to further extension to June 30, 2028 at the election of the 2024 Lenders.

During the three months ended March 31, 2026, the Company did not draw or repay any amounts from the 2024 Credit Facility (During the three months ended March 31, 2025, the Company repaid $1.8 million of the drawn amount and did not draw from the 2024 Credit Facility). For the first quarter of 2026, the Company incurred $nil as interest expense and $0.7 million as underutilization fees (For first quarter of 2025, the interest amounted to $0.1 million and underutilization fees amounted to $0.5 million). During the three months ended March 31, 2026, the Company repaid interest amounting to $nil and underutilization fees amounting to $0.7 million (For three months ended March 31, 2025, interest repaid amounted to $0.1 million and underutilization fees amounted to $nil). As of March 31, 2026, there was no interest payable and the amount payable as underutilization fees was $0.7 million and was recorded as accounts payable (Note 11) (December 31, 2025: interest payable was $ nil and underutilization fees amounted to $0.7 million recorded as accounts payable).

During the first quarter of 2026, the Company incurred consulting fees of $77 thousand provided by immediate family members of management, which are included in general and administrative expenses (During the first quarter of 2025: $52 thousand). As at March 31, 2026, consulting fees payable to immediate family members of management were $46 thousand (December 31, 2025: $57 thousand).

Apart from the above-mentioned transactions, the Company had transactions with Allseas which are detailed in Note 6.

21

Table of Contents

TMC the metals company Inc.

Notes to Interim Condensed Consolidated Financial Statements

(in thousands of US Dollars, except share, per share amounts and unless otherwise stated)

(Unaudited)

17.Contingent Liabilities

On January 23, 2023, investors in the 2021 private placement from the Business Combination filed a lawsuit against the Company in the Commercial Division of New York Supreme Court, New York County, captioned Atalaya Special Purpose Investment Fund II LP et al. v. Sustainable Opportunities Acquisition Corp. n/k/a TMC The Metals Company Inc., Index No. 650449/2023 (N.Y. Sup. Ct.). The Company filed a motion to dismiss on March 31, 2023, after which the plaintiffs filed an amended complaint on June 5, 2023. The amended complaint alleges that the Company breached the representations and warranties in the plaintiffs’ private placement Subscription Agreements and breached the covenant of good faith and fair dealing. The Plaintiffs are seeking to recover compensable damages caused by the alleged wrongdoings. The Company denies any allegations of wrongdoing and filed a motion to dismiss the amended complaint on July 28, 2023. On December 7, 2023, the Court granted the Company’s motion to dismiss the claim for breach of the covenant of good faith and fair dealing and denied the Company’s motion to dismiss the breach of the Subscription Agreement claim. The Company filed a notice of appeal regarding the Court’s denial of the Company’s motion to dismiss the breach of the Subscription Agreement claim. The appeal was heard on November 8, 2024. The NY Appellate Division upheld the lower court’s ruling in December 2024, moving the case into the discovery phase, which is currently ongoing. At this time no further court proceedings or trial date have been set. There is no assurance that the Company will be successful in its defense of this lawsuit or that insurance will be available or adequate to fund any settlement or judgment or the litigation costs of this action. Such losses or range of possible losses cannot be reliably estimated.

On January 16, 2026, American Metal Inc. and American Metal Resources LLC filed a civil claim against TMC The Metals Company Inc. and The Metals Company USA LLC in the Supreme Court of British Columbia, Vancouver Registry, captioned American Metal Inc. and American Metal Resources LLC v. TMC The Metals Company Inc. and The Metals Company USA LLC, No. S260335. The complaint alleges, among other things, breach of contract, breach of confidence and related claims arising from discussions between the parties regarding potential collaboration and the submission of applications for deep seabed mineral exploration licenses to NOAA. On March 3, 2026, the Company filed a response denying the material allegations and asserting a counterclaim against Robert Heydon and the plaintiffs alleging, among other things, breach of contract, breach of confidence and breach of fiduciary duty in connection with the alleged misuse of the Company’s confidential information. On April 10, 2026 the plaintiffs filed their response to the counterclaim. The litigation is in its early stages, and no trial date has been set. The Company intends to vigorously defend against the claims and pursue our counterclaim. At this time, the Company is unable to estimate the potential loss, if any, associated with this matter.

18.Segmented Information

The Company’s Chief Executive Officer is the chief operating decision maker (“CODM”) and reviews financial information on a consolidated basis to allocate resources and assess performance. Accordingly, the Company operates as a single operating and reportable segment, namely exploration of seafloor polymetallic nodules, which includes the development of a metallurgical process to treat such seafloor polymetallic nodules. Details on the geographical segmentation of the Company’s long-lived assets based on where each legal entity is domiciled are as follows:

  ​ ​ ​

March 31, 

  ​ ​ ​

December 31, 

Equipment

2026

2025

Nauru

$

480

$

519

Total

$

480

$

519

  ​ ​ ​

March 31, 

  ​ ​ ​

December 31, 

Software

2026

2025

Singapore

 

2,182

 

2,125

Total

$

2,182

$

2,125

22

Table of Contents

TMC the metals company Inc.

Notes to Interim Condensed Consolidated Financial Statements

(in thousands of US Dollars, except share, per share amounts and unless otherwise stated)

(Unaudited)

19.Subsequent Event

On May 11, 2026, we entered into a Contract for Development Work and Commercial Production with Allseas Deepsea Marine Contractors, a wholly owned subsidiary of Allseas, for the design, development, build, testing, commissioning and operation of an integrated offshore polymetallic nodule collection and production system in our license area, building on our prior Strategic Alliance Agreement and pilot system trials (the “Agreement”). The Production System is designed for a steady-state production capacity of 3.0 million tonnes per annum of wet nodules, with commissioning and commencement of commercial production subject to receipt of a commercial recovery permit from NOAA. The Agreement defines the development costs to be funded by both parties, reimbursement of operating costs during commercial operations, and amends certain initial costs and lay-up costs incurred through the effective date. The Agreement also governs the settlement of amounts previously accrued by the Company in respect of development work and lay-up costs, including amounts owed to Allseas and its affiliates as at March 31, 2026 totaling $32.1 million: these amounts invoiced by Allseas under the former agreement, represent 50% of the costs incurred by Allseas (the "Incurred Costs"). Upon executing the Agreement, the Company has agreed to pay an additional $2.3 million, related to certain initial costs and lay-up costs. In settlement of these amounts (totaling $34.4 million) and pursuant to the Agreement, the Company will issue to Allseas Group S.A. 7,377,835 common shares, with a final settlement of costs up to the signing of this agreement to be completed in accordance with the terms of the Agreement. As prescribed in the Agreement, the settlement in shares is calculated using a volume-weighted average price (VWAP) over the 20 days preceding the effective date as stipulated in the Agreement, less a discount of 10%. Pursuant to the Agreement that Incurred Costs up to the signing of this agreement, not yet invoiced by Allseas, will be payable in any event, which the Company expects to settle in cash through production revenues, in accordance with the terms of the Agreement. The Agreement has an initial term of five years commencing on the start of commercial production, with provision for extension on terms to be agreed.

23

Table of Contents

Item 2.    Management’s Discussion and Analysis of Financial Condition and Results of Operations

The following discussion and analysis provide information which management believes is relevant to an assessment and understanding of our condensed consolidated results of operations and financial condition. The discussion should be read in conjunction with the unaudited condensed interim consolidated financial statements and notes thereto contained in this Quarterly Report on Form 10-Q and the consolidated financial statements and notes thereto for the year ended December 31, 2025 contained in our 2025 Annual Report on Form 10-K. This discussion contains forward looking statements and involves numerous risks and uncertainties, including, but not limited to, those described in “Risk Factors” in Item 1A of Part I of the 2025 Annual Report on Form 10-K. Actual results may differ materially from those contained in any forward-looking statements. Unless the context otherwise requires, references to “we”, “us”, “our”, “TMC” and “the Company” are intended to mean the business and operations of TMC the metals company Inc. and its consolidated subsidiaries. The unaudited condensed consolidated interim financial statements for the three months ended March 31, 2026 and 2025, respectively, present the financial position and results of operations of TMC the metals company Inc. and its consolidated subsidiaries.

Overview

We are a deep seabed minerals developer focused on the collection, processing and refining of polymetallic nodules found on the seafloor in international waters of the Clarion Clipperton Zone (“CCZ”). The CCZ is a geological submarine fracture zone of abyssal plains and other formations in the Eastern Pacific Ocean, with a length of around 7,240 kilometers (4,500 miles) that spans approximately 4,500,000 square kilometers (1,737,000 square miles). Polymetallic nodules are discrete rocks that sit unattached to the seafloor, occur in significant quantities in the CCZ and have high concentrations of nickel, copper, cobalt and manganese, alongside meaningful concentrations of rare earth elements (REEs) in a single rock.

Our mission is to build a carefully managed shared stock of metal (a “metal commons”) that can be used, recovered and reused for generations to come. We believe significant quantities of newly mined metal are required because existing metal stocks are insufficient to meet rapidly rising demand.

The four metals and REEs contained in the polymetallic nodules are on the U.S. Department of Interior’s “2025 List of Critical Minerals”, with end-uses in strategic sectors including semiconductors and AI data centers, steel manufacturing, the defense and marine industrial base. Nickel was included on the list of 13 minerals selected by the U.S. Department of War in March 2026 for targeted procurement efforts through the Defense Industrial Base Consortium. Our resource definition work to date shows that nodules in our contract areas represent the world’s largest undeveloped resource of several of these critical metals. If we are able to collect polymetallic nodules from the seafloor on a commercial scale, we plan to use such nodules to initially produce nickel, cobalt and copper-bearing intermediate and metal cathode products as well as a manganese silicate product of approximately 40% manganese comparable to medium-grade manganese ore. Once in production, we may explore expanding into other product formats including silicomanganese alloy, battery-grade sulfates and precursor Cathode Active Materials (pCAM), as well as extracting REEs contained in nodules.

We are now in the development stage following the release of the results of a pre-feasibility study on one of our development areas in a report titled S-K 1300 Prefeasibility Study for NORI Area D Technical Report Summary, dated August 4, 2025, prepared by AMC Consultants Pty Ltd. and other qualified persons (the “NORI-D PFS”), which declared the world’s first mineral reserves for a seafloor polymetallic nodule project demonstrating the project’s economic viability. We also recently released an initial assessment of certain of our other resource areas in a report titled S-K 1300 Technical Report Summary—Initial Assessment of TOML and NORI Properties, Clarion-Clipperton Zone, dated August 4, 2025, prepared by AMC Consultants Pty Lt. and other qualified persons (the “TOML and NORI IA” together with the NORI-D PFS, the “Technical Reports”). We have yet to obtain a commercial recovery permit or other related offshore and onshore permits from the regulators. Additionally, we do not yet hold the environmental or other permits required to construct and operate commercial-scale polymetallic nodule processing and refining facilities on land.

24

Table of Contents

Two parallel regulatory regimes exist to regulate deep seabed exploration and extraction activities in the high seas. The United States adopted the Deep Seabed Hard Mineral Resources Act of 1980 (“DSHMRA”), a U.S. domestic statute administered by the U.S. Department of Commerce through the National Oceanic and Atmospheric Administration (“NOAA”) to regulate deep-sea mining activities of its citizens in the high seas. NOAA implemented regulations for exploration licenses in 1981 and for commercial recovery permits in 1989 and amended these regulations introducing a consolidated exploration license and commercial recovery permit application process in 2026. In parallel, the International Seabed Authority (“ISA”), comprised today of 171 Member States and the European Union was established in 1994, pursuant to the United Nations Convention on the Law of the Sea (“UNCLOS”) to regulate deep seabed exploration and exploitation activities of the nationals of Member States. The ISA adopted exploration regulations in 2000 (amended in 2013 and 2014) and issued 19 polymetallic nodule exploration contracts (17 of which are located in the CCZ) but has not completed its adoption of the exploitation regulations, standards and guidelines despite initiating work in 2014, and despite being under an obligation to do so by July 2023. Almost 30 countries, including the United States, have not ratified UNCLOS and are not Member States of the ISA. The United States has remained a persistent objector to Part XI of UNCLOS which governs seabed mining in the Area.

We believe that DSHMRA provides a viable and robust regulatory path to commercial production, distinct from the ISA regime under UNCLOS, which despite expectations to the contrary, has repeatedly failed to adopt the regulations and standards and guidelines for the exploitation of mineral resources in the Area. On April 24, 2025, the Executive Order 14825, titled “Unleashing America’s Offshore Critical Minerals and Resources” directed the Secretary of Commerce to implement an expedited process for reviewing and issuing seabed mineral exploration licenses and commercial recovery permits under DSHMRA. In addition to directing the International Development Finance Corporation, Export-Import Bank and Trade and Development Agency to identify tools to support this new industry, the Executive Order instructed the Departments of War and Energy to assess the use of the National Defense Stockpile for nodule-derived materials and of entering into offtake agreements for these minerals. These departments were also directed to review and support domestic processing capabilities for seabed mineral resources.

We continue focusing on advancing our commercial production strategy under the DSHMRA regime. In April 2025, our wholly owned subsidiary, The Metals Company USA, LLC (“TMC USA”), submitted two exploration license applications (covering 187,017 square kilometers in the CCZ referred to as TMC USA-A and TMC USA-B) and one commercial recovery permit application (covering 25,160 square kilometers in the CCZ referred to as TMC USA-A) to NOAA. Following the introduction of the consolidated application process by NOAA in January 2026, TMC USA submitted a consolidated exploration license and commercial recovery permit application covering approximately 65,000 km², representing a significant expansion from the approximately 25,160 km² commercial recovery area in the initial April 2025 application, with an estimated resource of 619 million wet tonnes (Mt) of polymetallic nodules and potential exploration upside. On April 28, 2026, NOAA determined that the consolidated application is in full compliance with the applicable requirements under DSHMRA, and the application has advanced to the certification review stage. Final permit issuance remains subject to the completion of the certification stage (including interagency consultation) and an environmental review, including preparation of an Environmental Impact Statement. The application areas in total, including the TMC USA-A and TMC USA-B exploration license areas, are estimated to hold approximately 1.639 billion wet tonnes of measured, indicated and inferred mineral resources. Together, the mineral resources are estimated to contain approximately 15.5 million tonnes of nickel, 12.8 million tonnes of copper, 2.0 million tonnes of cobalt, and 345 million tonnes of manganese.

At the same time as we pursue the U.S. regulatory pathway, our wholly owned subsidiaries, Nauru Ocean Resources Inc. (“NORI”) and Tonga Offshore Mining Limited (“TOML”), continue to maintain their ISA contracts and comply with all of their contractual obligations under the ISA system. While the ISA does not have jurisdiction over activities conducted under the regulatory authority of the United States, NORI and TOML maintain two ISA exploration contracts in the CCZ. NORI is sponsored by the Republic of Nauru (“Nauru”), and TOML is sponsored by the Kingdom of Tonga (“Tonga”). Operations of NORI and TOML in the CCZ are being conducted under their ISA exploration contracts.

25

Table of Contents

We have key strategic partnerships with (i) Allseas, a leading global offshore engineering contractor, which developed and tested a pilot collection system, and is now modifying it into the first commercial production system, (ii) Pacific Metals Co. Ltd. (“PAMCO”), an experienced Japanese ferronickel producer, which is responsible for pre-feasibility and feasibility studies on nodule processing at their smelting facilities in Hachinohe, Japan, (iii) Korea Zinc, a world leader in non-ferrous metal refining and precursor Cathode Active Material (“pCAM”) technology, partnering to advance development in the U.S. and (iv) Mariana Minerals, a software-first mineral developer and operator working as part of TMC USA’s owners’ team to accelerate the development of potential domestic onshore processing and refining facilities (“Mariana”) and (v) Glencore International AG (“Glencore”) which holds offtake rights to 50% of the NORI nickel and copper production if produced from a TMC-owned or controlled facility. In addition, we are working with engineering firm Hatch Ltd. (“Hatch”) and consultants Kingston Process Metallurgy Inc. (“KPM”) to develop, test and engineer a near-zero solid waste flowsheet. The primary processing stages of the flowsheet from nodule to NiCuCo matte intermediate were demonstrated as part of our pilot plant program at FLSmidth facilities in Pennsylvania, USA and XPS’ (Glencore subsidiary) facilities in Ontario, Canada; and later at industrial scale at PAMCO’s facilities in Hachinohe, Japan. The matte refining stages have been tested at an SGS facility in Lakefield Canada with positive results. The near-zero solid waste flowsheet provides a design that is expected to serve as the basis for our onshore processing facilities. On March 19, 2026, we signed a Strategic Partnership Agreement with Mariana focusing on the potential development of a nodule processing and refining facility in the Port of Brownsville, Texas as part of our owner’s team.

To reach our objective and initiate commercial production, we are working to: (i) further refine our project economics, (ii) completed the development and commission a commercial offshore nodule collection system, (iii) continue to assess the environmental, social and cultural impacts of offshore nodule collection, and (iv) secure existing foreign and/or develop new domestic U.S. onshore facilities to process collected polymetallic nodules into a manganese silicate product, an intermediate nickel-copper-cobalt matte product and end-products of nickel, cobalt and copper metal.

Developments in the First Quarter 2026

Below are some of the major developments that occurred in the first quarter of 2026:

TMC Subsidiaries Submit Extensive Deep-Sea Dataset to Public Database as Company Launches Video Series on Findings of Environmental Research

On April 15, 2026, we announced that our subsidiaries NORI and TOML submitted extensive datasets to the ISA’s DeepData, covering a decade of exploration in the Clarion Clipperton Zone. Dataset includes 777 equipment deployments and over 4,800 distinct environmental samples, generating 76,000 biological records and 69,185 geochemical data points, across the entire water column. The submission builds on prior submissions (March 2023 and May 2024) that together comprise hundreds of thousands of records, over 12,000 seafloor images, and extensive deep-pelagic sampling below 4,000 meters, forming one of the most comprehensive deep-ocean monitoring programs. TMC’s subsidiaries now contribute roughly one-third of all CCZ data in DeepData. The data will also be published to the OBIS-ISA node, where TMC subsidiary data already account for 54% of all biological records, a share expected to increase significantly following publication.

Exclusivity on Lease Option for Site in Brownsville, Texas

On March 27, 2026, we announced that TMC USA currently holds an exclusive right of negotiation with the Port of Brownsville, Texas on a lease and / or lease option for land sufficient to develop a domestic nodule processing and refining ecosystem for TMC USA and other American nodule developers, with the ultimate decision conditional on U.S. government support. The option on a 50-year lease would cover a total of 1,466 acres of land at the Port of Brownsville, Texas, in two separate land parcels (735 acres on the Brownsville Texas Shipping Channel and an adjacent 731 acres). There is currently no financial commitment required of TMC USA.

Strategic Partnership with Mariana Minerals

On March 19, 2026, we signed a Strategic Partnership Agreement with Mariana Minerals (“Mariana”) focusing on the potential development of a nodule processing and refining facility in the Port of Brownsville, Texas as part of our owner’s team. Mariana brings an AI, software-first approach to the permitting, construction and operation of critical mineral projects: fast-tracked capital project execution, which enabled Tesla to build its Lithium plant in Texas in less than 20 months and is core to how SpaceX and other cutting edge businesses operate, can be even further accelerated via a software-first approach and offers a faster, more modern pathway to re-industrialization.

26

Table of Contents

TMC USA Files First Consolidated Deep-Seabed Mining Application, Increasing Expected Commercial Recovery Permit Area to 65,000 km2 and Receives Substantial Compliance from NOAA

On January 22, 2026, we announced that TMC USA had submitted a consolidated application to NOAA for an exploration license and a commercial recovery permit for polymetallic nodules in international waters of the CCZ. The application represents the first consolidated exploration license and commercial recovery permit application submitted under NOAA’s new consolidated application and review process and increases the applied for commercial recovery area from ~25,000 to ~65,000 km2, with an estimated resource of 619 million tonnes (Mt) of wet nodules and a potential exploration upside. TMC USA was able to apply under NOAA’s new consolidated process because it can demonstrate the scientific, technical and financial capability to pursue commercial recovery activities expeditiously.

On March 9, 2026, we announced that NOAA determined that the consolidated application submitted by TMC USA for an exploration license and commercial recovery permit is in substantial compliance with the applicable requirements under DSHMRA and its implementing regulations. This determination marks a key step in the U.S. regulatory process for exploration and commercial recovery of polymetallic nodules in the CCZ under NOAA’s new rule establishing a consolidated application and review process. The process enables a more efficient regulatory timeline by allowing exploration-phase environmental, geological, and engineering data to be incorporated directly into the commercial recovery review.

TMC Welcomes NOAA Rule Modernizing Deep-Seabed Mining Permits for U.S. Companies in the High Seas

On January 21, 2026, we welcomed the new rule issued by the National Oceanic and Atmospheric Administration (NOAA) updating regulations governing deep seabed mineral exploration and commercial recovery under DSHMRA. Final rule establishes a consolidated application and review process under DSHMRA, allowing companies that have completed the necessary exploration, environmental, and technological development work to rely on exploration-phase data in commercial recovery permit applications, reducing duplication and improving regulatory efficiency.

Developments Subsequent to March 31, 2026

Signing of Offshore System Development and Production Agreement with Allseas

On May 11, 2026, we signed a Contract for Development Work and Commercial Production with Allseas Deepsea Marine Contractors, a wholly owned subsidiary of Allseas, for the design, development, build, testing, commissioning and operation of an integrated offshore polymetallic nodule collection and production system in our license area, building on our prior Strategic Alliance Agreement and pilot system trials. The Production System is designed for a steady-state production capacity of 3.0 million tonnes per annum (“Mtpa”) of wet nodules, with commissioning and commencement of commercial production subject to receipt of a commercial recovery permit from NOAA. We expect system commissioning to begin in the fourth quarter of 2027, subject to receipt of required permits and regulatory approvals. Operating costs during commercial production are reimbursable on a cost basis, with performance-linked incentives. The Agreement also governs the settlement of amounts previously accrued by the Company in respect of development work and lay-up costs, including amounts owed to Allseas and its affiliates as at March 31, 2026 totaling $32.1 million: these amounts invoiced by Allseas under the former agreement, represent 50% of the costs incurred by Allseas (the "Incurred Costs"). Upon executing the Agreement, the Company has agreed to pay an additional $2.3 million, related to certain initial costs and lay-up costs. In settlement of these amounts (totaling $34.4 million) and pursuant to the Agreement, the Company will issue to Allseas Group S.A. 7,377,835 common shares, with a final settlement of costs up to the signing of this agreement to be completed in accordance with the terms of the Agreement. As prescribed in the Agreement, the settlement in shares is calculated using a volume-weighted average price (VWAP) over the 20 days preceding the effective date as stipulated in the Agreement, less a discount of 10%. Pursuant to the Agreement, Incurred Costs up to the signing of this agreement, not yet invoiced by Allseas, will be payable in any event, which the Company expects to settle in cash through production revenues, in accordance with the terms of the Agreement.  The Agreement has an initial term of five years commencing on the start of commercial production, with provision for extension on terms to be agreed. The contract is governed by the laws of England and Wales, with disputes subject to ICC arbitration in London. Allseas is a related party of the Company.

NOAA Confirms Full Compliance of TMC USA’s Consolidated Application

On April 28, 2026, TMC USA received notice of full compliance from NOAA on its consolidated application. This determination of full compliance is a procedural milestone confirming that the application satisfies the applicable requirements under DSHMRA and its implementing regulations; it does not constitute and should not be construed as an approval, grant, or issuance of the requested

27

Table of Contents

exploration license or commercial recovery permit. TMC USA formally submitted a consolidated application to NOAA for an exploration license and a commercial recovery permit for polymetallic nodules in the CCZ on January 22, 2026. The application is now in the certification review stage.

Regulation of Mining of Deep-Sea Polymetallic Nodules by the United States

The Deep Seabed Hard Mineral Resources Act

DSHMRA establishes a domestic legal regime for U.S. citizens to explore for and commercially recover hard mineral resources from the seabed in areas beyond U.S. national jurisdiction. DSHMRA affirms that deep-sea mining is a lawful exercise of the freedoms of the high seas, subject to a duty of reasonable regard to the interests of other states in their exercise of those and other freedoms recognized by the general principles of international law, and provides a regulatory structure administered by NOAA, an agency under the U.S. Department of Commerce. DSHMRA’s implementing regulations detail the criteria and conditions for NOAA’s issuance of deep seabed exploration licenses and commercial recovery permits to U.S. citizens, including any individual, corporation, or other entity organized under the laws of a U.S. state or territory.

The purpose of DSHMRA is to promote the development of seabed minerals by U.S. citizens while ensuring environmental protection, avoidance of conflict with other high seas uses, and consistency with international law. Before any license or permit is issued, NOAA must determine that the proposed activities meet a series of statutory requirements, including that the activity: (i) will not unreasonably interfere with the lawful use of the high seas by other states; (ii) is consistent with U.S. foreign policy and international obligations; (iii) does not create a risk to international peace and security; (iv) is not expected to result in significant adverse environmental effects; and (v) does not pose undue risk to the safety of life or property at sea. These findings reflect NOAA’s mandate of advancing U.S. commercial interests in seabed minerals while minimizing environmental, diplomatic and safety risks.

We believe NOAA has historically adopted a cautious and science-based regulatory approach under DSHMRA, coordinating with other U.S. federal agencies and supporting environmental studies to inform future decisions. In the 1980s and 1990s, the United States entered into reciprocal recognition arrangements with other nations with similar domestic seabed mining laws, in order to avoid overlapping claims prior to the establishment of the ISA. Once the ISA became operational in the 1990s, most reciprocating states transitioned to the UNCLOS/ISA regime. The United States, however, remains outside that framework.

Exploration licenses under DSHMRA grant exclusive rights to conduct technical studies in a defined area and are issued for ten-year terms, subject to extension. Commercial recovery permits authorize full-scale extraction for a period of 20 years subject to extension and enhanced environmental and operational requirements. To date, NOAA has issued exploration licenses over four areas.  Two of these licenses (USA-1 and USA-4) remain active and are currently held by Lockheed Martin. These licenses have been renewed until 2027 in accordance with DSHMRA’s statutory provisions, which require NOAA to grant extensions if the licensee has substantially complied with license terms.  NOAA has not issued any commercial recovery permits under DSHMRA as no U.S. citizen had applied for a commercial recovery permit prior to TMC USA.

The review process under DSHMRA involves three stages: (i) a determination that the application is in compliance with applicable requirements; (ii) certification of the applicant and the proposed program; and (iii) an environmental review and determination of terms and conditions. The certification process includes an interagency consultation with other U.S. government departments (including the Department of State, the Department of War, and the Environmental Protection Agency). Following certification, an Environmental Impact Statement, or EIS, is expected to be prepared, and a public comment period, including a public hearing, will be provided. Following the public comment period, NOAA will determine whether to issue the requested licenses and permit, and if so, under what terms and conditions. All licenses and permits issued under DSHMRA are subject to oversight, periodic reporting, and potential suspension or revocation for noncompliance.

DSHMRA and its implementing regulations do not include a statutory deadline for application review. However, the Executive Order signed by President Trump on April 24, 2025, directs the Secretary of Commerce to implement an expedited process for reviewing and issuing licenses and permits under DSHMRA.

DSHMRA’s implementing regulations for commercial recovery permits requires that all mining vessels and at least one transport vessel are U.S. flagged (15 C.F.R. § 971.205). TMC USA will ensure all vessels contracted for commercial recovery comply with relevant laws pertaining to vessel standards and crew safety. DSHMRA’s implementing regulations for commercial recovery permits also require that recovered minerals be processed in the United States unless a waiver is granted, in which case the permittee is required

28

Table of Contents

to provide assurances that processed materials are returned to the United States (15 C.F.R. § 971.209). We are currently evaluating U.S.-based vessel and processing options to satisfy this requirement as well as working with Japan and South Korea-based supply chains to ensure processed materials can be returned to the United States in the event the permit to process outside the United States is granted for an initial period. If necessary, we expect to seek a waiver based on the statutory criteria and applicable regulations.

We expect to become subject to additional U.S. laws and regulations as development progresses and are in the early stages of analyzing their applicability and potential impact on our operations.

Existing ISA Exploration Contracts

NORI and TOML currently hold exploration rights to certain polymetallic nodule areas in the CCZ, sponsored by the Republic of Nauru and the Kingdom of Tonga, respectively.

NORI, our wholly-owned subsidiary, holds exploration rights to four blocks (NORI Area A, B, C, and D, the “NORI Contract Area”) covering 74,830 square kilometers in the CCZ that were granted by the ISA in July 2011. NORI is sponsored by Nauru pursuant to a certificate of sponsorship signed by the Government of Nauru on April 11, 2011. In September 2017, Nauru and NORI entered into a sponsorship agreement formalizing certain obligations of the parties in relation to NORI’s exploration and potential collection of nodules in the NORI Contract Area, which was revised in May 2025.

TOML, our wholly-owned subsidiary which we acquired in March 2020, holds exploration rights to an area covering 74,713 square kilometers in the CCZ that were granted by the ISA in January 2012 (the “TOML Contract Area”). On March 8, 2008, Tonga and TOML entered into a sponsorship agreement formalizing certain obligations of the parties in relation to TOML’s exploration and potential collection of nodules in the TOML Contract Area, which was most recently revised in August 2025.

Key Trends, Opportunities and Uncertainties

We are currently a pre-revenue company, and we do not anticipate earning revenues (other than potential service revenue) until one of our wholly-owned subsidiaries receives an exploitation contract or commercial recovery permit and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale. We believe that our performance and future success are subject to risks and challenges, including those related to the final issuance of a commercial recovery permit by NOAA, development of environmental terms, conditions and restrictions associated with our application and development of our technologies to collect and process polymetallic nodules. While NOAA has determined that our consolidated application is in full compliance with the applicable requirements under DSHMRA (a procedural milestone that advances the application to the certification review stage), this determination does not constitute, and should not be construed as, a grant or approval of the requested licenses or commercial recovery permit. The permit issuance remains subject to the successful completion of all remaining review stages under DSHMRA, including certification (with interagency consultation), preparation of an Environmental Impact Statement, a public comment period, and NOAA’s final determination as to whether to issue the licenses and permit and, if so, under what terms and conditions. The timing of NOAA’s final decision remains uncertain and is outside the Company’s control. Actual timelines for certification, environmental review, and potential issuance of licenses or permits may differ materially from management’s current expectations. These risks, as well as other risks, are discussed in the section entitled “Risk Factors” in Item 1A of Part I of the 2025 Annual Report on Form 10-K, as filed with the SEC.

Basis of Presentation

We currently conduct our business through one operating segment. As a pre-revenue company with no commercial operations, our activities to date have been limited. Our results are reported under Generally Accepted Accounting Principles in the United States (“U.S. GAAP”) and in U.S. dollars.

Components of Results of Operations

We are in the development stage with no revenue to date and a net loss of $20.6 million for the three months ended March 31, 2026, compared to a net loss of $20.6 million in the same period of 2025. We have an accumulated deficit of approximately $971.9 million from inception through March 31, 2026.

29

Table of Contents

Our historical results may not be indicative of our future results for reasons that may be difficult to anticipate. Accordingly, the drivers of our future financial results, as well as the components of such results, may not be comparable to our historical or projected results of operations.

We align our operating expenses based on activity performed by our personnel, which allocates these costs under Exploration and Evaluation expenses and General and Administrative expenses. This alignment is adjusted throughout the year to reflect changes in business activities.

Revenue

To date, we have not generated any revenue. We expect to generate revenue once we receive a commercial recovery permit, and we are able to successfully collect and process polymetallic nodules into saleable products on a commercial scale. Any revenue from initial production is difficult to predict.

Exploration and Evaluation Expenses

We expense all costs relating to exploration and development of mineral claims. Such exploration and development costs include, but are not limited to, regulatory approvals, exploration mineral title management, geological, geochemical and geophysical studies, environmental baseline studies and process development activities. Our exploration expenses are impacted by the amount of exploration work conducted during each period. The acquisition cost of polymetallic nodule mineral title will be charged to operations as amortization expense on a unit-of-production method based on proven and probable reserves should commercial production commence in the future.

General and Administrative Expenses

General and administrative (“G&A”) expenses consist primarily of compensation for employees, consultants and directors, including wages and salaries, share-based compensation, consulting fees, investor relations expenses, expenses related to advertising and marketing functions, insurance costs, office and sundry expenses, professional fees (including legal, audit and tax fees), travel expenses and transfer and filing fees.

Share-based compensation costs from the issuance of stock options and restricted share units (“RSUs”) are measured at the grant date based on the fair value of the award and are recognized over the related service period. Share-based compensation costs are charged to exploration expenses and general and administrative expenses depending on the function fulfilled by the holder of the award. In instances where an award is issued for financing related services, the costs are included within equity as part of the financing costs. We recognize forfeiture of any awards as they occur.

Interest Income/Expense

Interest income consists primarily of interest earned on our cash balance.

Fees and Interest on Borrowings and Credit Facilities

Fees and interest on borrowings and credit facilities represent interest charged on our short-term debt and interest and underutilization fees associated with our credit facilities.

Foreign Exchange Loss/Gain

The foreign exchange income or loss for the periods reported primarily relates to unrealized gain or loss due to revaluation of foreign denominated accounts payable and accrued liabilities.

Change in Fair Value of Warrants Liability

The change in fair value of warrants liabilities primarily consists of the change in the fair value of the 9,500,000 Private Warrants issued to Sustainable Opportunities Holdings LLC concurrently with Sustainable Opportunities Acquisition Corp.’s (“SOAC”) initial

30

Table of Contents

public offering (the “Private Warrants”). For accounting purposes, we were considered to have issued the Private Warrants as part of the Business Combination, and we are required to re-measure the fair value of our Private Warrants at the end of each reporting period.

Results of Operations

The following is a discussion of our results of operations for the three months ended March 31, 2026 and 2025. Our accounting policies are described in Note 3 “Significant Accounting Policies” in our financial statements filed as part of the 2025 Annual Report on Form 10-K.

Comparison of the Three Ended March 31, 2026 and 2025

For the Three Months Ended

March 31, 

(Dollar amounts in thousands, except as noted)

  ​ ​ ​

2026

  ​ ​ ​

2025

  ​ ​ ​

% Change

  ​ ​ ​

Exploration and evaluation expenses

$

13,257

$

9,515

 

39

%

General and administrative expenses

20,725

 

8,500

 

144

%

Equity-accounted investment loss

 

2,998

 

35

 

8,466

%

Gain on dilution of investment

(4,602)

100

%

Change in fair value of warrants liability

 

(10,662)

 

441

 

(2,518)

%

Foreign exchange loss (gain)

 

(690)

 

1,095

 

(163)

%

Interest income

 

(1,136)

(19)

 

(5,879)

%

Fees and interest on borrowings and credit facility

665

1,021

(35)

%

Tax expense

44

100

%

Loss for the period, after tax

$

20,599

$

20,588

%

Three Months ended March 31, 2026 compared to Three Months ended March 31, 2025

We reported a net loss of approximately $20.6 million in the first quarter of 2026, compared to a net loss of $20.6 million in the same period of 2025.  The following explains the major reasons for the decrease in the net loss in the first quarter of 2026.

Exploration and Evaluation Expenses

Exploration and evaluation expenses for the three months ended March 31, 2026 were $13.3 million, compared to $9.5 million for the same period in 2025. The increase of $3.8 million is primarily due to an higher share-based compensation expense of $3.6 million due to the amortization of the fair value of RSUs granted to the officers in the third quarter of 2025,  increase of $1.8 million in prefeasibility study costs related to  the expanded scope of the prefeasibility study refresh, partially offset by a decrease in mining, technological and process development of $1.6 million and a decrease of $1.0 million in environmental cost.

General and Administrative Expenses

G&A expenses for the three months ended March 31, 2026 were $20.7 million compared to $8.5 million for the same period in 2025. The increase of $12.2 million in G&A expenses was mainly due to the result of an increase in share-based compensation of $11.1 million due to the amortization of the fair value of RSUs granted to the directors and officers in the third quarter of 2025 and increase in payroll costs, partially offset by a decrease in legal costs in the first quarter of 2026.

31

Table of Contents

Gain on Dilution of Investment

During the three months ended March 31, 2026, The Metals Royalty Company issued 1,000,000 common shares as compensation expenses and 3,134,481 common shares on the release of subscription receipts resulting in gross proceed of $15.7 million. The Company did not participate in the offering, which resulted in a decrease of its ownership interest from 27.2% to 25.15% (December 31, 2025: 27.2%). As the shares were issued at a price higher than The Metals Royalty Company’s book value per share, the Company recorded a dilution gain of $4.6 million.

Change in Fair Value of Warrants Liability

The fair value of the 9,500,000 Private Warrants liability at March 31, 2026 of $2.7 million, represents a decrease of $10.7 million in the first quarter of 2026, results from the decrease in the price of the Company’s shares and the price of our public warrants over this same period (-24% and -74% respectively). Refer to Note 12 in the Company’s first quarter of 2026 interim financial statements for further details on this non-operating, non-cash decrease.

Fees and Interest on Borrowings and Credit Facilities

There were no outstanding drawn amounts under the Company’s credit facilities during the three months ended March 31, 2026, and no interest expense was incurred compared to $0.1 million interest expense in the same period of 2025. Underutilization fees on these facilities were $0.7 million for the first quarter of 2026, remaining unchanged from the same period in 2025. The first quarter of 2025 also included interest of $0.2 million on the Company’s short term debt borrowings which were terminated in 2025.

Interest Income

The operating loss was offset by interest income of $1.1 million reflecting higher cash balances beginning in the second quarter of 2025.

Liquidity and Capital Resources

Our primary sources of financing have come from private placements and public offerings of Common Shares and warrants, and the issuance of convertible debentures. As of March 31, 2026, we had cash on hand of $119.7 million, including $9 million of tax withholdings remitted to authorities in early April 2026.

In light of the significant deficit in expected funding following the closing of the Business Combination in September 2021, we adopted what we call a “capital-light” strategy whereby we removed any allocation of funds to capital expenditures that were not deemed necessary to support the submission of an application for an exploitation contract for the NORI Area D and then the applications of exploration licenses and commercial recovery permits with NOAA under DHMRA, and by negotiating the settlement of program expenditures with our equity whenever possible, and by utilizing existing assets for offshore and onshore production.

We have yet to generate any revenue from our business operations. We are a development company and the recovery of our investment in mineral exploration contracts and attainment of profitable operations is dependent upon many factors including, among other things, the development of a commercial production system for collecting polymetallic nodules from the seafloor as well as the development of our processing technology for the metallurgical treatment of such nodules, the establishment of additional mineable reserves, the demonstration of commercial and technical feasibility of seafloor polymetallic nodule collection and processing systems, metal prices, and securing approvals under the U.S. regulatory regime or ISA exploitation contracts or provisional approvals. While we have obtained financing in the past, there is no assurance that such financing will continue to be available on favorable terms, in sufficient amounts, or at all.

32

Table of Contents

We expect to incur significant expenses and operating losses for the foreseeable future, particularly as we advance our application to NOAA for a commercial recovery permit and preparation for potential commercialization. Based on our cash balance and availability of borrowing under our credit facility with ERAS Capital LLC and Gerard Barron, when compared with our forecasted cash expenditures, we believe we will have sufficient funds to meet our obligations that become due within the next twelve months. Our estimates used in reaching this conclusion are based on information available as at the date of filing this Annual Report. Accordingly, actual results could differ from these estimates and resulting variances may result in our need for additional funding in an amount greater or earlier than expected, due to changes in business conditions or other developments, including, but not limited to, deferral of approvals, capital and operating cost escalation, currently unrecognized technical and development challenges, our ability to pay certain vendors or suppliers in our Common Shares or changes in external business environment.

In addition, we will, however, need and are seeking additional financing to fund our continued operations over time. These financings could include additional public or private equity, debt financings, equity-linked financings or other sources of financing, including through government-based funding, non-dilutive asset, royalty or project-based and/or asset-based financings. If these financing or other financing sources are not available, or if the terms of financing are less desirable than we expect, or if in insufficient amounts, we may be forced to delay our exploration and/or exploitation activities or further scale back our operations, which could have a material adverse impact on our business and financial prospects.

On September 16, 2022, we filed a registration statement on Form S-3 with the SEC, which the SEC declared effective on October 14, 2022, to sell up to $100 million of securities. In addition, on November 30, 2023, we filed an additional registration statement on Form S-3 with the SEC, which the SEC declared effective on December 8, 2023, to sell up to an additional $100 million of securities. As previously disclosed in 2025, remaining capacity on the two previously filed Form S-3s has been nearly extinguished following various equity and warrant transactions. We filed a new registration statement on Form S-3 on March 31, 2026, following the filing of our 2025 Annual Report. Securities that may be sold under the registration statements include common shares, preferred shares, debt securities, warrants and units. Any such offering, if it does occur, may happen in one or more transactions. Specific terms of any securities to be sold will be described in supplemental filings with the SEC.

On December 22, 2022, we entered into an At-the-Market Equity Distribution Agreement (the “Sales Agreement”) with Stifel, Nicolaus & Company, Incorporated (“Stifel”) and Wedbush Securities Inc., as sales agents, allowing us, from time to time, to issue and sell common shares with an aggregate offering price of up to $30 million. In 2025, we issued 7,542,996 common shares at an average share price of $2.02, for net proceeds of $14.8 million under the Sale Agreement. The Sales Agreement expired in October 2025.

On March 22, 2023, we entered into the 2023 Credit Facility with Argentum Cedit Virtuti GCV, the parent of Allseas Investments S.A. and an affiliate of Allseas, which was amended on July 31, 2023 and March 22, 2024, pursuant to which, we were able to borrow from the Lender up to $25 million in the aggregate, from time to time, subject to certain conditions. All amounts drawn under the 2023 Credit Facility bore interest at the 6-month SOFR, 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, our election) on the first business day of each of June and January. We agreed to pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2023 Credit Facility. We had the right to pre-pay the entire amount outstanding under the 2023 Credit Facility at any time, before the 2023 Credit Facility’s stated maturity of August 31, 2025. The 2023 Credit Facility also contained customary events of default. No amounts had been drawn under the 2023 Credit Facility. Pursuant to the Letter Agreement we entered into on March 24, 2025, we and Argentum Cedit Virtuti GCV agreed to cancel the 2023 Credit Facility with no outstanding amounts remaining, other than our obligation to pay the underutilization fee thereunder.

33

Table of Contents

On March 22, 2024, we entered into an Unsecured Credit Facility (the “2024 Credit Facility”) with Gerard Barron, the Company’s Chief Executive Officer and Chairman, and ERAS Capital LLC, the family fund of one of the Company’s directors, (collectively, the “2024 Lenders”), pursuant to which, we may borrow from the 2024 Lenders up to $20 million in the aggregate ($10 million from each of the 2024 Lenders), from time to time, subject to certain conditions. All amounts drawn under the 2024 Credit Facility will bear interest at the 6-month Secured Overnight Funding Rate (SOFR), 180-day average plus 4.0% per annum payable in cash semi-annually (or plus 5% if paid-in-kind at maturity, at our election) on the first business day of each of June and January. We will pay an underutilization fee equal to 4.0% per annum payable semi-annually for any amounts that remain undrawn under the 2024 Credit Facility. The 2024 Credit Facility also contains customary events of default. On August 13, 2024, we entered into the First Amendment to the 2024 Credit Facility with the 2024 Lenders, to increase the borrowing limit of the 2024 Credit Facility to $25 million in the aggregate ($12.5 million from each of the 2024 Lenders). On November 14, 2024, we entered into the Second Amendment to the 2024 Credit Facility with the 2024 Lenders, to increase the borrowing limit to $38 million in the aggregate ($19 million from each of the 2024 Lenders) and to extend the maturity of the 2024 Credit Facility to December 31, 2025. As per the Second Amendment, the rate of underutilization fee was retroactively increased from March 22, 2024, to 6.5% on any undrawn amounts under the 2024 Credit Facility. On March 26, 2025, we entered into the Third Amendment to the 2024 Credit Facility with the 2024 Lenders, to, among other things, increase the borrowing limit to $44 million in the aggregate ($22 million from each of the 2024 Lenders) and extend the maturity of the 2024 Credit Facility to June 30, 2026 with the 2024 Lenders having an option to extend the maturity date by up to two additional one year periods. As per the Third Amendment to the 2024 Credit Facility, the underutilization fees are to be paid quarterly in cash or shares at the 2024 Lenders election and the 2024 Lenders have an option to terminate the credit facility upon certain financing events. On March 25, 2026, the 2024 Lenders extended the maturity date of the 2024 Credit Facility by one year, expiring on June 30, 2027, subject to further extension to June 30, 2028 at the election of the 2024 Lenders.

On September 9, 2024, we entered into a Working Capital Loan Agreement with Allseas Investments, a company related to Allseas. In accordance with the Working Capital Loan Agreement, Allseas Investments provided a loan to us amounting to $5 million (the “Working Capital Loan”) on September 10, 2024, to be used towards general corporate purposes and the repayment of all outstanding amounts under the short-term loan between us and the Lender. The Working Capital Loan was payable to the Lender on or before the earlier of (i) the occurrence of certain financing events and (ii) April 1, 2025 (the “Repayment Date”). The Working Capital Loan bore interest based on the 6-month Secured Overnight Financing Rate, 180-day average plus a margin of 4.0% per annum payable in two installments on January 2, 2025, and the Repayment Date (or plus a margin of 5.0% if we deferred all interest payments to the Repayment Date). On October 18, 2024, we entered into the First Amendment to the Working Capital Loan Agreement with Allseas Investments, resulting in a further draw of $2.5 million by us and a total Working Capital Loan drawn amount of $7.5 million. On March 24, 2025, we entered into the Letter Agreement with Allseas Investments and Argentum Cedit Virtuti GCV, pursuant to which the repayment date under the Working Capital Loan Agreement was extended to September 30, 2025. In the second quarter of 2025, the entire Working Capital Loan amount along with the interest payable was repaid and the facility was cancelled.

On November 14, 2024, we entered into a securities purchase agreement (the “2024 Purchase Agreement”) with certain new and existing institutional investors for the sale of an aggregate of 17,500,000 common shares (the “Shares”) and accompanying Class B warrants (the “Class B Warrants”), in a registered direct offering. The offering price was $1.00 per common share, with each common share including an accompanying Class B Warrant to purchase 0.5 common shares. The Class B Warrants are exercisable immediately upon issuance at a price of $2.00 per share and expire five years from issuance. On November 26, 2024, we entered into the First Amendment to the 2024 Purchase Agreement, pursuant to which we agreed to sell and issue an additional 2,400,000 common shares and accompanying Class B Warrants to purchase 1,200,000 common shares to new investors on the same terms and conditions as initially offered. Including the First Amendment to the 2024 Purchase Agreement, we agreed to sell and issue in aggregate 19,900,000 common shares and Class B Warrants to purchase 9,950,000 common shares. We received gross proceeds in the offering, exclusive of warrant exercises, of $19.9 million (net proceeds of $14.2 million, after offering expenses), of which $5 million was received on February 6, 2025.

On May 12, 2025, we entered into a securities purchase agreement with certain new and existing investors, including an existing strategic investor, for the sale of an aggregate of 12,333,333 common shares and accompanying Class C Warrants, in a registered direct offering, for gross proceeds, exclusive of warrant exercises, of $37 million (net proceeds of $36.7 million, after offering expenses). The offering price was $3.00 per common share, with each common share including an accompanying Class C Warrant to purchase one common share. The Class C Warrants are exercisable immediately upon issuance at a price of $4.50 per share and expire three years from issuance.

34

Table of Contents

On June 16, 2025, we entered into a Securities Purchase Agreement with Korea Zinc, pursuant to which in consideration of gross cash receipt of $85.2 million, we agreed to issue and sell to Korea Zinc 19,623,376 of our common shares and accompanying warrants to purchase an aggregate of 6,868,181 common shares. The purchase price per share and accompanying warrant was set at $4.34. The Korea Zinc Warrant is exercisable at an exercise price of $7.00 per share and expires on June 25, 2028. Pursuant to this Securities Purchase Agreement, subject to certain exceptions, Korea Zinc will have a right to participate in any public offering or private placement of any of our common shares or common share equivalents primarily for capital raising purposes (each a “Proposed Offering”) up to such amount of securities to maintain its percentage ownership at the time of such Proposed Offering. Such right to participate in future financings will expire upon the earlier to occur of (i) June 16, 2030, (ii) the date on which Korea Zinc owns less than all of the common shares it purchased and subscribed pursuant to this Securities Purchase Agreement and (iii) immediately after a closing of a Proposed Offering where Korea Zinc does not exercise its participation right in full. The funds raised under this Securities Purchase Agreement are to be used for general corporate purposes.

We may receive up to approximately $432.5 million in aggregate gross proceeds from cash exercises of the Public Warrants, the Private Warrants, the Class A Warrants, the Class B Warrants, Class C Warrants, and Warrants issued to Korea Zinc, Nauru and Tonga based on the per share exercise price of such warrants. However, the exercise price for the outstanding Public Warrants and Private Warrants is $11.50 per common share and there can be no assurance that such warrants will be in the money prior to their expiration, and as such, such warrants may expire in September 2026 worthless. In certain circumstances, the Public Warrants and Private Warrants, Class A Warrants, Class B Warrants and Class C Warrants may be exercised on a cashless basis and the proceeds from the exercise of such warrants will decrease. Furthermore, even if the warrants will be in the money, the holders of the warrants are not obligated to exercise their warrants, and we cannot predict whether holders of the warrants will choose to exercise all or any of their warrants. The warrants issued to the Republic of Nauru and Kingdom of Tonga can only be exercised after the commercial recovery permit is received and commercial production commences and there can be no assurance that the exercise conditions will be met prior to their expiration.  In addition, the exercise price to purchase one common share under the outstanding Class A Warrants and Class B Warrants is $2.00 each, Class C Warrants is $4.5, warrants issued to Korea Zinc is $7.00, warrants issued to Republic of Nauru is $4.72 and warrants issued to Tonga is $5.87 (subject to customary adjustments) and there can be no assurance that such warrants will be exercised prior to their expiration, and as such, such warrants may expire, and we will not receive any proceeds from the exercise thereof.

Cash Flows Summary

Presented below is a summary of our operating, investing and financing cash flows:

For the Three Months Ended

  ​ ​ ​

March 31, 

(thousands)

  ​ ​ ​

2026

  ​ ​ ​

2025

Net cash used in operating activities

$

(615)

$

(9,347)

Net cash used in investing activities

$

(35)

$

(70)

Net cash provided by financing activities

$

2,719

$

8,293

Increase (decrease) in cash

$

2,069

$

(1,124)

Three Months ended March 31, 2026 compared to Three Months ended March 31, 2025

Cash flows used in Operating Activities

For the three months ended March 31, 2026, major operating activities included initial work on pre-feasibility studies update and work to advance our permit applications, resulting in net cash used in operating activities of $0.6 million. This consisted of $4.1 million on payroll costs, $1 million on various environmental work, $1.1 million on legal and consulting fees, $1.2 million on business development, communications and IT costs,  $0.8 million on prefeasibility studies and mining, technological and process development costs, $0.7 million on stakeholder engagement, $0.7 million on underutilization fees paid to the lenders of the 2024 Credit Facility and an additional $1 million for various expenses. The outflow was offset by receipt of interest income of $1.1 million and recovery of withholding taxes on awards that vested in the first quarter of 2026.

For the three months ended March 31, 2025, major operating activities included advanced work on pre-feasibility studies and work to advance our permit applications, resulting in net cash used in operating activities of $9.3 million. This consisted of $3 million on various environmental work, $2.6 million on payroll costs, $1.5 million on stakeholder engagement, $1 million on legal and consulting fees and an additional $1.2 million for various expenses.

35

Table of Contents

Cash flows used in Investing Activities

Net cash provided by investing activities for three months ended March 31, 2026 and 2025 represent the purchase of equipment and software development.

Cash flows provided by Financing Activities

Net cash provided by financing activities for the three months ended March 31, 2026 was $2.7 million, which comprised of proceeds from the exercise of stock options.

Net cash provided by financing activities for the three months ended March 31, 2025 was $8.3 million, which comprised of proceeds received from the Registered Direct Offering announced in November 2024 of $5 million (less fees of $0.5 million), proceeds from shares issued from our ATM of $5.6 million and the repayment of short-term debt of $1.8 million.

Contractual Obligations and Commitments

NORI Exploration Contract

As part of the NORI Exploration Contract with the ISA, NORI submitted a periodic review report to the ISA which included a five-year plan covering 2022 to 2026: NORI is currently implementing its approved five-year plan. NORI’s exploration contract expires on July 21, 2026. NORI submitted an application to the ISA for a five-year extension of the contract that is currently under review. The cost of the proposed five-year plan of work include in NORI’s extension application is dependent on the ISA’s approval of the NORI extension Work plans are reviewed annually by NORI, agreed with the ISA and may be subject to change depending on their progress to date.

TOML Exploration Contract

As part of the TOML Exploration Contract with the ISA, TOML submitted a periodic review report to the ISA which included a five-year plan covering 2022 to 2026. TOML is currently implementing its approved plan, which included an estimated five-year expenditure of up to $44 million. The five-year estimated expenditure is indicative and subject to change, TOML will review the program regularly and TOML will inform the ISA of any changes through its annual reports. TOML’s exploration contract expires on January 10, 2027. TOML is required to submit an application for extension no later than six months before the expiration of the contract. TOML intends to submit an application for a five-year extension in 2026.

Regulatory Obligations Relating to Exploration Contracts

Both TOML and NORI require sponsorship from their host sponsoring States, Tonga and Nauru, respectively. Each company has been registered and incorporated within the applicable host State’s jurisdiction. The ISA requires that a contractor must obtain and maintain sponsorship by a host state that is a member of the ISA, and such state must maintain effective supervision and regulatory control over such sponsored contractor. Each of TOML and NORI is subject to the registration and incorporation requirements of these nations. In the event the sponsorship is otherwise terminated, such subsidiary will be required to obtain new sponsorship from another state that is a member of the ISA. Failure to obtain such new sponsorship would have a material impact on the operations of such subsidiary and us.

Sponsorship Agreements

NORI is sponsored by Nauru pursuant to a certificate of sponsorship signed by the Government of Nauru on April 11, 2011. NORI is a Nauruan incorporated entity and is subject to applicable Nauruan legislation and regulations. In 2015, the Nauruan government established the Nauru Seabed Minerals Authority to regulate activities carried out by companies sponsored by Nauru.

Throughout the period of the NORI Exploration Contract, NORI must be sponsored by a State that is party to UNCLOS. If the nationality or control of NORI changes or NORI’s sponsoring State, as defined in the ISA Regulations, terminates its sponsorship, NORI must promptly notify the ISA. In either event, if NORI does not obtain another sponsor meeting the requirements prescribed in the ISA Regulations and fails to submit to the ISA a certificate of sponsorship for NORI in the prescribed form within six months, the NORI Exploration Contract will terminate.

36

Table of Contents

On July 5, 2017, Nauru, the Nauru Seabed Minerals Authority and NORI entered into a sponsorship agreement (the “NORI Sponsorship Agreement”) formalizing certain obligations of the parties in relation to NORI’s exploration and potential collection of nodules within the NORI Contract Area of the CCZ. On May 29, 2025 the Republic of Nauru and NORI signed a revised Sponsorship Agreement, updating the terms of the Agreement signed between the parties in 2017.

The revised Sponsorship Agreement will remain in force unless terminated by mutual agreement of the parties or earlier terminated in accordance with its terms, including in the event of a material breach by either party or upon the assignment of NORI’s rights and the transfer of sponsorship to another sponsoring State. Under the agreement, NORI will pay Nauru a seabed mineral recovery payment of $2 per tonne of polymetallic nodules recovered under an ISA contract, subject to annual inflation adjustment. In addition, NORI will pay an annual administration fee, initially set at $500,000, which may increase by 5% annually, to support Nauru’s administration of its sponsorship and regulatory oversight. The agreement also provides for potential continuity payments to Nauru if a subsidiary other than NORI develops nodules in the NORI Contract Area under the U.S. regulatory regime with the applicable payment amounts and schedule to be determined in accordance with the terms of the agreement. During any period in which such continuity payments are made, NORI has agreed to maintain an office in Nauru and make annual investments in local presence, community initiatives and training and capacity-building programs for Nauruan nationals. In connection with the Sponsorship Agreement, Nauru holds warrants to purchase 9,146,268 of our common shares at an exercise price of $4.72. In connection with the revised Sponsorship Agreement, we also executed a Deed of Guarantee and Indemnity in favor of Nauru, under which we guarantee certain financial obligations of NORI under Nauruan law and the Sponsorship Agreement and provides limited indemnification.

On March 8, 2008, Tonga and TOML entered into the TOML Sponsorship Agreement formalizing certain obligations of the parties in relation to TOML’s exploration and potential exploitation of a proposed application to the ISA (subsequently granted) known as the TOML Area. TOML updated the sponsorship agreement with Tonga in September 2021 and again on August 4, 2025.

The revised Sponsorship Agreement between Tonga and TOML will remain in force unless terminated by mutual agreement of the parties or earlier terminated in accordance with its terms, including in the event of a material breach by either party. Under the agreement, Tonga will continue to sponsor TOML’s seabed mineral activities in the ISA contract area. Upon commencement of commercial recovery of polymetallic nodules under an ISA contract, TOML will pay the Tonga Seabed Minerals Authority a commercial recovery payment of $2 per tonne of polymetallic nodules recovered from the contract area, subject to annual inflation adjustment. In addition, TOML will pay an annual administration fee of $90,000, which may increase by up to 5% annually, to support the administration of Tonga’s sponsorship and regulatory oversight. The agreement also provides for potential continuity benefit payments to Tonga if a subsidiary other than TOML develops nodules in the TOML Contract Area under the U.S. regulatory regime. The applicable payment amounts and schedule will be determined in accordance with the terms of the agreement. During any period in which such continuity benefits are provided, TOML has agreed to maintain an office in Tonga and make annual investments in local presence, community initiatives and training and capacity-building programs for Tongan nationals. In connection with the Sponsorship Agreement, Tonga holds warrants to purchase 1,000,000 of our common shares at an exercise price of $5.87. In connection with the revised Sponsorship Agreement, we also executed a Deed of Guarantee and Indemnity in favor of Tonga, under which we guarantee certain financial obligations of TOML under Tongan law and the Sponsorship Agreement and provides limited indemnification.

Allseas Agreements

On March 29, 2019, we entered into a strategic alliance with Allseas to develop a system to collect, lift and transport nodules from the seafloor to shore and agreed to enter into a nodule collection and shipping agreement whereby Allseas would provide commercial services for the collection of the first 200 million metric tonnes of polymetallic nodules on a cost plus 50% profit basis. In furtherance of this agreement, on July 8, 2019, we entered into a Pilot Mining Test Agreement with Allseas (“PMTA”), which was amended on five occasions through February 2023, to develop and deploy a PMTS, successful completion of which is a prerequisite for our application for an exploitation contract with the ISA. Under the PMTA, Allseas agreed to cover the development cost of the project in exchange for a payment from us upon successful completion of the pilot trial of the PMTS in NORI Area D.

37

Table of Contents

On March 16, 2022, NORI and Allseas entered into a non-binding term sheet for the development and operation of a commercial nodule collection system. The pilot nodule collection system developed and tested by Allseas is expected to be upgraded to a commercial system with an expanded targeted production capacity of up to an estimated 3.0 million tonnes of wet nodules per year, to be delivered in stepped increments. NORI and Allseas intend to equally finance all costs related to developing and getting the first commercial system into production. Once in production, NORI is expected to pay Allseas a nodule collection and transshipment fee and, as Allseas scales up production to up to an estimated 3.0 million wet tonnes of nodules per year, it is expected that unit costs will be reduced. Following the successful completion of the NORI Area D pilot collection system trials in November 2022 and subsequent analysis of pilot data, the parties are reviewing a commercial nodule collection system production targets, system design and cost estimates and intend to enter into a binding Heads of Terms by the end of 2024. There can be no assurances, however, that we will enter into definitive agreements with Allseas contemplated by the non-binding term sheet in a particular time period, or at all, or on terms similar to those set forth in the non-binding term sheet, or that if such definitive agreements are entered into by us that the proposed commercial systems and second production vessel will be successfully developed or operated in a particular time period, or at all.

Through December 31, 2025, we have made the following payments to Allseas under the PMTA: (a) $10 million in cash in February 2020, (b) $10 million through the issuance of 3.2 million Common Shares valued at $3.11 per share in February 2020, (c) issued Allseas a warrant to purchase 11.6 million Common Shares at a nominal exercise price per share in March 2021, (d) $10 million in cash in October 2021, following the closing of the Business Combination and meeting certain progress targets on the PMTS and (e) on February 23, 2023 issued 10.85 million Common Shares to Allseas. On August 9, 2023, 11,578,620 common shares were issued to Allseas upon the exercise of the warrant that was granted to Allseas in March 2021, and receipt of the exercise fee of $115.8 thousand. The warrant vested and became exercisable on successful completion of the PMTS in November 2022.

On November 11, 2022, our board of directors approved the successful completion and testing of the PMTS in the NORI Area D and payment of the third milestone amounting to $10 million and additional costs owed to Allseas under the PMTA by issuing 10.85 million Common Shares to Allseas priced at $1.00 per share on February 23, 2023.

On August 1, 2023, we entered into an Exclusive Vessel Use Agreement with Allseas pursuant to which Allseas will give us exclusive use of the vessel (“Hidden Gem”) in support of the development of the Project Zero Offshore Nodule Collection System until the system is completed or December 31, 2026, whichever is earlier. In consideration of the exclusivity term, on August 14, 2023, we issued 4.15 million Common Shares to Allseas.

Offtake Agreement

On May 25, 2012, DGE and Glencore entered into a copper offtake agreement and a nickel offtake agreement. DGE has agreed to deliver to Glencore 50% of the annual quantity of copper and nickel produced by a DGE-owned facility from nodules derived from the NORI Area at London Metal Exchange referenced market pricing with allowances for product quality and delivery location. Either party may terminate the agreement upon a material breach or insolvency of the other party. Glencore may also terminate the agreement by giving twelve months’ notice.

Borrowing with Company Related to Allseas

2023 Credit Facility

As described above, on March 22, 2023, we entered into the 2023 Credit Facility with Argentum Cedit Virtuti GCV, an affiliate of Allseas, under which we may borrow up to $25.0 million pursuant to the terms and conditions of the 2023 Credit Facility, as amended, which has a maturity date of August 31, 2025. On August 16, 2024, we entered into the Third Amendment to the 2023 Credit Facility, to increase the borrowing limit of the 2023 Credit Facility to $27.5 million. Under the terms of the Third Amendment, upon closing of the November 2024 Registered Direct Offering discussed above, the borrowing limit returned to $25 million. There was no outstanding balance under the 2023 Credit Facility as at December 31, 2025. Pursuant to the Letter Agreement entered into on March 24, 2025, we agreed to cancel the 2023 Credit Facility with no outstanding amounts remaining, other than our obligation to pay Argentum Cedit Virtuti GCV the underutilization fee thereunder.

38

Table of Contents

2024 Short-Term Loan and Working Capital Loan

On May 27, 2024, we entered into a short-term loan agreement with Argentum Cedit Virtuti GCV whereby we borrowed $2 million (the “Loan”) on May 30, 2024. The Loan matured on September 10, 2024 (maturity date) and accrued interest at a rate of 8% per annum. On the maturity date, we repaid the entire Loan amounting to $2 million and the accrued interest.

On September 9, 2024, we entered into a working capital loan agreement (the “Working Capital Loan Agreement”) with Allseas Investments, a company related to Allseas. In accordance with the Working Capital Loan Agreement, Allseas Investments provided a loan to us amounting to $5 million (the “Working Capital Loan”) on September 10, 2024, to be used towards general corporate purposes and the repayment of all outstanding amounts under the Short-Term Loan between us and the Lender. The Working Capital Loan is payable to the Lender on or before the earlier of (i) the occurrence of certain financing events and (ii) April 1, 2025 (the “Original Repayment Date”). The Working Capital Loan will bear interest based on the 6-month Secured Overnight Financing Rate, 180-day average plus a margin of 4.0% per annum and is payable in two installments on January 2, 2025, and the Original Repayment Date (or plus a margin of 5.0% if all interest payments are deferred to the Original Repayment Date, at our election). On October 18, 2024, we entered into the First Amendment to the Working Capital Loan Agreement with Allseas Investments, resulting in a further draw of $2.5 million by us and a total Working Capital Loan drawn amount of $7.5 million. On March 24, 2025, we entered into a Letter Agreement with Allseas Investments and Argentum Cedit Virtuti GCV, pursuant to which the Original Repayment Date under the Working Capital Loan Agreement was extended to September 30, 2025, with principal and interest now repayable on that date. During the second quarter of 2025, we repaid the entire outstanding loan and interest, amounting to $7.5 million and $0.5 million, respectively, and cancelled the Working Capital Loan Agreement.

2024 Credit Facility with ERAS Capital LLC and Gerard Barron

Under the 2024 Credit Facility wit ERAS Capital LLC and Gerard Barron we may borrow up to $44 million in the aggregate ($22 million from each of the 2024 Lenders). On March 25, 2026 the 2024 Lenders extended the Maturity Date by one year for any borrowings under the 2024 Credit Facility, expiring on June 30, 2027. See above for a further description of the 2024 Credit Facility. As of March 31, 2026, we had no borrowing under the 2024 Credit Facility and are only incurring the underutilization fee.

Off-Balance Sheet Arrangements

We are not party to any off-balance sheet arrangements.

Critical Accounting Policies and Significant Judgments and Estimates

Our condensed consolidated interim financial statements have been prepared in accordance with U.S. GAAP. In the preparation of these financial statements, we are required to use judgment in making estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities as of the date of the financial statements, as well as the reported expenses incurred during the reporting periods. Our estimates are based on our historical experience and various other factors that we believe are reasonable under the circumstances, the results of which form the basis for making judgments about items that are not readily apparent from other sources. Actual results may differ from these estimates under different assumptions or conditions.

Except as described in Note 3 to our condensed consolidated interim financial statements included in this Quarterly Report on Form 10-Q, there have been no material changes to our critical accounting policies and estimates as compared to the critical accounting policies and estimates disclosed in our 2025 Annual Report on Form 10-K.

Item 3.    Quantitative and Qualitative Disclosures About Market Risk

We are exposed to a variety of markets and other risks including the effects of change in interest rates, inflation and foreign currency translation and transaction risks as well as risks to the availability of funding sources, hazard events, specific asset risks, regulatory risks, public policy risks and technology risks. We also expect to be exposed to commodity risks if and when we commence commercial production.

39

Table of Contents

Interest Rate Risk and Credit Risk

Interest rate risk is the risk that the fair value of our future cash flows and our financial instruments will fluctuate because of changes in market interest rates.

Our current practice is to invest excess cash in investment-grade short-term deposit certificates issued by reputable financial institutions with which we keep our bank accounts and management believes the risk of loss to be remote. We periodically monitor the investments we make and are satisfied with the credit ratings of our banks. Due to the current high cash need of our operating plan, we have kept our funds readily available, placed in secure, highly liquid interest-bearing investments, as at March 31, 2026.

Credit risk is a risk of loss that may arise on outstanding financial instruments should a counter party default on its obligation. Our receivables consist primarily of general sales tax due from the Federal Government of Canada and as a result, the risk of default is considered to be low. Once we commence commercial production, we expect our credit risk to rise with our increased customer base.

Regulatory Risk

Regulations related to emissions limits, such as cap-and-trade schemes and carbon taxes, would likely increase our future cost of operations, energy purchase, and equipment selection in addition to costs associated with potential carbon tax and/or purchase of carbon offsets. It is difficult to estimate the impact of potential future regulations on future operations.

We are working on a plan for continuous reduction of emissions and aiming to develop operations with near zero emissions. When selecting the location of our onshore plant, one of our requirements is access to renewable energy as our metallurgical process will be the most energy intensive step in our operations. In addition, we are seeking to replace metallurgical coal used as reductant during calcining of nodules and have tested potential renewable alternatives. We are also identifying the best approach for decarbonizing our offshore operations. To date, we have not experienced any material impact to our business related to potential regulations but will continue to evaluate and monitor future developments.

Other Risks

We are exposed to a variety of markets and other risks including the effects of inflation and foreign currency translation, commodity pricing risks and transaction risks as well as risks to the availability of funding sources, hazard events specific asset risks, regulatory risks, public policy risks and technology risks. We also expect to be exposed to commodity risks if and when we commence commercial production.

Item 4.    Controls and Procedures

Evaluation of Disclosure Controls and Procedures

Under the supervision and with the participation of our management, including our Chief Executive Officer and Chief Financial Officer, we conducted an evaluation of the effectiveness of the design and operation of our disclosure controls and procedures, as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act. Based on this evaluation, our Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures were effective as of March 31, 2026.

Disclosure controls and procedures are controls and other procedures that are designed to ensure that information required to be disclosed in our reports filed or submitted under the Exchange Act is recorded, processed, summarized and reported, within the time periods specified in the SEC’s rules and forms. Disclosure controls and procedures include controls and procedures designed to ensure that information required to be disclosed in our reports filed under the Exchange Act is accumulated and communicated to management, including our Chief Executive Officer and Chief Financial Officer, to allow timely decisions regarding required disclosure.

40

Table of Contents

Changes in Internal Control over Financial Reporting

There were no changes in our internal control over financial reporting identified in connection with the evaluation of such internal controls that occurred during the three months ended March 31, 2026 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting. The Company adopted its Incentive-Based Compensation Recovery Policy (the “Clawback Policy”) in accordance with SEC Rule 10D-1 and Nasdaq listing standards. The Clawback Policy was in effect during the first quarter of 2026 reporting period and provides for the mandatory recoupment of erroneously awarded incentive-based compensation from current and former executive officers in the event of an accounting restatement. No recoupment was triggered or required during the three months ended March 31, 2026. The Company maintains a Cybersecurity Risk Management framework that is integrated into its overall enterprise risk management program. The framework is designed to identify, assess, and manage material risks from cybersecurity threats that could affect the Company’s business, operations, and financial reporting. During the three months ended March 31, 2026, there were no cybersecurity incidents that materially affected, or were reasonably likely to materially affect, the Company’s operations or financial reporting.

Limitations on the Effectiveness of Disclosure Controls and Procedures

Our management, including our Chief Executive Officer and Chief Financial Officer, does not expect that our disclosure controls and procedures or internal control over financial reporting will prevent all errors and all fraud. A control system, no matter how well designed and implemented, can provide only reasonable, not absolute, assurance that the control system’s objectives will be met. Further, the design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs. Because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that all control issues within a company are detected. The inherent limitations include the realities that judgments in decision-making can be faulty and that breakdowns can occur because of simple errors or mistakes. Controls can also be circumvented by the individual acts of some persons, by collusion of two or more people, or by management override of the controls. Because of the inherent limitations in a cost-effective control system, misstatements due to error or fraud may occur and may not be detected. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions or that the degree of compliance with the policies or procedures may deteriorate.

41

Table of Contents

PART II – OTHER INFORMATION

ITEM 1.    LEGAL PROCEEDINGS.

Except as set forth below, we are not currently a party to any material legal proceedings.

On January 23, 2023, investors in the 2021 private placement from the Business Combination filed a lawsuit against us in the Commercial Division of New York Supreme Court, New York County, captioned Atalaya Special Purpose Investment Fund II LP et al. v. Sustainable Opportunities Acquisition Corp. n/k/a TMC The Metals Company Inc., Index No. 650449/2023 (N.Y. Sup. Ct.). We filed a motion to dismiss on March 31, 2023, after which the plaintiffs filed an amended complaint on June 5, 2023. The amended complaint alleges that we breached the representations and warranties in the plaintiffs’ private placement Subscription Agreements and breached the covenant of good faith and fair dealing. The Plaintiffs are seeking to recover compensable damages caused by the alleged wrongdoings. We deny any allegations of wrongdoing and filed a motion to dismiss the amended complaint on July 28, 2023. On December 7, 2023, the Court granted our motion to dismiss the claim for breach of the covenant of good faith and fair dealing and denied our motion to dismiss the breach of the Subscription Agreement claim. We filed a notice of appeal regarding the Court’s denial of our motion to dismiss the breach of the Subscription Agreement claim. The appeal was heard on November 8, 2024. The NY Appellate Division upheld the lower court’s ruling in December 2024, moving the case into the discovery phase, which is currently ongoing.  At this time no further court proceedings or trial date have been set. There is no assurance that we will be successful in our defense of this lawsuit or that insurance will be available or adequate to fund any settlement or judgment or the litigation costs of this action. Such losses or range of possible losses cannot be reliably estimated.

On January 16, 2026, American Metal Inc. and American Metal Resources LLC filed a civil claim in the Supreme Court of British Columbia, Vancouver Registry, captioned American Metal Inc. and American Metal Resources LLC v. TMC The Metals Company Inc. and The Metals Company USA LLC, No. S260335. The notice of civil claim alleges various causes of action, including tortious intimidation, breach of contract, breach of confidence and breach of the duty of honest performance, arising from discussions between the parties regarding potential collaboration and the submission of applications for deep seabed mineral exploration licenses to the United States National Oceanic and Atmospheric Administration. The plaintiffs seek damages and other relief, including a declaration and constructive trust in respect of any exploration licenses awarded to TMC USA. On March 3, 2026, we filed a response to civil claim denying the material allegations in the notice of civil claim. On the same date, we filed a counterclaim against Robert Heydon, American Metal Inc. and American Metal Resources LLC alleging, among other things, breach of contract, breach of confidence, breach of fiduciary duty, inducement of breach of contract and related claims arising from the alleged misuse of the Company’s confidential information in connection with competing license applications. On April 10, 2026 the plaintiffs filed their response to the counterclaim. The litigation is in its early stages and no trial date has been set. We intend to vigorously defend against the claims and pursue our counterclaim. At this time, we are unable to estimate the potential loss, if any, associated with this matter.

ITEM 1A.  RISK FACTORS.

You should carefully review and consider the information regarding certain factors that could materially affect our business, consolidated financial condition or results of operations set forth under Item 1A. Risk Factors in our 2025 Annual Report on Form 10-K. There have been no material changes from or additions to the risk factors disclosed in those reports. We may disclose changes to risk factors or additional factors from time to time in our future filings with the SEC.

42

Table of Contents

ITEM 2.    UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS.

Issuer Purchases of Equity Securities

We did not repurchase any of our equity securities during the three months ended March 31, 2026.

ITEM 3.    DEFAULTS UPON SENIOR SECURITIES.

Not applicable.

ITEM 4.    MINE SAFETY DISCLOSURES.

Not applicable.

ITEM 5.    OTHER INFORMATION.

10b5-1 Trading Arrangements

During the three months ended March 31, 2026, none of our directors or officers (as defined in Section 16 of the Securities Exchange Act of 1934, as amended) adopted, modified or terminated any contract, instruction or written plan for the purchase or sale of our securities that was intended to satisfy the affirmative defense conditions of Rule 10b5-1(c) or any “non-Rule 10b5-1 trading arrangement,” as defined in Item 408(a) of Regulation S-K.

Issuance of Common Shares to Allseas

On May 11, 2026, the Company entered into the Contract for Development Work and Commercial Production (the “Agreement”) with Allseas Deepsea Marine Contractors, a subsidiary of Allseas Group S.A. (“Allseas”).

Pursuant to the Agreement, the Company will issue to Allseas Group S.A. 7,377,835 common shares (the “Shares”) in settlement of the March 31, 2026 amount owing of $32.1 million for development work previously performed by Allseas Group S.A. and its affiliates in connection with the nodule collection system and an additional $2.3 million of initial costs as negotiated. A final share settlement of additional costs up to the date of this agreement is to be completed in accordance with the terms of the Agreement. The final Share Settlement Amount and corresponding number of Shares are subject to determination in accordance with the terms of the Agreement and have not been finally determined as of the date of this Quarterly Report. As prescribed in the Agreement, the settlement in shares is calculated using a VWAP over the 20 days preceding the effective date as stipulated in the Agreement, less a discount of 10%. Pursuant to the Agreement, Incurred Costs up to the signing of this agreement, not yet invoiced by Allseas, will be payable in any event, which the Company expects to settle in cash through production revenues, in accordance with the terms of the Agreement.

The Shares will be issued in reliance on the exemption from registration provided by Section 4(a)(2) of the Securities Act of 1933, as amended, as a transaction not involving a public offering. Allseas Group S.A. is a sophisticated investor and the Company’s largest strategic shareholder. The Shares have not been registered under the Securities Act and may not be offered or sold in the United States absent registration or an applicable exemption from registration requirements.

43

Table of Contents

ITEM 6.    EXHIBITS.

The following exhibits are filed as part of, or incorporated by reference into, this Quarterly Report on Form 10-Q.

Exhibit
Number

  ​ ​ ​

Exhibit Description

  ​ ​ ​

Filed Herewith

  ​ ​ ​

Incorporated by
Reference Herein
from
Form or Schedule

  ​ ​ ​

Filing Date

  ​ ​ ​

SEC File/
Reg. Number

3.1†

Notice of Articles of TMC the metals company Inc.

Form 10-K
(Exhibit 3.1)

March 31, 2026

001-39281

3.2

Articles of TMC the metals company Inc.

Form 8-K
(Exhibit 3.3)

January 2, 2026

001-39281

10.1†

Contract For Development Work and Commercial Production, dated May 11, 2026, with Allseas Deepsea Marine Contractors

X

31.1

Certification of the Principal Executive Officer pursuant to Section 302 of the Sarbanes-Oxley Act of 2002

X

31.2

Certification of the Principal Financial Officer pursuant to Section 302 of the Sarbanes-Oxley Act of 2002

X

32*

Certifications of the Chief Executive Officer and Chief Financial Officer pursuant to Section 906 of the Sarbanes-Oxley Act of 2002

X

101.INS

Inline XBRL Instance Document (the instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document)

X

101.SCH

Inline XBRL Taxonomy Extension Schema Document

X

101.CAL

Inline XBRL Taxonomy Extension Calculation Linkbase Document

X

101.DEF

Inline XBRL Taxonomy Extension Definition Linkbase Document

X

101.LAB

Inline XBRL Taxonomy Extension Label Linkbase Document

X

104

Cover Page Interactive Data File (embedded within the Inline XBRL document)

X

†     Certain confidential portions of this Exhibit were omitted by means of marking such portions with brackets (“[***]”) because the identified confidential portions (A) (i) are not material and (ii) is the type of information that the Company treats as private or confidential or (B) are of a personal nature under Regulation S-K Item 601 (a)(6).

*     The certifications attached as Exhibit 32 that accompany this Quarterly Report on Form 10-Q are not deemed filed with the Securities and Exchange Commission and are not to be incorporated by reference into any filing of TMC the metals company Inc. under the Securities Act of 1933, as amended, or the Securities Exchange Act of 1934, as amended (whether made before or after the date of such Form 10-Q), irrespective of any general incorporation language contained in such filing.

44

Table of Contents

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

TMC THE METALS COMPANY INC.

 

Date: May 14, 2026

By:

/s/ Gerard Barron

Gerard Barron

Chief Executive Officer

Date: May 14, 2026

By:

/s/ Craig Shesky

Craig Shesky

Chief Financial Officer

45

Exhibit 10.1

AGREEMENT

THIS AGREEMENT (the “Contract) is made and entered into as of the date of the last signature by the Parties and shall be effective as from 30 March 2026 (the “Effective Date”), by and between:

I.

Allseas Deepsea Marine Contractors [***] (“Allseas”);

and

II.

TMC The Metals Company Inc. of 1111 West Hastings Street, 15th Floor, Vancouver BC V6E 2J3 Canada (“TMC”),

each individually also referred to as a “Party” and together referred to as the “Parties

WHEREAS

A.

Following the Strategic Alliance Agreement between DeepGreen Metals Inc (now TMC) and Allseas Group S.A. dated 29 March 2019, its appendices and its subsequent amendments (the “SAA”) and the Pilot Mining Test Agreement dated 8 July 2019 and its subsequent amendments, the Parties have agreed to further their co-operation by entering into this Contract for the design, development, build, testing and commissioning of a production system for the collection and transport of Nodules in the License Area as further detailed and described in this Contract (the “Work”).

B.

The Work shall be split into “Development Work” and “Commercial Production” (further defined in Annexure 1 below), both to be executed under this single Contract.

C.

The Parties agree that any principles of the SAA that remain relevant have been incorporated in this Contract, and that the SAA is therefore rendered obsolete. The Parties further acknowledge their intention to continue to collaborate in a strategic partnership in relation to the Project, while this Contract governs the specific rights and obligations in respect of the Work.

D.

TMC’s Affiliate The Metals Company USA LLC. (defined herein as the “Permit Holder”) has applied to NOAA for a Commercial Recovery Permit under DHSMRA, to enable commercial recovery of Nodules from the License Area. TMC will develop the required infrastructure and equipment to enable commercial recovery of Nodules.

E.

Under this Contract TMC is engaging Allseas to do all things necessary to develop the first Production System for 3.0MTPA of production capacity – including but not limited to the Production Vessel, collectors, and provision of all ancillary equipment and services necessary to commercially produce Nodules at the required rates, including establishment and operation of shorebases, charter and operation of supply vessels, supply of all crews, management of all crew-changes, emergency response processes, victualling, bunkering and all other things legally and practically required to undertake the Commercial Production in the License Area.

F.

This Contract sets out the rights and obligations of the Parties with respect to the Work. Part 1 sets out the conditions that apply to all of the Work. Part 2 sets out the conditions that apply to the Development Work but not to the Commercial Production. Part 3 sets out the conditions that apply to the Commercial Production but not to the Development Work.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

1


G.

While this Contract is initially for development of the first production system (comprising the first Production Vessel (the Hidden Gem) and the Collection System with nominal capacity to collect and produce 3.0MTPA of Nodules, and associated storage, transfer and transport capacity to transport produced Nodules to TMC’s nominated port), the Parties intend that this Contract also forms the foundation for future scaling up and continuation of production, to an ultimate greater production capacity, as per the Life-of-Mine Plan, subject to the terms of this Contract and any future written agreement between the Parties.

The Parties ultimate aim is to maintain a long-term strategic partnership for production within the License Area in accordance with the Life-of-Mine Plan, for the exploitation of the first two hundred (200) million wet tonnes of Nodules.

H.

The Parties have agreed an initial five (5) year period for Commercial Production to be undertaken on the basis of the commercial structure set forth in this Contract to enable the Nodule recovery process to be proven, and for reimbursement of Deferred CAPEX in development of the Production System. The Parties’ mutual intent is that the production of Nodules will continue as per the Life-of-Mine Plan. Beyond the Initial Term a revised commercial basis shall be agreed, whereby Allseas’ production costs are covered and margins and profits from offshore Nodule collection and transportation shall be mutually agreed.

During the Initial Term, the Parties’ mutual intent is to prove and refine the Nodule production process, with a focus on reliability initially to secure a resilient basis for onshore processing and driving down the unit cost of offshore Nodule production over time. During Extension Terms, Allseas will use reasonable endeavours to continuously reduce unit costs, such unit costs to be taken into consideration in the good faith negotiations concerning any Extension Term and any scaling up of Nodule production.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

2


TABLE OF CONTENTS:

Article 1

DEFINITIONS AND INTERPRETATION

5

Article 1A

PERMIT HOLDER BENEFIT AND BURDEN

5

Article 2

PURPOSE AND SCOPE

6

Article 3

CONTRACT DURATION

8

Article 4

BASIS OF AGREEMENT

8

Article 5

TMC AND ALLSEAS REPRESENTATIVES

9

Article 6

ALLSEAS’ AND TMC’S GENERAL OBLIGATIONS

10

Article 7

ALLSEAS PROVIDED INFORMATION

11

Article 8

ALLSEAS TO INFORM TMC / TMC TO INFORM ALLSEAS

11

Article 9

SUBCONTRACTING

11

Article 10

ASSIGNMENT & NOVATION

11

Article 11

VARIATIONS

12

Article 12

FORCE MAJEURE

13

Article 13

SUSPENSION

14

Article 14

TERMS OF PAYMENT

15

Article 15

TAXES AND TAX EXEMPTION CERTIFICATES

16

Article 16

CUSTOMS PROCEDURES

17

Article 17

INTELLECTUAL PROPERTY

18

Article 18

CHANGE IN LAW

19

Article 19

LAWS AND REGULATIONS

19

Article 20

INDEMNITIES

20

Article 21

INSURANCES

21

Article 22

CONSEQUENTIAL LOSS

22

Article 23

CONFIDENTIALITY

22

Article 24

TERMINATION

23

Article 25

AUDIT AND STORAGE OF DOCUMENTS

25

Article 26

LIENS

26

Article 27

BUSINESS ETHICS

26

Article 28

SANCTIONS AND ANTI-CORRUPTION

26

Article 29

HSE

28

Article 29A

CHANGE OF CONTROL

28

Article 30

GENERAL LEGAL PROVISIONS

29

Article 31

LIMITATION OF LIABILITIES

30

Article 32

GOVERNING LAW AND RESOLUTION OF DISPUTES

31

Article 33

REPRESENTATIONS & WARRANTIES

32

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

3


Article 34

CONTRACTS (RIGHTS OF THIRD PARTIES) ACT

32

Article 35

NON-SOLICITATION

32

PART 2:

DEVELOPMENT WORK

33

Article 36

PROGRAMME

33

Article 37

FORCE MAJEURE

33

Article 38

VARIATIONS

33

Article 39

CHANGE IN LAW - CONSEQUENCES

33

Article 40

COMPLETION OF DEVELOPMENT WORK

33

Article 41

TRANSITION TO COMMERCIAL PRODUCTION

34

Article 42

COMMERCIAL RECOVERY PERMIT

35

PART 3:

COMMERCIAL PRODUCTION

36

Article 43

VARIATIONS

36

Article 44

FORCE MAJEURE

36

Article 45

RELY-UPON INFORMATION

36

ANNEXURE 1 – DEFINITIONS

39

SCHEDULE 1 - SCOPE OF WORK

SCHEDULE 2 – TERMS OF COMPENSATION

SCHEDULE 3 – SCHEDULE OF KEY DATES

SCHEDULE 4 – ADMINISTRATIVE REQUIREMENTS

SCHEDULE 5 – QA, QC, HSE and SECURITY REQUIREMENTS

SCHEDULE 6 – ATTACHMENTS

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

4


NOW THEREFORE IT IS HEREBY AGREED AS FOLLOWS

PART 1: GENERAL CONDITIONS (applicable to all elements of the Work)

Article 1

DEFINITIONS AND INTERPRETATION

1.1

In this Contract and in the Schedules forming part of the Contract, the capitalised terms shall have the meaning ascribed to them in Annexure 1 – DEFINITIONS.

1.2

For purposes of this Contract, any reference to a Party shall be deemed to include such Party’s permitted assigns, successors, and legal representatives.

1.3

All instructions, notices, agreements, authorisations, approvals and acknowledgements shall be in writing. All such documentation together with all correspondence and other documents shall be in the English language.

1.4

Any reference to statute, statutory provision or statutory instrument shall include any re-enactment or amendment thereof for the time being in force.

1.5

Unless the context otherwise requires, words importing the singular shall include the plural, and words importing the masculine gender shall include the feminine and neuter genders, and vice versa.

1.6

The headings in this Contract have been included solely for ease of reference and shall not be considered in the interpretation or construction of this Contract.

1.7

No rule of construction shall apply to the disadvantage of a party on the basis that such party was responsible for the preparation of this Contract or any part of it.

Article 1A PERMIT HOLDER BENEFIT AND BURDEN

a)

The Parties acknowledge and agree that, unless expressly stated otherwise in this Contract, any right, benefit entitlement, protection, limitation of liability, exclusion, defence, indemnity, obligation or liability arising under or in connection with this Contract, each insofar as it applies to TMC (each a “Relevant Provision”) shall be deemed to be granted to, and binding upon TMC and the Permit Holder as if the Permit Holder were a party to this Contract.

b)

TMC enters into this Contract on its own behalf and as trustee and agent for the Permit Holder for the purpose of holding the benefit of, and accepting the burden of, each Relevant Provision on trust for the Permit Holder.

c)

Any obligation of TMC under this Contract may be performed by TMC or the Permit Holder, and performance by the Permit Holder shall discharge the corresponding obligation of TMC to the extent of such performance.

d)

TMC shall procure that the Permit Holder complies with all Relevant Provisions applicable to it, and shall remain responsible for any act or omission of the Permit Holder as if it were the act or omission of TMC.

e)

Allseas shall be entitled to enforce any Relevant Provision against TMC and/or the Permit Holder (as applicable).

f)

The Parties may amend, vary, novate or terminate this Contract in accordance with the applicable provisions without the consent of the Permit Holder, notwithstanding that it may have the benefit of, or be subject to, any Relevant Provision.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

5


Article 2

PURPOSE AND SCOPE

2.1

This Contract governs all of the Work, including:

a)

The Development Work, comprising:

(i)

Modification work on the Production Vessel;

(ii)

Development of the Collection System; and

(iii)

Any associated capital work required to enable Allseas to undertake the Commercial Production, including any necessary modifications to Additional Vessels and potentially to Transfer Vessel and Transport Vessels, as contemplated in Article 2.4 below and in Schedule 1 – Scope of Work;

And including in each case:

(iv)

The services of Allseas staff undertaking and supporting the Development Work;

(v)

All engineering;

(vi)

Procurement of equipment and materials;

(vii)

Fabrication, construction, installation, assembly, commissioning, testing;

(viii)

Maintaining the Production Vessel in a care and maintenance state prior to the commencement of modifications of it;

(ix)

Provision of fuel, oils and lubricants, labour and all other consumables actually and reasonably required to complete approved vessel movements including modification works, commissioning, sea-trials and performance testing; and

all as more fully detailed in Schedule 1 – Scope of Work;

and

b)

The Commercial Production, comprising:

(i)

Operation of the Production Vessel, the Collection System, Additional Vessel, and all other infrastructure required to recover Nodules from the seabed, lift to surface, partial de-watering, offloading and transporting of the Nodules;

(ii)

Charter and operation of Additional Vessel and any helicopter / aviation operations;

(iii)

Establishment and operation of the shore base;

(iv)

Supply of fuel, victualling and the like;

(v)

Recruitment, provision and management of all crews and crew changes and all associated employment-related services; and

(vi)

Provision of operational Allseas’ staff,

all as more fully detailed in Schedule 1 – Scope of Work.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

6


2.2

The Parties agree that the Nodules shall at all times remain the property of TMC and shall remain at TMC’s sole risk, notwithstanding the fact that they may, at certain times, be held in Allseas’ custody.

2.3

Regardless of where actual transfer of custody takes place, Allseas will measure the Actual Wet Tonnes Produced prior to offloading from the Production Vessel.

2.4

The Parties acknowledge and agree that at the time of execution of this Contract the manner of offloading and transport of the Nodules to their final destination remains undetermined. The base case scenario (Section 3.8, Schedule 1 – Scope of Work) is offloading of the Nodules onto a Transfer Vessel alongside the Production Vessel for onward transport on a Transport Vessel to a TMC designated port for offloading. Once the final destination of the Nodules is known, the Parties shall, if required, negotiate and agree upon the applicable terms and conditions in good faith, and such agreement (if any) shall be recorded in a written addendum to this Contract.

2.5

In the event TMC elects to pursue the scaling of nodule production through the deployment of an additional Production Vessel and Collection System in support of the Life-of-Mine Plan, TMC shall first invite Allseas to undertake such scope. Accordingly, where TMC wishes to scale up production:

a)

it shall notify Allseas and the Parties shall negotiate in good faith the commercial terms for the scaling up of production, having regard to the principles set forth in Article 3.5 below, in particular the principle that TMC will pay Allseas the actual cost of collecting and transporting Nodules, and that Allseas and TMC will negotiate in good faith margin and profit.

b)

TMC shall not engage any third party to undertake collection of Nodules in the Licence Area unless it has first invited Allseas to provide such services as contemplated by this Article and either i) Allseas has provided a written notice to TMC stating that it does not wish to participate in the scaling-up of Nodule collection, or ii) the Parties have failed to agree terms of such scaling up of Nodule collection within a reasonable time following TMC’s invitation.

For the avoidance of doubt, this Article 2.5 does not (i) obligate TMC to pursue any such scaling of production, or (ii) apply to processing facilities, onshore infrastructure, port facilities, or services other than offshore collection and transportation systems.

2.6

Allseas shall not offer any Production Vessel or any Additional Vessel nor any Collection System to any third party for the collection of Nodules unless it has first formally offered TMC the opportunity to engage Allseas to employ that Production Vessel, Additional Vessel, or Collection System for the collection of Nodules on such terms as the Parties may agree and either i) TMC has provided a written notice to Allseas stating that it does not wish to engage that Production System for the purposes of Nodule recovery, or ii) the Parties have failed to agree terms for scaling up of Nodule collection operations within a reasonable time following Allseas’ offer and having first entered into good faith negotiations in accordance with Article 2.5(a) above.

2.7

Articles 2.5 and 2.6 shall apply notwithstanding the expiry or non-extension of the Initial Term or any Extension Term. Article 2.5 shall not apply in the event of termination of this Contract by TMC for Allseas’ material breach, and Article 2.6 shall not apply in the event of termination of this Contract by Allseas for TMC’s material breach.

2.8

Neither Article 2.5 nor 2.6 shall apply if the Party entitled to the right of first offer is in uncured material breach of this Contract at the time the relevant notice is delivered or during the negotiation period.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

7


Article 3

CONTRACT DURATION

3.1

The Contract commences on the Effective Date and shall continue in full force and effect for a period of five (5) years after the commencement of Commercial Production, unless earlier terminated in accordance with the provisions of this Contract (the “Initial Term”).

3.2

Upon execution of the Contract, TMC will be deemed to have approved the First Development Package, provided that:

a)

Allseas must submit a detailed WP&B proposal for WP&B for the scope of work defined as DP1 and DP2 in Section 9.2.1 of Schedule 1 - Scope of Work, compliant with the requirements set forth in Schedule 1 – Scope of Work, within thirty (30) days of execution of this Contract; and

b)

Allseas may not spend/commit more on execution of the scope of work ascribed to DP1 and DP2 than the amount set forth in the approved Allseas’ estimate as per the WP&B approval process detailed in Section 2.4.6.2 of Schedule 2 – Terms of Compensation.

3.3

Subject to Article 41.2, the Development Work shall be deemed completed upon issuance of the Certificate of Completion and commencement of Commercial Production, in accordance with the requirements set forth in Articles 40 and 41 of this Contract.

3.4

Thereafter, the Commercial Production shall continue for the duration specified in Article 3.1.

3.5

Upon expiration of the Initial Term, this Contract shall continue for successive periods of up to five (5) years (each an “Extension Term”) subject to the following principles:

a)

The Parties shall negotiate in good faith and in the spirit of the SAA the commercial terms for the Commercial Production in any Extension Term, having regard to the principle that TMC will pay Allseas the actual cost of collecting and transporting Nodules, and that Allseas and TMC will negotiate in good faith margin and profit of Commercial Production in any Extension Term.

b)

The Parties shall initiate discussions regarding such extension no later than one (1) year prior to the expiration of the Initial Term (or the then-current Extension Term).

c)

If the Parties have not agreed revised commercial terms for the applicable Extension Term prior to the expiration of the Initial Term (or then-current Extension Term), Commercial Production shall continue without interruption on no less favourable terms for Allseas as of this Contract until such time as revised commercial terms are agreed in writing between the Parties. Notwithstanding the foregoing, if continuation of Commercial Production on such terms would result in a material and sustained economic loss to a Party, such Party may issue a notice to the other Party in accordance with Article 24.4, following which the Steering Committee shall convene and the provisions of Article 24 (including the process applicable where the (commercial) viability of the Project is materially affected) shall apply mutatis mutandis.

Article 4

BASIS OF AGREEMENT

4.1

This Contract comprises of:

a)

Part 1 (General Conditions)

b)

Part 2 (Development Work)

c)

Part 3 (Commercial Production)

d)

Annexure 1 to the Contract

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

8


e)

Schedules to the Contract:

(i)

Schedule 1 – Scope of Work

(ii)

Schedule 2 – Terms of Compensation

(iii)

Schedule 3 – Schedule of Key Dates

(iv)

Schedule 4 – Administrative Requirements

(v)

Schedule 5 – Quality Assurances, Quality Control, Health, Safety, Environmental and Security Requirements;

(vi)

Schedule 6 – Attachments

4.2

In the event of any inconsistency, conflict or ambiguity between the provisions of the documents forming the Contract, the following order of precedence shall apply with the document listed first taking highest priority.

a)

Part 2 and 3 - Special Conditions;

b)

Part 1 – General Conditions;

c)

Schedule 1 - Scope of Work;

d)

Schedule 2 - Terms of Compensation;

e)

Schedule 3 – Schedule of Key Dates; and

f)

the remainder of the Schedules in the order in which they appear.

Article 5

TMC AND ALLSEAS REPRESENTATIVES

5.1

The TMC Representative is [***] Project Director, [***]

5.2

The Allseas Representative is [***] Proposal Manager, [***]

5.3

Such representatives, or delegates appointed in accordance with the provisions of this Article 5, shall be readily available to enable both TMC and Allseas to discharge their obligations under the Contract.

5.4

The TMC Representative and any person authorised by him shall have access at all reasonable times to the Worksite and Allseas shall afford every facility for and every assistance in obtaining the right of access.

5.5

Allseas shall maintain at the Worksite a complete set of all relevant Technical Information together with all relevant documents and drawings provided by Allseas for the purposes of the Work. Such information shall be made available to the TMC Representative or any other person authorised by him at all reasonable times.

5.6

Each Party’s Representative has the authority to commit that Party in all matters under the Contract, subject to any delegation of such authority notified in writing to the other Party. The Representative shall be responsible for issuing to and receiving from the other Party all notices, information, instructions and decisions.

5.7

Each Party’s Representative may, by written notice to the other Party, delegate any of his authority to any nominated deputy, subject to the prior written approval of the other Party,

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

9


which shall not be unreasonably withheld or delayed. Such notice shall specify the precise authority of any such deputy and shall be sent to the other Party’s Representative.

5.8

Each Party may change its Representative at any time by notifying the other Party in writing of such change.

5.9

Except as expressly stated in the Contract, neither Party’s Representative shall have the power to amend the Contract or to relieve the other Party from any of its obligations under the Contract.

Article 6

ALLSEAS’ AND TMC’S GENERAL OBLIGATIONS

6.1

Allseas shall provide all management, supervision, personnel, materials and equipment, plant, consumables, facilities and all other things whether of a temporary or permanent nature reasonably required to complete the Work in accordance with Schedule 1 – Scope of Work and shall carry out all of its obligations under the Contract and shall execute the Work with all due care and diligence and with the skill to be expected of a reputable contractor experienced in the types of work to be carried out under the Contract.

6.2

Except to the extent that it may be legally or physically impossible or creates a hazard to safety Allseas shall comply with TMC’s instructions and directions on all matters relating to the Work.

6.3

Materials and equipment or parts thereof provided by Allseas shall be new or certified and of good quality.

6.4

All personnel employed on the Work shall, for the work which they are required to perform, be competent, properly qualified, skilled and experienced in accordance with good industry practice. Allseas shall verify all relevant qualifications of such personnel.

6.5

Allseas shall ensure that supervisory personnel of Allseas and Subcontractors shall read, write and speak fluent English.

6.6

Allseas shall make its own arrangements for the engagement of personnel, local or otherwise, and for their payment and onshore transport, housing, maintenance and board and lodging.

6.7

Allseas shall ensure that all of its employees and any Subcontractor engaged in the performance of the Work comply with applicable laws, rules and regulations including without limitation immigration laws and where required are in possession of a valid work permit for the duration of the Contract. When requested details of such work permits shall be submitted to TMC prior to the employee being engaged in the Work, subject always to applicable privacy laws.

6.8

TMC shall provide the services as specified in Schedule 1 – Scope of Work as services to be provided by TMC. Dates of delivery and methods of delivery shall be as specified in that Schedule.

6.9

TMC shall procure that the Permit Holder uses reasonable endeavours to obtain the Commercial Recovery Permit at its own cost and using reasonable efforts to secure the Commercial Recovery Permit in a timely manner. Upon receipt, TMC shall promptly obtain a copy of the Commercial Recovery Permit from the Permit Holder and provide same to Allseas.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

10


Article 7

ALLSEAS PROVIDED INFORMATION

7.1

Where Allseas is required to produce sketches, drawings, calculations, reports, recommendations and the like, or the preparation of such is necessary for the proper carrying out and completion of the Work, Allseas shall submit all such documents to TMC in accordance with Schedule 4 – Administrative Requirements, for review and comment, approval or for information, as applicable. TMC shall be afforded the time specified in the Contract (or if no time is specified a reasonable time and at least 10 (ten) working days) to carry out such review so that progress of the Work is not delayed.

Article 8

ALLSEAS TO INFORM TMC / TMC TO INFORM ALLSEAS

8.1

TMC shall permit Allseas (or its authorised designee) access to raw survey data, geophysical logs, multibeam and AUV data underlying the Base Data upon reasonable notice and subject to confidentiality restrictions, for the sole purpose of validating the data provided.

8.2

Allseas shall notify TMC without delay of all things which in the opinion of Allseas appear to be deficiencies, omissions, contradictions or ambiguities in the Contract or in any Base Data or Rely-Upon Information, or conflicts with Law. TMC shall review these items and issue within twenty-four (24) hours, or such longer period as may be agreed between the Parties, the necessary instructions. Allseas shall not proceed with any part of the Work affected before TMC issues the instructions, unless safety requires otherwise. TMC shall issue a Variation in accordance with Article 11 and Article 38 or Article 43 (as applicable) for any delay suffered by Allseas in the Development Work, or any impact suffered by Allseas on its ability to meet a Production Target, as a result of TMC’s instruction.

8.3

TMC shall without delay provide to Allseas all information reasonably required of TMC in order for Allseas to properly perform the Work in accordance with the Contract, including but not limited to Rely Upon Information, prior to commencement of the Development Work (provided it is available, or otherwise promptly as it becomes available). Where revisions of documents and/or information and approvals are required or requested from TMC, TMC shall perform such revisions and provide such approvals expeditiously and in a timely manner so as not to delay nor prejudice Allseas nor cause Allseas additional cost as a consequence of such delay.

Article 9

SUBCONTRACTING

9.1

Allseas shall not subcontract the whole of the Work.

9.2

Allseas shall not subcontract any major part of the Work where it concerns the Commercial Production without the prior approval of TMC which approval shall not unreasonably be withheld or delayed. For the purposes of this Article 9.2 a major part of the Work shall mean core or material obligations accepted by Allseas under this Contract and shall also mean any subcontract scope with a value of greater than [***] on an annual basis.

9.3

No Subcontract shall bind or purport to bind TMC or the Co-venturers. Nevertheless, Allseas shall ensure that any Subcontractor shall be bound by and observe the provisions of the Contract insofar as they apply to the Subcontract.

9.4

Allseas shall be responsible for all work, acts, omissions and defaults of any Subcontractor as fully as if they were work, acts, omissions or defaults of Allseas.

Article 10

ASSIGNMENT & NOVATION

10.1

Each Party may assign the Contract or any part of it or any benefit or interest in or under it to any Affiliate or to any other third party, and, where it concerns TMC, to a Co-venturer,

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

11


provided such Affiliate, Co-venturer or third party is not sanctioned under Article 28 and able to meet the obligations of the assigning Party under this Contract. Such assignment may only be undertaken with the prior written consent or agreement of the other Party which shall not unreasonably be withheld or delayed, except that no such consent shall be required for any transfer, assignment, novation or other arrangement implemented pursuant to Article 24.6 (Termination for Inability to Perform Event).

10.2

The assigning Party undertakes that, in the event of any assignment described above, it will execute without delay a formal assignment of interest in the Contract to the relevant party, to be effective upon the written assumption by the assignee of all obligations of the assigning Party under the Contract.

10.3

Allseas may novate its rights and obligations under this Agreement to any other entity belonging to the Allseas group of companies. A novation shall only become effective by a written agreement executed by all Parties, and upon such execution the original Party shall be released from its obligations under this Agreement, with the new Party assuming those obligations as if it were an original signatory.

Article 11

VARIATIONS

11.1

Where TMC directs, or the Parties agree, that any of the Work is to be varied, Allseas shall prepare a proposed revision to the applicable WP&B and submit it for TMC consideration in accordance with Article 11.6 below.

11.2

Where revisions so proposed to an approved WP&B are approved by TMC in accordance with the Contract, Allseas shall carry out the Work in accordance with the revised WP&B.

Allseas’ Right to Request a Variation

11.3

If Allseas considers that an occurrence has taken place for which it is entitled to receive a Variation, Allseas, before proceeding with any work affected by such occurrence, shall submit a revised WP&B and request in writing that TMC approve the revisions to the WP&B. Any such request shall include details of the occurrence including any relevant dates and the Article(s) of the Contract under which Allseas considers itself to be entitled to revise the approved WP&B. Such occurrences shall include but not be limited to the following:

a)

an instruction from TMC, whether contained in drawings or specifications issued by TMC or not, which in the opinion of Allseas constitutes a revision to the Work;

b)

matters arising under any Article of the Contract in respect of which it is specifically stated that a Variation will be authorised by TMC.

11.4

TMC shall within a reasonable time of having received a revised WP&B from Allseas, give notice to Allseas stating:

a)

that the proposed revisions to the WP&B (or part thereof) are approved; and/or

b)

that what is requested or part thereof is included in the obligations undertaken by Allseas under the terms of the Contract and that the request is accordingly rejected; and/or

c)

that the request or part thereof is rejected for other stated reasons.

Should Allseas wish to pursue any request for revision to an approved WP&B which has been rejected by TMC it shall proceed in accordance with the provisions of Article 32.

Allseas’ estimates

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

12


11.5

Within twenty-one (21) days of a request from TMC or of the event giving rise to Allseas’ contention that should be entitled to revise an approved WP&B, or such longer time as TMC shall agree where reasonable for any specific Variation, Allseas shall submit to TMC full details of the proposed adjustments to the approved W&PB. Such estimates shall include:

a)

description of the work to be varied under the Variation;

b)

a detailed schedule for the execution of the Variation showing the resources to be employed;

c)

the estimated costs;

d)

the effect (if any) on the Programme (if applicable); and

e)

any impacts on the applicable Annual Production Target (with respect to Commercial Production).

11.6

TMC and Allseas shall mutually agree the effects of Variations in accordance with the following principles:

a)

For the avoidance of doubt, Allseas shall have no entitlement to loss of profit, contribution to overheads or loss of opportunity in respect of any deductive Variation;

b)

With respect to Development Work, where work is of a similar nature and carried out under similar conditions to work priced in the Contract, it shall be estimated at the appropriate rates and prices included in the Contract (where applicable);

c)

With respect to Commercial Production, where work relies on personnel, plant or equipment for which rates are provided in the contract it shall be estimated at the appropriate rates and prices included in the Contract (where applicable);

d)

Where work is not of a similar nature or is not carried out under similar conditions to work priced in the Contract, then it shall be at estimated cost.

Article 12

FORCE MAJEURE

12.1

Neither TMC nor Allseas shall be responsible for any failure to fulfil any term or condition of the Contract if and to the extent that fulfilment has been delayed or temporarily prevented by a Force Majeure Event which has been notified in accordance with this Article 12 and which is beyond the control and without the fault or negligence of the party affected and which and to the extent, by the exercise of reasonable diligence, the said party is unable to mitigate.

12.2

For the purposes of this Contract only the following occurrences shall be Force Majeure Events:

a)

war, insurrection, civil strife, community action, civil commotion, political and terrorists’ activity, piracy, ambush, sabotage, kidnap or indigenous action or threat of any of the foregoing;

b)

ionising radiations or contamination by radioactivity from any nuclear fuel or from any nuclear waste from the combustion of nuclear fuel or radioactive, toxic, explosive or other hazardous properties of any explosive nuclear assembly or nuclear component thereof;

c)

pressure waves caused by aircraft or other aerial devices travelling at sonic or supersonic speeds;

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

13


d)

earthquake, flood, fire, explosion and/or other natural physical disaster, including named storms, tropical cyclones, hurricanes and typhoons but excluding sea-states and excluding all other weather conditions, regardless of severity; and

e)

maritime or aviation disasters.

12.3

For the avoidance of doubt, any disruption, delay, or impossibility of continuing the Work arising from or in connection with (environmental) protestors/activists shall not constitute a Force Majeure Event. In such circumstances, the Parties shall promptly consult in good faith and mutually agree on the appropriate measures to address the situation. The agreed consequences shall be reflected as appropriate in accordance with Article 11.

12.4

When a Force Majeure Event occurs, the Party that is or may be delayed in performing the Contract shall notify the other Party without delay giving the full particulars thereof and shall use all reasonable endeavours to remedy the situation and to mitigate the effects of the Force Majeure Event on the Work, without delay.

12.5

Following notification of a Force Majeure Event in accordance with Article 12.4 above, TMC and Allseas shall meet without delay with a view to agreeing a mutually acceptable course of action to minimise any effects of such occurrence and shall thereafter meet at not more than seven (7) day intervals.

12.6

In the event that a Force Majeure Event prevents either Party from performing its obligations under this Contract for a continuous period exceeding 6 (six) months, the non-affected Party shall have the right, upon written notice to the affected Party, to terminate this Contract without liability, without prejudice to any obligations, rights or remedies accrued prior to the commencement of the Force Majeure Event. Any payments due and outstanding at the date of termination shall remain payable, and termination under this Article shall be in accordance with Article 24.

Article 13

SUSPENSION

13.1

TMC shall have the right, by notice to Allseas, to suspend the Development Work or the Commercial Production or any part thereof to the extent detailed in the notice for any of the reasons listed in Articles 13.2 and 13.3.

13.2

For Development Work, in the event of:

a)

suspensions or delays in issuance of permits (including the Commercial Recovery Permit); or

b)

a change in permitting conditions by authorities giving rise to a reasonable prospect that legal authority to commence Commercial Production will be delayed; or

c)

delays in, or inability to secure, financing or liquidity required to progress the Development Work, including any delay in advancement of funds by TMC’s financiers; or

d)

at the direction of TMC’s financiers; or

e)

for financing or liquidity-related reasons directly affecting TMC’s ability to fund or progress the Development Work.

13.3

Upon receipt of any such notice, Allseas shall, unless instructed otherwise:

a)

discontinue the Development Work or the part of the Development Work detailed in the notice, on the date and to the extent specified; and

b)

properly protect and secure the Development Work as required by TMC.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

14


Any payments due and outstanding to Allseas at the date of suspension shall remain payable, as well as cost associated with continued lay-up of the Production Vessel.

13.4

For Commercial Production:

a)

in the event of changes in conditions or directions imposed by the Regulatory Authority on the Commercial Recovery Permit or other relevant Project approvals; or

b)

in order for TMC or the Permit Holder to ensure, assure or verify compliance with Law or a condition imposed on the Commercial Recovery Permit or on any other applicable regulatory approval.

Upon receipt of any such notice, Allseas shall, unless instructed otherwise, discontinue the Commercial Production (completely or to the extent instructed by TMC) on the date and to the extent specified. Allseas will be re-imbursed by TMC during such suspension and has the option to demobilise after fourteen (14) days and keep the Production Vessel in warm lay-up which will re-imbursed by TMC.

13.5

Allseas shall have the right, by notice to TMC, to suspend the Development Work or any part thereof to the extent detailed in the notice in the event that the Commercial Recovery Permit is not granted to the Permit Holder within three (3) months from the date Allseas has given notice to TMC, provided that such notice may not be issued before 1 July 2027. In the event of such a suspension, Article 13.3 shall apply.

13.6

In the event of any suspension, TMC and Allseas shall meet at not more than seven (7) day intervals with a view to agreeing a mutually acceptable course of action during the suspension.

13.7

If the period of any suspension exceeds sixty (60) days, provided that the Steering Committee has first met to discuss the appropriate course of action each Party may take, then Allseas may serve a notice on TMC requiring permission within fourteen (14) days from the receipt of such notice to proceed with the Development Work or Commercial Production or that part thereof subject to suspension. If within the said fourteen (14) days TMC does not grant such permission, Allseas by a further notice, may (but is not bound to) elect to treat the suspension as either:

a)

where it affects part only of the Development Work or the Commercial Production, an omission of such part under Article 11.4; or

b)

where it affects the whole of the Development Work or the Commercial Production, termination in accordance with Article 24.

13.8

Upon cessation of the period of suspension during the Development Work, Allseas shall prepare a revised Programme to include for rescheduling of the Development Work (if applicable). Allseas will be entitled to a Variation adjusting the Date for Completion as a result of the actual mitigated impact of the suspension on the Programme’s critical path.

Article 14

TERMS OF PAYMENT

14.1

This Article sets out the key terms of payment which are further detailed in Schedule 2 – Terms of Compensation.

14.2

In no event shall Allseas be entitled to any payment for any Work performed or any expenditure incurred where the work or expenditure in question has not been approved by TMC as part of an approved WP&B or Variation or as otherwise approved in accordance with the Contract.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

15


14.3

No commitment, purchase order, contract, or other binding obligation of any nature shall be re-imbursed by TMC unless such commitment is within the scope, budget, and authority of an approved WP&B.

14.4

Approval of a WP&B authorises Allseas to enter into commitments only to the extent and for the purposes expressly contemplated in that approved WP&B.

14.5

Each WP&B shall be prepared strictly in accordance with, and must contain the information specified in Section 9 of Schedule 1 - Scope of Work.

14.6

TMC shall approve each WP&B that is consistent with the agreed Scope of Work and complies with the requirements of this Contract, provided that TMC may defer or withhold approval to the extent necessary if it does not have sufficient financing or liquidity to fund and progress the relevant Work.

14.7

Where a WP&B pertaining to Development Work cannot be approved by TMC for the reasons set out in Article 14.6 (within the Initial Term or any Extension Term), it shall be deemed a permissible suspension in accordance with Article 13.1 and the Parties shall comply with the provisions of Articles 13.6, 13.7 and 13.8 accordingly.

14.8

Allseas shall submit to TMC a payment claim by the 5th business day of each month, for Work performed in the prior calendar month.

14.9

TMC shall, within 5 (five) business days of receipt of Allseas’ payment claim, assess the payment claim. TMC shall notify Allseas in writing of:

a)

the amounts TMC agrees are due taking into account the approved WP&B (“Approved Amounts”), and

b)

any amounts TMC disputes, together with an explanation of the basis for such dispute (“Disputed Amounts”).

14.10

Within 5 (five) business days of receipt of Allseas’ payment claim issued pursuant to Article 14.9 above, Allseas shall render TMC with an invoice for the payment claim.

14.11

TMC will pay the Approved Amounts within ten (10) business days of receipt of the invoice. The Disputed Amounts will become payable only after the dispute has been resolved. The Parties shall meet in good faith to resolve any Disputed Amounts as soon as reasonably practicable or escalate to the Steering Committee if no agreement is reached.

Article 15

TAXES AND TAX EXEMPTION CERTIFICATES

15.1

Allseas shall, in accordance with the provisions of Article 19, except as may be otherwise provided in the Contract, be responsible for:

a)

the payment of all taxes, imposed by any appropriate government authority, with respect to the wages, salaries, benefits or expenses and other remuneration paid directly or indirectly to persons employed by Allseas; and

b)

the payment of all corporation taxes with respect to income earned under this Contract imposed by any appropriate government authority, arising from this Contract; and

c)

if required by Law, establishment and registration in the country or countries (and any subdivision of) where any part of the Work under this Contract is to be performed and qualify as an organisation operating and doing business therein; and

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

16


d)

compliance with all statutory obligations to make deductions on account of and to remit the required amounts to any appropriate government authority, including, but not limited to corporate income tax, national insurance, employee taxes, charges, social security costs, levies and contributions paid to persons employed by Allseas, and the imposition of a similar obligation upon all Subcontractors or any other persons employed by them or providing services to them in connection with the Contract; and

e)

inserting in any Subcontract that Subcontractors or any other person employed by them or providing services on or in connection with the Contract shall comply with a like obligation to the obligations imposed on Allseas under this Article 15; and

15.2

If Allseas has a legal responsibility to collect any taxes directly from TMC for payment to any appropriate government authority, these shall be separately stated in the invoice and will be paid by TMC to Allseas. Absent such legal requirements, TMC shall fully reimburse Allseas for all such taxes incurred by Allseas or its Subcontractors.

15.3

TMC shall make payments to Allseas free of any deductions or withholding. TMC shall only withhold taxes from payments to Allseas imposed by the applicable laws, rules and regulations. If withholding taxes are applicable, TMC shall compensate Allseas and the Contract prices and rates shall be increased to such an extent that the net amount paid to Allseas after deduction of taxes equals the contractually agreed prices and rates.

15.4

To the extent that TMC is required by Law to withhold taxes from payments due to Allseas, TMC will within thirty (30) days of the date of receipt, forward to Allseas an official withholding tax receipt and/or other evidence of withholding and payment as imposed by the applicable laws, rules and regulations in the name of Allseas.

15.5

Allseas shall save, indemnify, defend and hold harmless TMC against all contributions and taxes of the type referred to in this Article and any interest or penalty thereon which may be assessed, by any appropriate government authority, on Allseas in connection with the Contract and from all costs reasonably incurred in connection therewith.

15.6

TMC shall save, indemnify, defend and hold harmless Allseas against all import duties, levies, charges, contributions and taxes of the type referred to in this Article and any interest or penalty thereon which may be assessed, by any appropriate government authority, on Allseas in connection with the Contract and from all costs incurred in connection therewith, other than those taxes and other matters referred to above which the provisions of this Article allow TMC to recover from Allseas.

15.7

Allseas’ prices are submitted exclusive of any indirect taxes, including but not limited to sales taxes, service taxes, customs duties, import/export fees and other similar taxes. Allseas may charge to TMC and is entitled to fully reimbursed by TMC any such indirect taxes as applicable in the manner which will not impact the compensation Allseas is entitled to receive under the Contract.

Article 16

CUSTOMS PROCEDURES

16.1

TMC and Allseas shall comply with any applicable trade embargo and export control laws, rules and regulations.

16.2

TMC shall be responsible for the importation of the Nodules into the jurisdiction where the Nodules are to be offloaded and for all customs duty, brokerage, quarantine and inspection requirements and all other things required by Law or by order of local law-enforcement, customs or government entities to enable the importation of the Nodules into the applicable jurisdiction.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

17


16.3

Allseas shall be responsible for the importation of its equipment into the jurisdiction where any of the Work is to be performed and for all customs duty, brokerage, quarantine and inspection requirements and all other things required by Law or by order of local law-enforcement, customs or government entities to enable the importation of the Allseas equipment into the applicable jurisdiction.

16.4

TMC shall assist or procure that the Permit Holder assists Allseas to enable it to import and re-export the Production Vessel, Additional Vessel, any equipment or other items which are temporarily imported into any country for the performance of the Work to mitigate customs duties, VAT or other levies on such items. TMC shall make Allseas aware of all necessary procedures and provide instructions to enable Allseas to comply with the necessary regulations in the mitigation of customs duties, VAT and other taxes and fees under the temporary import regime, where appropriate, and shall ensure that any customs and tax exemptions, rulings or other arrangement it may have or any other exemptions are extended to Allseas where possible.

16.5

TMC (or the Permit Holder, as applicable) shall be responsible for payment of customs duties, VAT/GST, applicable port fees, surcharges, imposts and levies with respect to the importation of all materials, goods, tools, equipment, supplies required for the Work including, but not limited to any vessel(s), whether provided by TMC, Allseas or a third party, and the Nodules.

16.6

Each Party shall render all necessary assistance to the other Party with the importation of Nodules or any property of either Party into any applicable jurisdiction where necessary to facilitate and enable the performance of the Work and the offloading of Nodules.

Article 17

INTELLECTUAL PROPERTY

17.1

Each Party shall retain ownership of and all rights in their respective Background IP.

17.2

All Intellectual Property rights in the Adaptive Management System shall remain with TMC.

17.3

Where any potential patent or registrable right in any country in the world results from:

a)

developments by Allseas which are based wholly on data, equipment, processes, substances and the like in the possession of Allseas at the Effective Date or otherwise produced outside of the Contract; or

b)

enhancements of or in the existing Background IP of Allseas,

all ownership of and rights in such Intellectual Property shall vest in Allseas.

17.4

Where any potential patent or registrable right in any country in the world results from:

a)

developments by TMC which are based wholly on data, equipment, processes, substances and the like in the possession of TMC at the Effective Date or otherwise produced outside of the Contract; or

b)

enhancements of or in the existing Background IP of TMC,

all ownership of and rights in such Intellectual Property shall vest in TMC.

17.5

Except as provided in the foregoing provisions of this Article 17, where any potential patent or registrable right in any country in the world arises out of the Work and is invented during the term of the Contract, all ownership of and rights in such Intellectual Property shall vest in Allseas.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

18


17.6

In the event that the Contract is not extended beyond the Initial Term or any Extension Term for any reason, or if the Steering Committee determines at any given time that TMC and Allseas no longer desire to pursue the business of Nodule collection together, the following shall apply:

a)

To the extent TMC continues the business of Nodule collection without Allseas:

Allseas shall grant TMC and the Permit Holder an irrevocable, non-exclusive, transferable, worldwide licence to use Allseas’ Intellectual Property relating to the Collection System for the purpose of commercial recovery of Nodules, whether by TMC itself, the Permit Holder, or through a third party engaged at TMC’s sole discretion, in consideration for which TMC will pay a technology license fee to be mutually agreed.

b)

To the extent Allseas continues the business of Nodule collection without TMC:

TMC shall grant Allseas an irrevocable, non-exclusive, transferable, worldwide licence to use TMC’s Intellectual Property to commercially market and use the Production Vessel and the Collection System, in consideration for which Allseas will pay a technology license fee to be mutually agreed.

17.7

Allseas shall save, indemnify, defend and hold harmless TMC and the Permit Holder from all claims, losses, damages, costs (including legal costs), expenses and liabilities of every kind and nature for, or arising out of, any alleged infringement of any patent or proprietary or protected right arising out of or in connection with the performance of the obligations of Allseas under the Contract except where such infringement necessarily arises from the Technical Information and/or TMC’s instructions. However, Allseas shall use its reasonable endeavours to identify any infringement in the Technical Information and/or in TMC’s instructions of any patent or proprietary or protected right, and should Allseas become aware of any such infringement or possible infringement then Allseas shall inform TMC immediately.

17.8

TMC shall save, indemnify, defend and hold harmless Allseas from all claims, losses, damages, costs (including legal costs), expenses and liabilities of every kind and nature for, or arising out of, any alleged infringement of any patent or proprietary or protected right arising out of or in connection with the performance of the obligations of TMC under the Contract or the use by Allseas of Technical Information or materials or equipment supplied by TMC.

Article 18

CHANGE IN LAW

18.1

In the event that any Change in Law occurs after the Effective Date of this Contract, and such change materially affects the rights, obligations, or performance of either Party under this Contract, the affected Party shall promptly notify the other Party. The Parties shall in good faith negotiate appropriate adjustments to the terms of this Contract to reflect the impact of such change, including any necessary modifications to scope, timelines, or costs.

18.2

If this Contract is assigned or novated by Allseas to a permitted successor or assignee, any change in law, regulation, or governmental requirement that materially affects such successor or assignee shall be treated as a Change in Law under this Contract, and the Parties shall cooperate to implement reasonable adjustments to ensure continued compliance and performance.

Article 19

LAWS AND REGULATIONS

19.1

Allseas shall comply with all Laws in the performance of the Work.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

19


19.2

Allseas shall obtain all Regulatory Approvals for its performance of the Work, and which relate to Allseas’ plant, equipment, personnel, and Allseas’ operations in conducting the Commercial Production Work as specified in Schedule 1 - Scope of Work. TMC shall provide the relevant letters of invitation when necessary.

19.3

TMC shall obtain, or procure that the Permit Holder obtains, all Regulatory Approvals, which pertain to the Nodules, the recovery of the Nodules, and the transport, importation and processing of Nodules, by Law or contract, which may be obtained by TMC or the Permit Holder (except as otherwise provided in Article 19.2 above), and which are necessary for Allseas to conduct the Work.

Article 20

INDEMNITIES

20.1

For the purpose of this Article 20 and Article 28, Allseas Group shall mean Allseas, its Subcontractors, its agents and employees of any of the foregoing and TMC Group shall mean TMC and the Permit Holder, their Co-venturers, other contractors, subcontractors and agents, and employees of any of the foregoing.

20.2

Allseas shall be responsible for and shall save, indemnify, defend and hold harmless TMC Group from and against all claims, losses, damages, costs (including legal costs) expenses and liabilities in respect of:

a)

loss of or damage to property of Allseas Group whether owned, hired, leased or otherwise provided by Allseas Group arising from, relating to or in connection with the performance or non-performance of the Contract; and

b)

personal injury including death or disease to any person employed by Allseas Group arising from, relating to or in connection with the performance or non-performance of the Contract; and

c)

subject to any other express provisions of the Contract, personal injury including death or disease or loss of or damage to the property of any third party to the extent that any such injury, loss or damage is caused by the negligence or breach of duty (whether statutory or otherwise) of Allseas Group. For the purposes of this Article 20.2(c) “third party” excludes the Co-ventures of TMC and Affiliates of Allseas and TMC.

20.3

TMC shall be responsible for and shall save, indemnify, defend and hold harmless Allseas Group from and against all claims, losses, damages, costs (including legal costs) expenses and liabilities in respect of:

a)

loss of or damage to property of TMC Group whether owned, hired, leased or otherwise provided by TMC Group arising from, relating to or in connection with the performance or non-performance of the Contract. For the purpose of this Article 20.3, property of TMC shall include the Nodules;

b)

personal injury including death or disease to any person employed by TMC Group arising from, relating to or in connection with the performance or non-performance of the Contract;

c)

subject to any other express provisions of the Contract, personal injury including death or disease or loss of or damage to the property of any third party to the extent that any such injury, loss or damage is caused by the negligence or breach of duty (whether statutory or otherwise) of TMC Group. For the purposes of this Article 20.3(c) “third party” excludes the Co-ventures of TMC and Affiliates of Allseas and TMC; and

20.4

Except as provided by Article 20.2(a), Article 20.2(b) and Article 20.5, TMC shall be responsible for and shall save, indemnify, defend and hold harmless Allseas Group from

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

20


and against any claim of whatsoever nature arising from pollution (including any pre-existing pollution) emanating from the property of TMC Group arising from, relating to or in connection with the performance or non-performance of the Contract.

20.5

Except as provided by Article 20.3(a) and Article 20.3(b) and Article 20.4, Allseas shall be responsible for and shall save, indemnify, defend and hold harmless TMC Group from and against any claim of whatsoever nature arising from pollution emanating from the property and equipment of Allseas Group (including but not limited to the Production Vessel) arising from, relating to or in connection with the performance or non-performance of the Contract.

20.6

Allseas shall be responsible for the recovery or removal and when appropriate the marking or lighting of any wreck or debris arising from or relating to the property, equipment, vessels or any part thereof provided by Allseas Group in relation to the Contract, when required by Law, or governmental authority, and shall, save, indemnify, defend and hold harmless TMC Group in respect of all claims, liabilities, costs (including legal costs), damages or expenses arising out of such wreck or debris, whether or not the negligence or breach of duty (whether statutory or otherwise) of TMC Group caused or contributed to such wreck or debris.

20.7

TMC shall be responsible for and shall save, indemnify, defend and hold harmless Allseas Group in respect of all claims, liabilities, costs (including legal costs), damages or expenses arising out of the removal of wreck or debris of TMC Group property, whether or not the negligence or breach of duty (whether statutory or otherwise) of Allseas Group caused or contributed to such wreck or debris.

20.8

Except where expressly stated otherwise, all exclusions and indemnities given under this Article 20 shall apply irrespective of cause and notwithstanding the negligence or breach of duty (whether statutory or otherwise) of the indemnified party or any other entity or party and shall apply irrespective of any claim in tort, under contract or otherwise at law.

20.9

If either Party becomes aware of any incident likely to give rise to a claim under the above indemnities, it shall notify the other Party and both Parties shall co-operate fully in investigating the incident.

20.10

Where applicable and if requested by Allseas in writing, TMC shall make available to Allseas details of its or the Permit Holder’s other contractors to be present in the License Area during the conduct of Commercial Production.

20.11

The indemnities given by the Parties under this Contract are in full and primary even if the indemnified parties are required to carry insurance.

Article 21

INSURANCES

21.1

Each Party shall arrange, and TMC shall procure that the Permit Holder shall arrange, as a minimum the insurances required by Law. All such insurances shall be placed with reputable and substantial insurers and shall for all insurances, other than Employers’ Liability Insurance/Workmen’s Compensation, to the extent of the liabilities assumed by the Parties under the Contract, include the other Party as additional insured. All insurances required under this Article 21 shall be endorsed to provide that underwriters waive any rights of recourse, including in particular subrogation rights against the other Party in relation to the Contract to the extent of the liabilities assumed by the insuring party under the Contract. The provisions of this Article 21 shall in no way limit the liability of either Party under the Contract.

21.2

The insurances to be effected under this Article shall be as follows (to the extent that they are relevant to the Work and the respective Party’s obligations under the Contract):

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

21


a)

Employers’ Liability and/or Worker’s Compensation insurance covering personal injury to or death of the employees of the Parties engaged in the performance of the Work to the minimum value required by any applicable legislation including extended cover (where required) for working offshore;

b)

General Third Party Liability insurance for any incident or series of incidents covering the operations of the Parties in the performance of the Contract, in an amount not less than [***]

c)

Marine Hull and Machinery insurance including war risk coverage and, to the extent not provided in (d) below, collision liability in respect of the Production Vessel in an amount not less than the value of the Production Vessel;

d)

Protection and Indemnity insurance including wreck and debris removal and oil pollution liability in respect of the Production Vessel.

Article 22

CONSEQUENTIAL LOSS

22.1

For the purposes of this Article 22 the expression “Consequential Loss” shall mean:

a)

consequential or indirect loss under the applicable law of the Contract; and

b)

loss and/or deferral of production, loss of product, loss of use, loss of revenue, profit or anticipated profit (if any),

in each case whether direct or indirect to the extent that these are not included in (a), and whether or not foreseeable at the Effective Date.

22.2

Notwithstanding any provision to the contrary elsewhere in the Contract and except any predetermined termination fees provided for in the Contract, TMC shall save, indemnify, defend and hold harmless Allseas from TMC’s own Consequential Loss and Allseas shall save, indemnify, defend and hold harmless TMC from Allseas’ own Consequential Loss, arising from, relating to or in connection with the performance or non-performance of the Contract.

Article 23

CONFIDENTIALITY

23.1

Neither Party shall at any time without the prior agreement of the other Party either:

a)

make any public statements, issue any releases or make any announcements concerning the subject matter of the Contract; or

b)

except as may be necessary to enable a Party to perform its obligations under the Contract, use, reproduce, copy, disclose to, place at the disposal of or use on behalf of any third party or enable any third party to use, peruse or copy any information including but not limited to drawings, data and computer software which:

(i)

is provided to a Party by or on behalf of the other Party in or in relation to the Contract; or

(ii)

vest in such Party in accordance with the Contract; or

(iii)

is prepared in connection with the Work.

The Party’s confidentiality obligations under this Article 23 shall survive the termination or expiration of this Contract for a period of five (5) years.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

22


23.2

The provisions of Article 23.1 shall not apply to information which:

a)

is part of the public domain; or

b)

was in the possession of the receiving Party prior to award of the Contract and which was not subject to any obligation of confidentiality owed to the other Party; or

c)

was received from a third party whose possession is lawful and who is under no obligation not to disclose; or

d)

Is required to be disclosed in order to comply with the requirements of any law, rule or regulation of any governmental or regulatory body having jurisdiction over the Work or one or both of the Parties, or of any relevant stock exchange.

23.3

It is furthermore agreed that TMC may make reference to this Contract to bona fide third-party potential investors in TMC who have signed confidentiality agreements with terms similar to those set forth in this Contract.

23.4

Allseas shall ensure that the provisions of this Article 23 are incorporated in any Subcontract and that its officers, employees and agents and those of the Subcontractors comply with the same.

23.5

Neither Party may, without the prior written consent of the other Party, issue any news release, advertisement or public communication in which any of the other Party, its affiliates or their activities or relationship with the Party are mentioned, except where the issuance of any news release or other public communication may be required by a Party in order to comply with Laws.

Article 24

TERMINATION

24.1

Both Parties shall have the right by giving notice to terminate all or any part of the Work or the Contract at such time or times as such Party may consider necessary for any or all of the following reasons:

a)

subject only to Article 24.2 in the event of any default on the part of the defaulting Party; or

b)

in the event of a Party becoming insolvent, or making a composition or arrangement with its creditors (except for the purposes of amalgamation or reconstruction), or receivership, insolvency or bankruptcy proceedings are commenced against such Party or any equivalent act or thing being done or suffered under any applicable law.

24.2

In the event of default on the part of a Party (“Defaulting Party”) and before the issue by the other Party (“Non-Defaulting Party”) of an order of termination of all or any part of the Work or the Contract, the Non-Defaulting Party shall give notice of default to the Defaulting Party giving the details of such default. If the Defaulting Party upon receipt of such notice does not commence and thereafter continuously proceed with action to remedy such default within thirty (30) days (or such longer period as is reasonably required or as the Parties may agree in writing, provided the Defaulting Party is diligently pursuing remedy), the Non-Defaulting Party may issue a notice of termination in accordance with the provisions of Article 24.1.

24.3

In the event of the Non-Defaulting Party giving the Defaulting Party notice of termination of all or any part of the Work or the Contract, such notice shall become effective on the date specified therein (or in the absence of any specified date at the date of receipt of the notice). If Allseas is the Defaulting Party, upon receipt of such notice Allseas shall immediately cease performance of the Work or such part thereof as may be specified in the notice.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

23


24.4

In the event that:

a)

the Commercial Recovery Permit is withdrawn by NOAA;

b)

the Commercial Recovery Permit is issued by NOAA subject to conditions which materially affect the commercial or technical viability of the Project; or

c)

the requirements for the Production Vessel to obtain a US flag cannot reasonably be met,

either Party may issue a notice of termination to the other Party. If such a notice is issued the Steering Committee shall convene within seven (7) days of the notice to determine the appropriate course of action, and the Contract shall remain in effect until the Steering Committee reaches its decision. If the Steering Committee fails to meet within this timeframe, or if the Steering Committee fails to reach an agreement to the contrary, then the Contract shall terminate thirty (30) days after such notice is received.

24.5

In addition, Allseas shall be entitled to terminate this Contract with immediate effect, without liability, if (i) any activity anticipated under this Contract is determined to be unlawful or noncompliant with conditions imposed on any Regulatory Approval or a lawful direction given by any Regulatory Authority, or becomes unlawful or non-compliant due to a Change in Law, or is otherwise in contradiction with Laws; or (ii) a competent Court imposes a ban on such activity, or (iii) Allseas’ Board of Directors determines, acting reasonably, that the performance by Allseas of any part of the Work is likely to result in application of any Governmental Restriction to Allseas’ detriment. In such event, Allseas shall provide written notice of termination to TMC, and the Contract shall be deemed terminated as of the date of such notice and any such termination shall constitute an Inability to Perform Event for the purposes of Article 24.6.

24.6

Termination for Inability to Perform Event:

a)

Where the Contract is terminated, or the Work is suspended and not resumed, as a result of an Inability to Perform Event, Allseas shall take all actions necessary to effect an orderly transition of the Work.

b)

Without limitation, Allseas shall provide all reasonable assistance required to enable TMC or its nominee to continue the Work, including access to and use of all Work-related information, documentation, systems, personnel and know-how.

c)

In such circumstances, the Parties shall implement arrangements under which Allseas shall make available to TMC or its nominee, including by way of lease, charter or other contractual arrangement, the Production Vessel (Hidden Gem) and other project-specific assets necessary for the continuation of the Work, taking into account amounts funded by TMC in connection with the Development Work and the objective of preserving project value, and such arrangements shall ensure that TMC or its nominee is able to continue the Work without interruption on terms that are commercially reasonable and no less favourable, in aggregate, than those applicable immediately prior to termination or suspension. Any transfer of assets pursuant to this Article 24.6 shall be on the basis of their fair economic value, having regard to amounts funded by TMC in connection with the Development Work.

d)

To the extent necessary to enable TMC or its nominee to continue the Work, Allseas shall grant, or procure the grant of, a non-exclusive, transferable licence to use Allseas’ Intellectual Property, Technical Information and know-how used in or required for the Work, for the purpose of continuing the Work, including the operation, maintenance, repair, modification and replacement of the Production System and associated equipment, in consideration for which TMC will pay a technology license fee to be mutually agreed. To the extent the grant of such licence or payment of any Technology Licence Fee is not permitted under the Law, Regulatory Approvals or any Governmental Restriction, Allseas shall, and shall procure its

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

24


Affiliates to, promptly transfer or vest in TMC or its nominee such Intellectual Property, Technical Information and know-how (or grant equivalent rights to the fullest extent permitted) as necessary for TMC or its nominee to continue the Work, on a fair economic value basis having regard to amounts funded by TMC in connection with the Development Work and the objective of preserving project value.

e)

The Parties shall act reasonably and in good faith in agreeing the terms of any such arrangements, provided that any disagreement on such terms shall not delay or prevent continued use of the Production Vessel by TMC or its nominee pending agreement, and Allseas shall continue to make the Production Vessel available on an uninterrupted basis until such terms are agreed.

f)

Where Allseas is subsequently able to resume performance of the Work, the Parties shall, acting reasonably and in good faith, agree arrangements to transfer back to Allseas any assets made available to TMC or its nominee pursuant to this Article 24.6, on the same fair economic value basis as applied at the time of transfer.

24.7

In the event of termination of all or any separable portion of the Work in accordance with this Article 24, Allseas shall be entitled to payment as set out in Schedule 2 – Terms of Compensation for the part of the Work performed in accordance with the Contract, the reasonable and proper direct costs unavoidably incurred in connection with such termination, and, to the extent applicable, compensation for demobilisation. For the avoidance of doubt, Allseas shall have no entitlement to loss of profit, contribution to overheads, loss of opportunity, or consequential damages arising out of such termination.

24.8

If TMC terminates the Contract under Article 24.1 b) due to an event of the any of the types contemplated in that Article occurring with respect to Allseas’ business, then any Nodules in the care, custody or control of Allseas at the time of termination remain the unencumbered property of TMC and TMC may take custody and control of any vessel, with the exception of the Production Vessel, in order to effect the transport of those Nodules to TMC’s selected offloading port and Allseas must do all things necessary including execution of documents and assistance with engagement of suitably qualified crews, captains and personnel, to enable TMC to effect the transport and discharge of those Nodules.

24.9

In the event of termination of the Contract, the provisions which by their nature are intended to survive termination – including, without limitation, those relating to confidentiality, intellectual property, liability, indemnification, governing law and dispute resolution – shall remain in full force and effect notwithstanding such termination.

Article 25

AUDIT AND STORAGE OF DOCUMENTS

25.1

During the course of the Work and for a period ending two (2) years after the expiry of the Contract, TMC shall have the right to audit at all reasonable times and, upon request, take copies of all of Allseas’ records (including data stored on computers), books, accounts, correspondence, memoranda, receipts, vouchers and other papers of every kind relating to;

a)

all invoiced charges made by Allseas on TMC; and

b)

any provision of this Contract under which Allseas has obligations the performance of which is capable of being verified by audit.

TMC shall not be entitled to investigate the make-up of fixed rate prices or lump sum prices included in the Contract.

25.2

Without limiting the ambit of Article 25.1 above, TMC and the Permit Holder shall have the right to inspect and audit the Production System, its records, and offshore operations at

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

25


reasonable times, and Allseas acknowledges that, as a condition of the Commercial Recovery Permit, any Regulatory Approval or Law, NOAA or other relevant authorities may have similar right of inspection and audit, and Allseas shall comply with such requirements.

25.3

Allseas shall provide access, assistance, and data as are reasonably necessary to verify compliance with the Contract and the conditions of the Commercial Recovery Permit and any Regulatory Approvals.

25.4

Allseas shall co-operate fully with TMC and/or its representatives in the carrying out of any audit required by TMC. TMC will conduct any audit in a manner which will keep to a reasonable minimum any inconvenience to Allseas.

25.5

Allseas shall obtain equivalent rights of audit to those specified above from all Subcontractors and will cause such rights to extend to TMC.

25.6

TMC and Allseas shall keep all documents and data, including that which is stored on computers related to this Contract for a period of seven (7) years after the expiry of the Contract.

Article 26

LIENS

26.1

Allseas shall not be entitled to claim or register any lien against the Nodules which are in the possession of Allseas for all claims against TMC.

26.2

TMC shall not claim any lien or attachment to the Work or any property of Allseas (including the Production Vessel).

Article 27

BUSINESS ETHICS

27.1

Both Allseas and TMC shall uphold the highest standards of business ethics in the performance of the Contract. Honesty, fairness and integrity shall be paramount principles in the dealings between the Parties.

27.2

Neither Party shall knowingly involve itself in any business in connection with, or use information arising from, the Contract, in any manner which conflicts with the interests of the other party.

27.3

Both Allseas and TMC agree that they will not, directly or indirectly, receive from, or give or offer to give to any contractors or suppliers or to government officials or any other persons anything of material value which would be regarded as an improper inducement to any party. Any breach of this obligation shall constitute a material breach of the Contract.

27.4

Allseas agrees and shall cause its employees, officers and directors to comply with the Insider Trading Policy of TMC, as included in Schedule 6 - Attachments.

Article 28

SANCTIONS AND ANTI-CORRUPTION

28.1

Neither TMC or Allseas nor any other member of its Group (to the best of its knowledge, after having made due and careful enquiry):

a)

is a Restricted Party;

b)

has violated any sanctions without the other Party already being aware of the violation at the date of this Agreement, or is violating any applicable Sanctions; and

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

26


c)

is directly or indirectly engaging in or has directly or indirectly engaged in any activity with a Restricted Party or in any other activity that may result in any person becoming a subject of Sanctions; or is subject to any claim, proceeding, formal investigation or formal notice with respect to Sanctions.

28.2

Each Party undertakes that neither it nor any member of its respective Group shall:

a)

request or execute any transaction or use any account to make funds available, to any person, directly or indirectly:

(i)

for the purpose of funding or supporting any trade, business or other activities of or with any Restricted Party; or

(ii)

in any manner that would reasonably be expected to result in any person being in breach of any Sanctions or becoming a Restricted Party;

b)

use any revenue or benefit derived from any activity or dealing with a Restricted Party or from any action which is in breach of any Sanctions;

c)

procure or permit that proceeds from any activity or dealing with a Restricted Party are credited to any bank account held by any member of the Group in its name or in the name of any other member of the Group;

d)

directly or indirectly engage in any activity, transaction or conduct that results or is reasonably likely to result in any party being in breach of any Sanctions or becoming a person subject to Sanctions; or

e)

directly or indirectly engage in any activity, transaction or conduct that evades or avoids, or has the purpose of evading or avoiding, or breaches or attempts to breach, directly or indirectly, in whole or in part, any Sanctions.

28.3

Each Party shall, to the extent permitted by law and promptly upon becoming aware of them, supply the other Party with full details of any claim, proceeding, formal notice, or formal investigation against it or any member of its respective Group in relation to Sanctions.

28.4

Each Party shall take all reasonable measures to ensure compliance with Sanctions, and shall endeavour that any member of its Group shall do the same.

28.5

In the event that either Party, or any member of its respective Group, becomes aware of any actual or potential Sanctions risk that may constitute a violation of applicable sanctions laws or regulations, including but not limited to those administered by any Sanction Authority, such Party shall notify the other Party without undue delay. This obligation includes, but is not limited to:

a)

Identification of any party involved in any project of its Group who is listed on a Sanctions List;

b)

Transactions or relationships that raise increased Sanctions concerns due to ownership, control, or geographic nexus;

c)

Identification of any party, entity, or jurisdiction involved in a transaction that is subject to Sanctions or export restrictions; and

d)

Cash management transactions involving goods, services, software, or technology subject to export controls, dual-use items, or similar restrictions.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

27


28.6

Each of the following shall constitute an Event of Default by either Party, and shall entitle the other Party to immediately suspend performance and/or terminate the Contract without liability:

a)

Any representation given under Article 28.2 above by a Party or any member of its respective Group is, or proves to have been, incorrect, inaccurate, or misleading when made or repeated;

b)

Any failure by a Party or any member of its respective Group to comply with or perform any obligation under Article 28.3 above; or

c)

Any breach of the sanctions representations or undertakings, including where a Party or any member of its respective Group becomes a Restricted Party or engages in any activity that results in a breach of Sanctions.

28.7

Each Party represents and warrants that it, and each member of its respective Group, has conducted its business in compliance with applicable anti-corruption laws and has instituted and maintained policies and procedures designed to promote and ensure ongoing compliance with such laws.

Article 29

HSE

29.1

Allseas shall be responsible for the health safety and wellbeing of all of its personnel and shall ensure that the Worksite is managed in accordance with a written health and safety management plan that has been provided to TMC and that is consistent with and compliant with the requirements of Schedule 1 - Scope of Work and Schedule 5 - Quality Assurances, Quality Control, Health, Safety, Environmental and Security Requirements.

29.2

Allseas shall provide a safe system of work for TMC personnel who might visit or work within the Worksite and shall provide all required inductions, training, personal protective equipment and other training, information and equipment necessary to ensure the safety of TMC personnel accessing the Worksite.

29.3

Allseas shall take full responsibility for the adequacy, stability and safety of all its operations.

29.4

Allseas shall immediately notify TMC of any safety-related incident occurring in the conduct Work or at any Worksite and shall co-operate with TMC in providing an appropriate response to any emergency occurring at the Worksite and shall immediately take such action as may be necessary to protect life and make safe property where such is in imminent peril.

ARTICLE 29ACHANGE OF CONTROL

(a)

TMC shall promptly notify Allseas in writing upon becoming aware that a Change of Control has occurred or is reasonably likely to occur in respect of the Permit Holder.

(b)

The Permit Holder shall not cease to be Controlled by TMC without the prior written consent of Allseas (such consent not to be unreasonably withheld or delayed).

(c)

If the Permit Holder ceases to be Controlled by TMC without such consent, Allseas may, by written notice to TMC, elect (in its sole discretion) to require one or more of the following:

(i)

Step-In: that TMC (or a nominee acceptable to Allseas, acting reasonably) step in to perform, or procure the performance of, all or any part of the obligations of the Permit Holder under this Contract, with TMC remaining fully liable for such obligations; and/or

(ii)

Novation: that TMC procure that a replacement entity acceptable to Allseas (acting reasonably) enters into a novation agreement on terms reasonably required by

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

28


Allseas, pursuant to which such replacement entity assumes all rights and obligations of the Permit Holder under this Agreement, and TMC provides such guarantees or credit support as Allseas may reasonably require.

TMC shall comply with any such requirement promptly and, in any event, within a reasonable period.

Article 30

GENERAL LEGAL PROVISIONS

30.1

None of the terms and conditions of the Contract shall be considered to be waived by either Party unless a waiver is given in writing by one Party to the other. No failure on the part of either party to enforce any of the terms and conditions of the Contract shall constitute a waiver of such terms.

30.2

Subject to the provisions of Articles 20 and 31, unless otherwise specifically stated in the Contract, both Parties shall retain all rights and remedies, both under the Contract and at law, which either may have against the other.

30.3

The rights, benefits and entitlements of a Party under this Contract shall inure to the benefit of that Party’s Affiliates.

30.4

Allseas shall act as an independent contractor with respect to the Work.

30.5

TMC enters into the Contract for itself and as agent for and on behalf of the other Co-Venturers. Without prejudice to the provisions of Article 34 and notwithstanding the above:

a)

Allseas agrees to look only to TMC for the due performance of the Contract and nothing contained in the Contract will impose any liability upon, or entitle Allseas to commence any proceedings against any Co-venturer other than TMC; and

b)

TMC is solely entitled to enforce the Contract on behalf of all Co-venturers as well as for itself. For that purpose TMC may commence proceedings in its own name to enforce all obligations and liabilities of Allseas and to make any claim which any Co-venturer may have against Allseas; and

c)

all losses, damages, costs (including legal costs) and expenses recoverable by TMC pursuant to the Contract shall include the losses, damages, costs (including legal costs) and expenses of TMC’s Co-venturers and its and their respective Affiliates except that such losses, damages, costs (including legal costs) and expenses shall be subject to the same limitations or exclusions of liability as are applicable to TMC or Allseas under the Contract.

d)

For the avoidance of doubt any and all limitations upon Allseas’ liability set out in the Contract shall represent the aggregate cumulative limitation of the liability of Allseas to TMC, its Co-venturers and its and their respective Affiliates.

30.6

All notices in respect of the Contract shall be given in writing and delivered by hand or by internationally recognised courier, or by email to the relevant address or email address specified in Article 30.8. Copies shall also be sent to any additional offices or email addresses that either Party may designate in writing from time to time.

30.7

Such notices shall be effective:

a)

if delivered by hand, at the time of delivery;

b)

if sent by internationally recognised courier, at the time and date recorded on the delivery receipt;

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

29


c)

if sent by email prior to 4:30pm (local time in place of receipt) on a business day, at the day it was sent, and otherwise on the next business day following the day it was sent.

30.8

If to Allseas:

Name: [***]
Title: Director
Email: [***]

Cc:

Name: [***]
Title: Vice President Commercial
Email: [***]

30.9

If to TMC:

Name: [***]
Title: Chairman & CEO
Email: [***]

Cc.

Name: [***]
Title: Project Director
Email: [***]

30.10

This Contract constitutes the entire agreement between the Parties in relation to its subject matter. The Parties agree that this Contract shall supersede all prior agreements, arrangements and understandings between the Parties and/or between the relevant Affiliates relating to such subject matter, other than the Exclusive Use Agreement, and the Parties shall do all things reasonably necessary and procure that their respective Affiliates do all things reasonably necessary to give effect to this provision. No amendments to the Contract shall be effective unless evidenced in writing and signed by the Parties to the Contract.

30.11

Both TMC and Allseas shall take all reasonable steps to mitigate any losses resulting from any breach of Contract by the other Party.

30.12

If any provision of this Contract shall be found by any court or administrative body of competent jurisdiction to be invalid or unenforceable, the invalidity or unenforceability shall not affect the other provisions of this Contract and all provisions not affected by such invalidity or unenforceability shall remain in full force and effect. TMC and Allseas agree to attempt to substitute, for any invalid or unenforceable provision, a valid or enforceable provision which achieves to the greatest possible extent, the economic, legal and commercial objectives of the invalid or unenforceable provision.

Article 31

LIMITATION OF LIABILITIES

31.1

Subject to Allseas having used reasonable endeavours to execute the Work but notwithstanding any other provision of the Contract to the contrary, Allseas’ total cumulative overall liability to TMC in respect of the:

a)

Development Work relating to the first Production System shall be limited in aggregate to [***] of the value of the Development Work for the first Production System to be determined in accordance with Schedule 2 – Terms of Compensation;

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

30


b)

Development Work relating to any subsequent Production System shall be limited in aggregate to [***] of the value of the Development Work associated with that subsequent Production System (and not aggregated with the liability arising under paragraph 1 above relating to the first Production System); and

c)

Commercial Production shall be limited, in any Production Year, to an aggregate amount equal to [***] of the approved annual WP&B value for that Production Year (as adjusted to account for Variations and in accordance with Schedule 1 - Scope of Work).

31.2

The limitation of Allseas’ liability under Article 31.1 shall not apply to:

a)

any liabilities assumed by Allseas under Articles 15, 17, 21 and 22;

b)

any indemnity given by Allseas under Article 20;

c)

any liability arising from Allseas gross negligence or wilful misconduct;

d)

any amounts recovered by Allseas from third parties pursuant to Subcontracts for which Allseas must account to TMC; or

e)

amounts recovered from insurers or amounts that should have been recovered from insurers but for a breach of policy terms or failure by Allseas to place insurance as required by the Contract, for which Allseas must account to TMC.

31.3

Any exclusion or limitation of liability under the Contract shall exclude or limit such liability not only in contract but also in tort or otherwise at law, or any other legal proceeding.

Article 32

GOVERNING LAW AND RESOLUTION OF DISPUTES

32.1

This Contract and all questions arising in connection with it are governed by and will be construed in accordance with the laws in force in England and Wales excluding those conflict of law rules and choice of law principles which would deem otherwise. The ruling language of the Contract is English. The Parties agree that the Contract is not governed by the United Nations Convention on the International Sale of Goods.

32.2

Any dispute between TMC and Allseas in connection with or arising out of the Contract or the Work shall be resolved by means of the following procedure:

a)

the dispute shall initially be referred to the TMC Representative and the Allseas Representative who shall discuss the matter in dispute and make all reasonable efforts to reach an agreement; and

b)

if no agreement is reached under Article 32.2 a) within thirty (30) days, the dispute shall be referred to each member of the Steering Committee, as identified in Section 8.3 of Schedule 1 – Scope of Work.

32.3

If no agreement is reached under Article 32.2(b) within thirty (30) days, either party may refer the dispute to arbitration. The arbitration shall be conducted under the ICC Rules in London, before a panel of three (3) arbitrators.

32.4

The dispute resolution mechanism set out in Articles 32.2 and 32.3 is the exclusive remedy of the Parties in the event of a dispute arising out of the Contract or the Work.

32.5

It shall be a condition precedent to the referral of a dispute to the arbitration under Article 32.3 that the party that intends to commence proceedings in relation to the dispute first uses its reasonable endeavours to follow and complete the procedures set out in Article 32.2.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

31


32.6

Where any claim or counter claim in connection with or arising out of the Contract is made, the party making the claim or counter claim shall ensure that such claim or counter claim contains, without limitation, the following information:

a)

a clear summary of the facts on which the claim or counter claim is based;

b)

the basis on which the claim or counter claim is made, including the principal contractual terms and/or statutory terms relied on;

c)

the nature of the relief claimed; and

d)

where a claim or counter claim has been made previously and rejected by the other party, and the party making the claim or counter claim is able to identify the reason(s) for such rejection, the grounds of belief as to why the claim or counter claim was wrongly rejected.

32.7

Whilst any matter or matters are in dispute, Allseas shall proceed with the execution and completion of the Work and both Allseas and TMC shall comply with all the provisions of the Contract.

Article 33

REPRESENTATIONS & WARRANTIES

33.1

Each Party represents, warrants and covenants to the other that as of the date of this Contract, it is (a) corporation duly formed and validly existing under the laws of its incorporation, (b) it has the requisite power and authority to enter into this Contract, and (c) this Contract has been duly authorized, executed and delivered and constitutes a legal, valid and binding obligation of such Party in accordance with its terms.

Article 34

CONTRACTS (RIGHTS OF THIRD PARTIES) ACT

34.1

A person who is not a party to this Contract shall have no rights under the Contracts (Rights of Third Parties) Act 1999 to enforce any term of this Contract.

Article 35

NON-SOLICITATION

35.1

During the term of this Contract and for a period of twelve (12) months following its termination or expiration, neither Party shall, directly or indirectly, solicit for employment or engagement any employee, consultant, or contractor of the other Party who was involved in the performance of this Contract, without the prior written consent of the other Party.

35.2

During the same period, neither Party shall hire or engage, whether as an employee, consultant, or otherwise, any individual who was employed or engaged by the other Party in connection with this Contract, unless such individual has ceased to be employed or engaged by the other Party for a period of at least six (6) months prior to such hiring or engagement.

35.3

This article shall not restrict either Party from hiring individuals who respond to general advertisements or recruitment campaigns not specifically targeted at the other Party’s personnel.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

32


PART 2: DEVELOPMENT WORK

The provisions of this Part 2 apply to the Development Work only.

Article 36

PROGRAMME

36.1

Allseas shall be responsible for the programming of the Development Work and for independently controlling its progress.

36.2

Allseas shall develop planning in accordance with Section 2.13.1 of Schedule 1 - Scope of Work.

36.3

Allseas shall submit the planning together with full supporting details to TMC for review. The mutually agreed baseline planning and subsequent revisions will be referred to as Programme. Allseas shall use the Programme as the basis for progress reporting, scheduling, forecasting and controlling performance of the Development Work.

36.4

To take account of Variations and actual progress of the Development Work, Allseas shall continually update the Programme and supporting details and regularly submit them to TMC for review. Once a revised work plan has been approved by TMC it shall become part of the current Programme.

Article 37

FORCE MAJEURE

37.1

In addition to what has been agreed in Article 12 – Force Majeure, upon cessation of any Force Majeure Event that affects the Development Work, Allseas shall prepare a revised Programme to include for rescheduling of the Work so as to minimise the effects of the delay and Allseas will be entitled to a Variation adjusting the Date for Completion of Development Work as a result of the actual mitigated impact of the Force Majeure Event on the Programme’s critical path.

Article 38

VARIATIONS

38.1

TMC has the right to request Allseas at any time to make a change in the Development Work.

38.2

A mutually agreed course of action following a request issued by TMC will constitute a Variation and shall be subject to Article 11.

Article 39

CHANGE IN LAW - CONSEQUENCES

39.1

Subject to Article 18, should a Change in Law result in any delay in the Programme, Allseas shall be entitled to an adjustment in the Programme reflecting the effects of the Change in Law. This will constitute a Variation and shall be subject to Article 11.

Article 40

COMPLETION OF DEVELOPMENT WORK

40.1

The Development Work will be concluded by means of a final system acceptance test (the “SAT”) to be conducted when Allseas considers that the Development Work is complete in strict accordance with Section 7 of Schedule 1 – Scope of Work (including completion of all sea trials and performance, reliability and durability tests).

40.2

The Parties acknowledge that the SAT cannot be conducted unless the Commercial Recovery Permit has been granted.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

33


40.3

Prior to commencement of the SAT, all prerequisite approvals, punch-list items, and Completion Documentation required under Schedule 1 – Scope of Work must have been completed, reviewed, and approved by TMC, except for documentation dependent on the SAT results.

40.4

The SAT shall be conducted by Allseas in accordance with the approved test programme (Schedule 3 – Schedule of Key Dates, Key Date 13). TMC shall be entitled to attend and witness the SAT.

40.5

Upon completion of the SAT, Allseas shall issue to TMC a notice of completion confirming that the SAT has been completed and that the Production System is ready to proceed to Commercial Production.

40.6

Allseas shall identify any deviations from the approved test programme in the notice of completion, together with a reasoned justification demonstrating that the Production System remains ready and fit for Commercial Production.

40.7

Within twenty-four (24) hours of receiving the notice of completion, TMC shall either:

a)

confirm in writing that the SAT has been satisfactorily completed and that the Development Work is complete; or;

b)

notify Allseas in writing of any required retesting, specifying in reasonable detail the basis of such requirement.

40.8

Following completion of the SAT, Allseas shall update the Completion Documentation with the SAT results and shall submit the updated Completion Documentation to TMC within five (5) days.

40.9

TMC shall review the updated Completion Documentation within ten (10) days of receipt and, if satisfied that the Development Work has been completed in accordance with the Contract, shall issue a Certificate of Completion. The date of the Certificate of Completion shall constitute the Date of Completion of the Development Work.

Article 41

TRANSITION TO COMMERCIAL PRODUCTION

41.1

Subject to Article 41.2, from the Date of Completion of Development Work, provided that (i) the Commercial Recovery Permit has been issued by NOAA under the DSHMRA and (ii) TMC has approved a WP&B for Commercial Production, then:

a)

the Development Work compensation regime shall cease, except to the extent expressly stated otherwise in the Contract;

b)

the compensation regime applicable to Commercial Production under Part 3 and Schedule 2 – Terms of Compensation of the Contract shall apply (OPEX reimbursement, production reconciliation, and any production-linked compensation mechanisms); and

c)

repayment or recovery of Development Work costs and deferred CAPEX shall continue in accordance with Schedule 2 – Terms of Compensation.

41.2

Notwithstanding the provisions of Article 41.1, the Parties acknowledge that certain activities comprising Commercial Production may have commenced prior to the Date of Completion of Development Work, including but not limited to mobilisation of Additional Vessel to support the commencement of Commercial Production. To the extent this has occurred TMC will compensate Allseas for those limited activities only under the compensation terms applicable to Commercial Production set forth in Schedule 2 – Terms of Compensation, and specifically limited to compensation under Sections 2.5.3, 2.5.4 and

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

34


2.5.5 of Schedule 2. For clarity, notwithstanding any approval of a WP&B for this limited early Commercial Production scope, Allseas shall not be entitled to any production-linked compensation mechanisms, nor repayment of any Deferred CAPEX amounts pursuant to Section 2.6 of Schedule 2.

Article 42

COMMERCIAL RECOVERY PERMIT

42.1

TMC shall inform Allseas in writing at its earliest opportunity of any developments in the obtaining of the Commercial Recovery Permit (Schedule 3 – Schedule of Key Dates, Key Date 11) to enable the Parties to mitigate the effects of any delay in issuance of the Commercial Recovery Permit and to work together cooperatively on development and timing of the initial Commercial Production WP&B.

42.2

Without prejudice to Article 24.4, if the Commercial Recovery Permit has not been issued within ninety (90) days of completion of the Harbour and Sea Trials and such delay prevents commencement of mobilization, sail to field and SAT (Schedule 3 – Schedule of Key dates, Key Date 13), Allseas shall be entitled, upon written notice to TMC, to scale operations down to a minimum level and sail the Production Vessel to a low-cost location, unless otherwise mutually agreed by the Parties.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

35


PART 3: COMMERCIAL PRODUCTION

The provisions of this Part 3 apply to the Commercial Production only.

Article 43

VARIATIONS

43.1

TMC has the right to issue instructions to Allseas at any time to direct Allseas to make a change to a Mine Plan provided the instructed changes are within the operational limitations of the selected equipment including the Production Vessel, Additional Vessel and the Collection System, and such a direction may include additions, substitutions and changes in quality, form, character, kind, position, dimension, level or line and changes in any method of undertaking the Commercial Production.

43.2

An instruction under Article 43.1 will constitute a Variation and shall be subject to Article 11. When safety requires or when both Parties agree, on receipt of any such Variation, Allseas shall proceed immediately as instructed even though the amount of any adjustment to any applicable Production Target may not have been determined.

Article 44

FORCE MAJEURE

44.1

In addition to what has been agreed in Article 12 – Force Majeure, if the event of force majeure has an impact on Commercial Production then:

a)

TMC may direct Allseas to implement reasonable mitigation measures to be taken to mitigate impacts on Commercial Production; and

b)

Allseas will be entitled to a Variation to adjust the applicable Production Target.

44.2

Subject to the provisions of this Article and always subject to Allseas agreeing that it is safe and practical in the circumstances of the force majeure event to do so, Allseas shall remain on stand-by at the Licence Area, provided that TMC will reimburse Allseas at the applicable rates agreed in Schedule 2 – Terms of Compensation.

44.3

If, as a result of a force majeure event, Allseas encounters a backlog of materials, goods, tools, equipment, supplies or the Nodules at any location (including on the Production Vessel or on Additional Vessel) then Allseas may, subject to TMC’s instructions, move such materials, goods, tools, equipment, supplies or the Nodules to another location to store such materials, goods, tools, equipment, supplies or the Nodules.

Article 45

RELY-UPON INFORMATION

45.1

Notwithstanding the provisions of Article 8 of Part 1 – General Conditions, the following provisions apply to the Commercial Production.

45.2

Allseas shall be responsible for developing and executing the Mine Plan and shall use its best endeavours to achieve the Production Target.

45.3

TMC shall be responsible for the accuracy of the Rely Upon Information. Allseas may rely on the Rely Upon Information but nothing else, in all other respects it is responsible for making its own enquiries and obtaining its own information in every aspect relevant to the development and execution of the Mine Plan.

45.4

TMC warrants that the Rely Upon Information is accurate. If the Rely Upon Information is materially inaccurate (eg. the actual Nodule abundance is less than the estimate and impacts Production Target or the seabed soil strength deviates and causes issues for the collector vehicle to manoeuvre and maintain production) then:

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

36


a)

Allseas must take reasonable steps to amend the Mine Plan to take account of the variances in Nodule abundance or seafloor conditions, and use reasonable endeavours to recover the lost Nodule production;

b)

Allseas may make a submission to TMC proposing an adjustment in the Production Target for the relevant Year, taking account of the actual Nodule abundance and actual seafloor conditions encountered;

c)

TMC must give reasonable consideration to the submission made by Allseas under (b) above and Allseas will be entitled to a Variation to adjust the relevant Production Target.

45.5

Allseas shall conduct the Commercial Production in strict accordance with an approved Mine Plan. If the Rely Upon Information was accurate and Allseas fails to achieve the Production Target, then Allseas must use its reasonable endeavours to mitigate the under-run in production through reasonable means that may include without limitation:

a)

extending operational uptime where feasible;

b)

enhancing maintenance and repair efficiency;

c)

implementing engineering or process improvements;

d)

performing equipment upgrades or reconfigurations to improve system throughput or reliability; and

e)

optimizing vessel operations and resource allocation to restore production performance,

and the Production Target shall remain unchanged.

45.6

If TMC becomes aware of any inaccuracy in, or wishes to alter any of the Rely Upon Information or the Base Data, it may issue revised Base Data to Allseas at any time and Allseas shall incorporate such revised Base Data into a revised version of the Mine Plan. Where Allseas contends that such superseding Base Data or Rely Upon Information should lead to any adjustment in the Production Target it may make a submission to TMC and the process outlined in Article 45.4 above shall apply.

45.7

Except as set out in this Article 45, Allseas shall not be entitled to rely on any other data, survey, studies, opinions or representations not explicitly identified as Rely Upon Information for purposes of developing or executing a Mine Plan nor as a basis for asserting that any adjustment should be made to any Production Target and Allseas shall be deemed to have satisfied itself, before entering into the Contract, as to the extent and nature of the Work including but not limited to the services, personnel, materials and equipment, plant, consumables and facilities required for the Work, the correctness and sufficiency of the rates and prices stated in Schedule 2 – Terms of Compensation, general and local conditions including seabed and subsoil conditions, climatic, sea, other water and weather conditions, and all other matters which could affect progress or performance of the Work.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

37


IN WITNESS WHEREOF, this Contract has been duly executed by authorized representatives for and on behalf of the Parties on the dates set forth below:

Allseas Deepsea Marine Contractors [***]

  ​ ​ ​

TMC The Metals Company Inc.

Name:

Name:

Title:

Title:

Date:

Date:

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

38


ANNEXURE 1 – DEFINITIONS

ACTUAL WET TONNES PRODUCED means the quantity of wet tonnes in metric tonne (equal to 1000kg) measured by the calibrated belt weighing system prior to offloading, corrected for actual moisture content based on representative sampling, chain-of-custody controls, and laboratory analysis in accordance with the Sampling and Moisture-Correction Protocol.

ADAPTIVE MANAGEMENT SYSTEM (AMS) means the software and hardware system designed and created by TMC to monitor the collection of the Nodules in the License Area including but not limited to the operation of the Production System.

ADDITIONAL VESSEL means any vessel(s) employed or used by Allseas in connection with the Commercial Production and including the Transfer Vessel, Transport Vessel, Supply Vessel, support vessels and emergency response vessels, but excluding the Production Vessel.

AFFILIATE means, in relation to a Party, any entity that directly or indirectly Controls, is Controlled by, or is under common Control with that Party, where “Control” means the power to direct the management or policies of an entity, whether through ownership of voting securities, by contract or otherwise and, in the case of TMC, includes the Permit Holder.

ALLSEAS REPRESENTATIVE means that person referred to in Article 5.

BACKGROUND IP means Intellectual Property owned or controlled by a Party (or its Affiliates) prior to the Effective Date or developed by or for that Party outside the scope of the Work (and not specifically for TMC under this Contract).

BASE DATA means the Life-of-Mine Plan and the annually updated mine planning inputs prepared by TMC for each Year, identifying the nominated Block(s) to be mined in that Year, estimated hectares, estimated nodule abundance (expressed as kilograms of Nodules per square metre), general bathymetric envelope, and, for the Block(s) planned to be mined in the forthcoming Year, the applicable Rely-Upon Information.

BASE SPECIFICATIONS means the agreed technical and functional specifications forming the baseline requirements for the design and the development of the Production System.

BASELINE SYSTEM DOCUMENTATION means the integrated technical, planning, and systems documentation to be delivered by Allseas within ninety (90) days of the Commencement Date, establishing the initial technical and planning baseline for execution of the Development Work.

BLOCK means a geographically bounded seabed area within the License Area defined by TMC (in terms of location, boundary, and area) for mining in a given Year.

CHANGE IN LAW means a change or amendment to any Law or introduction of any new Law or change in interpretation or enforcement practices to any existing Law, enacted and coming into effect after the date of execution of the Contract.

CHANGE OF CONTROL means any event by which the Permit Holder ceases to be Controlled (directly or indirectly) by TMC. A Change of Control shall not include any change arising solely as a result of a reorganisation, restructuring, or transfer of shares or ownership interests within the TMC Group, provided that the Permit Holder remains Controlled (directly or indirectly) by TMC following such reorganisation, restructuring or transfer.

COLLECTION SYSTEM shall mean all required plant and equipment comprising an integrated system for the collection from the seabed of Nodules including a collector vehicle, a remotely operated submarine vehicle, risers, jumpers, control umbilicals, launch and retrieval system, and all other ancillary equipment required to effect the recovery, transport to surface, dewater, store and offloading of Nodules from the seabed, but excluding the Production Vessel or Additional Vessel.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

39


COMMERCIAL PRODUCTION means all work that Allseas is required to carry out in accordance with the provisions of the Contract, for the commercial recovery, collection and, if applicable, transport of Nodules from the License Area to shore pursuant to and in compliance with a valid Commercial Recovery Permit issued by NOAA under the DSHMRA, and including the provision of all materials, services, the Production Vessel, Additional Vessel, Collection System, and other plant, equipment and services to be rendered in accordance with the Contract as more fully described in Section 3 of Schedule 1 – Scope of Work and excluding Development Work.

COMMERCIAL RECOVERY PERMIT means the commercial recovery permit issued by NOAA to the Permit Holder pursuant to the DSHMRA, authorizing the commercial recovery of Nodules from the Licence Area.

CONTROL means the direct or indirect ability to direct or cause the direction of the management and policies of an entity, whether through the ownership of voting rights, by contract or otherwise, and shall include ownership of more than 50% of the voting rights in a company.

CERTIFICATE OF COMPLETION means the written confirmation issued by TMC to Allseas upon completion of the Development Work as further specified in Article 42.

COMMENCEMENT DATE means the date on which the last Party signs this Contract.

CONTRACT PRICE means the price for the Work calculated in accordance with Schedule 2 – Terms of Compensation, exclusive of Sales Tax, VAT or other similar taxes.

CO-VENTURER means any other entity with whom TMC is or may be from time to time engage or contract for the exploration and/or recovery of Nodules or other offshore developments including a joint operating agreement; a unitisation agreement; an exploration and/or production license or lease; a concession agreement; or a production sharing contract and the successors in interest of such Co-venturer or the assignees of any interest of such Co-venturer.

COST STATEMENT means a schedule verifying actual cost incurred and time incurred in execution of the Work in any given calendar month.

DATE FOR COMPLETION OF DEVELOPMENT WORK means the date specified as K14 in Schedule 3 - Schedule of Key Dates.

DATE FOR COMMENCEMENT OF COMMERCIAL PRODUCTION means the date specified as K14 in Schedule 3 – Schedule of Key Dates.

DEFERRED CAPEX means the portion of Eligible Costs approved under the Development Work that is repaid by TMC through production tonnage-based cash repayment mechanisms during Commercial Production, as further described in Section 2.6 of Schedule 2 – Terms of Compensation.

DESIGN REVIEW means a structured technical review conducted by Allseas to assess design maturity, system integration, and readiness against applicable specifications and assumptions.

DEVELOPMENT COMPLETION means the stage where the criteria for completion of all Development Work as detailed in Section 7.2 of Schedule 1 – Scope of Work is all met.

DEVELOPMENT PACKAGE (DP) means a defined grouping of Development Work activities established for planning, cost tracking, and WP&B governance purposes.

DEVELOPMENT WORK means all work that Allseas is required to carry out in accordance with the provisions of the Contract as per Section 2 of Schedule 1 – Scope of Work, for the design, development, build, and testing of the Production Vessel and Additional Vessel, Collection System and ancillary equipment required for the collection and, if applicable, transport of Nodules from the License Area to shore, including

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

40


all engineering, procurement, fabrication, assembly, vessel modification, testing, commissioning, and conduct of performance tests – all as more fully described in Section 2 of Schedule 1 – Scope of Work, and including the provision of all materials, services and equipment to be rendered in accordance with the Contract, but excluding the Commercial Production.

DEVELOPMENT WORK COSTS means all costs incurred by Allseas in performing the Development Work, including engineering, project management, procurement, fabrication and vessel modification costs, costs of developing the Collection System, development activities, development capital expenditure, and any additional lay-up or holding costs incurred during the Development Work, as approved through the WP&B process.

DIGITAL TWIN means a data-driven virtual representation of the Production System used for operational monitoring, simulation, performance analysis, and planning.

DSHMRA means Deep Seabed Hard Mineral Resources Act (30 U.S.C. § 1401 et seq.) and its implementing regulations at 15 C.F.R. Part 971.

EARLY PRODUCT DELIVERABLES means the early engineering, planning, interface, and alignment documentation to be delivered by Allseas within thirty (30) days of the Commencement Date in accordance with Section 2.3 of Schedule 1 – Scope of Work.

EFFECTIVE DATE means 30 March 2026.

ELIGIBLE COSTS means those costs incurred by Allseas that are eligible for reimbursement or repayment in accordance with Section 2.2.1 of Schedule 2 – Terms of Compensation, subject to approval through the WP&B process and the applicable compensation mechanism.

EXCLUSIVE USE AGREEMENT means the agreement titled Exclusive Vessel Use Agreement executed between TMC and Allseas Group SA on 1 August 2023.

EXTENSION TERM means additional term(s) as referenced in Article 3.5.

FIRST DEVELOPMENT PACKAGE means DP1 as described in Section 9 of Schedule 1 - Scope of Work.

GOVERNMENTAL RESTRICTION means any lawful direction, rule, directive, order, sanction, prohibition, restriction, licence condition, consent requirement or other measure imposed by any relevant government or Regulatory Authority which applies to Allseas or its assets, activities, business, operations, ownership, management, counterparties or transactions, including any:

a)

trade, economic or financial sanction, embargo or similar restrictive measures;

b)

asset freezing, blocking or seizure measures;

c)

export, import, customs or trade control restrictions;

d)

revocation, suspension, refusal or non-renewal of any licence, permit, approval or authorisation;

e)

restrictions on access to financial markets, banking systems, capital, funding or payment mechanisms;

f)

national security, foreign investment or critical infrastructure measures (including ownership, control or divestment requirements); or

g)

restrictions relating to labour, immigration, visas, employment or the appointment of directors or officers;

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

41


in each case to the extent that such measure materially restricts, prevents, prohibits or materially adversely affects Allseas’ ability to carry on its general business operations whether under this Agreement or otherwise.

INITIAL COSTS means Eligible Costs incurred by Allseas prior to the Effective Date in connection with the Project, as identified and agreed under this Schedule and including Lay-Up Costs.

INITIAL TERM means the duration of the Development Work and the period of five (5) Years from the date of commencement of Commercial Production.

INTELLECTUAL PROPERTY means all intellectual property and proprietary rights, whether registered or unregistered and whether existing now or in the future, including: patents, patent applications and rights to apply therefor, utility models, inventions and discoveries, trade secrets, knowhow and confidential information, copyrights (including rights in software and databases), moral rights (to the extent waivable), mask works, industrial designs, trademarks, service marks, trade names, domain names and getup, and all renewals, extensions and rights of action for past, present and future infringement, misappropriation or violation thereof.

LAW means all applicable laws, statutes, ordinances, decrees, international treaties and conventions, regulations, directives, by-laws, subordinate legislation, common law, judgments, orders, notices, directions, determinations, codes of practice and guidance (to the extent they are binding), and requirements of any governmental, regulatory supervisory or other duly constituted authority having jurisdiction over (i) the Parties, or (ii) the Work or any part thereof, from time to time.

LAY-UP COSTS means Eligible Costs incurred by Allseas prior to the Effective Date and during Development Work to maintain the Production System in lay-up or limited operational readiness.

LICENSE AREA means the geographic area described in the Permit Holder’s application made to NOAA on 22 January 2026 for a Commercial Recovery Permit under DSHMRA as further detailed in Schedule 6 - Attachments.

LIFE-OF-MINE PLAN means the strategic, long-term mining plan prepared by TMC or the Permit Holder that sets out the anticipated sequencing of Blocks to be mined over the economically recoverable life of the mineral resource, together with indicative production rates, planned ramp-up of production capacity, and assumptions regarding the number and deployment of production and transport vessels over time. The Life-of-Mine Plan is based on available geological, environmental, regulatory, and planning assumptions and is intended to inform long-term development planning, regulatory engagement, and project-level capacity and infrastructure planning.

MINE PLAN means the annual operational mining plan developed by Allseas for the nominated Block(s) for a given Year, based on the applicable Base Data and Rely-Upon Information, and setting out the planned mining paths, collection-vehicle operating patterns, and associated transport and logistics sequencing for execution of mining operations.

MOBILISATION COSTS means Eligible Costs incurred in preparing the Production System and associated logistics for the commencement of Commercial Production, as approved through the applicable WP&B and including costs such as transport of the Production System and Additional Vessel to the License Area or the Block.

MONITORING & SENSOR ARCHITECTURE means the collection of sensors, telemetry, data pathways, and interfaces supporting operational monitoring, environmental monitoring, AMS functionality, and Digital Twin integration.

NODULE(S) means polymetallic nodule(s).

NOAA means the National Oceanic and Atmospheric Administration in the United States.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

42


OFAC means the Office of Foreign Assets Control of the United States Department of Treasury.

OPERATING EXPENDITURE (OPEX) means the sum of all reimbursable operating costs incurred by Allseas during Commercial Production, including crew, consumables, maintenance, logistics, and other recurring operational costs, as approved through the applicable WP&B and as further detailed in Section 2.5.8 of Schedule 2 – Terms of Compensation.

OPERATIONAL SCHEDULE means a consolidated planning schedule showing the anticipated sequencing and timing of offshore Commercial Production activities in a specific Production Year.

OPERATIONAL PACKAGE (OP) means a defined package of Commercial Production work scoped and approved as a discrete package of approved work through the WP&B process, in developed, approved and updated in accordance with Section 9.3 of Schedule 1 - Scope of Work.

PERFORMANCE INCENTIVE means the production-linked incentive payable to Allseas during Commercial Production, calculated in accordance with this Section 2.7 of Schedule 2 – Terms of Compensation.

PERMIT HOLDER means The Metals Company USA LLC., a North Carolina limited liability company, of 2626 Glenwood Avenue, Suite 550, Raleigh, NC 27608, United States of America.

PRODUCTION VESSEL means any vessel (with DP3 capability) engaged in the Work for the purposes of launching, retrieving and operating a Collection System, receiving Nodules at surface, and trans-shipping Nodules to a Transport Vessel. Hidden Gem will be the first Production Vessel.

PRODUCTION RECONCILIATION means the process of comparing Actual Wet Tonnes Produced against Reference Wet Tonnes and against the approved Mine Plan, using data derived from the Production System, Adaptive Management System, and Digital Twin.

PRODUCTION TARGET means the annual wet metric tonnage of Nodules to be collected in a Production Year, as set out in Section 5 of Schedule 1 – Scope of Work and subject to approval through the applicable Work Plan & Budget (WP&B) for that Year.

PROGRAMME means the detailed work plan for carrying out the Development Work which shall be prepared by Allseas and which TMC has approved as the current detailed work plan that Allseas shall utilise in the performance of the Development Work in accordance with Article 38.

PRODUCTION SYSTEM means the Production Vessel and the Collection System but excluding the Adaptive Management System.

PRODUCTION YEAR means a consecutive twelve (12) month period commencing on the date on which Commercial Production commences (under the first approved WP&B for an Operational Package) and each anniversary thereof.

PROJECT means the integrated development and commercial offshore nodule collection and transportation undertaking in the License Area, comprising the design, development, financing, construction, commissioning and operation of the Production System and all associated infrastructure and services required to enable the commercial recovery, handling, transfer and transportation of Nodules to a designated port in accordance with the Life-of-Mine Plan, and includes both the Development Work and the Commercial Production.

REFERENCE WET TONNES means the provisional quantity of wet tonnes in metric tonne (equal to 1000kg) calculated using the measured belt weight and a default moisture content assumption, used solely for preliminary reporting, interim cost reimbursement, and provisional incentive calculations.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

43


RELY UPON INFORMATION means the following data and information to be provided by TMC pertaining to each Block:

a)

detailed bathymetric survey data of the seabed at a resolution of 2.0 m, unless otherwise agreed, including seabed slope, elevation, contours, obstacle identification, and seabed features;

b)

geophysical (multibeam hull-based backscatter and AUV survey data) showing a resource estimate of nodule abundance, thickness and distribution in the Block;

c)

seabed soil/strength report including soil shear/strength and any known seabed conditions which might affect manoeuvrability of the collection vehicle;

d)

obstacle map and seabed hazards register (e.g., large boulders, ridges, slopes > 6°) for the Block;

e)

requirements under the Commercial Recovery Permit as applicable to the Work, and

f)

an anticipated measure of abundance.

REGULATORY APPROVALS means any and all authorizations, permits, licences, contracts (including but not limited to the Commercial Recovery Permit) and permissions issued by a Regulatory Authority with respect to the Work and the fulfilment of the respective obligations of the Parties under the Contract and the obligations of the Permit Holder.

REGULATORY AUTHORITY means any (a) multinational, federal, provincial, state, regional, municipal, local, governmental or public department, ministry, central bank, court, tribunal, arbitral body, commission, agency board or bureau, marine classification society, having jurisdiction; (b) any subdivision, agent, commission, board or authority of any of the foregoing; (c) any quasi-governmental or private body exercising any regulatory, administrative, expropriation or tax authority under or for the account of any of the foregoing, including any private body having received a mandate to perform public services; and (d) any judiciary or quasi-judiciary tribunal, court or body.

REPAYMENT DENOMINATOR means the cumulative target production quantity of 10,000,000 Actual Wet Tonnes Produced, used solely for the calculation of Deferred CAPEX repayment amounts under the tonnage-based repayment mechanism set out in Schedule 2 – Terms of Compensation.

RESTRICTED PARTY means a person, or a person owned or controlled (directly or indirectly) by a person, that is:

a)

listed on any Sanctions List or is otherwise a subject of Sanctions;

b)

located in or organised under the laws of a country or territory which is a subject of country-wide or territory-wide Sanctions or whose government is the subject of country or territory wide Sanctions or;

c)

acting on behalf of any of the persons listed under paragraphs (a) or (b) above.

SANCTIONS means any trade, economic or financial sanctions laws, regulations, embargoes or restrictive measures administered, enacted or enforced from time to time by a Sanctions Authority.

SANCTIONS AUTHORITY means:

a)

the Security Council of the United Nations;

b)

Australia;

c)

the US;

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

44


d)

the European Union (or any of its member states);

e)

the United Kingdom;

f)

Switzerland;

g)

any other jurisdiction where a Party operates;

h)

the governments and official institutions or agencies of any of paragraphs (a) to (g) above.

SANCTIONS LIST means any list of specifically designated persons, entities (or equivalent) or countries maintained by, or public announcement of Sanctions designation made by a Sanctions Authority, each as amended, supplemented or substituted from time to time.

SIMULATOR ENVIRONMENT means a simulation environment linked to the Digital Twin used for engineering validation, training, and operational scenario testing.

STEERING COMMITTEE means the joint senior oversight and escalation body established by the Parties in accordance with Section 8.3.1 of Schedule 1 – Scope of Work.

SUBCONTRACT means any contract between Allseas and any third party for the performance of any part of the Work including for supply of services, equipment, goods, materials, or any other thing required for delivery of the Work.

SUBCONTRACTOR means any third party engaged by Allseas as a party to a Subcontract.

SUPPLY VESSELS has the meaning given in Section 3.4.1 of Schedule 1 – Scope of Work.

TECHNICAL INFORMATION means any and all information provided by or caused to be provided by TMC pursuant to the Contract, including the Rely Upon Information. Technical Information does not include any information, documentation, design data, or information of any other kind or nature that has been previously developed by or on behalf of Allseas.

TMC-NOMINATED PERSONNEL means personnel nominated by TMC or the Permit Holder or required by regulators to be present onboard a Production Vessel or at any other offshore location for purposes of monitoring, observation, regulatory compliance, data analysis, or client-representative purposes and for monitoring and overseeing Commercial Production.

TMC REPRESENTATIVE means that person referred to in Article 5.

TRANSFER VESSEL means a vessel of agreed specification used to receive Nodules from the Production Vessel via an offloading system, to hold Nodules and to transship Nodules to a Transport Vessel.

TRANSPORT VESSEL means a vessel (conventional bulk carrier) used to receive, and transport recovered Nodules from the Production Vessel or the Transfer Vessel to the designated port of offloading.

VARIATION means any revision to an approved WP&B that is in turn approved by TMC in accordance with the Contract and includes any change, addition, omission, substitution, alteration, modification or change to the quality, character or timing of the Works or to the scope, manner of performance, Programme, specifications or Production Target.

VOLUME-WEIGHTED AVERAGE SHARE PRICE (VWAP) means the volume-weighted average trading price of TMC’s publicly traded common shares (NASDAQ) over a twenty (20) trading day period immediately preceding the relevant payment date, as reported by the principal exchange on which such shares are listed. For any payments through shares at a certain value in euros the [***] the value will be converted to Euros by an exchange rate over the same twenty (20) day period.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

45


WORK means the Development Work and the Commercial Production and Variations thereto.

WORKSITE means any physical location where the Work is performed which shall include the Production Vessel and Additional Vessel.

WP&B means a document containing a separately defined scope (of either Development Work or Commercial Production) with corresponding schedule and estimated cost developed for the purposes of defining and authorizing expenditure and execution of Work, to be prepared by Allseas and submitted to TMC, and where applicable approved by TMC for implementation, all in accordance with the requirements set forth in Section 9 of Schedule 1 - Scope of Work.

YEAR means a calendar year.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

46


Schedule 1 – Scope of Work

Contents

Contents

1

1

General

3

1.1

Purpose

3

1.2

Summary of Work

3

1.3

Governing Documents

3

1.4

U.S. Flagging and Regulatory Compliance

3

2

Development Work

4

2.1

Objectives

4

2.2

Scope of Development Work

4

2.3

Early Project Deliverables

7

2.4

Design Review Process

9

2.5

Feasibility & Bankability Studies

10

2.6

Testing, Completion and Handover

11

2.7

Hidden Gem Reactivation and Certification

12

2.8

Supply Vessel Modifications

13

2.9

Sampling System – Design & Installation

14

2.10

Monitoring System Architecture & Sensor Integration

15

2.11

Radon, Alpha Radiation, Dust and Ventilation

15

2.12

Monitoring Architecture and Sensor Criticality

16

2.13

Development Work Scheduling Requirements

17

3

Commercial Production Work

18

3.1

Objectives

18

3.2

Scope of Commercial Production

18

3.3

Deliverables

20

3.4

Supply Vessel Mobilization, Modification and Operations

20

3.5

TMC Personnel Accommodation, Transfer and Workspace Requirements

21

3.6

Sampling & Chain-of-Custody – Operations

22

3.7

Production Wet Tonnage Measurement and Reconciliation

24

3.8

Nodule Offloading and Marine Transportation

25

3.9

Operational Monitoring, Sensor Management and Data Acquisition

28

3.10

Radon, Alpha radiation, Dust and Ventilation – Operational Controls

29

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 1 of 44


3.11

Commercial Production Scheduling Requirements

30

4

Technical Datasets and Design Interface

31

4.1

Purpose

31

4.2

Rely-Upon Information and Technical Integration

31

4.3

Allseas Design Information

31

4.4

Data Exchange & Interface Protocols

31

4.5

Operational Data Capture & Reconciliation

32

4.6

Data Quality Management Plan

32

5

Key Performance Requirements

32

5.1

Production Targets and Availability

32

5.2

System Performance and Resource Recovery Efficiency

33

5.3

Measurement and Reconciliation

34

6

Management of Change

35

6.1

Purpose and Principles

35

6.2

Change Control Procedure

35

6.3

Change Log and Reporting

35

7

Acceptance & Completion

35

7.1

Purpose

35

7.2

Development Work Completion Criteria

35

8

Interface and Cooperation

36

8.1

Purpose

36

8.2

Cooperation Principles

36

8.3

Project Coordination and Governance Interfaces

36

8.4

Technical, Data, and Reporting Interfaces

37

8.5

Co-Location, Access, and Collaboration

37

9

Work, Plan & Budget (WP&B) Framework

38

9.1

Purpose

38

9.2

Development Work WP&B Framework

39

9.3

Operational Work WP&B Framework

40

9.4

WP&B Preparation and Maturity Requirements

41

10

ESG and Sustainability requirements

42

10.1

ESG Reporting and Sustainability Data Provision

42

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 2 of 44


1

General

1.1

Purpose

This Scope of Work defines the activities, deliverables, and performance obligations of Allseas and TMC under the Contract for the permitting, design, development, construction, commissioning, and operation of the Production System and Additional Vessels for the commercial collection and transport of Nodules from the License Area.

The Parties acknowledge that TMC engages Allseas under the Contract to undertake the Development Work and the Commercial Production, and this is to be undertaken in accordance with the Commercial Recovery Permit held by the Permit Holder. Where any obligation imposed on TMC in this Schedule 1 -Scope of Work must be undertaken by the Permit Holder TMC shall procure the performance of that obligation by the Permit Holder. Where a right or entitlement accrues to the benefit of TMC under this document that right or benefit may be exercised by either TMC or the Permit Holder or both, at the discretion of TMC, as though TMC and the Permit Holder were a single entity

1.2

Summary of Work

The Work to be performed by Allseas is divided into two distinct parts:

(a)

Development Work – covering the engineering, design, procurement, fabrication, installation, testing, commissioning, and digital systems development of the Production System.

(b)

Commercial Production– covering the operation and maintenance of the Production System and Additional Vessels to recover, lift, dewater, transfer and transport polymetallic nodules in accordance with the approved Mine Plan.

The obligations by TMC are:

(a)

Development Work – obtaining permits, maintain a mine plan which is technically and commercially viable, arranging onshore processing or stockpiling agreements which suit the annual anticipated production of the Production System.

(b)

Commercial Production– maintaining permits, maintain a mine plan, maintaining onshore processing or stockpiling arrangements which enable the production in accordance with the Annual Production Targets.

1.3

Governing Documents

All Work shall be executed in accordance with the following documents and principles:

Approved Work Plan and Budget (WP&B) for each Work.
Approved Mine Plan and Annual Production Targets.
Applicable U.S. laws, regulations, and Regulatory Approvals under the DSHMRA, including NOAA and other relevant U.S. authorities.
TMC policies, procedures and requirements listed in Schedule 6 - Attachments

1.4

U.S. Flagging and Regulatory Compliance

a)

The Parties acknowledge that, if so required by the DSHMRA and implementing regulations issued by NOAA, any Production Vessel engaged in commercial recovery operations under the

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 3 of 44


Commercial Recovery Permit shall be documented under U.S. law and operate under the U.S. flag.

b)

TMC shall be responsible for procuring that the Permit Holder obtains and maintains the Commercial Recovery Permit and all NOAA determinations, permit conditions, and approvals relating to the scope of the permitted activities. TMC’s responsibility is limited to (directly or through the Permit Holder) maintaining and ensuring regulatory compliance at the permit level and any other permits or licenses related to the resource, extraction of minerals and transport to delivery location.

c)

Allseas, as the owner and operator of the Production Vessel(s), shall be responsible for all aspects of vessel compliance, including the U.S. reflagging process.

This responsibility comprises, without limitation:

providing technical vessel documentation, safety and class certificates, and crew information;
undertaking such vessel modifications, documentation steps, or operational measures as may be reasonably required to meet U.S. flag eligibility or waiver conditions; and
ensuring that vessel operations remain compliant with all relevant Laws, U.S. maritime, safety, and environmental regulations applicable under the Commercial Recovery Permit and US coastguard requirements and directions.

Any costs, schedule adjustments, or procedural requirements arising from U.S. flagging or associated compliance obligations shall be addressed through the WP&B process.

2

Development Work

2.1

Objectives

Allseas shall design, engineer, procure, construct, test, and commission a fully integrated Production System capable of a production rate of up to 3.0 million tonnes per annum (Mtpa) (wet) of Nodules based on an average abundance of 17 kg/m2. The Production System shall include all necessary modifications to the Production Vessel(s), as well as the Collection System for Commercial Production.

2.2

Scope of Development Work

The Development Work is described by scope categories and types of work, which define the nature and boundaries without prescribing phasing, grouping, sequencing, or budgeting.

Planning, sequencing, and authorization shall occur through a program-based development framework, under which the work is organized into discrete development packages for the purposes of phasing, budget control, and execution approval. The detailed scope, timing, and budget of each Development Package shall be defined and approved through the applicable WP&B process in accordance with Section 9.

2.2.1

Scope description

(a)

Engineering and Design

Develop detailed engineering and system integration design.
Incorporate the Rely-Upon Information provided by TMC into the design basis and performance parameters.
The Production System shall provide for return water discharge from the Vertical Transport System (VTS) at a depth of not less than 2,000 meters below sea level.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 4 of 44


Provide support to TMC during preparation of feasibility, environmental impact and mine planning studies.

(b)

Procurement, Fabrication, and Installation

Procure all equipment and materials required for the Work, including but not limited to long-lead items, critical equipment, and all supporting or ancillary components.
Modify, fabricate, assemble, and integrate system components, including vessel modifications and equipment installation on the Production Vessel and all elements of the Collection System.
Manage all subcontractors and suppliers in accordance with the Approved WP&B.

(c)

Testing and Commissioning

Conduct harbor acceptance tests, system integration tests, and sea trials.
Perform System Acceptance Testing (SAT) witnessed by TMC, demonstrating compliance with performance and functional requirements.
Complete commissioning reports, performance data, and certification packages.

(d)

Adaptive Management System (AMS)

The AMS will be developed and owned by TMC as an integrated environmental and operational monitoring platform required under DSHMRA and NOAA oversight.

Allseas shall support TMC in the implementation of the AMS to ensure complete interoperability within the Production System.
TMC shall develop the AMS with the objective of supporting efficient production operations and regulatory compliance while minimizing additional onboard personnel requirements, to the extent reasonably practicable
Allseas’ support shall include using all reasonable endeavors to:
oProvide detailed system interface specifications, operational data mapping, and sensor configurations;
oEnsure data quality, calibration, and synchronization between offshore systems and the AMS;
oParticipate in AMS design workshops and contributing to the definition of key performance and environmental parameters to be monitored;
oSupport integration testing between the AMS and offshore control systems, including vessel data, riser telemetry, and collector performance data streams.

The AMS is intended to collect, process, and visualize real-time operational and environmental data including:
oNodule collection rates, system performance, and equipment status;
oSediment plume dispersion, discharge parameters, and seabed conditions; and

Key environmental indicators as required by DSHMRA and NOAA or as conditions imposed on the Commercial Recovery Permit.

The AMS will include automated alerting, adaptive response triggers, and secure data transmission protocols enabling NOAA and other Regulatory Authority to observe operations in real time.

(e)

Digital Twin and Simulator Environment

The Digital Twin shall be developed by Allseas as a high-fidelity operational model representing the Production System.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 5 of 44


The Digital Twin shall replicate system dynamics and environmental interactions using live data feeds from the AMS and Allseas’ onboard control systems, allowing for:
oPerformance optimization and predictive maintenance;
oEnvironmental simulation and impact forecasting;
oRisk assessments and what-if scenario modeling; and
oVerification of system behavior during operational variations or contingency events.
Allseas shall design and implement a Simulator Environment linked to the Digital Twin to be used for:
oEngineering validation and procedure testing;
oCrew training, including communication protocols and emergency response drills;
oTraining of TMC control center personnel in monitoring, alarm response, and regulatory reporting; and
oValidation of safety-critical procedures under simulated fault and failure conditions.

(f)

Realtime Data Sharing Protocols and Control Center Integration

Allseas shall work collaboratively with TMC to design and implement Realtime Data Sharing Protocols defining frequency, latency, encryption, and access hierarchies between the Production System, AMS, Digital Twin, and the TMC Control Center.
Allseas shall provide continuous two-way communication between the Production System and the Control Center to support remote oversight, operational decision-making, and regulatory governance under DSHMRA or applicable Laws.
The Control Center Interface shall provide real-time dashboards and data visualizations enabling NOAA and other authorized agencies to monitor system and environmental performance.
Realtime data and telemetry generated by the Collection System shall be securely transmitted through defined data sharing protocols that specify data frequency, latency tolerances, access controls, and encryption standards. All data exchanges shall employ industry-recognized cybersecurity controls, including encrypted communications, authenticated system-to-system interfaces, role-based access, continuous monitoring, and security event logging. Intrusion detection and prevention capabilities shall be implemented at all data exchange endpoints to identify, prevent, and respond to unauthorized access or anomalous activity, ensuring the confidentiality, integrity, and availability of operational data. Configuration changes to data exchange interfaces and security controls shall be subject to appropriate change management and audit logging.

2.2.2

Development Work Deliverables

Deliverables under Section 2.2 include, but not limited to:

System architecture & base specifications
System design documentation
Detailed engineering packages for all subsystems
AMS interface specification
Digital twin architecture & integration
Inputs into WP&B and design reviews
Simulator architecture & scenarios
Monitoring & Sensor Architecture and criticality register
Realtime data interface specification
Installation and integration documentation
Commissioning & SAT procedures
Final Development Completion report and acceptance confirmation

Unless expressly stated otherwise in this Schedule or an applicable WP&B, deliverables produced by Allseas under the Development Work shall be provided to TMC for information and coordination purposes.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 6 of 44


Where a deliverable is intended to serve as a material input to Mine Plan development, regulatory submissions or compliance under the Commercial Recovery Permit, WP&B approvals, or Long-Lead Item (“LLI”) procurement or other material commitments, such deliverable shall be provided to TMC for review.

Where TMC reasonably determines that such a deliverable may materially affect cost, schedule, regulatory compliance, or Production Targets, TMC may require that such deliverable be subject to approval, which approval may be granted or withheld in TMC’s sole discretion.

For the avoidance of doubt, TMC’s participation in reviews or provision of comments does not relieve Allseas of responsibility for the design, execution, and performance of the Work.

2.3

Early Project Deliverables

2.3.1

Objective

The Early Project Deliverables ensures that, within the first ninety (90) days following the Commencement Date, Allseas provides TMC with the engineering, planning, interface, and regulatory-alignment documentation required to support:

initiation of regulatory engagement under DSHMRA;
Mine Plan development;
WP&B preparation and approval; and
feasibility and financial modelling inputs.

These Early Project Deliverables form part of the Development Work obligations.

2.3.2

30-Day Engineering & Alignment documentation

Within thirty (30) days of the Commencement Date, Allseas shall deliver the following Early Project Deliverables engineering and alignment documentation:

(a) Project kick-off & Organisation

Project kick-off meeting;
Organisation chart and key personnel assignments;
Communication protocols and weekly/fortnightly reporting cadence and report formats;
Change Control Procedure; and
Meeting structure for engineering, interfaces and WP&B.

(b) Level-2 Baseline Programme

Engineering work breakdown and key activities;
Long-lead procurement timeline and plan;
Vessel modification block schedule;
Riser, umbilical and collector integration timeline;
AMS and Digital Twin integration milestones;
Durations and productivity assumptions;
Vendor lead times;
Weather allowances and metocean constraints;
Key interfaces and sequence assumptions; and
Initial critical path identification.

(c) Risk Register

Technical, operational, schedule, regulatory and integration risks;
Proposed mitigation actions; and
Probability / consequence scoring.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 7 of 44


(d) System Architecture & Interfaces Overview

High-level system architecture diagrams;
Preliminary subsystem interfaces (mechanical / hydraulic / electrical / control);
Preliminary AMS and Digital Twin information needs; and
Preliminary list of required data inputs from TMC.

With the purpose to create a shared early understanding of scope, schedule, risk, regulatory pathway, and system architecture; enabling TMC to engage early with structured information; and providing the foundation of the Development Work Package WP&B Framework.

2.3.3

90-Day Baseline System Documentation

Within ninety (90) days of the Commencement Date, Allseas shall deliver the Baseline System Documentation, establishing the technical and planning baseline for Development Work execution.

The Baseline System Documentation shall support WP&B approval and provide TMC with the necessary inputs for Mine Plan development, regulatory submissions, and early financial modelling.

(a) Level-3 Integrated Baseline Programme

Fully networked Critical Path schedule, including engineering, procurement, installation and commissioning sequence;
Critical path and float path identification; and
Resource-loaded where applicable.

(b) System Architecture

System block diagrams;
Functional architecture (all subsystems);
Riser/umbilical/collector interfaces;
Production Vessel modification architecture; and
Control-system data flows.

(c) Base Specifications

Allseas’ design document including:

Performance requirements and engineering criteria;
Environmental and operational envelopes;
Subsystem functional specifications;
Integration requirements; and
Collection efficiency & Resource utilization reference parameters.

(d) Monitoring & Sensor Architecture

Full device list;
Measuring ranges and specifications;
Calibration concept; and
Criticality register (A / B / C designation).

(e) Sampling System – Engineering Concept

Arrangement drawings;
Structural and control requirements;
Safety features; and
Space and integration constraints.

(f) Initial System Hazard Analysis

HAZID (preliminary);
Early RAM/FMECA structure; and

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 8 of 44


Key hazards and proposed mitigation strategies.

(g) Vessel Modification Plan

High-level modification scope;
Block planning (dry-dock / afloat);
Subsystem installation sequence; and
Integration with riser, umbilical, LARS, and control systems.

(h) Regulatory Compliance Matrix

Roadmap of United States Coast Guard (USCG), class, flag, NOAA, DSHMRA requirements; and
Identification of items requiring early regulatory engagement.

(i) WP&B Alignment Package

Scope and schedule for proposed Development Work WP&B packages;
Initial cost ranges and exposure items; and
Variances or unresolved risks requiring Steering Committee attention.

All Early Project Deliverables shall be issued for information and then updated in rolling revisions as mutually deemed required.

2.4

Design Review Process

2.4.1

Objective

To ensure robust technical governance of the Production System design, Allseas shall implement a structured Design Review process with defined approval gates where required prior to major commitments, procurement, and integration.

2.4.2

Design Review Levels

Allseas shall conduct design reviews and approvals according to the Allseas Integrated Management System consisting of the following minimum:

Confirms the overall system architecture, functional specifications, performance assumptions, operability envelope, and key interfaces;
Validates alignment with the Base Specifications;
Provides the basis for releasing major design work and preparing long-lead procurement packages;
Confirms that detailed engineering, subsystem specifications, drawings, and integration plans are complete; and
Verifies readiness for fabrication, vessel modification, offshore installation, and commissioning.

2.4.3

Design Review Participation and Outcomes

TMC shall be entitled to participate in all relevant and final design reviews relating to the Development Work.

Material comments or concerns raised by TMC during such reviews shall be documented and addressed by Allseas through incorporation, mitigation, or written response.

Design Review outcomes are intended to confirm technical maturity, alignment, and readiness of the design for the next stage of development. They do not constitute approval of scope, budget, or authority to commit, nor do they authorize the release of long-lead procurements, commencement of fabrication or vessel modification activities, or locking of a design baseline.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 9 of 44


Any authority to proceed with procurement, fabrication, modification shall be granted only through an approved WP&B and in accordance with Section 9.

Material outcomes from Design Reviews shall be reflected, as applicable, in updates to the Base Specifications, Feasibility and Bankability Studies (Section 2.5), and Key Performance Requirements (Section 5).

2.4.4

Documentation

Allseas shall maintain a Design Review register including agendas, review comments, action logs, closure evidence, and Design Review outcomes. This register shall be shared with TMC and included in WP&B reporting.

2.5

Feasibility & Bankability Studies

2.5.1

Objective

Allseas shall provide the required input for this feasibility study to support the bankability of the Production System and the Annual Production Targets.

The objective of this package is to provide analytical and technical evidence to support verification and confirmation of the capability of the Production System, when designed and operated in accordance with the Mine Plan and applicable assumptions, to achieve the Production Targets, and to identify key risks, sensitivities, and mitigations relevant to such capability.

The required input from Allseas for the feasibility study shall:

demonstrate, using engineering, reliability, operational and logistical evidence, the likelihood of achieving the nominal production capacity of the Collection System;
identify key risks and associated mitigation plans; and
be prepared with a level of detail, technical robustness, and evidence quality consistent with the standards of disclosure and technical justification required under SEC Regulation S-K 1300 for mineral project technical studies, including relevant requirements for:
(i) data quality, material assumptions, and modifying factors;
(ii) engineering design maturity;
(iii) production scheduling and capacity analysis;
(iv) operational readiness, availability modelling, and contingency analysis; and
(v) supporting economic and risk assessments.

For clarity, this reference to S-K 1300 is for the purpose of defining the expected level of detail and technical rigor of the feasibility study report and does not require the submission of a formal S-K 1300 Report.

2.5.2

Scope of study package

1.

Probabilistic Uptime & Production Simulation — Perform simulations that integrate: (i) equipment reliability and repair durations, (ii) maintenance strategy and spares logistics, (iii) marine operations and weather/sea-state downtime, (iv) transport interface constraints, and (v) operating rules in the Mine Plan. Output includes annual P10/P50/P90 uptime and production distributions and confidence on meeting targets.

2.

Functional Safety/ RAM — Where required perform Failure Modes, Effects and Criticality Analysis of the Collection System at subsystem level (collector, riser, umbilical, LARS, compressors and control), with Reliability-Availability-Maintainability (RAM) roll-ups to system availability and critical spares policy.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 10 of 44


3.

Logistics & Weather Assurance — Modeling of offshore/port cycles, bunkering, crew changes, transfer windows, and seasonal weather envelopes, including sensitivity of production to metocean variance.

4.

Mine Plan Execution Efficiency — Validation that assumed collection efficiency and resource utilization efficiency (per Section 4.2) are attainable under realistic maneuvering paths, obstacle densities, turning radii, and recovery-to-return cycles.

5.

Sensitivity & Scenario Analysis — Stress testing of key assumptions (failure rates, repair times, weather year, abundance bands, fuel limits).

2.5.3

Deliverables

Bankability Evidence Report summarizing methods, assumptions, results (P10/P50/P90), and recommended mitigations;
Functional Safety/RAM Register with criticality rankings and spares;

The feasibility study package described in this Section 2.5.3 shall be prepared and submitted within twelve (12) months following the Commencement Date, unless otherwise agreed through the approved WP&B. The timing and sequencing of inputs and interim submissions shall be aligned with the Programme and the availability of underlying engineering definition.

2.5.4

Approval & Use

The package shall be reviewed and is intended amongst others, to validate the production capability of the Production System under the applicable design assumptions.

2.6

Testing, Completion and Handover

2.6.1

Testing Sequence

Allseas shall conduct a structured testing and commissioning program for the entire Production System, comprising, without limitation:

1.

Factory Acceptance Tests (FAT) – testing of components and subsystem prior to delivery and integration;

2.

Site Integration Tests (SIT) – testing and commissioning of subsystems upon installation and integration on board the Production Vessel

3.

Harbor Acceptance Tests (HAT) – integration verification and system functional testing on board the Production Vessel ;

4.

Sea Trials (ST) – progressive functional testing under representative operating conditions;

5.

System Acceptance Testing (SAT) – in field end-to-end demonstration of Production System functionality and performance.

2.6.2

Completion Documentation

Allseas shall issue a Development Completion report comprising:

SAT test results;
QA / QC and non-conformance reports closed out;
Updated spare-parts and maintenance lists;
Verified AMS / Digital Twin integration reports;
Updated functional safety register; and
Final Development Completion report summarizing test results and readiness for Commercial Production.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 11 of 44


2.7

Hidden Gem Reactivation and Certification

2.7.1

Objective

To return Hidden Gem to full operational status following its period in cold layup, Allseas shall reactivate, inspect, restore, and certify the Hidden Gem in accordance with applicable class and flag-state requirements and the conditions of the Commercial Recovery Permit, including obtaining any associated regulatory approvals applicable to commercial recovery operations.

2.7.2

Scope of Work

TMC shall procure that the Permit Holder must use reasonable endeavours to engage with NOAA and other relevant U.S. authorities in a timely manner in connection with the reactivation, repurposing, and certification of the Hidden Gem under DSHMRA and the permitting framework established thereunder.

Such engagement shall include seeking clarification, confirmation, and, where appropriate, tailoring or interpretation of applicable operational, environmental, and safety requirements, having regard to the first-of-kind nature of the project and the intended use of the Hidden Gem as a deep seabed mining vessel.

Without limiting the foregoing, the Permit Holder’s engagement shall address:

the operational, environmental, and safety requirements applicable under DSHMRA and conditions imposed under the Commercial Recovery Permit; and
any additional systems, modifications, or operational measures required to satisfy requirements beyond U.S.-flag documentation or waiver conditions, including manning, lifesaving appliances, emissions controls, and pollution-prevention systems.

For the avoidance of doubt, nothing in this Section obligates TMC nor the Permit Holder to obtain any regulatory outcome or exemption, and compliance with applicable Law and regulatory requirements shall ultimately be determined by the relevant Regulatory Authorities.

Allseas shall perform, manage, and be responsible for the following activities:

(a) Lay-up exit and Initial Assessment

Conduct a comprehensive layup-exit survey to determine the condition of hull, machinery, electrical systems, safety systems, accommodations, and all marine systems currently dormant or preserved;
Identify deficiencies, repairs, replacements, and refurbishment needs; and
Prepare a reactivation plan documenting the required actions, timeline, and cost estimate for approval under the WP&B.

(b) Class and Flag Reinstatement

Coordinate with Hidden Gem’s classification society and flag state to reinstate all certificates, including but not limited to:
oClass certificates (hull & machinery);
oLoad line certificate;
oSafety construction, equipment, radio certificates;
oInternational safety management code (ISM), International ship and port facility security (ISPS), Maritime labour convention (MLC) certificates;
oEnvironmental and pollution-prevention certificates; and
oCertificate for underwater inspection in lieu of drydocking (UWILD).

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 12 of 44


Develop and implement a class survey strategy that supports sustained remote operations, including the use of Underwater Inspection In Lieu of Drydocking (UWILD), subject to class approval.
Schedule and complete all special surveys, annual surveys, machinery overhauls, and functional testing required to lift the current suspension of certification.

(c) Regulatory Compliance for DSHMRA Operations

Ensure Hidden Gem (and any subsequent Production Vessel) meets the technical, operational, environmental, and safety requirements applicable under Laws, conditions imposed on Regulatory Approvals, conditions imposed by or lawful directions given by Regulatory Authorities.
Implement any additional systems or modifications required to satisfy U.S.-flag documentation or waiver conditions, including manning, lifesaving appliances, emissions controls, and pollution-prevention systems.

(d) Systems Restoration and Commissioning

Restore all marine systems to full operability, including propulsion, power generation, DP, ballast, cranes, cargo systems, accommodation HVAC, communications, and navigation systems.
Commission vessel systems in accordance with OEM procedures and class requirements.
Perform docking and sea trials as required for recertification and readiness for Collection System integration.

(e) Documentation

Compile a vessel reactivation package including:
oAll reinstated certificates and survey reports;
oClass and flag compliance records;
oTest and commissioning records; and
oUpdated safety management documentation.
Provide the package to TMC and incorporate it into the Development Completion documentation set.

2.7.3

WP&B Governance

All reactivation activities, surveys, repairs, and certification work shall be planned, budgeted, and approved under a WP&B.

2.8

Supply Vessel Modifications

Allseas shall be responsible for ensuring that the Supply Vessels are suitably modified, outfitted, or upgraded to support offshore logistics for the project, including, without limitation:

Cargo capacity: Vessel deck and tank configurations capable of transporting sufficient fuel to refuel Hidden Gem (and subsequent Production Vessel(s)) and the required consumables, spares, or dry cargo;
Personnel accommodation: Accommodation and safety provisions to support crew change rotations, including bunks, galley, HVAC, and lifesaving appliances complying with relevant U.S. flag/class requirements or other means of transporting equivalent amount of personnel;
Walk-to-Work system: Installation of a motion-compensated Walk-to-Work (W2W) gangway system or similar suitable for safe personnel transfer under typical metocean conditions;

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 13 of 44


Communications & data systems: Integration of vessel communications, AIS, DP systems, telemetry modules, and data links to support operational oversight via the AMS and TMC control center; and
Environmental and safety compliance: Any modifications necessary to comply with environmental protection, ballast water, spill response, and emissions regulations applicable under the Commercial Recovery Permit and Law.

All modifications shall be performed under Allseas’ engineering and project-management responsibility, applying the same design, quality, safety, and documentation standards used for the Hidden Gem modifications.

2.9

Sampling System – Design & Installation

2.9.1

Objective

To design, engineer, install, and commission a conveyor-belt sampling system capable of capturing accurate and representative samples of dewatered Nodules immediately prior to offloading.

The sampling system is required to support two primary objectives:

1.

determination of moisture content for verification of Actual Wet Tonnes Produced and associated reporting; and

2.

characterisation of particle size distribution (PSD) to confirm that the product is suitable for safe bulk transportation.

Sampling shall provide documentary evidence that the proportion of fine material is within acceptable limits, recognising that excessive fines (e.g. material below approximately 1 mm) may increase the risk of cargo liquefaction and loss of vessel stability during marine transport.

While analyses indicate that the likelihood of such conditions is low, the sampling system shall ensure that each bulk carrier cargo can be traced to recorded product samples, providing an auditable basis for transport safety assurance, risk management, and allocation of liabilities.

2.9.2

Scope of Work

Allseas shall:

Design a sampling system located on the final conveyor segment upstream of the over-the-side transfer boom.
Ensure the sampler complies with international sampling principles for bulk commodities
Engineer structural, mechanical, control, and safety interfaces with the Hidden Gem (and any subsequent Production Vessel’s) material-handling system.
Install the sampler, drives, housing, chutes, and integrated sample-handling cabinet.
Implement automation controls, sensor feedback loops, and logic required for consistent cut intervals.
Integrate sampling data streams into the AMS and digital twin.
Conduct commissioning tests demonstrating:
correct cutter path and velocity;
correct increment mass;
zero bias; and
sample integrity during handling.

2.9.3

Deliverables

Sampling system design package;
Structural & control integration drawings;

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 14 of 44


Commissioning test reports; and
Procedure for collection and handling of samples, including storage and handover for onboard analysis.

2.10

Monitoring System Architecture & Sensor Integration

2.10.1

Objective

To develop and integrate a comprehensive monitoring architecture that supports operational control, environmental compliance, plume modelling, and AMS/digital twin functionality.

2.10.2

Scope of Work

Allseas shall:

Develop a monitoring system architecture defining all sensors, telemetry nodes, interfaces, and data pathways across the Production System; and
Select, engineer, procure, and install monitoring devices and all other ancillary materials and equipment that are required for the monitoring system architecture as designed by Allseas to operate as per the approved specifications, including:
oproduction flow meters, density sensors, weight meters;
ovessel position and motion sensors;
oriser and umbilical telemetry;
oenvironmental and plume-monitoring sensors (acoustics, turbidity, total suspended solids (TSS), multibeam echosounder(MBES), light detection and ranging (LiDAR), acoustic doppler current profiler (ADCP));
oair quality sensors;
oClosed-circuit television (CCTV) and safety monitoring systems;
oImplement synchronised time-stamping and communications protocols compatible with the AMS/digital twin;
oIntegrate all sensors into the central control system and AMS data interface; and
oConduct initial calibration, verification, and acceptance testing.

2.10.3

Deliverables

Monitoring system architecture document;
Sensor list & integration matrices;
Calibration certificates; and
Commissioning test reports.

2.11

Radon, Alpha Radiation, Dust and Ventilation

Allseas shall provide and implement mitigation measures for radon accumulation, alpha-radiation exposure, and dust hazards associated with nodule storage and handling, including measures addressing risks to personnel safety and potential impacts to the marine environment arising from airborne dust emissions and deposition to surface waters.

2.11.1

Scope of Work

Allseas shall:

Engineer ventilation systems for holds, conveyors, storage holds, and enclosed spaces to prevent radon accumulation;
Provide extraction, dilution, or purging systems where ventilation alone is insufficient; and
Minimise dust generation by design through:
oenclosed conveyors;
ocontrolled drop heights;

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 15 of 44


odust-tight housings; and
oappropriate filtration/extraction.
Design accommodation, bridge, and control rooms with positive-pressure clean-air systems (PIL-equivalent); and
Provide radon and dust-monitor installation layouts, wiring, and interfaces.

2.11.2

Deliverables

Ventilation & radon control design package;
Dust control design package; and
Hazard assessment & engineering justification.

2.12

Monitoring Architecture and Sensor Criticality

2.12.1

Objective

During the Development Work, Allseas shall design, install and commission a complete monitoring and sensor architecture for the Production System, including classification of sensors and data streams by criticality class.

The monitoring and sensor architecture shall provide the basis for:

production measurement and performance monitoring;
system health, integrity monitoring, and operational control; and
regulatory compliance under the applicable Commercial Recovery Permit, including environmental impact monitoring, environmental sampling, and reporting obligations.

The design shall provide the basis for operational monitoring (Section 2.12.2) and the data quality management plan (Section 4.6).

2.12.2

Monitoring & Sensor Architecture

Allseas shall prepare a Monitoring & Sensor Architecture document which, as a minimum, shall include:

A structured list of all sensors and monitoring devices by subsystem (collector, riser, umbilical, LARS, compressors, power, vessel, environmental, plume, sampling);
Functional grouping of sensors (control, safety, integrity, performance, environmental, redundancy);
Measuring ranges, accuracy requirements and update frequencies;
High-level data paths from field devices to control systems, AMS and digital twin; and
Identification of data streams required for regulatory reporting and Production Reconciliation.

2.12.3

Sensor Criticality Classification (A/B/C)

Allseas shall assign each sensor and data stream to a criticality class, for example:

Class A – Safety / Regulatory / Integrity critical;
Class B – Production / Performance critical; and
Class C – Advisory / Diagnostic / Non-Critical.

For each class, the design shall define minimum requirements for:

redundancy and failover;
calibration and verification;
data availability and retention; and
alarm and fault-handling logic.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 16 of 44


2.12.4

Interfaces with AMS, Digital Twin and Data Quality Management Plan

The monitoring, sensor architecture and criticality register shall:

provide the input list and performance assumptions for the AMS and digital twin interface specifications; and
be cross-referenced in the data quality management plan (DQMP - Section 4.6 4.6), which shall define how the designed architecture is governed in operation.

2.12.5

Development Work Deliverables

The following shall be delivered as part of the Development Work:

Monitoring & sensor architecture;
Criticality register (A/B/C); and
cross-references in Base Specifications and AMS/Digital Twin interface specifications.

Implementation and day-to-day operation of the Monitoring & Sensor Architecture and criticality register shall be performed under the Commercial Production scope of work, as per the requirements set forth in Section 3.9.

2.13

Development Work Scheduling Requirements

2.13.1

Programme

Allseas shall prepare and maintain an integrated Programme in accordance with the Contract.

The Programme shall:

be prepared in a recognized scheduling software (e.g., Primavera P6 or equivalent);
identify the critical path, schedule float, and sequencing of all major activities;
contain identified resource loading required (resource-loaded schedule), by trade/ labour classification, and contain logical links clearly identifying predecessor and successor relationships between activities, leads and lags, and concurrency between activities;
identify key milestones, including design reviews, long-lead commitments, FAT/SIT/ HAT/ST/SAT dates, and the completion of the Development Work;
include interfaces with TMC inputs, regulatory dependencies, and deliverables requiring TMC approvals; and
include the schedule for AMS/digital twin development, integration testing, and Simulator Environment readiness.

2.13.2

Schedule Basis and Assumptions

Alongside the baseline Programme, Allseas shall submit a schedule basis and assumptions document detailing:

activity definitions and durations;
labour, fabrication, and vessel availability assumptions;
labour productivity assumptions;
critical vendor lead times;
weather contingencies;
logistics assumptions;
interface points with TMC and third parties;
regulatory approval assumptions; and
risk allowances and schedule contingency planning.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 17 of 44


2.13.3

Schedule Updates

Allseas shall update the Programme:

monthly, aligned with WP&B reporting;
showing actual progress, forecast completion, and variances from baseline; and
identifying critical-path changes, and delays.

Each update shall include:

updated Gantt chart / critical path method (CPM) network;
progress curves (S-curves) for engineering, procurement, fabrication, installation, commissioning, mobilisation and trials;
forecast date for completion of Development Work;
schedule risks and mitigation actions; and
native Primavera P6 file (or equivalent) with the schedule update and baselines.

2.13.4

Schedule Risk and Delay Mitigation

If Allseas identifies any event or risk that may delay one or more key milestones or the date for completion of Development Work, Allseas shall:

notify TMC;
assess and present the likely schedule impact;
propose reasonably practicable mitigation or recovery measures; and
implement agreed recovery actions.

2.13.5

Schedule Integration with WP&B

The Programme shall form part of the approved WP&B.
Any revision to the baseline (re-baselining) shall require:

documentation of variance; and
justification for change.

3

Commercial Production Work

3.1

Objectives

Allseas shall operate, maintain, and manage the Production System to collect, lift, dewater and transfer Nodules from the License Area to Transport Vessels and to the designated port of offloading, in accordance with the approved Mine Plan, with the objective of Achieving the Annual Production Targets and maintaining operational and environmental compliance, including compliance with all Laws and conditions imposed on Regulatory Approvals.

3.2

Scope of Commercial Production

3.2.1

Mine Plan Execution

Allseas shall conduct the Commercial Production in strict adherence to the approved Mine Plan and in compliance with all Laws and all conditions imposed on Regulatory Approvals and all lawful directions given by any Regulatory Authority including operational, environmental, and regulatory requirements applicable as part of the Commercial Recovery Permit, including the following:

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 18 of 44


Conduct collection operations in accordance with the approved Mine Plan and within boundaries, respect exclusion zones, and environmental restrictions defined by TMC or the Permit Holder; and
Operate under all applicable regulatory conditions and permit requirements issued by NOAA and other U.S. authorities.

3.2.2

Operations and Logistics

Allseas shall be responsible for the safe, continuous, and efficient conduct of the Commercial Production, including operation of the Production System and Additional Vessels and all associated marine logistics to support production activities, including the following:

Operate and maintain the Hidden Gem (and any subsequent Production Vessel), the Collection System and Transfer Vessel;
Operate and manage Nodule transportation to port of offloading
Manage all vessel logistics, crew operations, fueling, consumables, and shore base activities; and
Ensure continuous readiness and safe operation of the Production System.

3.2.3

Maintenance and Availability

Allseas shall perform all maintenance activities necessary to sustain the operational integrity, class compliance, and availability of the Production System and Transfer Vessel during the Commercial Production, including the following:

Implement preventive and corrective maintenance programs to sustain target system availability;
Maintain a spare parts strategy and critical spares inventory; and
Record and report all maintenance events and downtime.

3.2.3.1

Asset Integrity Management (AIM) Framework

Allseas shall maintain an AIM framework for all major system components including:

Condition-based monitoring (CBM);
fatigue-life tracking for riser, umbilical and lifting systems;
Safety critical element (SCE) performance standards;
IMR (Inspection, Maintenance & Repair) plans;
anomaly management procedures;
obsolescence risk management;
lifecycle cost modelling aligned with OP4; and
regulatory compliance under DSHMRA and class/flag requirements.

3.2.3.2

Underwater Inspection and Class Survey Compliance (UWILD)

Allseas shall maintain and execute the ABS, or equivalent class, approved underwater inspection in lieu of drydocking (UWILD) program developed during the Development Work.

This includes:

conducting all required underwater inspections, ROV surveys, and non-destructive testing at the intervals and scope approved by ABS;
submitting UWILD inspection records, images, and reports to ABS in the required format;
maintaining the Hidden Gem’s (and any subsequent Production Vessel’s) continuous class status without unplanned drydocking;
ensuring that hull, coatings, appendages, sea chests, and thruster units remain compliant with ABS requirements for UWILD continuation; and
coordinating any ABS-mandated corrective actions through the WP&B process.

All UWILD activities shall be integrated into the preventive and corrective maintenance program and shall be planned in a manner that minimises operational disruption.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 19 of 44


3.2.4

Adaptive Management System and Control Center Operation

At all times during the Commercial Production Allseas shall:

Maintain continuous operation and uptime of the AMS and digital twin systems, ensuring seamless data streaming to the TMC control center and NOAA.
Support real-time environmental and operational oversight by providing data access to authorized stakeholders.
Operate the Simulator Environment for periodic training, procedure validation, and emergency response drills.
Coordinate with TMC to refine adaptive operational responses based on live AMS data and regulatory feedback.

3.2.5

Reporting and Data Management

During the Commercial Production Allseas shall:

Submit monthly production, uptime, and fuel consumption reports;
Provide environmental, HSEQ, and compliance reports in accordance with Commercial Recovery Permit requirements; and
Maintain full operational logs, maintenance records, simulator training records, and cost tracking data.

3.2.6

Demobilization and Handover

At the conclusion of the Initial Term or any Extension Term, or upon early termination, Allseas shall safely demobilize, decommission, or lay up the Production System. Unless the Contract provides otherwise, all data, records, and documentation shall be transferred to TMC, and all environmental and safety obligations arising under the Commercial Recovery Permit and associated regulatory approvals shall be fully satisfied.

3.3

Deliverables

Monthly production and performance reports;
Maintenance logs and uptime records;
AMS and digital twin operational logs;
Environmental and safety compliance reports;
Annual performance review and Production Reconciliation; and
Final operational completion and demobilization report.

3.4

Supply Vessel Mobilization, Modification and Operations

3.4.1

Objective

To ensure continuous and reliable support to the Production System during the Commercial Production, Allseas shall arrange, modify, mobilize, and operate a suitable fleet of Supply Vessels (the “Supply Vessels”) to transport crew, fuel, consumables, equipment, and logistics cargo between the designated U.S. shore base and Hidden Gem (and any subsequent Production Vessel) and other offshore assets.

3.4.2

Shore base Interface and Logistics Corridor

The primary operational logistics corridor shall connect Hidden Gem (and any subsequent Production Vessel) with the designated U.S. West Coast shore base, anticipated to be San Diego, Long Beach, or Port Hueneme (final location to be determined by TMC and Allseas through the WP&B process).
Allseas shall design and execute all marine logistics routes, schedules, fuel transfer procedures, cargo-handling processes, and personnel transfers to ensure uninterrupted support to offshore operations.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 20 of 44


Mobilization activities, including loading, bunkering, and crew transfers at the shore base, shall be coordinated with TMC and shall comply with all applicable U.S. Coast Guard, port, and customs regulations and all Laws.

3.4.3

Mobilization and Operational Responsibilities

Allseas shall be responsible for:

Chartering, procuring, modifying, and mobilizing the Supply Vessels in accordance with the approved WP&B;
Operating and maintaining the Supply Vessels safely and efficiently, including master, crew, maintenance, and compliance with U.S. flagging or waiver requirements;
Managing voyage planning, fuel supply, crew rotations, consumable delivery, backloading, and waste-handling logistics;
Ensuring interface compatibility between Supply Vessels and the Hidden Gem (and any subsequent Production Vessel) for personnel transfer, fuel delivery, and cargo operations;
Maintaining records of Supply Vessel movements, loads, consumables, and personnel transfers in alignment with AMS data protocols and WP&B reporting;
Ensuring compliance with U.S. maritime law, U.S. Coast Guard requirements, and applicable Commercial Recovery Permit conditions; and
Coordinating with the designated U.S. shore base operator for berthing, resupply, warehousing, and hazardous materials handling.

3.4.4

Integration with Mine Plan and Commercial Production

The scheduling and utilization of the Supply Vessels shall be integrated into the annual Mine Plan and logistics plan to ensure that:

production operations are continuously supported;
weather and metocean risks are managed through contingency planning;
supply chain bottlenecks and turnaround times are minimized; and
crew and technical specialist transfer requirements are aligned with Commercial Production needs.

3.4.5

WP&B Governance

All Supply Vessel-selection decisions, modification scopes, and mobilization plans shall be developed and approved through the WP&B approval process (Section 9)

3.5

TMC Personnel Accommodation, Transfer and Workspace Requirements

3.5.1

Objective

To ensure safe, reliable, and continuous support for monitoring, regulatory compliance, scientific observation, and clientrepresentative oversight during offshore operations, Allseas shall provide accommodation, transfer capability, and suitable onboard workspace for TMC-Nominated Personnel as identified in the approved WP&B.

3.5.2

Personnel Categories and Manning Levels

Allseas shall accommodate and support TMC-Nominated Personnel on a rotational 5weekson / 5weeksoff basis. These personnel may include, without limitation:

Environmental and plumemonitoring scientists;
Marine ecologists and marine mammal observers;
Regulatory and environmental compliance officers;
NOAA or other thirdparty observers required under DSHMRA;

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 21 of 44


TMC client and Permit Holder representatives;
Data scientists, AMS/digital twin operators, and technical specialists; and / or
Safety observers or HSEQ auditors.

The number of TMC-Nominated Personnel to be accommodated shall correspond to the personnel categories and headcounts defined in the approved WP&B. Expected total up to a maximum of 12 at any given time.

Allseas shall provide sufficient onboard accommodation for TMC-Nominated Personnel, including, but not limited to:

Cabins and berthing capacity consistent with the personnel matrix;
Access to galley, mess, laundry, and sanitation facilities;
Emergency muster, lifesaving appliances, and medical support consistent with total persons onboard; and
Secure storage space for scientific, environmental, and compliance equipment.

Allseas shall ensure the Hidden Gem and any subsequent Production Vessel meets all applicable U.S. Coast Guard, class, and flagstate requirements for the expanded accommodation capacity.

3.5.3

Workspace Requirements – Production Vessel(s)

Allseas shall make available and maintain suitable onboard workspace for TMC-Nominated Personnel, including:

Dedicated office spaces for TMC personnel and compliance officers
A scientific laboratory or environmental monitoring room for sample handling, equipment calibration, and data review;
A data integration and AMS monitoring station linked to the digital twin and the onshore control center;
IT and communications infrastructure enabling realtime regulatory oversight; and
Secure storage for monitoring instruments, sampling kits, and scientific equipment.

3.5.4

Transfer and Logistics

Allseas shall coordinate personnel transfers between the designated U.S. shore base (San Diego, Long Beach, or Port Hueneme) and Hidden Gem (and any subsequent Production Vessel) via Supply Vessels, ensuring:

Safe Walk-to-Work transfer operations;
DP or equivalent stationkeeping capability;
Scheduling aligned with Mine Plan operations and AMS reporting requirements; and
Compliance with U.S. Coast Guard standards for offshore personnel transfer.

3.5.5

WP&B Governance

All personnel numbers, accommodation upgrades, Supply Vessel modifications, and workspace outfitting shall be defined and approved through the WP&B.

3.6

Sampling & Chain-of-Custody – Operations

3.6.1

Purpose and Scope

This Section defines the operational procedures for representative sampling of Nodules from the conveyor system and the Chain of Custody (CoC) requirements for all samples collected.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 22 of 44


This process ensures traceable, verifiable, and auditable sample integrity for Production Reconciliation and performance assessment.

3.6.2

Sampling System Operation

Allseas shall operate and maintain the installed sampling system, including samplers or equivalent incremental sampling equipment, to obtain representative samples of the Nodule stream during production and offloading activities.

Sampling shall be performed in accordance with the validated sampling procedures established during the Development Work and updated through the WP&B process.

3.6.3

Chain of Custody Requirements for Samples

Allseas shall maintain a documented and auditable CoC for all samples collected, including:

unique sample identification, timestamp, and location metadata;
automated or manually logged sample collection records;
tamperevident sealed containers or bags;
a CoC log capturing each handover event and responsible personnel;
secure storage until transfer to TMC or designated laboratories; and
uploading of CoC data to the shared database for reconciliation.

Samples shall remain sealed and traceable from the point of collection to the point of delivery.

3.6.4

Qualified Personnel

All sampling and sample-handling activities shall be carried out by qualified sampling technicians trained in:

proper sampling techniques,
contamination control,
equipment calibration,
CoC documentation, and
safe handling and temporary storage.

TMC-nominated Third-party or TMC-representatives may witness sampling activities.

3.6.5

Sample Handling and Processing

Allseas shall ensure that samples are:

collected using calibrated sampling equipment;
processed using approved procedures (e.g., drying, moisture control, weighing, sealing);
stored in controlled conditions to prevent contamination or deterioration; and
transferred to TMC or delegated third parties according to the CoC log.

3.6.6

Documentation and Reporting

Sampling logs, CoC records, equipment calibration reports, and any deviations or non-conformances shall be included in:

Monthly Production Reconciliation reports;
WP&B reporting packages; and
Annual Mine Plan updates.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 23 of 44


3.6.7

Clarification of Responsibilities

Allseas’ obligations under this Section relate solely to the physical execution, handling, and documentation of sampling activities.

The interpretation, analysis, and certification of samples remain the responsibility of TMC.

3.6.8

Integration with Mine Plan and Production Reconciliation

Sampling data shall support:

Daily and monthly Production Reconciliation reports;
Validation of collection efficiency and resource utilisation efficiency parameters (Section 5.2);
Adjustment of operational plans, production forecasts, and Mine Plan execution strategies; and
Annual Mine Plan updates and WP&B refinements.

3.6.9

Testing, Calibration, and Verification

Allseas shall:

Perform periodic calibration and verification of the sampler, increment mass, and timing;
Maintain calibration logs in accordance with the DQMP;
Immediately report any deviations or equipment malfunction impacting sample integrity; and
Conduct a commissioning-level re-verification after any major modification or repair.

3.6.10

WP&B Governance

The design assumptions, sampling frequency, cutter interval, sample mass, and required onboard analyses shall be defined and approved under the WP&B.
Operational sampling resource requirements (crew, consumables, storage materials, lab equipment) shall be budgeted and reviewed annually through the WP&B process.
Allseas shall include sampling-system performance, downtime, calibration status, and consumable usage in its regular WP&B reporting.

3.7

Production Wet Tonnage Measurement and Reconciliation

3.7.1

Objective

To establish a clear and auditable framework for measuring, reporting, and reconciling production quantities expressed in Wet Tonnes, for use in production reporting, regulatory compliance, and application under Schedule 2 – Terms of Compensation.

3.7.2

Reference Wet Tonnes

For interim reporting and provisional commercial purposes, Allseas shall calculate Reference Wet Tonnes based on:

the measured belt weight; and
a default moisture content assumption applied in accordance with the agreed reporting methodology.

Reference Wet Tonnes may be used for:

preliminary production reporting;
interim cost reimbursement; and
initial performance incentive or production-linked calculations,

in each case subject to subsequent reconciliation in accordance with this Section.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 24 of 44


3.7.3

Actual Wet Tonnes Produced

Actual Wet Tonnes Produced shall be determined by correcting the measured belt weight using the actual moisture content derived from the applicable sampling and laboratory analysis.

Actual Wet Tonnes Produced constitute the final and binding production quantity for:

production reconciliation;
performance assessment;
regulatory and permit reporting; and
final commercial settlement under Schedule 2 – Terms of Compensation.

3.7.4

Reconciliation and Adjustments

Allseas shall perform reconciliation between Reference Wet Tonnes and Actual Wet Tonnes Produced on a regular basis, at a minimum monthly, or at such other interval as may be agreed between the Parties or through the WP&B process.

Any adjustments arising from such reconciliation shall be reflected in subsequent reporting and invoicing periods in accordance with Schedule 2 – Terms of Compensation, without reopening prior reporting periods.

3.7.5

Records and Auditability

Allseas shall maintain auditable records relating to:

belt weighing measurements;
calibration records;
sampling logs and laboratory results; and
reconciliation calculations.

Such records shall be made available to TMC, the Permit Holder, and any relevant Regulatory Authority in accordance with the Contract and applicable permit requirements.

3.8

Nodule Offloading and Marine Transportation

3.8.1

Objective

To safely, efficiently, and reliably offload dewatered Nodules from the Hidden Gem (and any subsequent Production Vessel) to a Transfer Vessel and to transfer such Nodules onward to Transport Vessel(s) for shipment to the port of offloading, in accordance with Commercial Recovery Permit requirements, environmental and operational constraints, and all applicable safety and regulatory standards.

3.8.2

Scope Overview

The scope comprises the integrated offshore transfer and marine transport of recovered Nodules, including:

offloading of Nodules from the Hidden Gem to a dedicated Transfer Vessel;
onward transfer from the Transfer Vessel to Transport Vessel(s); and
marine transportation of Nodules to the Port of Offloading using Transport Vessel(s), intended to be conventional bulk carrier vessel(s).

Unless otherwise expressly agreed in writing, the provision, chartering, and operation of the Transfer Vessel and the Transport Vessel(s) shall be the responsibility of Allseas.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 25 of 44


3.8.3

Offshore Transfer Operations

Allseas shall be responsible for the execution of all Nodule offloading and offshore transfer operations, including, without limitation:

operation of the Nodule-handling, conveying, and offloading systems, including chutes, booms, hoppers, buffer storage, and associated control systems;
safe positioning and station-keeping of the Hidden Gem (and any subsequent Production Vessel) for transfer operations;
establishment of communication protocols between the Hidden Gem (and any subsequent Production Vessel), the Transfer Vessel, and the Transport Vessel(s);
coordination of vessel approach, maneuvering, station-keeping, and transfer operations;
management of safety zones and operational exclusion areas;
monitoring offloading rates, mass flow, and stability conditions;
integration of offloading data streams with the AMS and TMC control center;
coordination of emergency response and contingency actions, including equipment failure, loss of station-keeping, spillage, or safety incidents;
implementation of spill prevention, containment, and cleanup procedures; and
compliance with NOAA observer requirements and Commercial Recovery Permit conditions.

Offshore transfer operations shall be deemed complete upon safe loading of Nodules onto the Transport Vessel(s).

3.8.4

Transfer Vessel

Allseas shall provide, charter, and operate a Transfer Vessel to support offshore transfer operations.

The Transfer Vessel shall:

be suitable for the intended offshore transfer operations; and
comply with the interface and compatibility requirements set out in Section 3.8.7.

The Parties acknowledge that a suitable Transfer Vessel may require modification or enhancement. Where such modifications are required, including dynamic positioning capability, offshore receiving systems, storage, or offloading systems, such activities shall constitute Development Work and shall be executed pursuant to an approved Development Work Package under the WP&B Framework.

3.8.5

Transport Vessel(s)

Allseas shall provide, charter, and operate Transport Vessel(s) for the marine transportation of recovered Nodules to the Port of Offloading.

The Transport Vessel(s):

are not required to be equipped with dynamic positioning capability;
shall receive Nodules offshore via controlled slow-steaming alongside a dedicated Transfer Vessel; and
shall be compatible with the transfer methods, design, class, and stability limitations of both the Transfer Vessel and the Transport Vessel(s).

Following completion of offshore loading, the Transport Vessel(s) shall transport the Nodules to the Port of Offloading.

The planning, scheduling, and execution of Transport Vessel operations shall be carried out in accordance with the applicable WP&B.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 26 of 44


3.8.6

Offloading Documentation and Reconciliation

(a) Offloading Documentation

Allseas shall prepare offloading documentation covering:

transfer from the Hidden Gem (or other Production Vessel) to the Transfer Vessel; and
transfer from the Transfer Vessel to the Transport Vessel(s),

including:

date, time, and location of transfer;
Wet Tonnes discharged (as measured by belt scale / weightometer);
sample IDs corresponding to the transfer batch;
deviations, abnormal events, or delays; and
AMS data references.

(b) Reconciliation

Offloading records shall be reconciled monthly against logs and Transport Vessel draft/hold measurements where applicable.

3.8.7

Vessel Compatibility Requirements

The Transfer Vessel and Transport Vessel(s) shall meet the following minimum requirements:

sufficient hold capacity consistent with Mine Plan transfer cycles;
structural capability to receive Nodule flow at rated offloading speeds;
compatibility with offloading boom geometry;
adequate maneuvering or station-keeping capability;
stability and ballast systems aligned with loading rates;
compatible communications systems with the Hidden Gem (and any subsequent Production Vessel) and AMS;
environmental compliance, including spill-response capability and emissions requirements;
appropriate lighting and safety equipment; and
compliance with USCG, class, flag, and Commercial Recovery Permit conditions.

3.8.8

Operational Constraints and Safety Parameters

Allseas shall establish and maintain procedures covering:

maximum allowable sea state for transfer operations;
emergency disconnect procedures;
DP or mooring alarm limits;
safe loading and transfer rates;
maximum permissible hold fill rates;
emergency stop triggers;
personnel access control;
environmental monitoring during transfer; and
spill-cleanup protocols.
Such procedures shall be issued to TMC for review.

3.8.9

Commercial Treatment

Marine transport services, including Transfer Vessel and Transport Vessel operations, shall be defined, priced, and approved through the applicable WP&B.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 27 of 44


Unless otherwise agreed:

such services shall be treated as OPEX; and
where applicable, modifications to, or procurement of vessels or equipment required to perform services shall be classified as Development Work,

and shall be compensated in accordance with Schedule 2 – Terms of Compensation, including any applicable demurrage, standby, and weather allowance provisions.

3.8.10

Custody Transfer

Unless otherwise expressly agreed in writing, custody of recovered Nodules shall transfer to TMC (or its designated consignee) upon discharge at the Port of Offloading.

3.9Operational Monitoring, Sensor Management and Data Acquisition

3.9.1

Objective

During the Commercial Production, Allseas shall operate, maintain and continuously improve the Monitoring & Sensor Architecture and criticality register as developed under Section 2.12, to ensure that all Class A/B/C monitoring functions perform as designed and that data streams meet the requirements of the DQMP (Section 4.6) and Commercial Recovery Permit.

3.9.2

Execution of Monitoring Architecture

Allseas shall:

maintain all monitoring devices, data paths and interfaces in accordance with the approved Monitoring & Sensor Architecture;
keep the Criticality Register up to date as equipment is replaced, upgraded or reconfigured;
ensure that Class A and Class B sensors achieve target availability and performance; and
promptly investigate and rectify monitoring failures that affect safety, integrity, production, or regulatory reporting.

3.9.3

Calibration, Verification and QA/QC

In accordance with the DQMP (Section 4.6), Allseas shall:

perform scheduled calibration and verification of sensors, with special focus on Class A and Class B devices;
record calibration results and non-conformances;
apply QA/QC checks to key data streams (range checks, drift detection, missing data flags); and
implement corrective actions where data quality thresholds are not met.

3.9.4

Data Availability and Redundancy

For Class A and Class B signals, Allseas shall ensure that:

redundancy and failover mechanisms as defined in Section 2.12 are implemented and maintained;
data are buffered and preserved during communication outages; and
loss of primary sensors triggers appropriate alarms, fallback modes and repair actions.

3.9.5

Operational Interface with AMS and Digital Twin

Allseas shall operate and maintain the AMS and digital twin data interfaces so that:

real-time and historical data required by the AMS/digital twin specifications are reliably provided;

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 28 of 44


data quality flags and calibration status are propagated to AMS/digital twin; and
identified anomalies in AMS/digital twin outputs are investigated and, where relevant, traced back to sensor or data-quality issues.

3.9.6

Reporting and Continuous Improvement

Allseas shall:

report monitoring performance, sensor downtime and data-quality issues within the monthly WP&B reports;
recommend monitoring or sensor upgrades through OP4 and the AIM framework; and
update the Monitoring & Sensor Architecture and criticality register as improvements are implemented.

3.10

Radon, Alpha radiation, Dust and Ventilation – Operational Controls

3.10.1

Objective

To minimise occupational exposure to radon, alpha radiation, and nodule dust during routine operations and material handling.

3.10.2

Operational Responsibilities

Allseas shall:

Operate all ventilation, extraction, and dilution systems per design parameters;
Conduct scheduled radon and air-quality monitoring at designated sampling points;
Record and trend radon levels, reporting exceedances immediately;
Maintain dust suppression systems during reclaim, conveyance, and transfer; and
Prevent dust accumulation on decks and equipment through routine housekeeping.

3.10.3

Access Control & Safety Procedures

Allseas shall, at all times during Commercial Production, ensure that:

Enclosed or semi-enclosed spaces shall be treated as restricted-entry zones when nodules are present;
Entry shall require atmospheric testing and a permit-to-work; and
Breathing apparatus and PPE requirements shall follow the HSEQ risk assessment.

3.10.4

Training and Awareness

Allseas shall ensure that all personnel on board the Hidden Gem (and any subsequent Production Vessel), including Allseas personnel, TMC personnel, and any third-party or regulatory personnel, whether operational, supervisory, technical, scientific, or administrative, receive appropriate and role-relevant training on:

Alpha radiation and radon hazards;
Proper use of air-quality monitoring equipment;
Dust exposure risks; and
Emergency response procedures.

3.10.5

Integration with WP&B and HSEQ Systems

All operational radon, dust, and ventilation tasks shall be included in the applicable WP&B and managed under Allseas’ HSEQ Management System.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 29 of 44


3.11

Commercial Production Scheduling Requirements

3.11.1

Operational Schedule

Allseas shall prepare and maintain an Operational Schedule covering:

annual production planning and execution sequences;
Supply Vessel rotations and logistics cycles;
maintenance windows and planned shutdowns;
Simulator Environment training schedule; and
mandatory reporting and regulatory milestones.

The Operational Schedule shall be aligned with the approved annual Mine Plan and WP&B.

3.11.2

Operational Look-Ahead Schedules

Allseas shall issue, reasonably in advance:

a 28-day look-ahead schedule;
a 14-day detailed schedule for vessel rotations, and critical activities; and
daily operational plans during active collection windows.

3.11.3

Schedule Progress Measurement & Reporting

Allseas shall:

measure progress against the Operational Schedule;
report variances monthly in WP&B Reports; and
include downtime analysis (planned and unplanned), cause categorization, and impact on production.

3.11.4

Schedule Deviations and Mitigation

If any operational delay actually or is likely to impact the Annual Production Target or Mine Plan execution, Allseas shall:

notify TMC;
propose recovery actions (e.g., additional operational hours, re-sequencing, maintenance strategy adjustment); and
implement agreed recovery actions and track their effectiveness.

3.11.5

Integration with AMS and Digital Twin

Operational schedules shall be uploaded to the AMS and digital twin to allow:

mine-plan-to-execution comparison;
predictive operational modelling;
identification of schedule–performance deviations; and
optimization of production cycles.

3.11.6

Integration with WP&B

Operational scheduling assumptions, logistics cycles, and maintenance windows shall be incorporated into the annual WP&B.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 30 of 44


4

Technical Datasets and Design Interface

4.1

Purpose

This Section defines the technical information interfaces between TMC and Allseas in relation to the development of the Mine Plan, Production System design and integration, operational monitoring, and data management.

4.2

Rely-Upon Information and Technical Integration

The technical dataset provided by TMC as part of the Rely-Upon Information, shall be used by Allseas in conjunction with its own design assumptions, analyses, and operational methodologies, in the design, integration, and operation of the Production System and Additional Vessels, for the purpose of;

system design, including collector, riser, and vessel modifications;
Mine Plan development and refinement;
path planning and maneuverability assessment;
slope and obstacle avoidance analysis;
assessment of collection efficiency and resource utilization efficiency assumptions;
production modelling and feasibility assessment; and
integration into the digital twin and definition of the operational envelope.

Any modelling, simulation, or optimization activities performed under this Section are analytical and probabilistic in nature and are intended to support planning and optimization only, and do not constitute a guarantee of production outcomes or system performance.

4.3

Allseas Design Information

Allseas shall provide TMC with:

Vehicle maneuverability limits: turning radii, minimum corridor width, slope tolerance, obstacle clearance, and speed profiles.
Soil and seabed condition assumptions: soil strength requirements, acceptable traction ranges, and seabed conditions necessary for collector performance.
Operational constraints: collector operating envelope, riser/umbilical constraints, and surface vessel maneuvering requirements.

These inputs form the technical performance basis for the Mine Plan, including the identification, evaluation, and selection of Block(s) by TMC, considering the operational capabilities and constraints of the Production System.

4.4

Data Exchange & Interface Protocols

The Parties shall establish a technical data exchange protocol defining:

Path planning;
Mining sequence selection;
Resource utilization efficiency modelling;
coordinate systems;
file formats & metadata;
frequency of updates;
version control;
validation steps;

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 31 of 44


secure data transfer; and
AMS/digital twin compatibility requirements.

Data exchange is for the purpose of implementing and refining the Mine Plan, operating and optimizing the Production System, supporting system performance validation and continuous improvement, and enabling monitoring, reconciliation, and regulatory reporting.

4.5

Operational Data Capture & Reconciliation

During operations, Allseas shall capture, manage, and make available operational and environmental data necessary to support Mine Plan execution, monitoring, reconciliation, and regulatory reporting, in accordance with the Monitoring & Sensor Architecture and the data quality management plan (Section 4.6).

4.6

Data Quality Management Plan

4.6.1

Purpose

The DQMP defines the governance framework for the quality, integrity, traceability and retention of all operational and environmental data generated by the Production System. It applies to the Monitoring & Sensor Architecture and criticality register developed under Section 2.12 and to operational monitoring under Section 3.9.

4.6.2

Scope

The DQMP shall cover, at a minimum:

sensor and data-stream inventory (by reference to the criticality register);
calibration and verification policies;
data validation and QA/QC rules;
time-synchronisation standards;
data logging, buffering and backup;
change control for monitoring configurations; and
data retention, access and audit trails for TMC, Permit Holder, and/or NOAA review.

4.6.3

Deliverables

Allseas shall prepare, maintain and periodically update the DQMP, and shall provide TMC and relevant Regulatory Authorities with access to the DQMP and its associated records upon reasonable notice.

5

Key Performance Requirements

5.1

Production Targets and Availability

(a) Steady-State Production Capability

Allseas shall design and operate the Production System to achieve a Production Capability of 3.0 Mtpa (wet basis) under normal operating conditions and based on the Rely-Upon Information.

(b) Annual Production Targets (Ramp-Up)

The Project will target the following ramp-up profile:

Year 1: 1.0 Mt
Year 2: 1.5 Mt
Year 3: 2.0 Mt

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 32 of 44


Year 4: 2.5 Mt
Year 5: 3.0 Mt

(c) System Availability

Allseas shall design the Production System and develop maintenance, reliability, and operational strategies to achieve an operational availability consistent with the Production Targets.

The design and operational criteria for the Production System’s availability shall:

incorporate long-term metocean and weather statistics relevant to the Licence Area, including downtime modelling and seasonal variability;
reflect reliability, maintainability, redundancy, and spares philosophies appropriate for continuous offshore production;
be supported by RAM (Reliability, Availability and Maintainability) models demonstrating the ability of the Production System to achieve the WP&B Annual Production Targets across a representative long-term operating period; and
identify and quantify key operational risks and mitigation strategies, including weather-related interruptions and environmental constraints.

The target operational availability will be established and shall form part of the applicable Production Targets.

5.2

System Performance and Resource Recovery Efficiency

5.2.1

Design and Operation

Allseas shall design, construct, and operate the Production System and Additional Vessels, with the objective of enabling efficient and effective mining of each Block, having regard to the physical characteristics of the seabed, obstacle density, maneuverability constraints, and operational practicality as reflected in the applicable Rely-Upon Information, and recognizing that such characteristics may vary by Block.

5.2.2

Resource Recovery and Block Utilisation Parameters

System performance shall be evaluated by reference to indicative planning and assessment parameters reflecting the effectiveness with which the Production System converts accessible in-situ resources into recovered tonnes under the Mine Plan, including:

1.Collection Efficiency [***]

The proportion of recoverable nodules encountered within accessible and traversable areas that are successfully collected by the Collection System.

2.Block Utilisation Efficiency [***]

An estimate of the proportion of the accessible and practically mineable area of a Block that is effectively covered and mined through execution of the Mine Plan, taking into account obstacle avoidance, maneuverability requirements, path planning, entry and exit constraints, and the need to minimize excessive operational downtime or inefficient maneuvers.

These parameters reflect reasonable estimates based on current knowledge, pilot operations, and system design maturity, recognising that certain areas within a Block may remain unmined where access would be impracticable, inefficient, or disproportionate in operational effort relative to expected recovery.

Where measured performance [***] from the applicable planning assumptions (that is – reference values for collection efficiency and block utilisation stated above), Allseas shall investigate the underlying causes and, where reasonably practicable, propose design, operational, or

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 33 of 44


Mine Plan adjustments intended to improve coverage, manoeuvrability, or recovery efficiency, without constituting an obligation to recover specific areas or quantities of resource.

5.3

Measurement and Reconciliation

Performance against the parameters set out in Section 5.2 shall be measured using operational data captured through the AMS and digital twin and reconciled at appropriate intervals to support Mine Plan updates, performance evaluation, and WP&B refinement.

Reconciliation outputs shall be used as inputs for Mine Plan optimisation, system performance assessment, and ongoing feasibility and production confidence evaluation.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 34 of 44


6

Management of Change

6.1

Purpose and Principles

This Section establishes the principles governing the identification, control, and documentation of changes to the scope, technical baseline, schedule, interfaces, or deliverables of the Development Work and Commercial Production.

The objectives of this Section are to:

ensure that changes are managed in a controlled, transparent, and auditable manner; and
prevent uncontrolled scope, cost, or schedule impacts.

6.2

Change Control Procedure

Allseas shall establish, maintain, and comply with a documented Change Control Procedure governing the management of technical, operational, schedule, and interface changes.

The Change Control Procedure shall:

define how changes are identified, assessed, reviewed, approved, and documented;
ensure consistency with the WP&B Framework under Section 9; and
provide appropriate visibility to TMC.

The Change Control Procedure shall be submitted to TMC for review as an Early Development Work deliverable.

6.3

Change Log and Reporting

Allseas shall maintain a change log recording all proposed and approved changes, including at a minimum:

a description of the change;
the trigger or source of the change;
approval status and date; and
reference to the applicable WP&B or Variation.

The change log shall be provided to TMC as part of monthly reporting.

7Acceptance & Completion

7.1

Purpose

This Section defines the acceptance criteria for completion of the Development Work.

7.2

Development Work Completion Criteria

Development Completion occurs when:

All Development Packages (DP1 through DP8) under the development WP&B Framework of Section 9 are completed;
All FAT, SIT, HAT, Sea Trials, and SAT procedures are completed and accepted;

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 35 of 44


AMS and digital twin integration validated with real data;
All mandatory documentation has been delivered by Allseas to TMC (test results, calibration certificates, maintenance plans, training records, updated functional safety register);
the technical, operational, and reliability evidence required under Section 2.5 to support feasibility and bankability assessment has been submitted and is complete, including substantiation of system performance, reliability, and availability assumptions; and

The Development Completion report is accepted.

8

Interface and Cooperation

8.1

Purpose

This Section sets out the principles governing coordination, interface management, and information exchange between the Parties in support of the execution of the Development Work (Section 2) and the Commercial Production (Section 3).

8.2

Cooperation Principles

The Parties shall coordinate their activities to:

exchange relevant information in a timely and transparent manner;
maintain alignment on engineering, operational, environmental, and regulatory requirements;
avoid unnecessary delay, duplication, or interference between activities; and
identify interface risks at an early stage and collaborate on appropriate mitigation measures.

8.3

Project Coordination and Governance Interfaces

8.3.1

Steering Committee (Project Oversight and Escalation Function)

The Parties shall establish a joint Steering Committee, comprising senior representatives appointed by each Party, to provide senior-level project oversight and coordination in support of the execution of the Work.

At the commencement of the Project, the Steering Committee shall comprise the TMC Chief Executive Officer [***], appointed by TMC, and the Allseas Vice President Commercial [***], appointed by Allseas.

Each Party may replace its Steering Committee representative from time to time by written notice to the other Party, provided that any replacement shall be a senior representative with appropriate authority, experience, and familiarity with the Project.

The Steering Committee’s role shall include, as appropriate:

senior alignment on project objectives, priorities, and execution approach;
review of WP&B’s prior to approval in accordance with Section 9;
oversight of major procurement and contracting strategies;
awareness and discussion of key project, technical, operational, commercial, and regulatory risks;
serving as an escalation forum for matters that the project team is unable to resolve at working level; and

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 36 of 44


making decisions that are expressly reserved as Steering Committee decisions in accordance with the Contract.

Where a WP&B is not supported as submitted, the Steering Committee may request clarification or request that the Project Team consider adjustments, following which a revised WP&B shall be resubmitted for review and approval in accordance with Section 9.

The Steering Committee shall use good faith efforts to resolve escalated matters and support timely decision-making.

8.4

Technical, Data, and Reporting Interfaces

The Parties shall coordinate on technical, data, and reporting interfaces necessary to support:

system integration and operational readiness;
Mine Plan execution and optimization;
AMS and Digital Twin operation and data exchange; and
regulatory, environmental, and operational reporting requirements.

This coordination includes the provision and exchange of information required to support WP&B preparation, design reviews, procurement activities, and regulatory submissions.

Allseas shall maintain appropriate interface documentation necessary to manage integration and coordination of the Work, commensurate with the scope and phase of the project. Such documentation shall be updated and made available to TMC.

8.5

Co-Location, Access, and Collaboration

8.5.1

Co-Location of TMC Personnel

To support effective collaboration during the Development Work and Commercial Production, Allseas shall make reasonable office space available for designated TMC representatives at its primary engineering and project management coordination locations.

Such co-location supports coordination and information exchange only and does not relieve Allseas of responsibility for the Work nor confer supervisory authority on TMC.

8.5.2

Access to Facilities and Works

Allseas shall provide TMC representatives with reasonable access to engineering offices, fabrication yards, integration sites, subcontractor and supplier facilities, and vessel modification works for coordination and familiarisation purposes.

TMC representatives may attend FAT, SIT, HAT, SAT, sea trials, and integration tests, subject to applicable health, safety, security, and site access requirements and Allseas must give TMC at least 14 days’ notice prior to conducting any such testing work to enable TMC to assign representatives to attend and arrange appropriate logistics.

8.5.3

Participation in Engineering and Interface Coordination Activities

TMC representatives shall be invited to participate in key coordination activities, including engineering and system-integration meetings, design and safety reviews, procurement-alignment discussions, and readiness reviews for commissioning and offshore deployment.

Allseas shall provide TMC with reasonable prior notice of such activities, considering the nature and urgency of the subject matter, to enable meaningful participation where practicable.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 37 of 44


Such participation is for coordination and information purposes only and does not constitute an approval obligation, unless expressly required under this Schedule or the Contract.

8.5.4

Communication Channels

The Parties shall maintain open and effective communication channels, including regular coordination meetings and shared digital workspaces for key documents, interface records, and design inputs.

Allseas shall notify TMC in a timely manner of material issues affecting system integration, Mine Plan execution, or regulatory compliance.

8.5.5

Cost Treatment

Costs associated with office accommodation, workstations, and reasonable hosting of TMC personnel shall be addressed through the WP&B process and shall be reimbursable only to the extent approved under an applicable WP&B and in accordance with Schedule 2 – Terms of Compensation.

9

Work, Plan & Budget (WP&B) Framework

9.1

Purpose

The WP&B Framework sets out how the Parties plan, define, agree, execute, and monitor the Development Work and the Commercial Production.

It establishes a structured process for the preparation, review, approval, and update of Work Plans and Budgets, which together define the authorized scope, schedule, and cost for the performance of the Work.

The WP&B Framework is intended to:

provide a clear and transparent basis for defining scope, schedule, and approved budget prior to execution;
establish the agreed basis on which Allseas may perform work, incur costs, and make commitments, including LLI commitments;
support TMC’s governance, disclosure, and approval requirements, including those applicable under SEC reporting requirements;
enable timely commitment of LLIs where required to protect the Programme; and
support disciplined cost, schedule, and risk management throughout the project.

Execution of the Work and incurrence of costs shall only be undertaken in accordance with an agreed WP&B, which applies to the defined scope, assumptions, and period set out therein and does not imply approval of any subsequent WP&B.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 38 of 44


9.2

Development Work WP&B Framework

9.2.1

Development Packages

The Development Work shall be structured and managed through the following Development Packages:

Table 9-1 Overview of the preliminary Development Packages as defined at Effective Date

Package

Description

Scope / Intended Content (minimum governance definition)

DP1

Engineering Definition, Project Setup & Tendering

Front-end engineering definition, project setup and governance, initial programme basis, procurement and vendor strategy, supplier pre-qualification, preparation and issue of early tender packages, and establishment of initial WP&B baselines and assumptions.

DP2

Hidden Gem Lay-up

Costs incurred during the Development Work, including crewing, insurance, class and flag maintenance, port and berth costs, preservation and maintenance activities, and other vessel holding or standby costs incurred prior to Installation & Commissioning

DP3

Detailed Engineering, Project & Construction Management

Integrated detailed engineering, constructability and system integration planning, procurement and tender documentation, project and construction management planning, and refinement of schedule and cost baselines.

DP4

Hidden Gem Reactivation

Reactivation planning and execution, surveys and inspections, class and flag readiness activities, certification pathway definition, and readiness evidence for subsequent integration and modification works.

DP5

Tank Conversion, Storage & Offloading Systems

Engineering, procurement coordination, fabrication and installation planning for tank conversion and storage/offloading systems, including interface definition and readiness for commissioning.

DP6

Long-Lead/ Procurement items Production System

LLI procurement activities including tendering, technical and commercial evaluation, vendor selection recommendations, contract terms, lead-time validation, delivery schedules, and procurement commitments for the Production System

DP7

Long-Lead/ Procurement items Transfer Vessel

procurement or chartering including vessel identification, tendering, lead-time validation, technical and commercial evaluation, vendor selection recommendations, contract terms, scope definition, delivery schedules, and preparation for commissioning and entry into service

DP8

Installation & Commissioning

Installation and integration activities, FAT/SIT/HAT/SAT planning and execution, commissioning documentation, validation of system interfaces (including AMS/Digital Twin data pathways), and readiness for offshore trials.

DP9

Mobilisation, Transit & Offshore Trials

Mobilisation planning and execution, transit, offshore trials, operational readiness preparations, handover inputs, and completion documentation supporting transition to Commercial Production

Subdivision of DP6 into DP6.x sub-packages may be used to align approvals with vendor lead times and risk exposure and does not create additional contractual approval levels.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 39 of 44


The scope descriptions above are indicative and are intended to support WP&B development and governance, and do not constitute a detailed scope of work beyond that defined in an approved WP&B.

9.3

Operational Work WP&B Framework

9.3.1

Operational Packages (OP)

The Commercial Production shall be governed by the following Operational Packages, renewed on an annual and rolling basis:

Package

Description

OP1

Annual operational plan, budget & execution authority (to be developed for each Year)

OP2

In-year WP&B revision (as required) (revision of OP1)

OP3

Year-end reconciliation & forward planning (revision of OP1)

OP4

Multi-year maintenance, upgrade & renewal planning

9.3.2

OP1 — Annual Operational Plan, Budget & Execution Authority

OP1 constitutes the primary annual operational WP&B and, once approved, authorises both the planned operations and the execution of those operations for the relevant operational year.

The OP1 WP&B shall include, as a minimum:

the annual operating plan;
the (updated) Mine Plan and annual Production Targets;
the approved annual operating budget and resource plan;
environmental, permitting, and Commercial Recovery Permit compliance plans;
the AMS/Digital Twin integration and data-delivery plan for the operational year; and
the planned maintenance programme and logistics strategy.

Approval of OP1 authorises Allseas to execute the approved operational activities for the relevant Production Year, including:

collector operations, lifting, dewatering, and transfer activities;
fleet operations, logistics, and shore-base support;
execution of the approved maintenance programme;
operation of the AMS/Digital Twin and delivery of regulatory and performance data; and
routine operational reporting and monthly WP&B tracking.

9.3.3

OP2 — In-Year WP&B Revision (as required)

A mid-year WP&B revision (OP2) may be prepared where required in the event of:

material deviations in production, weather, or system availability;
revised Mine Plan assumptions;
regulatory or permitting adjustments; and/or
required operational mitigations or optimisations.

Approved OP2 revisions supersede the applicable elements of the OP1 WP&B for the remainder of the operational year.

9.3.4

OP3 — Year-End Reconciliation & Forward Planning

OP3 shall be performed jointly at year-end and shall include:

Production Reconciliation report;

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 40 of 44


resource recovery utilization efficiency reconciliation;
cost reconciliation against the approved WP&B;
environmental and regulatory compliance summary; and
lessons learned and improvement proposals.

The outputs of OP3 shall inform the preparation of the subsequent OP1.

9.3.5

OP4 — Multi-Year Maintenance, Upgrade & Renewal Planning

OP4 establishes and maintains a rolling multi-year plan addressing:

class and flag surveys and dry-docking strategy;
Supply and Transport Vessel maintenance cycles;
riser, umbilical, and lifting system life-cycle and fatigue-cycle planning;
renewal and replacement planning for critical systems;
AMS/Digital Twin hardware and software refresh and obsolescence planning; and
a multi-year cost outlook and renewal forecast.

OP4 shall be updated at least annually and for each Production Year the applicable OP4 scope and expenditure will be included in and approved as part of the applicable OP1 WP&B.

9.4

WP&B Preparation and Maturity Requirements

Each WP&B submission (DP or OP) shall demonstrate a level of definition and maturity appropriate to the nature of the scope and the commitments sought, including:

sufficient engineering and technical definition to support execution and procurement decisions;
a description of the underlying technical scope, key assumptions, interfaces, and principal risks relevant to the proposed cost and schedule;
cost estimates and schedules grounded in validated assumptions and, where applicable, vendor input;
identification of material risks, uncertainties, and mitigation measures;
evidence appropriate to support board-level and SEC-aligned governance for any material commitment; and
for WP&B’s seeking authorisation to commit LLI, cost and schedule information based on completed tender evaluations and vendor-validated data, demonstrating a level of definition and accuracy appropriate for procurement commitment.

Where TMC reasonably identifies material concerns that may affect cost, schedule, regulatory compliance, or Production Targets, the Parties shall address such concerns as part of the WP&B finalization process.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 41 of 44


10

ESG and Sustainability requirements

This Section defines the obligations that apply across both the Development Work and Commercial Production and are not limited to any single technical workstream. These requirements govern disclosure, data use, reporting, ESG obligations, confidentiality, and other lifecycle-wide responsibilities that support regulatory compliance, stakeholder engagement, and consistent project governance under the Commercial Recovery Permit.

10.1

ESG Reporting and Sustainability Data Provision

10.1.1

Objective

Through its policies and sustainability approach, TMC is committed to adopting responsible business practices. TMC prepares annual and periodic Environmental, Social, and Governance (ESG) disclosures in accordance with applicable securities laws, sustainability reporting standards, and stakeholder commitments. Clients, regulators, and other stakeholders demand evidence-based assurance of compliance with such requirements, which involve conducting due diligence to identify and manage ESG risks in operations and supply chain.

Allseas shall support these obligations by providing timely, accurate, and complete ESG-related data arising from the performance of the Work. Allseas must at all times in undertaking the Work operate in compliance with TMC’s policies and supplier code of conduct.

10.1.2

Scope of ESG Reporting Support

Allseas shall collect, maintain, and provide to TMC all ESG-related information reasonably required for TMC’s annual ESG report, sustainability disclosures, stakeholder reporting, and DSHMRA-mandated public transparency obligations. This includes, without limitation:

(a)Environmental Data
Operational emissions data (CO, NOₓ, SOₓ, particulate matter) from the Production System and Additional Vessels;
Fuel consumption and energy-use and intensity data by vessel, system, and process;
Waste generation, waste handling, and disposal records;
Water withdrawals, water intensity data by vessel, system, and process; water discharges; spill incidents; and pollution-prevention events; and
Environmental monitoring outputs produced under the AMS (e.g., plume dispersion data, discharge parameters, sediment monitoring, biodiversity observations), as permitted for release under DSHMRA;

(b)Health, Safety, and Personnel Data

Marine casualties, lost-time injuries, TRIR, safety incidents, near misses, and corrective actions;
Crew and TMC-Nominated Personnel training records, including AMS and simulator training; and
Workforce statistics associated with Allseas’ direct operations (where appropriate and consistent with privacy laws).

(c)Social and Community Data

Record of community or stakeholder engagements performed by Allseas on behalf of or in coordination with TMC (if any); and
Supplier and subcontractor sustainability compliance information, including human-rights and labor-standard incidents, due diligence measures and compliance actions, as required under TMC’s Supplier Code of Conduct.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 42 of 44


(d) Governance and Compliance Data

Details about environmental management system and health and safety management system as well as third-party certifications;
Audit results, non-conformance reports, and corrective actions related to DSHMRA and NOAA obligations;
Ethical conduct and anti-corruption compliance certifications applicable to Allseas personnel and subcontractors assigned to the Work; and
Procurement transparency records for material purchases associated with the Project; and annual update on existence and implementation of Allseas’ ESG-related policies, strategy, goals, and targets.

(e) Activity Metrics and Vessel Data

Distance travelled (vessels and collectors), days at port, in transit and on station, operating days, and port calls; and
Vessel characteristics, energy efficiency index and ship energy efficiency management plan, and carbon intensity indicator and rating.

10.1.3

Greenhouse Gas (GHG) Emissions Data and Reduction Collaboration

Allseas shall provide TMC with accurate and timely greenhouse gas emissions data associated with the performance of the Work, including fuel consumption, energy use, and calculated COe emissions from all vessel operations and offshore equipment under Allseas operational control and supporting activities.

Allseas shall cooperate with TMC in identifying opportunities for GHG reduction, fuel efficiency improvement, and operational optimisation, consistent and in compliance with upcoming regulatory requirements such as the International Maritime Organization’s Net-Zero Emissions Framework, applicable reporting standards, and the WP&B.

10.1.4

Vessel Emissions Intensity Reporting

Allseas shall maintain and report vessel-level emissions intensity metrics, including but not limited to COe per operating hour, COe per tonne of nodules transferred, and fuel consumption per voyage or operational cycle.

Such data shall be submitted in a structured, auditable format suitable for inclusion in TMC’s ESG disclosures, regulatory reporting, and lifecycle assessment modelling.

10.1.5

Reporting Frequency and Format

Allseas shall provide quarterly ESG data updates and a comprehensive annual ESG report package in the format reasonably requested by TMC. Quantitative metrics are typically required within a month after the end of each quarter.

Allseas shall maintain data in a structured, auditable format suitable for regulatory review, public reporting, and assurance by TMC’s independent auditors.

Real-time or continuous environmental data generated through the AMS and digital twin shall be made accessible to TMC in accordance with Section 2 - Development Work and Section 3 -Commercial Production.

10.1.6

Data Quality and Verification

Allseas shall implement reasonable internal controls to ensure ESG data accuracy, consistency, and completeness.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 43 of 44


Upon reasonable request, Allseas shall provide supporting documents, logs, calibration records, and evidence required for TMC’s internal audit or third-party verification processes.

If material inconsistencies or data gaps are identified, Allseas shall promptly investigate, correct, and re-submit the affected data.

TMC may verify compliance with its policies and supplier code of conduct through a variety of mechanisms which may include a self-evaluation tool for suppliers, desktop-based audits or comprehensive on-site assessments led by TMC or a nominated third party.

10.1.7

Compliance with Evolving Standards

ESG reporting requirements may change due to regulatory updates (including US. Securities and Exchange Commission (SEC) or California climate-related disclosures), DSHMRA transparency conditions, or TMC’s voluntary reporting standards (e.g. Global Reporting initiative (GRI), Sustainability Accounting Standards Board (SASB) and Task Force on Climate-related Financial Disclosures (TCFD)). Allseas shall use reasonable efforts to support TMC in meeting such updated requirements, provided that any material change in scope, workload, or cost shall be addressed through the WP&B and Change Order process.

Significant changes regarding data needs, format, reporting frequency, and deadlines would be informed by TMC at the earliest reasonable opportunity, at least 3 (three) months before the start of the corresponding reporting period. Questions, guidance needs, or reporting gaps should be flagged by Allseas at the earliest reasonable opportunity, and in any event at least 2 (two) months before the start of the corresponding reporting period.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 44 of 44


Schedule 2 – Terms of Compensation

Contents

Contents

1

2

Terms of Compensation

2

2.1

Purpose and Principles

2

2.2

Eligible Costs, Non-Eligible Costs and Rate Escalation

3

2.3

Initial Costs & Lay-up Costs

5

2.4

Development Work Compensation

6

2.5

Commercial Production Compensation

9

2.6

Production tonnage-based Repayment Mechanism

13

2.7

Performance Incentive

14

2.8

Cash or Share Settlement

16

2.9

Payment Terms

16

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 1 of 17


2

Terms of Compensation

2.1

Purpose and Principles

This Schedule sets out the compensation framework governing payments by TMC to Allseas for the performance of the Work under the Contract, covering both the Development Work and the Commercial Production.

This Schedule defines the categories of compensable costs and payments, and the mechanisms by which such costs and payments are reimbursed or settled, as further detailed in the sections below.

In all cases, unless otherwise stated in this schedule 2 the payment process set forth in Article 14.6 shall apply to all payments under the Contract.

Pre-award incurred cost

TMC shall reimburse Allseas for the following costs incurred prior to the Effective Date:

Initial Costs, being costs incurred by Allseas prior to the Effective Date as further detailed in Section 2.3.1 below; and
Lay-up Costs, being costs incurred prior to the Effective Date to maintain the Hidden Gem and the Collection System in lay-up or limited readiness as further detailed in Section 2.3.2 below.

Development Work

Subject to approval of a WP&B, TMC shall reimburse Allseas for costs incurred in the performance of the Development Work under the Contract, including:

Development Work Costs, including engineering, project management, development activities, and development capital expenditure, including any additional lay-up or holding costs incurred during the Development Work; and
Mobilisation Costs incurred in preparation for the start of Commercial Production.

Commercial Production

Subject to approval of a WP&B, TMC shall reimburse Allseas for costs incurred in the performance of the Commercial Production under the Contract, including:

Operating Expenditure (OPEX) reimbursement;
Deferred CAPEX repayment, settled through production tonnage-based repayment mechanisms;
Performance Incentives linked to Actual Wet Tonnes Produced;
Demobilisation Costs; and

Costs under this Schedule are settled, as applicable, through one or more of the following mechanisms:

payment by TMC to Allseas in cash; or
issuance by TMC to Allseas of TMC shares, where expressly provided for in this Schedule.

The specific eligibility, calculation, timing, and settlement mechanics applicable to each category are summarised in Table 2-1 and set out in the relevant sections of this Schedule.

All amounts are in Euro (EUR) unless stated otherwise.

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 2 of 17


Table 2-1 Compensation categories and settlement mechanism (Summary)

Category

Payment Form
(default)

Tonnage
based
repayment

Price mechanism

Development Work

1.

Initial Costs (incurred prior Effective Date, as agreed in prior agreements between TMC and Allseas and their respective affiliate companies)

50% shares

Yes, remaining 50%

[***] trading days / At Cost

2.

Initial Lay-up Costs (incurred prior Effective Date, as agreed in prior agreements between TMC and Allseas and their respective affiliate companies)

50% shares

Yes, remaining 50%

[***] trading days / At Cost

3.

Development Work - Production System

50% cash, reimbursement of actual cost incurred in prior month, invoiced monthly

Yes, remaining 50%

At Cost

4.

Development Work – Supply Vessels

50% cash, reimbursement of actual cost incurred in prior month, invoiced monthly

Yes, remaining 50%

At Cost

5.

Mobilization Costs – Production Vessel

50% cash, reimbursement of actual cost incurred in prior month, invoiced monthly

Yes, remaining 50%

At Cost

6.

Marine Transportation Scope

50% cash, reimbursement of actual cost incurred in prior month, invoiced monthly

Yes,
Remaining
50%

At Cost

Commercial Production

1.

Performance incentive

100% cash, monthly

-

At monthly adjusted Performance Incentive rates

2.

Deferred CAPEX (tonnage-based repayment)

100% cash, monthly

-

At Rates

3.

OPEX reimbursement

100% cash, monthly

At Rates / At Cost +%

4.

Demobilization costs

100% cash, monthly

-

At Rates / At Cost +%

5.

Marine Transportation Scope (incl. Supply Vessels)

100% cash, monthly

At [***] vessel (s) and supply vessel(s)

2.2

Eligible Costs, Non-Eligible Costs and Rate Escalation

2.2.1

Eligible Costs

Costs are Eligible Costs if they are:

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 3 of 17


approved in the WP&B;
necessary, reasonable, and directly related to the execution of the Work;
actually incurred by Allseas and supported by substantiating documentation acceptable to TMC; and
incurred in accordance with the Contract.

Eligible Cost categories include actual and reasonable costs incurred by Allseas in performing the Development Work including but not limited to the following types of costs:

engineering, design, and project management costs;
procurement and fabrication costs;
Production Vessel modification and integration costs;
supply vessel modification and operating costs;
Costs incurred in developing, fabricating, testing and readying the Collection System for operation;
AMS/digital twin development support;
(de)Mobilisation Costs for the Production System;
commissioning and sea-trial costs for the Production Vessel and other elements of the Production System, as applicable;
regulatory, re-flagging and class-approval costs associated with the Hidden Gem; and
maintenance costs of the Production Vessel
personnel, logistics, and offshore operations costs; and
PFS/FS engineering, modelling, and feasibility-assurance costs for the Production System.

And in respect of the Commercial Production Eligible Costs will include but are not limited to:

maintenance costs Production Vessel, Collection System and Additional Vessel(s);
personnel, logistics, and offshore operations costs; and
OPEX for the Production Vessel and Additional Vessel (s).

2.2.2

Non-Eligible Costs

The following are non-Eligible Costs and Allseas is not entitled to be reimbursed for any such costs unless expressly approved in the WP&B:

Fines, penalties or sanctions;
financing charges or interest;
corporate overheads not directly attributable to the Work;
costs arising from Allseas’ negligence, wilful misconduct, or breach of contract or breach of Law; and
costs incurred outside the Approved WP&B scope, except for Initial Costs & Lay-up Costs as described in Section 2.3.

2.2.3

Rate Escalation

Engineering and Project Management rates, as per Section 2.4.1, shall be escalated with HCIP, the Netherlands as stated by Eurostat: Harmonised index of consumer prices (HICP) (prc_hicp).

Any rates shall be escalated with [***] the Netherlands and [***] where applicable Production Vessel is residing. When operating in the Licence Area, the residency split will be allocated as follows: the country owning the [***] where the Production Vessel is [***]

“Cost +” priced elements will not be eligible for escalation.

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 4 of 17


2.3

Initial Costs & Lay-up Costs

2.3.1

Initial Costs

On the Commencement Date, Allseas shall invoice TMC for [***] This invoice shall be based on the latest monthly cost reporting of the Initial Costs prior to the Effective Date, subject to subsequent quarterly true up to actual Initial Costs.

Allseas shall, no later than four (4) months after the Commencement Date, provide TMC with a statement of the actual Initial Costs, and an adjustment shall be made such that TMC has reimbursed to Allseas 50% of the actual Initial Costs.

Initial Costs shall include engineering, Project management, and technical support manhours incurred prior to the Effective Date, calculated at the pre-agreed fixed rates set out in Section 2.4.1, without escalation.

The Initial Costs shall be reimbursed by TMC to Allseas as follows:

50% shall be payable within seven (7) days of the Commencement Date, in TMC shares, valued at [***] with the relevant payment date for purposes of VWAP calculation being the Effective Date; and
The remaining 50% shall be reimbursed in cash, subject to production tonnage-based repayment in accordance with Section 2.6.

2.3.2

Lay-up Costs

Lay-Up Costs means costs incurred by Allseas in respect of the Hidden Gem, including costs associated with operating and maintaining the Hidden Gem during periods of lay-up:

during periods of lay-up between the completion of the pilot mining test campaign in 2022 and the Effective Date; and
in connection with Development Work activities where such costs are directly attributable to the lay-up, reactivation, or conversion of Hidden Gem for the purposes of the project.

TMC shall reimburse Allseas for 100% of the Lay-Up Costs, except where such costs arise during periods when Hidden Gem is preparing for or performing work for another client, adjusted Lay-Up Cost reimbursement for the period between K6 and K8 shall be addressed through the applicable WP&B approval process.

Lay-up Costs shall be reimbursed as follows:

[***] cost up to Effective Date shall be payable within seven (7) days from the Commencement Date, in TMC shares, valued at [***] with the relevant payment date for purposes of VWAP calculation being the Effective Date;
[***] that continue to incur after Effective Date, during the Development Work shall be reimbursed in cash on a monthly basis;
The remaining 50% of incurred costs for time incurred both prior to the Effective Date and during Development Work shall be reimbursed in cash, subject to production tonnage-based repayment in accordance with Section 2.6.

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 5 of 17


2.4

Development Work Compensation

During the Development Work, Eligible Costs shall be compensated as detailed in the following sections.

2.4.1

Engineering & Management (E&M) Rates

Rates are valid for 2026 and thereafter subject to escalation in accordance with Section 2.2.3.

Table 2-2 Engineering and Project Management rates

Activity

Euro/hour

Engineer

Development Work

[***]

Project Manager

Development Work

[***]

2.4.2

Engineering & Management (E&M) Cost

For engineering, modelling, feasibility study inputs, project management, interface management, class/regulatory engineering)

50% shall be payable in cash upon submission and approval of a Cost Statement until 50% of the estimated overall amount is reached
The remaining 50% shall be reimbursed in cash, subject to production tonnage-based repayment mechanism under Section 2.6.

2.4.3

Procurement, Fabrication, Integration & Vessel Conversion Costs

50% shall be payable in cash upon submission and approval of a Cost Statement until 50% of the estimated overall amount is reached.
The remaining 50% shall be reimbursed in cash, subject to production tonnage-based repayment mechanism under Section 2.6 below.

2.4.4

Mobilisation Costs of Hidden Gem and Transfer Vessel

Upon mobilisation completion of Hidden Gem and submission of a mobilisation cost confirmation:

50% shall be payable in cash upon submission and approval of a Cost Statement until 50% of the estimated overall amount is reached.
The remaining 50% shall be reimbursed in cash, subject to production tonnage-based repayment mechanism under Section 2.6.

2.4.5

Transfer Vessel – Acquisition and Residual Value Mechanism

The Transfer Vessel shall be realized through the acquisition of an existing vessel and its subsequent conversion for use as a Transfer Vessel as part of the Development Work. The commercial arrangements set out in this Section, including the Residual Value, are based on the acquisition and conversion of a drillship vessel. Any material deviation from such assumed vessel type shall be subject to prior written agreement of the Parties, including a review and, where appropriate, adjustment of the Residual Value and associated commercial terms.

(a) Development Costs of the Transfer Vessel

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 6 of 17


For the purposes of this Schedule, the “Development Costs of the Transfer Vessel” means the aggregate and directly attributable cost to the Transfer Vessel, including:

the acquisition or purchase price of the vessel; and
all costs incurred in connection with the engineering, conversion, modification, integration, commissioning and readiness of such vessel for the performance of the Work.

(b) Residual Value

A residual value (the “Residual Value”) shall be attributed to the Transfer Vessel, representing the agreed allocation of value of the Transfer Vessel that will be owned by Allseas as part the agreed financing structure.

The Residual Value shall be equal to [***] of the vessel.

(c) Reimbursable Portion

TMC shall reimburse Allseas an amount equal to the Development Costs of the Transfer Vessel less the Residual Value.

(d) Payment During Development Work

During the Development Work, TMC shall reimburse fifty percent (50%) of the Development Costs of the Transfer Vessel as such costs are incurred, in accordance with Section 2.4.1 till 2.4.4.

The remaining fifty percent (50%) of the Development Costs of the Transfer Vessel shall be treated as Deferred CAPEX, subject to adjustment in accordance with paragraph (e) below.

(e) Determination of Transfer Vessel Deferred CAPEX

At the commencement of Commercial Production, the Parties shall determine:

the final Development Costs of the Transfer Vessel; and
the Residual Value.

The Deferred CAPEX Amount recoverable by Allseas shall be equal to:

The Development Costs of the Transfer Vessel, less the Residual Value, less the amounts already reimbursed during the Development Work.

(f) Repayment Mechanism

The Deferred CAPEX Amount determined under paragraph (e) shall be repaid by TMC to Allseas in accordance with the production tonnage-based repayment mechanism set out in Section 2.6.

(h) Ownership

Legal and beneficial ownership of the Transfer Vessel shall remain with Allseas at all times. TMC shall have no ownership interest in the Transfer Vessel by virtue of any payments made under this Schedule.

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 7 of 17


(i) End of Term

In the event that the Deferred CAPEX Amount has not been fully repaid through the production tonnage-based repayment mechanism by the end of the Initial Term (or earlier termination of the Contract), the outstanding balance shall be payable in accordance with Section 2.6.

2.4.6

Development Packages and Provisional Sums

2.4.6.1

Initial Development Baseline

As at the Effective Date:

the Development Packages DP1 through DP9 set out in Table 2-3 define the preliminary structure for the Development Work and the Provisional Sums, detailed description in Section 9.2, Schedule 1- Scope of Work;
the Provisional Sums for the Development Package are based on Allseas’ best-known cost estimates as at the Effective Date these establish the reference baseline for planning, tracking, and governance purposes; and
the baseline is provided for comparison and control and does not authorize execution, cost incurrence, or commitments, except as expressly provided below.

2.4.6.2

Commencement of Development Work

From the Effective Date Allseas is authorized to commence Development Package 1 (DP1) immediately and continue DP2, subject to:

submission of the WP&B for DP1 for approval within thirty (30) days of the Commencement Date;
execution in accordance with the scope, assumptions, and controls reflected in the applicable baseline; and
a maximum expenditure commitment for DP1 and DP2 capped at [***]

All other Development Packages shall be progressed through the WP&B process, whereby each Development Package is developed from the relevant Provisional Sum and supporting estimates into an agreed WP&B, and upon approval by TMC of the applicable WP&B execution of that Package may commence.

Table 2-3 Break down Development Packages and Provisional Sums

Package

Description

Provisional Sum
(EUR)

DP1

Engineering Definition, Project Setup & Tendering

[***] -)

DP2

Hidden Gem Lay-up

[***] -)

DP3

Detailed Engineering, Project & Construction Management

[***] -)

DP4

Hidden Gem Reactivation

[***] -)

DP5

Tank Conversion, Storage & Offloading Systems

[***] -)]

DP6

Long-Lead Item Procurement

[***] -)

DP7

Transfer vessel

[***]

DP8

Installation & Commissioning

[***] - )

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 8 of 17


DP9

Mobilisation, Transit & Offshore Trials

[***] -)

TOTAL

[***] -)

2.5

Commercial Production Compensation

2.5.1

Operating Expenses (OPEX)

During Commercial Production, Eligible Costs for OPEX, including fuel, personnel, maintenance, logistics, consumables, vessel operations, third party services shall be reimbursed monthly in cash, in accordance with Section 2.5.8.

2.5.2

Agreed Vessel Day Rate (“Hidden Gem Day Rate”)

TMC will pay Allseas a fixed Hidden Gem Vessel day rate for each day that the Hidden Gem is reserved for the purposes of conducting the Commercial Production:

Table 2-4 Categorized Hidden Gem day rates

Activity

Euro/day

Persons on
board (max)

Including
/excluding

OPEX – Production and Transit/Mob/Demob Full crew

[***]

[***]

As listed 2.6.2.1 /
and 2.6.2.2

OPEX – Transit / Mob / Demob Delivery crew

[***]

[***]

As listed 2.6.2.1 /
and 2.6.2.2

OPEX – Conversion, Repair and Maintenance

[***]

[***]

As listed 2.6.2.1 /
and 2.6.2.2

OPEX – Warm Lay-up

[***]

[***]

As listed 2.6.2.1 /
and 2.6.2.2

OPEX – Cold Lay-up

[***]

-

As listed 2.6.2.1 /
and 2.6.2.2

It is intended that the Parties will agree day rates for any subsequent Production Vessel.

The Parties shall, on an annual basis or at such other intervals as they may agree, review the Vessel Rates to confirm their continued appropriateness and to give effect to any escalations or adjustments contemplated under this Contract. Such review shall be undertaken in a collaborative and pragmatic manner and shall not constitute a detailed audit of underlying cost assumptions. If, as a result of such review, either Party reasonably considers that the Vessel Rates materially diverge from the underlying cost basis, the Parties shall meet and, acting in good faith, agree any appropriate adjustment.

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 9 of 17


2.5.2.1

Components Included in the Day Rate

The Hidden Gem day rate includes and any subsequent Production Vessel day rate will include, without limitation:

vessel ownership and financing cost;
crew wages and benefits for listed amount;
vessel planned maintenance;
insurance;
Port, quay or anchorage charges;
class and flag compliance;
vessel management;
standard stores & victualling;
Waste resulting from standard vessel consumables; and
Overhead and margin.

2.5.2.2

Components excluded in the Day Rate

The following costs are not included in the Production Vessel day rate and remain separately reimbursable OPEX:

Fuel;
Crew change offshore transport;
Waste disposal other than standard vessel consumables;
Satellite subscriptions;
ROV;
Other third party cost not included in categories under Section 2.5.2.1; and
Escalation as per Section 2.2.3.

2.5.3

Reimbursement of Supply Vessel Costs

Except to the extent that development of bespoke engineered equipment or modifications to supply vessels is required which shall be Development Work, TMC shall reimburse Allseas the actual and reasonable costs incurred for the Supply Vessel(s) as described in Section 3.4 of Schedule 1 – Scope of Work, in accordance with this Schedule and the approved WP&B.

Costs reimbursable may include, as applicable:

charter or hire costs for Supply Vessel(s);
vessel operating costs, including crew, fuel, consumables, insurance, maintenance, and compliance costs;
mobilisation, demobilisation, standby, including weather-related standby costs; and
costs associated with vessel modification, enhancement, or system integration required to enable offshore transfer operations.

All such costs incurred shall be treated as Operating Expenditure (OPEX) and TMC shall reimburse to Allseas the actual cost incurred in providing the Supply Vessel(s)s plus a markup as set forth in Section 2.5.6 below to cover overhead and administration costs

Where vessel modification, enhancement, or system integration is required to enable the Supply Vessel(s) to perform the offshore transfer function, such activities shall be treated as Development Work, and 50% of the associated costs shall be reimbursed as they are incurred, without markup, and paid in cash, and shall be subject to split payment and Deferred CAPEX repayment mechanisms applicable to Development Work in accordance with Section 2.6 below.

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 10 of 17


2.5.4

Reimbursement of Transfer Vessel Costs

TMC shall reimburse Allseas the actual and reasonable costs incurred for the Transfer Vessel as described in Section 3.9.2 of Schedule 1 – Scope of Work, in accordance with this Schedule and the approved WP&B.

Costs reimbursable may include, as applicable:

charter or hire costs for Transfer Vessel;
vessel operating costs, including crew, fuel, consumables, insurance, maintenance, and compliance costs;
mobilisation, demobilisation, standby, including weather-related standby costs; and
costs associated with vessel modification, enhancement, or system integration required to enable offshore transfer operations.

All such costs incurred shall be treated as Operating Expenditure (OPEX) and TMC shall reimburse to Allseas the actual cost incurred in providing the Transport Vessels plus a markup as set forth in Section 2.5.6 below to cover overhead and administration costs

Where vessel modification, enhancement, or system integration is required to enable the Transfer Vessel to perform the offshore transfer function, such activities shall be treated as Commercial Production, and the associated costs shall be reimbursed one hundred percent (100%) as they are incurred, without markup, and paid in cash, and shall not be subject to any split payment or Deferred CAPEX repayment mechanisms applicable to Development Work.

Where a Transfer Vessel is acquired and/or converted for the purposes of the Work, the associated acquisition and development costs shall be treated as Development Work and compensated in accordance with Section 2.4.5.

For the avoidance of doubt, OPEX reimbursement and the applicable margin under this Section shall not include any recovery of capital expenditure associated with the Transfer Vessel.

2.5.5

Reimbursement of Transport Vessel(s)

TMC shall reimburse Allseas the actual and reasonable costs incurred in chartering and operating Transport Vessels for the marine transportation of collected Nodules from the offshore transfer location to the port of offloading, as described in Section 3.9.3 of Schedule 1 - Scope of Work,

Costs reimbursable by TMC to Allseas shall include:

charter or hire costs for Transport Vessels;
Transport Vessel operating costs, including crew, fuel, consumables, insurance, and maintenance;
Transport Vessel mobilisation, demobilisation, standby, demurrage, and weather-related standby costs; and
Transport Vessel port, canal, and voyage-related charges.

All costs incurred shall be treated as Operating Expenditure (OPEX) and TMC shall reimburse to Allseas the actual cost incurred in providing the Transport Vessels plus a markup as set forth in Section 2.5.6 below to cover overhead and administration costs.

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 11 of 17


2.5.6

Vessel rates – Supply, Transfer and Transportation Vessels

TMC will reimburse Allseas for the Supply Vessels, Transfer Vessel and Transport Vessel(s) on a Cost+ basis, as defined in sections 2.5.3, 2.5.4 and 2.5.5 above.

Table 2-5 OPEX reimbursement for Supply, Transfer and Transportation Vessels

Vessel

Amount

Cost reimbursement

Supply Vessel(s)

As required, two (2) or three (3)

[***]

Transfer Vessel

One (1)

[***]

Transport Vessel(s)

As required.

[***]

2.5.7

Production Wet Tonnage for Compensation Purposes

2.5.7.1

Reference Wet Tonnes (Interim Basis)

For the purposes of interim invoicing, cost reimbursement, and any provisional production-linked remuneration, production quantities shall be expressed as Reference Wet Tonnes, calculated in accordance with Section 3.7 of Schedule 1 - Scope of Work.

Invoices issued on the basis of Reference Wet Tonnes shall be provisional and subject to reconciliation in accordance with this Schedule.

2.5.7.2

Actual Wet Tonnes Produced (Final Settlement)

Final production quantities for commercial settlement purposes shall be determined using Actual Wet Tonnes Produced, as defined in Section 3.7 of Schedule 1 – Scope of Work based on correction of measured belt weight using actual moisture content derived from sampling and laboratory analysis.

Actual Wet Tonnes Produced shall constitute the final and binding production quantity for:

final cost settlement;
performance assessment where relevant; and
any production-linked incentive, adjustment, or reconciliation under this Schedule.

Any adjustment arising from such reconciliation shall be applied as an adjustment in the next invoicing period.

2.5.8

OPEX Reimbursement

Allseas shall initially bear all OPEX associated with operating the Production System and Additional Vessels and shall be entitled to compensation for its services in accordance with this section 2.5.8.

2.5.8.1

Baseline OPEX Reimbursement

Subject to the adjustments set out in this Section 2.5.8, the baseline level of OPEX reimbursement shall be one hundred percent (100%) of OPEX incurred by Allseas in respect of:

Nodule collection, production support, Nodule transfer and shipping.

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 12 of 17


OPEX shall be reimbursed irrespective of whether the Production System is producing, including periods of “working” or “waiting on weather”, subject to the production-linked reimbursement thresholds set out in Section 2.5.8.2 which shall be applied to determine the final annual percentage of OPEX that is reimbursable for the relevant Production Year.

2.5.8.2

Annual Production-Based OPEX Adjustment

Annual OPEX reimbursement shall be determined by reference to the applicable production-linked reimbursement thresholds set out in (Production Year 1) and Table 2-7 (Production Years 2–5), where Allseas does not achieve the annual production reimbursement thresholds due to factors within Allseas’ control. Where the Actual Wet Tonnes Produced is less than the stated threshold for the relevant Production Year TMC will reimburse to Allseas only the stated percentage of actual OPEX costs incurred in that Production Year.

Table 2-6 OPEX reimbursement thresholds for Production Year 1

Actual Wet Tonnes Produced1 (Production Year 1)

OPEX Reimbursable
(%)

[***]

[***]

[***]

Linear interpolation from
[***] to [***]

[***]

[***]

1 P is Actual Wet Tonnes Produced in million tonnes

Table 2-7 OPEX reimbursement thresholds for Production Year 2 - 5

Actual Wet Tonnes Produced1 (Production Year 2-5)

OPEX Reimbursable
(%)

[***]

[***]

1.0 [***]

Linear interpolation from [***] to [***]

[***]

[***]

1 P = Actual Wet Tonnes Produced in million tonnes

2.5.9

Demobilisation Costs

Where Allseas demobilizes from the Licence Area or a Block with approval of TMC and ceases Commercial Production, TMC will reimburse in cash Allseas 100% of the actual and reasonable costs incurred in demobilizing the Production System and any Additional Vessels.

2.6

Production tonnage-based Repayment Mechanism

The production tonnage-based repayment mechanism applies to:

Initial Costs (final 50% portion)
Lay-up Costs (final 50% portion)
E&M Costs (final 50% portion)
Development CAPEX (final 50% portion)
Mobilisation Costs (final 50% portion)

(collectively “Deferred CAPEX Amounts”).

These amounts will be paid by TMC to Allseas on a monthly basis, and will be paid as an amount calculated based on actual production tonnage – calculated as follows:

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 13 of 17


[total of all Deferred CAPEX Amounts] * ([Actual Wet Tonnage produced by Allseas per month] / [the [***] million wet ton]).

The calculated repayment amount shall be invoiced by Allseas to TMC on a monthly basis.

Where the accumulative Actual Wet Tonnes Produced by Allseas during the Initial Term [***] and:

the Commercial Production ends without an Extension Term being agreed, all remaining Deferred CAPEX Amount shall be paid by TMC in full within (thirty) 30 days after the Initial Term; or
Parties agree to an Extension Term, production tonnage-based repayment mechanism continues during the Extension Term until fully settled.

The Parties agree that the Deferred CAPEX Amounts shall remain payable by TMC, even if the production tonnage-based repayment mechanism cannot be applied.

2.7

Performance Incentive

TMC will pay Allseas a Performance Incentive (PI) in respect of Actual Wet Tonnes Produced in any Production Year, in accordance with Table 2-8 .

Table 2-8 Initial Performance Incentive rates

Production Threshold
(per Production Year)

Initial Performance
Incentive rate
(USD per wet tonne)

[***]

[***]

[***]

[***]

The Performance Incentive shall accrue on Actual Wet Tonnes Produced and shall be payable monthly in accordance with Section 2.9.

In accordance with Section 2.9.2, the Performance Incentive shall be subject to quarterly reconciliation based on Actual Wet Tonnes Produced during the applicable quarter, and any positive or negative adjustment shall be reflected in the next monthly invoice.

Monthly Performance Incentive

The monthly Performance Incentive rate (MPI) shall be the applicable Performance Incentive rate determined under Table 2-8 , adjusted by a metals price indexation factor calculated in accordance with this Section.

Base and Actual Metal Prices

For each of Nickel, Copper, Cobalt and Manganese:

The Base Price (“Base”), means the average price for the twenty-four (24) months period immediately preceding the commencement of Commercial Production.
Actual Price (“Actual”), means the average price for the relevant invoicing month.

Reference Prices

The Reference Price for each metal shall be:

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 14 of 17


Nickel: LME Nickel Official Cash Settlement Price (USD per tonne).
Copper: LME Copper Official Cash Settlement Price (USD per tonne).
Cobalt: LME Cobalt Official Cash Settlement Price (USD per tonne).
Manganese: the Shanghai Metals Market (SMM) published price assessment for “Manganese Ore Australia 42% (CIF China)” (USD per dry metric tonne), used solely as a market reference benchmark for manganese commodity value.

If any Reference Price is discontinued, materially altered, or no longer publicly available, the Parties shall agree in good faith on a comparable successor index that reflects substantially the same underlying market

Partition Weights

Each metal shall be assigned a fixed partition weight, reflecting its relative economic contribution at Base Prices.

For each metal:

Graphic

Where:

Graphic

The partition values shall be determined at the start of Commercial Production and shall remain fixed for the duration of the Contract unless otherwise agreed.

The metals grades for the nodules are as per Table 2-9.

Table 2-9 Nodule metal grades

Metal

Grade (%)

Nickel

1.40%

Copper

1.10%

Cobalt

0.13%

Manganese

31.00%

Monthly Performance Incentive Formula

The Monthly Performance Incentive rate (USD per wet tonne) shall be calculated as:

[***]

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 15 of 17


The MPI shall apply to Actual Wet Tonnes Produced in the relevant month and shall be payable in accordance with Section 2.9.

2.8

Cash or Share Settlement

2.8.1

General Principle

Except where expressly stated otherwise in this Schedule, all amounts payable by TMC to Allseas shall be settled in cash paid in Euros.

TMC and Allseas may mutually agree to settle in shares at [***] instead of cash.

2.8.2

Mechanics of Share Settlement

Any request by Allseas or TMC for payments in TMC shares shall:

be made in writing;
apply only to the relevant payment amount and period specified for such request; and
not constitute an ongoing or automatic request for future payments.

2.8.3

Securities Law Compliance

Share payments remain subject to applicable securities regulations. If shares cannot be issued at the scheduled time, TMC may temporarily pay cash until issuance becomes legally permissible.

2.8.4

Share Settlement Mechanics

Where any amount is settled in TMC shares pursuant to this Schedule:

the number of shares to be issued shall be calculated by dividing the applicable payable amount by the applicable share price determined in accordance with this Schedule;
fractional shares shall be rounded down to the nearest whole share, with any residual amount settled in cash; and
TMC shall provide Allseas with reasonable written confirmation of the share issuance following settlement.

Each Party shall bear its own costs, taxes, and fees associated with the issuance or receipt of such shares, unless otherwise expressly agreed.

2.9

Payment Terms

2.9.1

General

Monthly payments shall be determined using the:

annual production forecast; and
annual OPEX and cost forecast.

as approved in the WP&B for the relevant Production Year.

The annual forecast establishes:

a monthly production estimate;
monthly OPEX recovery amount;

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 16 of 17


initial monthly performance incentive; and
preliminary monthly production tonnage-based repayment amount

2.9.2

Quarterly Reconciliation and True-Up

TMC shall settle the quarterly reconciliation, (positive or negative) in the next monthly invoice.

2.9.3

Annual Reconciliation

Final settlement amounts, reflected in OP3 review of the applicable annual WP&B in accordance with Section 9.3.4 of Schedule 1 - Scope of Work, shall be reflected in the next monthly invoice following the annual reconciliation.

Contract number TMCUSAA-ALL-0200-00-CON-0001

Page 17 of 17


Schedule 3 – Schedule of Key Dates

Contents

Contents

1

3

Schedule of Key Dates

2

3.1

Purpose

2

3.2

Development Work – Key Dates

2

3.3

Notification Schedule

3

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 1 of 4


3

Schedule of Key Dates

3.1

Purpose

This schedule of Key Dates sets out the execution milestones for the Development Work and start of Commercial Production under the Contract. It provides a baseline planning framework for coordination and progress tracking and will be updated through the WP&B process as engineering definition, procurement, construction, commissioning, and operational information matures.

Allseas shall maintain a detailed Programme, including the Key Dates consistent with the approved WP&B and the Contract.

3.2

Development Work – Key Dates

The Key Dates listed in Table 3-1 set out the planned sequencing of the Development Work, including design, procurement, vessel modification, equipment installation, commissioning, and readiness for commercial operations.

Such Key Dates are indicative planning milestones and are intended to support coordination and execution planning for the Development Work.

Table 3-1 Key dates

Key Date

Title

Description

Anticipated date

Key date Owner

K1

Commencement Date

Signed contract

Allseas and TMC

K2

Early Project Deliverables

Engineering definition, project setup, vendor engagement, execution & rendering strategy plan

[***]

Allseas

K3

Early Engineering Deliverables

Submission of Baseline System Documentation package

[***]

Allseas

K4

Submit WP&B for approval LLI commitment

Submission of updated WP&B(s) including tender evaluations for approval authorising LLI commitment

[***]

Allseas

K5

Subcontract awards for the long lead items

Commitments for long-lead Collection System, including collector, launch and recovery, vertical transport, deployment and retrieval, and offloading and storage systems

[***]

Allseas

K6

End of cold Lay-up Brunei

Mobilization to start preparation for the Japan pilot and potential start of K7

To be notified

Allseas

K7

Hidden Gem decommissioning and conversion work

Removal of redundant drilling modules and execution of foundational conversion works to prepare the vessel for installation of the Collection System.

[***]

Allseas

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 2 of 4


K8

Demobilization Japan pilot complete

Hidden Gem completion of Japan pilot Demobilization and available for mobilization to execute K9

To be notified

Allseas

K9

Dry docking and vessel conversion

Start dry-docking and vessel modification in preparation of Collection System installation activities.

[***]

Allseas

K10

Installation and Commissioning

Start installation, integration, and commissioning of Collection System; a.i. collector vehicle, launch and recovery, vertical transport system, and offloading and storage systems.

[***]

Allseas

K11

Commercial Recovery Permit issued

Issue of the Commercial Recovery Permit by NOAA in accordance with DSHMRA requirements.

Prior to K13

TMC

K12

HAT and Sea Trials

Commencement of harbour and sea trials, including functional and integrated testing of the Production System

[***]

Allseas

K13

Mobilization, Sail to field, SAT

Commencement of mobilisation of the Production Vessel, sailing from Asia via Long Beach (US) to field, deployment of the Collection System and performance of System Acceptance Testing (SAT)

[***]

(Note: Conditional to K11 completion)

Allseas

K14

Start Commercial Production

MC acceptance of SAT, Completion of Development Work, transition to Commercial Production

As per notification schedule in Section 3.3

Allseas

3.3

Notification Schedule

Allseas shall notify TMC of the anticipated readiness for start of Commercial Production - Key Date K14 using a collapsing notification window mechanism.

Notification shall be provided in three stages, aligned with the mobilization sequence, to support:

regulatory notifications and permit compliance;
mobilisation of Bulk Carrier vessels; and
coordination of onshore processing and logistics readiness.

The notification mechanism and applicable windows are set out in Table 3-2 below.

Table 3-2 Notification Schedule

Notification

Window Definition

Notification Milestone

N0

[***] for anticipated Completion of Development Work and mobilization readiness. Window: [***] / [***]

K14 - at K5

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 3 of 4


N1

[***] for anticipated Completion of Development Work and mobilization readiness. Window: [***] / +2 months]

K14 – six (6) months prior to the forecast Completion of Development Work

N2

[***] for Completion of Development Work. Window: [***] / [***]

K14 – three (3) months prior to the forecast Completion of Development Work / at commencement of final mobilization

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 4 of 4


Schedule 4 – Administrative requirements

Contents

Contents

1

4

Administrative requirements

2

4.1

Purpose and Scope

2

4.2

Project Initiation

2

4.3

Communication & Coordination

2

4.4

Reporting Requirements

3

4.5

Document Control

3

4.6

Interface Management

4

4.7

Document Deliverables Register

5

4.8

Recordkeeping & Audit

5

4.9

Data Management & Cybersecurity

6

4.10

Invoicing Administration

6

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 1 of 6


4

Administrative requirements

4.1

Purpose and Scope

This Schedule defines the administrative, communication, document-control, reporting, and interface-management requirements applicable to the Work.

Its purpose is to ensure:

clarity of communication;
orderly documentation control;
transparent reporting;
proper management of interfaces; and
efficient coordination between the Parties.

This Schedule does not modify the Scope of Work or impose additional technical requirements.

4.2

Project Initiation

4.2.1

Kick-Off Meeting

Within thirty (30) days of the Effective Date, the Parties shall hold a formal kick-off meeting to confirm:

communication lines and points of contact;
document control arrangements;
the Deliverables Register (initial issue);
reporting cadence and format;
status of Early Deliverables; and
data and interface exchange protocols.

Minutes shall be recorded and agreed between the Parties.

4.3

Communication & Coordination

4.3.1

Communication Framework

The Parties shall maintain regular communication through:

weekly coordination meetings;
monthly reporting meetings;
technical interface workshops as required; and
additional ad-hoc meetings when mutually agreed.

Meetings may be held in person or remotely.

4.3.2

Points of Contact

Each Party shall maintain a Project Directory with designated:

Project Director;
Project Manager;
discipline leads; and
document-control focal point.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 2 of 6


4.4

Reporting Requirements

4.4.1

Monthly Reporting

Allseas shall submit a consolidated Monthly Report, covering as applicable:

engineering and system-development progress;
vessel modification progress;
procurement and long-lead status;
schedule performance and critical paths;
cost performance against the approved WP&B;
risk and opportunity updates;
HSEQ highlights;
operational readiness status; and
once operations begin: production, uptime, maintenance, and environmental-monitoring summaries.

4.4.2

Exceptional Event Reporting

Allseas shall promptly notify TMC of:

any safety-related event,
any environmental incident or exceedance,
any event materially impacting schedule, cost, or system availability,
any event with potential regulatory or stakeholder implications.

A written factual report shall be provided within forty-eight (48) hours or as otherwise required by applicable law or permit conditions.

4.5

Document Control

4.5.1

Document Control System (Aconex)

TMC shall make its Aconex Document Control System available for use by both Parties. Allseas shall utilise Aconex as the primary platform for:

document transmittals and submissions,
revision control and version tracking,
review and comment workflows,
maintaining the Deliverables Register (DDR),
storing redline mark-ups and as-built documentation,
distribution of approved documents.

Allseas may maintain its own internal document-management system; however, Aconex shall serve as the Contract record for all documents exchanged or approved under this Schedule.

Where Aconex workflows conflict with Allseas internal systems, the Parties shall align procedures at the kick-off meeting.

4.5.2

General Requirements

Allseas shall maintain a controlled document-management system for:

design and engineering documents;
interface control documents;
AMS/DT documentation;
HSEQ documentation;

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 3 of 6


commissioning and verification documents;
operational procedures and sampling protocols; and
as-built documentation.

TMC shall have appropriate access for viewing, downloading, and commenting.

4.5.3

Document Types

Documents shall be classified as:

Design documents;
Management & planning documents;
HSEQ Documents;
Commissioning documents;
Operational document; and
As-Built documentation

4.5.4

Submittal Categories

Submittals shall be issued with one of the following review categories:

A — Accepted
C — Accepted with Comments
R — Revise and Resubmit
N — No Review Required

TMC shall provide review comments within ten (10) working days unless otherwise agreed.

4.5.5

Transmittals

Each submission shall include:

transmittal number;
document ID and revision;
submittal category requested;
description of changes; and
reason for revision.

4.5.6

As-Built Documentation

Allseas shall maintain redline mark-ups during fabrication, installation, integration, and commissioning.
As-built documents (Rev A or later) shall include:

updated drawings;
architecture diagrams;
sensor lists and calibration sheets;
final ICDs;
commissioning test results; and
FMECA/RAM updates.

As-built documentation shall be submitted within ninety (90) days of Development Completion.

4.6

Interface Management

4.6.1

Interface Control Document (ICD)

Allseas shall maintain an ICD covering:

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 4 of 6


mechanical and electrical interfaces;
AMS/DT data interfaces;
Mine Plan execution interfaces;
environmental-sensor data interfaces;
logistics and transport-vessel interfaces.

A baseline ICD shall be developed and issued during the Early Development phase in accordance with the approved DDR.

4.6.2

Interface Resolution Process

Interface issues shall be resolved:

at working-team level,
escalated to Project Managers if unresolved,
escalated to the Steering Committee for coordination issues.

This process does not modify contractual rights.

4.7

Document Deliverables Register

Allseas shall maintain and regularly update a Document Deliverables Register (DDR) identifying:

all defined deliverables in Schedule 1;
Early Deliverables;
documents required under this Schedule; and
WP&B and commissioning deliverables.

The DDR shall include for each item:

Title;
unique ID;
responsible party;
required revision level;
due date;
review category (A/C/R/N); and
approval status.

An updated DDR shall be issued within thirty (30) days of the Effective Date.

4.8

Recordkeeping & Audit

Allseas shall maintain records consistent with:

ABS and USCG requirements;
DSHMRA/NOAA licensing obligations; and
contractual obligations.

Records include:

engineering revisions;
inspection and test records;
operational logs;
environmental-monitoring data; and
reports and deliverables.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 5 of 6


4.9

Data Management & Cybersecurity

Allseas shall implement data-management practices that ensure:

secure transfer of operational and environmental data;
data availability for AMS and Digital Twin;
timestamp integrity and traceability; and
cybersecurity measures consistent with Good Industry Practice.

4.10

Invoicing Administration

Invoices shall be submitted by Allseas in accordance with Schedule 2 – Terms of Compensation and the approved WP&B and shall be administered in accordance with the procedures set out in this Schedule.

Invoices shall be submitted through the agreed document management system Aconex and shall include the supporting information required under Schedule 2.

TMC shall review submitted invoices for administrative completeness and consistency with the approved WP&B and applicable Variations Orders.

Any queries or discrepancies relating to an invoice shall be notified promptly and addressed through the contract administration process.

This Section sets out administrative procedures only and does not modify the payment terms, entitlement, or dispute resolution provisions of the Contract.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 6 of 6


Schedule 5 – Quality Assurance, Quality Control, Health, Safety, Environmental and Security Requirements

Contents

Contents

1

5

General

2

5.1

Purpose, Scope, and Applicable Standards

2

5.2

HSE Management System Requirements

2

5.3

HSE Planning and Responsibilities

3

5.4

Training, Competency and Certification

3

5.5

Environmental Management Requirements

4

5.6

Security Requirements

4

5.7

Quality Assurance and Quality Control

5

5.8

Incident Management and Reporting

5

5.9

Emergency Response and Contingency Planning

6

5.10

Audit and Verification

6

5.11

Continuous Improvement

7

5.12

Applicable IMCA Guidance and Reference Documents

7

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 1 of 8


5

General

5.1

Purpose, Scope, and Applicable Standards

This Schedule defines the Quality Assurance (QA), Quality Control (QC), Health, Safety and Environmental (HSE), and Security requirements applicable to Allseas for the performance of the Work under this Contract.

The Project shall be executed in accordance with Good Industry Practice for offshore construction and marine operations. For the avoidance of doubt, this includes guidance published by the International Marine Contractors Association (IMCA), which—while not legally binding unless explicitly incorporated—is recognized globally as the industry’s primary benchmark for safe and efficient offshore marine construction.

Allseas shall perform the Work in compliance with:

IMCA safety, environmental, quality, competence, marine operations and cyber guidance;
ISO 9001, ISO 14001, ISO 45001;
ABS class requirements;
ISM Code;
MARPOL;
U.S. Coast Guard and U.S. regulatory requirements;
Project-specific environmental and permitting requirements;
Allseas’ own certified HSEQ management system; and
The Scope of Work (Schedule 1) and the relevant Work Plan & Budget (WP&B).

Where conflicts arise, the Contract, regulatory obligations, and class requirements shall take precedence over IMCA guidance.

The requirements of this Schedule shall be implemented progressively and commensurate with the phase of the Work, taking into account whether activities relate to Development Work or Commercial Production.

5.2

HSE Management System Requirements

5.2.1

HSE Management System

Allseas shall maintain an HSE Management System aligned with:

IMCA HSSE Framework;
ISO 45001 (Safety);
ISO 14001 (Environmental);
IMO/ISM Code; and
Allseas’ internal HSEQ procedures.

TMC may review and verify compliance at any time.

5.2.2

HSE Policy

Allseas shall maintain an HSE Policy demonstrating commitment to:

zero harm;
proactive hazard identification;
environmental protection;
safe operations and prevention of pollution; and

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 2 of 8


continuous improvement.

5.2.3

Risk Assessment and Hazard Controls

Allseas shall implement:

Job Safety Analyses (JSA);
Task Risk Assessments (TRA);
SIMOPS assessments;
HAZID and HAZOP studies (as applicable); and
Permit-to-Work (PTW) and LOTO procedures.

These shall be carried out, having regard to applicable IMCA guidance, including IMCA M 103 and IMCA M 149, where relevant.

5.3

HSE Planning and Responsibilities

5.3.1

Roles and Responsibilities

Allseas shall appoint qualified personnel, including:

Offshore Construction Manager (OCM);
Vessel Master;
HSE Manager;
Safety Officers;
Medical Officer; and
Designated AMS/DT data and monitoring focal points.

5.3.2

HSE Plan

Allseas shall prepare a Project-Specific HSE Plan, including:

HSE objectives and KPIs;
key hazards and mitigations;
marine operations and lifting controls;
emergency response procedures;
environmental obligations and monitoring interfaces; and
required certifications and training.

5.3.3

Toolbox Talks and PTW

Allseas shall conduct:

pre-task briefings;
toolbox talks,
PTW reviews,
having regard to applicable IMCA guidance and recognized industry best practice, where appropriate.

5.4

Training, Competency and Certification

5.4.1

Competence Framework

Allseas shall maintain a competency system in accordance with Good Industry Practice and Allseas’ certified management systems, having regard to applicable IMCA competence guidance, including IMCA C 007 and IMCA C 014, where relevant.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 3 of 8


Personnel shall hold valid:

STCW certificates (as applicable);
Offshore survival and HUET;
DP certification (for DP operations); and
Specialist certificates for ROV, lifting, or crane operations (where relevant).

5.4.2

Project Induction

All personnel shall undergo:

Project-specific HSE induction;
vessel induction;
environmental briefings;
AMS/DT awareness training (where applicable); and
sampling system and chain-of-custody training (as applicable).

5.5

Environmental Management Requirements

5.5.1

Environmental Management System

Allseas shall maintain an Environmental Management System aligned with:

IMCA Environmental Code;
ISO 14001;
MARPOL requirements; and
environmental obligations under the Mine Plan and regulatory permits.

5.5.2

Environmental Monitoring Interfaces

Allseas shall support environmental monitoring activities, including:

deployment and recovery of monitoring sensors;
coordination with scientific personnel;
calibration support; and
integration of environmental data into AMS/DT.

5.5.3

Hazardous Materials & Waste

Allseas shall:

maintain a hazardous materials register;
manage storage, use, and disposal per IMCA and MARPOL;
provide SDS documentation; and
maintain spill response equipment onboard.

5.5.4

Spill Response

Allseas shall maintain spill response plans meeting:

IMCA environmental guidance; and
IMO/USCG requirements.

5.6

Security Requirements

5.6.1

Vessel and Offshore Security

All vessels shall comply with:

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 4 of 8


ISPS Code;
USCG access control requirements;
visitor management and identification logs; and
secure data and communication systems.

5.6.2

Cybersecurity

Allseas shall implement cybersecurity measures in accordance with Good Industry Practice and applicable regulatory requirements, having regard to relevant industry guidance, including IMCA M 249, where appropriate, covering:

AMS/DT data interfaces;
vessel control systems;
network segregation; and
access management and logging.

5.7

Quality Assurance and Quality Control

5.7.1

Quality Management System

Allseas shall maintain a QMS certified to ISO 9001 and consistent with Good Industry Practice, having regard to applicable IMCA quality guidance, where relevant.

5.7.2

Inspection and Test Plan (ITP)

Allseas shall develop ITPs covering:

FAT, HAT, SAT;
fabrication and NDT;
UWILD and class inspection activities; and
acceptance criteria for systems and subsystems.

5.7.3

Non-Conformance Management

Procedures shall cover:

NCR issuance;
root-cause analysis;
corrective actions; and
close-out verification.

5.8

Incident Management and Reporting

5.8.1

Incident Reporting

Allseas shall report:

Incidents;
near misses;
environmental deviations;
AMS alarms (if safety-related); and
using IMCA incident reporting structure.

5.8.2

Lessons Learned

A Lessons Learned register shall be maintained and shared quarterly.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 5 of 8


5.9

Emergency Response and Contingency Planning

5.9.1

Emergency Response Plan (ERP)

Allseas shall maintain a comprehensive ERP aligned with:

IMCA M 103,
IMCA guidelines for marine emergencies,
and covering:

o

medical emergencies,

o

fire & explosion,

o

spill events,

o

DP failures,

o

loss of power,

o

evacuation procedures.

5.9.2

Drills

Drills shall include:

muster and evacuation;
fire response;
medical drills;
DP incident drills; and
spill response.

5.10

Audit and Verification

5.10.1

TMC Audits

TMC may audit:

HSEQ systems;
vessel operations;
class and UWILD compliance;
environmental monitoring records; and
cybersecurity measures.

Audits and inspections by TMC shall be conducted on reasonable prior notice and subject to operational, safety, and security constraints, and in a manner that does not unreasonably interfere with the performance of the Work.

Audits and verifications shall be conducted against the requirements of this Contract, applicable law, and Allseas’ certified management systems. IMCA guidance may be referenced as informative guidance for Good Industry Practice but shall not constitute independent audit criteria unless expressly agreed.

5.10.2

Regulatory & Class Inspections

Allseas shall support inspections by:

NOAA observers;
USCG;
ABS; and
port state controls.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 6 of 8


5.11

Continuous Improvement

Allseas shall:

review HSEQ and QA/QC systems;
incorporate lessons learned;
update plans and procedures;
integrate AMS/DT data into improvement cycles; and
track and close HSEQ actions from audits or reviews.

5.12

Applicable IMCA Guidance and Reference Documents

Without limiting the generality of the foregoing, the following IMCA guidance documents may be relevant to the Work, depending on the nature of the activities performed, and may be used as reference material in support of Good Industry Practice:

5.12.1

HSE and Risk Management

IMCA HSSE Core Safety Principles
IMCA M 103 – Guidelines for the Management of Marine Operations
IMCA M 149 – Guidance on Risk Assessment
IMCA HSSE 041 – HSE Management System Guidance

5.12.2

Competence & Training

IMCA C 007 – Competence Framework for Marine Personnel
IMCA C 014 – Competence Assurance & Assessment Framework
IMCA C 005 – Safety Training Guidance

5.12.3

Marine Operations, DP & Construction

IMCA M 117 – Guidance on the Use of DP Systems
IMCA M 220 – DP Incident Reporting
IMCA M 202 – Vessel Assurance & Audit Guidance
IMCA M 190 – Worksite Interface Management

5.12.4

Lifting & Rigging

IMCA L 004 – Guidance on Lifting Operations
IMCA SEL 019 / LEEA guidance for Lifting Equipment

5.12.5

Diving / ROV / Underwater Inspection (applicable to UWILD support)

IMCA D 010 – ROV Guidance
IMCA D 020 – Underwater Inspection Guidelines
IMCA D 023 – Worksite Supervisor Competence

5.12.6

Environmental & Emissions

IMCA Environmental Code of Practice
IMCA SEL 042 – Environmental Management Guidance

5.12.7

Cybersecurity

IMCA M 249 – Cyber Security Guidance for Marine and Offshore Operations

5.12.8

Precedence

Where IMCA guidance conflicts with:

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 7 of 8


Contract requirements,
Applicable laws or regulatory permits,
ABS/flag/class rules,

the Contract and regulatory requirements take precedence.

Contract number TMCUSAA-ALL-0200-00-CON-0001 / 770002-ADSMC-TMC-001

Page 8 of 8


Schedule 6 – Reference Documents and Standards

Contents

Contents

1

6

Reference Documents and Standards

2

6.1

Reference Technical Documents

2

6.2

Contractual Templates and Forms

2

6.3

Applicable Design and Engineering Standards

3

6.4

Applicable Regulatory Instruments and Permits

4

6.5

TMC Corporate Policies

4

6.6

Attachments Index

4

Appendix A – Attachment List

5

Contract number TMCUSAA-ALL-0200-00-CON-0001/ 770002-ADSMC-TMC-001

Page 1 of 6


6

Reference Documents and Standards

Schedule 6 contains reference materials, baseline data, and template documents that exist at the time of Contract signing. These attachments provide supporting detail to the Scope of Work and clarify technical, regulatory, and administrative inputs used during the Development Work and Commercial Production.

Documents that will be prepared after Contract signing (e.g., design packages, PDR/FDR outputs, AMS/DT specifications, commissioning records, WP&B deliverables) are not included in this Schedule, as they are governed by Schedule 1 (Scope of Work) and the WP&B process.

6.1

Reference Technical Documents

These documents are provided for information only and do not impose additional design or performance obligations beyond those set out in Schedule 1

1.

Rely-Upon Information Package for line 19 & 20, consisting of:

Bathymetry data;
Soil and geotechnical surveys;
Obstacle and seabed hazard mapping;
Exclusion zones and standoff areas; and
Geological and resource datasets.

2.

Offshore Production Sampling System report:

Describes the preliminary configuration, functional concept, and performance assumptions of the offshore production sampling system. The report does not impose design, performance, or execution obligations beyond those set out in Schedule 1 and the approved WP&B.

3.

Preliminary Document Deliverable Register:

Is provided for planning and alignment purposes only and does not constitute a definitive or exhaustive list of deliverables. Final deliverables shall be determined through the Scope of Work and the approved WP&B.

6.2

Contractual Templates and Forms

The contractual templates and forms listed below are intended to support the administration, reporting, and governance of the Work.

These templates shall be developed, proposed, and refined during the early Development Work as part of the ongoing alignment process. Unless otherwise agreed, Allseas shall propose suitable draft formats for review and alignment with TMC, having regard to Good Industry Practice and the requirements of this Contract.

Once aligned, the agreed templates shall be issued as controlled documents and made available in Aconex.

The anticipated templates include:

Change Order Request Form
WP&B Submission Template
Monthly Development Progress Report Template
Monthly Commercial Production Report Template
Risk Register Template
Minutes of Meeting Template (Steering Committee / Working Teams)
Action Log Template

Contract number TMCUSAA-ALL-0200-00-CON-0001/ 770002-ADSMC-TMC-001

Page 2 of 6


Additional templates may be developed by agreement, where required to support effective project administration.

6.3

Applicable Design and Engineering Standards

6.3.1

Purpose and Intent

This Section defines the design and engineering standards framework applicable to the Offshore System. It establishes the baseline principles and hierarchy governing design and execution, without prescribing detailed engineering codes or limiting Allseas’ technical discretion in delivering the Work.

Design and engineering activities shall be developed in a manner consistent with offshore marine construction and operational practices and aligned with the safety, quality, and execution requirements set out in Schedule 5.

Nothing in this Section reduces Allseas’ obligation to deliver an Offshore System that meets the performance requirements of the Contract.

6.3.2

Good Industry Practice

All design and engineering activities shall be performed in accordance with Good Industry Practice applicable to offshore marine construction, subsea operations, vessel modification, and offshore logistics.

For clarity, Good Industry Practice includes engineering and execution approaches consistent with internationally recognised offshore marine guidance, including IMCA guidance, as referenced in Schedule 5.

6.3.3

Allseas’ Internal Engineering Standards

Allseas shall apply its internal engineering, design, quality, and marine-operational standards in the performance of the Work, provided such standards:

comply with applicable laws, regulations, flag state, and classification requirements; and
are sufficient to meet the performance and safety requirements of the Contract.

Allseas’ internal standards shall be the primary reference for detailed engineering unless superseded by mandatory regulatory or class requirements.

6.3.4

IMCA Guidance and Other Industry Standards

IMCA guidance represents recognised good practice for offshore marine construction and operations and shall be used as an execution and assurance benchmark.

Other recognised industry standards (including ISO, API, DNV, IEC, and IEEE) may be applied by Allseas where appropriate. Such standards shall not be contractually mandatory unless required by applicable law, classification, regulatory authorities, or expressly agreed by the Parties through an approved WP&B or Change Order.

6.3.5

Engineering Discretion and Responsibility

Allseas retains full responsibility for selecting and applying the detailed engineering methodologies, specifications, and standards necessary to deliver the Offshore System in a manner that:

meets all performance obligations under the Contract;
complies with applicable regulatory and class requirements;
is consistent with Good Industry Practice and IMCA-aligned execution principles; and
ensures safe, reliable, and efficient operation during Development Work and Commercial Production.

Contract number TMCUSAA-ALL-0200-00-CON-0001/ 770002-ADSMC-TMC-001

Page 3 of 6


Nothing in this Schedule limits or transfers Allseas’ responsibility for the adequacy of the design.

6.4

Applicable Regulatory Instruments and Permits

The regulatory instruments, permits, and approval regimes relevant to the Project include, as applicable:

U.S. Deep Seabed Hard Mineral Resources Act (DSHMRA) and its implementing regulations under Title 15, Subtitle B, Chapter IX, Parts 970 and 971 of the U.S. Code of Federal Regulations (CFR);
Exploration License application(s) under DSHMRA by TMC USA;
Commercial Recovery Permit application(s) submitted by TMC USA under DSHMRA;
any conditions attached to the licenses, permits, or applications;
environmental, safety, and operational approvals, permits, and regulatory requirements applicable to deep seabed mineral activities, offshore marine construction, subsea operations, vessel modification, and related marine activities;
flag state, classification society, and maritime regulatory requirements applicable to vessels and offshore systems used in connection with the Work, including U.S. Coast Guard vessel documentation, inspection, and certification requirements under Title 46 CFR, and any related determinations, approvals, or waivers administered by the U.S. Maritime Administration (MARAD); and
Identification, confirmation, and ongoing alignment of applicable regulatory instruments and permitting requirements shall be undertaken collaboratively, with TMC leading engagement in respect of permits, licenses, and approvals issued or applied for under DSHMRA, and Allseas providing technical input and support as reasonably required.

6.5

TMC Corporate Policies

The following TMC corporate policies apply to the Work:

Supplier Code of Conduct
Insider Trading Policy
Environmental Policy
Health and Safety Policy
Human Rights Policy
Code of Business Conduct and Ethics
Anti-Corruption and Anti-Bribery Compliance Policy

Allseas shall implement and adhere to principles equivalent to those set out in the above policies in the performance of the Work, including by establishing and maintaining appropriate management systems, procedures, and controls consistent with Good Industry Practice.

Such implementation shall include reasonable due diligence and oversight of subcontractors and suppliers engaged in connection with the Work, proportionate to their scope of activities and risk profile.

6.6

Attachments Index

A consolidated Attachment Index is appended to this Schedule, listing:
all documents included at Contract signing;
document titles;
issuing Party (TMC or Allseas); and
revision number and date.

The Attachment Index shall be stored and maintained in Aconex.

Contract number TMCUSAA-ALL-0200-00-CON-0001/ 770002-ADSMC-TMC-001

Page 4 of 6


Appendix A – Attachment List

Table A-1 Attachment list

Attachment
Ref.

Document Title/Description

Date

Originator

Rev

6.1-01

Rely-Upon Information Package – Line 19 & 20 (Bathymetry, Geotechnical, Obstacle & Resource Data)

Sep 2023 / Jun & Oct 2024

TMC

-

6.1-02

Offshore Production Sampling System report – NORI-AMC-0610-MUL-RPT-00001

March 2025

Australian Mining Consultants (AMC)

1

6.4-01

U.S. Deep Seabed Hard Mineral Resources Act (DSHMRA) and implementing regulations under Title 15, Subtitle B, Chapter IX, Parts 970 and 971 CFR

Effective Date

US Government

-

6.4-02

TMC USA Consolidated Application for an Exploration License for TMC USA-A and Commercial Recovery Permit for TMC USA A-A

January 2026

TMC

1

6.4-03

U.S. Coast Guard (USCG) vessel documentation, flag state, inspection, and certification requirements under Title 46 CFR

Effective Date

US Government

-

6.5-01

Supplier Code of Conduct

June 2024

TMC

-

6.5-02

Insider Trading Policy

July 2025

TMC

-

6.5-03

Environmental Policy

June 2024

TMC

-

Contract number TMCUSAA-ALL-0200-00-CON-0001/ 770002-ADSMC-TMC-001

Page 5 of 6


6.5-04

Health and Safety Policy

June 2024

TMC

-

6.5-05

Human Rights Policy

June 2024

TMC

-

6.5-06

Code of Business Conduct and Ethics

December 2024

TMC

-

6.5-07

Anti-Corruption and Anti Bribery Compliance Policy

December 2024

TMC

-

Contract number TMCUSAA-ALL-0200-00-CON-0001/ 770002-ADSMC-TMC-001

Page 6 of 6


Exhibit 31.1

CERTIFICATIONS UNDER SECTION 302

I, Gerard Barron, certify that:

1. I have reviewed this quarterly report on Form 10-Q of TMC the metals company Inc;

2.    Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;

3.    Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;

4.    The registrant’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:

a)   designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;

b)    designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;

c)    evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and

d)    disclosed in this report any change in the registrant's internal control over financial reporting that occurred during the registrant's most recent fiscal quarter (the registrant's fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant's internal control over financial reporting; and

5.    The registrant’s other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):

a)   all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and

b)    any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.

Date: May 14, 2026

/s/ Gerard Barron

Gerard Barron

Chief Executive Officer (Principal Executive Officer)


Exhibit 31.2

CERTIFICATIONS UNDER SECTION 302

I, Craig Shesky, certify that:

1.     I have reviewed this quarterly report on Form 10-Q of TMC the metals company Inc.;

2.    Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;

3.    Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;

4.    The registrant’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:

a)    designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;

b)     designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;

c)     evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and

d)    disclosed in this report any change in the registrant's internal control over financial reporting that occurred during the registrant's most recent fiscal quarter (the registrant's fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant's internal control over financial reporting; and

5.    The registrant’s other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):

a)   all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and

b)    any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.

Date: May 14, 2026

/s/ Craig Shesky

Craig Shesky

Chief Financial Officer (Principal Financial Officer)


Exhibit 32

CERTIFICATIONS UNDER SECTION 906

Pursuant to section 906 of the Sarbanes-Oxley Act of 2002 (subsections (a) and (b) of section 1350, chapter 63 of title 18, United States Code), each of the undersigned officers of TMC the metals company Inc., a British Columbia, Canada corporation (the “Company”), does hereby certify, to such officer’s knowledge, that:

The Quarterly Report for the quarter ended March 31, 2026 (the “Form 10-Q”) of the Company fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934, and the information contained in the Form 10-Q fairly presents, in all material respects, the financial condition and results of operations of the Company.

Dated: May 14, 2026

/s/ Gerard Barron

Gerard Barron

Chief Executive Officer

(Principal Executive Officer)

 

Dated: May 14, 2026

/s/ Craig Shesky

Craig Shesky

Chief Financial Officer

(Principal Financial Officer)